Upload
said-ali
View
151
Download
2
Embed Size (px)
Citation preview
Said El-Sayed Saad AliMechanical Maintenance Engineer
EL BAHER ST, IDKU, BEHERA, EGYPTMob: +20 100 2390433 / +20 122 4204883 / +244927125682
E-mail: [email protected]
Career Summary:
I have had more than 12 Years experience in Oil & Gas facilities and operations within
international Group of companies as well as in joint venture companies, primarily in LNG.
I have served as Mechanical Rotating Engineer and Mechanical Maintenance Supervisor in
both operating facilities as well as Project Management teams.
I’m currently working as the Mechanical Maintenance Supervisor of an Operating LNG Plant in
Angola.
With a solid background in Mechanical Engineering and I’m experienced in Developing short
and long term maintenance procedures, developing preparation, pre-execution and
execution of maintenance activities and coordinate related Risk register, Tool Box Talk
(TBT), monitors completion of the work carried out and tracking activities with feedback.
Qualification
Bsc in Power Mechanical – Faculty Of Engineering – Alexandria University, June 2001.
Graduation project : Test of pipe and fittings.
Graduation project grade : Very Good.
Accumulated grade : Good (72.8%).
Training and Employment History
FROM SEPTEMBER 2015 TILL NOW : Company : Egyptian Maintenance Company (EMC).
Location : Angola Liquefied Natural Gas (ALNG Plant).
Position : Senior Mechanical Maintenance Supervisor.
Duties : Supervision and Maintenance within HSE regulations for the following
Equipment ( preventive and corrective Maintenance- Major Overhaul ):
GT MS 6001 DLN gas turbine combustion inspection
GT MS 7001 EA gas turbine Hot gas path inspection.
Centrifugal Pumps (Single Stage – Multi Stage).
Air fan coolers.
Air blowers.
Lean Solvent double -casing centrifugal Sulzer pump seven stages.
SAP Program
FROM OCTOBER 2007 TILL SEPTEMBER 2015 : Company : Egyptian Maintenance Company (EMC)
Location : SEGAS (Spanish Egyptian Gas - LNG Plant).
Position : Senior Mechanical Rotary Maintenance Engineer.
Duties : Supervision and Maintenance within HSE regulations for the following
Equipment (preventive and corrective Maintenance- Major Overhaul ):
GE MS5002D and HITACHI H25 gas turbine combustion inspection.
GE MS5002D and HITACHI H25 gas turbine Hot gas path inspection.
Centrifugal Pumps (Single Stage – Multi Stage).
Axial Flow Pumps – Vertical Pumps.
Air fan coolers.
Air blowers.
Diaphragm pump (dosing pump).
Sea water vertically suspended, single casing diffuser with discharge through the
column ENSIVAL pump two stage.
Fire Sea water vertically suspended, single casing diffuser with discharge through
the column SPP pump Three stages diesel engine drive.
Propane Double-casing diffuser vertical suspended ENSIVAL pump five stage.
Lean Solvent double -casing centrifugal POMPE GABBIONETA pump seven
stages.
Familiar with GE and HITACHI gas turbines, NUOVO PIGNONE axial and
centrifugal compressors, IHI reciprocating compressor.
ENSIVAL, EBARA, KSB, NIKKISO, SPP, POMPE GABBIONETA.
FLOWSERVE pumps.
FBM HUDSON fan coolers, JOHNE CRANE mechanical seals, blowers and over
head cranes.
FROM DECEMBER 2004 TILL OCTOBER 2007 Company : West Delta Electricity Production
Location : Abu Qir, Alexandria.
Position : Maintenance Engineer in Steam Turbine Department.
Duties : Supervision and Maintenance considering HSE regulations for mechanical
Equipment as follows:
Steam Turbine (150 MW).
Centrifugal Pumps (Single Stage – Multi Stage).
Axial Flow Pumps – Vertical Pumps.
Positive Displacement Pumps (Gear – piston).
Overhauling for multi stag pumps (sulzer) in Abu Qir power station.
Work in Nondestructive Test (magnetic test and penetration test ) for steam turbine
blades in abu Qir power plant and El Seyouf power plant.
Air Compressors (Reciprocating) & Dryer.
Heat Exchangers (Heaters – Coolers).
All Types of Valves such as Control Valves (Hydraulic – Pneumatic – Electric), Gate
valves, Globe valves and Butterfly Valves.
Major Overhauling for Unit 5 (Steam Turbine and generator 320 MW) in Abu Qir
power station (ALSTOM).
Major Overhauling for Unit 2 (Steam Turbine and generator 150 MW) in Abu Qir
power station (ALSTOM).
Major Overhauling for Unit 3 (Steam Turbine and generator 150 MW) in Abu Qir
power station (ALSTOM).
Major Overhauling for Unit 4 (Steam Turbine and generator 150 MW) in Abu Qir
power station (ALSTOM).
Professional alignment skills using dial gauges:
- Face and rim alignment method.
- Reverse alignment method.
- Soft foot treatment.
Professional alignment skills using Easy Lazer .
DETAILED DUTIES FOR MAJOR OVERHAULING: For Turbine
- Steam Turbine "ALSTOM" (150 MW) from December 2006 till October 2007.o Making Complete Dismantling for HIP Casing,
LP Casing (Inner-Outer), HIP & LP Rotors, Gland Seals, Main Stop Valves,
Control Valves, Turning Gear, Journal Bearing, Thrust Bearing, Main Lube Oil
Pump, Auxiliary & Emergency Lube Oil Pumps and Hydraulic Oil Pump.
o Changing HIP Rotor Blades and Sealing Strips.
o Check the Clearance for all Parts of Steam
Turbine.
o Making Flushing for Lub. Oil & Hydraulic Oil
Lines.
o Performing Nondestructive Test for all Parts of
Turbine (Magnetic Test – Penetration Test).
o Making Alignment for Steam Turbine and
Generator.
For Generator o Change oil seal and hydrogen seal.
o Inspection for journal bearings.
o Remove the rotor.
o Raise the stator to check the winding.
FROM JULY 2004 TILL DECEMBER 2004
Company : Administration of Roads and Transport.
Location : Damnhur, El-Behera.
Position : Mechanical Maintenance Engineer.
Duties : Maintaining all mechanical equipment.
Personal Data
Marital status : Married.
Military service state : Completed.
Birth date : 27 November 1978.
Computer Skills
Operating Systems (all versions of Ms Windows).
Applications (Ms Office programs, AutoCAD and SAP program).
Internet.
SAP Program
Language
Arabic : Mother Tongue
English : Good written and oral