EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA CHEMICALS ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR NEW PROPOSED PROJECT OF VISHWA CHEMICALS FOR MANUFACTURING FACILITY OF SYNTHETHIC ORGANICS CHEMICALS (PHARMACEUTICALS) @ 200 MT/M (CATEGORY 5 ‘F’, B1) AT Plot No 4801/A/13 G.I.D.C. _ Ankleshwar, Bharuch-394116 (M) 990-999-5695, E-mail: [email protected] PREPARED BY: B. S. RANA (MEET ASSOCIATES) REG. OFFICE: 305, SATHI APARTMENT, MAHALAXMI LANE, SARANGPUR, AHMEDABAD-380001, M- 9586249761, 9909362746 E-Mail: [email protected]

environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

  • Upload
    doquynh

  • View
    302

  • Download
    11

Embed Size (px)

Citation preview

Page 1: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 1

B. S. RANA M/s.VISHWA CHEMICALS

ENVIRONMENTAL

IMPACT ASSESSMENT REPORT

FOR

NEW PROPOSED PROJECT

OF

VISHWA CHEMICALS FOR

MANUFACTURING FACILITY OF SYNTHETHIC ORGANICS CHEMICALS (PHARMACEUTICALS)

@ 200 MT/M (CATEGORY 5 ‘F’, B1)

AT

Plot No 4801/A/13 G.I.D.C. _ Ankleshwar,

Bharuch-394116 (M) 990-999-5695,

E-mail: [email protected]

PREPARED BY:

B. S. RANA (MEET ASSOCIATES)

REG. OFFICE: 305, SATHI APARTMENT, MAHALAXMI LANE, SARANGPUR,

AHMEDABAD-380001, M- 9586249761, 9909362746

E-Mail: [email protected]

   

Page 2: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 2

B. S. RANA M/s.VISHWA CHEMICALS

EXECUTIVE SUMMARY 13

CHAPTER 1. INTRODUCTION 21

1.1. Introduction 21

1.2. Purpose of the Study 21

1.3. Identification of Project and Project Proponent 22

1.4. Brief Description of Nature, Size, Location of the Project and

its Importance to Country, Region

22

1.4.1.

Nature and size of the Project 22

1.4.2 Location of the Project site 22

1.4.3. Importance to country, region 22

1.5. Scope and Methodology of the study 23

1.6. Applicable Environmental Regulations 24

1.7. Approved TOR for EIA Study by SEAC 25

CHAPTER 2. PROJECT DESCRIPTION 35

2.1. Introduction 35 

2.2. Type of project 35 

2.3. Need for the Project 35 

2.4 Justification of the project 35 

2.5. Project Cost 36

2.6 Location of the Project site 36

2.6.1 Land requirement details 39

2.6.2

Environmental Settings 40

2.6.3 Site Photographs 40

2.7 2.7.1 Products and Production Capacities 41

2.7.2 Details of By-products 42

2.7.3 Raw Materials Requirement 42

2.8 Proposed schedule for Approval and Implementation 45

2.9 Manufacturing Process 45

2.10 Plant Infrastructure and Basic requirements

2.10.1 List of plant machinery 65

2.10.2 Water requirement 65

2.10.3 Power requirement 67

Page 3: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 3

B. S. RANA M/s.VISHWA CHEMICALS

2.10.4 Fuel requirement 68

2.10.5 Manpower requirement 68

2.11 Emission, Effluent Generation & Waste Generation with

Control System

68

2.11.1 Air Emission 68

2.11.2. Effluent generation and its management (ZLD) 69

2.11.3 Effluent treatment plan 69

2.11.4 Details of the Hazardous Waste 70

2.11.5 Details of the Non- hazardous waste 70

2.11.6 Details of Solids Waste During Operation 71

2.12 Green Belt Development 71

2.13 Rain Water Harvesting 71

CHAPTER 3. DESCRIPTION OF ENVIRONMENT 72

3.1 Introduction 72

3.2 Methodology 72

3.3 Topography 74

3.4 Geology 75

3.5 Geomorphology & Soil types 78

3.6 Hydrogeology 78

3.7 Seismology 78

3.8 Land use 79

3.9 Meteorology 81

3.10 Climate 81

3.11 Relative Humidity 81

3.12 Water Quality 81

3.13 Soil Environment 97

3.14 Biological Environment. 99

3.15 Socioeconomic Environment 105

3.16 Traffic survey 108

CHAPTER 4. ANTICIPATED ENVIRONMENTAL IMPACTS AND

MITIGATION MEASURES

109

4.1. Prelude 109

4.2. Valued Environmental Components and Potential Impacts 109

Page 4: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 4

B. S. RANA M/s.VISHWA CHEMICALS

4.2.1. Potential Impacts during Project Operation 109

4.3.

Potential Impacts and Mitigation Measures during Project

Implementation (Construction phase)

110

4.3.1 Environment, Noise Environment, Land Environment, Solid

and Hazardous waste, Site Security and Safety, Water

Environment, Soil Environment, Socio- economic

Environment, Health and Well-being of Construction

Workers

110

4.4. Potential Impacts and Mitigation Measures during Operation

phase

110

4.4.1. Air Environment 110

4.4.2. Noise Environment 118

4.4.3. Water Environment 119

4.4.4. Storm Water 119

4.5.1 Surface Water Quality 119

4.6.1 Land Environment 119

4.7.1 Solid and Hazardous Waste 120

4.8.1 Socio-Economic Environment 122

4.9.1 Ecology and Biodiversity 122

4.10.1 Odour Problem 122

4.11.1 Energy Conservation 123

4.12.1 Safety Provisions 124

CHAPTER 5. ANALYSIS OF ALTERNATIVES 125

5.1. Introduction 125

5.2 analysis of site alternative 125

5.3. analysis of alternative for technologies 126

CHAPTER 6. ENVIRONMENTAL MONITORING PROGRAMME 127

6.1. Environmental Monitoring Program 127

6.2. Objectives of Monitoring 127

6.3. Environmental Monitoring Program 127

6.3.1. Monitoring Equipment and Consumables 128

6.3.2. Environmental Budget 129

6.3.3. Emission Monitoring & Evaluation 130

CHAPTER 7. ADDITIONAL STUDIES 131

Page 5: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 5

B. S. RANA M/s.VISHWA CHEMICALS

7.1. Risk Assessment 131

7.1.1. Hazard Identification& Risk Assessment (HIRA) 131

7.2. Disaster Management Plan 133

7.2.1. Introduction to Disaster Management Plan 133

7.2.2. Information on risk evaluation preliminary hazard analysis 137

7.2.3. Disaster preparedness 138

7.2.4. Safety and mitigating measures 146

7.2.5. Post emergency planning 147

7.2.6. Health, Safety and Environmental Protection 148

EMERGENCY MANAGEMENT CHART 152

CHAPTER 8. PROJECT BENEFITS 152

8.1. Introduction 152

8.2. Improvement in the Social Infrastructure 152

8.3. CSR Activities 152

8.4. Economic Development 153

8.5. Employment Potential 153

CHAPTER 9. ENVIRONMENTAL MANAGEMENT PLAN 154

9.1. prelude 154

9.2. the environmental management plan 154

9.3. objectives of environmental management plan 155

9.4. EMP for Construction Phase 156

9.4.1. Environment, Noise Environment, water environment

soil/Land Environment, management of Solid and

Hazardous waste, management of Socio- economic and

cultural Environment

156

9.5. EMP For Operational Phase 156

9.5.1. Management of Air Environment 157

9.5.2.

