75
Company Profile

T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

  • Upload
    vanminh

  • View
    277

  • Download
    7

Embed Size (px)

Citation preview

Page 1: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 4 Ref: WAME/gc/17

Index THE COMPANY ............................................................................................................................ 3

GROUP STRUCTURE .................................................................................................................... 4

Company Profile

Page 2: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 2 Ref: WAME/gc/17

INDEX

THE COMPANY ............................................................................................................................ 3

GROUP STRUCTURE .................................................................................................................... 4

GROUP MANAGEMENT STRUCTURE .............................................................................................. 5

GROUP FINANCIAL INFORMATION ................................................................................................. 6

GROUP MANAGEMENT ................................................................................................................ 7

KEY CLIENTELE . ......................................................................................................................... 9

PROJECTS ................................................................................................................................ 11

AWARDS AND CERTIFICATES . .................................................................................................... 58

GROUP RESOURCES ................................................................................................................. 65

FACILITIES ............................................................................................................................... 73

Page 3: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 3 Ref: WAME/gc/17

THE COMPANY Wade Adams (Middle East) Limited, registered in 1995, is the holding and/or management company of the following:-

Wade Adams Contracting (L.L.C.), Dubai, United Arab Emirates (since 1991) (formerly Union Transporting and Contracting Company (UTCC) (since 1976))

Wade Adams Sharjah (L.L.C.), Sharjah, U.A.E. (since 2002)

Wade Adams Emirates, Abu Dhabi, U.A.E. (since 2011)

Wade Adams Oman, Muscat, Oman (since 2009)

Gulf Consolidated Contractors W.L.L.(GCC), Qatar (since 2003)

Hilal Bil Badi & Partners Contracting Company W.L.L.(HILALCO), Abu Dhabi, U.A.E. (since 1993)

Union Energy Inc., BVI, registered as a Branch in HFZ, Sharjah, U.A.E. (since 1998)

The roots of Wade Adams Contracting (L.L.C.) go back to 1976 when a prominent local family formed Union Transporting and Contracting Company (UTCC). Even today many of the senior management team of erstwhile UTCC continue to serve Wade Adams in various capacities. Wade Adams Group specialised in all aspects of Design and Build, EPIC and Employer designed to build construction services. Wade Adams has a proven track record in executing Airport Infrastructure, Buildings, Dams, District Cooling, Energy, Industrial, Landscape and Theme, Marine, MEP, Road and Bridges, Residential Infrastructure and Utility Network projects.

The Company works to high standards and stringent HSE requirements as is evident by the certification of the integrated management systems of all Group Companies to ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007 by Bureau VERITAS. Wade Adams has a firm order book of approximately AED 4.00 billion (US$ 1.1 billion), an employee force of over 11,000 and strategic investments in land, buildings (including its own labour camps to house the large workforce), plant and equipment and is in an enviable position to consolidate its position as one of the major contractors in the Gulf region and take on further challenges. Wade Adams (Middle East) Limited is registered and operates under the laws of the British Virgin Islands.

Wade Adams Contracting LLC, Dubai Improvement of Interchange No 5

Page 4: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 4 Ref: WAME/gc/17

GROUP STRUCTURE

Wade Adams (Gulf) Limited 100% owned by “WAME”

Wade Adams (Middle East) Limited

(“WAME”)

Wade Adams Contracting (L.L.C)

Dubai & Northern Emirates

Gulf Consolidated Contractors (WLL)

Doha, Qatar

Wade Adams Sharjah (L.L.C) Sharjah, United Arab Emirates

Hilal Bil Badi & Partners Contracting Company (WLL)

Abu Dhabi (HILALCO)

Wade Adams Emirates L.L.C

Abu Dhabi

Wade Adams Oman LLC

Muscat, Oman

Union Energy Inc., BVI

Branch at Hamriya free Zone, Sharjah

Bouvardia Management Limited

100% owned by “WAME”

Wade Adams Contracting (L.L.C)

Qatar - Branch

Page 5: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 5 Ref: WAME/gc/17

GROUP MANAGEMENT STRUCTURE

Project execution & Profit Centers

Business Segments

WAME Board of Directors

WAME Group Executive Committee Chairman/President – Kypros Tsentas

Group Managing Director – John Papadouris Group General Manager – Kyriakos Antzoulis

Corporate & Project Management Office, Dubai

Ma

nag

er

Wad

e A

dam

s C

on

tracti

ng

L.L

.C

Du

ba

i, U

AE

Ma

nag

er

Wad

e A

dam

s S

ha

rjah

L.L

.C

Sh

arj

ah

, U

AE

Ma

nag

er

Wad

e A

dam

s E

mir

ate

s L

.L.C

Ab

u D

ha

bi, U

AE

Ma

nag

er

Wad

e A

dam

s O

man

LL

C

Mu

scat,

Om

an

Ma

nag

er

Gu

lf C

on

so

lid

ate

d C

on

tracto

rs W

LL

(G

CC

)

Do

ha

, Q

ata

r

Ma

nag

er

Hil

al B

il B

ad

i &

Part

ne

rs C

on

tracti

ng

Co

. W

LL

(HIL

AL

CO

)

Ab

u D

ha

bi, U

AE

Un

ion

En

erg

y In

c.

Ham

riya F

reezo

ne

, S

ha

rjah

, U

AE

STRATEGIC SUPPORT

BUSINESS

DEVELOPMENT

CONTROLLING

CORPORATE FINANCE& LEGAL

CORPORATE

GOVERNANCE

GROUP TREASURY

HUMAN

RESOURCES

INTERNAL AUDIT

IT

RISK MANAGEMENT

PROJECT SUPPORT

ADMINISTRATION

ACCOUNTING

CONTRACTUAL

ESTIMATION

HEALTH & SAFETY

PLANNING

PLANT

QUALITY

SOURCING &

PROCUREMENT

TECHNICAL

Civil

Infrastructure Buildings

Landscaping &

Theming Works

Oil & Gas

Storage

Earthworks

District Cooling

Roads

Bridges &

Underpasses

Industrial

Airports

Marine Works Utility Networks

Dams Residential

Page 6: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 6 Ref: WAME/gc/17

GROUP FINANCIAL INFORMATION

843

646

426 367

318 313 340

427 445

554

23

32

86 136

44 53 50

40 36

131

0

100

200

300

400

500

600

700

800

900

1000

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 (F)

Qatar

UAE

USD Millions

Wade Adams (Middle East) Group - Turnover 2008-2017

Page 7: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 7 Ref: WAME/gc/17

GROUP MANAGEMENT Name Nationality Designation Qualification

Corporate Management Kypros Tsentas Cypriot Chairman / President B.Sc. Civil Engineering John Papadouris British Group Managing Director Associate Civil

Engineering Degree Kyriakos Antzoulis Cypriot Group General Manager B.Sc. (Hons) Civil

Engineering

Group Managers Keith Waiting British Group Contracts Manager Fellow of the Royal

Institution of Chartered Surveyors

N.M. Naushad Indian Group Admin and Human

Resources Manager Master Degree in Business Administration, B. Com. Degree, Diploma in Personnel Mgmt. & Industrial Relations

Mathew Varghese Indian Group Estimation Manager B. Tech. in Civil

Engineering Asharaf Ali Indian Group IT Manager Masters in

Engineering(Applied Electronics)

Basanth Nandish Indian Group Audit Manager B. Tech. in Civil

Engineering, M. Sc. in Quality Assurance MBA in Personnel Mgmt.

Col Musharaf Khan Indian Group HSE Manager

I Dip (OSH), Grad IOSH, MIIRSM, NEBOSH

Nikolaos Andreopolous

Cypriot Group Plant & Transport Manager

M. Sc Operational Research

Page 8: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 8 Ref: WAME/gc/17

Country Managers Marios Spanos Cypriot Manager Hilalco

Abu Dhabi B.Eng. (Civil Engineering)

Michael Tsialis Cypriot Manager Wade Adams

Contracting & Wade Adams Emirates

M.S Construction Engineering and Management

Nikos Tanteles Cypriot Manager - Wade Adams

Sharjah and Country Manager - Oman

M.Sc. Civil Engineering

Nabil Shehade American Country Manager - Qatar Bachelor of Science in

Engineering

CFO’s / Financial Controllers

Rakesh Kabra Indian Chief Financial Officer -

UAE & Oman Chartered Accountant

Rajindh Munindradasa

Srilankan Chief Financial Officer - Qatar

Chartered Accountant

Page 9: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 9 Ref: WAME/gc/17

KEY CLIENTELE

• Dubai Health Care City

• Dubai Hilss Estate LLC

• Dubai Industrial City

• Dubai Land Residence LLC

• Dubai Municipality

• Dubai Properties

• Dubai Silicon Oasis

• Dubai Sports City

• Dubai Technology & Media Free Zone Authority (TECOM)

• Dubai Water & Electricity Authority

• Emaar Properties PJSC

• Empower

• Jebel Ali Free Zone Authority (JAFZA)

• Meraas Development

• Meydan Sobha LLC - FZ

• Nakheel LLC

• Palm Deira LLC

• Roads & Transport Authority, Dubai

• Tatweer

WADE ADAMS CONTRACTING LLC

• Air British Petroleum (Air BP)

• Directorate of Public Works, Sharjah

• Sharjah Airport Authority

• Sharjah Municipality

• Sharjah Aviation Services Company (SASCO)

WADE ADAMS SHARJAH LLC

• Al Ain Municipality

• Abu Dhabi Airport Company (ADAC)

• Abu Dhabi Ports Company (ADPC)

• Abu Dhabi Company for Onshore Oil Operation (ADCO)

• Abu Dhabi Municipality

• Abu Dhabi National Oil Company (ADNOC)

• Public Works Department, Abu Dhabi

• Tourism Development & Investment Company (TDIC)

• The Zoo & Aquarium Public Institution – Al Ain

• Tawazun Indsutrial Park (TIP)

• Western Region Municipality

HILAL BIL BADI & PARTNERS CONTRACTING COMPANY WLL

Page 10: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 10 Ref: WAME/gc/17

Note: The above lists are in alphabetical order.

• Gulf Warehousing Company

• Public Works Authority (Ashghal)

• Qatar Petroleum

• Qatalum

GULF CONSOLIDATED CONTRACTORS WLL

• Abu Dhabi National Oil Company (ADNOC)

• Al Ain Municipality

WADE ADAMS EMIRATES LLC

• Impresa Costruzioni Guiseppe Maltauro WADE ADAMS QATAR

Page 11: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 11 Ref: WAME/gc/17

PROJECTS TYPICAL PROJECTS Airports

Page 12: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 12 Ref: WAME/gc/17

Bridges & Underpasses

5

th Interchange, Sheikh Zayed Road (Dubai)

Al Sufooh Area Underpass (Dubai)

Mamzar Interchange (Dubai)

Garhoud Interchange (Dubai)

Page 13: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 13 Ref: WAME/gc/17

Bridges & Underpasses

Ras Al Khor Interchange (Dubai)

Palm Jumeirah Road (Dubai)

Al Reef Interchange (Abu Dhabi)

Page 14: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 14 Ref: WAME/gc/17

Buildings

Sir Baniyas Island Hotel (Abu-Dhabi)

Residential Building at Umm Al Hassan (Bahrain)

New Al Safiya Building Complex (Dubai)

Page 15: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 15 Ref: WAME/gc/17

Bulk Earthworks / Grading

Dui By-pass road

Page 16: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 16 Ref: WAME/gc/17

Bicycle & Jogging Tracks

Page 17: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 17 Ref: WAME/gc/17

Dams

Page 18: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 18 Ref: WAME/gc/17

Infrastructure

Dubai Internet City (Dubai)

Works at Sharjah World & Trade Center (Sharjah)

Emirates Hills (Dubai)

Page 19: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 19 Ref: WAME/gc/17

Landscaping & Theming

Marine Works

Page 20: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 20 Ref: WAME/gc/17

Break water developments (Abu-Dhabi)

Land reclamation – Al Raha Beach Resort (Abu-Dhabi)

Land reclamation (Bahrain)

Page 21: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 21 Ref: WAME/gc/17

Oil & Gas

Page 22: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 22 Ref: WAME/gc/17

Road Works

Al Hamidiya Road (Ajman)

Al Sahil Road (Abu-Dhabi)

Al Reef (Abu Dhabi)

Ring Road (Sharjah)

Wali Al Ahed Roads (Bahrain)

Dubai Bypass Road

Page 23: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 23 Ref: WAME/gc/17

Utilities

Page 24: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 24 Ref: WAME/gc/17

Others

Al Wathba Camel Race Track (Abu Dhabi)

Clock Tower Roundabout (Al Ain)

Deep Excavation Works (Al Falah, Abu Dhabi)

Pumping Station Works (Dubai)

Pumping Station Works (Dubai)

Page 25: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 25 Ref: WAME/gc/16

PROJECT LISTS Wade Adams Group has carried out numerous projects over the years. Extending its influence and competencies, the Company now has the strength to carry out works in all areas of civil engineering. The chart below identifies under broad categories, the number of projects the Company has executed over the past 10 years. These categories include infrastructure, bridges & underpasses, road works, bulk earthworks / grading, utilities (which include water, irrigation, sewerage, drainage pipelines, telecommunication lines, electrical cabling), pumping stations, marine works, buildings and some miscellaneous works such as airport runways, landscaping and similar works. WADE ADAMS GROUP

Bridges & Underpasses, 30

Building, 8

Bulk Earthworks / Grading, 39

Infrastructure, 113

Marine Works, 3

Misc, 23

Road works, 70

Utilities, 53

Roads & Infrastructure, 22

Page 26: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 26 Ref: WAME/gc/17

WADE ADAMS CONTRACTING LLC

Category No. of Projects Value (DHS MN)

Bridges & Underpasses 18 3,039.39

Bulk Earthworks / Grading 18 264.37

Infrastructure 82 8,247.84

Misc 11 135.33

Road and Bridge works 5 1,596.44

Road works 26 1,855.76

Utilities 38 2,245.21

Roads & Infrastructure 14 582.31

Grand Total 212 17,966.61

Bridges & Underpasses, 18

Bulk Earthworks / Grading, 18

Infrastructure, 82

Misc, 11

Road and Bridge works, 4

Road works, 26

Utilities, 38 Roads & Infrastructure, 14

Note: Project details are for the Wade Adams Contracting LLC projects (completed and ongoing) commencing October 2004

Page 27: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 27 Ref: WAME/gc/17

List of Ongoing Projects

OUR REF

PROJECT NAME

CLIENT

CONSULTANT

CATEGORY

CONTRACT AMOUNT (DHS MN)

DATE OF COMMENCEMENT

ORIGINAL COMPLETION

DATE

EM 715

INFRASTRUCTURE WORKS AT AL FURJAN PHASE II - AREA 11

NAKHEEL PJSC ARIF & BINTOAK INFRASTURCTURE WORKS

20.00 TBA TBA

EM 714

P1135FZ.C400 JAFZA SOUTH INFRASTRUCTURE PHASE 5, BALANCE OF WORKS

JAFZA WSP STREET LIGHTING WORKS

3.15 TBA TBA

EM 713

R978/4A DEVELOPMENT OF CYCLE AND JOGGING TRACK

ROAD AND TRANSPORT AUTHORITY

PARSONS OVERSEAS LIMITED

CYCLE & JOGGING TRACK WORKS

62.47 28-Jun-16 27-Sep-16

EM 712

R879/1 JAFZA FLYOVER NEAR IC10 OVER SHEIKH ZAYED ROAD

ROAD AND TRANSPORT AUTHORITY

HYDER CONSULTING MIDDLE EAST LTD

ROAD & BRIDGE WORKS

104.62 24-Apr-16 4-Nov-17

EM 711

DUBIOTECH, PALM JUMEIRAH, TECOM B & C AND JUMEIRAH LAKE TOWERS DISTRICT COOLING PROJECTS - EMP-TR-0158. CONSTRUCTION, COMPLETION & MAINTENANCE, IN THE DEFECTS LIABILITY PERIOD, THE CHILLED WATER PIPING NETWORKS FOR DUBIOTECH MAF CITY CENTER, TECOM B, PALM JUMEIRAH CRESCENT & TRUNK, AND THE VALVE & AIR VENT CHAMBER FOR TECOM C, JUMEIRAH LAKE TOWERS, PALM JUMEIRAH CRESCENT & TRUNK.

