Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
THE SPIRAL
thespiralny.com
EXTERIORTerraces on every towerfl oor, ranging in size from 200 sq � to 1,000 sq �
THE SPIRAL AT A GLANCE
ARCHITECTBjarke Ingels Group
TOTAL RENTABLE AREA��� million sq �
CERTIFICATIONLEED Silver Core & ShellCertifi cation expected
ADDRESS
�� Hudson BoulevardNew York, NY �����
NUMBER OF FLOORS
��
thespiralny.com
SPECIFICATIONSDELIVERY FOR TENANT CONSTRUCTONo Q�-Q������
TCOo Q������
TRANSPORTATIONo Direct�access�to�the�� �traino Convenient to a variety of private and public transportation options including Penn Station, Port Authority, Lincoln Tunnel, NY Waterway, Heliport��and�A�C�E�and�������subway�lines
PARKING, DROP OFF AND PICK UPo Executive parking spaces available with garage entrance�on��th�Street o Tenant-shared designated black car drop off ����on��th�Street
GREEN SPACE�o Hudson Boulevard Park is located directly in front of the Hudson Boulevard lobby entrance
o Close proximity to the High Line
BICYCLESo Dedicated bike storage room on the lower level����with�entrance�on��th�Street
SLAB HEIGHTSo�Floors��-����-�����’�higho�Floors� -������-������’�high
MECHANICAL FLOORSo�Floors����� ������������
VERTICAL TRANSPORTATION
Passenger Elevatorso Direct Ascent to Every Flooro�Zone����Floors��-o�Zone����Floors� -��o�Zone����Floors���-��o�Zone����Floors���*-�o�Zone���Floors���*-�o�Zone����Floors��*-�*�Cross-over�fl oor
FREIGHT ELEVATORSo���freight�elevators�o�������lb–�����lb�capacity�per�cab
LOADING DOCKSo���loading�docks�for�tenant�use
FLOOR LOADo���lbs�live�load�for�offi ce�fl oors
ELECTRICITYo�Sub-metered�electricityo�Two�electrical�closets�per�fl ooro�Base�building�system�designed�for�up�to��������wa� s/USF��exclusive�of�base�building�HVAC�����power�and�lighting
HVACo�Base�building�system�to�consist�of�central�cooling����towers��primary�and�secondary�condenser�water����pumps��with�waterside�economizer�DX�units�and����central�outside�air�risers�supplied�by�heat����recovery�unitso�Base�building�system�designed�for�up�to�������wa� s/USFo�Base�building�hours����AM–��PM��Monday�through����Friday�and���AM–���PM�on�Saturdayo�Condenser�water�shall�be�available�for�supplemental����cooling�requirements
EMERGENCY BACK-UPo Landlord will provide emergency power for fi re and life safety loads, and essential base building loads including security and partial operation of the base building condenser water planto Tenant generators to be located in future-proofed base building mechanical rooms
TELECOMo���points�of�entry�for�telecom�providerso�Specifi c�service�providers�to�be�determined
FIRE PROTECTIONo Landlord will provide combination sprinkler/standpipe risers in each egress stairwell as required by Local Building Code
NATURAL GASo Gas service will be available
thespiralny.com
THE NEIGHBORHOODN
Y�W
ATER
WAY
HELIPORT
���H
UD
SON
YARD
S
WESTTOWER
��TH
�AV
ENU
E
��RD�STREET
��TH�STREET
��TH�STREET
��TH�STREET
��TH�STREET
��ST�STREET
THE�SHOPS�AT�HUDSON�
YARDS
��TH�STREET
��TH
�AV
ENU
E
��TH�AV
ENU
E
HOTEL/CONDO
��HUDSONBOULEVARD
THESHED
THEEUGENE
PUBLICPLAZA
NY
�WAT
ERW
AY
HELIPORTHELIPORTHELIPORTHELIPORTHELIPORTHELIPORTHELIPORTHELIPORTHELIPORTHELIPORTHELIPORTHELIPORTHELIPORTHELIPORTHELIPORT
���H
UD
SON
YARD
S
WESTTOWER
��TH
�AV
ENU
E
��RD�STREET
��TH�STREET
��TH�STREET
��TH�STREET
��TH�STREET
��ST�STREET
THE�SHOPS�AT�HUDSON�
YARDS
��TH�STREET��TH�STREET��TH�STREET��TH�STREET
��TH
�AV
ENU
E��
TH�A
VEN
UE
��TH
�AV
ENU
E��
TH�A
VEN
UE
��TH
�AV
ENU
E
��TH�AV
ENU
E
HOTEL/CONDOCONDO
��HUDSON��HUDSON��HUDSONBOULEVARDBOULEVARDBOULEVARD
THESHED
THEEUGENEEUGENE
PUBLICPLAZA
THE�SPIRAL
HU
DSO
N R
IVER
RESIDENTIAL
FIVEMANHATTAN
WEST
ONE�MANHATTAN
WEST
�� HUDSON YARDS
�� HUDSON YARDS
�� HUDSON YARDS
�� HUDSON YARDS
�� HUDSON YARDS
THE SPIRAL is located in the heart of Hudson Yards, home to best-in-class companies across a variety of industries.