Management of Noise Environment 158

9.5.3. Management of Water Environment 159

9.5.4. Management of Land Environment 159

9.5.5 Management of Solid and Hazardous Waste 159

9.5.6 Management of Hazardous Raw materials 160

9.5.7. Management of Biological Environment 160

Page 6: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 6

B. S. RANA M/s.VISHWA CHEMICALS

9.5.8. Management of Socio-economic factors 161

9.5.9. Management of Traffic 161

9.6. Additional Mitigation Measures 161

9.6.1. Water Conservation 162

9.6.2. Energy Conservation 162

9.6.3. Storm Water Management 163

9.6.4. Green Belt Development 163

9.6.5. Odour Management Plan 164

9.6.6. Safety measures to prevent the Occupational HealthHazards 165

9.6.7. Social welfare measures for future planning 165

9.7. Summary of Environment Management Plan and Actions 165

9.8. Findings 168

9.9 Conclusions 169

CHAPTER 10. CONCLUSION 170

CHAPTER 11. DISCLOSURE BY CONSULTANT 171

 

TABLE: 

Table 1.1 ToR Compliance Status 24

Table 2.1 Area Details 39

Table 2.2 Environmental Settings of the Project Site 40

Table 2.3 Existing & Proposed Products and Production Capacities 41

Table 2.4 Raw Materials requirement 44

Table 2.5 Details of plant machinery 65

Table 2.6 Water Consumption & wastewater generation details 66

Table 2.7 Power requirement 67

Table 2.8 Fuel Consumption Details 68

Table 2.9 Flue gas Stacks and process vents details 68

Table 2.10 effluent characteristics 69

Table 2.11 details of hazardous waste 70

Table 2.12 details of non-hazardous waste 70

Table 2.13 Annual Runoff 71

Table 3.1 Environmental Attributes & Frequency of Monitoring 73

Table 3.2 Climatology (Year: 2016) 81

Table 3.3 Site Specific Meteorological data 82

Page 7: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 7

B. S. RANA M/s.VISHWA CHEMICALS

Table 3.4 Ambient Air Quality Monitoring Locations 85

Table 3.5 Ambient Noise Quality Monitoring Locations 89

Table 3.6 Ambient Noise Quality in the Study Area 89

Table 3.7 Applicable Noise Standards 89

Table 3.8 Ground Water sampling locations in the study area 92

Table 3.11 Ground Water monitoring analysis report 92

Table 3.12 Surface Water Sampling Locations 94

Table 3.13 Surface water Analysis Reports 94

Table 3.14 Standard Water Quality Criteria 96

Table 3.15 Soil Sampling Locations 98

Table 3.16 Soil quality in study area 99

Table 3.17 List of Flora in the Study Area 100

Table 3.18 List of Dominant Fauna Recorded in Study Area 103

Table 3.19 List of villages present in the study area 106

Table 4.1 Ground level concentration of pm10 in µg/m3 111

Table 4.2 Ground level concentration of PM2.5 in µg/m3 112

Table 4.3 Ground level concentration of SO2 in µg/m3 112

Table 4.4 Ground level concentration of NOx in µg/m3 112

Table 5.1 Alternatives for technologies 126

Table 6.1 Environmental Monitoring Plan (During Operational Phase) 129

Table 6.2 Budget Allocation for Environmental Management 130

Table 7.1 Hazards and Risk Assessment Worksheet 131

Table 9.1 Summary of Environmental Management Plan 166

 

Figures  

Figure 1.1 Methodology of EIA Study 23

Figure 2.1 Project Location Map 36

Figure 2.2 project site 37

Figure 2.3 Google Image of the project site (5 & 10 Km radius) 38

Figure 2.4 Plant Layout 40

Figure 2.5 Water Balance Diagram 67

Figure 3.1 Topographic Map of The Study Area 75

Figure 3.2 ground water level in Ahmedabad city 77

Page 8: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 8

B. S. RANA M/s.VISHWA CHEMICALS

Figure 3.3 Seismic Zoning Map of India 79

Figure 3.4 Land Use Map of the Study Area (10 km Radial Zone) 80

Figure 3.5 Wind Rose (Winter Season) 83

Figure 3.6 Google Image showing Ambient Air Monitoring Locations 85

Figure 3.7 Google Image showing Ambient Noise Monitoring Locations 88

Figure 3.8 Google Image showing Ground Water Monitoring Locations 91

Figure 3.9 Google Image showing Soil Monitoring Locations 94

Figure 3.10 Villages within 10 km radius 98

 

Annexure : Annexure I : Land Possession Document

Annexure II : ToR Letter

Annexure III : Plant layout

Annexure IV : Environmental Policy

Annexure V : TSDF Membership copy

Annexure VI : Latest Consent

Annexure VII : QRA

Annexure VIII : Undertaking letter for Owing EIA & EMP report

Annexure IX : Undertaking by EIA Consultant

Abbreviations

AAQM : Ambient Air Quality Monitoring BOD : Biochemical Oxygen Demand

COD : Chemical Oxygen Demand

DO : Dissolved Oxygen

CPCB : Central Pollution Control Board

GPCB : Gujarat Pollution Control Board

EIA : Environmental Impact Assessment

EMP : Environmental Management Plan

ETP : Effluent Treatment Plant

Page 9: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 9

B. S. RANA M/s.VISHWA CHEMICALS

IMD : Indian Meteorological Department

KVA : Kilo Volt Ampere

KLD : Kilo Litres per day

CMD : Cubic meter per day

MoEF & CC : Ministry of Environment, Forests & Climate Change

PM : Particulate Matter

PPEs : Personal Protective Equipments

TDS : Total Dissolved Solids

ZLD : Zero Liquid Discharge

MTPA : Metric Tonne per Annum

GSEB : Gujarat State Electricity Board

NAAQS : National Ambient Air Quality Standards

EPA : Environment Protection Act

SEIAA : State Level Environmental Impact Assessment Authority

SEAC : State Level Expert Appraisal Committee

ToR : Terms of Reference

CHWTSDF : Common Hazardous Waste Treatment, Storage and Disposal Facilities

TSDF : Treatment, Storage and Disposal Facilities

HDPE : High Density Polyethylene

LDPE : Low Density Polyethylene SOP : Standard Operating Procedure GLC : Ground Level Concentrations

HSE : Health, Safety & Environment

VOC : Volatile Organic Compounds

QRA : Quantitative Risk Assessment

DMP : Disaster Management Plan

CSR : Corporate Social Responsibility

LED : Light Emitting Diode

CFL : Compact Fluorescent Lamp

CFM : Cubic feed per meter

Page 10: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

FOR PROPOSED MANUFACTU

EIA REPORT

RING OF SYNT

Page 10

THETIC ORGANNIC CHEMICALLS

M/s.VISHHWA CHEMIICALS

Page 11: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

FOR PROPOSED MANUFACTU

EIA REPORT

RING OF SYNT

Page 11

THETIC ORGANNIC CHEMICALLS

M/s.VISHHWA CHEMI

ICALS

Page 12: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

 

FOR PROPOSED

MANUFACTU

EIA REPORT

RING OF SYNT

Page 12

THETIC ORGANNIC CHEMICALLS

M/s.VISHHWA CHEMIICALS

Page 13: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 13

B. S. RANA M/s.VISHWA CHEMICALS

EXECUTIVE SUMMARY

Introduction

M/s Vishwa Chemicals is incorporated in the year 2017 to manufacture some synthetic organic

products & Intermediates which have a good export potential. The ever-increasing demand for

the products in India & Abroad has prompted the promoters to undertake manufacturing of

some selected synthetic organic products & Intermediates.

The industry has earned the reputation of being one of the major infallible suppliers of

intermediates and specialty chemicals across the globe.M/s Vishwa Chemicals is a team of

performing range of aptitude, talented and affirmative professionals, when it comes to quality

and excellence. The proposed production capacity is 200 MT/Month.

Type of Project:

The project is neither an interlinked project nor an interdependent project. The proposed project

is an existing manufacturing unit for the production of Various Chemicals & Intermediates. For

the manufacturing of the new products, some equipment and machinery will be utilized. The

project falls under category ‘B’, section 5(f) “Synthetic organic chemical industry” of EIA

notification 2006 and subsequent amendments

Project cost:

Total Project cost for proposed project activity is Rs. 59 lacs.

Location of the Project Site:

The proposed project, M/s. Vishwa Chemicals is Located at Plot No 4801/A/13 G.I.D.C. _

Ankleshwar. The site is well connected by road and rail network. The nearest road is Baroda –

Ankleshwar Express Highway (4.4 Km, E), Railway station is Ankleshwar Railway Station (2.1

Km, WNW) and nearest airport is Surat Airport (54 Km, SSW).

