Review of Benchmark Infrastructure Costings Presenter: Viraj Abeykoon 24 July 2018

Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

Review of Benchmark Infrastructure Costings

Presenter:

Viraj Abeykoon

24 July 2018

Page 2: Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

1 Title of Presentation goes here

This presentation contains certain statements and projections provided by or on behalf of Cardno Limited with respect to the anticipated future undertakings. Any

forward‐looking statements reflect various assumptions by or on behalf of Cardno. Accordingly, these statements are subject to significant business, economic and

competitive uncertainties and contingencies associated with the business of Cardno which may be beyond the control of Cardno which could cause actual results or

trends to differ materially, including but not limited to competition, industry downturns, inability to enforce contractual and other arrangements, legislative and

regulatory changes, sovereign and political risks, ability to meet funding requirements, dependence on key personnel and other market and economic factors.

Accordingly, there can be no assurance that any such statements and projections will be realised. Cardno makes no representations as to the accuracy or

completeness of any such statement of projections or that any projections will be achieved and there can be no assurance that any projections are attainable or will

be realised.

Additionally, Cardno makes no representation or warranty, express or implied, in relation to, and no responsibility or liability (whether for negligence, under statute or

otherwise) is or will be accepted by Cardno or by any of their respective officers, directors, shareholders, partners, employees, or advisers (Relevant Parties) as to or

in relation to the accuracy or completeness of the information, statements, opinions or matters (express or implied) arising out of, contained in or derived from this

presentation or any omission from this presentation or of any other written or oral information or opinions provided now or in the future to any interested party or its

advisers. In furnishing this presentation, Cardno undertakes no obligation to provide any additional or updated information whether as a result of new information,

future events or results or otherwise.

Except to the extent prohibited by law, the Relevant Parties disclaim all liability that may otherwise arise due to any of this information being inaccurate or incomplete.

By obtaining this document, the recipient releases the Relevant Parties from liability to the recipient for any loss or damage which any of them may suffer or incur

arising directly or indirectly out of or in connection with any use of or reliance on any of this information, whether such liability arises in contract, tort (including

negligence) or otherwise.

This document does not constitute, and should not be construed as, either an offer to sell or a solicitation of an offer to buy or sell securities. It does not include all

available information and should not be used in isolation as a basis to invest in Cardno.

Disclaimer

Review of Infrastructure Benchmark Costings

Page 3: Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

2 Title of Presentation goes here

01 Introduction

02 Overview of Methodology

03 Background Data Processing

04 Monte-Carlo Analysis

05 Standardising Rates

06 Example Results

Topics

Review of Infrastructure Benchmark Costings

Page 4: Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

Title of Presentation goes here3

Introduction01

Review of Infrastructure Benchmark Costings

Page 5: Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

4 Title of Presentation goes here

The project aims to achieve:

> Streamlined delivery of PSPs and ICPs

> Provide accurate Benchmark Cost Estimates with a high

degree of confidence

6 Infrastructure categories were investigated:

> Roads and Intersections

> Bridges

> Culverts

> Sporting Pavilions

> Sports and Recreational Fields

> Community Centers

Introduction01

Review of Infrastructure Benchmark Costings

Page 6: Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

Title of Presentation goes here5

Overview of

Methodology

02

Review of Infrastructure Benchmark Costings

Page 7: Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

6 Title of Presentation goes here

Collate VPA DataExtract Statistical

PropertiesRun Monte-Carlo

Process

Prepare representative drawings and

extract quantities

Obtain Total Project Costs for

Infrastructure Items

Obtain two types of Rates

Overview of Methodology02

Review of Infrastructure Benchmark Costings

Page 8: Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

Title of Presentation goes here7

Background Data

Processing

03

Review of Infrastructure Benchmark Costings

Page 9: Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

8 Title of Presentation goes here

Create a database of previously adopted rates

Split to various infrastructure items

Checked for Regional/ Topographical variations

Estimates with insufficient granularity were discarded

Background Data Processing 03

Page 10: Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

9 Title of Presentation goes here

Background Data Processing

> Extracting Statistical Properties

Average Rate for each element

Standard Deviation for each element

> Regional Variances and Topographical

Variances were not observed in the

data.

> Extracted costs modeled to follow a

normal distribution

Example

03

50 52.5 55 57.5 60

Item Estimate 1 Estimate 2 Estimate 3 Mean Standard

Deviation

Kerb (per

meter)

55 52 60 55.67 4.041

Drainage Pipe

(per meter)

260 250 300 270 26.458

Review of Infrastructure Benchmark Costings

Page 11: Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

Title of Presentation goes here10

Monte-Carlo Analysis04

Review of Infrastructure Benchmark Costings

Page 12: Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

11 Title of Presentation goes here

> Monte-Carlo analysis is a world-renowned tool used to

simulate a range of possibilities

> In this instance, a range of infrastructure costs

> Results can be used to provide Probabilistic Estimates

> Cardno conducted 200,000 simulations

> Quantities for above simulations were extracted from

representative drawings

Monte-Carlo Analysis04

Review of Infrastructure Benchmark Costings

Page 13: Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

12 Title of Presentation goes here

Monte-Carlo Analysis04

Item Rate ($/m) Quantity (m) Total ($)

Kerb 56.00 10 560.00

Drainage 265.00 10 2650.00

TOTAL 3210.00

Review of Infrastructure Benchmark Costings

50 52.5 55 57.5 60

%

230 250 270 290 310

%

Page 14: Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

13 Title of Presentation goes here

Monte-Carlo Analysis

Repeating this process over 200,000

iterations provides a distribution of

possible project costs.

P50 and P90 Totals were selected.

04

0

5000

10000

15000

20000

25000

24

300

00

25

410

00

26

520

00

27

630

00

28

740

00

29

850

00

30

960

00

32

070

00

33

180

00

34

290

00

35

400

00

36

510

00

37

620

00

38

730

00

39

840

00

40

950

00

42

060

00

43

170

00

44

280

00

45

390

00

46

500

00

Fre

qu

en

cy

Project Cost

Cost Frequency Distribution

Review of Infrastructure Benchmark Costings

Page 15: Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

Title of Presentation goes here14

Standardising Rates 05

Review of Infrastructure Benchmark Costings

Page 16: Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

15 Title of Presentation goes here

Standardising Rates

> Obtained 2 sets of rates for each item

producing P90 and P50 Monte-Carlo

totals

> Based on ‘Inversing’ Normal Distribution

of rates

> Example Monte Carlo result is P90 = $3,420

05

Item P90 Rate

($/m)

Quantity (m) Total ($)

Kerb 57.00 10 570.00

Drainage 285.00 10 2850.00

TOTAL 3420.00

Review of Infrastructure Benchmark Costings

50 52.5 55 57.5 60

%

230 250 270 290 310

%

Page 17: Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

Title of Presentation goes here16

Example Results06

Review of Infrastructure Benchmark Costings

Page 18: Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

17 Title of Presentation goes here

Example Results06

Review of Infrastructure Benchmark Costings

Page 19: Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

18 Title of Presentation goes here

Example Results06

Page 20: Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

19 Title of Presentation goes here

Example Results06

Review of Infrastructure Benchmark Costings

Page 21: Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

20 Title of Presentation goes here

Example Results06

Review of Infrastructure Benchmark Costings

Page 22: Review of Benchmark Infrastructure Costings - vpa-web.s3 ... · Review of Infrastructure Benchmark Costings 50 52.5 55 57.5 60 % 230 250 270 290 310 % 16 Title of Presentation goes

Thank you

21 Title of Presentation goes hereReview of Infrastructure Benchmark Costings