EMPOWER DIRECTOR-PROJECT EMPOWER

DISTRICT COOLING WORKS

29.45 12-Apr-16 8-Oct-16

EM 710

BUSINESS BAY PHASE 1 & 2 DISTRICT COOLING PROJECT. CONSTRUCTION, COMPLETION & MAINTENANCE, IN THE DEFECTS LIABILITY PERIOD, THE CHILLED WATER PIPING NETWORKS FOR DAMAC PARAMOUNT HOTEL, BBDM CORRIDOR EXTENSION TO JUMA AL MAJID TOWER AT SHEIKH ZAYED ROAD AND BB CREEK UPPER & LOWER SIDES - EMP-TR-0154

EMPOWER NIL

DISTRICT COOLING WORKS

41.90 03-Mar-16 29-Aug-16

EM 709

MRHE-22 HTA: INFRASTRUCTURE WORKS FOR 346 HOUSES AT MAKAN DISTRICT, HATTA, UAE - TENDER NO. A2/2015/35

MOHAMMED BIN RASHID HOUSING ESTABLISHMENT

JOUZY CONSULTING ENGINEERS

INFRASTRUCTURE WORKS

113.98 24-Mar-16 21-Feb-17

EM 708

DMS 145102 DEIRA ISLAND A: CONSTRUCTION OF ROAD AND UTILITIES

PALM DEIRA LLC TBA ROAD & UTILITIES WORKS

407.00 TBA TBA

EM 707

R999/4A DUBAI WATER CANAL- PHASE 4A ROAD AND TRANSPORT AUTHORITY

PARSONS OVERSEAS LIMITED

INFRASTRUCTURE WORKS

306.00 17-Jan-16 12-Oct-16

EM 706

R1013/1 IMPROVEMENTS OF AL SHINDAGHA CORRIDOR (SANA JUNCTION)

ROAD AND TRANSPORT AUTHORITY

PARSONS OVERSEAS LIMITED

ROADS, BRIDGES WORKS

611.107 10-Jan-2016 29-Dec-17

EM 705

MBR DUBAI HILL ESTATE - GOLF IRRIGATION PUMPING STATION

DUBAI HILL ESTATE LLC

PARSONS OVERSEAS LIMITED

IRRIGATION PUMPING STATION WORKS

5.33 18-Feb-16 04-Aug-16

EM 704

P125 PROSPECT HEIGHTS - PHASE 1 (TIJARA TOWN)

DUBAI LAND RESIDENCES LLC

AECOM Middle East Ltd

ROAD & INFRASTRUCTURE WORKS

45.301 26-Oct-15

22-Apr-16

EM 703

R902/4B EXTENSION OF ACADEMIC CITY ROAD ROAD AND TRANSPORT AUTHORITY

M/S CDM SMITH INC. ROADS, BRIDGES AND UNDERPASS WORKS

474.31 11-Oct-15

10-Oct-17

Page 28: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 28 Ref: WAME/gc/17

OUR REF

PROJECT NAME

CLIENT

CONSULTANT

CATEGORY

CONTRACT AMOUNT (DHS MN)

DATE OF COMMENCEMENT

ORIGINAL COMPLETION

DATE

EM 702

R1023 DIRECTIONAL RAMP FROM AL KHAIL ROAD TO FINANCIAL CENTRE ROAD

RTA ITALCONSULT BRIDGES WORKS

119.20 11-Oct-15

09-Oct-16

EM 701

DUBAI LAND RESIDENTIAL COMPLEX (DLRC), DUBAI HEALTH CARE CITY II (DHCC II) & TECOM A - DISTRICT COOLING PROJECT. CONSTRUCTION, COMPLETION & MAINTENANCE, IN THE DEFECTS LIABILITY PERIOD, THE CHILLED WATER PIPING NETWORKS, 5 NOS. SEMI-PERMANENT PLANTS AND DISMANTLING & SHIFTING OF WTC TEMPORARY PLANT - EMP-TR-0142

EMPOWER TBA

UTILITIES

19.00 03-Sep-15 31-May-16

EM 700

DS158 - MAIN IRRIGATION LINES AT SHEIKH ZAYED ROAD

DUBAI MUNIPALITY MWH IRRIGATION WORKS 309.79 04-Nov-15 21-Jan-18

EM 698

0107 - JEBEL ALI HILLS, INFRASTRUCTURE WORKS - PACKAGE 3

MERAAS DEVELOPMENT LLC

PARSONS OVERSEAS LIMITED

INFRASTRUCTURE WORKS

216.897 24-May-15 13-Nov-16

EM 696

TRA/RDS/R971/1 DEVELOPMENT OF JUMEIRAH CORNICHE CONSTRUCTION OF ACCESS TO MARINA CLUB

ROAD AND TRANSPORT AUTHORITY

TBA JUNCTION IMPROVEMENT WORKS

6.2 1-Feb-15 17-Mar-15

EM 695

CONTRACT NO. MSD1/419/DM1/022 INFRASTRUCTURE WORKS - PACKAGES 1 & 2

MEYDAN SOBHA LLC – FZ

AE7 INFRASTRUCTURE WORKS

543.356 18-Jan-15 2-Mar-17

EM 693

WORKS AT MR. HILAL BIL BADI'S HOUSE IN DUBAI HILAL BIL BADI To Be Advised TBA

TBA 5-Jan-15

TBA

EM 691

R902/2A IMPROVEMENT OF SHEIKH MOHAMMED BIN ZAYED ROAD

ROAD AND TRANSPORT AUTHORITY

M/S CDM SMITH INC. ROADS & INFRASTRUCTURE WORKS

227.37 23-Nov-14 21-Nov-16

EM 690

DMS 139243A CONSTRUCTION OF ROADS & SEWERAGE NETWORK FOR DEIRA ISLAND A

THE PALM DEIRA LLC TBA ROADS AND SEWERAGE WORKS

101.91 9-Nov-14 8-May-16

EM 689

INTERNATIONAL MEDIA PRODUCTION ZONE (IMPZ) DISTRICT COOLING PROJECT, BUSINESS BAY (BB) AL HABTOOR TOWER DISTRICT COOLING PROJECT. CONSTRUCTION, COMPLETION AND MAINTENANCE , IN THE DEFECTS LIABILITY PERIOD, THE CHILLED WATER PIPING NETWOKRKS AT THE INTERNATIONAL MEDIA PRODUCTION ZONE AND BUSINESS BAY AL HABTOOR TOWER - EMP-TR-0120

EMPOWER TBA DISTRICT COOLING WORKS

40.90 20-Oct-14 16-Jun-15

EM 670

DP043-13 MUDON P-123 - ROADS & INFRASTRUCTURE CONSTRUCTION

DUBAI LAND RESIDENCES LLC

AECOM MIDDLE EAST Ltd

ROAD & INFRASTRUCTURE

57 19-Jan-14 15-Nov-16

Page 29: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 29 Ref: WAME/gc/17

List of Completed Projects

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT

AMOUNT (DHS MN)

DATE OF COMMENCEMENT

COMPLETION DATE

EM 699

P1136FZ.C300 JAFZA SOUTH STREET LIGHTING PHASE 3

JEBEL ALI FREE ZONE AUTHORITY (JAFZA)

WSP MIDDLE EAST

STREET LIGHTING WORKS

14.65 TBA TBA

EM 697

REEM OASIS DEVELOPMENT, SHALLOW SERVICES AND INTERNAL ROADS - PACKAGE 4 & 5

AL ARYAM PHASE 2 LLC (EMAAR DUBAI LLC IS THE DEV. MGR)

HALCROW INTERNATIONAL PARTNERSHIP

ROADS & SHALLOW SERVICES

106.47 10-Feb-15 9-May-16

EM 694

MSD1/419/D1/023 BICYCLE & JOGGING TRACKS MEYDAN SOBHA LLC – FZ

AE SEVEN MORSE ARCHITECTURE & ENGINEERING CONSULTANCIES LLC (AE7)

BICYCLE & JOGGING TRACKS

80.99 21-Jan-15 14-Sep-15

EM 692

GREEN COMMUNITY EXPANSION PHASE 3 AT DIP, ENABLING WORKS CONTRACT

PROPERTIES INVESTMENT LLC

AECOM / DEWAN ARCHITECTS & ENG.

EARTHWORKS 9.84 1-Dec-14 28-Feb-15

EM 688

ENGINEERING WORKS FOR DSOA, JUNCTION IMPROVEMENT FOR ACADEMIC CITY ROAD

DUBAI SILICON OASIS AUTHORITY

KHATIB & ALAMI ROADS & INFRA WORKS

20.40 19-Oct-14 17-Apr-15

EM 687

MBR GARDENS DEVELOPMENT, DUBAI HILLS ESTATE, SHALLOW SERVICES AND INTERNAL ROADS, MAIN ROAD 2 & 3 - PACKAGE 04

DUBAI HILLS ESTATE LLC (EMAAR PROPERTIES PJSC IS THE DEV. MGR.)

PARSONS OVERSEAS LIMITED

ROADS & SERVICES 47.00 22-Oct-14 20-May-15

EM 686

9022 – AL KHAWANEEJ LABOR CITY MERAAS DEVELOPMENT

KHATIB & ALAMI INFRASTRUCTURE WORKS

37.90 18-Sep-14 17-Sept-15

EM 685

MBR GARDENS DEVELOPMENT - DUBAI HILLS ESTATE, SHALLOW SERVICES OF MAIN ROAD-1 EXTENSION AND TEMPORARY SPINE ROAD

DUBAI HILLS ESTATE LLC (EMAAR PROPERTIES PJSC IS THE DEV. MGR.)

PARSONS OVERSEAS LIMITED

ROADS & INFRASTRUCTURE WORKS

15.30 23-Jul-14 23-Oct-14

EM 684

0107 JEBEL ALI HILLS, INFRASTRUCTURE WORKS MERAAS DEVELOPMENT

PARSON OVERSEAS LTD INFRASTRUCTURE WORKS

27.18 31-Aug-14 28-Dec-14

EM 683

ARABIAN RANCHES II - PHASE 2, DEEP SERVICES - ADDITIONAL ROAD WORKS AT PA 14

EMAAR PROPERTIES PJSC

PARSONS ROAD WORKS 1.55 20-Aug-14 19-Sep-14

EM 682

P1136FZ.C200 JAFZA SOUTH LED STREET LIGHTNING PHASE 2

JEBEL ALI FREE ZONE AUTHORITY (JAFZA)

WSP MIDLLE EAST INFRASTRUCTURE WORKS

15.5 07-Sep-14 05-Mar-15

EM 681

AL MINHAD AIRBASE, PAVEMENTS WORKS FOR AL MINHAD AIRBASE (SUB-CONTRACT)

AL SAHRAA GENERAL TRANSPORT & CLEARANCE

NIL PAVEMENT WORKS 2.7 To be advised To be advised

EM 680

CYCLE TRACK UNDERPASS AT MEYDAN ROAD AND TRANSPORT AUTHORITY

PARSON OVERSEAS LTD INFRASTRUCTURE WORKS

19.2 01-Sep-14 27-Feb-15

EM 679

ARABIAN RANCHES II - PHASE 2, DEEP SERVICES PACKAGE

EMAAR PROPERTIES PJSC

PARSONS DRAINAGE & SEWERAGE WORKS

5.73 16-Jun-14 13-Feb-15

EM 678

MBR GARDENS DEVELOPMENT, DUBAI HILLS ESTATE, DEEP SERVICES IN MAIN ROAD 2 & 3

EMAAR PROPERTIES PJSC

PARSONS DRAINAGE & SEWERAGE WORKS

25.83 12-Ju-14

12-Feb-15

EM 677

DUBAI DESIGN DISTRICT (D3) COOLING PROJECT - CONSTRUCTION, COMPLETION AND MAINTENANCE, IN THE DEFECTS LIABILITY PERIOD, OF THE CHILLED WATER PIPING, BUSINESS PARK AREA (PACKAGE 1) - EMP-TR-0114

EMPOWER EMPOWER DISTRICT COOLING PROJECT

13.19 10-Jul-14 10-Dec-14

EM 676

DS133/2 AL QUOZ 2nd SEWERAGE NETWORKS (C355) STAGE 2

DUBAI MUNICIPALITY

ITALCONSULT SEWERAGE NETWORKS

18.20 10-Jun-14 21-Apr-15

Page 30: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 30 Ref: WAME/gc/17

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT

AMOUNT (DHS MN)

DATE OF COMMENCEMENT

COMPLETION DATE

EM 675

MBR GARDENS DEVELOPMENT - DUBAI HILLS ESTATE, IRRIGATION PUMPING STATION WORKS (IPS-01)

EMAAR PROPERTIES PJSC

PARSONS IRRIGATION & PUMPING STATION WORKS

28.64 18-Jun-14

13-Apr-15

EM 674

MBR GARDENS DEVELOPMENT - DUBAI HILLS ESTATE, GOLF COURSE GRADING WORKS

DUBAI HILLS ESTATE LLC

PARSON OVERSEAS LTD EARTHWORKS 26.98 20-Feb-14

27-Oct-14

EM 673

JUMEIRAH VILLAGE & JUMEIRAH PARK - DMS 137664, INTERIM ACCESS ROAD BETWEEN JUMEIRAH VILLAGE & JUMEIRAH PARK - GATE #5

JUMEIRAH VILLAGE LLC

TO BE ADVISED INFRASTRUCTURE WORKS

10.50 29-May-14 28-Nov-14

EM 672

P1135FZ.C100 HEAVY VEHICLE GATES IN JAFZA SOUTH

JEBEL ALI FREE ZONE AUTHORITY (JAFZA)

AECOM MIDDLE EAST INFRASTRUCTURE WORKS

17.93 16-Mar-14 31-Jan-15

EM 671

R978/1 JUMEIRAH JOGGING TRACK ROAD AND TRANSPORT AUTHORITY

PARSON OVERSEAS LTD INFRASTRUCTURE WORKS

98

16-Feb-14 2-Oct-14

EM 669

MBR DEVELOPMENT - PHASE 1, SHALLOW SERVICES & INTERNAL ROADS

EMAAR PROPERTIES PJSC

PARSONS ROADS & INFRASTRUCTURE WORKS

21.94 4-Nov-13 5-Mar-14

EM 668

COMPREHENSIVE IMPROVEMENTS OF THE PARALLEL ROAD (Contract-3C1)

ROAD AND TRANSPORT AUTHORITY

PARSON OVERSEAS LTD ROAD WORKS 77.84 20-Oct-13 13-Feb-15

EM 667

P1135FZ JAFZA SOUTH INFRASTRUCTURE PHASE 5 JEBEL ALI FREE ZONE AUTHORITY (JAFZA)

AECOM MIDDLE EAST INFRASTRUCTURE WORKS

15.52 31-Oct-13 28-Apr-14

EM 666

P1136FZ JAFZA SOUTH SOLAR STREET LIGHTING JEBEL ALI FREE ZONE AUTHORITY (JAFZA)

WSP MIDDLE EAST SOLAR STREET LIGHTING WORKS

9.25

24-Sep-13

14-June-14

EM 665

VILLA COMPLEX PHASE III, INFRASTRUCTURE PACKAGE (P-048/C)

DUBAI SILICON OASIS AUTHORITY

ARCHGROUP INFRASTRUCTURE WORKS

29.75

18-Aug-13

17-Sep-14

EM 664

CTSS/BUF/VIP/006B - DEVELOPING THE FACILITIES WITHIN NAD AL SHEBA COMPLEX, PHASE 2 - INFRASTRUCTURE AND LANDSCAPE WORKS

ROADS AND TRANSPORT AUTHORITY

DAR AL-HANDASAH CONSULTANTS

INFRASTRUCTURE AND LANDSCAPE WORKS

53.60 21-Jul-13 22-Nov-13

EM 663

DS138/2A NAD EL SHIBA 4th, DRAINAGE PUMPING STATION

DUBAI MUNIPALITY MWH DRAINAGE PUMPING STATION

17.5 7-Apr-13 6-Apr-14

EM 662

VILLA COMPLEX PHASE III, GRADING PACKAGE (P-048/A)

DUBAI SILICON OASIS AUTHORITY

ARCHGROUP GRADING PACKAGE 3.29 21-Mar-13 19-May-13

EM 661

ARABIAN RANCHES 2 DEVELOPMENT, AL QUDRA ROAD "U" TURN ACCESS

EMAAR PROPERTIES PJSC

PARSONS ROAD WORKS 3.02 16-Feb-12 15-Jul-13

EM 660

DS190/2 SEWER NETWORK & RISING MAIN AT AL QUOZ INDUSTRIAL AREA

DUBAI MUNICIPALITY

TO BE ADVISED SEWERAGE WORKS 25.94 10-Feb-13 11-May-14

EM 659

ARABIAN RANCHES 2 DEVELOPMENT, UTILITY CONNECTION & DEEP SERVICES - PACKAGE 1

EMAAR PROPERTIES PJSC

PARSONS UTILITIES & SERVICES PACKAGE

30.71

13-Jan-13

12-Jan-14

EM 658

BUSINESS BAY DISTRICT COOLING PROJECT - CONSTRUCTION, COMPLETION AND MAINTENANCE IN THE DEFECTS LIABILITY PERIOD, THE SOUTH EAST (TP03 & TP04) PIPE NETWORK - EMP-TR-0081

EMPOWER

EMPOWER

UTILITIES 7.11 5-Dec-12 3-May-13

Page 31: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 31 Ref: WAME/gc/17

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT

AMOUNT (DHS MN)

DATE OF COMMENCEMENT

COMPLETION DATE

EM 657

JAP014 - JUMEIRAH LAKES TOWERS INFRASTRUCTURE WORKS

(DMCCA) FAITHFUL+GOULD & WILBUR SMITH ASSOCIATES

INFRASTRUCTURE WORKS

16.39 31-Mar-12 2-Nov-13

EM 656

R824/1 ROADS IN AL QUOZ 3 ROADS AND TRANSPORT AUTHORITY

AL TURATH ENGINEERING CONSULTANTS

ROADS & INFRASTRUCTURE WORKS

21.73 17-Nov-12 12-Sep-13

EM 655

THE VILLA REMAINING WORKS (V2036), COMPLETION OF THE VILLA PHASE III WORKS

DUBAI PROPERTIES LLC

AECOM ROADS & INFRASTRUCTURE WORKS

9.32 11-Nov-12 11-Apr-13

EM 654

VH01/CO2B FINAL ROADS & INFRASTRUCTURE WORKS

VICTORY HEIGHTS GOLF AND RESIDENTIAL DEVELOPMENT LLC

DIAR CONSULT ROADS AND INFRASTRUCTURE WORKS

3.15

15-Dec-12

14-Aug-13

653

TECOM-C DISTRICT COOLING PROJECT, JBR AL BATEEN DISTRICT COOLING PROJECT - CONSTRUCTION, COMPLETION AND MAINTENANCE IN THE DEFECTS LIABILITY PERIOD OF THE SEMI-PERMANENT PLANT, CHILLED WATER DISTRICT COOLING PIPE NETWORKS AND TO UNDERTAKE MATERIAL SHIFTING. EMP-TR-0071

EMPOWER EMPOWER UTILITIES 13.10 22-Apr-12 28-Apr-13

EM 652

DUBAI WATERFRONT - BADRAH & VENETO, INFRASTRUCTURE WORKS N018-040-03-10

NAKHEEL PJSC DAR AL HANDASAH INFRASTRUCTURE WORKS

137.00 19-Jun-11 16-Jun-12

EM 651

BUSINESS BAY PHASE 1 & 2 DISTRICT COOLING PROJECT. CONSTRUCTION, COMPLETION AND MAINTENANCE IN THE DEFECTS LIABILITY PERIOD, THE WORKS IN CONNECTION WITH THE NORTH WEST PIPE NETWORK EXTENSION.