thespiralny.com
A BREATH OF FRESH AIR
THE SPIRAL ensures that every fl oor of the tower opens up to the outdoors, creating hanging gardens and cascading atria that connect the open fl oor plates from the ground fl oor to the summit into a single, uninterrupted work space.
thespiralny.com
OUTDOOR TERRACES | Green space on every tower fl oor
PANORAMIC VIEWS | Expansive views of Midtown, Central Park, the Financial District and the Hudson River
thespiralny.com
OFFICE SPACE | Bright, fl exible layouts and confi gurations
PARK VIEWS | Soaring ceiling heights complemented by fl oor-to-ceiling windows
thespiralny.com
STACKING PLAN
��
��
��
��
�
��
*�Cross-over�fl oor
��–�
� –��
��–��
��*–�
��*–�
�*–�
ELEVATORS
Zone Floors
�
��
��
��
��
��
�
�
�
�
�
�
�
�
��
��
�
��
�
��
��
��
��
��
�����
�����
������
��� �
� ����
� ��
� � �
� ���
������
������
� � �
� �� �
������
������
������
������
�����
������
������
������
������
���� �
����
������
�����
������
HIGH RISE
Floor Sq Ft
��
��
��
��
�
��
�
��
��
��
��
��
��
��
�
Pfi zer
Pfi zer
Pfi zer
Pfi zer
Pfi zer
Pfi zer
Pfi zer
Pfi zer
Pfi zer
Pfi zer
Pfi zer
Pfi zer
Pfi zer
Pfi zer
Pfi zer
LOW RISE
Floor Sq Ft
�
��
��
��
����
����
���
�����
PODIUM
Floor Sq Ft
��
�
��
��
��
��
��
��
��
�
��
�
��
��
��
�����
����
������
�����
�����
����
�����
� ����
� ����
� ���
������
� �� �
������
������
���� �
MID RISE
Floor Sq Ft
thespiralny.com
3RD FLOOR
RSF: ������ Slab Height: ��' Window Modules: �'
46’-
5”
36 ’- 1”
52’-
6”
47’
-2”
37’- 0”
STAIR B
STAIR C
STAIR D
STAIR A
MEN
'SW
ASH
ROO
M
MECHANICALROOM
SERVICEELEVATOR
LOBBY
ELECTRICALROOM
TELE
CO
M
ELECTRICALROOM
WO
MEN
’SW
ASH
ROO
M
TELE
CO
M
ELECTRICALROOM
MECHANICALROOM
VES
TIBU
LE
ELEVATORLOBBY 1
69'-8"
65’-
9”61
’-10
”
69 ’- 8”
��'-�
�"
��'-�"
��'-�
"
thespiralny.com
3RD FLOOR TEST FITS
STAIR B
MECHANICALROOM
SERVICEELEVATOR
LOBBY
ELECTRICALROOM
TELE
CO
M
STAIR C
STAIR D
ELECTRICALROOM
WO
MEN
’SW
ASH
ROO
M
TELE
CO
M
ELEVATORLOBBY 1
STAIR B
STAIR C
STAIR D
SERVICEELEVATOR
LOBBY
ELECTRICALROOM
L
ELEVATORLOBBY 1
STAIR A
MEN
'SW
ASH
ROO
M
MECHANICALROOM
VES
TIBU
LE
STAIR B
STAIR C
STAIR D
STAIR A
MEN
'SW
ASH
ROO
M
MECHANICALROOM
SERVICEELEVATOR
LOBBY
ELECTRICALROOM
TELE
CO
M
ELECTRICALROOM
WO
MEN
’S'
WA
SHRO
OM
TELE
CO
M
ELECTRICALROOM
MECHANICALROOM
VES
TIBU
LE
ELEVATORLOBBY 1
FINANCIAL TEST FIT
RSF: ������
Offi ces: ��
Workstations/Benching: ���
Total Staff Seats: ���
Conference Rooms: ��
Total Huddle Rooms: �
OPEN OFFICE TEST FIT
RSF: ������
Offi ces: ��
Workstations/Benching: ���
Total Staff Seats: ���
Conference Rooms: �
Total Huddle Rooms: �
thespiralny.com
26TH FLOOR
46'-5
"52
'-6"
36'-1" 37'-0"
47'-2
"
46’-
5”
36 ’- 1”
52’-
6”
47’
-2”
37’- 0”
WO
MEN
’SW
ASH
ROO
M
