SG3 (Optical Access and Transport)Progress Report
23-07-2015
Meeting Chair: Mr Jishnu Aravindakshan, Chair SG3Meeting Co-chair: Mr Gupteswar Majhi, Vice Chair SG3
Agenda 23rd July 2015, Thursday (Room No: 308, IIIT-B, Electronic City,
Bangalore (Opp Infosys campus, Gate 1)) Session 1
◊ 9-9.30: Registration◊ 9.30-10.30:
o Approval of Agendao Introduction of SG3 Vice Chairo Approval of Minutes of previous meetings and work plano Any other item
◊ 10.30: 11.00: Tea Break
<Doc number> 2© TSDSI 2015
Agenda Session 2
◊ 11.00-12.30:o Discussion on Terms of Reference (NIP 40)o Discussion on NIP for New work item on E- band point to point MW
(NIP7)o Discussion on Creation of framework document for CPRI-T (SWIP01)
◊ 12.30-14.00: Lunch Break◊ 14.00-16.30:
o Further discussion on NIP40 and SWIP01◊ 16.30-17.00: Tea Break◊ 17.00-17.30:
o Approval of ToRo Approval of draft Minutes of Meetingo Closing of SG3 meeting
<Doc number> 3© TSDSI 2015
Welcome IIITB and Prof Dr. Debabrata Das, Dean - Academic and R&D,
Professor and Hewlett Packard Chair, I I I T – Bangalore for hosting the SG1 and SG3 F2F meeting.
Introduction of Mr Gupteswar Majhi, Vice Chair SG3 elected on July 13th 2015
Minutes of the Meeting:◊ Conference Call 01: On 22/04/2015◊ Conference Call 02: On 04/06/2015◊ Conference Call 03: On 09/07/2015
<Doc number> 4© TSDSI 2015
Work Plan
<Doc number> 5© TSDSI 2015
Work Item No
Supporters/Contributors
Identification tag
Description
01 Ericsson, Huawei, Intel, Tejas
CPRI-T Fronthaul through transport of CPRI signal from RRH to the C-RAN baseband.
02 Huawei, Tejas SDN-T Specifying the southbound interface, controller and northbound interface for OTN, MPLS-TP, Carrier Ethernet, DWDM/ROADM, IP/MPLS equipment used in various backhaul layers
03 Airtel, Ericsson, Huawei
VBAND V-band point to point connection
04 Airtel, Tejas OTNINTROP OTN interoperation w.r.t. protection and OAM
05 Ericsson, TCIL EBAND E-band point to point connection
Work Item and NIPs
<Doc number> 6© TSDSI 2015
Work Item No
NIP No Identification tag
Description
01 NIP 9 CPRI-OPT Fronthaul through optical transport of CPRI signal from RRH to the C-RAN baseband.
05 NIP 7 EBAND E-band point to point connection
06 NIP 8 CPRI-EBAND Front haul in E-band for connected through a CPRI interface between radio unit and the baseband.
NIP 8,9 combined as a single study item SI01
Backhaul WG Plan FY15-16
<Doc number> © TSDSI 2015 7
CN WG/SG Work flow
<Doc number>
8© TSDSI 2014
May Jun Jul Aug Sep Oct Nov Dec
Framework Document Concall
NIP Consolidation
doneConcall Concall
Concall& F2F
Meeting
Jan Feb Mar
Standard
F2F meeting
for finalization
Concall
2015
2016