,80 Qv ~',v P.o. BOX 529100, MIAMI, FL 33152 80050~50 ZQQ >pi,'I lJ'x FLORIDA POWER 4 LIGHT COMPANY Nay 1, 1980 L-80-136 Office of Nuclear Reactor Regulation Attention: Nr. R. M. Reid,Chief Operating Reactors Branch <4 Division of Operating Reactors U. S. Nuclear Regulatory Commission 4'ashington, D. G. 20555 Dear Nr. Reid: Re: St. Lucie Unit 1 Docket No. 50-335 Inservice Test Pro ram A revised pump and valve Inservice Test Program for St. Lucie Unit 1 is attached. The program shall be conducted in accordance with the 1974 Edition of the ASNE Boiler E Pressure Vessel Code (through Summer 1975 Addenda) except for specific relief requested in accordance with 10 CFR 50.55a(g)(5)(iii). The .program is applicable for the period April 21, 1980 to April 21. 1990. Very truly yours, W Robert E. Uhrig Vice President Advanced Systems 5 Technology REU/NAS/VTC/cph cc: Nr James P. O'Reilly, Region II Harold F. Reis, Esquire Backset 8 ~+ -3p~ Cootrol@So as o~~~ ~ of QOCQmg+ "EGMATOA'g 9 pt',gg F~g PEOPLE...SERVING PEOPLE

Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

,80 Qv ~',v

P.o. BOX 529100, MIAMI,FL 33152

80050~50 ZQQ>pi,'I lJ'x

FLORIDA POWER 4 LIGHT COMPANY

Nay 1, 1980L-80-136

Office of Nuclear Reactor RegulationAttention: Nr. R. M. Reid,Chief

Operating Reactors Branch <4Division of Operating Reactors

U. S. Nuclear Regulatory Commission4'ashington, D. G. 20555

Dear Nr. Reid:

Re: St. Lucie Unit 1

Docket No. 50-335Inservice Test Pro ram

A revised pump and valve Inservice Test Program for St. Lucie Unit 1 isattached. The program shall be conducted in accordance with the 1974 Editionof the ASNE Boiler E Pressure Vessel Code (through Summer 1975 Addenda) exceptfor specific relief requested in accordance with 10 CFR 50.55a(g)(5)(iii).The .program is applicable for the period April 21, 1980 to April 21. 1990.

Very truly yours,

W Robert E. UhrigVice PresidentAdvanced Systems 5 Technology

REU/NAS/VTC/cph

cc: Nr James P. O'Reilly, Region IIHarold F. Reis, Esquire

Backset 8 ~+ -3p~Cootrol@So as o~~~ ~

of QOCQmg+"EGMATOA'g9pt',gg F~g

PEOPLE...SERVING PEOPLE

Page 2: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

P~

/

Iw )g~))oG', ),"~t,.',nJ

~<30095'B J

E%

I

IgI

~ ~

Page 3: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

80 05050

/+5'TTACHMENT

A

St. Lucie Unit No. 1

Section Z Valve Test Program

Section EI Pump Test Program

Page 4: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

I

Page 5: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

ABSTRACT

The planned inse~ice inspection and testing programs were

developed, employing the R. G. 1.26, Rev'sion 2, criteriafor qua3.itv group classifications and standards (Quali y

~ Group A is the same as ASSAM Class 1, etc.) .

Section I. Valve Test'ro am Out3.ine

The va3.ve test program shall be conducted, in accordance withSubsec io'n AV of Section XZ of the 1974 'Edition o tne ASME

Boi3.er and Pressur Vesse3. Code thru Summer 1975 Adcenca,

except for spec'' re3.ief requested in accordance with 10 WR

~

e

50.55a(g) (5) (iii) which is icentified in Subsections I.G.

The per'od for this valve tes orogram starts April 21, 1980,

and ends April 21, 1990.

Section II. Puma Tes Proa am Outline

The pump "'est program shal3. be conducted 'n accordance with

Subsection ZTG of Section XZ of the 1974 Edit'on of the ASY~

Boil r and Pressu e Vessel Code thru Summer 1975 Addenda.<

except for specific relief requested in accordance with 10 CFR

50.55a(g) . (5) -(iii) whi'ch is identified in Subsection II.A.The period for the pump test 'program starts April 21, 1980, and

and ends April 21, 1990.r

Page 6: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 7: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

~TABLZ OF CONTZii1TS

Section X. Valve

X.A.

Z.B.

X.C.

Test Program

List of Drawings

'List of Valve Categories

List of DefinitionsX.D.

X.Z.

List of Valve Table Symbols

List of Category (A-B-C) Valves:Table I - Tests to Code

X.F.

X. G.

X. H.

List,of Category (A) Valves:Table Z.A. - Seat Leakage Rates

List of Categorv (A-B-C) Valves:Table XX - To Code and. Relief Request

List of Exclusions: (ZHV-1300)Table I'XZ

X.X. Relief Recuest BasisAttachment A;1

Section ZZ. Pump Tes" Pmgram

XX.A. Table XU — Test Parameters

IZ.B. Test IntervalII.C. Relief Request Basis

Attachment A-2

Page 8: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

I.A. LIST OF DARLINGS (CCbT)

C-E DRAKES

E-39 367-210-110E-39367-210-111E-39367-210-120E-19367-210-121E-19367-Z.0-130E-39367-210-131E-19367-210-140E-39367-2l0-150E-39367-210-160E-39367-210»163

Bev 13Rev 08Rev 11Rev 11Rev L?Rev 12Rev llRev 11Rev U.Rev 11

Reactor Ccolant SystemRem~ Coolant PmtpChemical and Volume Ccn~l Syst~.Chemical and Vo2.are Control SystemSafety Injection SystemSafety Injecticn SystemFuel Pco3. SystemSamnling SatanHasta Yanagement Sys~ Sheet 1Haste V~garent Systole Sheet 4

~~ DRANINCS8770~79 Rev 13

8770~80 Rev 11

8770M-082 Rev 10

8770~083 Rev 108770~84 Rev 108770~85 Rev 9

8770~085 Rev 48770-G-086 Rev 9877~088 Bev 9

8770~92 Rev 38770~93 Bev 38770~878 Rev 11350~115 Rev 68770~862 Rev 3.0

Hain, Ex~~n, Au+i.iiary Steamand Air Evacuation SystemsFeedwatm', Condensate & AirEvacuation Syst~Cia~ting arB Intake Ccoling NahumSys~Catxcnent Cco~g SystanFixemt~~, Dcnestic & Y~e-Uo Sys~Service & Inst~rent Air Syst~Shetlof 2Ins~nent Ai Sys~ Sheet 2 of 2Nisc~~eous Svstms She t 3.

Ccntaimnent Snray arZ Refueling'isa~~ SystemsiMcMzecm SampL'zg SvstemMismllar~us Sys"ms She t 3PV.C - Con~1 Diagrams Sheet 1S~~ Cm~~tor Blcwdawn Sc~t 1 cf 2EVX Ai~Hew Diagram

Page 9: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

Z.B. LZST OZ VX~V CATZGOR"=S

CAT GORY A — Valves or wh'ch sea le 'cace is limi 8 :=ca specific max'mum amount in th closMposit'on for fulfillmen oz the'nct'or.

CATEGORY 3 — Valves for'hich. seat leahage in -'e. closeiposition is inccnsecuential =.or fulfilm~entof their func icn.

CAT CORv- C - Valves whic. a"e ski='-ac-'ua-''nq '- s=orseto some svs em cha=ac eris-''c, such, aspressure (relief valves) or flew cirec icr(check valves) .

CATEGORY- D — Valves which are actuat~ Qv ar. ene~T-sou-c capable cf an'y one ape= ior., suchas rup ure c:is.cs or e:r=losive ac uat cvalves.

CAT"GORY Valves which a e normally lac!ce (cr sealec )open o lacked. (ar sealed,) c'ose tc ful 'lthei func 'on.

= OO~lOT

lCoa'aination of cat caries, s- a as c co ' ='Ctc he ipse wi e mo than cne cisti"guishinc c -ecc=ycha ac istic 's app'c hl . Zn suci c ses,.

al'eauirementsaf eacn cz the inctivic'ual catena=ies areapplicable,'lthough duplication or repetit'cn o"common tes: c = cuiremen~a 's z -e essarv.

Page 10: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 11: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

I. C. LIST OF DEFINITIONS:

ACTIVE VALVES — are required to change positionez,ther by opening, closing, or opening and re-closing to either safely shut down the reactoror mitigate the consequences of an accident.

2) PASSIVE VALVES — are not required to changeposition to ez.ther safely shut down'he reactoror mitigate the consequences of an accident.

3) EXERCISING — Exercising is the demonstration,based on direct or indirect visual or otherposition indication, that the valve exhibitsthe required change of disk position to fulfillits function.

a) FULL STROKE — is the valve stem or discmovement to the position required (toopen or to close) to fulfillits function.

b) Normall o en valve - verification ofseating upon cessation or reversal offlow.

c) Normall closed valve - verification ofopening upon cessation of pressuredifferential or initiation of flow or bymechanical force.

Page 12: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

Z. D. LIST OF VALVE TABLE SYMBOLS

VALVE NUMBER

SIZE:

TYPE:

IDENTI"ICATION

INCHES

Gate — Globe - Check - 3-WayPlug - Ball -Relief " Safety

ACTUATOR:

SafeDiaph.Butfy.S/CSZS/RCheckPowerASS'TCHECK(

DOMiO

SOS/AA/Cyl.PO

- Sa ety- Diaphragm- Butterfly- Stop Check- Safety/ReliefCheck- Power AssistedCheck Valve

- Diaphragm Operator- Motor Operator- Solenoid Operator- Self Actuated- Air Cylinder- Piston Operator

CODE CLASS:

CODE CATEGORY:

1 - 2 - 3

A - B - C (OR COMBINATION OF)SEE TABLE A BELOW AND SUB-SECTIONZ. B.

ACTIVE/PASSIVE:

NOR~ POSITION: NONCLOLC

— Normally Open- Normally ClosedZ,ocked Open- Locked Closed

A - P (SEE TABLE A BELOW)

rAILURE MODE: cOFCFAX

- Fa' Open- Fail Closed- Fail-As-Zs

REMOTE POSITIONINDICATION:

TEST PERIOD:

Yes - No

1. REFUELZNG SHUTDOWN - ASCHEDULED SHUTDOWN (iTHE REACTOR HAD OF" ) WITH

- REACTOR MAINTAINED ZN MODE 6FOR AT LEAST 72 HOURS.

2.

3.

COLD SHUTDOWN - SFE NOTE(S)FOR DEFINITION UNDERSUB-SECTION Z. E. AND 1. G.

OPERATION - 3 MONTHS OR LESS(CODE)

ZNSERVZCE INSPECTION:(ISZ) TESTS

-CONT'D-

SEE APPROPRIATE LIST OF CATEGORY

(SUB-SECTION Z. E. & Z. G.)

Page 13: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

Z. D. LIST OF VALVE TABLZ SYMBOLS (CONT'D)

RRB HO. iVUMBER RZLAT S TO APPROPRZATZ VALVERELZZF REQUEST BAS ZS

RZi~~S RELAT D TO SPECIAL ALTZRNAT T~STZNG

VALVECATECORY FUNCTION

CODELEAK TEST

CODEZZZR. C'EST

CODEPOSIT. VZRZ".

ACTIVE I%V-3420

PASS~( ) Iinr-3420

ACTIVE HONE

~

ESSIVE

NONE

C ( S/R) ACTIVE iHONE

C (Check) ACTIVE HONE

(2) O~SSZVE(1) HONE

IWV-3410

HONE

ZHV-3410

HONE

I%V-3510

IWT-3520

NONE

NONE

HONE

iHQNZ

HONE

HONZ

HO¹

APT-3700

NOTE: (1) Pe=er to Relief Reques" Ho. 0.

(2) Refer to Relief Request. No. 00

Page 14: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

T Z ZZST OZ V~COar (~-a-C), ~~-r~WO Faa. ~~L- ~ - ~SrP~m~ias To (COOZ), mc"=~~ XS OT~"-9WZSZ mOZ=-a ("-rL) .

C.~T" C4RZ A-3 V%7- S

Zxercise valve (ful' =oke) . oz'ce ~ilitv ever r3 mon~s (Cade) .

ZL 2 Exercise valve ("ul3. s~oke) =ar age~'l'<'old

shutdown(Cade).'~i»

3 Exercise valve (=ull s -ake) for ope ahili"vcu-in'efuelingshutdown (Code) .

Ezercise vs.ve (full s"-oke) =or one aaility priorta retur-.. to servic (Code) .

»Q Zxe cise valve (w" th Rema e Pos i al ''ator ancinaccessibl =ar d'ec observation) =ar ve i"™cat'on af valve aosi-''on dm~-~c refuel'~c out lessthan evem 2 vears (Cade).

Zxercise valve (wi"' =ail-Sa=e Actuatars} ta ohserrefailure made eve~ 3 months (Coce} .

Z=-8

EF-9

Z'cezcise va ve (wi~a =ail-Safe 9c='uatars) "a ahsencefa'lux'e mode during cold shutdown (Cace) .

Exercise valve (with Fail-Safe Actuators) to observefailure mode during refueling shutdown (Code) .

ZST-l 4xerc'se valve - =ower opera ed (=u ~ s»-ake) ancmeasu=e t'-.e (Cade) (5 secands — Ymx. } (:-P<~) .

ZST-2. Zxe c'se valve - "ower oceratec. (=.ul'~oke) a .c,measure t~e (Code) (l,0 secands — H~~. ) ( PL} .

Rce cise valve - "ower operatemeasu e time (Cade} (=0 scca..cs

s -oke) anc.- -'-'av-) (F =)-"S~-4 Zzercise valve - power o-era"ed (=u s ake) a d

measu e time (Cade) (l20 se ancs —~'.) (=-PL) .

- S'P» w<erc'e valve — "-ower oreratac (=u'trake) a .™measu= time (Cade) (l80 secancs — ~m~. ) (=P ) .

"S -6 e cise va ve « power oaera-e= (=.ull s -ok+) a..cme su= e (Cad ) (l3 se ands - ~< -c.) (:-PL) .

SL'P» lOC-1

'eat~™~leagaceov4»v ve~ ~s (Cace ) ~

ATL» 4L«~ o«»«1 ss

Operational check of valve (verification of position)before and after operation (Code) .

Page 15: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

LIST OF CATEGORY (A-8-C): LEGEND FOR TABLE I (CONT')

CATEGORY "C" VALVES

EF-1 Exercise valve (full stroke) for operabilityevery 3 months (Code).

