LARP Collaboration Meeting @LBL, April 26 th The Commissioning of the Technical Systems of LHC 1. The final validation that all the collider components/systems perform as specified. 2. All the tests are performed without beam. 3. The sectors under test are fully installed but installation is going on in other sectors. 4. Also, tests are going on in other sectors. Félix Rodríguez-Mateos, CERN-TS

The Commissioning of the Technical Systems of LHC

  • Upload
    demi

  • View
    31

  • Download
    0

Embed Size (px)

DESCRIPTION

The Commissioning of the Technical Systems of LHC. The final validation that all the collider components/systems perform as specified. All the tests are performed without beam. The sectors under test are fully installed but installation is going on in other sectors. - PowerPoint PPT Presentation

Citation preview

Page 1: The Commissioning of the Technical Systems of LHC

LARP Collaboration Meeting @LBL, April 26th 2006

The Commissioning of the Technical Systems of LHC

1. The final validation that all the collider components/systems perform as specified.

2. All the tests are performed without beam.

3. The sectors under test are fully installed but installation is going on in other sectors.

4. Also, tests are going on in other sectors.

Félix Rodríguez-Mateos, CERN-TS

Page 2: The Commissioning of the Technical Systems of LHC

Felix Rodriguez-Mateos/CERN-LARP collaboration meeting 060426

the mandatein

div

idual sy

stem

test

shard

ware

com

mis

sionin

g

After the qualification for qualification for operation of the operation of the individual systemsindividual systems of a sector (vacuum, cryogenics, quench protection, interlocks, powering, etc.),

each sector will be each sector will be commissioned as a commissioned as a wholewhole up to the powering to nominal current of all the circuits.

Validation and specific Validation and specific studiesstudies will be carried-out on the first commissioned sector.

commissioningcoordination

equipmentgroups

infrastructuregroups

operation& controls

groups

cryogenics

electricitymagnet

collimators

rf

beamtransfer

instrumentation

quenchprotection

cooling &ventilation

accesscontrol

& safetyinterlocks

Page 3: The Commissioning of the Technical Systems of LHC

Felix Rodriguez-Mateos/CERN-LARP collaboration meeting 060426

subsystems ready

the logic

all systems ready for machine check out

individualsystem tests

hardwarecommissioning

InjectionSystem

RF CollimatorSystem

SuperconductingCircuits

ShortCircuitTests

Hardware Commissioning Hardware Commissioning Coordination with System Coordination with System Owners Owners define and carry-

out

Sytem owners Sytem owners define and carry-out

Page 4: The Commissioning of the Technical Systems of LHC

Felix Rodriguez-Mateos/CERN-LARP collaboration meeting 060426

preparation

the scopeall the accelerator systems in the LHC tunnel with particular emphasis to superconducting circuits

documentationdocumentation the programthe program the schedulethe schedule the manpowerthe manpower

individual system tests

commissioning

failure scenarios

x 65

Page 5: The Commissioning of the Technical Systems of LHC

Felix Rodriguez-Mateos/CERN-LARP collaboration meeting 060426

preparation : software

requirementsrequirements prototypesprototypes

procedures

commissioning scenario x 15

sacec : software applications for the commissioning of the electrical circuits

AB/PO

AB/CO HCC

AT/ACR

AT/MEL

AB/CO

QPS Power Converters Powering Interlock

Documents on PMA toolsrequirements being preparedat present

Page 6: The Commissioning of the Technical Systems of LHC

Felix Rodriguez-Mateos/CERN-LARP collaboration meeting 060426

the number of simultaneous work fronts

FCR1 FCR2 UJ or RR CCC

1 SCT

1 SCT

1 SCT

2 PT 2 PT 1 SCT

2 PT 1 SCT

2 PT 1 SCT

2 PT 1 SCT

2 PT 2 PT + 1 SCT

2 PT + 2 PT + 1 SCT

August 2006

February 2007

2 PT = powering tests in two adjacent sectors1 SCT = short circuit tests of one powering area

9 f

ronts

5 f

ronts

1 f

ront

front = instance of the sequencer running

Page 7: The Commissioning of the Technical Systems of LHC

Felix Rodriguez-Mateos/CERN-LARP collaboration meeting 060426

subsystems ready

the as designed documentation

all systems ready for machine check out

defines the pre-requisites to start the tests in terms of conditions and availability of systems

describes in what conditions the system should be delivered to the next step

specifies the objective of the test and either describes each step or summarizes the test procedure

