System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

Embed Size (px)

Citation preview

Page 1: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

System OverviewSystem Overview

Chapter 1Chapter 1

Page 2: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

System Overview 1-2

ObjectivesObjectives

Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new

system Learn how to Logon to system Learn how to Navigate in the system

Page 3: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

System Overview 1-3

Architectural Overview for TRACArchitectural Overview for TRAC

LWA Primary Sites

Point to Point Network

TRAC System

DCEO Oracle Server

Windows Based

26 Oracle Servers

TRAC System

Page 4: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

System Overview 1-4

Architectural Overview for IWDSArchitectural Overview for IWDS

Internet

IWDSApplication Server for the State

WebSphere JavaDB2 UDB OS/390Web-based

Illinois Workforce Development System

WindowsIE 5.1

Web Server

LWA Primary Sites

& Satellites

Page 5: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

System Overview 1-5

IWDS Phase 2IWDS Phase 2

Dislocation Event Tracking System (DETS) Provider Management Grant Planning Local Customization (customization in TRAC info

has been converted over to LWA Specific Data) Local Demographics Electronic Identity Card support (Swipe Card) Deployment date – currently scheduled May 3, 2004

Page 6: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

System Overview 1-6

Technical Specifications – Technical Specifications – Hardware RecommendationsHardware Recommendations

Pentium III/IV or compatible processor at 1Ghz or more 256 MB of memory (minimum), 512 MB recommended 30 GB or larger hard drive Video card & monitor capable of displaying 800x600 or

higher resolution Ethernet Card High Speed Internet connection for best response

Page 7: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

System Overview 1-7

Technical Specifications – Technical Specifications – Operating SystemsOperating Systems

Windows XP Pro Windows 2000 SP3, Professional Edition Windows 2000 SP3 Windows NT4 Workstation, SP6a Windows NT4 Server SP6a Windows 98 SE Windows ME Mac OS 9 and 10.1.5 (Web browser support only)

Page 8: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

System Overview 1-8

Technical Specifications – Technical Specifications – Web BrowsersWeb Browsers

IE 6.0 (Windows) IE 5.5 SP2 (Windows) Netscape 6.2.3 IE 5.0 on OS9 or OS X’s Classic Mode

(Macintosh)

Page 9: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

System Overview 1-9

Technical Specifications – Technical Specifications – Additional SoftwareAdditional Software

Adobe Acrobat Reader 5.0 or higher

Download it for free at this site: http://www.adobe.com/products/acrobat/readstep2.html

Phase two allows exporting reports to Adobe Acrobat or Excel 2000

Page 10: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

System Overview 1-10

Pop-Up BlockersPop-Up Blockers

If using Pop-Up Blocking Software IWDS uses pop-ups within the system Set an exception to IWDS.State.IL.US to allow pop-ups

from the production IWDS website

Page 11: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

System Overview 1-11

Internet Explorer OptionsInternet Explorer Options

Click on to change settings

Page 12: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

System Overview 1-12

Internet Explorer OptionsInternet Explorer Options

Page 13: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

System Overview 1-13

Internet Explorer OptionsInternet Explorer Options

Uncheck Box

Page 14: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

System Overview 1-14

Internet Explorer OptionsInternet Explorer Options

Uncheck Box

Page 15: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

Illinois Workforce Illinois Workforce Development SystemDevelopment System

Page 16: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

LogonLogon

Page 17: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

Change Displayed ToolbarsChange Displayed Toolbars

Page 18: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

Changed ToolbarsChanged Toolbars

Page 19: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

System Overview 1-19

Staff LogonStaff Logon

Page 20: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

System Overview 1-20

Password ErrorPassword Error

Page 21: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

System Overview 1-21

Staff Logon ResponseStaff Logon Response

Informational Message

System Environment

Available Options

Page 22: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

Staff MenuStaff Menu

Page 23: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

System Overview 1-23

Change PasswordChange Password

Page 24: System Overview Chapter 1. System Overview 1-2 Objectives Understand Overall Schematic Review Phase 2 Be aware of technical recommendations for new system

System Overview 1-24

SummarySummary

Recommended hardware and software configurations were discussed

The IWDS screen was setup for best viewing results

The logon process was reviewed Several IWDS screen components were

examined