35
1. These n mining to incl undergr INTRODUC notes speci applications ude retain round cave CTION ifically cove s. Howeve ning walls, rns. Figure Figu er the desig r, the princi concrete e 1 shows so ure 1: T 1 n of rock an ples and de dams, bu ome typical Typical Anc nchors, roc esign proce uildings, b l application chor Applica Support of k bolts and dures show ridges, tun ns. ations f Rock Slopes in Robert Ber August 2 dowels in wn can be e nnels, sha n Open Pits rtuzzi 2012 open pit xtended fts and

Support of Rock Slopes in Open Pits

Embed Size (px)

DESCRIPTION

Support for Open Pit slope

Citation preview

Page 1: Support of Rock Slopes in Open Pits

1.

These nmining to inclundergr

INTRODUC

notes speciapplicationsude retainround cave

CTION

ifically coves. Howeve

ning walls, rns. Figure

Figu

er the desigr, the princi

concrete e 1 shows so

ure 1: T

1

n of rock anples and dedams, bu

ome typical

Typical Anc

nchors, rocesign proceuildings, bl application

chor Applica

Support of

k bolts and dures showridges, tunns.

ations

f Rock Slopes in

Robert BerAugust 2

dowels in wn can be ennels, sha

n Open Pits

rtuzzi 2012

open pit xtended fts and

Page 2: Support of Rock Slopes in Open Pits

The denumero

The merequired

weight,

Factor o

Does thincreas

(1) A cop

esign methoous text boo

HoeLon

Tho

KorWedRoc

Han

WindesPre

HutBi T

ethods set d for each a

of Safety,

he reinforcine the resist

py of this pap

ods are inoks, for exam

ed, E. and ndon, 1974.

omas, H.H.

rari, K. anddge Failureck Mechanic

nna, T.H. F

ndsor, C.R. sign and evss 1993.

chinson, DTech Publis

out in the aanchor. The

w

F

ng load supting force?

per is attache

all cases mple:

Bray, J.

The Engine

d Fritz, P. e. Design cs, ASCE, 1

Foundations

and Thompvaluation co

.J. and Diehers, Canad

above textse simple ca

w H2

2ta

FoS Resist

Distur

pplied by th

ed to these n

2

the use o

Rock Engi

eering of La

Stability AMethods i

1977 (1).

s in Tension

pson, A.G. omprehensiv

derichs, M.da 1996.

s enable thase of plana

an–

tan

tingForce

rbingForce

he cable bo

otes.

of simple s

neering, In

arge Dams

Analysis of n Rock Me

n. McGraw

Rock reinfve. Rock E

.S. Cable b

he designer ar sliding is s

olt act to de

Support of

statistics an

st. of Minin

Part 1. Wil

Rock Slopechanics, 1

Hill, 1982.

forcement tEngineering

bolting in u

to arrive aset out belo

crease the

f Rock Slopes in

Robert BerAugust 2

nd are cov

ng and Me

ley 1976.

pes for Pla6th Sympos

technology,g Vol 4. Pe

underground

at the workow.

disturbing

n Open Pits

rtuzzi 2012

vered in

etallurgy,

ane and sium on

testing, ergamon

d mines,

ing load

force or

Page 3: Support of Rock Slopes in Open Pits

There is(active)can onlincreas

Assume

Therefo

Solving

s some just) cable. Ony be develoes the resis

e the cable

Resisting fo

Disturbing f

ore,

Shear resis

Therefore

for T

tification forn the other hoped after ssting force.

is not tensi

orce = sa

force = w

N

stance = s

F

T

r assuming hand, if the some movem

oned (pass

shear resisalong failure

weight of bl

N = Wcos

cH

sinWcos

FoS cH/ s

Tp FoSWsi

3

it decreasecable is no

ment has ta

sive)

stance alonge plane

lock acting

+ Tsin ( -

s Tsin

in Wcos

in cH/sin

s the disturot tensionedaken place a

g failure pla

along failur

)

tan∅

Tsin tan

Wsin

Wcos ∅

Support of

bing force ifd (passive) tand therefo

ane + com

e plane

n∅ Tcos

f Rock Slopes in

Robert BerAugust 2

f it is pre-tethe reinforc

ore it is sugg

mponent of T

n Open Pits

rtuzzi 2012

ensioned cing load gested it

T acting

(1)