ELEVATORMACHINE
ROOM
SERVICEELEVATOR
LOBBY
MECHANICALROOM
STAIR A
STAIR B
ELECTRICALROOM
ELECTRICALROOM
TELE
CO
M
TELE
CO
M
STAIR C
ELEVATORLOBBY 4
STAIR D
MECHANICALROOM
MEN
'SW
ASH
ROO
M
RSF: ������ Slab Height: ��' Window Modules: �'
��'-�" ��'-�"
��'-�
"
��'-�
"
��'-�
"
thespiralny.com
26TH FLOOR TEST FITS
ELEVATORMACHINE
ROOM
STAIR A
SERVICEELEVATOR
LOBBY
MECHANICALROOM MECHANICAL
ROOM
ELECTRICALROOM
STAIR B STAIR D
WO
MEN
’SW
ASH
ROO
M
TELE
CO
M
TELE
CO
M
ELECTRICALROOM
ELEVATORLOBBY 4
STAIR C
MEN
'SW
ASH
ROO
MM
EN'S
WA
SHRO
OM
MECHANICALROOM
STAIR D
TELE
CO
M
ELECTRICALROOM
ELEVATORLOBBY 4
STAIR C
S
WO
MEN
’SW
ASH
ROO
M
ELEVATORMACHINE
ROOM
STAIR A
SERVICEELEVATOR
LOBBY
MECHANICALROOM
ELECTRICALROOM
STAIR B
TELE
CO
M
OPEN OFFICE TEST FIT
RSF: ������
Offi ces: ��
Workstations/Benching: ���
Total Staff Seats: ���
Conference Rooms: �
Total Huddle Rooms: ��
OFFICE TEST FIT
RSF: ������
Perimeter Offi ces: ��
Interior Offi ces: ��
Total Offi ces: ��
Conference Rooms: �
Total Collaboration Areas: �
thespiralny.com
34TH FLOOR
46'-5
"47
'-6"
37'-0"43'-8"
46’-5
”
43’-8”
47’-6
”
37’-0”
STAIR A
SERVICEELEVATOR
LOBBY
WO
MEN
’SW
ASH
ROO
M
MECHANICALROOM
TELE
CO
M
TELE
CO
M
ELECTRICALROOM
STAIR B
ELECTRICALROOM
STORAGE
ELEVATORLOBBY 5
MECHANICALROOM
STAIR D
MEN
'SW
ASH
ROO
M
RSF: ������ Slab Height: ��' Window Modules: �'
thespiralny.com
34TH FLOOR TEST FITS
OPEN OFFICE TEST FIT
RSF: ������
Offi ces: ��
Workstations/Benching: ���
Total Staff Seats: ���
Conference Rooms: �
Total Huddle Rooms: ��
OFFICE TEST FIT
RSF: ������
Perimeter Offi ces: ��
Interior Offi ces: ��
Total Offi ces: ��
Conference Rooms: �
Total Collaboration Areas: �
STAIR A
SERVICEELEVATOR
LOBBY
WO
MEN
’SW
ASH
ROO
M
MECHANICALROOM
TELE
CO
M
TELE
CO
M
ELECTRICALROOM
STAIR B
ELECTRICALROOM
STORAGE
ELEVATORLOBBY 5
MECHANICALROOM
STAIR D
MEN
'SW
ASH
ROO
M
STAIR A
SERVICEELEVATOR
LOBBY
WO
MEN
’SW
ASH
ROO
M
MECHANICALROOM
TELE
CO
M
TELE
CO
M
ELECTRICALROOM
STAIR B
ELECTRICALROOM
STORAGE
ELEVATORLOBBY 5
MECHANICALROOM
STAIR D
MEN
'SW
ASH
ROO
M
thespiralny.com
46TH FLOOR
L41
'-5"
47'-6
"
36'-1"57'-4"
47’-6
”
57’-4”
41’-5
”
36’-1”
STAIR A
SERVICEELEVATOR
LOBBY
MECHANICALROOM
MECHANICALROOMW
OM
EN’S
WA
SHRO
OM
ELEVATORLOBBY 5
TELE
CO
M
TELE
CO
M
MEN
'SW
ASH
ROO
M
ELECTRICALROOM
ELEC
TRIC
AL
ROO
M
STAIR DSTAIR B
RSF: ������ Slab Height: ��' Window Modules: �'
thespiralny.com
46TH FLOOR TEST FITS
MEN
'SW
ASH
ROO
M
SERVICEELEVATOR
LOBBY
STAIR A
MECHANICALROOM
WO
MEN
’SW
ASH
ROO
M
ELEVATORLOBBY 5
TELE
CO
M
TELE
CO
M
ELECTRICALROOM
ELEC
TRIC
AL
ROO
M
STAIR B STAIR D
MECHANICALROOM
MEN
'SW
ASH
ROO
M
SERVICEELEVATOR
LOBBY
STAIR A
MECHANICALROOM
WO
MEN
’SW
ASH
ROO
M
ELEVATORLOBBY 5
TELE
CO
M
TELE
CO
M
ELECTRICALROOM