EMPOWER EMPOWER UTILITIES 13.053 12-Jul-11 6-Feb-12

EM 650

DN600 TRANSMISSION PIPELINE IN CENTRAL AREA FEDERAL ELECTRICITY & WATER AUTHORITY (FEWA)

FEDERAL ELECTRICITY & WATER AUTHORITY (FEWA)

UTILITIES 18.98 19-Jun-11 16-Jun-13

EM 649

BUSINESS BAY PHASE 1 & 2 DISTRICT COOLING PROJECT. CONSTRUCTION, COMPLETION AND MAINTENANCE IN THE DEFECTS LIABILITY PERIOD, THE WORKS IN CONNECTION WITH THE TP05 & TP11 DISTRICT COOLING DISTRIBUTION PIPE NETWORK EXTENSION

EMPOWER EMPOWER UTILITIES 7.72 16-May-11 13-Aug-11

EM 648

IMPROVEMENTS OF THE 5TH INDUSTRIAL INTERSECTION / SHARJAH (EMIRATES ROAD). SECOND STAGE: IMPROVEMENTS OF AL DHAID INTERCHANGE, KING ABDUL AZEEZ INTERCHANGE AND UNIVERSITY CITY INTERCHANGE

MINISTRY OF PUBLIC WORKS AUTHORITY

PARSONS OVERSEAS LTD

ROADS, BRIDGES AND SERVICES

468.89

17-Apr-11

4-Jun-13

EM 647

ARABIAN RANCHES DEVELOPMENT, DISTRICT 8 POLO VILLAS, INFRASTRUCTURE WORKS

EMAAR PROPERTIES PJSC

PARSONS INTERNATIONAL LTD.

INFRASTRUCTURE WORKS

12.275

27-Mar-11

31-Oct-11

Page 32: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 32 Ref: WAME/gc/17

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT

AMOUNT (DHS MN)

DATE OF COMMENCEMENT

COMPLETION DATE

EM 646

DSOA VILLA COMPLEX - INFRASTRUCTURE WORKS PHASE II (P-009/C)

DUBAI SILICON OASIS AUTHORITY

KHATIB & ALAMI INFRASTRUCTURE 3.154

3-May-11

31-Dec-11

EM 645

ENGINEERING WORKS FOR DSOA SEWERAGE CONNECTION FOR DEVELOPERS (P-042)

DUBAI SILICON OASIS AUTHORITY

KHATIB & ALAMI UTILITIES 1.50 1-Jan-11

16-Apr-12

EM 644

BUSINESS BAY PHASE 1 & 2 DISTRICT COOLING PROJECT, TENDER FOR THE CONSTRUCTION, COMPLETION AND MAINTENANCE IN THE DEFECT LIABILITY PERIOD OF THE MAIN (NORTH WEST) PIPE NETWORL-EMP-TR-0056

EMPOWER EMPOWER UTILITIES 21.50 4-Dec-10 31-Dec-11

EM 643

BUSINESS BAY PHASE 1 & 2 DISTRICT COOLING PROJECT, CONSTRUCTION, COMPLETION & MAINTENANCE IN THE DEFECTS LIABILITY PERIOD, THE WORKS IN CONNECTION WITH THE TP11 SEMI-PERMANENT DISTRICT COOLING PLANT & CHILLED WATER PIPE NETWORK

EMPOWER EMPOWER UTILITIES 3.85 25-Nov-10

12-Feb-11

EM 642

BUSINESS BAY PHASE 1 & 2 DISTRICT COOLING PROJECT, CONSTRUCTION, COMPLETION & MAINTENANCE IN THE DEFECTS LIABILITY PERIOD, THE WORKS IN CONNECTION WITH THE TP04 SEMI-PERMANENT DISTRICT COOLING PLANT & CHILLED WATER PIPE NETWORK - EMP - TR - 0047

EMPOWER EMPOWER UTILITIES 3.86 25-Nov-10 12-Feb-11

EM 641

IMPROVEMENT OF AL HAMIDIYA INTERCHANGE, EMIRATES OF AJMAN

MINISTRY OF PUBLIC WORKS AUTHORITY

INDROESSE INFRASTRUCTURE

ROADS & BRIDGES

208.62 19-Dec-10 12-Jul-12

EM 640

BUSINESS BAY PHASE 1 &2; DISTRICT COOLING PROJECT TO CONSTRUCT, COMPLETE AND MAINTAIN IN THE DEFECTS LIABILITY PERIOD, THE WORKS IN CONNECTION WITH THE ELECTRICAL EQUIPMENT CONCRETE FOUNDATIONS, SEMI-PERMANENT DISTRICT COOLING PLANT (TP10) AND CHILLED WATER PIPE NETWORK

EMPOWER EMPOWER UTILITIES 4.60 21-Sep-10 13-Jan-11

EM 639

JAP014 - JUMEIRAH LAKES TOWERS, JLTE ROADS AND INFRASTRUCTURE

NAKHEEL LLC WILBUR SMITH ASSOCIATES / FAITHFUL+GOULD

ROADS & INFRASTRUCTURE

53.79 26-Aug-10 31-Jul-12

EM 638

DUBAI LAND RESIDENTIAL COMPLEX, SKY COURTS DISTRICT COOLING PROJECTS

EMPOWER EMPOWER UTILITIES 6.50 1-Jul-10 27-Oct-10

EM 637

BUSINESS BAY PHASE 1 &2 D.C. LINE 7, DISTRICT COOLING PROJECT

EMPOWER EMPOWER UTILITIES 3.10 1-Jul-10 18-Sep-10

EM 636

ENGINEERING WORKS FOR DSOA (P-002), RE-PLANNING OF BLOCKS 6 & 27, STORM WATER MITIGATION PLAN & STORAGE SOLUTION

DUBAI SILICON OASIS

KHATIB & ALAMI

UTILITIES

4.70

1-Jul-10

28-Sep-10

Page 33: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 33 Ref: WAME/gc/17

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT

AMOUNT (DHS MN)

DATE OF COMMENCEMENT

COMPLETION DATE

EM 635

PT – 79 DUBAI INDUSTRIAL CITY ROADS & INFRASTRUCTURE, RESUMPTION OF WORKS CONTRACTS 3, 4 & 6 PROPOSED WORKS.

TAMDEEN TECOM INVESTMENTS

CANSULT MAUNSELL LIMITED

ROADS & INFRASTRUCTURE

104.07 01-Mar-10 31-Mar-12

EM 634

CWI 220/2009 SUPPLY, INSTALL TEST AND COMMISSION 100MM TO 450MM WATER DISTRIBUTION NETWORK OF FIBER CEMENT GLASS REINFORCED EPOXY PIPES AT VARIOUS LOCATIONS IN DUBAI INCLUDING CHANGE OF HOUSE CONNECTION AND ASSOCIATED WORKS.

DEWA

NIL

UTILITIES

127.0

04-Nov-09

1-May-12

EM 633

R842/4 IMPROVEMENTS OF AL KHAIL ROAD,ALKHAILROAD - UMMSUQAIM ROAD JUNCTION 17

ROADS & TRANSPORT AUTHORITY

CANSULT MAUNSELL LIMITED

ROAD AND BRIDGE WORKS

308.00

6-Jun-09

6-Jul-10

EM 632

R882/2 IMPROVEMENT OF AL SAFOOH AREA NETWORK ROADS R3 & R5, PARKING AT METRO STATIONS

ROADS & TRANSPORT AUTHORITY

PARSONS DE LEUW CATHER OVERSEAS

ROAD WORKS

46.90

15-Feb-09

15-Jun-09

EM 631

IMPZ ROADS & INFRASTRUCTURE(P-067A), RECTIIFICATION WORKS

TAMDEEN, TECOM INVESTMENTS

HALCROW INTERNATIONAL PARTNERSHIP

INFRASTRUCTURE 1.78 11-Nov-08 3-Jan-09

EM 630

THE PALM JUMEIRAH, GATEWAY TOWERS ROADWAY ACCESS

NAKHEEL LLC

PARSONS DE LEUW CATHER OVERSEAS

ROAD WORKS 78.00 09-Oct-08 7-Apr-09

EM 629

VICTORY HEIGHTS GOLF & RESIDENTIAL DEVELOPMENT, ADDITIONAL DEFERRED ROADS & INFRASTRUCTURE WORKS

VICTORY HEIGHTS DEVELOPMENT

KHATIB & ALAMI INFRASTRUCTURE 29.09 10-Sep-07

28-Feb-10

EM 628

DUBAI HEALTH CARE CITY – PHASE II, VARIATION – ADDITIONAL WORKS

DUBAI HEALTH CASE CITY

PARSONS DE LEUW CATHER OVERSEAS

INFRASTRUCTURE 82.58 10-Aug-08

4-Oct-09

EM 627

BUSINESS BAY DM CORRIDOR, DISTRICT COOLING DISTRIBUTION PIPE NETWORK

EMPOWER MAUNSELL CONSULTANCY UTILITIES 79.14 2-Aug-08 30-Nov-09

EM 626

R 777 / 4A DUBAI CREEK CROSSINGS SEVENTH CROSSING

ROADS & TRANSPORT AUTHORITY

PARSONS DE LEUW CATHER OVERSEAS

BRIDGES & UNDERPASSES

693.01 25-Jun-08 2010

EM 625

PALM JEBEL ALI -NO 23-040-02-03, CONSTRUCTION OF ROADS & INFRASTRUCTURE TO CRESCENT E

NAKHEEL LLC HYDER CONSULTING MIDDLE EAST LTD.

INFRASTRUCTURE 605.82 22-Jun-08 2010

EM 624

1047 VILLA COMPLEX FOR DSOA - PHASE II, INFRASTRUCTURE PACKAGE (P - 009/C)

DUBAI SILICON OASIS

ARCHGROUP INFRASTRUCTURE 145.5 1-Jul-08 2009

EM 623

THE PALM DEIRA, DI FRONT INFRASTRUCTURE WORKS

NAKHEEL LLC WILBUR SMITH ASSOCIATES

INFRASTRUCTURE 49.37 1-Jun-08 2008

EM 622

DS145 - AL BARSHA SOUTH 1 SEWERAGE & DRAINAGE (C 671)

DUBAI MUNICIPALITY

AL TURATH / DR. AHMED ABDEL WARITH CONSULTING ENGINEERS

UTILITIES 229.60 2-Jul-08 2010

EM 621

260 KEY VILLAS AT DUBAILAND / P-103, INFRASTRUCTURE WORKS

DUBAI PROPERTIES MAUNSELL CONSULTANCY INFRASTRUCTURE 20.30 2-Jun-08 2009

EM 620

CONSTRUCTION SERVICES FOR MAIN IRRIGATION TANK & PUMPING STATION IN DUBAILAND TREZ/112

TATWEER DUBAI LLC

KHATIB & ALAMI UTILITIES 161.16 4-May-08 2009

EM 619

THE VILLA @ DUBAI LAND (P 117), REMAINING INFRASTRUCTURE WORKS

DUBAI PROPERTIES MAUNSELL CONSULTANCY INFRASTRUCTURE 209.67 15-Jan-08 2009

EM 618

THE PALM JUMEIRAH, CRESCENT CARRIAGEWAY REINSTATEMENT

NAKHEEL LLC ASSOCIATED CONSULTING ENGINEERS INT'L

ROAD WORKS 38.16 25-Feb-08 30-Jun-08

Page 34: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 34 Ref: WAME/gc/17

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT

AMOUNT (DHS MN)

DATE OF COMMENCEMENT

COMPLETION DATE

EM 617

CIVIL WORKS FOR ACMS, PDC AND SCADA NAKHEEL LLC ASSOCIATED CONSULTING ENGINEERS INT'L

MISC. 9.27 19-Feb-08 15-Sep-08

EM 616

PHASE III EAST, PRECINCTS 2-10: INFRASTRUCTURE - SERVICES AND ROADS

NAKHEEL LLC MOUCHELL PARKMAN INFRASTRUCTURE 304.52 26-Apr-08 2010

EM 615

DUBAI INDUSTRIAL CITY, ROAD & INFRASTRUCTURE

DUBAI INDUSTRIAL CITY

CANSULT LIMITED INFRASTRUCTURE 184.54 16-Feb-08 2009

EM 614

558 KEY VILLAS AT DUBAI LAND P113 DUBAI PROPERTIES CANSULT LIMITED UTILITIES 4.63 26-Jan-08 24-May-08

EM 613

DUBAI SPORTS CITY, VEHICULAR BRIDGE / FILTRATION ROOM, CONTRACT No. DSC/P/5010/07

DUBAI SPORTS CITY LLC

KHATIB & ALAMI BRIDGES & UNDERPASSES

23.26 16-Oct-07 2009

EM 612

R762/3 DUBAI BYPASS PHASE III, AL QUDRA BRIDGE

ROADS & TRANSPORT AUTHORITY

WILBUR SMITH ASSOCIATES

BRIDGES & UNDERPASSES

82.29 4-Dec-07 2009

EM 611

JAP006/PJ THE PALM JUMEIRAH POINTE INFRASTRUCTURE

NAKHEEL LLC ASSOCIATED CONSULTING ENGINEERS (ACE)

INFRASTRUCTURE 59.9 27-Dec-07 11-Mar-08

EM 610

DUBAI WATERFRONT - MADINAT AL ARAB N 018-040-03-02&04 AL OUD DISTRICT A STAGE 1&2,PHASE-3 EAST PRECINCT 1, INFRASTRUCTURE & ROADS

NAKHEEL LLC MOUCHELL PARKMAN INFRASTRUCTURE 22.00 16-Oct-07 13-Mar-08

EM 609

ARABIAN RANCHES DEVELOPMENT RESIDENTIAL VILLAS, DISTRICT 7 (A, B, C & H) PHASE II, INFRASTRUCTURE WORKS AND STREETSCAPE

EMAAR PROPERTIES PJSC

PARSONS INTERNATIONAL LTD

INFRASTRUCTURE 24.382 1-Oct-07 30-Jun-08

EM 608

REMAL HOUSING PROJECT AT DUBAILAND , GRADING PACKAGE

MIZIN DAR BULK EARTHWORKS / GRADING

19.29 10-Sep-07 8-Dec-07

EM 607

CW/119A/2007 SUPPLY, INSTALLATION, TESTING & COMMISSIONONG OF FIBRE CEMENT/ GLASS REINFORCED PLASTIC/GLASS REINFORCED EPOXY/ DUCTILE IRON WATER TRANSMISSION PIPE LINES & ASSOCIATED WORKS AT VARIOUS LOCATIONS IN EMIRATES OF DUBAI (1200 MM DIA

PIPELINE ALONG SHK. ZAYED ROAD)

DUBAI ELECTRICITY & WATER AUTHORITY

DUBAI WATER & ELECTRICITY AUTHORITY

UTILITIES 67.600 8-Jul-07 2009

EM 606

CW/211A/2007 SUPPLY, INSTALLATION, TEST & COMMISSION 100 MM TO 450 MM DIA WATER DISTRIBUTION NETWORK OF FIBRE CEMENT/GLASS REINFORCED PLASTIC/GLASS REINFORCED EPOXY PIPES AT VARIOUS LOCATIONS IN DUBAI INCLUDING CHANGE OF HOUSE CONNECTIONS & ASSOCIATED WORKS

DUBAI ELECTRICITY & WATER AUTHORITY

DUBAI WATER & ELECTRICITY AUTHORITY

UTILITIES 86.38 4-Jul-07 2009

EM 605

P-122 TECOM ROADS IMPROVEMENTS, INFRASTRUCTURE WORKS

DUBAI PROPERTIES PARSONS DE LEUW CATHER OVERSEAS

BRIDGES & UNDERPASSES

87.660 18-Aug-07 2009

EM 604

DUBAI BYPASS PHASE IV - PART 2 ROADS & TRANSPORT AUTHORITY

WILBURTH SMITH ASSOCIATES

ROAD WORKS 361.27 1-Jul-07 2009

EM 603

TIJARRA TOWN (GLOBAL EXCHANGE CITY), INFRASTRUCTURE CONTRACT

DUBAI PROPERTIES MAUNSELL CONSULTANCY SERVICE LTD.