Page 4: Support of Rock Slopes in Open Pits

Assume

Solving

Equatioproposeparame For exa

using th

Once th

These m

e the cable

Resisting fo

Disturbing f

for T

ons (1) and ed that diffeeter, i.e. hig

ample,

Fc =

F =

Fw =

Fu =

hese values

he working

chorest

cho

des

free

corr

matters are

is pre-tensi

orce =

force =

F

T

(2) assumerent FoS sher FoS for

1.5 for c

1.2 for f

1.0 for w

2.0 for w

s Equation (

T

load has be

oice of anchtressable)

oice of safet

sign of anch

e length (un

rosion prote

dealt within

ioned (activ

= shear res

= weight oacting al

FoS cH/ s

Ta FoSWs

sin

e a uniformhould be us

r ill defined

cohesion, c

friction,

weights and

water press

(1) becomes

T Wsin

een obtaine

hor type (p

y factors

or bond zon

bounded zo

ection

n the follow

4

ve)

sistance alo

of block actiong failure

in Wcos

Wsin Tcos

sinα‐ cH/ sin

∅ Fo

m FoS for ased, depenparameters

c

d forces and

sures

s

cH/1.5sin W

∅/ .

d, the follow

pre-tensione

ne

one)

wing sections

ong failure p

ing along faplane

Tsin tan

s

Wcos tan∅

Scos

all the unknoding on the

s.

d

Wcos ∅/

wing matter

ed, strand o

s.

Support of

plane

ailure plane

n∅

own parame degree of

.

s have then

or bar, tem

f Rock Slopes in

Robert BerAugust 2

e – compon

meters. It haconfidence

n to be addr

mporary/per

n Open Pits

rtuzzi 2012

ent of T

(2)

as been in each

(3)

ressed:

manent,

Page 5: Support of Rock Slopes in Open Pits

2.

The mafew excthe slopmining usual toenvironperman The curlong strit is said Active s3, and is offeremass to

CHOICE O

ajority of opceptions whpe to be suor that it is o design cament is fou

nent suppor

rrent practicrand anchord to be “act

support invoprovides efed by an ano occur befo

OF SUPPOR

pen pits havhich continuupported isto be mine

able anchound to be rts (e.g. Figu

ce in open prs which maive”, if not t

olves stressffective supnchor grouteore any sup

Figure

RT PHILOS

ve an operae operating

s not exposed out or durs as temphighly aggrure 3).

pit mining inay or may nhen it is ter

sing the cabport prior toed over its

pport from th

2: Typ

5

SOPHY

ating life of g for 20 yeased until seumped againorary suppressive in w

n Australia inot be pre-tmed “passiv

ble anchor oo any movefull length a

he cable an

pical Tempo

less than 2ars or moreeveral yearsnst as mininorts (e.g. Fwhich case

is to use thetensioned. ve”.

over an unbement of theand require

nchor is mob

orary Strand

Support of

20 years al. Also it is s after the ng progress

Figure 2) une the only o

e term cableIf the anch

bounded lene rock masss some mobilised.

d Anchor

f Rock Slopes in

Robert BerAugust 2

though theoften the ccommence

ses. Therenless the poption is to

e anchor tohor is pre-te

ngth, Figures. Passive

ovement of

n Open Pits

rtuzzi 2012

re are a ase that

ement of fore it is articular

o design

o refer to ensioned

es 2 and support the rock

Page 6: Support of Rock Slopes in Open Pits

Generacheape

The excSignificfrom a p

ally, passiveer and easie

No

Ten

ception to tant shear dpassive anc

Figure

e support er to install.

need to ens

nsion is not

the rule howdisplacemenchor can be

3: Typ

systems a

sure an unb

applied.

wever, is wnt can occue mobilised

6

pical Perman

re adopted

bounded len

when large, r along sucand hence

nent Strand

d in open

ngth of anch

continuousch a structur

an active sy

Support of

d Anchor

pit mines

hor.

s, flat structre before thystem is us

f Rock Slopes in

Robert BerAugust 2

because t

tures are uhe available sually consid

n Open Pits

rtuzzi 2012

hey are

ndercut. support

dered.

Page 7: Support of Rock Slopes in Open Pits

3.

A fully etensile resistanlittle resthe grou 3.1.

Within tdiameterespect Typical

ANCHOR T

encapsulatecapacity th

nce to sheasistance to ut over a su

Cable Anc

the Australer or 15.2 mtively.

cable anch

Borbe m

Cabtypi

Bonsystthe occgrea

Freesecin g

Spabetw

Cen

Nosanc

Gro

-

-

-

A wcomsettand

Greof th

TYPE

ed reinforcinat can be d

ar where theshear and

ubstantial le

chors

ian contextmm diamete

hor installati

rehole – themaintained

ble Anchor cally 15.2 m

nd Length –tem this colength of aur. Over thase or oil.

e Length – tion the starease and t

acers – utilween strand

ntralisers –

se Cone – achor.

out – cemen

Type A (no

Type B (higfaster set obtaining fr

Type C (low

water cemenmmonly usetlement. Thd produces a

eases – are he anchors.

ng bar or bodeveloped oe bolt crossthe develo

ength.

cable ancher strand wit

ons are pre

e diameter sbetween th

– the cabmm diamete

– this sectioomprises allanchor behhe bond le

over this sends are frethen coverin

ised approds and grou

are used to

a nose con

nts which ar

ormal or ord

gh early strrarely justi

resh supplie

w heat) whic

nt ratio of 0.d. Normallhese causea grout of u

only used .