Nature and Size of the project:

M/s Vishwa Chemicals has proposed for manufacturing of new chemical products. The

proposed production capacity will be 200 MT/Month.

Page 14: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 14

B. S. RANA M/s.VISHWA CHEMICALS

Water Requirement:

The total fresh water requirement during the operation phase for the proposed facility will be 5.0

KLD. Main source of water supply will meet through Ankleshwar GIDC.

Waste water generation & Management:

Total Effluent generation for proposed facility will be 3 KLD [3 KLD (Domestic) + 0 KLD

(Industrial)], which will be treatment in ETP and treated water will be reused for flushing,

gardening, washing and cooling Tower make-up. Domestic waste water will also be treated in

newly set up ETP.

Electricity Requirement:

The Total power requirement will be 74 HP. The main source of power is PGVCL.. The back-up

will be provided from DG Sets having capacity of 0.6 TPH in Case of power failure. Therefore,

no additional electricity will be required for proposed project.

Fuel Requirement & Stack details:

Natural Gas being used as a fuel for Boiler. Diesel is being used in D.G set. Scrubber is

installed for process rectors. Stack height of Boiler is 9 m. Therefore, no additional fuel will be

required for proposed project. In rainy season / at night online heater is used to enhance the

temperature of water as per requirement.

Manpower Requirement:

There will be 4 peoples required for the proposed project. Thus, total manpower will be 4

workers.

Solid & hazardous waste management:

Hazardous waste like Discarded drum / Container, Used / Spent oil, Distillation residue,

Discarded product material (R&D) etc. will be generated and sold or disposed to MPCB

authorized vendor / recycler and / or will be disposed at CHWTSDF.

Green Belt Development:

Page 15: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 15

B. S. RANA M/s.VISHWA CHEMICALS

Total 257 m2 area (Approx. 15 %) will be provide in the premises. Suitable local plant of variety

of species are planted with adequate spacing.

Description of the Environment

Study area

The baseline quality of various components of the environment, viz. air, noise, water, land,

biology, meteorological and socio-economic is assessed within the impact zone of about 10 km

around the proposed site. The report presents the data collected during the sampling period of

three months during winter season from March’17 and May’17.

Climate of the study area

The climate of the region is classified as tropical wet and dry climate. The annual maximum

temperature is 41.5 ˚C in the month of May and minimum temperature is 11.8 ˚C in the month

of January. The average annual rainfall for the Ankleshwar as a whole is 852 mm. Most of the

rainfall is received from June to September.

Seismicity

According to the seismic-zoning map of India, the project area falls in Zone III-Moderate Risk

zone of seismicity.

Air Environment

AAQM was carried out in 8 locations on 24 hourly average basis as per guidelines of CPCB

and NAAQS within 10 km radius of the study area. PM10 and PM2.5 was found in the range of

71 to 92 μg/m3 and 32 to 43 μg/m3 respectively. SO2 found in the range of 19 to 34 μg/m3 and

NOx: 35 to 48n μg/m3. The PM10, PM2.5, SO2 &NOx parameters are found within the

permissible limit as per NAAQS level. Other parameters like VOCs, Heavy metals, Benzene

etc. were found within permissible limit.

Noise Environment

Noise can be defined as an unwanted sound. A total of 8 locations were identified for ambient

noise monitoring in the study area. The daytime varied from 42 dB(A) to 70 dB(A) and night

Page 16: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 16

B. S. RANA M/s.VISHWA CHEMICALS

time noise varied of 46 dB(A) to 68 dB(A). Both daytime noise and night time noise were found

within the limit.

Water Environment

In order to establish the baseline water quality, 8 ground water and 3 surface water samples

were collected and analyzed in the study area. The analysis result for ground water samples

were within drinking water limit as per IS 10500: 2012. The surface water quality is within

NAAQs November 2009 as per classification of water quality criteria.

Soil Quality

Soil samples were collected from 8 locations in the study area and analyzed for physico-

Chemicals characteristics. Soil quality was found to be normal.

Particle Size: Particle sizes of the different constituents (clay, silt, sand and gravel) control the

porosity and water holding characteristic of the soil. Clay (size < 0,002mm) amount in the soil

samples is 14% to 15% and Sand (size 0.002 to 0.075mm) in the soil sample is 68% to 70%.

All the samples in the study area are free of gravel (size > 4.75mm). Analysis shows it is

sandy soil with less water holding capacity Biological Environment.

Land Use/Land Cover of the Study Area

The basic purpose of land use pattern and classification in an EIA study is to identify the

manner in which different parts of land in an area are being utilized or not utilized. Remote

sensing data provides reliable accurate baseline information for land use mapping, as it is a

rapid method of acquiring up-to-date information of over a large geological area.

Biological Environment

Biological environment includes flora and fauna including aquatic species found in the study

area of 10 km radius.

Flora: Dominant families of plants recorded in the study area are Caesalpiniaceae,

Mimosaceae, Euphorbiaceae, Cucurbitaceae, Papilionaceae. The area showed overall 71

plant species from 60 genera and 32 families.

Page 17: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 17

B. S. RANA M/s.VISHWA CHEMICALS

Fauna: The various animal species in the study area are found, detailed study is given in

Baseline Chapter-3. Field observations of fauna were carried out. The commonly available

mammals, amphibians, reptiles, butterflies, dragonflies and damselflies within 10 km

surroundings were enumerated

Socio-economic Environment:

Socio-economic data were collected from within 10 km radius of the Project site. These include

30 villages as per census of India 2011. According to the 2011 national census, the population

of Ankleshwar was declared to be 3,15,596 With regards to Sex Ratio in Ankleshwar, it stood

at 892 per 1000 male compared to 2001 census figure of 933. The average national sex ratio

in India is 940 as per latest reports of Census 2011 Average literacy rate of Ankleshwar in

2011 were 85.74 compared to 78 of 2001. If things are looked out at gender wise, male and

female literacy were 79.51 and 70.69 respectively. For 2001 census, same figures stood at 55

and 45 in Bharuch District.

Anticipated Environmental Impacts & Mitigation Measures

Air Environment

In order to estimate the ground level concentrations due to the emission from the

proposed project, AERMOD View – Lake Environmental Software has been

employed.

These predicted ground level concentrations when added to baseline scenario, the

overall scenario levels of PM10, SO2, NOx, are well within the permissible limits

specified by CPCB.

VOCs and other NAAQS parameters are observed within below detectable limit, the

detail explanation is mentioned in Baseline chapter-3.

Adequate mitigation measures have been already installed to control air pollution.

Noise Environment

The major noise source includes various machines, pumps, motors, DG sets and vehicular

traffic. The noise levels were below the stipulated standards of CPCB for residential and

industrial areas.

Technical and administrative measures are already implemented to minimize the noise levels

which include periodic maintenance of machinery, mandatory use of personal hearing

Page 18: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 18

B. S. RANA M/s.VISHWA CHEMICALS

protection equipment with operable mufflers, oiling and lubrication, noise suppression

measures such as enclosures, buffers, greenbelt development etc.

Water Environment

M/S Vishwa Chemicals Industries will intend to achieve a Zero Liquid Discharge. The total

fresh water requirement during the operation phase for the Proposed facility is 5.0 KLD. Main

source of water supply will meet through GIDC. Domestic waste water shall be disposed in

Soak pit.

Land Environment

A total of 275 m2 area (Approx. 15 %) has been earmarked for the green area development.

There will be little impact envisaged due to the operation of the plant. There is no discharge of

solid as well as liquid effluent in open land. The green area development and tree plantation

will help in enhancing the aesthetics of the plant. Thus no adverse impact is envisaged on land

environment.

Biological Environment

Analysis of abiotic factors reveals that ambient air and fresh water quality will remain practically

unaffected. Hence no impact on flora and fauna is envisaged. Moreover, there are no reserve

forest, Historic places and protected areas within 10 km radius.

Socio-economic Environment

The proposed project is expected to provide direct and indirect employment opportunity to

skilled and unskilled workers. The project will contribute to the socio-economic development of

the area at the local level in turn reducing migration for employment. Hence, the proposed

project will have positive impact on the socio-economic environment.