ELEC
TRIC
AL
ROO
M
STAIR B STAIR D
MECHANICALROOM
OPEN OFFICE TEST FIT
RSF: ������
Offi ces: ��
Workstations/Benching: ���
Total Staff Seats: ���
Conference Rooms: �
Total Huddle Rooms: �
OFFICE TEST FIT
RSF: ������
Perimeter Offi ces: ��
Interior Offi ces: ��
Total Offi ces: ��
Conference Rooms: �
Total Collaboration Areas: �
thespiralny.com
56TH FLOOR
L
42'-0
"43
'-1"
70'-5"43'-4"43’-4”
42’-0
”
70’-5”
43’-1
”
MEN
'SW
ASH
ROO
M
SERVICEELEVATOR
LOBBY
STORAGEROOM
RISERROOM
MECHANICALROOM
STAIR A
STAIR B
ELEVATORLOBBY 6
ELECTRICALROOM
TELE
CO
M
TELE
CO
M
WO
MEN
’SW
ASH
ROO
M
ELECTRICALROOM
STAIR D
RSF: ������ Slab Height: ��' Window Modules: �'
thespiralny.com
56TH FLOOR TEST FITS
ELECTRICALROOM
MEN
'SW
ASH
ROO
M
SERVICEELEVATOR
LOBBY
STORAGEROOM
RISERROOM
MECHANICALROOM
STAIR A
STAIR B
ELEVATORLOBBY 6
ELECTRICALROOM
TELE
CO
M
TELE
CO
M
WO
MEN
’SW
ASH
ROO
M
STAIR D
ELECTRICALROOM
MEN
'SW
ASH
ROO
M
SERVICEELEVATOR
LOBBY
STORAGEROOM
RISERROOM
MECHANICALROOM
STAIR A
STAIR B
ELEVATORLOBBY 6
ELECTRICALROOM
TELE
CO
M
TELE
CO
M
WO
MEN
’SW
ASH
ROO
M
STAIR D
OPEN OFFICE TEST FIT
RSF: ������
Offi ces: ��
Workstations/Benching: ���
Total Staff Seats: ���
Conference Rooms: �
Total Huddle Rooms: �
OFFICE TEST FIT
RSF: ������
Perimeter Offi ces: ��
Interior Offi ces: ��
Total Offi ces: ��
Conference Rooms: �
Total Collaboration Areas: �
thespiralny.com
THE SPIRAL, developed by Tishman Speyer and designed by architectural fi rm Bjarke Ingels Group (BIG), is an instantly recognizable addition to the emerging skyline at Hudson Yards. THE SPIRAL’s unique design features classic Manha� an step-backs that twist and taper towards the sky, allowing light and air to reach the streets below, and provides lush outdoor terrace space to tenants on every tower fl oor.
With�nearly�����million�square�feet�of�sustainable�Class�A�offi ce�space��THE�SPIRAL off ers connected workspaces that are designed with creativity and collaboration in mind. Floor-to-ceiling windows, fl exible fl oor plans, and seamless indoor/outdoor spaces complement the sweeping views of Midtown, Central Park, the Financial District, and the Hudson River.
Centrally located in New York City's most dynamic new neighborhood, Hudson Yards, THE SPIRAL’s tenants receive endless options for retail, dining, entertainment, and culture. Direct access to the� �train�and close proximity to Penn Station, Port Authority, Lincoln Tunnel, NY Waterway, A��C��E�and���������trains make for eff ortless commutes and inter-borough connections.
THE SPIRAL represents the future of connected workspace for industry leaders.
thespiralny.com
LEASINGGUS FIELD
gfi [email protected]����-�����-�����
GREG CONEN
[email protected]����-�����-�����