INFRASTRUCTURE 120.81 7-Jul-07 27-Dec-08

Page 35: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 35 Ref: WAME/gc/17

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT

AMOUNT (DHS MN)

DATE OF COMMENCEMENT

COMPLETION DATE

EM 602

N 018-040-03-02 & 04 DUBAI WATERFRONT - MADINAT AL ARAB AL OUD DISTRICT A - CONSTRUCTION COMPLETION AND MAINTENANCE OF INFRASTRUCTURE & ROAD WORK -AL OUD DISTRICT A (STAGE 1 & 2)

NAKHEEL LLC MOUCHELL PARKMAN INFRASTRUCTURE 325.52 26-Jul-07 2009

EM 601

R880 DEVELOPMENT OF MIRDIF INTERCHANGE ROADS & TRANSPORT AUTHORITY

AL BURJ AFRICON BRIDGES & UNDERPASSES

213.66 15-May-07 10-Jul-07

EM 600

THE PALM JUMERIAH, CRESCENT SEWER SYSTEM & OTHER SERVICES

NAKHEEL LLC ASSOCIATED CONSULTING ENGINEER INT'L (ACE)

UTILITIES 136.35 3-May-07 1-Aug-08

EM 599

DSO VILLA COMPLEX - PHASE 2, GRADING WORKS

DUBAI SILICON OASIS ARCHGROUP CONSULTANTS

BULK EARTHWORKS / GRADING

28.97 1-May-07 28-Aug-07

EM 598

DS 164 SEWAGE PUMPING STATION (SN) AND ITS NEW RISING MAINS

DUBAI MUNICIPALITY KHATIB & ALAMI UTILITIES 540.68 1-May-07 2010

EM 597

INSTALLATION & COMMISSIONING OF 11 KV CABLES

DUBAI ELECTRICITY & WATER AUTHORITY

NIL UTILITIES 10.80 11-Mar-07

EM 596

P-123/M2035 MUDON P-123, ROADS AND INFRASTRUCTURE PACKAGE A

DUBAI PROPERTIES MAUNSELL CONSULTANCY

INFRASTRUCTURE 258.00 17-Feb-07 2008

EM 595

N035-40-01-C-040 DUBAI MARITIME CITY, INFRASTRUCTURE CONTRACT NO. 3 (CP 404)

NAKHEEL LLC MOUCHELL PARKMAN INFRASTRUCTURE 360.23 15-Feb-07 2009

EM 594

DUBAI SPORTS CITY - AREAS 1,2 & 4, SEWERAGE TREATMENT PLANT CIVIL WORKS

M/S. EAGLE ELECTRO MECHANICAL COMPANY

HYDER CONSULTING MISC. 18.12 2-Jan-07 2009

EM 593

DI-OPC-CONTRACT-INF-01-07-002 DUBAI INDUSTRIAL CITY - PHASE I, ROADS AND INFRASTRUCTURE (CONTRACT 4)

DUBAI INDUSTRIAL CITY

CANSULT LIMITED INFRASTRUCTURE 303.21 16-Jan-07 2008

EM 592

DI-OPC-CONTRACT-INF-01-07-002 DUBAI INDUSTRIAL CITY - PHASE I ROADS AND INFRASTRUCTURE (CONTRACT 3)

DUBAI INDUSTRIAL CITY

CANSULT LIMITED INFRASTRUCTURE 362.52 16-Jan-07 2008

EM 591

MIRDIF BUILDINGS, ROADS & INRASTRACTURE WORKS

DUBAI PROPERTIES CANSULT INFRASTRUCTURE 124.960 26-Nov-06 13-Oct-07

EM 590

DUBAI STUDIO CITY - BOUTIQUE STUDIOS, URBAN SETTLEMENT AND INFRASTRUCTURE

DUBAI TECHNOLOGY & MEDIA FREE ZONE AUTHORITY

MAUNSELL CONSULTANCY PVT LTD.

INFRASTRUCTURE 23.21 2-Jan-07 15-Jun-07

EM 589

DUBAI HEALTH CARE CITY PHASE II, ROADS & SERVICES (AREAS 4 & 5)

SAMA DUBAI L.L.C. PARSONS DE LEUW CATHER OVERSEAS LIMITED

INFRASTRUCTURE 41.83 12-Dec-06 9-Nov-07

EM 588

DUBAI SPORTS CITY, CANAL INFASTRUCTURE & BRIDGES

DUBAI SPORTS CITY LLC

KHATIB & CRACKNELL BRIDGES & UNDERPASSES

57.02 2-Jan-07 2008

EM 587

ARABIAN RANCHES DEVELOPMENT DISTRICT - 6 (A,B,C,D,E & F) INFRASTRUCTURE WORKS PHASE II

EMAAR PROPERTIES PJSC

PARSONS INTERNATIONAL LTD

INFRASTRUCTURE 22.71 20-Sep-06 19-Sep-07

EM 586

R/882/2 IMPROVEMENT OF AL SAFOOH AREA NETWORK ROADS R3 & R5

ROADS & TRANSPORT AUTHORITY

PARSONS DE LEUW CATHER

BRIDGES & UNDERPASSES

312.01 18-Sep-06 2009

EM 585

ACACIA GARDENS TECOM SITE ABYAAR REAL INVESTMENT DEVELOPMENT

MAUNSELL CONSULTANCY SERVICES LTD

INFRASTRUCTURE 12.37 19-Oct-06 15-Jun-07

Page 36: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 36 Ref: WAME/gc/17

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT

AMOUNT (DHS MN)

DATE OF COMMENCEMENT

COMPLETION DATE

EM 584

ARABIAN RANCHES DEVELOPMENT DISTRICT - 7 (D,E,FG)

EMAAR PROPERTIES PJSC

PARSONS INTERNATIONAL LTD

INFRASTRUCTURE 54.49 2-Sep-06 1-Sep-07

EM 583

P-088 DUBAI STUDIO CITY, ROADS AND INFRASTRUCTURE - PHASE 1

DUBAI TECHNOLOGY & MEDIA FREE ZONE AUTHORITY

HOK INFRASTRUCTURE 40.57 2-Sep-06 3-Mar-07

EM 582

JAP006-C105 THE PALM JUMEIRAH BRIDGES AND VIADUCTS & RAMP ADDITIONAL WORKS FOR FRONDS L,M & O

NAKHEEL LLC PARSONS DE LEUW CATHER

BRIDGES & UNDERPASSES

57.36 19-Aug-06 31-Jan-07

EM 581 SD-0411.B.47 DUBAI HEALTH CARE CITY PHASE II ROADS & SERVICES (AREAS 1,2 & 3)

SAMA DUBAI L.L.C. HALCROW INTERNATIONAL PARTNERSHIP

INFRASTRUCTURE 140.47 5-Aug-06 28-Oct-07

EM 580

P-103 254 KEY VILLAS AT DUBAILAND/ P-103, INFRASTRUCTURE CONTRACTS

DUBAI PROPERTIES MAUNSELL CONSULTANCY SERVICES LTD.

INFRASTRUCTURE 1.55 20-May-06 18-Dec-06

EM 579

P-125 GLOBAL BUSINESS EXCHANGE CITY DUBAI PROPERTIES MAUNSELL CONSULTANCY

BULK EARTHWORKS / GRADING

22.12 28-Oct-06 24-Feb-07

EM 578

ARABIAN RANCHES DEVELOPMENT, INFRASTRUCTURE WORKS-PHASE II, DISTRCIT 5A & B

EMAAR PROPERTIES PJSC

PARSONS INTERNATIONAL LTD.

INFRASTRUCTURE 25.31 1-Jul-06 27-Dec-06

EM 577

558 VILLAS AT DUBAILAND / P-113, ROAD & INFRACTURE WORKS

DUBAI PROPERTIES CANSULT LIMITED INFRASTRUCTURE 52.92 12-Sep-07 8-Aug-08

EM 576

DIP-0410.B.47 LA VILLE CONTEMPORAINE - THE LAGOONS, ROADS & SERVICES (AREA 2)

DUBAI INTERNATIONAL PROPERTIES

HALCROW INTERNATIONAL PARTNERSHIP

INFRASTRUCTURE 63.63 1-Jul-06 15-May-07

EM 575

R800/2A DIRECTIONAL RAMPS AT WIMPY INTERCHANGE

ROADS & TRANSPORT AUTHORITY

DE LEUW CATHER OVERSEAS LTD.

BRIDGES & UNDERPASSES

67.3 20-May-06 19-May-07

EM 574

CW/347/2004 DEVELOPMENT OF F.C. WATER DISTRIBUTION PIPELINES NETWORKS OF WIAMETERS VARYING FROM 100 TO 300 MM IN VARIOUS PARTS OF DUBAI

DUBAI ELECTRICITY & WATER AUTHORITY

NIL UTILITIES 56.568 5-Apr-06 4-Jun-08

EM 573

R882/1 IMPROVEMENTS OF AL SAFOOH AREA ROAD NETWORK ROADS R1 & R2

ROADS & TRANSPORT AUTHORITY SYSTRA MV

BRIDGES & UNDERPASSES

185.74 20-May-06 30-Nov-07

EM 572

P-088 DUBAI STUDIO CITY DUBAI TECHNOLOGY & MEDIA FREE ZONE AUTHORITY

HOK BULK EARTHWORKS / GRADING

7.62

1-Apr-06

29-Jul-06

EM 571

WIDENING OF AL QUDRA ROAD TATWEER DUBAI LLC PARSONS DE LEUW CATHER

ROAD WORKS 43.25 11-Mar-06 5-Nov-06

EM 570

DIRECT ACCESS OF SHEIK ZAYED ROAD TO IBN BATTUTA MALL

NAKHEEL LLC SYSTRA MV ROAD WORKS 13.13 29-Jul-06 25-Jan-07

EM 569

DISTRICT 3B - ARABIAN RANCHES DEVELOPMENT INFRASTRUCTURE WORKS - PHASE II

EMAAR PROPERTIES PJSC

PARSONS INTERNATIONAL LTD

INFRASTRUCTURE 28.18 20-Feb-06 18-Aug-06

EM 568

P 117 THE VILLA @ DUBAI LAND ROAD & INFRASTRUCTURE

DUBAI PROPERTIES MAUNSELL CONSULTANCY

INFRASTRUCTURE 168.23 15-Jul-06 13-Oct-07

EM 567

VH01/C02 VICTORY HEIGHTS GOLF & RESIDENTIAL DEVELOPMENT (ROADWORKS &

VICTORY HEIGHTS GOLF RESIDENTIAL &

KHATIB & ALAMI CONSOLIDATED

INFRASTRUCTURE 120.95 2-May-06 20-Feb-08

Page 37: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 37 Ref: WAME/gc/17

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT

AMOUNT (DHS MN)

DATE OF COMMENCEMENT

COMPLETION DATE

INFRASTRUCTURE WORKS) DEVELOPMENT LLC ENGINEERING CO.

EM 566

DUBAI SPORTS CITY, AREAS 1,2 & 4 INFRASTRUCTURE WORKS

DUBAI SPORTS CITY LLC

KHATIB & ALAMI CONSOLIDATED ENG. CO

INFRASTRUCTURE 137.33 11-Feb-06 5-Jul-07

EM 565

P-100/1 MIRDIF VILLAS ROAD & INFRASTRUCTURE

DUBAI PROPERTIES CANSULT LIMITED INFRASTRUCTURE 86.332 22-Jan-06 2009

EM 564

THE VILLA AT DUBAI LAND (PACKAGE: EARTHWORKS)

DUBAI PROPERTIES MAUNSELL CONSULTANCY

BULK EARTHWORKS / GRADING

32.28 14-Jan-06 12-Jul-06

EM 563

JAP 003 IBN BATTUTA MALL - ROADWORKS, PARKING & SIGNALISED JUNCTION

NAKHEEL LLC PARSONS INTERNATIONAL LTD

ROAD WORKS 9.7 10-Dec-05 9-Apr-06

EM 562

INFRASTRUCTURE WORKS - PHASE 2 FOR DSO SITE (P012)

DUBAI SILICON OASIS KHATIB AND ALAMI INFRASTRUCTURE 84.72 1-Oct-05 31-Aug-06

EM 561

DUBAI INTERNATIONAL FINANCIAL CENTRE IP02 & IP06/08 WESTERN ROAD AND SERVICE DIVERSION

DUBAI INTERNATIONAL FINANCIAL CENTRE

MAUNSELL CONSULTANCY

INFRASTRUCTURE 55.67 24-Sep-05 24-Sep-06

EM 560

ARABIAN RANCHES DEVELOPMENT INFRASTRUCTURE WORKS TO DISTRICT 4A & B

EMAAR PROPERTIES PJSC

PARSON INTERNATIONAL LTD

INFRASTRUCTURE 21.36 20-Jul-05 15-Jan-06

EM 559

R659/10 IMPROVEMENT OF INTERCHANGE NO. 5 DUBAI MUNICIPALITY DE LEUW CATHER OVERSEAS

BRIDGES & UNDERPASSES

304.50 5-Jul-05 19-May-07

EM 558

P447FZ FREE ZONE SOUTH INFRASTRUCTURE, PHASE 3B

PORTS, CUSTOMS & FREE ZONE CORPORATION

KHATIB & ALAMI

ROAD WORKS

45.73 2-Jul-05 1-Jul-06

EM 557

INTERNATIONAL MEDIA PRODUCTION ZONE/P-067A

DUBAI TECHNOLOGY & MEDIA FREE ZONE AUTHORITY

HALCROW INFRASTRUCTURE 244.1 2-Jul-05 21-Jun-07

EM 556

ARABIAN RANCHES DEVELOPMENT DISTRICT 7, INFRASTRUCTURE WORKS, DEEP SERVICES, SECTOR E,G, & H

EMAAR PROPERTIES PJSC

PARSONS INTERNATIONAL LIMITED

INFRASTRUCTURE 20.20 25-Apr-05 21-Aug-05

EM 555

PP20 GATE PRECINCT WEST ROAD EXTENSION DUBAI INTERNATIONAL FINANCIAL CENTRE

TURNER INTERNATIONAL

ROAD WORKS 4.57 18-Jun-05 3-Nov-05

EM 554

R 572/1- ROADS IN AL HAMAR, PHASE 2 DUBAI MUNICIPALITY HYDER CONSULTING M.E. LTD.

ROAD WORKS 47.73 23-May-05 17-May-06

EM 553

INFRASTRUCTURE WORKS TO DISTRICT 3A - ARABIAN RANCHES DEVELOPMENT

EMAAR PROPERTIES PJSC

PARSONS INFRASTRUCTURE 6.67 28-Apr-05 21-Aug-05

EM 552

DUBAI SPORTS CITY ADVANCE GRADING WORKS

DUBAI SPORTS CITY LLC

KHATIB & ALAMI BULK EARTHWORKS / GRADING

23.04 24-Apr-05 22-Jul-05

EM 551

VILLA COMPLEX FOR DUBAI SILICON OASIS PHASE 1 (P-006/C)

DUBAI SILICON OASIS ARCHON INFRASTRUCTURE 36.02 19-Feb-05 19-Feb-06

EM 550

ENGINEERING WORKS FOR DUBAI SILICON OASIS/P(010)

DUBAI SILICON OASIS KHATIB AND ALAMI INFRASTRUCTURE 146.59 19-Feb-05 19-Feb-06

EM 549

DUBAI INTERNATIONAL FINANCIAL CENTRE - IP01/01 INTERIM SERVICES DIVERSION

DUBAI INTERNATIONAL FINANCIAL CENTRE

MAUNSEL CONSULTANCY

UTILITIES 21.00 30-Jan-05 20-Dec-05

EM 548

JUMEIRAH BEACH RESIDENCE PE049/2 PACKAGE - ROADS AND INFRASTRUCTURE

DUBAI TECHNOLOGY & MEDIA FZA

DESIGN AND ARCHITECTURE (DAR)

MISC. 11.15 15-Jan-05 14-Jul-05

EM 547

IBN BATTUTA MALL (PREVIOUSLY THE GARDEN SHOPPING MALL)

NAKHEEL LLC

PARSONS/ PROJECT MANAGEMENT TURNER INT’L

MISC. 21.18 4-Jan-05 31-May-05

Page 38: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 38 Ref: WAME/gc/17

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT

AMOUNT (DHS MN)

DATE OF COMMENCEMENT

COMPLETION DATE

EM 546

INFRASTRUCTURE WORKS TO DISTRICT 6- ARABIAN RANCHES DEVELOPMENT

EMAAR PROPERTIES PJSC

PARSONS INTERNATIONAL

INFRASTRUCTURE 18.48 10-Nov-04 9-May-05

EM 545

CITY OF ARABIA- EARTHWORKS CONTRACT REF. 3727 (D)/6.1/04/004

ILYAS AND MUSTAFA GALADARI MANAGEMENT INVESTMENT & DEVELOPMENT LLC

P&T ARCHITECTS AND ENGINEERS LTD.

BULK EARTHWORKS / GRADING

21.36

28-Oct-04

7-Mar-05

EM 542

R 757/3 AL QUDRA BRIDGE DUBAI MUNICIPALITY ITAL CONSULT BRIDGES & UNDERPASSES

19.65 8-Sep-04 4-Feb-05

EM 541

JUMEIRAH BEACH RESIDENCE (P055) PACKAGE NO. 0522-SITE WIDE INFRASTRUCTURE AND UTILITIES

DUBAI TECHNOLOGY & MEDIA FREE ZONE AUTHORITY

CANSULT INFRASTRUCTURE 85.37 20-Nov-04 12-Feb-06

EM 540

ENGINEERING WORKS FOR DUBAI SILICON OASIS "DSO"-GRADING WORKS FOR DSO REMAINING AREA

DUBAI SILICON OASIS KHATIB & ALAMI BULK EARTHWORKS / GRADING

11.39 1-Aug-04 28-Jan-05

EM 538

EMIRATES LIVING DEVELOPMENT DM LATERAL ROAD

EMAAR PROPERTIES PJSC

PARSONS INTERNATIONAL

ROAD WORKS 11.56 15-May-04 14-Oct-04

EM 537

ARABIAN RANCHES DEVELOPMENT INFRASTRUCTURE DISTRICT #8

EMAAR PROPERTIES PJSC

NIL INFRASTRUCTURE 12.41 3-May-04 30-Oct-04

EM 536

ENGINEERING WORKS FOR DUBAI SILICON OASIS 'DSO' - ADDITIONAL AREA GRADING /P005

DUBAI SILICON OASIS KHATIB & ALAMI BULK EARTHWORKS / GRADING

10.75 21-Apr-04 18-Oct-04

EM 535

CW/062/2003 SUPPLY, INSTALL, DISTRIBUTION A.C. PIPELINES NETWORK FROM 100 MM TO 300 MM AT VARIOUS LOCATIONS IN DUBAI

DUBAI ELECTRICITY & WATER AUTHORITY

UTILITIES 52.23 24-Mar-04 13-May-06

EM 534

JAP014-C02 DMCC INDUSTRIAL AREA AND JUMEIRAHLAKE TOWERS INFRASTRUCTURE & LANDSCAPING

NAKHEEL LLC WILBUR SMITH ASSOCIATES

INFRASTRUCTURE 324.83 24-Apr-04 2009

EM 533

ENGINEERING WORKS FOR DUBAI SILICON OASIS FAST TRACK GRADING

DUBAI SILICON OASIS KHATIB & ALAMI BULK EARTHWORKS / GRADING

0.97 29-Feb-04 29-Apr-04

EM 532

JAP 006-C105 THE PALM JUMEIRAH BRIDGES VIADUCTS AND RAMPS

NAKHEEL LLC PARSONS, BRIDGES & UNDERPASSES

48.66 10-Apr-04 4-Feb-05

EM 530

R 757/2 PALM ISLAND (JUMEIRAH)M ROAD CORRIDOR AND ACCESS SCHEME

DUBAI MUNICIPALITY DELEUW CATHER OVERSEAS LTD.