Environmental Monitoring Program

Environmental Monitoring Program is designed for operation phase of the project for

monitoring of various environmental parameters like air, water, noise, soil and ecology etc.

Environmental Management Plan

The EMP presents the project specific guidelines on:

Page 19: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 19

B. S. RANA M/s.VISHWA CHEMICALS

Environmental management strategies

Specialized engineering construction procedures in relation to environmental guidelines

of the country

Spill prevention and control

Management of wastes and hazardous Chemicals

Air, water and soil quality protection

Noise control

Soil erosion control and slope stabilization

Vegetation, wildlife and habitat protection

Socio-economic and welfare considerations

Risk and disaster management plan

To prepare a checklist for statutory compliance

Budget allocation for environment management plan.

Risk Assessment

The Risk assessment study has been conducted for all the operations involved in the project.

The study considers all the hazards associated with all the activities which will be involved. The

hazards leading to possible consequences are summarised in the chapter-7 and the risk

mitigation measures and intended safeguards are specifically mentioned in the chapter-7 in the

EIA report. The risk to personnel, process / operation is considered in the study.

Disaster Management Plan

Disaster Management Plan is prepared for identification of various hazards addressed

qualitatively and included onsite and off-site emergency plan. A Disaster Management Plan is

prepared to meet any grave emergency which can occur due to Natural Disasters such as

Floods, Earthquakes, or due to Man-Made Disasters such as Acts of war and Fires, Power

failures. Details of risk assessment and disaster management plan are given in the EIA report.

Project Benefits

Growth in the industrial sector creates new opportunities for employment and can also help

diversify the economy.

Page 20: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 20

B. S. RANA M/s.VISHWA CHEMICALS

CSR Activities

Initially CSR budget commitment will be approximately 2 % of company’s annual profit

M/S Vishwa Chemicals will initiate various CSR activities for the development and care of the

area and people. The various CSR activities undertaken by M/S Vishwa Chemicals Industries

include.

Organized Health check-up camp for School children.

Tree Plantation on both side of Village Road from Highway to Village.

Funds will be provided to arrange extracurricular activities for nearby schools.

Plants will be maintained at Roads passing nearby.

School uniforms, notebooks and scholarship will be provided to poor students.

Regular medical camps and eye-camps in the surrounding villages to provide treatment

with free supply of medicines and highlight the aspects of hygiene and good health.

Conclusion:

The project proponent will follow all the statutory norms and guidelines as per EPA,

1986 to safeguard environment.

Waste water generated from the proposed project will be treated in to ETP.

Ambient Air Quality of the project site will be within the permissible limit as prescribed by

National Ambient Air Quality Standards.

Noise is expected to be on higher side during Operational phase noise shall be within

industrial premises which will not exceed 75 dB(A).

The project will generate employment opportunities during operational stage. The

standard of living of local people due to employment is likely to be better, so we may

say that it is positive socio-economic impact. The region will get economic boost.

Overall the project will have positive impact for socio-economic and cultural

development.

 

Page 21: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 21

B. S. RANA M/s.VISHWA CHEMICALS

CHAPTER 1. INTRODUCTION

1.1. Introduction

M/s Vishwa Chemicals is incorporated in the year 2017 to manufacture some synthetic organic products

& Intermediates which have a good export potential. The ever-increasing demand for the products in

India & Abroad has prompted the promoters to undertake manufacturing of some selected synthetic

organic products& Intermediates.

The industry has earned the reputation of being one of the major infallible suppliers of intermediates and

specialty chemicals across the globe.M/s Vishwa Chemicals is a team of performing range of aptitude,

talented and affirmative professionals, when it comes to quality and excellence.

1.2. Purpose of the Study

The proposed expansion project falls under category ‘B’, section 5(f) “Synthetic organic chemical

industry”. As per the EIA notification, 2006 & subsequent amendments, proposed project will have to

obtain Environmental Clearance from EAC, MoEFCC New Delhi.

In order to obtain the Environmental Clearance from the EAC, MoEFCC New Delhi, Form-1, Pre-

feasibility Report and proposed ToR submitted. ToR issued on dated 30 April, 2017. M/s. Vishwa

ChemicalsIndustrieshas retained the services of Green Circle Inc, Vadodara to undertake Environmental

Impact Assessment (EIA) studies for assessing the impact of the proposed Project, industrial

development project, on various environmental parameters in the study area and prepare an

Environment Management Plan for mitigate the adverse impacts of the proposed project.

As per the additional ToR (Minutes of 17thEAC Meeting) and Model ToR prescribed by MoEFCC,

baseline data has been prepared for one season i.e winter season (March ’17 to May’17). The study

area comprises of the core zone (project area) and the buffer zone (10 km around the core zone from

the periphery).

1.3. Identification of Project and Project Proponent

Identification of Project:

M/s Vishwa Chemicals has proposed to expand a plant for manufacturing of various products &

Intermediates at Plot No.4801/A/13, G.I.D.C. Ankleshwar, Dist, Bharuch, Gujarat. It is a private

organization engaged in manufacturing ofSynthetic Organic chemicals & Intermediates products.

Identification of Project Proponent:

M/s. Vishwa Chemicals is proposed by Mr. Mayank Patel, the Proprietorof this Company and she has

plan to manufacture of chemicals &Intermediatesproducts.

Page 22: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 22

B. S. RANA M/s.VISHWA CHEMICALS

1.4. Brief Description of Nature, Size, Location of the Project and its Importance to Country, Region

1.4.1. Nature and size of the Project

M/s. Vishwa Chemicalshas proposedfor manufacturing of various chemicals &Intermediate products at

the project site. The proposed production capacity will be 200 MT/Month.

1.4.2. Locationof the Project site

The proposed project is located at Plot No. 4801/A/13, G.I.D.C. Ankleshwar, Dist: Bharuch, Gujarat.

The project site at inter section of latitude 21°61'80.22" N and longitude 73°03'81.92" E

The nearest road is Baroda – Ankleshwar Express Highway (4.4 Km, E), Railway station is Ankleshwar

Railway Station (2.1 Km, WNW) and nearest airport is Surat Airport (54 Km, SSW).

1.4.3. Importance to country, region

Ankleshwar & Surrounding area has emerged as major chemical manufacture city with a presence in

global market. Chemical industry in the state contribute more than one third to the country total

production.

Raw materials purchase from indigenous production. This helps in the economic development of the

country to a great level. Thus, to decrease the dependency on imports, the project can work in a positive

manner.

Our products have good demand in national markets. We shall export the products & in local market as

well as in Asia Pacific Region.

1.5. Scope and Methodology of the study

The scope of the EIA study is based on the generic structure of environmental impact assessment

document as stated in the Appendix III of the EIA Notification 2006 (S.O. 1533), Ministry of Environment

and Forests, Government of India.

The scope of the study includes a detailed characteristic of environment in the study area associated

with the proposed development on various environmental components. For the purpose of

environmental assessment, areas within 10 km radius of the project have been studied and the following

methodology will be adopted:

Generation and collection of baseline data for valued environmental components as per the EIA

guidelines.

Identification and quantification of significant environmental impacts due to the project and

associated activities.

Evaluation of impacts due to proposed expansion activities and preparation of an environmental

impact statement

Page 23: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

Pre

min

auth

Deli

orga

F

paration of

imizing iden

horities for i

ineation of

anizational

OR PROPOSED

appropriate

ntified adve

implementa

f post En

setup requi

MANUFACTU

e Environme

erse impacts

ation of mitig

nvironmenta

red for mon

Figure 1.

EIA REPORT

RING OF SYNT

Page 23

ental Mana

s along with

gation meas

al Quality

nitoring the

1 Methodo

THETIC ORGAN

agement Pla

h budgetary

sures.

Monitoring

effectivene

ology of EIA

NIC CHEMICAL

an (EMP) en

y provisions

g Program

ss of mitiga

A Study

LS

M/s.VISH

ncompassin

s to be mad

mme (EQM

ation measu

HWA CHEMI

ng strategie

de by the pr

MP) along

ures.

