SAIC-D-2018 Rev 2

Embed Size (px)

Citation preview

  • 7/27/2019 SAIC-D-2018 Rev 2

    1/1

    1. SAES-D-109, Design of Small Tanks, (29 December 2004) & 04 January 2006 (on Dec 2005 Cutoff CD)

    contract & use this document along with this checklist as applicable.

    REFERENCE DOCUMENTS:

    A5Alternative under-tank leak detection and sub-grade protection systems

    have prior approval of the Saudi Aramco Engineer.

    SAES-D-109

    Para 14.3.4

    A3 The liner is extended to the internal top edge of the ring foundation.SAES-D-109

    Para 14.3.2

    A4Joints in the liner are satisfy the leak tightness, permeability, and

    chemical resistance requirements for the liner material.

    SAES-D-109

    Para 14.3.3

    A1Flexible membrane liner of minimum 1000 microns (40 mil) thickness

    compatible with the stored product are applied under tank bottom.

    SAES-D-109

    Para 14.3.2

    Saudi Aramco

    Name, Sign and Date:

    A2 Liner is placed at bottom of the ring foundation or minimum 1 meterbelow the top edge of the ring foundation whichever is greater.

    SAES-D-109Para 8.6 / 14.3.2

    Name, Organization,

    Initials and Date:

    T&I Witnessed

    Y = YES N = NO F = FA*Person Responsible for Completion of Quality Work / Test

    REMARKS:

    QC Supervisor Proponent and Others

    Contractor / Third-Party

    NOTES: 1. December 2005 Cutoff Standards CD contains 04 January 2006 Major Revision to SAES-D-109. Ensure this is applicable to the

    Name, Initials and Date:

    Quality Record Approved: Work Verified

    Performed Inspection Work / Rework May Proceed

    Name, Initials and Date:

    T&I Witnessed QC Record Reviewed

    Construction Representative* PMT Representative

    Work VerifiedT&I WitnessedName, Initials and Date:

    Work is Complete and Ready for Inspection:

    Name, Initials and Date:

    SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005) Rev 2 31-Dec-05

    SAUDI ARAMCO INSPECTION CHECKLISTSAIC NUMBER DATE APPROVED

    SAIC-D-2018 1-Dec-06 MECH-

    QC Record Reviewed

    Work Verified

    QC Inspector PID Representative

    QC Record Reviewed

    QR NUMBER

    PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

    Insp of Under-Tank Leak Detection, Sub-Grade Protection

    PLANT NO.EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID.

    LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

    TRAVEL TIM

    SAUDI ARAMCO USE ONLYSCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT

    SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUI

    SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

    ITEM

    No.ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DA

    Page 1 of 1