26
1 SUPPLIER SUMMIT 2017 MONTERREY MEXICO Programmatic Approach to Facility Optimization

SUPPLIER SUMMIT 2017 - interpartner.dkinterpartner.dk/onewebmedia/Activities/2017/Arca/Ingersoll Rand.pdf · Ingersoll Rand advances the quality of life by creating comfortable, sustainable

  • Upload
    buihanh

  • View
    214

  • Download
    1

Embed Size (px)

Citation preview

1

SUPPLIER SUMMIT 2017MONTERREY MEXICO

Programmatic Approach to Facility Optimization

2

Ingersoll Rand advances the quality of life by creating comfortable, sustainable and efficient environments.

Our people and our family of brands—

including Club Car®, Ingersoll Rand®,

Thermo King® and Trane® work

together to enhance the quality and comfort

of air in homes and buildings;

transport and protect food and perishables;

and increase industrial productivity and

efficiency.

We are a $13 billion global business

committed to a world of sustainable

progress and enduring results.

3

America

384 Climate

75 Industrial

24 Corporate

Europe, Middle East,

India, and Africa

137 Climate

31 Industrial

21 Corporate

Asia Pacific

134 Climate

59 Industrial

2 Corporate

World-Class Talent in Every

Market

More than 40,000 employees

globally

Global Footprint and Locations

We have a total of 867 facilities around

the world, including 51 manufacturing

facilities worldwide.

Our Global Footprint

Manufacturing, Distribution & Office Locations

4

Supplier Summit 2017

Leverage existing Strategic Relationship

Programmatic Approach to Facility Optimization

Total Cost of Ownership

Innovation

Strategic planning

Streamlined Project Development & Execution

Discussion Topics:

Strictly Confidential – Do Not Distribute

5

Programmatic Approach to Facility Optimization via Strategic Collaboration

Total cost ofownership

RiskmanagementValue

Total cost of

ownership

Risk

Management

Strategic

Planning

Operational

Excellence

Innovation

Strictly Confidential – Do Not Distribute

Streamlined

Project

Development

& Execution

6

Programmatic Approach to Facility Optimization via Total Cost of Ownership

Total cost ofownership

RiskmanagementValue

Total cost of

ownership

Risk

Management

Strategic

Planning

Operational

Excellence

Innovation

Strictly Confidential – Do Not Distribute

Streamlined

Project

Development

& Execution

7

Total Cost of OwnershipCapital, Install, Maintenance, and Energy

Power & Maintenance Costs make up 85% of TCO in 10 Year Analysis

Unplanned Maintenance Costs represent a Major Risk Factor to Operating Budgets

Asset Management – Optimizing LifeCycle Costs

Capital Investment: Compressor, Dryer/Filter, Receiver, Cooling System, Freight, Start-up/Commissioning

Installation: Storage, Dryage, Placement/Foundation, Electrical, Plumbing, Ventilation to Piping

Maintenance/Repair: Consumable, Wearables, Hard Parts (Compressor/Dryer/Filter) & Service Labor

Strictly Confidential – Do Not Distribute

Success Defined by Asset Availability & Lowest TCO

8

10

46

7

9

7

12

0

10

20

30

40

50

60

70

80

90

100

TotalElectricitycost / year

Leaks LargeReceiver /

LowerPressure

Intelliflow VSD 2-Stage MasterController

ERS Result

Success Defined by Asset Availability & Lowest TCO

Air Receiver

Capacitance

4-Stage

TechnologyAccessory

Design

Total Energy

Costs

Master

ControllerIntelliflow Energy

RecoveryLeak Repair IMPROVED

Total Energy

Costs

Holistic Design & Centralized Air Systems

Strictly Confidential – Do Not Distribute

9

Historical Cost of Ownership Model

Capital Cost & Installation

Routine Maintenance

0

$$$$

1 2 3 4 5 6 7

Unscheduled Repairs

• Capitalize Major Repairs

8 9 10

Strictly Confidential – Do Not Distribute

• ‘Surprise’ Expenditures• Major Repairs often Capitalized• Plant Productivity Impacted• Extended Outage Potential

10

Financially Capped / Risk Transfer Cost of Ownership Model

Capital Cost & Installation

Routine Maintenance

0

$$$$

1 2 3 4 5 6 7 8 9 10

Strictly Confidential – Do Not Distribute

Budgeted Costs Leveled Over Life Cycle

• Allow Accurate Budgeting• Maximum Utilization of Asset• Plant Productivity Optimized• Maintenance Work Scheduled