7

olt in resin oover a relatses a joint. opment of fu

hors are noth nominal

esented in F

should be she borehole

ble anchor er and ultim

on of the an of the ancind the geongth the st

ection tense of grout. ng with a pl

oximately evut/breather t

o keep the a

e is someti

re commonl

inary) Portl

rength) is raify its greaes.

ch is often u

.35 – 0.38 hy, the only

e the cemenniform stren

in active su

or grout is ctively short In contrastull axial-loa

ormally conultimate cap

Figures 2 an

uch that at wall and an

can consisate capacity

nchor is bonchor. In anological featrands shou

ion is impaThis is achastic sheat

very two mtubes.

anchor withi

mes used t

y used inclu

and cemen

arely warraater expens

used for ve

has proven admixturesnt grains tongth throug

upport syste

Support of

characteriselength of tht, cement g

ad may requ

nstructed fropacities of 1

nd 3 and es

least 10 mmny cable str

st of one oy of nomina

nded to the active syst

tures upon uld be clean

rted to the hieved by coh.

metres to m

n the centre

to assist the

ude:

t which is n

anted. Its lese and the

ry long anc

satisfactorys required ao stay sepahout the ho

ems over th

f Rock Slopes in

Robert BerAugust 2

ed by its larhe bolt andgrouted cabuire deform

om either 1184 kN and

ssentially co

m clearancerand.

or more stral 250 kN.

rock. In a tem this co which slidn with no tr

anchor. Alovering the

maintain se

e of the bor

e installatio

normally ade

esser bleede usual diff

hors.

y for anchorare those to rated until

ole.

he unbonde

n Open Pits

rtuzzi 2012

rge axial its high

les offer mation of

2.7 mm d 250 kN

omprise:

e should

rands of

passive omprises ing may races of

ong this strands

paration

rehole.

on of the

equate.

ding and ficulty in

rs and is prevent they set

d length

Page 8: Support of Rock Slopes in Open Pits

Typical given o VariousHutchincivil eng

Ancperpsup

Beaplatmob

Barbea

details of n Figures 2

s cable optnson & Diedgineering.

chor Block –pendicular

pport system

aring Plate te plays a vbilised.

rrel and Wearing plate a

temporary 2 and 3.

tions are avderichs, 199

Figure

– this simplyto the cab

ms in hard ro

– even in very signific

edge Anchoand the cabl

and perma

vailable as 96). Figure

e 4: Ty

8

y involves uble installatiock unless

fully groutecant role in

ors – these le strands.

anent stran

shown in 4 shows a

ypical Perm

using neat gon. Anchothe surface

ed cables tn allowing a

provide po

nd anchors

the pages typical per

anent Bar A

Support of

grout to creor blocks a is very irre

esting has all the supp

sitive conne

used in civ

that followmanent bar

Anchor

f Rock Slopes in

Robert BerAugust 2

ease as flat are not neeegular.

shown theport availab

ection betw

vil enginee

w (reproducr anchor as

n Open Pits

rtuzzi 2012

surface, eded for

e anchor le to be

ween the

ring are

ed from used in

Page 9: Support of Rock Slopes in Open Pits

Plain SStrand

9

Support of f Rock Slopes in

Robert BerAugust 2

n Open Pits

rtuzzi 2012

Page 10: Support of Rock Slopes in Open Pits

10

Support of f Rock Slopes in

Robert BerAugust 2

n Open Pits

rtuzzi 2012

Page 11: Support of Rock Slopes in Open Pits

Epoxy Coated/Enncapsulatedd Strand

11

Support of f Rock Slopes in

Robert BerAugust 2

n Open Pits

rtuzzi 2012

Page 12: Support of Rock Slopes in Open Pits

Swaged

d/Buttonedd Strand

12

Support of f Rock Slopes in

Robert BerAugust 2

n Open Pits

rtuzzi 2012

Page 13: Support of Rock Slopes in Open Pits

Birdcag

ged Strandd

13

Support of f Rock Slopes in

Robert BerAugust 2

n Open Pits

rtuzzi 2012

Page 14: Support of Rock Slopes in Open Pits

Nutcag

ged Strand

14

Support of f Rock Slopes in

Robert BerAugust 2

n Open Pits

rtuzzi 2012

Page 15: Support of Rock Slopes in Open Pits

Bulbed

d Strand

15

Support of f Rock Slopes in

Robert BerAugust 2

n Open Pits

rtuzzi 2012

Page 16: Support of Rock Slopes in Open Pits

16

Support of f Rock Slopes in

Robert BerAugust 2

n Open Pits

rtuzzi 2012

Page 17: Support of Rock Slopes in Open Pits

17

Support of f Rock Slopes in

Robert BerAugust 2

n Open Pits

rtuzzi 2012

Page 18: Support of Rock Slopes in Open Pits

3.2.