ICALS

es for

roject

with

Page 24: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 24

B. S. RANA M/s.VISHWA CHEMICALS

1.6. Applicable Environmental Regulations

The proposed project will abide and function under the purview of the following Rules, Acts &

Regulations which are formulated by the Govt. of India to protect the environment and development in a

sustainable way:

The Water (prevention & Control of Pollution) Act, 1974

The Water (Prevention & Control of Pollution) Cess, Act, 1977

The Air (Prevention & Control of Pollution) Act, 1981

The Environmental (Protection) Act, 1986

Environmental Impact Assessment Notification dated 14th September, 2006 and

subsequent amendments.

Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016.

Solid Waste Management Rules, 2016

The MSIHC (Manufacture, Storage and Import of Hazardous Chemicals) rules 1989 and

amendment in 2000

Chemical Accident (Emergency Planning, Preparedness and Response) Rules, 1996

Noise Pollution (Regulation and Control) Rules, 2000 and its amendments

The public Liability Insurance Act, 1991

The Batteries (Management and Handling) Rules 2001 and amendment in 2010

1.7. Approved TOR for EIA Study by SEAC

The EIA study has been conducted in-line with the additional ToR and Model Terms of Reference (ToR)

given by MoEFCC and taking into consideration the structure of the report given in the EIA Notification

2006. The compliance to the same has been presented in Table 1.1.

Table 1.2 ToR Compliance Status

S.N. ToR Points Compliance Status

SpecificToR

1. A tabular chart with index for point-wise compliance of below mentioned TORs.

Noted.

2. Executive summary of the project — giving a prima facie idea of the objectives of the proposal, use of resources, justification, etc. In addition, it should provide a compilation of EIA report, including EMP and the post-project monitoring plan in brief.

Included in initial pages of EIA report

3. Justification for selecting the proposed product and unit size.

Pls. refer Chapter 2, Section 2.4., Page No.

Page 25: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

S

4

5

6

7

8

9

1

1

1

1

1

B. S. RANA

S.N.

4. Land purpo

5. Land permlocateGIDC

6. Locatfrom scale

7 Topo

8 Geoloarea.

9 In cUnde[i.e. wless tas peRulesNotifi

10 Preseon sa

11 Layouvariouand aeasy rever

12 Techavailafor se

13 ProduCapa

14 ChemDetai

F

requiremenoses, its ava

possessioission to ued in GIDC

C Authority

tion of the the project

e).

graphy deta

ogical featu

case of pertaking stawater consuthan 25 TPer the Manas (MSIHC cation, 200ent land usatellite imag

ut plan of thusunits withadequate mmovement

rsing back.

nical detaiable technoelecting the

uct spectruacity) and pr

mical name ils on end u

OR PROPOSED

T

nt for the prailability and

on documeuse the proC, copy of

project sitesite to be d

ails of the p

ures and g

project locaating that uumption les

PD; and not agement, St

Rules), 196 vide SO 1e pattern o

gery.

he factory phin the plan

margin all rouof the emeMark the sa

ls of the ologies (BAT

same.

um (Proposrocesses.

of each pruse of each

MANUFACTU

ToR Points

roject includd optimizati

ents. Copyoject land plot holding

e and nearedemarcated

project area

geo-hydrolo

ated outsinit is compss than 25

covered intorage, Imp989] as pe1599 (E) daf the study

remises clet. Provisionund the perrgency veh

ame in the p

plants aloT), propose

sed produc

roposed proh product. (P

EIA REPORT

RING OF SYNT

Page 25

s

ding its breaion.

y of NA for indus

g certificate

est habitatsd on a topo

.

ogical statu

de notifiedplying the tM3/day; Fu

n the categoport of Hazaer the ameated 25/06/2

area shall

early demar of separate

riphery for uicle / fire teplant layout

ong with ded technolo

cts along w

oduct to beProvide CA

THETIC ORGAN

ak up for va

order shostrial purpose obtained

s with distasheet (1: 5

us of the s

d area: Lthree condiuel consumory ofMAH ardous Chemendment to 2014. be given b

rcating e entry & exunobstructednders witho.

details on ogy and rea

with produ

e manufactuAS number

NIC CHEMICAL

rious Cha2.1.

owing se. If from

LanAnn

nces 0000

Cha

Cha

study Cha3.6

Legal tions ption units mical

EIA

Unit

ased Cha3.5

xit d

out

Cha2.4,

best sons

Prodwithtechpropproc

ction ChaSecPag

ured. of all

ChaSec

LS

M/s.VISH

Complian

apter 2, Se, Page No.

d documenexure I- La

apter 3, Sec

apter 3, Sec

apter 3, Sec

t is located

apter 3, Sec, Page No.

apter 2, Se Page No.

duct will bh beshnologies, posal focess or tech

apter 2, Section 2.7.1ge No.

apter 2,Secction 2.7.2.,P

HWA CHEMI

nce Status

ction 2.6., T

ent attachend Docume

ction 3.3

ction 3.3

ction 3.4 ,

in GIDC are

ction 3.8., F

ction 2.6.,F

be manufat ava

hence or alternhnology.

ection 2.7,., Table

ction 2.7,SPage No.

ICALS

Table

ed as ents.

3.5 &

ea

Figure

Figure

acture ailable

no native

Sub-2.3.,

Sub –

Page 26: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

S

1

1

1

1

1

2

2

2

2

B. S. RANA

S.N.

the p

15 Detai

16 Detaiprodudescrmate

17 Detaiactivi

18 Assesameobtain

19 Undeprem

20 Detairecycwater

21 ExploEffortreceiv

22 Segrespeciplan disch

23 Capaof eaand treatmenviroon woprodu

F

roducts & ra

ils on raw m

ils of compuct along wribing eachrial balance

ils on strateties.

ssment of se to meet wned from th

ertaking staises (If proj

ils on watercled & reusr conservati

ore the pots to minimving water b

egation of wific treatmefor maximu

harge for eff

acity of ETPch unit alontreated eff

ment unit inonmental porst case sucts that ca

OR PROPOSED

T

aw material

materials, so

lete manufawith chemi

h unit procee, consumpt

egy for the

source of thwith the reqhe concern a

ating that nect is locate

r balance insed. Detailsion

ossibilities fize effluentbody.

waste streant and disp

um recycle fluent.

P in KL/dayng with schfluent qualin reduction parameters. scenario con be manuf

MANUFACTU

ToR Points

ls. In case o

ource and s

acturing procal reactio

esses and tion of raw m

implementa

he water suuirements fauthority for

no bore weed within th

ncluding quas of metho

for Zero Lt discharge

ams, characposal of eaof treated w

. Details of ematic flowties with sin respect Inlet efflue

nsidering pfactured in t

EIA REPORT

RING OF SYNT

Page 26

s

of Dyes, Cl

storage with

ocess / opens, procesunit operatmaterials et

ation of cle

upply with afor the projr supply of

ell shall be e Industrial

antity of efflods to be a

iquid Dischand to ma

cterization ach stream waste wate

f ETP includw diagram. Ispecific effi

of all concent quality sproduction othe plant co

THETIC ORGAN

number).

in the prem

erations of s flow diagtions along tc.

aner produ

adequacy oject. Permisraw water.

dug within estate).

luent generadopted fo

harge (ZLDaintain qual

and qualityincluding a

er and mini

ding dimensInlet, transiticiency of cerned/regushould be bof most polloncurrently.

NIC CHEMICAL

mises. ChaSec

each gram with

ChaNo.

ction We macrequthe

of the ssion

ChaSecPag

n the Enc

rated, r the

ChaSecNo.

D) or ity of

ChaSecNo.

with action mum

Theinduno domgenactivto se

sions tional each lated

based uting

ChaSecNo.

LS

M/s.VISH

Complian

apter 2,Secction 2.7.2.,P

apter 2, Se

shal cchinety anduire to minenvironmen

apter 2,Secction 2.10.ge No.

closed as a

apter 2, Section 2.11.2.

apter 2, Section 2.11.2.

ere is no ustrial proceneed of se

mestic efferated frvity, which eptic tank/ s

apter 2, Section 2.11.2.

