SAIC-L-2131 Rev 0

Embed Size (px)

Citation preview

  • 7/27/2019 SAIC-L-2131 Rev 0

    1/3

    SAES-B-064,

    Para. 10.6

    SAES-B-064,

    Para. 10.5.1

    FAIL N/A RE-INSP DA

    SAES-L-450,

    Para. 14.2

    PASS

    SAES-B-064,

    Para. 10.6

    SAES-L-450,

    Para. 14.3.1

    SAES-L-450,

    Para. 14.3.2

    A10

    For powerlines operating at 13.8 kV or less and having only one or two

    poles near a pipeline, the minimum horizontal separation may be

    reduced to 15 m or, for pipelines designated in the exception 10.3,(item

    13 above), the minimum horizontal separation may be reduced to 4.5 m.

    A9

    Where pipeline and powerline corridors cross, the minimum horizontalseparation between any pipeline and the poles or structures of overhead

    powerlines shall be 30 m for powerlines operating in excess of 13.8 kV.

    A8

    Where the pipeline and powerline corridors cross, the horizontal angle of

    intersection between the pipeline and powerlines operating in excess of

    13.8 kV should be between 45 to 135 degrees.

    A7SAES-B-064,

    Para. 10.5.2

    Two pipelines may be located near one another provided that a minimum

    clearance equal to the greater of one meter or twice the diameter of the

    larger pipe is maintained between them.

    SAES-B-064,

    Para. 10.6

    When a buried pipeline is installed through a river bottom, wadi, or other

    places where water run-off occurs, concrete coated pipe in accordance

    with (01-SAMSS-012) Submarine Pipe Weight Coating shall be used to

    provide the required stability in case of floods.

    SAES-L-450,

    Para. 14.11

    A6

    Spacing of parallel buried or above-grade pipelines, every pipeline musthave a minimum clearance of 15 meters on one side, with the exceptions

    of:

    a) a pipeline crossings and tie-ins, or for short pipeline sections less than

    20 m in length.

    b) for pipelines designated in the exception to Item No. A12above, every

    pipeline must have a minimum clearance of 4.5 m on one side for

    maintenance vehicle access is not required.

    A5

    A4

    The berm of the new pipeline shall not disturb the flexibility of adjacent

    above ground pipelines and shall not cause damage to pipelines with

    heat tracing such as sulfur pipelines.

    (NOTE:A minimum clearance of 3 meters is recommended. )

    A3

    The minimum clearance between pipelines or between a pipeline and an

    obstruction shall be as specified in Item No. A3, unless additional

    clearance is specified on the construction drawings.

    SAES-L-450,Para. 14.2

    ITEM

    No.ACCEPTANCE CRITERIA REFERENCE

    A1

    If the pipeline crosses or comes within 50 meters of buried pipelines or is

    within 50 m of other buried steel installations, the Cathodic Protection

    Unit of CSD shall be contacted to determine if bonding stations are

    needed.

    A2

    All bonding stations shall be completed and the line backfilled within the

    time frame specified in (SAES-X-400) Cathodic Protections of BuriedPipelines. The as-built drawings shall indicate any buried installations

    and bonding stations.

    WORK PERMIT REQUI

    CONTRACTOR INSPECTION LEVELSAUDI ARAMCO INSPECTION LEVEL

    SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER

    EC / PMCC / MCC NO.REV. NO. PURCHASE ORDER NUMBER

    SCHEDULED INSPECTION DATE & TIME MH's SPENTQUANTITY INSP.ACTUAL INSPECTION DATE & TIME

    SAUDI ARAMCO USE ONLY

    TRAVEL TIM

    LAYOUT DRAWING NUMBER

    PLANT NO.EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID.

    PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR

    Inspection of Pipeline Crossing or Parallel with Existing

    Pipelines and Other Buried facili ties.SAIC-L-2131 25-May-05 PIPE-

    SAUDI ARAMCO ID/PID - 2/19/05 - REV A (Standards Cutoff - August 2004)

    SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

    Page 1 of 3

  • 7/27/2019 SAIC-L-2131 Rev 0

    2/3

    FAIL N/A RE-INSP DA

    A12The minimum vertical distance between the bottom of any pipe and the

    top of the duct bank shall be 1.0 m.

    REFERENCE PASS

    A11

    All underground powerline cables and non-Saudi Aramco

    communications cables crossing pipeline corridors, except as permitted

    below, shall cross under pipes by means of a duct bank designed in

    conformance with SAES-P-104.