Rock bocan be

Bar anczone wanchor.

3.3.

Pre-tenzone ofgood grthe strais dictatthe freeused bediscussnot govthe “dracalculat

where:

x

In most

Bar Ancho

olts of 19, 2used havin

BA

chors can bwhich may in. However,

1. they

2. they

Pre-tensio

sioned ancf a strand arout bond. ands or bar ted by the ge length is feneath founsed in Sectivern, the miaw-in” of theted using th

Ifmin = Min

E,A = Elas

P = Req

xo = Exte6 m

t cases, this

ors

23, 26, 29, 3g ultimate c

R DIAMETEmm

19

23

26

29

32

25

38

be fitted witn some cas the main a

y have very

y can be ins

oned or Act

chors compranchor the s

The free lein grease f

geometry offrom the slondations theon 4.4. Fonimum freee wedges ahe following

imum free l

stic modulu

quired proof

ension requmm)

s minimum f

32, 35 and capacities a

ULTIMAT

ER REGU

h one or twses result idvantages

y little stretch

stalled upwa

tive Ancho

rise a free lstrands areength of botfilled plasticf the applicaope face to e free lengt

or strand ane length wout the anchosimplified e

I

length

s and cross

f load

uired to ach

free length

18

38 mm diamas given in T

TABLE 3.1TE BREAKI

ULAR GRADkN

280

410

525

655

800

950

1130

wo nuts or win a shorterof bar anch

h

ards more e

rs

length and e alternatelyth bars andc sheathingation. For e the postulath is usuall

nchors, anduld be dicta

or head to pequation:

Ifmin EAPx

s sectional a

hieve draw

as derived

meter bar inTable 3.1.

1 NG LOAD

DE SU

with a mechr anchor zohors are:

easily than s

a bond or ay spread and strands is . In many cexample whated slidingy controlled

d where geoated by the rovide a giv

xo

area of anc

n in of the

from this m

Support of

n either regu

UPER GRADkN

305

450

570

710

870

1040

1230

hanical sheone that the

strand anch

anchor zoned crimped tusually ach

cases the rhen used for surface. W

d by the coometry of thextension r

ven lock off

hor

wedges (n

ethod is les

f Rock Slopes in

Robert BerAugust 2

ular or supe

DE

ell in the ane equivalen

hors

e. Within ttogether to hieved by erequired frer slope stabWhere anch

one pullout he applicatirequired to f load. This

normally ab

ss than 1 m

n Open Pits

rtuzzi 2012

er grade

chorage nt strand

he bond provide

encasing e length

bilisation hors are criterion on does achieve may be

out 5 to

.

Page 19: Support of Rock Slopes in Open Pits

4.

An anch

Our levranges regard Therefo 4.1.

The uncnot unre For comanchors 4.2.

The ancThe maanchor grout inthe top grout isnot a go As a guuniform

The abo For a grmargin

SAFETY FA

hor has to b

1. Fail

2. Pull

3. Pull

4. Pull

el of knowlefrom beingto grout/ro

ore in consid

Failure of S

certainty regeasonable t

mparison ths and 63-65

Failure of S

chor force, aximum shezone, until

nvolves adhof the bond

s not faulty overning cri

uide, the ultm over the bo

1.0 MPa fo

2.0 MPa fo

3.0 MPa fo

ove values

roup of barssketch whic

For 2 stran

For 3 stran

For 4 stran

ACTORS A

be designed

ure of the s

l-out of the

l-out of the

l-out of a m

edge regardg precise in ock bond fdering desig

Strands or

garding theto work at s

he current 5% for temp

Steel/Grou

T, is transfeear is at theslip occurs

hesion, frictd zone and and the striterion.

timate bondond length

r clean plai

r clean stra

r clean “bird

are based o

s or strandsch shows th

ds, reductio

ds, reductio

ds, reductio

AND DESIG

d for the foll

strands or b

strands or b

grout/rock b

ass of rock

ding the ultithe case o

ailure and gn safety fa

r Bar

e ultimate ststresses up

practice in porary anch

ut Bond

erred as shee top of theprogressiv

ion and mebreaks dowands are fre

d stress betshould not

n bar

nd or defor

d caged” str

on a minimu

s, the effecthe interactio

on factor is

on factor is

on factor is

19

GN CRITER

lowing poss

bar

bar through

bond zone b

containing

mate load vof failure of

very unceactors one m

trengths of sto 100% of

civil enginors.