Exercise valve (full stroke) for operabilityduring cold shutdown (Code).

TF-1

Exercise valve (full stroke) for operabilityduring refueling shutdown (Code).

E

Safety and relief valve tests (Set Point)to ASME Table INV-3510-1 (Code).

NOTES:

Co"d Shutdown — ISI tests scheduled for TestPeriod 2 (Cold Shutdown) shall commence no laterthan 48 hours after reaching MODE 5 (ColdShutdown) conditions, or no later than 64 hoursif MODE 5 (Cold Shutdown) conditions are reachedbe-:ween Friday 1600 hours and Monday 0800 hours.:.. tne case of frequent Cold Shutdowns, valve"es-'ng will not be performed more often thanon" every three (3) months for Category A, B,anc C valves. Valves that are not tested duringa specific Cold Shutdown, due to plant startup,will be identified to assure their testing inthe event of untimely Cold Shutdowns within thethree (3) month, time. period. In any event, plantstartup shall not be delayed to complete valvetesting.

Page 16: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

Ill

45

Page 17: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

L|;ST OF CATEGORv (A B C) .- LEGEND FOR TABL l (CONT D)

2) Corrective Action - Where a valve fails o meetthe requirements oz this program and/or thereference Code, the condition(s) shall bereviewed by the Facilitv Review Group zordisposition and, determination o= whether 'tinvolves an unrev'wed safety auestion priorto commencing with plant startup or continuingwith plant operat'on.

Page 18: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 19: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORIDA POP(ER L LIGIIT COlhPANY

VALVEHUIIBER

SIZE TYPE ACTU. CODECL.

CODE ACT/ NORM.CAT. PAS POS ~

FAIL-UREMODE

RL"M.POS.XND.

TESTPER-.

XSITESTS

REMARII;S

V-1200

V-1201

V-3.202

6 Safe

6 Safe

6 Safe

S/A

S/A

S/A A NC

C A NC

C A NC

No

No

No

TF-1

TF-1

TF-1

svsvcssReactor Coolant System

onenf0-19367 — 21- 110 Rev. 13

unoonassVALVE TEST PROGRAM TABLE X

TESTS TO CODE

Page 20: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 21: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

Fl Onlo~ VOy<rn a uct>X COur WV

VALVENUHBER

SXZE TYPE ACTU'ODE CODECL. CAT.

ACT/PAS

HOBM, PAXX-POS ~ VRH

MQOB

RHH.POS.XND.

TESTPER:

XSXTESTS

No Table X Valv s

svsvcuReactor Coolant Pump

I IIAI1C

E-19367-210-ill Rev. 8

V(1OaAhilVALVE TEST PROGRAM TABLE I

TESTS TO CODE

Page 22: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

40

Page 23: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORIDAI',LIGI3|'OMPAH'f

VALVEHOI IBER

SXZH TYPH ACTIJe CODE CODECGA CAT.

ACT/ NOBMe PAXL-PQS URH

MODE

REM. .TEST XSXPOSe PERi TESTSXND~

V-2521 Globe DO NO FC Yes 3 ..'EF-73 EST-3

SYSTCiiChemical Volume and Control

E-19367-210-120 Rev. 11

VAOOAAI4VALVE TEST PROGRAM TABLE X

THSTS TO CODE

Page 24: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

Ill

Page 25: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORlDA Pal IGl)T COlhPAl(Y

VALVENUMBER

SIZE TYPE ACTU; CODECL.

CODE ACT/ NORM.CAT. PAS POS ~

FAXr,-URHMODE

REM.POS.XND.

TEST,PEB-.

XSXTESTS.

V-2525

V-2511

Gate

Globe

MO 2

DO 2 B

NC

NO

FAI Yes

Yes

33

33

EF-1EST-3

EF-7EST-1

V-2508

V-2509

Gate

Gate

MO 2

MO 2

B A NC

B A NC.

FAI

FAI

Yes

Yes

33

33

EF-1EST-2

EF 1EST-2

V-2510

V-2444

V-2443

Globe

Check

Check

DO 2.

S/A 2

S/A 2

A NO

C A NC

C A NC

FC'esNo

No

33

EF-7EST-1

EF 1

EF-1

l Y 1 V t 44 una4nhuChemical Volume and Control ~~~« VALVE TEST PROGRAM

I,'IlkII CE-19367-210-121 Pev. 11

TABLE ITESTS TO CODE

Page 26: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 27: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORIDA I'OSIER 6 LIGll7 COMPANY

VALVENUMBER

SIZE TYPE ACTU; CODECL.

CODE ACT/ NORM.CAT. PAS POS ~

FAIL-UREMODE

REM.POS.INDE

TESTPER'SITESTS.

V-3662 Gate MO A NC FAI Yes 33

EF-1EST-* * < 20 sec.

V-3663 Gate MO A NC FAI Yes 33

EF-1EST-*. ~* ~ 20 sec.

svsvcuSafety Injection System

E-19367-210-130 Rev. 12

PllOOAhl4VALVE TEST PROGRAM TABLE I

TESTS TO CODE

Page 28: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

40

C

'I

Page 29: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORlOA VOl'ILR 6, LlGIO'OMPAt(Y

VhLVHNUMBER

SXZE TYPE ACTU; CODECK

CODECAT .

ACT/PAS

NO tN . FAXL- REM .I'OS - UAE POS,

MOnE XNO ~

TESTPEA:

XSXTESTS.

llcv-361 5 6 Globe MO NC FAX Yes 33

El -3.EST-* * < 15 sec.

llCV-3625

llCV-36 3 5

6 Globe

6 Globe MO

NC

NC

PAX Yes

FAX Yes

33

33

EF 1EST-*

HF-1HST-*

* < 15 sec.

15 sec..

llCV-364 5

llCV-361 6

llCV-3 6 2 6

I1CU.- 3 6 3 6

6 Globe

2 Globe

2 - Globe

2 Globe

MO

MO

NC FAX Yes

NC FAX Yes

NC FAX Yes

NC FAX Yes

3'3

33

EP- 1EST-*

EP» 1EST-2

HP-lEST-2

HF-1HST-2

15 sec.

llCU-36 4 6

llCU-36 1 7

2 Globe

2 Globe

NC FAX Yes

NC FAX Yes

HP- 1EST-2

HP- 1EST-2

llCV-3 6 2 7 2 Globe MQ FAX Yes 33

HP- 1EST-2

SYIWC4L'«~~ -Safety Xnjec Lion System

I'll0 4 AA4VALVE TEST PROGKQ4 TABLE X

TESTS TO CODE

Page 30: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

P

Page 31: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLOIIIOA POl'IM 8, LIGIIT COMPANY

VALVEH UHBEII

SIZE 'TYPE ACTU'ODECL.

CODECAT.

Acr/ NORH. PAII,-PAS POS ~ UAE

BODB

gL'M.POS ~

XND.

TEST ISIPEA'ESTS.

REI&RKS

IICV-3637

IICV-3647

2 Globe

2 Globe

110 PAX

A NC PAI

Yes

Yes

33

33

El -1EST-2

EP-1EST-2

5 Y If ta4Safety Injection System

E-19367-210-131 Bev. l~

PIIOOAhMVALVE TEST PROGRAM TABLE

TBS'I'8 TO CODE

Page 32: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORIDA POprEl Gill CDthPAllY

VALVEl4Ur lOER

SIKH TXPB ACTU CODE CODECL. CAT.

ACT/PAS

NORr'OSIN-

UREHODH

REM.POS.IHD.

TEST ISIPHR — TESTS.

REMARKS

MV-07-lA

MV-07-18

V"07141

V-07l33

PCV-07-lA

24 Butfy

24 Butfy

1 Check

2 Check

12 Globe

MO

MO

S/A

S/A

DO

2 8

2 C

2 C

PAI

NO " FAX

NC 'O

Yes

Yes

No

Yes

33

33

33

'EP-1EST-*

EP-1EST--

EP 1

EP-1

EF-7EST 3

* < 90 sec.

* < 90 sec.

PCV-07-18 12 Globe DO 2' NC FO Yes 33'P-7EST-3

MOU-07-2A 24 Butfy NC FAX Yes 33

EF-1EST=3

MOV-07-28 24 Butfy MO FAI Yes 33

HF-1EST-3

5 V I 1 L SI

iicic Containment Spray SystemC II@ I1

siia.a 0770 'G- 000 ReV. 9

rnoanhMVALVE TEST PROGRAM TABLE I

TLSTS TQ CODE

Page 33: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORIDA POSER S. LIGHT COMPANY

VALVENUMBER

SE-07-lA

SE-07-18

SIZE TYPE

Gate

Gate

ACTU. CODECL.

SO

SO

CODE ACT/ NORM.CAT. PAS POS.

8

FAIL-UREMODE

FC

FC

REM.POS.IND.

Yes

Yes

TESTPER.

33

33

ISITESTS

I

EF-7EST-2

EF-7EST-2

SE-07-2A Gate SO Yes 33

EF-7EST-2

SE-07-28 Gate SO 8 A NC FC Yes 33

EF-7EST-2

V-07269

V-07270

Check S/A 2

Check S/A 2 'C

A NC

A NC

No

No

EF-1

EF-1

SYSTEMContainment Spzay System

ciiinv~siic 8770 -G- 008 llev. 9

PllOOAAMYllLC VALVE TEST PROGRAM TABLE I

TESTS TO CODE

Page 34: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 35: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORIDA PO'l'(ER 4, LIGII7 COIhPAHY

VALVENUlIQER

SIZE TYPE ACTU; CODE CODECL. CAT.

ACT/PAS

NORIfo PAIL- REI4 ~

POS. URH POS.MDDB XND.

TEST XSXPEBi TESTS

V-4 206

V-4207

8 Check S/A

8 Check S/A

3 C

3 C

NONO'oNo

3 HF-1

EF-1

STITCH»cc.c Fuel Pool SystemDhshf

E-19367-210-140 Bev llPh04hhl4

VALVE TEST PROGBAH TABLE ITESTS TO CODE

Page 36: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 37: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLOnlna VOlILa S. LIGIIV COur Wy

VALVENUMBER

SIKH TYPE ACTU'ODE CODECL ~ CAT.

ACT/ Norm, FAIL-PAS POS ~ URH

MODH

REM.POS,INDo

.TEST XSIPER; TESTS

REMARKS

MV-14-1 24 Butfy MO 3 B A NO FAX Yes 3 EF-1EST-4

MV-14-2

MV-14-3

MV-14-4

24 Butfy

24 Butfy

24 Butfy

MO

MO

MO

3 B

3 B

A No

A NO

A NO

FAI

PAI

PAI

Yes

Yes

Yes

-EF-1EST-4

EF-1EST-4

EP-1EST-4

HCV-14-8A 16 Butfy PO 3 B A NO FC Yes -3~ 3

EST-4EF-.7

HCV-14-8B 16 Butfy PO A NO FC Yes 33

EST-4EF-7

HCV-14-9

HCV-14-10

RCV-14-1

V-14143

V-14147

V-14151

16 Butfy

16 Butfy

2 3-Way

-24 Check

24 Check

. 24 Check

PO

PO

DO

S/A

S/A

S/A

3 B

3 C

3 '

A No FC

A NO

A No

No

A NO FC Yes

Yes

Yes

No

No

No

33

EST-4EP-7

EST-4EF-7

EP-1EST-4

EF-1

EP-1

EF-1

lYSTCli""'omponent Cooling Systemc«i«t

8770-G-083 Rev. 10

I A04llhMVALVE TEST PROGRAM TABLE I

THSTS TO CODE

Page 38: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

4l

Page 39: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORlDA POl'IER 6 LIGll7 CO)hPAHY

VALVENUHBER

SXZH TYPE ACTU; CODECL.

CODECAT.

ACT/ NORM. rAXr,-PAS POS ~ URH

MODE

RHH.POS.XND.

TESTPHR,~

XSXTESTS.

NO TABLE IVALVES

lY I T L'

»via Sample SystemI: II+ il~E-19367-210-150 Rev. 11

s noanhMVALVE TEST PRQGRM TABLE

TESTS TO CODE

~A ~ 4

Page 40: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLOAlDA POY(ER 6, LIGllT COMPANY

VhLVENUMBER

SIZE TYPE ACTU; CODECL.

CODE ACT/ NORM.CAT. PAS POS.

FAII-UBHMODE

RHH.POS ~

IND.

TESTPER: .

ISITESTS

REMARKS

SR-8201

SR-8202

SR-8203

SR-8204

SR-8209

SR-8210

SR-8211

SR-8212

SR-&205

SR-8206

SR-8207

SR-8208

SR-8213

SR-8214

SR-8215

SR-8216

6

6

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

Safe

S/A 2

S/A

S/A 2

: S/A 2

S/A 2

S/A 2

S/A 2

S/A

S/A 2

S/A

S/A 2

S/A 2

S/A 2

S/A 2

S/A 2

S/A 2

C A NC

NC

C A NC

NC

C A NC

C A NC

C A NC

C A NC.

C A NC

C A'CC A NC

C A NC

C A NC

C A NC

C A NC.

C A NC

No

No

No

No 1

No 1

No

No

No

No

No

No

No

No

No

No

No

TF-1

TF-1

TF-1

TF-1

TF-1

TF-1

TF-1

TF-1

TF-,l

TF-1-

TF-1

TF-1

TF-1

TF-1

TP-1

TF-1

SY1lCW unoanhal>««Main,Ext.,hux.Stm a Air Evac.Sy 9«~ VALVE TEST PROGRAM

r i<s>s f"'770-G-079 Rev 13

TAB? 8 ITESTS TO CODE

Page 41: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

4l

Page 42: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORlDA POl'IER L LIGII7 COlhPAHY

VALVENUlIBER

SXZH TYPE ACTU; CODE CODE ACT/CL; CAT. PAS

NORM.POS ~

FAXL- REM.URH POS.MODE XND.

TESTPER'SXTESTS

MV-08-14

MV-08-13

. Gate MO

Gate MO 2 B A

NC

NC

FAX Yes

FAX Yes

33

33

Eip 1EST-4

EF-1EST-4

MV-08-3 Gate 'MO 2 B A NC FAX No EF-1EST-4

V-8477

V-8130

V-8163

V-8448 6.

Check

Check

S/A

S/A

2 C A

2 C A

Check S/A 2 . C

Check S/A 2 C A

NC

NC

NC

NC

No

No

No

No

EF-1

EF-1

EF-1

EiF ]

jTSTLN un04llAMisvic Main,Hxt.,Aux.Stm & Air Evac.Sy V~«VALVE TEST PROGRAMc ssssa f'"'-'770-G-079 Rev 13

TABLE XTESTS TO CODE

Page 43: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 44: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORIDA I'OWER 8, LIGIIT COlhPAHY

VALVENUENER

SIZE TYPE ACTU; CODECL.