EDMS

Page 8: The Commissioning of the Technical Systems of LHC

Felix Rodriguez-Mateos/CERN-LARP collaboration meeting 060426

HCP in circulation for engineering check

LHC-D-HCP-0004 The Commissioning of the Inner Triplet Region

Esther Barbero SotoDavide BozziniPaul CruikshankReiner DenzBruno PuccioFélix Rodríguez MateosRüdiger SchmidtLuigi SerioHugues ThiesenMarkus Zerlauth

This document describes the sequence of the steps which lead to the commissioning of the complete inner triplet. It gives the backbone of the general procedures and refers to more detailed documents associated to the different systems, which in turn describe the individual system tests and the hardware commissioning procedures.

Page 9: The Commissioning of the Technical Systems of LHC

Felix Rodriguez-Mateos/CERN-LARP collaboration meeting 060426

subsystems ready

the as tested documentation

all systems ready for machine check out

contains the sequence of the testsincludes the data gathered during the testsdescribes the eventual non conformities

MTF

Page 10: The Commissioning of the Technical Systems of LHC

Felix Rodriguez-Mateos/CERN-LARP collaboration meeting 060426

the sequence

RH23

RH87

RE52RE48

RE58

RE62

RE72

RE78

RE82

RE12RE88

RE22

RE18

RE28

RE42

RE38

RE68

UJ 46

UA47

UJ 47RA47

UW45

US45

UL46

TX46

UJ 44

UX45

RA43

UA43

UL44

UJ 43 RR53

UJ 53

UXC55

USC55

PM54

PX56

RZ54UP53

UJ 561

UJ 57RR57

UJ 56

PM56

UL56TU56

UD62

UJ 62

UJ 63

PM65

UJ 64

UA63

RA63

TD68

UP62

UL64

PZ65

PX64

UJ 66

UJ 67

UJ 68

UX65

UA67

RA67

TD68

UD68

UP68

UL66

TX64

UW65 US65

Point 7

RR73

RR77

UJ 76

PM76

TZ76

RA83

UA83

UJ 83

UJ 84

PM85

PX84

PZ85

UX85

TX84

UL86

UA87

RA87 UJ 86

UJ 87

UW85

US85

UL84

TI 8UJ 88

PGC8

TJ 8

RR13

UJ 13

RT12

UJ 14

US15

TI 12

PM15

PX14

UX15

UL14

UJ 12

LSS4

P M I 2

UJ 17

UJ 18

UJ 16TI 18

RR17

PM18 PX16 PX15

USA15

UL16

UJ 22

UJ 23UJ 24

UA23

RA23

TI 2

PGC2

RA27

UJ 26

PX24

UX25

PM25

UW25US25

UL24

UL26

UJ 27 UA27

ALICE

PZ 33

PM32

UJ 32 UJ 33

RZ33

TZ32

CMS

Point 6

LHCb

ATLAS

SPS

PX46PZ45

PM45

RT18

Point 8

Point 5

Point 4Point 3.3

Point 3.2

Point 2

Point 1Point 1.8

1

2

3

4

Page 11: The Commissioning of the Technical Systems of LHC

Felix Rodriguez-Mateos/CERN-LARP collaboration meeting 060426

personnel underground

Front 1Front 2 Front 1 Front 2

Left Right

6.6 km

in the field on callcryogenics operationcryogenics instrumentationquench protectionmachine interlockspower converterscoordinationcontrolsoperation