ear betweee bond zonvely down thechanical inwn the adheree of greas

tween the sexceed:

rmed bar

rand

um grout co

tive perimeton between

0.8

0.6

0.4

RIA

sible modes

the grout

by shear (i.e

the whole o

values for ththe steel th

ertain with must first co

strand and f the quoted

neering is to

en the wire se and decrhis zone. Tnterlock. Inesion compose etc., failu

strand and

ompressive

ter is multip strands in

Support of

s of failure:

e. like a pis

or part of th

he four condhrough to qregard to

onsider the b

bar is very d minimum b

o use 50-6

strands of theases towa

The bond ben practice sonent. Howure of the s

grout which

strength of

lied by a reda double ca

f Rock Slopes in

Robert BerAugust 2

ston in a cyl

he anchor.

ditions listequite imprecrock massbases of de

low. Therebreaking str

60% for pe

he cable anards the enetween strasome slip owever, provstrand/grout

h is assume

f 30 MPa.

duction factable installa

n Open Pits

rtuzzi 2012

inder)

ed above cise with failure.

esign.

efore it is ress.

rmanent

nd grout. d of the nds and ccurs at

vided the bond is

ed to be

tor, see ation.

Page 20: Support of Rock Slopes in Open Pits

Also thecross-s Again eunless t 4.3.

Shear s

Normal betweeforce, T where:

Figur This is unless length dabout 1 The texLittlejohrelevanvalues g

e cross-secectional are

experience there is som

Failure of t

stresses alo

whe

the

practice isn grout an

T, is related

l =

d =

=

re 5: C

the case ethe rock is

does not pr0 m.

xt by Hannhn and Bruct to some given in Ta

ctional area ea.

has shownmething ser

the Grout/R

ong the grou

ether the an

amount of s

s to designd rock usinto the fixed

T

fixed an

effectiv

working

ross section

even thougs soft. Howroportionally

na (1982) rece in 1976. Australian ble 4.1 inco

of the stran

that failureriously wron

Rock Bond

ut/rock inter

nchorage is

slip betwee

the bond ng tabulated anchor de

T = dl

nchor length

e anchor di

g bond stres

n showing t

gh it is unliwever, it my increase t

eproduces The informconditions

orporate a s

20

nds/bars sh

e of the steng with the g

d

rface are co

a tension o

en grout and

zone baseed values bsign by the

h

iameter

ss

the idealise

kely that dust be recothe capacity

data on romation is no

are given safety factor

hould not ex

el/grout bongrout or inst

omplex and

or compress

d rock

ed on an avbased on e

equation (F

d cable bolt

istribution oognised thay and typica

ock/grout boot repeated

in Table 4r of about 2

Support of

xceed 15-20

nd is not a tallation pro

depend on

sion type or

verage alloexperience. Figure 5):

t assembly

of the bondat simply inally bond len

ond valueshere. Sele

4.1. It is c.0.

f Rock Slopes in

Robert BerAugust 2

0% of the b

governing ocedure.

:

r some hybr

owable bond Thus the

within a bo

d stress is ncreasing thngths are li

s first publisected designconsidered

n Open Pits

rtuzzi 2012

borehole

criterion

rid

d stress e anchor

rehole

uniform he bond mited to

shed by n values that the

Page 21: Support of Rock Slopes in Open Pits

SED

QuaFresSlig

ShaFresSlig

MudFresSligMod

IGN

BasFresSligMod

Gra

MET

BrisSligModHigh

GEN

StroMedWea

For lowworkingstrength

In the abond stof 1.4 M

DIMENTAR

artzitic sansh htly to Mod

ale (e.g. Assh htly to Mod

dstone (e.gsh htly weathe

derately we

NEOUS

salt (Melbosh htly weathe

derately we

anite (Fresh

TAMORPH

sbane Metahtly weathe

derately wehly weather

NERAL

ong rock dium rock ak rock

w strength rg bond stresh, i.e.

absence of tress is ofteMPa.

ROC

RY

ndstone (e.g

erately wea

hfield Sha

erately wea

g. Melbourn

ered athered

urne)

ered athered

h)

ICS

amorphics ered to freshathered red

ock massess at the ro

shear strenen taken as

K TYPE

g. Hawkesb

athered

le)

athered

ne Mudston

h

s and wherck/grout int

Cohesionm

ngth data fo1/30 of the

21

TABLE 4.1

bury Sands

ne)

re shear strerface shou

min

or the rocke unconfined

1

A

stone)

rength datauld not exce

mass or fid compress

Support of

ALLOWABLBOND

[k

800 –500

500 –300

750 –500 –300

1500 1000 400 –

1400

10400 200

1000 700 –350

a exist, the eed half of t

eld pull-outsive strength

f Rock Slopes in

Robert BerAugust 2

LE AVERASTRESS

kPa]

– 1200 – 800

– 1000 – 500

– 1500 – 1000 – 750

– 3000 – 2000 – 1500

– 1600

000 – 700 – 300

– 1400 – 1000

0 - 700

maximum the minimu

t tests, the h up to a m

n Open Pits

rtuzzi 2012

GE

average m shear

working maximum

Page 22: Support of Rock Slopes in Open Pits

4.4.