CODECAT.

ACT/ NORM. PAIL-PAS POS. URH

MODE

RHMPOS<XND.

TEST ISIPER'ESTS

MV-09-09 Gate MO A NC FAI Yes 33

'F-1EST-4

MV-09-10 Gate MO 2 A NC FAI Yes EF-1EST-4

MV-09-3.1 Gate MO A NC/

FAI Yes 33

EF-1 ~

EST-4

l9l-09-12 Gate MO 2 A NC FAI Yes 33

EF-l.EST-4

MV-09-13 Gate MO A NC FAX Yes 33

EF-1EST-4

MV-09-14 Gate MO 3 A NC FAI Yes 3'3

EF 1EST-4

rrrrtu r noan~r4rirc.c Feedvater, Cond. 6 Air Evac.Sy 1~r«VALVE TEST PROGRAMCIIAllr

8770-G-080 Rev. 11

TABLE ITESTS TO CODE

Page 45: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORlDA POPIER 5, LIGl(7 COMPAHY

VALUEHUHBER

SX2'H TYM ACTU; COQHCL.

CODECAT.

ACT/ NORM.PAS POS ~

FAX>; ru".lC.URE POS ~

HDDB XND ~

TESTPERI

XSlTESTS

REHANG "

U-21252

U-21162

U-2120S

U-21208

U-,21303

30

30

30

Butfy

Check

Check

Check

Butfy

Man. 3

S/A 3

S/A 3

S/A 3

Man 3

NC

NO

A NO

A NO

A ~ NC

FAX No

No

FAI No

3

EF-1

EF-1

EF-3.

EF-l

SVSVtIS»«~ Circ. a Intake Clg.Ntr"'"'770-6-082 Rev 10

s ssoasshs4

System s«"" VALVE TEST PROGHAM TABLE ITESTS TO CODE

Page 46: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 47: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORlDA P LIGli7 COMPANY

VhLVHNUt lBER

SXEH TYPH ACTUS CODE CODEACT/'L.

CAT. PASNOBM e PAXL-PQS ~ URH

MODB

REM.. TESTPOSe PER~XHDo

XSITESTS

REMARKS

V-17204

V-17214

l-l/2 Check S/A

l-l/2 Check S/A 3 C A NC'

A NC NO

NO 3

EF-1

EF-1

5» j» K 44 VtlOOAhl4'~»«Miscellaneous Systems (Diesel Oi Q»"" VALVE TEST PROQRtQS

~ P8770-G-086 Rev. 9 .]

TABLE ITHSTS TO CODE

Page 48: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

4S

Page 49: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORIDA PO LIGI)7 COMPANY

VALVENUI1BER

SIKH TYPH ACTUi CODHCL.

CODE ACT/ NORMCAT. PAS POS ~

PAIL-UBHHODH

BEH.. THS'2POSe PER~INDE

ZSITESTS

I-V-27101 3/8 Check S/A 2 AC A NC. No 31

EF-1SLT-1

I-V-27102 3/8 Check S/A 2 AC NC No 31

EF-1SLT-1

8770 — G — 092 Rev. 3

EY31C44

Hydrogen Sample Systemvrloonhu

VALVE TEST PROGRAM TAOLH XTESTS TO CODE

Page 50: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

I

Page 51: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORIDA PO'l'IL.R E LIGII7 COlhPAHY

VALVENOHBER

SXZH TXPH ACTU; CODECL.

CODE ACT/CAT. PAS

NORM e PAX�-LPOS�

URHHODH

RL'Me .THSTXSX'OSe

PERi TESTS.XNDe

NO TABLE IVALVES

$ e $ T c a4

civic Waste Management System

E-19367-210-160 Rev. 11

i noanat4VALVE TEST PROGRAM TABLE X

TESTS TO CODE

Page 52: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORlDA POi'(ER 6 LIGll7 COthPANY

VALVENUllBHR

SIKH TYPE ACTU; CODE CODECL. CAT.

nCT/PAS

NORM, PAII-POS ~ UBH

MODH

REM,POS IINDE

.THSV ISIPHR . TESTS

V-6779 Check S/A 2 A NC No EF-1

)YllCW»vie Waste Management Systeml.II&II f

E-19367-210 — 163 Rev. 11

vnoonAMv<rl.u VALVE TEST PROGRAM TABLE I

TESTS TO CODE

Page 53: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

F1.OR1O~ r Oyian S. uGin COu1 nOV

VALVENU51DER

SXSH TYM ACTU; CODE CODECLs CAT.

ACT/PAS

NORH FAlL- REM.POSE URH POS,

MODB XND ~

TEST XSXPERi . TESTS.

No Table IValves

STITCH PAOOllhhl~'vicSHRVICE 6 INSTRUMENT AIR SYSTEM YITLu VALVE TEST PROGKg4C IlkII~ f .. ~

8770-G-085 Rev. 9

TABLE ITESTS TO CODE

Page 54: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

Cl

Page 55: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORIDA POP(ER 5 LIGII7 COMPANY

VALVENOHBER

SIZE ACT0 ~ CODECL ~

CODE ACT/ NORMCAT. PAS POS ~

REM.. THSTPOS ~ PERiXND~

XSITESTS.

No Table IValves

STITCHILRT Instrument & Test

'lllLK Q77P Q P93 Rev. 3

vnoanhuVALVE TES T PRO GRAM TAG? H I

TESTS TO CODE

Page 56: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 57: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FiORlDA Pop(BR 6, ilGlir CdMPAHY

VALVEHUHBER

SIZH TYPE .ACTUo CODH CODE ACT/CGA CAT. PAG

HOBM e

POS>PAIL- MM,UM POSiHQDH XND.

JEST ISIPHRi VEST8.

RE1 ERKS

NO TABLEVALVES

) Y I 'E C W VhOOhil4Firewater, Domestic, 6 Makeup S Ub~ VALVE TEST PROQRM

L I~ 4 Il~8770 -G- 0&4 Bev. l0

TABLE ITESTS TO CODE

Page 58: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 59: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORIDA 5, LIGIIY COMPANY

VhLVBNUIIDER

SXZH TYPE ACTU; CODHCL..

CODECAT.

ACT/PAS

NO I PAXL-POS ~ UBH

HODH

BHH.POS IXHDo

.TESTPER,~

XSX'ESTSREMARKS

'o

Table IValves

ST

l�'I

C~»v~c IIVAC (Air Flow)

8770 — G — 862 Rev. 10

VAOQllhl4VALVE TEST PROGRM

/

~ p

TAOLE XTBSTS TO CODE

Page 60: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 61: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

LIST OF CATEGORY (A) VALVES: Table I.A. seat leakagetest parameters to FPL requirements.

Seat leakage rates based on required gas test 6 pres-sure of 39.6 psi (+2.4 psi -0 psi). Leakage ratesshown in Table I.A. are maximum allowable values.

Page 62: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

~ ~ I I I I

I I I I

I I I I I

I I I I I

I I I I I I I

I I I I I

I I I I ~ I

~ I I I ~ I

I I II

~ ~

Page 63: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

' 555

~ ~ ~

Page 64: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 65: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

LIST OF CATEGORY (A-B-C): LEGEND FOR TABLE ZITESTING TO CODE REQUIREMENTS DETERMINED TO BEIMPRACTICAL AND RELIEF REQUESTED... PARAGRAPH50.55a (g) 5 (iii).

LEGEND - The LEGEND in Sub-Section I. E. appliesto this Table.

NOTES:

2)

Notes 1, 2 and 3 of Sub-Section Z. E. applyto this Table.

Each valve in Table II is either

a) Partially tested to code or,

b) Relief requested and supported by ReliefRequest Basis including Alternate Tests.

Page 66: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 67: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLO[tlDA I'0$ILA t LIGllT COMPAl(Y

YALYB~ NUHDHR

S I'l8 TYPE ACTD, CODECL.

CODECAT.

ACTS NORI4. FnrL-PAS POS ~ UBB

wonH

new.POS,HAND.

TESTPER<

XSXTESTS

RRQNO- REMARKS

V-1405

V-1402

V-1403

2->g

Gate

globe

Gate

~ HO

SO

HO

NO FAI

h NC FC

h NO FAI

Yes

Yes

Yes

EF-3EST-3

EF-yEST-/3

EP-3EST-3

22

22

. V-1404 Globe SO A'C FC 'esEF-9'ST-3

SYIlCNRHACTOR COOLANT SYSTEM

L ~ IAIIH-l9367-210-110 RHY. 1".

0' 4 0 flALlVl'tLQ YALVH TEST PROGRAH TPI C~5DH AND

RHLXEF REQUEST

Page 68: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

I'LORIDA t 0>'I ER E LIGlt7 t:OMPAlhY

VALVENUHOHR

SXZH TYPH ACTUS CODE CODEcr . cur,

ACT/PAS

HORH e

POS.PAXL- RHH,URH POSoBODB XND.

THSTPHR( ~

XSX . RRBHSTS NP. REI4ARI<S

NO TABLE IIVALVES

>vSreu~~vis Reactor Coolant PumpI, Ilail'"'~ E-19367-210-ill 'e~. Q

fill00 Ilail.lT Itic. ~ - VALVE TES T PROGRA>i TP CODE AND

TABLE IIRHLXHP REQUEST

Page 69: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 70: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

rzolllnA A E LlGll7 CO)/PAl(Y

VALVEHOl lOER

SXZE 'l'YPH ACTU. CODECL.

CODE ACT/ NO?Uf.CAT PAS POS

PhlL-UBMHODE

REH,POS,INDE

'1BSl'ER<

XSXT,ES'ZS

RRDNO. REMAR1(S

SH-02-01

SE-02-02

V-2515

V-2516

V-2430

Gate

Gate

Globe

Globe

Check

SO

SO

DO

S/A

8 A

A 'O

.A A NO

C A NO

A A NO

PC

Yes

Yes

Yes

Yes

No

1.11

11'

HiP 9HST-3

HP-9EST-3

EP-9EST-.lSLT-1

PiP 9

EST-3.SLT-1

33

33

12

ivllCuChemical Volume and Control

H-19367-210-120 Rev. 11

liAOOllhLlVALVE TEST PROGRAM TVcoQE kND

HELXEF REQUEST

Page 71: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 72: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

PLORInA R E. L1GllT COMPhllY

VALVENUMB Hlt

SIl8 SYPH ACZU, CODE COOH ACT/ Nanil.QQ QQ'g'PQ )lQQ ~

1."AZX- RHW.UBB 1'OS,l4ODH XNO.

IP HQ i/I

PHltlXSXTl'ST,")

RRBNO. REMARKS

PCV-2161

SH-01-01

V-2505

3/4

3/4

Globe DO

Globe DO

Globe DO 2

NO

NO

PC

PC

PC

Yes

Yes

Yes

22

221

221

EF-8EST 1

HP~QEST 3,

SLT 1

EF-8HST 1SLT-1

22

22

V-2501

V-25l4

Gate

Gate

MO

MO

B A

2 B

QO .

NC

PAI

PAI

Yes

Yes

EF-$HST-3

EF-3'EST.-3

55

66

V-2174

V-2504

Globe

Gate

Myn;

MO'

B NC

NC

FAI No

PAI Yes

EF-3

EP-3..EST-3

77

V-2191

V-2177

V-2190

Check S/A 2

Check S/A

Check S/A C

NC

NC

NC

No

No

EF 3

svscruChelllical Volume and Control

rg ll All

p.-19367-210-121 Rev. 11

liA40ILAIIVAI.VH TEST PROGRAM YO CFlDE lND

RHLIHP REQUEST

Page 73: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 74: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

VLOnll)A a LiGlli COul Al(Y

VAIVBNUl1DBR

SXZB TYPE ACTU. CODB CODECI'j ~ CAT

hCT/Vns

NORI 1.

POS.PhlL-VRB1 l01)B

RBH.POS.XNl).

rgQS$ 0

PBltr ~

rsxTBSrl'8

RRDNO. RE14AR1(S

v-3106

v-3107

V-3401

V-3410

V-07000

V-07001

10 Check

10 Check

Check

S/A

S/A

S/A'

Check S/A

14 Check. S/A

14 . Check S/A

NC

NC

NC

No

.No

No

No

No

HP-1 ~ 2

EP-1

EP-1

HP-1 3

EP-1

Hl".-1 . 4

V-3659

V;3660

V-3656

V-3654

v-3653

V-3655

I-V07009

3 Gate

3 Gate

6 Gate

6 Gate

4 Gate

4 Gate

2 Gate

HO

MO

HO

HO

Han.

LO.

LO

LO FAI

LO PAX

LC FAI

PAI

LO PAX

Yes

Xes

Yes

Xes

Yes

Yes

No

HP-2EST *

EF-2EST-*

OC-1

OC-1

OC-1

OC-1SLT-1

0/1

OC-1'

"< 90 sec.

*~ 90 sec.

V-3463 2 Gate Han. LC PAI No OC-1ST.T-l-

0/1

r v I I L'4

Sa fe ty In'jection Sys tern

I.;-19367-210-130 Rev. 12

l~AOOllhllr I'rr.Q VALVE TEST PROGRAM TAnr.H IX

TO CODE ANDRELIEF REQUEST

Page 75: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 76: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLOIt(DA t'Ol'lL'Il4 LIGllT COlhPAltY

VALVEHUt lBER

SX'l8 TYPB ACTU. CODI"„ CODE ACT/cr,. 'we, phs

HORl'1.POS.

PAIL- REW. rESZURE POSo PHg)I'IDB XNI).

zsxVI"S VS

RRBNO. REI4ARI<S

V-3405 S/CI IK S/A 2 C A NC No

V-3414 S/CIIK S/A 2 C A NC No EP '3

V-3427

I-V07008

PCV-3306

IICV-3657

10

10

12

S/CIIK '/AGlobe Man.

Globe PO

Globe DO

2 C A

2 B P

B P

B P

NC

LO

LC

.No

PO Yes

PC'es

PAI No

EP-3.I

Oc-.l

OC-1

OC-3.

0

0

0

Pg ~ ~ Allp- 19 367-210-130 1(ev. 12

I VI IL'LI~i s ic Safety Injec tion Sys tern

r neo« "nVALVE TEST PROGRAH TVCODB AND

ABLr; IX

HELXEP REQUEST

Page 77: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

VLOntnA l 01(l:.A t. LIC;ltT COlhl hllY

VALVENUMDER

S X'lE TYPE ACTU, CODE CODECG. CAT,

ACT/PAS

NOl0l. FAlL- REH.liOS. UBE POS

l 10l)E lNO.