HWA CHEMI

nce Status

ction 2.7,SPage No.

ection 2.9.,

check thed rectify ifnimize wasnt.

ction 2.10., 2., Table

Annuxure.V

ction 2.11, . & 2.11.3.,

ction 2.11, . & 2.11.3.,

generatioess effluentegregation. luent will rom propwill be dispsoak pit sys

ction 2.11, . & 2.11.3.,

ICALS

Sub –

,Page

e all f any ste to

Sub-2.6.,

VIII

Sub-Page

Sub-Page

on of ts. So

Only be posed posed stem.

Sub-Page

Page 27: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

S

2

2

2

2

B. S. RANA

S.N.

24 In casl. Copconcefor spll. Chbe seMoEF

25 In caCETPinculi(1) To(2) C(3) Aday) (4) Bo(5) Creorts(Last and p(6) Cby the(7) Envir(8) C

26 In casl. ActNotarconnell. EcosysteIll. CecredibIV. Tocontathe gof thedepthestabpotab

27 In caCapaincludadeq

F

se of dischapy of permisern authoritpare capaciaracteristic

ent to CommFCC/CPCBase of wasP, MEE, Sding otal capacitopy of CC&

Actual load a

ooked quanCopies of Xs of the wat2 year). C

point wise copies of She GPCB anRecommen

ronmental Aommon Facse of Zero Lion plan forrized underection will nonomical an

em to achievertification oble instituteo estimate &amination stroundwater

e ground wah based on blished andble water sta

se of in-hoacity of MEEding evapouacy of the

OR PROPOSED

T

arqe into GIssion letter ty of drainagty availables of the com

mon pipelin/GPCB disc

ste water sSpray Drye

ty of the CF&A of the CFat present (

ntity & SparXGN generter / Air / Haopies of ins

compliance how – Causnd its complndatoins aAudit reportcilities Up gLiquid Dischr 'Zero' disctaking for a

not be takennd technicave Zero Liquof adequacyes of Nation& monitor gtatus, piezor flow and oater flow of available gr

d all the paraandard sha

use MEE/SE/Spray dryration capa

e proposed

MANUFACTU

ToR Points

IDC drainagwith quantitge network

e to take addmbined efflune with refecharge normsent to Comer etc. Det

F. (Qualitative

e capacity orated inspeazardous sastructions isthereof.

se notices. Ciance

and sugges of CETP

gradation scharge (ZLDharge of effssuring tha

n in the unital viability ofuid Dischary of proposeal repute.

ground wateometer wellther three othe proposeround wateameters mell be monito

Spray dryer yer in KL/hracity, steamboiler to su

EIA REPORT

RING OF SYNT

Page 27

s

ge / Pipelinety (KL/day) / pipeline wditional effluuent and trerence to thems. mmon Factails of Co

and Quant

of CF ection reortamples collssued GPC

Closure not

estions of and ite com

cheme, if an) fluent shall

at undergrout. f the effluenrge (ZLD). ed ZLD sch

er quality & s, one on u

on the downed project ar depth shaentioned in ored.

for waste wr. Technical

m required fupply steam

THETIC ORGAN

e: from the

with confirmauent. eated water e

ilities (CF) ommon fac

titative – KL

ts with analected by G

CB in last 2

tices etc. se

the last mpliance reny.

be includedund drainag

nt treatment

eme throug

its up gradient on gradient sat different all be IS 10:500 f

water treatml details of for evapora for evapor

NIC CHEMICAL

ation

to

Not in G

like, ilities

L per

alysis GPCB

year

erved

two eport.

Not proj

d. ge

t

gh

of ide

for

TheinduOnlygenactivto se

ment: MEE

ation, ration

Not

LS

M/s.VISH

Complian

Applicable GIDC draina

applicableect is ZLD.

ere is no ustrial proy domesticerated frvity, which eptic tank/ s

Applicable

HWA CHEMI

nce Status

as no dischage/pipeline

e as prop

generatioocess effluc effluent wrom propwill be dispsoak pit sys

ICALS

harge

posed

on of uents.

will be posed posed stem.

Page 28: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

S

2

2

3

3

3

3

3

3

B. S. RANA

S.N.

in adeconopropogaseoconta

28 Techsyste

29 UndeprovidMEE,

30 Econsyste

31 Plansto becontaefflue

32 ActioPoly valua

33 One tempand r

34 AnticproducorreCompconduVECsmagn

35 One monsThe previseas pr

F

ddition to thomical viabosed for thous emissi

aining solve

nical detaiem etc. (If an

ertaking staded for the, Spray drye

omical andem.

s for manage generatedainer washent discharg

n plan for Aluminium

able product

season Serature, relrainfall shou

ipated enviuction maysponding ponents) mucted withins and likelnitude in ord

complete ssoon seasoparametersed Nationalroject spec

OR PROPOSED

T

he steam rebility of the e

e evaporaton/VOC fronts & other

ls of ATFny).

ating that e waste waer etc. (Whi

d technica

gement, colld from spillahing etc. Mge during un

reuse of liq Chloride ts instead o

Site-specificlative humiduld be incor

ronmental iy be evalua

likely impamay be idn the studyy impacts

der to identi

eason basen) to be giv

s to be covl Ambient Aific parame

MANUFACTU

ToR Points

equired for evaporationtion systemom evaporchemicals.

FD/Crystalliz

a separatter treatmeichever is a

l viability

lection, andage, leakagMeasures nforeseen c

quid waste etc. within

of sendinyou

c micro-mdity, hourly porated.

impcats dueated for siacts VECs

dentified. By area for a

will have ify mitigatio

e line ambieven along wered shall

Air Quality Seters like N

EIA REPORT

RING OF SYNT

Page 28

s

the proces system. Co

m in order ration of in.

zer/ spray

te electric ent system applicable)

of the eff

d disposal oges, vesselproposed

circumstanc

streams likpremises

utside to ac

meteorologicy wind spee

e to the proignificance s (Valued Baseline stall the concto be assn measures

ent air quawith the date

be in accoStandards (NNH3, HCI, C

THETIC ORGAN

ss etc. Tecontrol measto avoid/redustrial eff

Dryer, RO

meter wilviz. ETP, F

fluent treat

of waste strel washing, for preve

ces.

ke Spent ato convert

ctual end-us

cal data ued and dire

oposed projand basedEnvironm

tudies maycerned/idensessed for s.

lity data (exes of monitordance withNAAQS) asCL2, HBr,

NIC CHEMICAL

chno-sures duce fluent

O/NF Not CrysRO/

l be FRO,

Enc

ment ChaSecNo.

eams used nting

ChaSecPag

acids, into

sers.

TheSpeChlo

using ection

ChaNo.

ject / d on ental y be tified their

PleaAntiimpa

xcept oring. h the s well VOC

Cha3.5.

LS

M/s.VISH

Complian

proposed Astallizer / sp/NF system

closed as a

apter 2, Section 2.11.2.

apter 7, Section 7.1.1ge No.

ere shall nent Acid , oride.

apter 3, Se

ase refer icipated acts on pag

apter 3, Se, Page No.

HWA CHEMI

nce Status

ATFD/ pray Dryer,

Annuxure.V

ction 2.11, . & 2.11.3.,

ection 7.1., ., Table

o generatioPoly Alum

ction 3.9.,

Chapter 4environm

ge no.

ection 3.9.,T

ICALS

VIII

Sub-Page

Sub-7.1.,

on of minium

Page

4 for mental

Table

Page 29: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 29

B. S. RANA M/s.VISHWA CHEMICALS

S.N. ToR Points Compliance Status

etc. Locations of the monitoring stations should be so decided so as to take into consideration the pre-dominant downwind direction, population zone and sensitive receptors. There should be at least one monitoring station in the upwind direction. There should be at least one monitoring station in the pre dominant downwind direction at a location where maximum ground level concentration is likely to occur.

36 Modeling indicating the likely impact on ambient air quality due to proposed activities. The details of model used and input parameters used for modeling should be provided. The air quality contours may be shown on location map clearly indicating the location of sensitive receptors, if any, and the habitation. The wind rose showing pre-dominant wind direction should also be indicated on the map. Impact due to vehicular movement shall also be included into the prediction using suitable model. Results of Air dispersion modeling should be superimposed on satellite Image / geographical area map.