Liftout oThis is a

Hanna model asome cangles such ththe sum

Failure of t

of a mass oa controver

1. the

2. the rem

(1982) discand “full scacases makedepending at their res

m of the indi

the Rock M

of rock encorsial subject

shape of th

strength mainder of th

cusses thesale” tests. Tes allowanc

on rock copective pulvidual cone

Fig

Mass

ompassing t because:

he failed roc

(friction anhe rock is no

e matters inThe author ce for sheaonditions (selout cones

es.

gure 6:

22

an anchor

ck mass is u

nd adhesioot known.

n detail anduses the Br strength iee Figure 6intersect th

Pull-out of

or group of

uncertain (s

on) betwee

d summariseritish Standin the rock 6). Where he overall vo

f Mass of R

Support of

f anchors m

ee Figure 6

n the faile

es the ratheard (BS 80 and allowsmultiple anolume must

ock

f Rock Slopes in

Robert BerAugust 2

must be con

6).

ed mass a

er sparse da 81-1989) ws for differenchors are t be calcula

n Open Pits

rtuzzi 2012

sidered.

and the

ata from which, in ent cone installed

ated, not

Page 23: Support of Rock Slopes in Open Pits

4.5.

Based ostraight

Once thpattern

It is theeconomcapacityare genfail to badditionrequire conside After ththe slopbolts pepattern

Summary

on the disct forward an

1. Assbar

2. Ass(thisfollo

3. Asslengthat

4. Chegiveopecon

5. For wed

he total supusing eithe

indi

vert

e author’s emise on dry, the spac

neral guidesbe fully effecn, a supporintensive d

ered which w

e support spe geometryer bench heshould be c

of Design

cussion presnd has the fo

sess the reqanchor are

sess the nus depends owing sectio

sess the algth of the bt the bond le

eck againste a safety fen pit applictinuous join

strand andges at anc

pport intenser variation i

vidual cable

tical and ho

experience illing whilsting may be s to the limictive and inrt pattern o

drilling. If smwill result in

spacing hasy. Typicallyeight (i.e. 2created by a

Procedure

sented abovollowing ste

quired work appropriate

mber of stron the lev

on).

lowable grobond zone,ength does

rock massfactor of at cations; chents, etc.).

chors, chechor head (u

sity has bein:

e anchor ca

rizontal spa

that 500 kt still maincalculated

its on spacin general spof less thanmaller spacn more acce

s been estay the vertica2, 3, or 4 aalternating

23

ve it can beeps:

king load pe.

rands or bavel of corro

out/rock bo and alter not exceed

s failure anleast 1 aga

eck for com

ck for miniusually less

en assesse

apacity and/

acing

kN anchors ntaining pra

from the reing. If anchpacings gren 2 m x 2ings are ind

eptable spa

ablished theal spacing snd not say subsequen

e seen that

er anchor a

ar size and osion protec

ond stress anchor hol

d about 10 m

d alter the ainst cone

mpentancy o

imum free than 1 m).

ed it is nec

/or

are typicalacticable aequired suphor spacingeater than 5m would n

dicated largcings.

e next step should prov

2.8, 3.3, et rows.

Support of

the design

and decide

the appropction and is

and therefe diameter m.

free lengthpullout (diff

of rock mas

length to p

cessary to a

ly used in nchor spacport intensit

gs are too w5 m are not not be pracer capacity

is to checkide a whole

etc.). In ad

f Rock Slopes in

Robert BerAugust 2

n procedure

e whether s

priate hole ds discussed

fore determr if necessa

h, if appropfficult to do ss, bedding

provide dra

assess the

open pit mcings. Givty. Howeve

wide apart trecommen

cticable as y anchors sh

k to see if ite number ofdition, a sta

n Open Pits

rtuzzi 2012

is quite

trand or

diameter d in the

mine the ary such

priate, to in most planes,

aw in of

support

mining to ven this er, there they can nded. In it would hould be

t fits into f rows of aggered

Page 24: Support of Rock Slopes in Open Pits

5.