TESTPER)

ISXTESTS

RBBNO. REMARKS

v-3113

V-3123

V-3133

V-3144

V-3114

V-3124

V-3134

V-3144

V-3217

V-3227

V-3237

V-3247

V-3215

v-3225

V-3235

V-3245

Check S/A

Check S/A

Check S/A

Check S/A

12 Check S/A

12 Check

12 Check

S/A

S/A

12 Check S/A

l2 Check S/A

12 Check S/A

12 Check S/A

12 Check S/A

2 Check S/A

2 Check S/A

Check S/A

Check S/A

1 C

l C

1 C

1 C

1 C

1 C

1 C

1 C

1 C

1 C

1 C

1 C

2 ~ C

2 C

A

NC,

NC

NC

NC

NC

No

No

No

No

No

No

No

No

No

No

No

No

No

No

2

EF-3

HP-3

EF-3

EF-3

EP-2

EP-2

EF-2 6

EP-2

EP-2'P-2

EP-2

EF-3

EF-3

EF-3

EF 3

ITllL~Sd fe Ly .'I n haec tion Sys > ni

lp l ~J 367 210-13 l, Pey. 3 2

I' 0 0 Illll1/%Ltd ~ VALVE TEST PBOGRAM Tl coDH~IND

BELIEF HEQOHST

Page 78: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 79: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

PLOltlDA VOPlEA t LIGll'f COMPAl)Y

VALVENUHDHR

SIKH TYPB ACTO. CODE COBOL

CL. CAT.ACT/L'h5

NORl l. PhIL- RHH.LOS URE POS

1 IOI)H IND.

TH Sign

PHRi ~

ISXTESTS

RRDNO. RBHARl(S

11CV-3618

11CV-3628

1 Globe

1 Globe DO

NC PC

PC

Yes

Yes 22

P 8BST-2

HP-0HST-2

11CV-3630 1 Globe DO NC PC Yes BF-8 llBST-2 ll

IICV-3648 1 Globe DO FC Yes EF-8HST-2

V-3400 10 Gate PAI Yes HF-2 12

V-3401 10 Gate MO NC FAX Yes EF-2 12

v-3651 10 ate MO PAX Yes EP-2 '2V-3652 10 'ate PAX Yes HF-2 12

V-3614

V-3624

V-3634

V-3644

12

12

12

*ate

ate

ate

:ate

MO

MO

MO

LO PAX Yes

LO PAI Yes

LO PAI Yes

LO PAI Yes

OC-1

OC-1

OC-1

OC-1

l 1 l 1 t ttSntetp Xn>ectio~ne stua

liilOOIIAllVALVE TEST PROGRAM TABLE II

TO CODE ANDRHI XHP REQUEST

Page 80: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

I LO(tlOA VOL'lI.'A 6, LtGIIT COI/PhHY

VAI.VG~ NIjtIIIER

SX'l8 'I'YPH ACTU. CODE CODECI.. CAT,

ACT/PAS

I'IOIUl, I AXL- REM,LiOS. VRl'OS .

IIODE XND.

TESTPER<

XSX'I 88'L'S

RRBNO. REHARI<S

LCV-07-llA Gate DO NC FC Yes EF-SEST-2SLT-1

I.CV-. 07-11B Gate DO NC FC Yes 221

EF-0 2EST-2 .. 2SLT,-1

V-07206 Gate Man. 2 LC FAX No Oc-1SLT-1

4/0

V-07109 Gate Han. 2 A LC FAX No Oc-1SLT-1

4/0

V-07170

V-07100

Gate

Gate

Man.

Han.

2 A LC FAX No

LC FAX No

OC-1SLT-1

OC-1SLT-'1

4/0

4/0

lfllLL4»~i< Containment Spray System

sIiVa 0770 — C — 000 Rev.

unoon~nYI1Ll'AI',VETEST PROGRAM TART E XXTO CODE AND

RELXEI REQUEST

Page 81: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

I'I.GRIP I!II5 LIGIIY COMPAI(Y

VALVENUIIDER

GXKH TYPH ACTU, CODE CODECfg, CWl',

nCT/PAS

NOIgl. I: JLlL- RHH.POS. UBM POS.

1IODH XND.

TBS~1PERE'sxTESTS

BBDNO. BEGARI(S

V-07192

V-07193

V-07129'-07143

V-07174

V-07172

12 "heck S/A

12

12

liec)C S/A

heck S/A

12 heck S/A

24 .heck S/A

24 heck S/A

NC

NC

NC

NC

NC

No

No

No

No

No

No

5 )

5

Con ta inmen t Spray Sys tern

Yl~ 4 I I8770 -G-088 Aev. 9

f> ~ L C 0 Il*LVALVE TEST PROGRAH TFMoDE9iND

RELIEF REQUEST

0

Page 82: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

~''I.ORIPA 'R t 1IGll|'0tkPAllY

VAE VBHOt IDES

GXFH '1'YPH MIXU, CODH CODE ACT/CI'j, CWL', BAH

HOIUI. I:hXX- lKtl,uos. Unr; VOS.

l IOI)B XHD a

I/Q,QJJlPERE'SXT.I"STB .

Rl(DHO. RHI4ARKS

V-07192

V-07193

V-07129

V-07143

V-07174

V-07172

V-07119

V-07120

V-07256

U-07258

12 "heck S/A

12 Iiecg S/A

12 "heck S/A

12 heck S/A

24 heck

24 heck

S/A

S/A

heck

2 'heck.

S/A

S/A

heck S/A

24 heck S/A

2,

2

2

A

.C A"

C

A

C A

C A

NC

NC

NC

NC

No

No

No

'Ho

EF-2 6

EF-2 ~ 6

5 ~

EP-2 3

EF 2

Containmen t Spray System-rg g ~ *II

8770 -G-088 Rev. 9

I'ii0 iIII@II

VALVE TEST PBOGBAH TABLE X XTO CODE hND

R|DXBP RHQUHST

Page 83: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORIDA PO)'tER C LIGIIY COlhPhlhY

VALVENUHDER

ACTU ~ CODECG+

CODL'rr,nc z/ Horu t.PAS POS ~

r"nrr.-URBHODH

REI<. TEST XSXPOS ~ . PBILt ~ TESTSXl'ID ~

RRBNO ~

REl RRl<S

NO TABLH IIVALVES

irSlcursvp~ puel Pool SystemP

Q ~ I A ll1'-1 0367-~l A-lRA Pnrr 1 1

liflOOlie W

VALVE TEST PRQGRAHTABLH II

TO CODE ANDRELIEF REQUEST

Page 84: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

rLOIIInA VOyIEII t. LIC II> COuI'AIn

VhLVHNUIIOER

SIKH TYPH ACTU, CODE CODECL. ClLT,

ACT/ NOIW. Fhn,-PAS 1'OS. UIIE

1101)H

RHH,POS.XNI).

TESTPERI

ISZTHSTS

RRBNO. REI4ARI<S

IICV-14-1

IICV-14-2

IICV-14-6

8 Butfy

8 Butfy

8 Butfy

PO NO

A NO

FC

r"c

r"c

Yes

Yes

Yes

221

221'

2.1

EP-0 1EST-1 '

SLT-1

EP 0EST-1SLT

EF-&EST-1SLT-1

IICV-14-7 0 Butfy PO A NO .PC Yes 221

Er"-8HST-1SLT-1

I-SB-14167

T-SB-14178

IICV-14-3A

IICV-14-3B

24 Butfy

24 Butfy

14 Butfy

14 Butfy

Man.

hlan.

DO

DO

PAI

A NC r"o

A NC FO

A NO PAI No

Yes

Yes

2

22

22

EF-0HST-4

EF-0EST-4

33

33

lfI )Cu»«~ Component Cooling SysteioCI ~

heal

""" II77n-r;-n&-I Ikov. IiI

0 0 0 0 Ilail I

VALVE TEST PROGRAhI TABLE IXTO CODE AND

RHI XEF REQUEST

Page 85: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

CS

Page 86: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

VhLV.HUH

TYPH ACTUS CODE CODHCL, CATi

hCZ/PhS

PAIL- RHH.URH'OS iMODE XNn.

THB'1'HR('SXTHSTB

RRBNO-

P

REMARKS

MV-14-5 10 Butfy MO A NO PAI Yes 22

EF-2EST-4

44

MV-14-6 10 Butfy MO NO FAI Yes 22

EP-2EST-4

44

MV-14-7

MV-14-8

LCV-14-1

10 Butfy MO

10 Butfy MO

3 Globe DO

NO FAI Yes

PC No

NO PAI Yes

22

2.2

EF-2EST-'4

44

EP-2 4EST-4 4

svscouComponent Cooling System

o Ii*1)

8770-G-083 Rev. 10

vnoow~wVALVE TEST PROGRAM TABLE II

TO CODE ANDRHLXHF REQUEST

Page 87: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

Cb

4$

Page 88: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

r~OalnA PO)'lER t LIGllT CO)ht'AHY

VhLVH'UHBBR

ACTU ~ COBB CODE ACT/CL, CAT, MS

NOR'1 .LiOS ~

r"WrL- REM ~

unL r OS,l<ODB XND~

rESTr sn>

XSX RRBVt'Sra . NO ~

REI4AR1<S

V-5200 3/8 Globe'O 2 NC FC . Yes 221

EF-8 .

"ST-1SLT-1

V-5203 3/8 Globe DO ~ 2 A A NC, PC Yes- 221

EF.- 8 ~ 1EST-1 '

SLT-1

V-5201 3/8 Globe. DO 2 A NC FC Yes 221

EF-8EST- 1SLT-1 ~

22

V-5204 3/8 Globe DO A A FC Yes 22 '

EF-8.EST-1SLT-1

22

V-5202 3/8 lobe DO 2 A A NC J'C - es . 221

EP-8EST-1SLT-1

3'

3

V-5205 3/8 lobe DO 2 A A NC FC es 221

EF-8EST- 1SLT-X

33

IT I I CASample System

tlat'L'% '1 0367-~l A-l RA Pr ir 1 1

I> 0 0 0 Ilh I.l~ ~ VALVE TEST PROGRAM TMLE II

TO CODE ANDREr,xEr'EQtjEST

Page 89: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

Ill

Page 90: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLOt<IPA PO)'lER L LIGllT COMPAlhY

VALVENUHBHR

SXZH TYPE ACTU. COMCL,

CODECAT,

Acr/ NORI.I.PAS POS.

PAIL-URH140 DH

RHt4;POS.IND.

TESTPHR( ~

XSX RRBTHS~rg NQ ~

REI IARKS

HCV-08-1A 34 PowerASST'CHECK

A/CYL 2 BC A NO FC es 22

EF-8EST-~ * < 6 sec.

HCV-0 8- 1B

V-8148

V-8117

34 PowerASST'DCHECK

Check

Check

A/CYL 2

S/A 2

S/A 2

BC A NO FC

A NO

A

es

0

22

EF 8EST-* * <, 6 sec.

) Yi1I:LIHain /team S stem

g I~ A ll8770 G 079 Rev. 13—

fiA0 0 l1 hi@'I~«. —. VALVE THS T PROGRAII TO CODE ANDTABLE IX

RELIEF REQUESTtQ~

Page 91: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

CID

l

Page 92: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORIDA P .It Im, LIGIIT COMPAHY

VALVE- NUMBER

ACTU. CODE CODE ACT/CL, CAT, L'AS

NORM,VOS.

FAXL™ REM.URH POS,HODB XND~

TESTPER<

XSXTESTS

RRBNO- REMARKS

V-9'157

V-9139

V-9123

V-9107

V-9119

V-9151

V-9135

6

Check

Check.

.S/A

8/A

C

3 C A

Check S/A 3

Check S/A 3 C

Check S/A 2. C A

Check S/A 2 C A

Check S/A 2 C

. NC

NC

NC

NC

NC

NC

NC

No

No

No

No

.2

No

No 2

EF-2

EF-2

EF-2

EF-2

EF-2

EF-2

EF-2

MV-09-7 20 Gate MO 2.' NO FAX Yes 33

EF-l.EST-.4

22

MV-09-8 20 Gate MO 2 B A NO FAX Yes 33

EF-l.EST.-4

22

V-9252 Check S/A 2 C A NO No

V-9294

V-12487

LCV-12-9

18 Check

Gate

S/A

Man. 3

Globe DO 3

C

B

NO

NO

NC

No

FC No.

FAX No 4/0

5Y$ /gW»ii< Feedwater,Cond. & Air Hvac.Sys.I IIAI1

8770-G-080 Rev. 11

PAO4AhllVALVE TEST PROGRAM TABLE XX

TO CODE ANDRELXEF REQUEST

m th4aaae~ ~«y

Page 93: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

Cl

P

Page 94: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

I:LORII)A I . t t. I.IGIIY COMP/iltY

Vht,VI,"IIUlII)I''R

S1Zr; VXII; ACTIj. CODI:CI'>.

CODE hC'I'/ NON).ClVI'. PCS l'QB a

r"AXr.—U RliIIODH

RHH.POD',XHD,

II'S'I'HII

< 'I'ES ti'8RRDNO. Rl'MhRI(S

FCV-23-3 2 Globe DO B A NO Yes 2

2

BF-8BST-2

FCV-23-4 '2 Globe DO 'B A NO FC Yes .'2' EF-'8HST-2

FCV-23-5

FCV-23-6

2 Globe .

2 Globe

DO 2

DO

A NO.

NO

FC Yes

Yes

2.2

22

HF-8EST-2,

EF-8EST-2

FCV-23-'7. 1/2 Globe DO -2 B A NO FC Yes 2.2

EiFi 8EST~2

FCV-23-9 1/2 Globe DO 2 B A NO FC Yes 22

EF-8EST-2

IT T YL's4

Steam Generator Blow o

3509 — G — 115 Rev. 6

tt noon~lw) f IZLttst qPI VI 'I I.S 1 PRQGRAH TABLE XX

TQ CODE ANDRELIEF REQUEST

Page 95: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

4k

Page 96: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

l'l.ORlPJI, l'OgtCA E. Llo)lT CO)hPAllY

VALVENOHDER

S X'l8 TYPH ACTU. (ODL'L, CODECAT.

ACT/ NOtul. FAXX,-PnS POS. URE

110DH

REl4.POS.XHD.