Please refer Section 4.4.1 of Chapter 4 

37 Base line status of the noise environment, impact of noise on present environment due to the project and proposed measures for noise reduction including engineering controls.

Chapter 3, Section 3.9.,Table 3.6., Page No.

38 Specific details of

a) Process gas emission from each unit process with its quantification.

b) Air pollution Control Measures (APCM) proposed for process gas emission. Adequacy of the air pollution control measures (APCM) for process gas emission measures to achieve the GPCB norms.

c) Details of the utilities required.

d) Type and quantity (MT/hr & MT/Day) of fuel to be used for each utility.

e) Flue gas emission rate emission from each utility.

f) Air Pollution Control Measures (APCM) proposed to each of the utility along with its adequacy

g) List the project specific sources of fugitive emission along with its quantification and proposed measures to control it.

h) Details on tail gas treatment.(lf any)

Chapter 2, Section 2.11, Sub- Section 2.11.1.,Table 2.9 & 2.10., Page No.

39 Action plan for odour control to be submitted. Chapter 4, Section 4.13., Sub-Section 4.13.1., Page No.

Page 30: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 30

B. S. RANA M/s.VISHWA CHEMICALS

S.N. ToR Points Compliance Status

40 Management plan for solid/hazardous waste including storage, handling, utilization and safe disposal as per the hazardous and Other Wastes (Management and Transboundary Movement ) Rules 2016. CPCB guidelines in respect of specific treatment, such as solar evaporation, incineration, etc, need to be followed. How the manual handling of the hazardous wastes will be mi nimized Methodology of de- contamination and disposal of discardedcontainers and its record keeping.

Chapter 4, Section 4.10.,Sub- Section 4.10.1., Page No.

41 Membership of Common Environmental Infrastructure like TSDF, Common Incineration Facility (CHWIF), MEE, spray dryer etc.

Membership of the TSDF will be taken at the time of CTE fresh application of the EC of proposed project.

42 Name and quantity of each type of solvents to be used for proposed production. Details of in-house solvent recovery system including mass balance, solvent loss, recovery efficiency (% recovery), feasibility of reusing the recovered solvents etc. for each type of solvent.

43 Appropriate monitoring network has to be designed and proposed, to assess the possible residual impacts on VECs.

Unit will adopt monitoring network proposed in chapter 6.

44 A detailed EMP including the protection and mitigation measures for impact on human health and environment as well as detailed monitoring plan and environmental management cell proposed for implementation and monitoring of EMP. The EMP should also include the concept of waste-minimization, recycle/reuse/recover techniques, energy conservation, and natural resource conservation. Total capital cost and recurring cost/annum earmarked far environment pollution control measures.

Detailed EMP with budget is described in chapter 9.

Details of monitoring plan are given in sectiob 6.1 of chapter 6.

Details of Environment Management Cell are covered in chapter 9.

Total cost and recurring cost per annum is given in table 6.2 of chapter 6.

45 Details of in-house monitoring capabilities and the recognized agencies if proposed for conducting monitoring.

46 Permission from PESO, Nagpur for storage of solvents, other toxic chemicals, if any.

47 Occupational health impacts on the workers and mitigation measures proposed to avoid the human health hazards along with the personal protective equipment to be provided. Provision

Chapter 9, Section 9.6., Page No.

Page 31: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 31

B. S. RANA M/s.VISHWA CHEMICALS

S.N. ToR Points Compliance Status

of industrial hygienist and monitoring of the occupational injury to workers as well as impact on the workers. Plan for periodic medical checkup of the workers exposed. Details of work place ambient air quality monitoring plan as per Gujarat Factories Rules.

48 Details on volatile organic compounds (VOCs) from the plant operations and occupational safety and health protection measures. Proposal for Leak Detection and Repair (I-DAR) program as per the CPCB guidelines.

Chapter 9, Section 9.5., Sub- Section 9.5.1., Page No.

49 Risk assessment including prediction of the worst-case scenario and maximum credible accident scenarios should be carried out. The worst-case scenario should take into account the maximum inventory of storage at site at any point of time. The risk contours should be plotted on the plant layout map clearly showing which of the facilities would be affected in case of an accident taking place. Based on the same, proposed safeguard measures including On-Site / Off-Site Emergency Plan should be provided.

Chapter 7, Section 7.1.,Page No.

50 MSDS of all the products and raw materials. Chapter 2, Table 2.3

51

Details of hazardous characteristics and toxicity of raw materials and products to be handled and the control measures proposed to ensure safety and avoid the human health impacts. This shall include the details of Antidotes also

Hazardous properties of chemicals are given in table 7.2 of chapter 7 on page no. 7-5 .

Please refer section 7.14.4 of chapter 7 on page no 7-21 for details of antidotes.

52 Details of quantity of each hazardous chemical (including solvents) to be stored, Material of Construction (MOC) of major hazardous chemical storage tanks, dyke details, threshold storage quantity as per schedules of the Manufacture, Storage & Import of Hazardous Chemicals Rules of major hazardous chemicals, size of the biggest storage tank to be provided for each raw material & product etc. How the manual handling of the hazardous chemicals will be minimized?

Pls refer section 2.6.2 of chapter 2 on page no.

53 Details of the separate isolated storage area for flammable chemicals. Details of flame proof electrical fittings, DCP extinguishers and other safety measures proposed. Detailed fire control plan for flammable substances and processes showing hydrant pipeline network, provision of DG Sets, fire pumps,

Page 32: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

S

5

5

5

5

5

5

B. S. RANA

S.N.

jocke

54 Submmaintsafety

55 Detaiannunumbdevelcommactivinearb

56 Actioplantapublis

57 Detaicommthe ovplan fbudgpropostatus

58 (a) Dapprothe E(b). operainfringnorm

59 Whatcompcompbe giv

F

ey pump, tox

mit checklistenance, sty related m

iled five-yeal budget, p

ber of trelopment [w

mitment of tties outsid

by areas an

n plan for ations, planshed guidel

iled socio-emunity welfaverall improfor social coetary provisosed to be cs of the are

oes the comoved by its

EIA report. Does the

ating procegement / des / conditio

t is the hiepany to deapliance withven.

OR PROPOSED

T

xic gas dete

st in the forengtheningeasures

ear greenbplanning sc

ees to bewith map], the managee the prem

nd elsewher

the greenbnning schelines.

economic deare programovement of orporate ressions for thecarried out;

ea.

mpany haveBoard of D

Environmess / proeviation / vns? If so, it

erarchical sal with the eh the EC co

MANUFACTU

ToR Points

ectors etc.

orm of Dog of HSE, m

belt develochedule, sp

planted, budgetary

ement to camises at are.

belt developedule, etc.,

evelopment m most usef

the environsponsibilitiee next five yspecific to

e a well laidDirectors? I

ent Policyocedures toiolation of tmay be det

ystem or aenvironmenonditions? D

EIA REPORT

RING OF SYNT

Page 32

s

's & Don'tmanufacturin

pment proecies, widtharea und

y outlay etarry out theappropriate

pment — sp in accord

t measures ful in the pronment. Submes, with appyears and athe current

d down EnvIf so, it may

y prescribeo bring inthe environtailed in the

administrativtal issues aDetails of th

THETIC ORGAN

s of preveng utility sta

ogram incluh of plantatder green tc. -along e tree plant places in

pecies, widdance to C

including oject area fomit a detaileropriate

activities demograph

vironment Py be detaile

e for stannto focus mental or f

e EIA.

ve order oand for enshis system

NIC CHEMICAL

entive aff for

QRAencl

uding tions,

belt with

ation n the

ChaSec

th of CPCB

ChaSec

or ed

hic

ChaSec

Policy ed in

ndard any

orest

ChaSec

f the uring may

ChaSec

LS

M/s.VISH

Complian

A and Dlosed.

apter 9, Section 9.6.4.,

apter 9, Section 9.6.4.,

apter 9, Section 9.6.4.,

apter 9, Section 9.6.4.,

apter 9, Section 9.6.4.,

HWA CHEMI

nce Status

DMP repo

ection 9.6.Page No.

ection 9.6.Page No.

ection 9.6.Page No.

ection 9.6.Page No.

ection 9.6.Page No

ICALS

rt is

,Sub-

,Sub-

,Sub-

,Sub-

,Sub-

Page 33: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 33

B. S. RANA M/s.VISHWA CHEMICALS

S.N. ToR Points Compliance Status

60 Does the company have a system of reporting of non compliances / violations of environmental norms to the Board of Directors of the company and / or shareholders or stakeholders at large? This reporting mechanism should be detailed in the EIA Report.