The maBertuzz Tempor For tem10 mm free tenagents the use Perman In the prestresbecausinvestigbeen edirectiocorrosiv For thisin a thicpoly-ethmentionencapscementthereforconditio There aanchorsbetweethe borwhethefor permtend to ample i

(2) A cop

CORROSIO

atter of corrzi (1999) (2)

rary Anchor

mporary anthickness

ndon lengthcannot reac

e of individua

nent Anchor

case of a ssed steel we it provi

gations on thexcavated an, of up tove environm

s reason peck wall diffuhylene or poned cracksulated bondt grout insire essentiaons have pr

are two ves as describn the corru

rehole requir the autho

manent ancuse tempon most case

py of this pap

ON PROTE

rosion proteand summa

rs

chors, withis considere

h the constrch the presal coated a

rs

permanenwas generades an ahe load tranand inspecto 2 mm widment these c

ermanent anusioned-tigholy-propylens and to d length thede the cor

al. Full scroved the va

ery importabed above, gated and ired for an r is perman

chors are asorary anchoes.

NST

5

1

2

per is attache

ECTION

ection is disarised below

hin the fixeded to be noruction shoutressed stend greased

t anchor aally conside

alkaline envnsfer mechated have s

dth are almcracks are d

nchors are fht, elastic ane. Corrugform a bae tendon forrugated ducale groutialidity of this

ant factors the quality smooth andanchor is c

nent (fully ss per Tablers is to use

NO. OF TRANDS

1 to 4

5 to 12

3 to 25

25 to 40

ed to these n

24

scussed in w.

d anchor leormally sufuld be such

eel or can gad strand.

an uncrackeered to be avironment anism, as wshown that

most inevitabdetrimental

fully encaseand chemicagated sheatharrier agaiorce will firsuct. A comng tests as system.

with regarof the corrud sealing thclearly depesheathed) oe 5.1. Curree a minimum

TABLE 5.1

BOREHO

otes.

detail in H

ength a cefficient to prh that air, wain ingress.

ed cement an effectivefor the s

well as actuacracks, bo

ble within tto the long

ed along theally passivehing has thenst extern

stly be transmplete fillingand subseq

d to the cugated sheahe nose conendant on tr temporaryent practicem hole diam

1

OLE DIAMET[mm]

100

150

210

250

Support of

anna (1982

ement groutrotect the t

water and c. This is no

grout bode protectionsteel. Hoal tests withoth in radiathe fixed anterm perfor

e free and fe plastic shee capacity tal agents. sferred fromg with high

quent pullo

constructionathing and tne of the anthe numbery. Typical be in Australimeter of abo

TER

f Rock Slopes in

Robert BerAugust 2

2) and in P

t cover of tendon. Wcorrosion prormally achi

dy surroundn against coowever, theh anchors thal and longnchor lengtrmance.

fixed anchoeathing mato bridge th In a comm the stranh strength ut test un

n of fully sthe sealing nchor. Ther of strandsborehole dian open pit

out 75 mm.

n Open Pits

rtuzzi 2012

ells and

at least ithin the romoting ieved by

ding the orrosion, eoretical hat have gitudinal th. In a

or length ade from e above mpletely d to the grout is der site

heathed of joints

e size of s and on ameters ts which This is

Page 25: Support of Rock Slopes in Open Pits

6.

There isimportaare:

In stronreadily materialittle chaas mud The firsused. Wand it ismarine down-th The sedrilling circulat A big ishole is the grou The insfollowin With regconsidea valid after stgrout do The gewhen fix

CONSTRU

s little doubance. Base

met

grou

ng, brittle rodrilled with

als form chipance of holstones and

st is that cloWhen suchs possible work the a

he-hole ham

cond is theis used. It ing water te

ssue is grousually imput escaping

stallation ong sketches

gard to grouered importareason for ressing. If oes not rem

ometry of txing the pla

UCTION AN

bt that consd on the au

thod of drilli

uting

ock (say wit percussionps when dre blockage weak sand

ogging can h clogging ofor joints a

author is awmmer becam

e problem ois not a pro

ends to was

ut leakage practicable. g from aroun

f a passive in Figure 8

uting of the ant that thegrouting firthis is don

main at the t

the rock faate assembl

D INSTALL

struction couthor’s expe

ng, cleanin

h unconfinen equipmenrilled and th

during drilldstones two

occur withinoccurs high nd bedding

ware of subme clogged

of sidewall oblem if wash the sidew

from the b The autho

nd the anch

e (un-tensi8.

hole (and te hole be furst the anchne then cartop of the fir

ce at the hly, to preven

25

LATION

ntrol, particerience ther

g and leaka

ed strength nt and in pahere is usualing. Howe

o problems h

n the hole wair pressur

g planes to bstantial pn.

smear whiashboring orwalls clean.

orehole. Inor normally hor.

oned) cabl

the inner anlly grouted horage zonre is requirerst grouting

head of thent cutting th

cularly for pre are two m

age testing

greater thaarticular a dally little smver, with wehave to be f

when downres build upbe blown

neumatic lift

ich is a par diamond c

n open pit muses a no

le bolt into

nnulus for fuin one pas

ne and thened in ensurstage.

e cable neehe cable. S

Support of

ermanent amain areas

of the hole

an 50 MPa) down-the-ho

mear of the eaker sedimfaced.