BRIDGES & UNDERPASSES

234.50 7-Jun-04 28-Jan-06

EM 529

JAP001-022 - THE GARDENS INTERCHANGE NAKHEEL LLC DE LEUW CATHER OVERSEAS LTD

BRIDGES & UNDERPASSES

59.20 2-Oct-03 30-Sep-04

EM 527

ALTERNATE ROUTE FOR SHARJAH TO RAS AL KHAIMAH ROAD CONTRACT 1

MINISTRY OF PUBLIC WORKS & HOUSING

HALCROW INTERNATIONAL

ROAD WORKS 184.86 18-Jun-03 27-May-05

EM 523

EMIRATES HILLS DEVELOPMENT THE SPRINGS PHASE 1 & THE MEADOWS PHASE 2 - INFRASTRUCTURE WORKS

EMAAR PROPERTIES PJSC

PARSONS INTERNATIONAL LTD.

INFRASTRUCTURE 68.41 9-Jan-03 8-Feb-04

EM 514

JAP 005 JUMEIRAH ISLANDS, PACKAGE 2 INFRASTRUCTURE WORKS

NAKHEEL LLC PARSONS INTERNATIONAL

INFRASTRUCTURE 114.46 21-Apr-02 30-Jun-04

EM 511

DS 117/3 MAIN PUMPING STATION "K", PHASE III

DUBAI MUNICIPALITY KHATIB & ALAMI AND METCALF & EDDY INTERNATIONAL INC.

UTILITIES 72.21 2-Mar-02 1-Mar-04

Page 39: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 39 Ref: WAME/gc/17

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT

AMOUNT (DHS MN)

DATE OF COMMENCEMENT

COMPLETION DATE

CWIP 115

LABOUR ACCOMODATION AT JEBEL ALI, BLOCK B - PHASE II

WADE ADAMS PORT SAEED ENGINEERING

BUILDING 12.2 15-Dec-05 15-Jul-06

CWIP 114

LABOUR ACCOMODATION AT JEBEL ALI BLOCK B (4 NOS.)

WADE ADAMS - BUILDING 14 1-Feb-05 31-Oct-05

Page 40: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 40 Ref: WAME/gc/17

WADE ADAMS SHARJAH (LLC)

Category Total Value (DHS MN)

Bulk Earthworks/Grading 7 602.06

Infrastructure 6 526.11

Misc. 1 125.38

Road Works 16 545.61

Utilities 4 73.35

Grand Total 34 1,872.51

Bulk Earthworks/Grading, 7

Infrastructure, 6

Misc, 1

Road Works, 16

Utilities, 4

Note: Project details are for the Wade Adams Sharjah LLC projects (completed and ongoing) commencing October 2002

Page 41: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 41 Ref: WAME/gc/17

List of Completed Projects

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT

AMOUNT (DHS MN)

DATE OF COMMENCEMENT

ORIGINAL COMPLETION

DATE

SH 134

SHARJAH INTERNATIONAL AIRPORT NEW RUNWAY AT 250M SEPARATION, MAIN CIVIL WORKS AND AIRSIDE SYSTEMS PACKAGE

GOVT. OF SHARJAH DEPARTMENT OF CIVIL AVIATION

HALCROW INTERNATIONAL PARTNERSHIP

EARTHWORKS 436.74 1-Dec-11 31-Jan-14

SH 133 SASCO EXPANSION PROJECT SHJ/007/TC02, ADDITIONAL STORAGE FACILITIES FOR SASCO DEPOT AT SIA

SHARJAH AVIATION SERVICES COMPANY LLC (SASCO)

MOTT MACDONALD LTD. UTILITIES 28.00 22-Aug-11 2012

SH 132 SHARJAH INTERNATIONAL AIRPORT, NEW RUNWAY AT 250M SEPARATION, ADVANCE PACKAGE

SHARJAH AIRPORT AUTHORITY

HALCROW INTERNATIONAL PARTNERSHIP

EARTHWORKS 77.790 24-Feb-11 2011

SH 131 CONTRACT R201 INTERNAL ROADS IN RAMLA AREA

SHARJAH MUNICIPALITY

HALCROW INTERNATIONAL PARTNERSHIP

ROAD WORK 61,800

04-Jan-10

2011

SH 130

HAMRIYAH DEEPWATER HARBOUR STORAGE YARDS

SHARJAH PORTS AUTHORITY

HALCROW INTERNATIONAL PARTNERSHIP

INFRASTRUCTURE

123.558 05-Mar-08

2009

SH 129 ROADS & DRAINAGE IN TURFANA AND RIFAA

SHARJAH MUNICIPALITY

HALCROW INTERNATIONAL PARTNERSHIP

INFRASTRUCTURE 201.10 5-Mar-08 2009

SH 128 SHARJAH INTERNATIONAL AIRPORT, APRON EXPANSION PROJECT

SHARJAH AIRPORT AUTHORITY

HALCROW INT’L PARTNERSHIP

MISC. 125.38 1-May-07

2009

SH 127 R447 ROADS IN AL SHAHBA AND AL DARARI

SHARJAH MUNICIPALITY

HALCROW INTERNATIONAL PARTNERSHIP

ROAD WORKS 120.46 14-May-06 3-Jan-08

SH 126 STARS ISLAND DEVELOPMENT - ADVANCED EARTHWORKS

AL HANOO HOLDING COMPANY

HALCROW INTERNATIONAL PARTNERSHIP

BULK EARTHWORKS / GRADING

32.45 29-Jun-05 27-Nov-05

SH 125 ROADS & WATER WORKS FOR AREA II - TENDER ED1150 SAIF-ZONE

SHARJAH AIRPORT INTERNATIONAL FREEZONE

MAUNSELL CONSULTANCY INFRASTRUCTURE 156.45 1-Oct-06 31-Mar-06

SH 124 UMM AL QUWAIN INDUSTRIAL AREA AL TAMMER REAL ESTATE EST.

HALCROW INTERNATIONAL PARTNERSHIP

ROAD WORKS 42.71 3-Mar-05 3-Mar-06

SH 123 CONTRACT R 473 RAHMANIYA AREA DEVELOPMENTS

DIRECTORATE OF PUBLIC WORKS - SHARJAH

HALCROW INTERNATIONAL PARTNERSHIP

BULK EARTHWORKS / GRADING

46.72 4-Feb-05 6-Dec-05

SH 122

ED 1136 SEWERAGE, IRRIGATION, WATER AND LANDSCAPE WORKS FOR AREA 1- SCOPE IRRIGATION AND WATER NETWORK AREA 1

SHARJAH AIRPORT INTERNATIONAL FREEZONE

MAUNSELL CONSULTANCY UTILITIES 16.62 29-Jan-05 29-Jun-05

SH 121 R403 AL FALAJ AREA ROADS SHARJAH MUNICIPALITY

HALCROW INTERNATIONAL PARTNERSHIP

ROAD WORKS 32.43 13-Oct-04 12-Aug-05

SH 119 AL SUBAIKHA AREA - FOUL DRAINAGE SHARJAH MUNICIPALITY

HALCROW INTERNATIONAL PARTNERSHIP

UTILITIES 25.12 6-Sep-04 6-Sep-05

SH 118 CAR RACE TRACK

HH SHEIK MARWAN BIN RASHID AL MUALLA, CHAIRMAN OF LAND DEPT, CAR RACE CLUB

NIL ROAD WORKS 1.65 17-Jul-04 17-Aug-04

SH 117

A- SUPPLY/INSTALLATION SEWAGE & WATER PIPES FOR AREA 42 / B- SUPPLY/INSTALLATION DRAINAGE & IRRIGATION WORKS-PHASE 1

SAIF ZONE ENGINEERING DEPT

NIL UTILITIES 3.61 1-May-04 14-Aug-04

SH 116 CONTRACT R404 AL JAZZAT AREA ROADS

SHARJAH MUNICIPALITY

HALCROW INTERNATIONAL PARTNERSHIP

ROAD WORKS 46.45 26-May-04 26-May-05

Page 42: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 42 Ref: WAME/gc/17

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT

AMOUNT (DHS MN)

DATE OF COMMENCEMENT

ORIGINAL COMPLETION

DATE

SH 115 CONTRCT R 416 - EARTHWORKS AT DHAID ROAD

DIRECTORATE OF PUBLIC WORKS - SHARJAH

HALCROW INTERNATIONAL PARTNERSHIP

BULK EARTHWORKS / GRADING

0.61 17-Feb-04 17-Apr-04

SH 114

CONTRACT R 132 - AL NAHDA LINK ROAD TO JUNCTION 8 E

DIRECTORATE OF PUBLIC WORKS - SHARJAH

HALCROW INTERNATIONAL PARTNERSHIP

ROAD WORKS

154.13

4-Mar-04

23-May-05

SH 113 CONSTRUCTION OF ROADS IN AREA A2 AT SAIF ZONE

SAIF ZONE ENGINEERING DEPT

SAIF ZONE ROAD WORKS 4.43 1-Mar-04 31-May-04

SH 112 SHARJAH SHOOTING CLUB SHEIKH ABDULLAH AL THANI

GODWIN AUSTEN JOHNSON - AL KHATIB CRACKNELL

ROAD WORKS 1.93 1-Jul-03 31-Mar-04

SH 111 CONSTRUCTION OF 10 KILOMETER ROADS IN NEW SAIF -ZONE EXTENSION AREA

SHARJAH AIRPORT INTERNATIONAL FREEZONE

HORIZON CONSULTING ENGINEERS

ROAD WORKS 9.14 27-Jul-03 1-Jun-03

SH 110 CONTRACT R 249 KHORFAKKAN POWER STATION ROAD UPGRADING

DIRECTORATE OF PUBLIC WORKS - SHARJAH

HALCROW INTERNATIONAL PARTNERSHIP

ROAD WORKS 13.70 17-Jun-03 17-Jun-03

SH 109 INDUSTRIAL AREA 18 - INFRASTRUCTURE DEVELOPMENT

AL NOUF REAL ESTATE KHATIB & ALAMI INFRASTRUCTURE 35.28 1-Jun-03 1-Apr-03

SH 108 SHARJAH INSTITUTE OF TECHNOLOGY - INFRASTRUCTURE WORKS FOR MALE CAMPUS

DIRECTORATE OF PUBLIC WORKS - SHARJAH

HALCROW INTERNATIONAL PARTNERSHIP

INFRASTRUCTURE 5.16 3-Nov-02 21-Dec-02

SH 107 SHARJAH INSTITUTE OF TECHNOLOGY - INFRASTRUCTURE WORKS FOR NURSING COLLEGE

SHARJAH ELECTRICITY & WATER AUTHORITY

HALCROW INTERNATIONAL PARTNERSHIP

INFRASTRUCTURE 4.32 3-Nov-02 21-Dec-02

SH 106 KALBA LAGOON - EARTH WORKS/EDGE WALL

DIRECTORATE OF PUBLIC WORKS - SHARJAH

HALCROW INTERNATIONAL PARTNERSHIP

BULK EARTHWORKS / GRADING

5.41 14-Aug-02 12-Mar-03

SH 105 CONSTRUCTION OF PERIMETER ROADS OF 6 KMS SHARJAH AIRCRAFT PARKING

SHARJAH AIRPORT AUTHORITY

N/A ROAD WORKS 1.55 27-Feb-02 27-Jun-02

SH 105 CONSTRUCTION OF PERIMETER ROADS OF 6 KMS SHARJAH (1 LPO) / AIRCRAFT PARKING (2 LPOs)

SHARJAH AIRPORT AUTHORITY

N/A ROAD WORKS 1.54 27-Feb-02 25-May-02

SH 104 SHARJAH INSTITUTE OF TECHNOLOGY- ADVANCED EARTHWORKS

RULER’S OFFICE HALCROW INTERNATIONAL PARTNERSHIP

BULK EARTHWORKS / GRADING

2.33 13-Feb-02 3-Jun-02

SH 103 FREIGHT TERMINAL MAIN GATE ROAD WORKS

SHARJAH AIRPORT AUTHORITY

HORIZON CONSULTING ENGINEERS

ROAD WORKS 0.71 13-Jan-02 15-Mar-02

SH 102 (EM 506)

EXTERNAL WORKS CONTRACT FOR SHARJAH WORLD TRADE & EXPO CENTRE

DIRECTORATE OF PUBLIC WORKS - SHARJAH

CANSULT LTD. ROAD WORKS 11.40 30-Sep-01 20-Apr-02

SH 101 R 234 ROADS IN INDUSTRIAL AREA 1 TO 6 SHARJAH MUNICIPALITY

HALCROW INTERNATIONAL PARTNER SHIP

ROAD WORKS 41.58 8-Aug-01 16-Nov-02

Page 43: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 43 Ref: WAME/gc/17

HILAL BIL BADI & PARTNERS CONTRACTING COMPANY WLL

Category Total Value (DHS MN)

Bridges & Underpasses 3 221.25

Building 5 564.03

Bulk Earthworks / Grading 10 272.01

Infrastructure 18 2,757.31

Marine Works 3 224.84

Misc. 10 154.57

Road Works 17 648.07

Utilities 8 889.04

Roads & Infrastructure 8 1,203.31

Grand Total 73 6,934.43

Bridges & Underpasses, 3

Building, 5

Bulk Earthworks / Grading, 10

Infrastructure, 18 Marine Works, 3

Misc, 10

Road Works, 17

Utilities, 8 Roads & Infrastructure, 8

Note: Project details are for the Hilalco projects (completed and ongoing) commencing October 2002.

Page 44: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 44 Ref: WAME/gc/17

List of Ongoing Projects

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT

AMOUNT (DHS MN)

DATE OF COMMENCEMENT

ORIGINAL COMPLETION

DATE

AD 539

DESIGN AND BUILD APRON EXPANSION AND TAXIWAYS WIDENING AT AL AIN INTERNATIONAL AIRPORT

ABU DHABI AIRPORTS COMPANY (ADAC)

ADAC AIRPORT WORKS 12.84 07-Nov-16 28-Feb-17

AD 538

GRADING OF PLOT AND CONSTRUCTION OF GATCH ROAD AT KIZAD

TWOFOUR54 FZ-LLC TWOFOUR54 FZ-LLC GRADING WORKS 0.30 07-Sep-16 30-Nov-16

AD 537

AL FORSAN SEWAGE AND TSE CONNECTIONS AL FORSAN REAL ESTATE WS ATKINS & PARTNERS OVERSEAS

UTILITIES 17.93 17-Sep-16 15-May-17

AD 536

ENABLING WORKS FOR NORTH AL WATHBA ZONE 1

ABU DHABI SERVICES PJSC (TRADING AS MUSANADA)

WS ATKINS / ALTORATH INT’L ENG. ONSULTANT LTD.

ENABLING WORKS 79.95 18-Sep-16 17-Sep-17

AD 535

U.A.E. NUCLEAR POWER PLANT PROJECT (UNPP) - PAVEMENT WORK FOR CP-12 AREA

HYUNDAI ENG. & CONST CO. LTD. AND SAMSUNG C&T CORP. CONST. J.V. (HSJV)

HSJV ROAD WORKS 12.22 18-Apr-16 31-Oct-17

AD 534

PHASE 1 UTILITY WORKS FOR TAWAZUN INDUSTRIAL PARK IN AL AJBAN, ABU DHABI RFP: TIP/PED2085/CPD/ADZ/15

TAWAZUN INDUSTRIAL PARK (TIP)

PARSONS INTER. LTD

UTILITIES 64.85 03-Apr-16 02-Apr-17

AD 533

MRHE-22 HTA: INFRASTRUCTURE WORKS FOR 346 VILLAS AT MAKAN, HATTA, U.A.E.

MOHAMMED BIN RASHID HOUSING EST.

JOUZY CONSULTING ENGINEERS

INFRASTRUCTURE WORKS

113.97 24-Mar-16 21-Feb-17

AD 532

INTERNAL ROADS AND INFRASTRUCTURE FOR THE NEW RESIDENTIAL LANDS IN AL MAQTAA CHANNEL IN ABU DHABI

ABU DHABI CITY MUNICIPALITY

AECOM ROAD & INFRASTRUCTURE

112.41 13-Mar-16 03-Sep-17

AD 531

CONTRACT NO. 6103-203 LANDSIDE CONSTRUCTION WORKS FOR THE NEW DELMA COMMERCIAL PORT

ABU DHABI PORTS COMPANY (ADPC)

HSJV INFRASTRUCTURE & BUILDING WORKS

69.89 30-Dec-15 29-Dec-16

AD 530

YAS ISLAND DEVELOPMENT WEST YAS PAVEMENT CONSTRUCTION

NATIONAL WHEEL J&P LLC KELLOGG BROWN & ROOT SERVICES

PAVEMENT WORKS 9.80 01-Jan-16 31-Mar-16

AD 529

ASPHALT WORKS FOR ZIRKU AIRPORT RUNWAY EXTENSION AT ZIRKU ISLAND

AUH MARINE OPERATING COMPANY (ADMA OPCO) / ARCHIRODON CONST. (OVERSEAS) CO. S.A.

ARCHIRODON CONSTRUCTION (OVERSEAS) CO. S.A.

ROAD WORKS 2.79 TBA TBA

AD 528

P042 SIR BANI YAS ISLAND, PACKAGE: C64 DESIGN AND CONSTRU-CTION OF COASTAL PROTECTION MAIN WORKS, NORTH BEACH AND NORTH MARINA.

TOURISM DEVELOPMENT & INVESTMENT COMPANY (TDIC)

WORLEY PARSONS ENGINEERING PVT LTD

MARINE WORKS 209.87 23-Jul-15 23-Oct-16

AD 527

BARAKAH NUCLEAR POWER PLANT (BNPP), U.A.E. STEEL STRUCTURAL WORKS

HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD. AND SAMSUNG C&T CORPORATION CONSTRUCTION J.V. (HSJV)

HSJV STRUCTURAL WORKS 12.23 01-Jun-15 31-Jan 17

AD 521

ROAD, INFRASTRUCTURE AND PUBLIC REALM FOR SECTOR E-25 - PHASE 1

ABU DHABI CITY MUNICIPALITY

AECOM / HYDER CONSULTING

ROAD AND INFRASTRUCTURE WORKS

69.99 TBA TBA

AD 520

SB-02 SAADIYAT BEACH VILLAS INFRASTRUCTURE WORKS - CONTRACT NO.P137-C01.