Planned Maintenance Costs

11

Programmatic Approach to Facility Optimization via Innovation

Total cost ofownership

RiskmanagementValue

Total cost of

ownership

Risk

Management

Strategic

Planning

Operational

Excellence

Innovation

Strictly Confidential – Do Not Distribute

Streamlined

Project

Development

& Execution

12

Involvement

Ability to

Influence and

Guarantee Cost/Performance

Cost of Making

Improvement

Strategic

Planning

Program

Design

Build Close

Out

Facility

Design

Operate

Paradox: Early strategic involvement on collaborative basis is only gained where

sufficient trust established between ARCA and Ingersoll Rand

Opportunity for greatest value creation

Early strategic supplier engagement maximizes

value creation and innovation at lower total costs

Enables innovation when impact is greatest

Strictly Confidential – Do Not Distribute

13

Minimum Acceptable

Performance

Design Service

Live

Optimum

“As Built”

Peak Performance

Intended

Performance

Time

Perf

orm

an

ce

Existing Practices

Perpetual

Commissioning

First

Occupancy

Auto

Commission

Design, Build, Operate Cycle

Actual Service

Live

Addressing Real Lifecycle CostPerformance / Reliability Degradation Over Time

Strictly Confidential – Do Not Distribute

14

Enables Health Monitoring – Supports Trending & Analysis of Operating Parameters

Provides Event Notification w/ appropriate Service Organization ‘Escalation’

Allows for Remote Troubleshooting and Improved Problem Diagnosis

Provides Asset Documentation (Improved ‘Patient Record’)

Supports Control System ‘Fine Tuning’ to ensure Optimal Efficiencies

Real Time Measurement of Key Performance Indicators (KPI)

Provides Validation of System Performance

Enables Comparison of ‘Fleet Assets’

Essential for PackageCare™ Agreements w/ ‘System Availability Guarantee’

Essential to Compressed Air as a Utility (CAU) Solutions

Utilizing Remote Digital Solutions to Drive Asset

Availability & Performance

Strictly Confidential – Do Not Distribute

15

Air Station Solution effectively addresses Compressed Air as a Utility (CAU)

Client no longer chooses to Own & Maintain the generation of Compressed Air

Allows the Client to Focus on Core Competencies and Production Operations

Operational Responsibility and Risk transfers to the Air Station Service Provider

Monthly Fee may be treated as an Operating Expense on Income Statements

Capital Investment Avoidance – Air Station Operator provides Infrastructure Investment

Customized Equipment Configurations are Optimized to meet Process Requirements

Utilizing New Equipment ensures Air Station includes the latest Advanced Technologies

Consistency of Air Quality is contractually guaranteed (Flow, Pressure, Dew Point, etc.)

Air Station Solution can be implemented without disruption to Plant Operations

10 & 15 Year contracts (Early Termination & Outright Purchase Options)

Compressed Air as a Utility (CAU)

Strictly Confidential – Do Not Distribute

16

Programmatic Approach to Facility Optimization via Strategic planning

Total cost ofownership

RiskmanagementValue

Total cost of

ownership

Risk

Management

Strategic

Planning

Operational

Excellence

Innovation

Strictly Confidential – Do Not Distribute

Streamlined

Project

Development

& Execution

17 Flextronics & IR/Trane – 01.20.11

Supply-sideTransmission

Demand-side

Optimizing The Utility of Compressed Air

Holistic Air System Approach

1818 Strictly Confidential – Do Not Distribute

Holistic Asset Effectiveness

Site Readiness - Objective

Get a clear and objective understanding of state of current infrastructure and impact it can have on plant operational reliability / continuity

Assess whether your business objectives can continue to be met

Benefit from a fresh and unbiased perspective

Obtain strategy-based recommendations for future planning

Gain best practice insights that will enable you to take your site operational reliability to the next level

19

Compressed Air System Optimization

Step 1 – Value Identification Questionaire

• Identify Opportunity

• Prioritize

Step 2 – Assessment / Audit

• Level 1 - Intellisurvey

• Analyze

• Quantify

• Level 2 – Investment Grade Audit

• Analyze

• Quantify

Step 3 – Implement

• Implementation

• Verify Savings

• Sustain Savings

Strictly Confidential – Do Not Distribute

20

Total cost ofownership

RiskmanagementValue

Total cost of

ownership

Risk

Management

Strategic

Planning

Operational

Excellence

Innovation

Strictly Confidential – Do Not Distribute

Streamlined

Project

Development

& Execution

Programmatic Approach to Facility Optimization via Streamlined Project Development & Execution

21

Focuses on Understanding the Total Requirements of the System

Initial Design & Build-Out Potential

Understand the Variability of Demand (Time, Event, Seasonal, Etc.)