-the-hole pep in the viciopen. In twting of the

rticular procoring is ad

mining, lean-flowing gr

o an uphole

ully encapsus. Occasio

n the remairing that a

ds to be caee Figure 7

f Rock Slopes in

Robert BerAugust 2

anchors, is of concern

) the anchorole hammehole perime

mentary roc

ercussion dnity of the wo cases irock mass

oblem if augdopted beca

kage testinrout mix to

e is shown

ulated anchonally there nder of thezone of ve

arefully con7.

n Open Pits

rtuzzi 2012

of great . These

r can be r. Such eter and cks such

drilling is hammer nvolving when a

ger type ause the

g of the prevent

n in the

hors) it is may be

e anchor ry weak

nsidered

Page 26: Support of Rock Slopes in Open Pits

Figure

pos

e 7: Problemssible soluti

ms kinking ions – morta

the cable inar bed, ang

26

n both up-hogled washer

oles (left) anr & enlarged

Support of

nd down-hod plate holes

f Rock Slopes in

Robert BerAugust 2

oles (right). s, domed p

n Open Pits

rtuzzi 2012

Three plate

Page 27: Support of Rock Slopes in Open Pits

The incimporta

F

clination of ance of ensu

Figure 8: Din t

the cable ruring the ca

Desirable tethe cable bo

elative to thable is insta

ensile or unolts depend

27

he failure plled so it ac

desirable coing on relat

p

plane is alsocts in tensio

ompressivetive orientatplane

Support of

o critical. Fn not comp

e forces cantion betwee

f Rock Slopes in

Robert BerAugust 2

Figure 8 shpression.

n be induceden cable and

n Open Pits

rtuzzi 2012

ows the

d d failure

Page 28: Support of Rock Slopes in Open Pits

Figure 9: Installlation of a p

28

passive dou

uble-cable b

Support of

bolt in an up

f Rock Slopes in

Robert BerAugust 2

p-hole

n Open Pits

rtuzzi 2012

Page 29: Support of Rock Slopes in Open Pits

Figu

29

ure 8: conti

nued

Support of f Rock Slopes in

Robert BerAugust 2

n Open Pits

rtuzzi 2012

Page 30: Support of Rock Slopes in Open Pits

Figu

30

ure 8: conti

nued

Support of f Rock Slopes in

Robert BerAugust 2

n Open Pits

rtuzzi 2012

Page 31: Support of Rock Slopes in Open Pits

Exampl Calcula

From eq

From eq

From eq

le

ating cable l

quation (1),

quation (2),

quation (3),

oad

w .

, Tpassive

=

=

, Tactive 1

=

=

, T 2071x

=

=

xtan 45o

1.2x2071xsin

sin 45‐1

.

.

822 kN/m r

1.2x2071xsin

sin 45‐10o

.

.

703 kN/m r

xsin45o‐20x

1.5xsin

sin 45‐10

.

.

803 kN/m r

31

o tan 60o

n45o‐20x20sin 45o

‐20

10o tan 15o co

run of slope

45o‐20x20sin 45o

‐207o tan 15o 1.2c

run of slope

20n 45o

1.5xsin45

0otan15o

1.2cos

run of slope

2071kN/

071 cos 45o tan 1

os 45‐10o

e

1 cos 45o tan 15

os 45‐10o

e

5o‐2071 cos 45o

45‐10o

e

Support of

mrunofslo

5o

o

tan 15o

1.2

f Rock Slopes in

Robert BerAugust 2

ope

n Open Pits

rtuzzi 2012

Page 32: Support of Rock Slopes in Open Pits

If we hacase be

Compa

ad installedecomes,

rison:

CA

Pas

Act

Spe

Pas

the cable

Tp

=

=

ASE

ssive

tive

ecified FoS

ssive, down

10° below t

sin 45 1

.

.

1008 kN/m

[k

nhole

32

the horizont

799.230o tan 15o

m run of slop

LOA

kN / m run

822

703

803

100

tal ( = -10°

3cos 45

pe

AD

of slope]

2

3

3

8

Support of

°) then the

10o

RELATIV

T1

0.86T

0.98T

1.23T

f Rock Slopes in

Robert BerAugust 2

load in the

VE

T1

T1

T1

n Open Pits

rtuzzi 2012

passive

Page 33: Support of Rock Slopes in Open Pits

33

Support of f Rock Slopes in

Robert BerAugust 2

n Open Pits

rtuzzi 2012

Page 34: Support of Rock Slopes in Open Pits

34

Support of

f Rock Slopes in

Robert BerAugust 2

n Open Pits

rtuzzi 2012

Page 35: Support of Rock Slopes in Open Pits

35

Support of f Rock Slopes in

Robert BerAugust 2

n Open Pits

rtuzzi 2012