TEC Ihl

PERIXSXTESTB

RRllNO. REHARl<S

MV-21-3

HV-21-2

HV-21»4

Butfy

Butfy

Butfy

MO

MO

A NO

NO

No

PAX

FAX

PAX

Yes

Yes

Yes

22

2'

EF-2EST-4

'EP-2EST-'4

EP-2EST-4

22

V-21327

TCV-14-4A

TCV-14-48

30

30

Check

Butfy

Butfy

S/A . 3

PO

PO

FO

PO

No

No

No

EF-2 3

I '

5 1L <><'i«Circ. & Xntake Clg.Wtz

0770-G-002 Rev..'l0

I> il0 0 ll*JI

System VALVE TEST PROGRAM 'ABE>E X XT$ CODE AND

RELXEP REQUEST

Page 97: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

I'LORIDA I'0 t. LIGIIT COMPAI]Y

Vhf VENUHDER

SIZE TYPH ACTU. CODECG.

CODECA'I'Cr/ NORH. I."AXL- REW.PAS POB VBI POQ

I IODH XNI)o

TEST'ER<XSX'I.'I".S'r8

RRBNO. REMA RI<S

V-10794

V-10796

2 Globe

2 Globe

Man.

Man.

P LC

P LC

FAX No

FAX No

OC-l.SLT-1

OC-1SLT-1

0

V-10797 1 Ball Man. 2 P LC FAX No OC-1SLT-1

0

V-10798 1 Ball Han. P LC . FAX No OC-1SLT-1

HV-10-1

X-V-10195

2 Globe

2 Clseck

HO,

S/A AC

FAX Yes

No

22.

1

EF-IIEST-*SLT-1

EF.-2SLT-1

20 sec.

ITllL~~ I'<1OO Il*lI~i«c Service 6 XnsLrument Air Systeml I ~ All""'770-G-085 Aev. 9

VALVE TEST PROGRAM TVCQOE PHDRELXEF REQUEST

Page 98: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 99: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORIDA P 8, LIGIf'f COMPANY

VALVE- NUMI3ER

SXSH ACTU. CODHCL,

CODE ACT/ NOBll,CAT. PAS POS.

PAXL-UBHHODH

RHM,POS.INDe

TESTPL"R)

rsr.TESTS

RRBNO. REMARKS

I-SE-17-lA

I-SE-17-1B

2 Globe

Globe

SO

SO

B A NC

B A NC

FC No

No

EF-7

EF-'7

1't STCV

Misc. Systems (Diesel Oil)I,'I~ Alp

0770 — G — 086 Re@. 9

PA04AhMyALVE TEST PROGRAM TABLE II

TO CODE ANDRELIEF REQUEST

W~~ oAf~

Page 100: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORIDA t'0)'lllR E, LIG!IT COMPAl(Y

VALVEHU/lBHR

TYPE ACZU. CODE CODE ACT/CL> CAT, PAS

NOBH.POS

PAIL- RBH.UBH POS.IIODH IND.

TBSil'HRi XSITESTS .

RRBNO. RHI4ARI<S

MV-15-1 Gate MO 2 A A FAI Yes 221

EF-2EST-*SLT-1

*< 19 sec.

I-V-15328 Chec S/A. . 2 AC A NC ~ No 21

EP-2SLT-1

Qg ~ All

Rev. 108770-G-084

l131CM"'"~ Firewater, Domestic a MakeupliAOOILAII

Sys T)YL'c ~ VALVE TEST PROGRAM TABLE IITO CODE AND

RELIEF REQUEST

Page 101: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 102: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

l:LORlPA L LIGllT CO)hPAHY

VALVENUtlBER

SXKH TVPH ACTUe CODE CODE hCTjCGe CAT, PhS

NORl f.POS

rhZL- Rat<.UBB POSellODB INDe

THSPER)'SXTESTSRRBNO- REl4ARl<S

I-V-00139 3/8 Globe Man. 2 A P NC. FAI No 21

EF-'2SLT-1

1/0

I-V-00144 3/8 Globe Man. 2 A P NC FAI No 21

EF-2SLT-1

1/0

I-V-00140 Globe Man. 2 A P NC FAI No 21

EF-2SLT-1

2/0

I-V-00143 1 Globe Man. A P NC FAX No '21

EF-2SLT-1

2/0

V-00101 Gate . Man. 2 ' p NC FAI No SLT-1 3/0

e v e 'e c wrivi~ ILRT Instrument 6 TestYl<*ll

8770-G-093 Rev. 3

liAOO llal lVALVE TEST PROGRAM TVcoDERND

RELIEF REQUEST

Page 103: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORIDA R 0 LIG1)7 COMPAlhY

VhLVEHUHDBR

GXSB TYPH ACTU e CODE CODl"C5 a CWZ,

hC'Z/ N BHoPAS PQS..

PhXL™ MH.ORB POS g

HODH XNDe

THBTPER<'SXTESTS .

RRB

NO. RHl4ARl(S

FSE-27-1I

3/8 Gate 'O 'A NC PC Yes ~ 31

EF-1SLT-1

FSH-27-2 3/8 Gate SO 2 A A 'NC FC'es 31

EF-l.SLT-1

FSE-27-3

PSH-27-4

3/8 Gate SO

3/8 Gate SO

2 A

2, . A

A ~ NC

A NC .FC

Yes

Yes 31.

EF-1SLT-1

EF-ISLT-1

FSE-27-5 3/8 Gate SO 2 A A- NC FC Yes 31

EF-1 '.SLT-1

FSH-27-6 3/8 Gate SO 2 A A NC FC Yes 3. "1

EF-1SLT-3.

FSE-27-7

PSH-27-8

3/8 Gate . SO

3/8 Gate SO

2 A A NC

A NC

FC

FC

Yes

Yes

'31

31

EF-1 ~

SLT-1

EF-1SLT~f

FSH-27-9 3/8 Gate SO A NC 'FC Yes 3"1

EF-1SLT-1

FSE-27-10 3/8 Gate SO A A NC FC Yes 31

EF-1SLT-1

FSH-27-11 3/8 Ga'te 'O 2 A NC FC Yes 31

EF-1SLT-1

I te lLu'ivic Hydrogen Sampling Systemg all II

8770 — G — 092 Rev. 3

&000llhWTive.V, ~ yALVE TEST PQOGRAH TABLE XX

TO CODE ANDRCr,var RCQuESV

~ ~ e ~

Page 104: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

Ill

Page 105: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

~ I

~ ~ l ~

~ . ~ ~ ~

~ ~

Page 106: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORlPA PO)'lI!R E LIGll7 COMPAliY

VALVENUHDER

ACTU, CODECL,

CODE ACT/ Horu>.CAT, PAS POS.

FAIX,-UMHODB

REM.POSoXHDa

TESTPERi

XSXTESTS

RRBNO. REI&RI<S

U-6301 Diaph. DO 2 140 FC Yes 221

EF-8EST-.1SLT-,1

U-6302 Diaph. DO A No FC Yes 221

EF-8EST-1SLT-1

IVSICu I'laste Management System

I",—19367-210- 160 REU.

P(lOOllhWsist-u VALVE TEST PBOGRAH TABLE II

TO CODE ANDRELIEF REQUEST

Page 107: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

PLORIDAl:n t. LIG117 Col/PAI(Y

VALVE. NVt1BHR

S I'lH TYPE ACTU. COQH CODECL. CAT.

ncr/PAS

NOlUl. FAIL- RHH.POS. URH POS,

HODH XND.

TESTPERi.

ISXTESTS

RRBNO. REMARKS

V-25-20

V-25-21

FCV-25-7

24 Check

24 Check

Butty

. S/b 2 A/C

2 A/C

2

NC

NC* 'C

No

No

Yqsl

21

2'

221

EP-2SLT-1

HP-2SLT-1

EP-8-HST-*SLT-1

8 sec.

FCV-25-0 Butfy- NC PC Yes 22

.1

EP-8EST-*SLT-. 1

* < 8 sec.

crltLuIlVAC Air Flow Diac rams

0770 — C — 062 Rev. 10

Vll4 0 AAk4TITLE VALVE TEST PROGRAM TPCMN AND

RELIEF REQUEST

Page 108: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

l

Page 109: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

FLORIDA l'0)'IL'ft4 LIGllT COMPAltY

VhLVBNOHDPR

SIKH TYPH ACTU. COOH CODECL. Ch'L',

RCT/PhS

HORN. Phl'L- REH.PQS. Ulll; POQ,

HODB XHI) ~

TESlgl

PEREISXTPS

RRBNO. RBHAR)<S

FCV-25-2

PCV-25-3

PCV-25-4

I

Dutfy

40 Dutfy

40 Dutfy

Po

Po

Po

2 A

2 A

P

P

FC

Nc Fc

NC FC

Yes

Yes

Yes

22

.1

2i1

22

EF-2EST-1SLT-1

P.P-2EST-1SLT-1

EP-2EST-1SLT-1

2/02/0

2/0..2/0

2/02/0

PCV-25-5 48 Dutfy PO PC Yes 2 EF-2'EST-1

1 SLT-1

2/02/0

V-25-11 Gate Han. NC FAX. No Oc-.l '

L'r-13/0

V-25-12 3 Gate Han. FAX No Oc-1SLT-1

3/0.

V-25-13

V-25-14

Cate

3 Gate

Man.

Han.

Nc FAX No

FAI No

Oc-l.'r.r-l

OC-1

3/0.

3/0

V-25-15 3 Gate Man. 2 A NC . FAI No OC-1SLT-1

3/0

V-25-16 Gate Han. PAX No„ OC-1SLT-1

3/0

tlvAC - cowTr~oL DIACRAMSI, I~ All

0770-G-070 Rev. 11

l'IIOOllhlIVALVE TEST PROGRAM TABLE II

To coDr; ANDRELIEF REQOEST

Page 110: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 111: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

LIST OP EXCLUSIONS: TABLE III EXCLUSIONS TO CODE (INV-1300) .

Vent Valves

Drain Valves

Instrument Valves

~ Test Valves

maintenance Valves

Non-Nuclear Safety Valves

This table of valves is not included in this report. Theyare identified and included in plant records.

Page 112: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

Z.Z. BELZEF BEQUEST'ASXS - ATTACK~MT A-1 CODE BEQUZ~+ Va ZSDETERMXHED TO 3E XHPBACTZCAL.....PARAGRAPH 50.55a (g)5 (iii) AND RELXEP REQUESTED:

Reactor Coolant System

Chemical Volume and Control

Safety Znjection System

Containment, Spray Syst: em

Component Cooling Water System

Sampling System

Waste management System

iMain Steam System

Peedwater and'.Condensate System

Steam Generator Slowdown System

Service and Znstnment Air. System

Zntake Cooling Water System

Hydrogen Sampling System

ZLRT Znstrument and Test System

P imary Nater System

HVAC (Air Plow) System

Misc. Systems (Diesel Oil)Various Systems ("Passive Valves" )

Various Systems (Category E Valves)

Pg. 1 to 2

Pg.. 1 to 6

Pg. 1 to 6

Pg. 1 to 3

Pg. 1 to 3

Pg. 1 to 2

Pg 1 to 2.

Pg. 1 to 1

Pg. 1 to 3

Dg

Pg

to 1

1 to

Pg. 1 to 2

Pg. 1 to 1

Pg,

Pg,

1 to

1tolPg. 1 to 3

Pg. 1 to 1

Pg. 1 to

Pg. 1 to 1

Page 113: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 1 of 1

SYSTEL41: Reactor Coolant SystemReactor Coolant PumpChemical and Volume Control SystemSafety Injection Sist mContainment Spray and Refueling Water SvstemComponent Coo.ling Hater. System—Sampling SystemHaste Management SystemPuel Pool SystemMain, Extraction, and Auxiliary Steam SystemPeedwater and Condensate SvstemService and Instrument Air SystemZntake Cooling Hater SystemMiscellaneous Sampling Systems (Hydrogen Sampling System)Miscellaneous Svstems (Diesel Oil System)Pirewater, Domestic, and Makeup Systems (Primary Water)HVAC (Air Plow) SystemsS team Generator B lowdown SystemZI,RT Instrument and Test System

0. Valve: Passive Valves listed in Table I and Table ~ Z

Category: Passive

Class: 1, 2, or 3

Tes Requirement: INV - 3410

Basis for Relief: "Passive Valves" are not recuiredto chancre position to eitner safelyshut down the reactor or mitigatethe consequences of an accident.

00. Valve: Valves which are normally locked (or sealed)open or locked (or sealed) closed to fulfilltheir function. (INV-2110)

Category: E

Class: 1, 2, or 3

Test Requirement: INV — 3700

Basis for Relief: Catecory E valves, as defined in INV-2100,that perform a safety-related funct'on toeither safely shut down the reactor ormitigate the consequences o an accidenthave been classif'd as Category A, B, orC, as appropriate. Category E valves thatare used for ope ating convenience onlyare included in Table IZZ.

Page 114: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

4$

Page 115: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 1 of 2

RELXEF REQUEST BASIS

SYSTEM: Reactor Coolant

1. Valve: V-1402 and V-1404Category: BClass 1

Function: Provides low-temperature overpressure protectionfunction during cold shutdown to protect againstexceeding pressure-temperature limits.No credit. is taken in the Safety Analysis for anypressure reducing devices, except the pressurizersafety valves (V-1200, V-1201, and V-1202) andthe main steam safety valves (V-8201 throughV-8216).

Test Requirement: IWV-3410

Basis for Relief: The failure of either of these valvesin the open -.osition, by testing duringduring plant operation, would requirea unit outage to perform maintenanceon the failed valve.

The failure of either of these valvesin the open position, by testing duringcold shutdown, would result in a lossof system function. Both valves arerequired to ensure low-temperatureoverpressure protection during coldshutdown.

Alternate Testing: These valves will be tested during refueling'hutdowns.

NOTE: These valves are included in the St. Lucie Unit No. 1Valve Test Program in accordance with a previouscommitment to NRC Staff.

Page 116: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 2 of 2

RELIEF REQUEST BAS IS

SYSTEM: Reactor Coolant

2. Valve: V-1403 and V-1405Category: BClass 1

Function: Provides the flow path from the pressurizerto the associated solenoid operated valveused as the low-temperature overpressureprotection system during cold shutdown.This provides protection against exceedingpressure-temperature limits.

Test Requirement: IWV-3410

Basis for Relief: The failure of either o these valvesin the closed position; by testingduring plant operation, would requirea unit shutdown to perform maintenanceon the failed valve.

The failure of either of these valvesin the closed position, by testingduring cold shutdown, would result ina loss of system function. Both valvesare required to ensure low-temperatureoverpressure protection during coldshutdown.

Alternate Testing: These valves will be tested duringrefueling shutdowns.