    SAES-B-064,

    Para. 10.7

    SAES-B-064,

    Para. 10.7

    SAES-B-064,

    Para. 10.7

    A13The concrete duct bank shall be continuous and at the same elevation

    across the entire width of the corridor.

    A14

    10.8 The minimum vertical clearance (measured from grade) of

    overhead powerline conductors at pipeline crossings shall be 9.0 m for

    powerlines operating at 230 kV or less, and 13.5 m for powerlines

    operating at over 230 kV. For other powerline requirements, see SAES-

    P-107.

    SAES-B-064,

    Para. 10.8

    A15

    For cases in which the powerline is parallel to the pipeline, the minimum

    spacings between a pipeline and a parallel overhead powerline shall bemaintained as specified in SAES-B-064, Table 3.

    Minimum Spacing Between Pipeline and Parallel

    Overhead Powerline

    Powerline Voltage Minimum Spacing

    from Pipeline

    a. For any voltage less than 69 kV

    parallel for more than 1.6 km (1 mile): 30 m

    b. For any voltage 69 kV and greater,

    parallel for more than 1.6 km (1 mile): 150 m

    c. Up to 230 kV, parallel for less than 1.6 km: 30 m

    d. Up to 500 kV, parallel for less than 1.6 km: 50 m

    e. Up to 1000 kV, parallel for less than 1.6 km: 85 m

    SAES-B-064,

    Para. 10.10

    A16

    Non-Saudi Aramco piping (Includes 3rd Party Projects ) crossing pipeline

    corridors shall pass under the pipelines in a manner such that theminimum vertical distance between the bottom of any Saudi Aramco

    pipeline and the top of the non-Saudi Aramco piping is 0.5 m. The non-

    Saudi Aramco piping shall have no servicing points within Saudi Aramco

    pipeline corridors.

    SAES-B-064,

    Para. 10.11

    A17

    When the pipelines cross under roads or railroads through box culverts,

    the minimum spacing between any two pipes shall be twice the diameter

    of the larger pipe. The minimum spacing between any pipe and the

    overhead or side portion of the culvert structure shall be 1.5 pipe

    diameters, but in no case less than 1 m.

    SAES-B-064,

    Para. 10.12

    A18For Cathodic Protection details, see Standard Drawings, "Road

    Crossings for Pipelines." (Refer to Electrical Checklist-______ )

    AC-036660

    Shts. 1, 2, 3 & 4

    A19All buried pipelines, fittings, appurtenances, and anchors shall be coated

    as per SAES-H-002, Para. 5.4.1 thru 5.4.6.

    SAES-H-002,

    Para. 5.4

    A20 All buried coatings shall be 100% holiday checked and all holidaysrepaired prior to burial.

    SAES-H-002,Para. 5.1.1

    ITEM

    No.ACCEPTANCE CRITERIA

    SAUDI ARAMCO ID/PID - 2/19/05 - REV A (Standards Cutoff - August 2004)

    SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

    Inspection of Pipeline Crossing or Parallel with Existing

    Pipelines and Other Buried facilities.SAIC-L-2131 25-May-05 PIPE-

    0 0 0

    PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR

    Page 2 of 3

  • 7/27/2019 SAIC-L-2131 Rev 0

    3/3

    Contractor / Third-Party Saudi Aramco

    1. SAES-L-460, Pipeline Crossings Under Roads and Railroads, (30 September, 2003)

    2. SAES-L-450, Construction of On-Land and Near-Shore Pipelines, (30 September, 2003)3. SAES-B-064, Onshore and Nearshore Pipeline Safety, (30 J anuary, 2002)

    4. Standards Drawings AC-036660 Shts. 1, 2, 3, & 4.

    5. SAES-H-002, Internal and External Coatings for Steel Pipelines and Piping, (31 March, 2004)

    REMARKS:

    REFERENCE DOCUMENTS:

    Construction Representative* PMT RepresentativeQC Record Reviewed Work Verified

    QC Inspector PID Representative

    Name, Initials and Date:

    Work is Complete and Ready for Inspection:

    Name, Initials and Date:

    T&I Witnessed

    Name, Initials and Date:

    Performed Inspection Work / Rework May Proceed

    Name, Initials and Date:

    QC Record Reviewed Work Verified

    T&I Witnessed QC Record Reviewed Work Verified

    *Person Responsible for Completion of Quality Work / Test Y =YES N =NO F =FA

    QC Supervisor Proponent and Others

    Name, Sign and Date:

    Quality Record Approved:Name, Organization,

    Initials and Date:

    T&I Witnessed

    Page 3 of 3