Recognizing the Site Specific Factors for Designing the System

Centralized Systems Leverage the ‘Scale’ of Compressor Designs

Compression Technologies Selected based upon Ability to Optimize Efficiency

Systems are Designed to Deliver Efficiency Regardless of Demand Fluctuations

‘Mixed Technology’ Solutions Leverage the Strengths of Different Technologies

Better Part Load Performance

Reduced Maintenance Requirements

Systems designed to extend Service Intervals and maximize Asset Availability

Holistic Design & Centralized Air Systems

Systems Designed to Delivery Efficiency, Reliability & Safety

Strictly Confidential – Do Not Distribute

22

Waste Heat Utilized to Support Bottle Warmer Requirement

Integrated Utility Design & Waste Heat Recovery

Strictly Confidential – Do Not Distribute

23

Equipment

Repair Services

Scheduled

Services

Risk Transfer

Programs

Assessment

Services

Strategic

Services

• Compressed Air Assets

• Accessories Components

• System Controls

• Installation Services

• Start-up & Commissioning

• Training

• Time & Material Repair

• Quoted Repairs

• Emergency Repairs

• Emergency Rentals

• Long-Term Rentals

• OEM/Non-OEM Parts

• Remanufactured Equipment

• Equipment Overhaul

• PlannedCare™ Agreement

• Scheduled Maintenance

• Diagnostics Tools

• Long-Term Rentals

• Equipment Overhaul

• PackageCare™ Agreement

• Preventative Services

• Predictive Services

• Total Cost Certainty

• Risk Transfer

• Full Repair or Replacement

• Capability Testing

• Enhanced Reporting

• Improved Asset Performance• VIQ Survey

• IntelliSurvey

• Supply-Side and/or

Demand-Side Audits

• Leak Assessment:

• Asset Documentation

(Fleet Management)

• Air System Modeling

• Remote Monitoring

• Performance Contracts

• System Availability

Guarantees

• Turnkey Solutions

• Compressed Air as a Utility

‘Best in Class’ Equipment deserves

Superior Service Offerings…

Pre-Purchase to Full Life Cycle driving

operational risk mitigation

Hierarchy of Advanced Services for Improved Reliability & Asset Management

Strictly Confidential – Do Not Distribute

24

A Unique Approach to Arca Continental

Strategic Account Management

•Deep strategic

organizational

relationship

•Dedicated Vertical

Market Expertise

•Process Knowledge –

Applying the ‘Right

Solution’ for Each

Project

•Global Solution

Offerings Compliant

with Master Supply

Agreements

Assessment & Planning

•Technical Expertise –

“Air Scientist”

Knowledge of Systems

•Consistent value

proposition with global

execution

•Recommendations in

accordance with site

specific conditions

•Ability to leverage best

practices across sites

Digitally Connected Solutions

•Total system cost of

ownership reduction

•Smart, connected

compressed air system

•Service productivity &

first pass resolution

•Asset availability

•System Efficiency

•Baseline, improve,

validate, retain…

Seamlessly Aligned For Consistent Global Execution

25

Eric FraistatStrategic Account Manager – Coca-Cola

Global Strategic Accounts

Compression Technologies & Services

New York, NY USA

+1.718.753-8210

Email: [email protected]

Alexandre Jordão

Strategic Account Manager

Latin America

Compression Technologies and Services

Al. Caiapós, 311 06460-110 - Barueri – SP Brasil

Office +55.11.2109.8722

Mobile +55 11.99339.0127

Email: [email protected]

ARCA CONTINENTAL Supplier Summit 2017Ingersoll Rand Attendees

Strictly Confidential – Do Not Distribute

Marlon GaleanaCustomer Center Monterrey’s Manager

Compression Technologies and Services

Av. RR # 305. Parque Industrial JM

Apodaca, N.L. México

Office +81 8245 1000 ext 6015

Mobile +55 4354-4318

Email: [email protected]

26 Strictly Confidential – Do Not Distribute

Thank You