o operatorx experte engineert technician 22 present in the field

Front 1 arc and the matching section on the even side

Front 2 arc, the matching section on the odd side and the inner triplets on both sides

two shifts = 15 hour days resources deployed for the powering tests

Page 12: The Commissioning of the Technical Systems of LHC

Felix Rodriguez-Mateos/CERN-LARP collaboration meeting 060426

the sequence of tests around an even pointPowering Tests

Page 13: The Commissioning of the Technical Systems of LHC

Felix Rodriguez-Mateos/CERN-LARP collaboration meeting 060426

the field

RH87

RE78

RE82

RE12RE88

Point 7

RR73

RR77

UJ 76

PM76

TZ76

RA83

UA83

UJ 83

UJ 84

PM85

PX84

PZ85

UX85

TX84

UL86

UA87

RA87 UJ 86

UJ 87

UW85

US85

UL84

TI 8UJ 88

PGC8

TJ 8

RR13

UJ 13

RT12

UJ 14

US15

TI 12

PM15

PX14

UX15

UL14

UJ 12

LSS4

UJ 17

UJ 18

UJ 16TI 18

RR17

PX16 PX15

USA15

UL16

LHCb

ATLAS

SPS Point 8

Point 1

minor control centres

field control room

arc and even matching section

inner triplets and odd matching section

warm magnets

~210 cold circuits 190 orbit corrector circuits~10 warm circuits

~210 cold circuits 190 orbit corrector circuits~10 warm circuits

Page 14: The Commissioning of the Technical Systems of LHC

Felix Rodriguez-Mateos/CERN-LARP collaboration meeting 060426

the field control room

DFBs

Field control room

UA 83 – Left of Point 8

PowerConverters

EnergyExtractionSystems

+ wi-fi coverage of the UA+ printer

+ social corner + water fountain

+ desks+ meeting table+ lockable closets

cryogenics powering tests interlocks post-mortem

Page 15: The Commissioning of the Technical Systems of LHC

Felix Rodriguez-Mateos/CERN-LARP collaboration meeting 060426

the first commissioning

Page 16: The Commissioning of the Technical Systems of LHC

Felix Rodriguez-Mateos/CERN-LARP collaboration meeting 060426

the phases

CD:3 cool down from 4.5 to 1.9 K

CD:2 cool down from 80 to 4.5 K

W:ELQA electrical quality assurance at warm

C:ELQA electrical quality assurance at cold

W:SCT short circuit tests

W:LT leak test

W:ISTs all sorts of system tests at warm

CD:1 cool down from 300 to 80 K

C:ISTs system tests at cold

C:PT powering tests

W: PT pressure test

Page 17: The Commissioning of the Technical Systems of LHC

Felix Rodriguez-Mateos/CERN-LARP collaboration meeting 060426

Interlock tests of a powering subsector prior and after connection of the power cables to the DFB leads

Pow

er

Convert

ers

co

nnect

ed

to

Magnets

Pow

er

Convert

ers

co

nnect

ed

to

Magnets

Pow

er

Convert

ers

not

conn

ect

ed

to

Magnets

Pow

er

Convert

ers

not

conn

ect

ed

to

Magnets

300 K

1.9 K

90 K

Test of power converters connected to the DC cables in short circuit, including controls for powering, ramp, monitoring

connexion of power cablesto the current leads

Electrical Quality Assurance

superconducting magnet circuits

Individual System Tests of the Quench Protection and Energy Extraction Systems

Post-Mortem System tests

Commissioning of the electrical circuits one by one or in groups at low, intermediate and nominal currents

Commissioning of all the electrical circuits of the sector powered in unison to nominal current with nominal ramp rates

Individual System Tests of Powering Interlock Control

Page 18: The Commissioning of the Technical Systems of LHC

Felix Rodriguez-Mateos/CERN-LARP collaboration meeting 060426

powering of the superconducting magnet circuits

HCA:PIC2 Stand-by current to commission the protection functionalities of the powering interlock controllers and all its connected systems with current through the circuits

to verify the compatibility of the switch-on and switch-off processes of the converters with the sensitivity of the protection systems (namely QPS)