NOTE: No credit. is taken in the Safety Analysis forany pressure reducing devices, except the pressurizersafety valves (V-1200, V-1201, and V-1202) and themain steam safety valves (V-8201 through V-8216) .These valves are included in the St. Lucie Unit No. 1Valve Test Program in accordance with a previouscommittment to NRC Staff.

Page 117: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 118: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 1 of 6

RELIEF REQUEST BASIS

SYSTEM: Chemical Volume and Control

l. Valve: FCV-2161Category: BClass: 2

Function: Provides flow control for Boric Acid Makeup Pumps

Test Requirement:

Basis for Relief:

Alternate Testing:

INV-3410

Failure of this valve in the open position,by testing during plant operation, couldresult in the injection of concentratedboric acid solution into the Reactor CoolantSystem. This could place the plant in anunsafe mode of operation.

This valve will be tested during coldshutdowns.

2. Valve: SE-01-01 and V-2505Category: AClass: 2

Function: Provides controlled leakoff flow path for thereactor coolant pump seal system.

Test Requirement:

Basis for Relief:INV-3410

Testing these valves during plant operat'onwill interupt flow of the controlledleakoff from the reactor coolant pumpseals, which could result in damage tothe reactor coolant pumps. This couldplace the plant in'n unsafe mode ofoperation.

Alternate Testing: These valves will be tested during coldshutdowns.

Page 119: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

Cl

Page 120: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit Vio. 1 Page 2 of 6

RELIEF REQUEST BASIS

SYSTEM: Chemical Volume and Control

3. Valve: SE-02.-'01. and: SE-02-02Category: BClass: 1

Function: Provides charging flow path to the ReactorCoolant System.

Test Requirement:

Basis for Relief:

Alternate Testing:

IWT-3410

Testing these valves during plantoperation would isolate char~~.ng flow,thus causing an unbalanced flow conditionin the Chemical Volume and ControlSystem when charging and letdownflow is required, Modes 1 thru 5.

These valves will be tested duringrefueling shutdowns.-

4. Valve: V-2515 and V.-,2516Category: AClass: 1

Function: Provides the letdown flow path from the ReactorCoolant System to the Chemical Volume and ControlSystem.

Test Requirement:

Basis for Relief:IWV-3410

Testing either of these valves duringplant operation would isolate letdownflow, thus causing an unbalanced flowcondition in the Chemical Volume andControl System when charging and letdownflow is required, Modes 1 thru 5.

Further, testing either of these valvesderring cold shutdown could result inexceeding pressure-temperature limits.

Alternate Testing: These valves will be tested duringrefueling shutdowns.

Page 121: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

tI

4$

4$

Page 122: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 3 of 6

RELIEF REQUEST BASIS

SYSTEM: Chemical Volume and Control

5. Valve: V-2501Category: BClass: 2

Function: Provides flow path from Volume Control Tank tothe charging pump suction header.

Test Requirement: IWV-3410

Basis for Relief: Failure of this valve in the closedposition, by testing during plantoperation, would isolate the chargingpump suction header from the volumecontrol tank. This could result indamage to the pumps and place the plantin an unsafe mode of operation.

Further, testing this valve during coldshutdowns would isolate one of theboration flow paths to the reactorcoolant system. This could result, inplacing the plant in an unsa fe modeof operation.

Alternate Testing: This valve will be tested duringrefueling shutdowns.

6. Valve: V-2514 and V-2174Category: BClass: 2

Function: Provides flow path from normal boric acid makeupflow path to the emergency boration flow path.

Test Requirement: IWT-3410

Basis for Relief: Testing these valves during normalplant operation could result in theinjection of concentrated boric acidsolution into the Reactor Coolant System.This could place the plant in anunsafe mode of operation.

Alternate Testing:

Failure of either of these valves inthe closed position, by testing duringcold shutdowns, would result in the lossof one of the emergency boration flowpaths required during cold shutdowns.

These valves will be tested duringrefueling shutdowns.

Page 123: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 124: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 4 of 6

RELIEF REQUESTBASIS'YSTEi~1:

Chemical Volume and Control

7. Valve: V-2504Category: BClass: 2

Function: Provides flow path from the Refueling Water Tankto the charging pump suction header.

Test Requirement: IWV-3410

Basis for Relief: Testing this valve during normal plantoperation could result in the injectionof concentrated boric acid solution intothe reactor coolant system. This couldresult in placing the plant in an unsafemode of operation.

Further, failure of this valve in theclosed position, by testing during coldshutdowns, would result in the loss ofone of the emergency boration flow pathsrequired during cold shutdowns.

Alternate Testing: This valve will be tested during refuelingshutdowns.

8. Valve: V-2191Category: CClass: 2

Function: Prevents reverse flow from th'e charging pumpsuction header to the Refueling Water Tankwhen V-2504 is open'.

Test Requirements: IWV-3520

Basis for Relief: Testing this valve during normal plantoperation would result in the in~ectionof concentrated boric acid solution intothe reactor coolant system. Th's couldresult in placing the plant in an unsafemode of operation.

Alternate Testing:

Further, failure of of this valve in theopen position by testing during cold,shutdowns would result, in the loss ofone of the emergency boration flow pathsrequired during cold shutdowns.

This check valve will be exercised'.during refueling shutdowns.

Page 125: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 126: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit Ho. 1 Page 5 of 6

RELIEF REQUEST BASIS

SYSTEM: Chemical Volume and Control

9. Valve: V-2177 and V-2190Category: CClass: 2

Function: Prevents reverse flow from the charging pumpsuction header to the emergency boration flowpath.,

Test Reauirement:

Basis for Relief:INV-3520

Testing these valves during normal plantoperation could result in the injectionof concentrated boric acid solution intothe reactor coolant svstem. Th's couldplace the plant in an unsafe mode ozoperation.

Alternate Testing:

Failure,of either of these va3.ves in theclosed posit'on, by testing dur'ing coldshutdowns, would resu3.t in the loss ofone of the emergency boration flow pathsreauired during cold shutdowns.

These valves will be disassembled, on analternating basis (staggered test basis),during refueling snutdowns over the tenyear Inservice Inspection Interval toinspect the valves'reedom of motion t,oopen and closed positions. Any problemsfound during this inspection would because, for inspection the other valve.

10.

Page 127: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 6 of 6

RELIEF REQUEST BASIS

SYSTEM: Chemical Volume and Control

12. Valve:Category:Class:

V-2430C2

Function: Prevents reverse flow from the Reac or CoolantSystem into the Chemical Volume and Control System,if a component downst earn of this valve mal unct'onsor fails to perform its function.

Test Reauirement:

Basis for Relief:IHV-3520

There are no provisions for test'ng thisvalve to ensure verif'at'on tnat thedisk has seated properly upon c ssationor reversal oz flow.

Alternat Test-'ng: This valve w'1'e disassembled during arefuel'ng shutdown over the ten vearInservice Inspection Interval to inspectthe valves 'reedom o f mot'n to open andclosed positions.

Page 128: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

CS

Page 129: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 1 of 6

RELIEF REQUEST BASIS

SYSTE "0: Safety Injection1. Valve: V3405, V3414, and V3427

Category: CClass: 2

Function: Prevents reverse flow from the High PressureSafety Injection System Supply Header to anon-operating High Pressure Safety Injection Pump.

Test Reauirement:

Basis for Relief:

GvV-3520

These valves cannot be tested during plantoperation because the High Pressure SafetyInjection System Pumps do not developsufficient discharge head to establisha flow path to the Reactor Coolant System.

Further, testing these valves duringcold shutdowns is impractical since itcould subject the Reactor Coolant Svstemto condit'ons exceeding pressure-temperaturelimits.

Alternate Testing: These check valves will be exercisedduring refueling shutdowns..

2. Valve: V3106 and V3107Category: CClass: 2

Function: Prevents reverse flow from the Low PressureSafety Injection System Supply Header to anon-operat'ng Low Pressure Safety Injection Pump.

V

Test Recuirement:

Basis zor Relief:

Alternate Test'g:

INV-3520

These valves cannot be t s ed during plantope ation because the Low Pressure SazetyInjection System Pumps do not developsufficient discharge head to es abl'sh aflow path to the Reactor Coolant Svstem.

These check valve w'll be exerc'sedduring cold shutdowns.

Page 130: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 131: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 2 of 6

RELIEF REQUEST BASIS

SYSTEM: Safety Injection3. Valve: V3401 and V3410

Category: CClass: 2

Function: Prevents reverse flow from a non-operatingHigh Pressure Safety Znjection Pump to theRefueling Water Tank Supply Header.

Test Requirement: IWV-3520

Basis for Relief: These valves cannot be tested duringplant operation because the High PressureSafety Injection System Pumps do not de-velop sufficient discharge head toestablish a flow path to the ReactorCoolant System.

Further, testing these valves duringcold shutdowns is impractical since itcould subject. the Reactor Coolant Systemto conditions exceeding pressure-temper-ature limits.

Alternate Testing: These check valves will be exercisedduring refueling shutdowns.

Additional Testing: These check valves will be exercisedquarterly during the performance ofassociated pump tests.

4. Valve: I-V07000 and I-V07001Category: CClass: 2

Function: Prevents reverse flow from a non-operatingLow Pressure Safety Injection Pump to theRefueling Water Tank Supply Header.

Test Requirement:

Basis for Relief:

IWV-3520

These valves cannot be tested duringplant operation because the Low PressureSafety Injection Pumps do not developsufficient discharge head to establish aflow path to the Reactor Coolant System.

Alternate Testing: These check valves will be exercisedduring cold shutdowns.

Additional Testing: These check valves will be exercisedquarterly during .the performance ofassociated'pump tests.

Page 132: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

4k

Page 133: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit ~3o. 1 Page 3 of 6

RELIEF REQUEST BAS IS

SYSTEM: Safety Injection5. Valve: V3113, V3123, V3133, and V3143

Category: CClass: 2

Function: Prevents reverse flow from the Low PressureSafety Injection System and the Safety InjectionTank System to the High Pressure Sa ety InjectionSystem.

Test Requirements: IWV-3520

Bas is for Relief: These valves cannot be tested duringplant operation because the High PressureSafety Injection Pumps do not developsufficient discharge head to establisha flow path to the Reactor Coolant System.

Furthex, testing these valves duringcold shutdowns is impractical since itcould subject the Reactor Coolant Systemto conditons exceeding pressure-temper-ature limits.

Alternate Testing: These check valves will be exercisedduring refueling shutdowns.

6. Valve!Category:Class:

V3114, V3124, V3134, and V3144C2

Function: Prevents reverse flow from the High PressureSafety Injection System to the Low PressureSafety Injection System.

Test Requirements:

Basis for Relief:INV-3520

These check valves cannot be testedduring plant operation because the LowPressure Safety Injection Pumps do notdevelop 'sufficient discharge head toestablish a flow path to the ReactorCoolant System.

Alternate Testing: These check valves vill be exercisedduring cold shutdowns.

Page 134: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

45

Page 135: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit iso. 1 Page 4 of 6

RELIEF REQUEST BASIS

SvSTEM Sazety Injection7. Valve: V-3217, V-3227, V.-'237.; and V,-3247

Category: CClass: 2

Function: Prevents reverse flow from the Reactor CoolantSystem to the H'gh Pressure Sazety Injection System,the Safety Inject'on Tank System, or the LowPressure: Safety Injection System.

Test Reauirement: ZNV-3520

Basis for Reliez: These check valves cannot be tested duringplant operation because neither the HighPressure Sazety Injection Pumps, theSafety Injection Tanks, nor the Low PxessureSaf ety Znjection Pumps develop suf z icientdischarge head to establish a flow pathto the Reactor Coolant Svst m.

Alternate 'Zesting: These check valves will be exercisedduring cold, shutdowns.

8. Valve: V".3659 and V.-3660Category'. BClass: 2

Function: Provides a minimum@flow (rec'rculat'n-flow) pathfrom the High Pressure Safety Znjec ion Pumps,the Low Pressure Safety Injection Pumps, and theContainment Spray Pumps to the Refueling WaterTank.

Test Reguizement: DPT-3410

Basis zor Rel'ef:

Alternate Testing:

These valves cannot be tested during plantoperation because the Technical Spec'r"'cationsrequire these valves to be positioned openwith the power supply to the valve operatorremoved dur'ng operat'on in Modes 1, 2,and 3 (with pressurize" pressure greate"than 1750 psia) .

Furthe , the failure of eithe of thesevalves in the closed position bv test'ngduring plant operation, could result in'n pump damage, if'ny oz the "umps startedand ope ated without suffic'ent low throughthe operating pump.

These valves will be tested during co ds huidown s ~

Page 136: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 137: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St.. Lucie Unit Ho. 1 Page 5 of 6

RELZEF REQUEST BAS ZS

SYSTEM Safety Znject'on

9. Valve: V-3215, V-3225, V-3235, and V-3245Category: CClass: 2

Function: Prevents reverse flow from the High PressureSafety Znjection System and Low Pressure SafetyZnjection System 'nto the Safety Znjection Tanks.

Test Requirement: ZWV-3520

Basis for Relief: These valves cannot be tested duringplant operation because the SafetvInjection Tank oressure is 'nsuff'cientto establish a flow path to the Reac orCoolant Syst m.

These valves cannot be tested duringcold shutdowns because one of theshutdown cooling system flow pathsto the reactor would be isolatedduring the performance of the test.

Alternate Test'ng: These check valves will be exerc'sedduring refueling shutdowns.

10. Valve: V-3463 and Z-V07009Category: A.

Class: 2

Function: These valves provide a flow path to the RefuelingWater Tank from the Safety Znjection Tanks, whenthe associated dra'n valve is opened.

Test Recuirement:

Basis for Relief:

Zi'iV-3 4 10

These valves are positioned closed andlocked closed during plan". operation.—These "Passive Valves" are not requiredto change pos'ion to eitner safely shudown the reactor or miticate theconsequences of an accident. Therefore,exercising these valves is not ecuired.

I

Page 138: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 139: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 6 of 6

RELI "F REQUEST BASIS

SYSTEM:I E I Sazety Injectionll. Valve: HCV-3618, HCV-3628, H&1-3638, and HCV-3648

Category: BClass: 1

Function: P ovides flow path from Safety InjectionSystem header to the Waste Management System.

Test Recuirement:

Basis for Relief:

Alter..ate Testing:

IWV-3410

These drain valves are normally closedduring slant oneration. Failure ofany of'hese valves in the open position,by testing during plant opezation, wouldresult in draining the Sazetv Injection

ank associated with the valve. Thiswould plac the plant in an unsafe modeoz ope ation.These valves will be tested curing coldshutdowns.