TOURISM DEVELOPMENT & INVESTMENT COMPANY

PARSONS INTERNATIONAL LTD

INFRASTRUCTURE WORKS

19.40 07-Sep-14 04-Jul-15

AD 517

BARAKAH NUCLEAR POWER PLANT/UAE CIRCULATING WATER INTAKE/DISCHARGE CONDUITS WITHIN THE FOOTPRINTS OF UNITS 3 & 4.

HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD. AND SAMSUNG C&T CORPORATION CONSTRUCTION J.V. (HSJV)

HSJV UTILITIES 270.24 07-Feb-14 30-Sep-16

Page 45: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 45 Ref: WAME/gc/17

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT

AMOUNT (DHS MN)

DATE OF COMMENCEMENT

ORIGINAL COMPLETION

DATE

AD 516

WORLD DESSERT THE ZOO & AQUARUIM PUBLIC INSTITUTION IN AL AIN

HYDER CONSULTING MIDDLE EAST

BUILDINGS, INFRASTRUCTURE AND UTILITY WORKS

251.49 01-April-14 30-June-15

AD 515

MR. HILAL AL BADI'S HOUSE IN ABU DHABI MR. HILAL AL BADI AL DHAHERI

PARSONS INTERNATIONAL LTD

BUILDINGS, INFRASTRUCTURE AND UTILITY WORKS

35.00 01-Oct-14 01-Oct-17

AD 513

UPGRADE INFRASTRUCTURE AT AL QUOA, WADI AL FLAIE AND AL HAYER AREAS IN AL AIN

ABU DHABI SEWERAGE SERVICES COMPANY (ADSSC)

PARSONS INTERNATIONAL LTD

INFRASTRUCTURE 119.89 02-Feb-14 02-Feb-16

AD 511

BANIYAS RESIDENTIAL DEVELOPMENT (411 VILLAS) ROAD AND UTILITIES INFRASTRUCTURE WORKS

ENGINEERS OFFICE KEO INTERNATIONAL CONSULTANTS

ROAD AND UTILITIES INFRASTRUCTURE

205.59 13-Oct-13 12-Jan-15

AD 509

FRAMEWORK CONTRACT FOR GENERAL CONSTRUCTION WORKS BASED ON TASK ORDERS

ABU DHABI PORTS COMPANY ADPC GENERAL MISCELLANEOUS CONSTRUCTION

1.00 to 20.00

1-Jul-14 1-Jul-18

AD 507

BARAKAH NUCLEAR POWER PLANT / U.A.E. - CIRCULATING WATER INTAKE STRUCTURE UNITS 1 TO 4

HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD.

CONSTRUCT REINFORCED CONCRETE

219.906 4-May-13 3-Feb-17

AD 505

SOUTH AIRFIELD DEVELOPMENT AND REHABILITATION CONSTRUCTION - PACKAGE 2

ABU DHABI AIRPORTS COMPANY (ADAC)

JACOBS INTERNATIONAL HOLDINGS INC

TAXIWAYS, ROADS AND FENCING

536.00 23-Jul-13 14-Jan-15

AD 501

AL AIN WILDLIFE PARK AND RESORT - SITE WIDE INFRASTRUCTURE PHASE 1

AL AIN ZOO & AQUARIUM PUBLIC INSTITUTION

HYDER CONSULTING ME

DESIGN & BUILD 55.00 22-May-12 2014

AD 492

BRAKA NUCLEAR POWER PLANT PROJECT RETAINING WALL & UCT WORKS

HYUNDAI ENGINEERING & CONSTRUCTION CO LTD

HYUNDAI UTILITIES 45.55 7-Nov-11 2014

Page 46: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 46 Ref: WAME/gc/17

List of Completed Projects

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT

AMOUNT (DHS MN)

DATE OF COMMENCEMENT

ORIGINAL COMPLETION

DATE

AD 526

AL DHAFRA AIRBASE DEMOLITION AND RECONSTRUCTION OF EXISTING RUNWAY - CONTRACT NO. CMW-12023-B001

U.A.E. ARMED FORCES COMMAND OF MILITARY WORKS

INFRASTRUCTURE 69.96 TBA TBA

AD 525

PROTECTION OF AIRPORT RUNWAY AGAINST SEA EROSION IN DELMA ISLAND, WESTERN REGION

DEPARTMENT OF MUNICIPAL AFFAIRS WESTERN REGION MUNICIPALITY

CMW MARINE WORKS 19.73

28-Mar-15 15-Sep-15

AD 524-

A

MISCELLANEOUS WORKS AT SAADIYAT BEACH RESIDENTIAL INFRASTRUCTURE (SB12 TO SB18) - CONTRACT P088 C03 - PURCHASE ORDER P-1009278

TOURISM DEVELOPMENT & INVESTMENT COMPANY (TDIC)

PARSONS INTERNATIONAL LTD

ROAD AND INFRASTRUCTURE WORKS

0.50 18-Jan-15 18-Mar-15

AD 523

DESIGN & BUILD OF CODE C PARKING LAYOVER AT ABU DHABI NTERNATIONAL AIRPORT - CONTRACT NO. ADAC 034 2014

TDIC PARSONS INTERNATIONAL LTD

DESIGN & BUILD 5.99 17-Sep-14 05-Nov-14

AD 522

HILALCO NEW OFFICE, LIWA TOWER, ABU DHABI

HILALCO HILALCO INTERNAL FIT OUT WORKS

2.00 03-Aug-14 03-Nov-14

AD 519

BARAKAH NUCLEAR POWER PLANT/UAE PAVEMENT WORK FOR HEAVY EQUIPMENT ROAD - SUBCONTRACT NO. C-057.

HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD. AND SAMSUNG C&T CORPORATION CONSTRUCTION J.V.

HSJV ROAD WORKS AND UTILITIES

8.76 15-Jul-14 30-Apr-15

AD 518

SERVICE ROAD AT SWEIHAN AIRBASE

COMMAND OF MILITARY WORKS / AL SAHRAA GENERAL TRANSPORT & CLEARANCE

AL SAHRAA GENERAL TRANSPORT CLEARANCE

ROAD WORKS 1.15 13-Jul-14 12-Aug-14

AD 514

TEMPORARY ACCESS ROAD QASR AL SARAB AREA, EARTH AND ROAD WORKS

TOURISM DEVELOPMENT & INVESTMENT COMPANY (TDIC)

TDIC EARTH AND ROAD WORKS

4.05 05-Feb-14 20-Feb-14

AD 512

DESIGN, SUPPLY AND INSTALLATION OF STORM WATER NETWORK UPGRADE AROUND TRANSFER BAGGAGE FACILITY BUILDING AT ABU DHABI INTERNATIONAL AIRPORT CONTRACT NO. ADAC/045/2013

ABU DHABI AIRPORTS COMPANY

ADAC STORM WATER NETWORK

534.70 12-Feb-14 12-April-14

AD 510

THE EXPANSION OF ADIA, CAPACITY ENHANCEMENT PROGRAM. CONTRACT AUH.06.11.0436 SOUTH SIDE PERIMETER SECURITY GATES & PARKING ENHANCEMENT CONSTRUCTION WORKS

ABU DHABI AIRPORTS COMPANY (ADAC)

DORSCH CONSULT

CONSTRUCTION WORKS FOR GATES & PARKING

39.228 03-Sep-13 02-Apr-14

AD 508

EARTH WORKS AND ROAD WORKS. PROJECT: 10019 SWEIHAN AIR BASE

CMW/KIER CONSTRUCTION LLC

WS ATKINS AND PARTNERS

EARTHWORKS AND ROAD WORKS

32.861 15-Sep-13 15-Feb-14

AD 506

SIR BANI YAS ISLAND CENTRAL DEVELOPMENT ZONE - LOOPING AND SEPARATION OF IRRIGATION RING MAIN

TOURISM DEVELOPMENT & INVESTMENT COMPANY (TDIC)

PARSONS INTERNATIONAL LTD

LOOPING AND SEPARATION OF IRRIGATION RING MAIN

18-Jun-13

12-Feb-14

AD 504

REINSTATEMENT OF ROADS AROUND GLENELG SCHOOLS AT SAS AL NAKHIL, PROJECT NO. 7003 - AGREEMENT NO. 147003C1

ABU DHABI NATIONAL OIL COMPANY (ADNOC)

ADNOC

ROAD WORKS 29.64 29-Oct-12 2013

AD 503

ROAD WORKS ALONG MUROOR ROAD

AL HABTOOR LEIGHTON LLC TO BE ADVISED

ROAD WORKS 0.68 26-Sep-12 2012

AD 502

PAVEMENT WORKS FOR SWEIHAN AIR BASE ALSAHRAA GENERAL TRANSPORT & MAINTENANCE

ASG PAVEMENT WORKS 81.91 1-Sep-12 2013

Page 47: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 47 Ref: WAME/gc/17

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT

AMOUNT (DHS MN)

DATE OF COMMENCEMENT

ORIGINAL COMPLETION

DATE

(ASG)

AD 500

SAADIYAT BEACH VILLAS PHASE 1, ROADS AND MISCELLANEOUS WORKS PACKAGE

TOURISM DEVELOPMENT & INVESTMENT CO. (TDIC)

PARSONS INTERNATIONAL LTD

ROADS & MISC. WORKS PACKAGE

12.66 8-May-12 2012

AD 499

ERMINAL 3 (T3) EARLY SITE WORKS CONSTRUCTION, CONTRACT NO. AUH.06.12.0455

ABU DHABI AIRPORTS COMPANY (ADAC)

GHAFARI ASSOCIATES LLC

ROAD, UTILITIES ETC. 17.62 1-Aug-12 2012

AD 498

SHEIKH ZAYED DESERT LEARNING CENTRE AND U.A.E. WORLD DESERT GRADING AND RAMP & TUNNEL ACCESS WORKS

ED ZUBLIN AG CHALABI ARCHITEKTEN & PARTNERS (CAP)

ROAD AND UTILITIES 43.40 6-May-12 2013

AD 497

P132 - SAADIYAT BEACH ACCESS, CIVIL AND LANDSCAPE WORKS

TOURISM DEVELOPMENT & INVESTMENT COMPANY

PARSONS INTERNATIONAL LTD

DESIGN & BUILD CIVIL & LANDSCAPE WORKS

9.00 12-Mar-12 2012

AD 496

GRANDSTAND TEMPORARY MARKING AND LANDSCAPING WORKS

ABU DHABI NATIONAL EXHIBITION COMPANY (ADNEC)

ADNEC LANDSCAPING 1.45 7-Jan-12 2012

AD 495

ABU DHABI BREAKWATER DEVELOPMENT ROADS AND INFRASTRUCTURE WORKS

NATIONAL INVESTMENT CORPORATION

PARSONS INTERNATIONAL LTD

ROADS AND INFRASTRUCTURE

73.01 03-Jan-12 2013

AD 494

RUWAIS HOUSING COMPLEX EXPANSION PHASE III EXTERNAL INFRASTRUCTURE WORKS FOR PACKAGES 10 & 12 PROJECT NO. 6056

ABU DHABI NATIONAL OIL COMPANY (ADNOC)

ADNOC INFRASTRUCTURE 68.42 14-Dec-11 2013

AD 493

KHALIFA PORT AND INDUSTRIAL ZONE (KPIZ) PROJECT - INDUSTRIAL ZONE AREA A - SECONDARY INFRASTRUCTURE PHASE 1 PACKAGE 1

ABU DHABI PORTS COMPANY (ADPC)

INTERNATIONAL BECHTEL CO. LTD

INFRASTRUCTURE 285.47 17-Oct-11 2013

AD 491

HODARIYAT BRIDGE - PAVEMENT & UTILITY WORKS

OVERSEAS AST - VSL MIDDLE EAST JV

PARSONS INTERNATIONAL LTD

ROAD AND UTILITY WORKS

12.91 1-Aug-11 2011

AD 490

NWDZ & SAVANNAH LODGE SEWER SYSTEM AND REED BED TREATMENT PLANTS (STP 02 & STP-04, CONTRACT NO. P042-C044

TOURISM DEVELOPMENT & INVESTMENT COMPANY (TDIC)

PARSONS INTERNATIONAL LTD

UTILITIES 16.26 3-Apr-11 2011

AD 489

AL RUWAIS REFINERY EXPANSION PROJECT - ASPHALT PAVING WORKS

SAMSUNG ENGG/BIN ASHEER TRANSPORT & GEN CONTR. EST

BIN ASHEER ROAD WORKS 7.80 28-Nov-10 2011

AD 488B

EASTERN MAJLIS REHABILATION WORKS-CONTRACT NO. P042-C46

TOURISM DEVELOPMENT & INVESTMENT COMPANY (TDIC)

TDIC UTILITIES 0.50 3-Apr-11 2011

AD 488A

SIR BANI YAS ISLAND PRIORITY PROJECTS EQUESTRIAN CENTRE AND SAVANNAH LODGE WATER CONNECTIONS

TOURISM DEVELOPMENT & INVESTMENT COMPANY (TDIC)

PARSONS INTERNATIONAL LTD.

UTILITIES 3.46 24-Oct-10 2011

AD 487C

P030 ZAYED NATIONAL MUSEUM PACKAGE C06: CONSTRUCTION OF REMOTE SERVICE FACILITY AND MAIN BUILDING SUBSTRUCTURE WORKS.

AL HABTOOR-MURRAY & ROBERTS

WSP UTILITIES 5.00 20-Jan-11 2011

AD 487B

BARRIERS INSTALLATION WORK IN ADCOP PROJECT (MP 21 – KP280)

ABU DHABI CRUDE OIL PIPELINE/CHINA PETROLEUM ENG. CONST. CORP.

ILF CONSULTING ENGINEERS

UTILITIES 1.62 1-Dec-10 2011

AD 487A

EASTERN MANGROVE PROJECT EXTERNAL SERVICE CONNECTION INCLUDING HDPE PIPELINE WITH FIRE HYDRANT

BROOKFIELD MULTIFLEX HYDER CONSULTING MIDDLE EAST LTD

INFRASTRUCTURE 4.20 1-Nov-10 2011

Page 48: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 48 Ref: WAME/gc/17

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT

AMOUNT (DHS MN)

DATE OF COMMENCEMENT

ORIGINAL COMPLETION

DATE

AD 486

MWD - MOTOR WORLD DEVELOPMENT PROJECT INFRASTRUCTURE WORKS PHASE 1

ALDAR PROPERTIES PJSC RMJM / AECOM INFRASTRUCTURE 64.00 9-Aug-10 2011

AD 485

DESIGN AND BUILD CONTRACT OF MAIN ENTRY, PARKING, LINEAR PARK PERIPHERY THEMED RETAINING WALL

ZOO & AQUARIUM PUBLIC INSTITUTION

DESIGNER: HYDER CONSULTING

INFRASTRUCTURE 159.00 7-Jun-10 2013

AD 484

IMPROVEMENT,DEVELOPMENT,UPGRADING AND MAINTENANCE OF INFRASTRUCTURE FACILITIES INCLUDING MINHAJ AND STRATEGIC PROJECTS - LIWA CITY EAST

WESTERN REGION MUNICIPALITY

EUROESTUDIOS INFRASTRUCTURE 94.8 30-May-10 2011

AD 483

PACKAGE 1, INFRASTRUCTURE WORKS FOR RIHAN HEIGHTS AT ZAYED SPORTS CITY, SECTOR W-57, ABU DHABI

MUBADALA CAPITAL AND REAL STATE LLC

WS ATKINS & PARTNERS OVERSEAS

INFRASTRUCTURE 27.80 1-May-10 2011

AD 482

EXPANSION OF ABU DHABI INTERNATIONAL AIRPORT CONTRACT NO. CT294/ADAC092-MUBADALA STRATA INFRASTRUCTURE PHASE 1 FOR AL AIN INTERNATIONAL AIRPORT

SUPERVISION COMMITTEE FOR THE EXPANSION OF THE ABU DHABI INTERNATIONAL AIRPORT (SCADIA)

MOUCHEL MIDDLE EAST LTD

ROADS & INFRASTRUCTURE

49.00 20-Mar-10 2010

AD 481

AL FALAH COMMUNITY DEVELOPMENT INFRASTRUCTURE WORKS VILLAGE 1

ALDAR PROPERTIES FLOUR MIDEAST LTD

INFRASTRUCTURE 418.478 01-Mar-10 2012

AD 480

MISCELLANEOUS WORKS AT SIR BANIYAS ISLAND

TOURISM DEVELOPMENT INVESTMENTS COMPANY (TDIC) ANANTARA

TOURISM DEVELOPMENT INVESTMENTS CO. (TDIC) ANANTARA

MISC. 7.00 27-Sep-09 2010

AD 480D

SIR BANIYAS ISLAND PRIORITY PROJECTS ENABLING WORKS CONTRACT

TOURISM DEVELOPMENT INVESTMENTS COMPANY (TDIC) ANANTARA

TURNER & TOWNSEND INTERNATIONAL LTD.

INFRASTRUCTURE 26.084 24-Feb-10 2010

AD 479

WIDENING OF EASTERN CORNICHE ROAD CONTRACT NO.4

DEPARTMENT OF MUNICIPAL AFFAIRS - MUNICIPALITY OF AUH

PARSONS INTERNATIONAL LTD.

ROAD WORKS

67.55

6-Jul-09

2010

AD 478

EXPANSION OF ABU DHABI INTERNATIONAL AIRPORT T1 - T3 BUSINESS PARK GRADING, ROADS & INFRASTRUCTURE CONTRACT NO. WBS: 1,13,1.2

SUPERVISION COMMITTEE FOR THE EXPANSION OF THE ABU DHABI INTERNATIONAL AIRPORT (SCADIA)

STANLEY CONSULTANTS INC.