HCA:PLI1HCA:PLI2HCA:PLI3HCA:PLI4

Injection level20% of Inom

50% of Inom

80% of Inom

to set up the power converter current loops

to verify the cooling control of the current leads

to validate the protection mechanisms under real powering conditions and with limited amount of energy in the circuits

to validate quench-related procedures, e.g. cryogenic recovery procedures

to validate the sensitivity and compatibility during ramps of the systems susceptible to noise pick-up, couplings, etc

to perform a last check on the polarities of the circuits by verifying voltages across current leads (at low current using QPS signals)

1/2

Page 19: The Commissioning of the Technical Systems of LHC

Felix Rodriguez-Mateos/CERN-LARP collaboration meeting 060426

powering of the superconducting magnet circuits

HCA:PNO Nominal current to verify that the power converters work correctly during the ramp of the current

to verify the cooling control of the current leads

to calibrate the DCCTs for the main power converters and the Inner Triplet power converters and to verify that the calibration systems work correctly

to validate the protection mechanisms under real powering conditions and with nominal energy in the circuits

to verify the quench current level of each circuit

to validate quench-related procedures, e.g. cryogenic recovery procedures

HCA:PAC Nominal current(all circuits of a sector)

to verify the tracking of the current to verify thermal performance of the

ventilation and water cooling systems in underground areas

to have a 24-h reliability run in order to detect premature failures due to wrong settings or possible assembly errors

2/2

Page 20: The Commissioning of the Technical Systems of LHC

Felix Rodriguez-Mateos/CERN-LARP collaboration meeting 060426

HCP in circulation for approval

LHC-D-HCP-0003 Powering of the Superconducting Circuits of a Sector up to Nominal Current

Amalia Ballarino, Davide BozziniKnud Dahlerup-PetersenReiner Denz, Robin LaucknerBruno Puccio, Félix Rodríguez-Mateos Roberto Saban, Rüdiger SchmidtLuigi Serio, Hugues ThiesenAntonio Vergara, Markus Zerlauth

This document describes the sequence of the steps which lead to the powering of the superconducting circuits of a powering sub-sector to nominal current. It covers the phases after the connection of the power cables to the current leads up to the powering in unison of all the circuits of a sector to nominal current.

Page 21: The Commissioning of the Technical Systems of LHC

Felix Rodriguez-Mateos/CERN-LARP collaboration meeting 060426

failure scenarios failure scenarios during the

commissioning were studied

the objective was to define strategies for at least a few case studies per major system in order to gain in reactivity at the time of failures

evaluate the impact on the program and

define alternatives to carry-on

six sessions of the HCWG were devoted to this study:

Superconducting Electrical Circuits Cooling and Ventilation System Cryogenic System Vacuum System & Leak Tests Electrical Power Distribution Power Interlock Controllers

can it becircumvented

do itaccordingto definedprocedures

cleardiagnostic

applydiagnosticprotocols

decisioncrash

programme

failure

yes

yes

decision

applydiagnosticprotocols

Page 22: The Commissioning of the Technical Systems of LHC

Felix Rodriguez-Mateos/CERN-LARP collaboration meeting 060426

HCP in circulation for engineering check

LHC-D-HCP-0006 Failure Scenarios for the Electrical Circuits

Davide BozziniReiner DenzKnud Dahlerup-PetersenHugues ThiesenAntonio VergaraMarkus Zerlauth

This document describes the failure scenarios for the Electrical Circuits which are relevant during the Hardware Commissioning. The objective is to identify show stoppers and define the strategies to repair, recover or do with them.

Page 23: The Commissioning of the Technical Systems of LHC

Felix Rodriguez-Mateos/CERN-LARP collaboration meeting 060426

Thanks for your attention…