12. Valve: V-3480, V-3481, V-3651, .and V-3652Category: BClass: 1

Function: Provides flow path from the Reactor CoolantSystem to the Shutdown Cooling System.

Basis for Relic The failure oz either of these valvesin the open position, by 'tes-'ing dur'ngplant opexation, would recuire a unitshutdown to per=orm maintenance on thefailed valve.

Alternate Testing: These valves will be tested during coldshutdowns.

Page 140: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 141: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 1 of 3

RELIEF REQUEST BASIS

SYSTEM: Component Cooling Water

1. Valve: HCV-14-1, HCV-14-7, HCV-14-2, and HCV-14-6Category: AClass: 2

Function: Provides. supply and return flow path forcomponent coolant water to the reactor coolantpump seal coolers.

Test Requirement: XWV-3410

Basis for Relief: These valves cannot be tested duringplant operation because closing anyof these valves would result in theloss of cooling capability to thereactor coolant pump seal coolers.This would result in damage to thereactor coolant pumps which couldplace the plant in an unsafe mode ofoperation.

Alternate Testing: These valves will be tested duringcold shutdowns.

2. Valve: I-SB-14167 and I-SB-14178Category: BClass: 3

Function: Provides component cooling water flow pathfrom heat exchanger outlet to associatedsupply header.

Test Requirement: IWV-3410

Basis for Relief: These valves cannot be tested duringplant operation because closing eitherof these valves would result in loss ofcooling capability to the equipmentsupplied with component cooling water.This could cause overheating of equipmentwhich could place the plant in an unsafemode of operation.

Alternate Testing: These valves will be tested duringcold shutdowns.

Page 142: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 2 of. 3

RELIEF REQUEST BASIS

SYSTEM: Component Cooling Water

3. Valve: HCV-14-3A and HCV-14-3BCategory: BClass: 3

Function: Provides flow path from component cooling .watersystem to shutdown cooling system heat, eexchangers.

Test Requirements: IWV-3410

Basis for Relief: Testing these valves during plantoperation would cause an unbalancedflow condition in the Component CoolingWater System resulting in decreasedflow to essential equipment. Thiscould cause overheating of equipmentwhich could place the plant in anunsafe mode of operation.

Alternate Testing: These valves will be tested duringcold shutdowns.

4. Valve: NV 14 5 I NV 14 6 I 1'DT 14 7 I and 1ST-14-8Category: BClass: 3

Function: Provides supply and return flow path forcomponent cooling water to the containemntcooling units.

Test Requirement:t

Basis for Relief:ENV-3410

These valves cannot, be tested duringplant operation because closing any ofthese valves would result in a loss of coolingcapability to the associated containmentcooling units. This could causeoverheating of equipment which couldplace the plant in an unsafe mode ofoperation.

Alternate Testing: These valves will be tested duringcold shutdowns.

Page 143: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 144: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

'St. Lucie Unit No. 1 Page 3 of 3

RELlEF REQUEST BASIS

SYSTEM: Component Cooling Water

5. Valve:Category:Class:

LCV-14-1B3

Function: Provides flow path from demineralized watersystem to component cooling water surge tank.

Test Requirement:.

Basis for Relief:IWV-3410

This valve is in service and operatesduring plant operation and duringshutdowns. Any malfunction or abnormaloperation of this valve would be detectedat this time.

Alternate Testing: This valve is exercised automaticallyduring plant operation and duringshutdowns.

Page 145: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 146: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 1 of 2

RELIEF BEQUEST BASIS

SYSTEM: Sampling

1. Valve: V-5200 and V-5203Category: AClass: 2

Function: Provides flow path from reactor coolantsystem to sample system.

Test Requirement: IWV-3410

Basis for Relief: The failure of either of these valvesin the open position, by testing duringplant operation, could result in aloss of containment integrity.

Alternate Testing: These valves wil'1 be tested duringcold shutdowns.

Additional Testing: These valves are exercised duringplant operation. Any malfunctionsor abnormal operation of these valveswauld be detected at this time.

2. Valve: V-5201 and V-5204Category: AClass: 2

Function: Provides flow path from the pressurizer surgeline to the sample system.

Test Requirement:

Basis for Relief:

IWV-3410

The failure of either of these valvesin the open position, by testing duringplant operation, could result in aloss of containment, integrity.

Alternate Testing: These valves will be tested. duringcold shutdowns.

Additional Testing These valves are exercised duringplant operation. Any malfunctionsor abnormal operation of these valveswould be detected at this time.

Page 147: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 148: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 2 of 2

RELIEF REQUEST BASIS

SYSTEM: Sampling

3. Valve: V-5202 and V-5205Category: AClass: 2

Function: Provides a flow path from the pressurizersteam space to the sample system.

Test Reauirement:

Basis for Relief:

IWT-3410

The failure of either of these valvesin the open position, by testing duringplant operation, could result in aloss of containment integrity.

Alternate Testing: These valves will be tested duringcold shutdowns.

Additional Testing: These valves are exercised during plantoperation. Any malfunctions or abnormaloperation of these valves would bedetected at this time.

Page 149: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

III

Page 150: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit iso. 1 Page 1 of 2

RELIEF REQUEST BASIS

SYSTEM: Waste Management

1. Valve: V-6301 and V-6302Category: AClass: 2

Function: Provides flow path from the reactor drain tankto the suction header of the reactor drainpumps

Test Requirement:

Basis for Relief:IWV-3410

The failure of either of these valvesin the closed position, by testingduring plant operation, would resultin a loss of system function.

Alternate Testing: These valves will be tested duringcold shutdowns.

2. Valve: V-6741Category: AClass: 2

Function: Provides flow path for nitrogen supply tocomponents located inside containment.

Test Requirement:

Alternate Testing:

The failure of this valve in the openposition, bv testing during plantoperation, ould result in a lossof containment integrity.This valve will be tested duringcold shutdowns.

Page 151: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 152: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 2 of 2

RELIEF REQUEST BASIS

SYSTEM: Waste Management

3. Valve: V-6554 and V-6555Category: AClass: 2

Function: Provides flow path from components locatedinside containment to the gas surge tank(containment vent header) located outsidecontainment.

Test Requirement:

Basis for Relief:

Alternate Testing:

IWV-3410

The failure of either of these valvesin the closed position, by testingduring plant operation, would causea loss of system function.These valves will be tested duringcold shutdowns.

Page 153: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 154: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 1 of 1

RELIEF REQUEST BASIS

SYSTEM: Main Steam

1. Valve: HCV-08-1A and HCV-08-1BCategory: BCClass: 2

Function: Provides flow path from steam generator tothe main'steam header system.

Test Requirement:

Basis for Relief:

Alternate Testing:

IWT-3410

These valves cannot be tested duringplant operation because closing thesevalves would cause a unit trip.These valves will be exercised duringcold shutdowns.

2. Valve: V-8117 and V-8148Category: CClass: 2

Function: Prevents reverse flow from the main steam headersystem to the steam generator, if the associatedmain steam isolation valve is open.,

Test Reauirement:

Basis for Relief:INV-3520

These valves will be disassembled, onan alternating basis (staggered test basis),during refueling shutdowns over the tenyear Inservice Inspection Interval toinspect the valves'reedom of motion toopen and closed positons. Any problemsfound during this inspection would because for inspection of the other valve.

Page 155: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

4S

rt~

Page 156: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 1 of 3

RELIEF REQUEST BASIS

SYSTEM: Feedwater and Condensate

1. Valve:

Category:Class

V-9107, V-9119, V-9123, V-9135, V-9139/V-9151, and V-9157C2

Function: Prevents reverse flow from the Main FeedwaterSystem into the Auxiliary Feedwater System.

Test Requirements: INV-3520

Basis for Relief: These check valves cannot be testedduring plant operation becauseestablishing a flow path to the steamgenerators with auxiliary feedwater atambient conditions would result inthermal shock to the Main FeedwaterSystem piping.

Alternate Testing: These check valves will be exercisedduring cold shutdowns.

2. Valve: MV-09-7 and MV-09-8Category: BClass: '2

Function: Provides flow path from the Main Feedwater Systemto the associated steam generator.

Test Requirement:

Basis for Relief:IWV-3410

These valves cannot be tested duringplant operation because closing eitherof these valves would result in a lossof feedwater flow to the associatedsteam generator and cause a unit trip.

Alternate Testing: These valves will be tested duringcold shutdowns.

Page 157: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 158: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 2 of 3

RELIEF BEQUEST BASIS

SYSTEM: Feedwater and Condensate

3. Valve: V-9252 and V-9294Category: CClass: '

Function: Prevents reverse flow from the associatedsteam generator into'he feedwater system.

Test Requirement: IrAV 3520

Basis for Relief: These valves will be disassembled,on an alternating basis (staggeredtest basis), during refueling shutdownsover the ten year Inservice InspectionInterval to inspect the valves'reedomof motion to open and closed positions.Any problems found during this inspectionwould be cause for inspection of thether check valve.

4. Valve: V-12487Category: BClass: 3

Function: Provides the flow path from'he condensatestorage tank to the condensate transfer pumpsuction and to the main steam condenser

makeup'ystem(secondary plant) .

Test Requirement:

Basis or Relief:

IriPT 3410

This manual valve is a normally open,passive valve..'t is only'closed "oisolate the main'condenser makeupsystem for maintenance or other similarpurposes.

"Passive Valves" are not recuired tochange position to either safely shu"down the reactor or mitigate theconsequences of an accident. Therefore,exercisina this passive valve is notrequired.

Alternate Testing: None

Page 159: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

III

4

Page 160: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

S t. Lucie Unit No.. 1 Page 3 of 3

RELIEF REQUEST BASlS

SYSTEM: Feedwater and Condensate

5. Valve: LCV-12-9Category: BClass: 3

Function: Provides flow path from the demineralized watersystem to the condensate storage tank.

'Test Requirement:

Basis for Relief:IWV-3410

This valve is in service and operatesduring plant operation and during hotshutdowns. Any malfunction or abnormaloperation of this valve would be detectedat this time.

Alternate Testing: This valve is exercised automaticallyduring plant operation and duringshutdowns.

Page 161: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 162: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 1 of 1

RELIEF REQUEST BASIS

SYSTEM: Steam Generator Blowdown

l. Valve: . FCV-23-3, 4,5,6,7, aad 9Category: BClass: 2

Punction: Provides flow path from the associated s earngenerator to the closed blowdown system.

Test Requirements: ZWV-3410

Basis for Relief: Testing these valves during plant operationcould result in an unbalanced floe condition.This could cause a loss of chemistrycontrol.

Alternate Testing: These valves will be tested duringcold shutdowns.

Page 163: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

III

Page 164: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 1 of '3

RELIEF REQUEST BASIS

System: Containment Spray

1. Valve: V-07192, V-07193, V-07129, and V-07143Category: CClass: 2

Function: Prevents reverse flow in the Containment SpraySystem, if a containment spray pump is notoperating.

Test Requirement:

Basis for Relief:

IWV-3520

Testing these valves, by placing thecontainment sprav system in operationor connecting an external water source,would result in spraying the structuresand components located inside thecontainment building.

Alternate Testing: These valves will be disassembled, on analternating basis (staggered test basis),during refueling shutdowns over the tenyear Inservice Inspection Interval toinspect the valves'reedom of motion toopen and closed positions. Any problemsfound during this inspection would because for inspection of the other valves.

2. Valve: LCV-07-llA and LCV-07-11BCategory: AClass: 2

Function: Provides flow path from the reactor cavity andcontainment sump to the equipment drain tank.

Test Requirement:

Basis for Relief:

IrAV-3 410

Failure of either of these valves inthe closed position, by testing duringplant operation, would result in a lossof one of the systems required for leakdetection inside containment.

Alternate Testing: These valves will be tested during coldshutdowns.

Page 165: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

45

Page 166: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 2 of3'ELIEF

REQUEST BASIS

SYSTEM: Containment Spray

3. Valve: V-07120 and V-07119Category: CClass: 2

Function: Prevents reverse'-flow to the Refueling HaterTank.

Test Requirement: INV-3520

Basis for Relief: These valves cannot be tested duringplant operation because neither theRefueling Hater Tank, the High PressureSafety Injection Pumps, nor the LowPressure Safety Injection Pumps developsufficient discharge head to establisha flow path to the reactor coolantsystem.

Alternate Testing: These check valves. will be exercisedduring cold shutdowns.

Additional Testing: These check valves will be exercisedquarterly during the performance ofSafety Injection System pump tests.

4. Valve: V-07206, V-07189, V-07170, and V-07188Category: AEClass: 2

Function: Provides supply and return flow path fromthe refueling cavity to the fuel poolsystem ion exchangers.

Test Requirement:

Basis for Relief:IWV-3410

These "Passive Valves" are not requiredto change position to either safelyshut down the reactor or mitigate theconsequences of an accident. Therefore,exercising these valves is not required.

Alternate Testing: None

Page 167: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 168: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Zucie Uni.h Ho. 1 Page 3 of 3

RELXEF REQUEST BAST.S

SYSTEM: Contairment Spray '(Containment Recirculat'or.)

5. Valve:Category:Class:

V-07174 and V-07172C2

Function: Prevents reverse flow from the RefuelingWater Tank to the containment recirculationS~p o

Tes Requi "e .ent: ZWV-3520

Bas's for R ~'here are no provisions for testingthis check valve to Code requirements.

These valves will be d'assembled,on an alternating basis (staggered testbasis), during refueling shutdownsover the ten year Xnservice lnspec ioninterval the inspect the

valves'reedomof motion to open and closedpositions. Any .problems found duringtRis inspection would be cause forinspection of the otner valve.

6. Valve: V-07256 and V-07258Category: CClass: 2

Function: Provides redundant flow path from Sodium HydroxideAddition Tank to containment spray pump suction.

Test Requirement:

Basis for Relief:iWV-3520

Testing these valves by placing the con-tainment, spray system in operationwould result in introducing sodiumhydroxide solution into the containmentspray system piping.Testing these valves by connecting anexternal water source would result inthe ability to supply sodium hydroxidesolution to the containment spray system,if required.

Alternate Testing: These check valves will be exercisedduring cold shutdowns.

Page 169: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

4$

t

Page 170: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 1 of 2

.RELIEF REQUEST BASIS

SYSTEM: Intake Cooling Water

1. 'alve: MV-21-2 and MV-21-3Category: BClass: 3

Function: Provides flow path from the Intake CoolingWater System to the Turbine Cooling WaterSystem.

Test Requirement:

Basis for Relief:IWV-3410

These valves cannot be tested duringplant operation because closingeither of these valves would resultin loss of cooling capability to theassociated Turbine Cooling WaterSystem heat exchanger. This wouldcause overheating of secondary plantequipment which could place the plantin an unsafe mode of operation.