ROADS & INFRASTRUCTURE

159.83

25-Jun-09

2010

AD 477

CONTRACT NO. P-088 - WORKS PACKAGE 003 SAADIYAT BEACH RESIDENTIAL INFRA. (SB 12 THROUGH SB 18) AND EDGE PROTECTION WORKS (SB 18, 20,21 & 22)

TOURISM DEVELOPMENT & INVESTMENT COMPANY (TDIC)

PARSONS INTERNATIONAL LTD.

INFRASTRUCTURE

205.80

14-Jun-09

2010

AD 476

KHALIFA PORT AND INDUSTRIAL ZONE (KPIZ) PROJECT CONTRACT NO. 1001-250 TAWEELAH ROAD DUALLING

ABU DHABI PORTS COMPANY (ADPC)

ABU DHABI PORTS COMPANY (ADPC)

ROAD WORKS

68.14

31-May-09

2010

AD 475

INFRASTRUCTURE WORKS – HYDRA VILLAGE (AL REEF VILLAS) ABU DHABI

PAL TECHNOLOGY (HYDRA PROPERTIES)

NATIONAL ENG. BUREAU

INFRASTRUCTURE 355.00 20-Jun-09 2011

AD 474

PARK ROTANA MIXED USE DEVELOPMENT, ABU DHABI SECTOR E- 48, PLOT NO. 367 EXTERNAL DRAINAGE WORKS

TERNA S.A.

-

INFRASTRUCTURE

3.60

18-Apr-09

2009

AD 473A

MARINE WORKS: DELMA JETTY CONSTRUCTION

DEPARTMENT OF MUNICIPAL AFFAIRS WESTERN REGION MUNICIPALITY

EUROSTUDIOS

INFRASTRUCTURE 35.50 13-Dec-2009 2011

Page 49: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 49 Ref: WAME/gc/17

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT

AMOUNT (DHS MN)

DATE OF COMMENCEMENT

ORIGINAL COMPLETION

DATE

AD 473

IMPROVEMENT, DEVELOPMENT, UPGRADING AND MAINTENANCE OF INFRASTRUCTURE FACILITIES AND PROJECTS - (SIR BANIYAS - ZONE 7)

DEPARTMENT OF MUNICIPAL AFFAIRS - WESTERN REGION MUNICIPALITY

EUROSTUDIOS

INFRASTRUCTURE

235.00

22-Mar-09

2014

AD 472

AL AIN WILDLIFE PARK & RESORT PROJECT DESIGN AND CONSTRUCTION OF SITE

ZOO & AQUARIUM PUBLIC INSTITUTION

CH2M HILL

INFRASTRUCTURE

500.00

9-Mar-09

2011

AD 471

EXPANSION OF THE ABU DHABI INTERNATIONAL AIRPORT - DESIGN AND BUILD APRON AND INCIDENTAL WORKS AT AIR BANI YAS ISLAND AIRPORT - CONTRACT # CT205/ADAC039

SUPERVISION COMMITTEE FOR THE EXPANSION OF THE ABU DHABI INTERNATIONAL AIRPORT

STANLEY CONSULTANTS AND HALCROW INT.

MISC.

32.36

16-Feb-09

2009

AD 470

ADNEC PHASE 5 - IDEX 2009 HIGHWAY CONTRA FLOW WORKS PROVISION OF CONSTRUCTION SERVICES

ABU DHABI NATIONAL EXHIBITION COMPANY

(ADNEC)

HYDER CONSULTING

ROAD WORKS

28.38

1-Dec-08

2009

AD 469

POLICE AND CIVIL DEFENCE FACILITY - SIR BANI YAS ISLAND

TOURISM DEVELOPMENT & INVESTMENT COMPANY (TDIC)

CANSULT MAUNSELL

MISC.

6.20

15-Oct-08

2009

AD 465

ADNEC - NEW EXHIBITION FACILITIES - PHASE 2 PACKAGE NO.EX0001-ADNECP2 EXTERNAL ROADWORKS AND RAMP PACKAGE

ADNEC / MACE INTERNATIONAL LTD

MACE INTERNATIONAL LTD

BRIDGES & UNDERPASSES

49.99 1-Jul-08 2009

AD 464

PARIS-SORBONNE UNIVERSITY ABUDHABI, AL REEM ISLAND -STRUCTURAL FILL

AL HABTOOR PARSONS INTERNATIONAL LTD.

BULK EARTHWORKS / GRADING

18.00 22-May-08 2008

AD 462

BREAK WATER DEVELOPMENT MARINA VILLAGE - ROADS AND PARKING

ADUC NCIL ROAD WORKS 18.00 23-Sep-07 2008

AD 461

P058 - SIR BANIYS HOTEL DEVELOPMENT PACKAGE: C06 - HOTEL REFURBISHMENT: EXTERNAL WORKS

TOURISM DEVELOPMENT & INVESTMENT COMPANY (TDIC)

BOVIS LEND LEASE

INFRASTRUCTURE 250.00 24-Jun-07 2009

AD 460

P058 - SIR BANI YAS HOTEL DEVELOPMENT PACKAGE: C05 - HOTEL REFURBISHMENT: INTERNAL WORKS

TOURISM DEVELOPMENT & INVESTMENT COMPANY (TDIC)

BOVIS LEND LEASE

BUILDING 30.00 24-Jun-07 2009

AD 459

ADISC RESIDENTIAL, LEISURE & COMMERCIAL COMPOUND ENABLING WORKS

PRIVATE PROPERTY MANAGEMENT

PRIVATE PROPERTY MANAGEMENT

BULK EARTHWORKS / GRADING

8.40 7-Jul-07 2007

AD 457

TEMPORARY TDIC HEAD OFFICE (KHALIFA PART) SITE WORKS CONTRACT P045-C03

TOURISM DEVELOPMENT & INVESTMENT COMPANY (TDIC)

TOURISM DEVELOPMENT & INV. CO. (TDIC)

MISC. 5.70 6-Mar-07 2007

AD 456

ETIHAD INTERIM TERMINAL ABU DHABI INT'L AIRPORT EARTH WORKS & ROAD WORKS

AL HABTOOR WS ATKINS ROAD WORKS 35.00 4-Nov-06 2008

AD 455

ABU DHABI GOLF CLUB LANDSCAPING & ROAD WORKS

TOURISM DEVELOPMENT & INVESTMENT COMPANY (TDIC)

FREDERIC R. HARRIS INC.

INFRASTRUCTURE 5.25 21-Oct-06 2007

AD 453

ADWEA CONTRACT NO. 2257 INTERCONNECTION OF ADCO/ TRANSCO POWER NETWORKS LOT 2 OVERHEAD LINES 400 KV AND 220 KV OVERHEAD TRANSMISSION LINES ACCESS ROAD/ PLATFORM WORKS

ADWEA/KEC INTERNATIONAL LIMITED

LAHMEYER INTERNATIONAL

BULK EARTHWORKS / GRADING

9.65 4-Dec-04 2005

AD 452

AL WATHBA CAMEL RACE TRACK CROWN PRINCE (PVT) MANAGEMENT

WS ATKINS ROAD WORKS 26.49 11-Jul-04 2005

AD 451

JETTY UPGRADE - JEBEL DHANNA CONTRACT NO. 6115.01/EC 10549

ABU DHABI COMPANY FOR ONSHORE OIL OPERATION

ADCO MARINE WORKS 14.97 7-Feb-04 2004

AD 450

BU HASA INFRASTRUCTURE UPGRADE ASPHALT ROAD WORKS

AL HABTOOR ENGINEERING (HEE)

ADCO ROAD WORKS 1.43 13-Mar-04 2004

Page 50: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 50 Ref: WAME/gc/17

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT

AMOUNT (DHS MN)

DATE OF COMMENCEMENT

ORIGINAL COMPLETION

DATE

AD 449

ADWEA CONTRACT NO. G1046 400 KV OVER HEAD LINE FROM E48 TO MUSSAFAH

ADWEA/KEC INTERNATIONAL LIMITED

PB POWER LIMITED

ROAD WORKS

7.36

8-May-04

2004

AD 448

CONFERENCE PALACE HOTEL EXTERNAL WORKS PACKAGE BP 14A & B

ARABIAN CONSTRUCTION COMPANY

TURNER CONT. INTERNATIONAL

INFRASTRUCTURE 37.19 16-Jun-03 2004

AD 447

URGENT WATER WORKS FOR ABU DHABI ISLAND

ABU DHABI DISTRIBUTION COMPANY (ADDC)

ADDC UTILITIES 1.54 8-Jun-03 2004

AD 446

CONSTRUCTION OF NEAD PHASE-1, DEVELOPMENT - INFRASTRUCTURE PACKAGE

ABU DHABI COMPANY FOR ONSHORE OIL OPERATION

HYDER CONSULTING

INFRASTRUCTURE 121.13 1-Feb-03 2004

AD 445

CONSTRUCTION OF BRIDGES AT OFFICERS CITY AND BETWEEN TWO BRIDGES CITY CONTRACT NO. 999

ABU DHABI MUNICIPALITY

FREDERIC R. HARRIS INC.

BRIDGES & UNDERPASSES

53.05

23-Nov-02

2004

AD 444

SITE PREPARATION FOR ULG-LSGO PLANT AT RUWAIS

GRANITE/TECHNIP- COLFLEXIP MACE INTL. LTD BULK EARTHWORKS / GRADING

7.70 15-Nov-02 2003

AD 443

AMIRI FLIGHT PACKAGE 1 - ADVANCE EARTH WORKS

AMIRI FLIGHT HALCROW INTERNATIONAL

BULK EARTHWORKS / GRADING

11.30 7-Oct-02 2003

AD 441

SHUWEIHAT WATER TRANSMISSION SCHEME LOT B - MIRFA TO MUSSAFAH

TEISAI/ADWEA TEBODIN BULK EARTHWORKS / GRADING

137.60 1-Nov-02 2004

AD 440

IMPROVEMENTS TO CLOCK TOWER ROUNDABOUT

AL AIN MUNICIPALITY SCOTT WILSON KILPATRICK & CO. LTD.

ROAD WORKS 28.50 17-Sep-02 2003

AD 439

SHUWEIHAT WATER TRANSMISSION SCHEME TEMPORARY FACILITIES FOR LOT A,B,C & D

MARUBENI/TEISEI CORPORATION

TAISEI CORPORATION

UTILITIES 6.26 21-Aug-02 2003

AD 438

TRIP PROJECT NO. 997 EAST ROAD WIDENING IP 43A TO IP145

ABU DHABI MUNICIPALITY DE LEUW CATHER INTERNATIONAL

ROAD WORKS 43.05 16-Sep-02 2002

AD 437

WATER SUPPLY TO CONFERENCE PALACE HOTEL CONTRACT D - 1599

ABU DHABI DISTRIBUTION COMPANY (ADDC)

ADDC UTILITIES 1.99 30-Jun-02 2003

AD 436

AL RAHA BEACH RESORT - ABU DHABI MARINE WORKS

AL HABTOOR FOR PRIVATE DEPARTMENT

DMJM/TEST UTILITIES 20.00 18-Jun-02 2003

AD 435

FILLING AT AL DHAFRA AIR BASE ZONE 1 B CONTRACT MW-241-2001

DIRECTORATE OF MILITARY WORKS

STANLEY CONSULTANTS INC.

BULK EARTHWORKS / GRADING

29.95 6-May-02 2002

AD 430

MISCELLANEOUS FILLING WORKS WORKS DEPARTMENT DIWI CONSULT BULK EARTHWORKS / GRADING

12.00 22-Jun-02 2003

AD 429

THIRD BRIDGE CROSSING FOR ABU DHABI ISLAND CONTRACT 2

WORKS DEPARTMENT RENDEL PALMER & TRITTON

BRIDGES & UNDERPASSES

107.20 19-Jan-02 2005

AD 428

INCREASED DIGESTER CAPACITY MAFTAQ WTW CONTRACT NO. 512/2

ABU DHABI MUNICIPALITY SEWERAGE PROJECT COMMITTE

PARSONS INTERNATIONAL LTD.

MISC. 18.29 01-Aug-02 2004

802 WORKSHOP AT MAFRAQ BUILDING 2.75 1-May-02 -

Page 51: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 51 Ref: WAME/gc/17

GULF CONSOLIDATED CONTRACTORS LLC

Category Total Value (QAR MN)

Bridges & Underpasses 1 160.75

Bulk Earthworks / Grading 4 141.16

Infrastructure 7 1,102.26

Misc 1 27.16

Road Works 10 1,833.08

Utilities 4 545.72

Grand Total 27 3,810.13

Bridges & Underpasses, 1

Bulk Earthworks / Grading, 4

Infrastructure, 7

Misc, 1

Road Works, 10

Utilities, 4

Page 52: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 52 Ref: WAME/gc/17

List of Ongoing Projects OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY

CONTRACT AMOUNT

(MN)

DATE OF COMMENCEMENT

ORIGINAL COMPLETION

DATE

QR 733

MAINTENANCE OF TSE NETWORK FRAME WORK

ASHGHAL NIL MAINTENANCE OF TSE NETWORK

TSE FRAME CONTRACT

31-MAY-15

28-MAY-20

QR 732

MRPSC/023/2014-2015/L ROADS AND INFRASTRUCTURE IN DOHA INDUSTRIAL AREA (PACKAGE 2), PROJECT ID:IA 13/14 C 067 ST WORK ORDER NO. QS001-P02

PUBLIC WORKS AUTHORITY - ASHGHAL

PROGRAMME MANAGEMENT - PARSONS BRINCKERHOFF, GENERAL ENGINEERING - DAR AL HANDASAH (DESIGN) & AECOM (SUPERVISION)

ROADS & INFRASTRUCTURE

1.23 B 16-SEP-15 14-OCT-18

QR 731

DESIGN & CONTRUCT NEW ORBITAL HIGHWAY & TRUCK ROUTE (P023) CONTRACT 1: NEW DOHA PORT TO ORBITAL HIGHWAY

JOANNOU & PARASKEVAID ES LTD. (J&P)

ROAD WORKS 40.00 27-APR-15 28-JUN-15

QR 730

MRPSC/020/2012-2013/L ROAD AND INFRASTRUCTURE FOR COMMERCIAL STREET IN AL KHOR AREA - IA/13-14/C 02 ST

PUBLIC WORKS AUTHORITY (ASHGHAL)

KHATIB & ALAMI / WSP ROADS & INFRASTRUCTURE WORKS

245.00 14-JAN-14 27-JUL-15

QR 721

CONSTRUCTION OF ROADS UTILITY CROSSING AND STREET LIGHTING IN THE INDUSTRIAL AREA-MESAIEED (PACKAGE 6) GC09100600

QATAR PETROLEUM

TO BE APPOINTED INFRASTRUCTURE 604.5 20-DEC-09 11-NOV-15

Page 53: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 53 Ref: WAME/gc/17

List of Completed Projects

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT

AMOUNT (MN)

DATE OF COMMENCEMENT

ORIGINAL COMPLETION DATE

QR729 ER-112124 MIXING OF RECLAIMED MATERIALS AND FILLING WORKS

QATAR FERTILISER COMPANY (QAFCO)

TO BE APPOINTED

MIXING OF RECLAIMED MATERIALS & FILLING WORKS

9.90 12-JUN-13 2013

QR 727

PWA/GTC/063/2010-2011 CONSTRUCTION OF DOHA AND RAYYAN SEWERAGE IMPROVEMENTS TO EXISTING TSE NETWORK CP731, PROJECT CODE: IA 10-11 C 002 G

PUBLIC WORKS AUTHORITY (ASHGHAL)

TO BE APPOINTED UTILITIES 46.51 15-MAR-12 2013

QR 725

GC11101500 ENGINEERING, PROCUREMENT, INSTALLATION AND COMMISSIONING (EPIC) FOR DUKHAN COASTAL FACILITIES ACCESS ROAD

QATAR PETROLEUM TO BE APPOINTED ROAD WORKS 25.65 27-SEP-11 2013

QR 724

EPIC FOR DUAL CARRIAGEWAY FROM RAS LAFFAN AVENUE TO SEALINE AVENUE (SOUTH OF ORYX - GTL) AND HALUL AVENUE EXTENSION

QATAR PETROLEUM TO BE APPOINTED

EARTHWORKS, ROAD WORKS, UTILITIES & ELECTRICAL WORKS

112.96 25-SEP-11 2013

QR 723 GC11103600 EPIC FOR TEMPORARY SAFETY ROAD IMPROVEMENTS TO EXISTING SEALINE ROAD IN MESAIEED

QATAR PETROLEUM TO BE APPOINTED ROAD WORKS 73.781 23-JUL-11 2012

QR 720

GT 08115900 EPIC FOR NEW SOUTH SIDE ROAD AND GRADING OF CORIDOR AT RAS LAFFAN INDUSTRIAL CITY. CONTRACT NO. GT 08115900

QATAR PETROLEUM TO BE APPOINTED INFRASTRUCTURE 148.0 29-OCT-09 2011

QR 718

QATALUM PROJECTS SERVICE AREAS AND POTROOM BUILDING CONTRACT NO. 1010060

SNC- LAVALIN INTERNATIONAL INC

NIL INFRASTRUCTURE 102.4

13-AUG-09 15-SEP-10

QR 717

EARTHWORKS AND CIVIL WORKS AT AQUA PARK SALWA ROAD

AQUA MASTERS ASSOCIATED CONSULTING ENGINEERS (ACE)

EARTHWORKS/ CIVIL WORKS

1.8 01-JAN-09 30-APR-09

QR 716

CONSTRUCTION OF LAY DOWN AREA FOR TRUCKS AT QATALUM PROJECT

QATALUM NIL BULK EARTHWORKS / GRADING

1.0 17-JUN-09 20-SEP-09

QR 715

QATALUM PROJECT SERVICE AREA AND POTROOM BLDG TENDER NO. 5532165-C037, QASCO CHANNEL ENLARGEMENT- CONTRACT NO. 101037

SNC –LAVALIN INTERNATIONAL INC.