Alternate Testing: These valves will be tested duringcold shutdowns.

2. Valve: MV-21-4Category: BClass: 3

Function: Provides flow path from the Intake CoolingWater System to the Circulating Water Pumpshaft bearings.

Test Requirement:

Basis for Relief:IWV 3410

This valve cannot be tested duringplant operation because closing thisvalve would result in loss of coolingwater to the Circulating Water Pumpshaft bearings. This could causedamage to these pumps.

Alternate Testing: This valve will be tested during coldshutdowns.

Page 171: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 172: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 2 of 2

RELIEF REQUEST BAS IS

SYSTEM: Intake Cooling Water

3. Valve: V-21327Category: CClass: . 3

Function: Prevents reverse flow from the Intake CoolingNater System to the Domestic Water Supply System.

Test Requirement.: IWV-3520

Basis for Relief: This check valve cannot be tested duringplant operation because the Domestic Water(City Water Storage Tanks) System does notdevelop sufficient discharge head toovercome the discharge head of the IntakeCooling Water Pumps.

Alternate Testing: This check valve will be exercisedduring cold shutdowns.

4. Valve: TCV-14-4A and TCV-14-4BCategory: BClass: 3

Function: Temperature control valves for associatedIntake Cooling Water System heat exchanger.

Test Requirement: IWV-3410

Basis for Relief: These valves are in continuous serviceduring plant operation and during shutdowns.These modulating valves are for temperaturecontrol of Component Cooling Water System.Any malfunctions would be noted by.,abnormaloperating conditions.

Alternate Testing: None

Page 173: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

4$

Page 174: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 1 of 1

RELIEF REQUEST BASIS

Hydrogen Sampling

1. Valve:Category:Class:

FSE-27-1, 2, 3, 4, 5, 6, 7, 8, 9, 10, and llAGate

Function: Provides flow path for each of 7 separatesample point, locations inside contaiment(FSE-27-1 thru 7) to hydrogen sample analyzeroutside containment and return flow path tocontainment (FSE-27-8 thru 11).

Test Requirement:

Basis for Relief:

Alternate Testing:

IVJ-3410

These self-contained, completelyenclosed solenoid valves have noexternal valve position indications.Therefore, stroke-time measurementsand valve position verification isimpractical.Establishing a flow path as shown bythe Hydrogen Analyzer Flow Indicatorwill demonstrate that the moving partsof these valves function satisfactorily.

Page 175: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 176: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 1 of

RELIEF REQUEST BASIS

SYSTEM: Service and Instrument Air

1. Valve: MV-18-1Category: AClass: 2

Function: Provides flow path for instrument air supplyto components located inside containment.

Test Requirement: IWV-3410

Basis for Relief: Failure of this valve in the openposition, by gesting during plantoperation, would result in a losscontainment integrity.

'Alternate Testing: This valve will be tested duringcold shutdowns.

2. Valve: I-V-18195Category: ACClass: 2

Function: Prevents reverse flow from the instrument airsystem inside containment to the instrumentair supply system located outside containemnt.

Test Requirement: INV-3520

Basis for Relief: Failure of this valve in the openposition, by testing during plantoperation, would result in a lossof containment integrity.

Alternate Testing: This check valve will be exercisedduring cold shutdowns.

Page 177: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 178: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 1 of 2,

RELIEF REQUEST BASIS

'YSTEM:ILRT Instrument and Test

Valve: I-V-00139 and I-V-00144Category: AClass: 2

Function: Provides pressure sensing flow path forcontainment Integrated Leak Rate Test.

Test Requirement:

Basis for Relief:

Alternate Testing:

IWV-3410

These "Passive Valves" are notrequired to change position toeither safely shut down the reactoror mitigate the consequences of anaccident. Therefore, exercisingthese valves is not required.

These normally closed valves arerequired to be opened during theperformance of the containmentIntegrated Leak Rate Test.

2. Valve: I-V-00140 and I-V-00143Category: AClass: 2

Function: Provides controlled leakage rate functionfor the containment Integrated Leak RateTest.

Test Requirement:

Basis for Relief:

IWT-3410

These "Passive Valves" are notrequired to change position toeither safely shut down the reactoror mitigate the consequences of anaccident. Therefore, exercisingthese valves is not required.

Alternate Testing: These normally closed valves arerequired to be opened during theperformance of the containmentIntegrated Leak Rate Test.

Page 179: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 2 of 2

RELIEF REQUEST BASIS

SYSTEM: ILRT Instrument and Test

3. Valve: V-0010.1Category: AClass: 2

Function: Provides pressurization flow path for thecontainment Integrated Leak Rate Test.

Note: This valve was installed in accordancewith a previous commitment to NRC Staff.

Test Requirement: IWV-3410

Basis for Relief:

Alternate Testing:

This "Passive Valve" is not requiredto change position to either safelyshutdown the reactor or mitigate theconsequences of an accident. Therefore,exercising of this valve is not required.

None

Page 180: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

Ill

Page 181: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 1 of 1

RELIEF REQUEST BASIS

SYSTEM: Primary Water

1. Valve: NT-15-1Category: AClass: 2

Function: Provides a primary water flow path to theQuench Tank.

Test Requirement: IWV-3410

Basis for Relief: Failure of this valve in the openposition, by testing during plantoperation, would cause a loss ofcontainment integrity.

Alternate Testing: This valve will be tested duringcold shutdowns.

2. Valve: I-V-15328Category: ACClass: 2

Function: Prevents reverse flow from the Quench Tank tothe Primary Water System.

Test Requirement: IWV-3520

Basis for Relief: Failure of this valve in the openposition, by testing during plantoperation, would cause a loss ofcontainment integrity.

Alternate Testing: This valve will be'ested duringcold shutdowns.

Page 182: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

4l

45

Page 183: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 1 of 1

RELIEF REQUEST BASIS

SYSTEM: Misc. Systems (Diesel Oil)1. Valve: I-SE-17-lA and I-SE-17-1B

Category: BClass: 3

Function: Provides flow path from the EmergencyDiesel-generator Diesel Oil Storage Tankto the Skid-mounted Diesel Oil Day Tank.

Test Requirement:

Basis for Relief:IWV-3410

These self-contained, completelyenclosed solenoid valves have noexternal valve position indicators.Therefore, stroke-time measurementsand valve position verification isimpractical.

Alternate Testing: An increase in level in the Skid«mounted Diesel Oil Day Tank, whileexercising these valves quarterly,will demonstrate that the movingparts of these valves functionsatisfactorily.

Page 184: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 185: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 1 of 3

RELIEF REQUEST BASIS

SYSTEM: HVAC (Air Flow)

1. Valve:Category:Class:

V-25-20 and V-25-21A/C2

Function: These check valves and the associated airoperated butterfly valves provide the vacuumrelief function to protect the containmentvessel against excess external pressure.These valves prevent the differential pressurebetween the containment and the shield buildingatmosphere from exceeding limits. These checkvalves prevent reverse flow in the containmentrelief system.

Test Requirement:

Basis for Re'lief:

IWV-3520

These valves are located inside thecontainment building at approximatelyelevation 80.0. Testing these valvesrequires containment entry. Personnelperforming the tests would be exposedto radiation of approximately 5,000millirems per'our (predominately neutron).We estimate one man-hour will be requiredfor testing these valves. Therefore,testing these valves during normal plantoperation would result in a commitmentof 5,000 millirems each test or a totalof 20,000 millirems annually (20 man-remsexposure each year).

Alternate Testing: These check valves will be exercisedduring cold shutdowns.

Page 186: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 187: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 2 of 3

RELlEF REQUEST BASES

SYSTEM: HVAC

2. Valve: FCV-25-2, FCV-25-3, FCV-25-4, and FCV-25-5Category: AClass: 2

Function: Provides supply and exhaust flow path foroutside air supply to the reactor containment'nd reactor containment building exhaust, tothe plant vent system.

Test Requirement: IWV-3410

Basis for Relief: These "Passive Valves" are not requiredto change position to either safely shutdown the reactor or mitigate theconsequences of an accident. Therefore,exercising these .valves is 'not: required.

Alternate Testing: These normally closed valves will beexercised during the performance ofthe local leak rate tests duringr'efueling shutdowns. *

3. Valve:

Category:Class:

V-25-11, V-25-12, V-25-13, V-25-14, V-25-15,and V-25-16A2

Function: Provides outside air supply and reactor containmentbuilding exhaust flow path for the containmenthydrogen purge system.

Test Requirement: IWV-3410

Basis for Relief: These valves are positioned closed andlocked closed during plant operation andduring shutdowns. These valves are underadministrative control.

Alternate Testing: These valves will be exercised during theperformance of the local leak rate testsduring. refueling shutdowns.

Page 188: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv
Page 189: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1 Page 3 of 3

RELIEF REQUEST BASIS

SYSTEM: HVAC (Air Flow)

4. Valve:Category:Class.»

FCV-25-7 and FCV-.25-8A2

Function: These air operated butterfly valves and theassociated check valves provide the vacuumrelicf function to protect the containmentvessel against excessive esternal pressure.These valves prevent the differential pressurebetween the containment and the shield buildingatmosphere from exceeding limits. Thesebutterfly valves provide a flow oath fromoutside containment into'he-containment vessel.

Test Requirement: IWV-3410

Basis for Relief:

Alternate Testing:

These valves are located in theannular space between the containmentvessel 'steel shell and the concreteshield building at approximatelyelevation 80.0. Testing these valvesrequires containment entry. Personnelperforming the tests would be exposedto radiation of approximately 5,000millirems (predominately neutron) .Ne estimate approximately one man-hourwill be required for testing thesevalves. Therefore, testing thesevalves during normal plant operationwould result in a commitment of 5,000millirems each test or a total of20,000 millirems annually (20 man-remsexposure each year).These valves will be tested duringcold shutdowns.

Page 190: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

CS

Page 191: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

I I ~ PUt'1P TEST PROGRAYi

II.A. Table IV - Test Parameters

This subsection outlines the pumps which are provided with an

emergency power source.

I I.B. Test Interval

In accordance with relief request to sub-section IWP 3400, thequarterly test interval as defined in this pump test program isonly inclusive of operational Nodes 1, 2, 3 or 4 (as appropriate)in Table 1.1 of the St. Lucie Technical Specifications.

II.C. Attachment A-2

Relief request basis.

Page 192: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

4$

'L

'\ ~

J~ '

k

Page 193: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. I.uci. |t No. 1

IIIIIIIIIIIMIG I ITGlll'IIIP

Page l of 2

IIL;r PBESSIIBB

uj.DIFFEBIMI'IAL SPEEDPllESSUllL'P

IES'I'NfEINAL

ILL le held

llaketqp l?Ieger

Cailmnent Cooling

N43

YLS

YES

YES

YLl

YES

YES

YES»

QUEERLY(2)

QUMmRLY (2)

QUAR'IKBLY(2)

QUEERLY (2)

QUMlTKHLY(2)

Cu>taiiwvnt

SIpray lhasa

YES YES YL%» QUA~Y(2)

QUARTI.RLY(2)

Dleeel Oil .

Transfer lhaig

1)

1)

QIIAHTEIUZ(2)

QUAM.EBLY(2)

Mvarglwg

YES YES

YE(i

YES

YES»

YES»

QUMGRRLY(2)

QUARKBLY(2)

QUMKFM.Y(2)

lnLake

Cool l>g

l4lwr Piaqp

lA

VIE YEl3

YL'S

YES

YES1

YES»

YES

YLB"

QUEERLY (2)

QUARIRRLY(2)

QUEERLY (2)

PlC'illa) l -.

'I 3'l lb Vi+P "Ir"rPWi:33'hllIZlV'ILL!PA'3AllLel'L'lS

Page 194: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

~01

I

C

Page 195: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Iuci nit No. lrrOnm K(en a LIG1II CuamV.

Page 2 of 2

MC'eal,IIffE1'BISGUN>

PlnmW1M(nu.P15-'M JOB PP

SPEEO

HPly% I

0Vl&ISTIGI

vnor

Ml'C'Nlhlo

hiucl 1lary

I.'eedwa ter

Peri@YES

YPQ

YES YCB'carbineDriven

Yean QUAR?L'BLY(2)

QUARIHRLY(2)

QUARTl BLY(2)

Axe Pressure Safety

In)ection Pcxiyl

YLS

YES 'I) WG

QUEERLY (2)

QUAIGRRLY(2)

1 I I 'racjoure

Safety Xnject1on

YES

1)IA

') w

YES

YES

QUARIKBLY(2)

QUAIGRRLY(2)

QUARTERLY(2)

OTL':l) &'ixed hydraulic

syst: em-test perfc,recircul a tion.

2) Refer to Belief

esistancermed on

est No. l.

,* Bearing Temperatemeasured only ontest.

.e, Tb, isthe annual

x

PNXl@tgTI'1'[L" PIMP TW1'14XdN11

Page 196: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

(S

i ~t

4$

Page 197: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv

St. Lucie Unit No. 1

Page 1 'of 1

ATTACHMENT A-2

RELIEF RE VEST BASIS

1) Pumps:

Boric Acid Makeup Pump No. 1ABoric Acid Makeup Pump No. 18

Component Cooling Water Pump No. 1AComponent Cooling Water Pump No. 18Component Cooling Water Pump No- 1C

Containment Spray Pump No. 1AContainment Spray Pump No. 18

Diesel Oil Transfer Pump No. 1ADiesel Oil Transfer Pump No. 18

Charging Pump No. 1ACharging Pump No. 18

'hargingPump No. 1C

Intake Cooling Water Pump No. 1AIntake Cooling Water Pump No. 18Intake Cooling Water Pump No. 1C

Auxiliary Feedwater Pump No. 1AAuxiliary Feedwater Pump No. 18Auxiliary Feedwater Pump No. 1C

Low Pressure Safety Injection Pump f')o. 1ALow Pressure Safety Injection Pump No. 18

High Pressure Safety Injection Pump No. 1AHigh Pressure Safety Injection Pump No. 18High Pressure Safety Injection Pump No. 1C

Test Requirements: IWV-3400 (Test frequency)

Basis for Relief: Section XI, ASME Boiler 8 Pressure Vessel Coderequires testing safety-related components- at leastonce every three (3) months. These pumps perform ~

redundant safety-related functions.

Alternate Testing: Perform pump tests and measure parameters listed onTable IV at least once every three (3) months.

Page 198: Revised Inservice Valve & Pump Test Program.'ABSTRACT The planned inse~ice inspection and testing programs were developed, employing the R. G. 1.26, Rev'sion 2, criteria for qua3.itv