QATALUM INFRASTRUCTURE 25.70 02-JAN-09 30-APR-09

QR 714

GC07107100 EPIC OF VEHICLE LAYBYS AND ROAD UPGRADE OF POINT 'N' POINT 'U' UMMBAB ROAD IN DUKHAN FIELDS

QATAR PETROLEUM QATAR PETROLEUM ROAD WORKS 35.33 28-SEP-08 27-SEP-09

QR 713 C 039.1 EXCAVATION AND CONCRETE WORKS FOR MISC BUILDINGS AT QATALUM PROJECT

SNC LAVLIN INTERNATIONAL

QATALUM MISC. 27.16 5-AUG-08 22-FEB-09

QR 712 CONSTRUCTION OF ROADS AND LANDSCAPING IN DUKHAN FIELDS

QATAR PETROLEUM QATAR PETROLEUM ROAD WORKS 81.46 10-DEC-07 2009

QR 711 ASPHALT LAYING WORKS

AL HUDA ENGINEERING WORKS

ROAD WORKS 17.69 5-NOV-07 28-FEB-08

QR 710 D05P1 AL WUKAIR WAREHOUSES FOR GULF WAREHOUSING COMPANY

GULF WAREHOUSING

AL FEREEJ CONSULTANCY &

BULK EARTHWORKS /

25.40 1-JAN-07 30-APR-07

Page 54: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 54 Ref: WAME/gc/17

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT

AMOUNT (MN)

DATE OF COMMENCEMENT

ORIGINAL COMPLETION DATE

COMPANY DESIGN GRADING

QR 709

GTC 05/275/ED CONSTRUCTION OF ROADS, UTILITY CROSSING AND STREET LIGHTNING IN THE INDUSTRIAL AREA - MESAIEED (PACKAGE 2)

QATAR PETROLEUM QATAR PETROLEUM INFRASTRUCTURE 84.55 18-APR-06 17-JUN-07

QR 708

GTC 05/253/MIC ENGINEERING, PROCUREMENT, INSTALLATION AND COMMISSIONING (EPIC) OF STREET LIGHTING SYSTEM AND VEHICLE CRASH BARRIERS BETWEEN AL WAKRAH AND MESAIEED

QATAR PETROLEUM HALCROW UTILITIES 39.31 10-APR-06 9-JUL-07

QR 707 TEMPORARY CAMP/SITE FACILITIES (PHASE I & II, TSF) FOR CHIYODA - TECHNIP (JV) AT RAS LAFFAN

QATAR KENTZ (W.L.L.)

CHIYODA TECHNIP INFRASTRUCTURE 10.73 9-May-05 6-Nov-05

QR 706

CONTRACT NO. GTC 04/214/ED CONSTRUCTION OF ROADS UTILITY CROSSINGS AND STREET LIGHTNING IN THE INDUSTRIAL AREA

QATAR PETROLEUM QATAR PETROLEUM INFRASTRUCTURE 126.38 21-Dec-04 20-Mar-06

QR 705

DESIGN AND CONSTRUCTION OF NEW MAIN WITH APPROACH ROAD AND RECONSTRUCTION OF 3 NOS. SOAKAWAY PITS AT DPS IN THE DUKHAN FIELDS

QATAR PETROLEUM QATAR PETROLEUM ROAD WORKS 2.18 21-Nov-04 20-May-05

QR 704 QATAR MOTORCYCLE GRAND PRIX RACE TRACK LAYING OF ASPHALT WEARING COURSE

MIDMAC CONTRACTING CO. WLL

PARSONS ROAD WORKS 0.66 5-Jun-04 15-Jun-04

QR 702

GTC 166/ED/02 ENGINEERING, PROCUREMENT, INSTALLATION AND CONSTRUCTION OF DUAL CARRIAGEWAY BETWEEN DUKHAN & UMM BAB

QATAR PETROLEUM DHV (DESIGN CONSULTANT)

BRIDGES & UNDERPASSES

160.75 1-Oct-02 Feb-05

Page 55: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 55 Ref: WAME/gc/17

WADE ADAMS EMIRATES LLC

Category Total Value (Dhs MN)

Road Works 1 74.20

Civil Works 1 1.10

Utilities 3 821.32

Grand Total 5 896.62

Road Works, 1

Civil Works, 1

Utilities, 3

Page 56: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 56 Ref: WAME/gc/17

List of Ongoing Projects OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY

CONTRACT AMOUNT

(MN)

DATE OF COMMENCEMENT

ORIGINAL COMPLETION DATE

WE 305

CONSTRUCTION OF FIVE (5) MARINE SERVICE STATIONS IN NORTHERN EMIRATES, AGREEMENT NO. EPD14061

ADNOC DISTRIBUTION ADNOC

CONSTRUCTION OF MARINE SERVICE STATIONS

115.72 TBA TBA

WE 304

ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) FOR REPLACEMENT OF CRACKED TANKS IN TEN (10) SERVICE STATIONS IN ABU DHABI & RAS AL KHAIMAH

ADNOC DISTRIBUTION ADNOC EPC FOR CRACKED TANKS

38.6 02-Jun-14

02-Jun-15

WE 303

INTERNAL ROADS AT VARIOUS LOCATIONS IN AL AIN, STAGE 18, CONTRACT 1

AL AIN CITY MUNICIPALITY

JACOBS INTERNATIONAL

ROAD WORKS 74.12

01-Jun-14

30-Nov-15

Page 57: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 57 Ref: WAME/gc/17

List of Completed Projects

OUR REF

PROJECT NAME CLIENT CONSULTANT CATEGORY

CONTRACT AMOUNT

(MN)

DATE OF COMMENCEMENT

ORIGINAL COMPLETION DATE

WE 301

AGREEMENT NO. MD12035 REPLACEMENT OF UNDERGROUND FUEL STORAGE TANKS AT SERVICE STATION AL QUOZE #880

ADNOC DISTRIBUTION

ADNOC CIVIL WORKS 1.1 TBA TBA

WE 302

DESIGN & CONSTRUCTIION OF BOUNDARY WALL FOR WAREHOUSE OPEN YARD AT ABU DHABI INTERNATIONAL AIR PORT

ABU DHABI AIRPORTS COMPANY (ADAC)

ADAC

DESIGN & CONSTRUCTION OF BOUNDARY WALL

667 TBA TBA

Page 58: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 58 Ref: WAME/gc/17

AWARDS AND CERTIFICATES AWARDS

Quality Group Membership RTA Awards – Dubai Water Canal

Dubai Municipality Contractor Award Social, Culture & Heritage Project Award

Dubai Municipality Award RTA – Appreciation Award

Page 59: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 59 Ref: WAME/gc/17

ISO CERTIFICATES Wade Adams Middle East Limited

ISO 9001:2008 ISO 14001:2004

OHSAS 18001:2007

Page 60: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 60 Ref: WAME/gc/17

Wade Adams Contracting (L.L.C)

ISO 9001:2008 ISO 14001:2004

OHSAS 18001:2007

Page 61: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 61 Ref: WAME/gc/17

Wade Adams Sharjah (L.L.C)

ISO 9001:2008

ISO 14001:2004

OHSAS 18001:2007

Page 62: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 62 Ref: WAME/gc/17

Hilal Bil Badi & Partners Contracting Company WLL-HILALCO

ISO 9001:2008

ISO 14001:2004

OHSAS 18001:2007

Page 63: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 63 Ref: WAME/gc/17

Gulf Consolidated Contractors W.L.L

ISO 9001:2008

ISO 14001:2004

OHSAS 18001:2007

Page 64: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 64 Ref: WAME/gc/17

Wade Adams Emirates L.L.C.

ISO 9001:2008 ISO 14001:2004

OHSAS 18001: 2007

Page 65: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 65 Ref: WAME/gc/17

GROUP RESOURCES MANPOWER SUMMARY OF MANPOWER - TABLE

EMPLOYEES Number of Staff for the years

2010 2011 2012 2013 2014 2015 2016

Company/Country Managers 3 3 3 4 4 4 4

Head of the Departments 11 11 11 11 11 11 11

Managers/Section Heads 59 52 50 35 40 41 47

Deputy Manager 1 1 1 1 1 1 1

Operations Managers 2 2 2 2 3 4 4

Senior Project Managers 5 5 5 5 5 10 11

Project Managers 14 13 14 12 14 15 15

Deputy PRM/Site Agents 23 24 27 25 26 28 28

Engineers - Civil 118 157 155 125 165 176 176

Engineers - MEP 33 28 33 28 36 41 42

Contract Managers 4 4 4 3 4 6 6

Quantity Surveying 92 85 68 55 70 73 90

Head Office Staff 158 155 170 158 163 171 172

Administrative Staff 169 165 193 187 192 198 199

Draughting 82 76 64 55 71 80 96

HSE Staff 51 49 58 61 70 81 91

Laboratory/Material Testing 68 65 71 64 70 77 77

Land Surveying 142 129 102 94 109 126 148

Camp Employees/Cooks 483 489 462 404 382 375 345

Security Staff 114 98 112 108 118 123 126

Plant & Transport Staff 53 51 56 53 54 57 57

Mechanics/Worksop Staff 354 324 317 314 640 378 391

Drivers/Operators 1869 1725 1598 1480 1599 1684 1846

Foremen & Gangers 670 563 592 562 636 664 692

Tradesmen & others 2169 2130 2875 2402 3124 3781 3958

Labourers 3922 3362 3812 3328 3262 3785 4404 TOTAL

10,371 9,523 10,599 9,282 10,616 11,751 13,037

Page 66: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 66 Ref: WAME/gc/17

Summary of Manpower – Chart

2010

2012

2014

2016

0

500

1000

1500

2000

2500

3000

3500

4000

4500

Page 67: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 67 Ref: WAME/gc/17

PLANT, EQUIPMENT AND VEHICLES

0

100

200

300

400

500

600

700

800

900

DEWATERINGEQUIPMENT

ELECTRICALEQUIPMENT

HEAVYEQUIPMENT

HEAVYVEHICLE

LIGHTEQUIPMENT

LIGHT VEHICLE MOBILEEQUIPMENT

PICKUPS STATIONARYPLANT

WORKSHOPTOOLS &

EQUIPMENT

264

383

548 545

889

356

28

435

123

46

Page 68: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 68 Ref: WAME/gc/17

LIST OF PLANT, EQUIPMENT AND VEHICLES

Heavy Equipment

Description Quantity

1 SKID LOADER 82

2 BACK HOE LOADERS 71

3 WHEEL LOADER 64

4 CRAWLER EXCAVATOR 61

5 GRADERS 29

6 TELESCOPIC LOADERS 28

7 VIBRATORY ROLLERS 35

8 PNEUMATIC TYRE ROLLERS 34

9 TANDEM ROLLERS 35

10 MOBILE & CRAWLER CRANE 25

11 BULL DOZER 18

12 WHEEL EXCAVATORS 22

13 DUMPER 10

14 PAVER FINISHER 16

15 POWER ROAD SWEEPERS 7

16 CRAWLER DRILL MACHINE 2

17 AERIAL WORKING PLATFORM 2

18 FORK LIFT 3

19 TOWER CRANE 2

20 SCISSOR LIFTING PLATFORM 1

21 MILLING MACHINE 1

22 TRENCHER 1

Page 69: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 69 Ref: WAME/gc/17

Heavy Vehicles

Description Quantity

1 SIX WHEEL TRUCK 184

2 WATER TANKER 77

3 TIPPER TRAILER 62

4 HIAB – GRAB/HOOK 58

5 PASSENGER BUS 72

6 TRANSIT MIXER 22

7 CESSPIT TANKER 11

8 DIESEL / BITUMEN TANKER 15

9 FLAT TRAILER 9

10 GREASE TRUCK 12

11 LOW BED TRAILERS 11

12 SPRAY TANKERS 6

13 FOUR WHEEL TRUCK 4

14 CONCRETE PUMP 2

Page 70: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 70 Ref: WAME/gc/17

Stationary Plant

Description Quantity

1 STATIC DIESEL TANKER 33

2 STATIC CONTAINER 26

3 FUEL METER PUMP 31

4 WEIGH BRIDGE 11

5 STATIC MC TANKER 6

6 WETMIX PLANT 3

7 ASPHALT PLANT 160 & 240T/HR 5

8 CONCRETE BATCHING PLANT 2

9 BATCHING PLANT ATTACHMENT 3

10 SCREENING PLANT 2

Dewatering Equipment

Description Quantity

1 VACUUM PUMPS 6" 170

2 PRESSURE PUMPS 48

3 BOOSTER PUMPS 35

4 JETTING PUMPS 9

5 DIAPHRAGM PUMPS 1 Mobile Equipment

Description Quantity

1 MOBILE WATER TANKERS 22

2 MOBILE TRAILERS 6

Page 71: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 71 Ref: WAME/gc/17

Light Equipment

Description Quantity

1 PLATE COMPACTORS 195

2 CONCRETE VIBRATORS 120

3 HAND ROLLER 78

4 CONSTRUCTION MACHINERIES 67

5 PARTNER CUTTER 44

6 WELDING MACHINES 58

7 MOBILE AIR COMPRESSORS 49

8 STATIC AIR COMPRESSORS 50

9 ASPHALT CUTTERS 19

10 KERBSTONE CUTTER, TILE CUTTER 18

11 STEEL BAR BENDERS 32

12 STEEL BAR CUTTERS 27

13 FUEL METER PUMP 12

14 BEAM VIBRATOR 1

15 SAND BLASTING MACHINES 11

16 CONCRETE MIXERS 23

17 GUARD RAIL MACHINE 3

18 POWER TROWELS 4

19 CABLE TRAILER 8

20 WOOD JOINERY EQUIPMENTS 2

21 CHIPPING MACHINES 2

22 PLATFORM POWER CLIMBER 1

23 FLOOR POLISHING MACHINE 1

24 CONVERTER 1

25 PLANNING MACHINE 2

26 VIBRATORY HAMMER 1

27 HYDRAULIC DRUM CUTTER 1

Page 72: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 72 Ref: WAME/gc/17

Light Vehicles – Saloons

Description Quantity

1 ALL PURPOSE LARGE 332

2 SALOON CARS 24 Pickups

Description Quantity

1 P/UP - DOUBLE CABIN 276

2 P/UP - LONG BODY 72

3 MINI BUS (14+1 SEATS) 41

4 MINI BUS (29+1 SEATS) 11

5 P/UP - TIPPERS 18

6 RECOVERY VEHICLE 2

7 FIBER GLASS BOAT 2

8 QUAD BIKE, YAMAHA 12

9 HONDA MOTOR CYLCE 1

Electrical equipment

Description Quantity

1 GENERATORS (0-500 KVA above) 368

2 MOBILE ELEC CABLE TRAILERS 8

3 CABLE WINCHES 7

Workshop tools & Equipment

Description Quantity

1 DYDRAULIC PRESS 19

2 TYRE CHANGER 10

3 STEAM WASHER 6

4 HYDRAULIC FLOOR CRANE 6

5 LATHE MACHINE 4 6 RECYCLING MACHINE (WATER) 1

Page 73: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 73 Ref: WAME/gc/17

FACILITIES

WORKSHOP

Wade Adams maintains fully functional workshop facilities with highly experienced staff. Together they are able to maintain the fleet as per manufacturer’s recommendations. Servicing and repairs are carried out in-house with limited downtime.

Workshop supervisors & mechanics

Page 74: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 74 Ref: WAME/gc/17

CAMP Residential accommodation owned by Wade Adams has the capacity to house over 11,000 people. The accommodation maintains the highest standards possible ensuring the resident’s needs are met, considering comfort and cultural backgrounds to food and leisure preferences.

Catering facilities cater for the varied cuisine choices with 24 kitchen amenities each catering to a different cultural cuisine.

Work-life balance is greatly supported by the company and facilities for various sports have been provided within the accommodation. These include basketball, badminton, football, volleyball and table tennis. Cable television is provided at every dining hall allowing for various programs in different languages and for different nationalities.

Page 75: T COMPANY Company Profile G STRUCTURE - Wade · PDF fileCompany Profile . Page 2 ... The Company works to high standards and stringent HSE requirements as is evident by ... •Abu

Page 75 Ref: WAME/gc/17

CONTACTS

Wade Adams (Middle East) Limited Omar Hodge Building Wickhams Cay 1, P. O. Box 313, Road Town, Tortola British Virgin Islands

Corporate and Project Management Office, Dubai Tel: +971 4 453 5000 Fax: +971 4 450 8087 E-mail: [email protected]

Wade Adams Contracting (L.L.C.)

P.O. Box 4337, Dubai United Arab Emirates Tel: +971 4 453 5000 Fax: +971 4 450 8087 E-mail: [email protected]

Wade Adams Sharjah L.L.C.

P.O. Box 38200, Sharjah, United Arab Emirates Tel: +971 453 5000 Fax: +971 450 8087 E-mail: [email protected]

Wade Adams Emirates L.L.C

P.O.Box 42443 Abu Dhabi, United Arab Emirates Tel. No. 02 6819777 Fax No. 02 6819778 E-mail: [email protected]

Wade Adams Oman LLC

P.O. Box 26, Muscat, Sultanate of Oman Tel: +968 24499463 Fax: +968 24499472 E-mail: [email protected]

Gulf Consolidated Contractors W.L.L.

(Local Company – Managed by WAME) P.O. Box 22501, Doha, Qatar Tel: +974 44850602 Fax: +974 44850599 E-mail: [email protected]

Hilal Bil Badi & Partners Contracting Company W.L.L. (HILALCO)

P.O. Box: 28177, Abu Dhabi, United Arab Emirates Tel: +971 2 6998999 Fax: +971 2 4488655 E-mail: [email protected]

Union Energy Inc. Omar Hodge Building Wickhams Cay 1, Road Town, Tortola British Virgin Islands Registered Branch in Hamriya Free Zone, Sharjah, U.A.E. P.O. Box 41523, Sharjah, United Arab Emirates Tel: +971 6 5263188 Fax: +971 6 5263078 E-mail: [email protected]