No.

61 Phase wise project implementation schedule with bar chart and time frame, in terms of site development, infrastructure provision, EMS implementation etc.

After obtaining /Environmental Clearance for proposed project, installation will be completed within 6-8 months.

62 Certificate of accreditation issued by the NABET, QCI to the environmental consultant should be incorporated in the EIA Report.

Page no.10 of EIA Report

63 An undertaking by the Project Proponent on the ownership of the EIA report as per the MoEF&CC 0M dated 05/10/2011 and an undertaking by the Consultant regarding the prescribed TORs have been complied with and the data submitted is factually correct as per the MoEF&CC 0M dated 04/08/2009.

Enclosed as Annexure-IX

64 In case of Expansion of the project a. Need for the proposed expansion should be justified in

detail.

b. Adequacy of existing EMS (Environmental Management System).

c. Records of any legal breach of Environmental laws i.e.

details of show- cause notices, closure notices etc. served by the GPCB to the existing unit in last five years and actions taken then after for prevention of pollution.

d. Copies of Environmental Clearances obtained for the

existing plant, its point wise compliance report.

e. Environmental audit reports for last 3 years and compliance of its recommendations/Suggestions. (Include latest audit report and its compliance.)

f. Copy of Consent to Operate (CC&A) obtained along with

point wise compliance status of all the conditions stipulated therein.

g. Compliance of MoEFCC circulars vide No: J-

11011/618/2010-lAll (l)

a. Pls refer section 2.2 of chapter 2 on page no.

b.Existing is having CTE/CTO of non EC category.

c.Not any Notice of GPCB

d.First time applied for EC

e.Not any issued.

f. Enclosed as Annexure VI

g.Enclosed as Annexure X

Page 34: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 34

B. S. RANA M/s.VISHWA CHEMICALS

S.N. ToR Points Compliance Status

dated 30/05/2012 and J-11013/41/2006-IA-II(I) dated 20/10/2009.

h. Copies of XGN generated Inspection reports with

analysis reports of the water/Air/Hazardous samples collected by GPCB (Last 2 year). Copies of instructions issued by GPCB in last 2 year and point wise compliance thereof.

Not collected any samples.

Copies of instructions issued by GPCB in last 2 year and point wise compliance thereof is enclosed as Annexure-XI

65 In case of project is located in Ankleshwar-Panoli, Vatva-Narol & Vapi GIDC. Compliance of MOEFCC's 0M no. J-11013/5/2010-lA.ll (l) dated

25/11/2016 regarding lifting of moratorium on the consideration of projects for environmental clearance.

(B) Compliance of direction under section 18 (1) (b) of the Water (Prevention and Control of Pollution) act, 1974 issued by CPCB dated 31/03/2016 regarding compliance of CETP.

a) Action initiated by GPCB, if any, against proposed unit regarding non-compliance of prescribed standards under the various environmental laws.

b) Performance of CETP with respect to current hydraulic load & prescribed standards with No Objection Certificate of CETP regarding incorporation of the proposed unit for acceptance of waste water.

c) Performance of TSDF site with respect to current load & prescribed standards with No Objection Certificate of TSDF site regarding incorporation of the proposed unit for acceptance of hazardous waste to the common infrastructure.

d) Copies of quarterly action report taken for the above points submitted to the CPCB.

e) Report of GPCB which have conducted monitoring as per the said direction by CPCB dated 31/03/2016.

Proposed project there shall

generation of process effluent and maintaining zero liquid discharge complying the MOEFCC's 0M no. J-11013/5/2010-lA.ll (l) dated 25/11/2016 regarding lifting of moratorium on the consideration of projects for environmental clearance.

Additional Information required by SEIAA, Gujarat

1. Complete Zero Liquid discharge (ZLD) as commited during the SEAC meeting.

Chapter 9, Section 9.6.,Sub- Section 9.6.4., Page No

2. Sound management of spent acid and other liquid waste streams as per the hazardous and other Wastes (Management and Transboundary Movement) Rules 2016.

The Wastes (Management and Transboundary Movement) Rules 2016.will be followed .

 

Page 35: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 35

B. S. RANA M/s.VISHWA CHEMICALS

CHAPTER 2. PROJECT DESCRIPTION

2.1. Introduction

This section of the report describes the features of the proposed project in detail to allow an assessment

of its environmental impact. A complete description is important to understand the potential

environmental implications of the initiative and accordingly addressing issues in an appropriate manner.

Description of the proposed expansion project components and activities are presented together with

the aspects during the construction and operation phase of the project which are also important from the

environmental perspective.

This chapter highlights the features of proposed chemical manufacturing plant with respect to storage

yard for storage of raw materials, utilities, infrastructure facilities and sources of waste generation, their

quantity, treatment and safe disposal of the waste.

2.2. Type of project

The project is neither an interlinked project nor an interdependent project. The proposed project is a new

manufacturing unit for the production of Various Chemicals & Intermediates. For the manufacturing of

the new products, some equipments and machinery will be utilized. The project falls under category ‘B’,

section 5(f) “Synthetic organic chemical industry” of EIA notification 2006 and subsequent amendments.

2.3. Need for the Project

This report highlights the details of the selected site, raw materials, availability of water, fuel and

electricity, features of the main plant equipment, environmental aspects, estimates of the project cost

and the schedule for the project implementation.

2.4. Justification of Project

M/s Vishwa Chemicals has been incorporated with main object to manufacture SO chemicals &

Intermediates which have a good export potential. The Proposed expansion unit is tolocated at, Baroda

– Ankleshwar Express Highway, A/p –Ankleshwar GIDC Estate. The site is well connected by roads and

close to National Highway (NH-8), Railway station (Ankleshwar ,2.1 km) and Airport (Surat - 54 km). The

raw material required for this plant is easily available from and within local markets of Gujarat.

Manpower required is easily available and which in turn will generate employment. Products are

primarily meant for export for which import and export facilities are available in Gujarat. Moreover, this

will result in revenue generation and socio-economic upliftment through CSR activities.

Page 36: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

2.5. Proj

Total Projec

2.6. Loca

2.6

Ankleshwa

The neares

Railway Sta

Coordinate

F

ect Cost

ct Cost for p

ation of th

6.1. Loc

r, Dist, Bha

st road is B

ation (2.1 K

es: Latitude

OR PROPOSED

proposed p

he Project

cation:M/s.

ruch, Gujar

aroda – An

Km, WNW) a

e 21°61'80.2

MANUFACTU

roject activi

site

. Vishwa C

rat.

kleshwar E

and nearest

22" N and L

Figu

EIA REPORT

RING OF SYNT

Page 36

ity is Rs.59

Chemicals

Express Hig

t airport is S

Longitude 7

ure 2.1 Proj

THETIC ORGAN

lacs.

is Locate

hway (4.4 K

Surat Airpor

3°03'81.92"

ject Locati  C

NIC CHEMICAL

d at Plot

Km, E), Rai

rt (54 Km, S

" E

on

LS

M/s.VISH

No. 4801

ilway statio

SSW).

HWA CHEMI

/A/13, G.I.

n is Ankles

ICALS

.D.C.

hwar

Page 37: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

FOR PROPOSED

F

MANUFACTU

igure 2.2 G

EIA REPORT

RING OF SYNT

Page 37

Google Ima

THETIC ORGAN

ge of the p

NIC CHEMICAL

project site

LS

M/s.VISH

HWA CHEMIICALS

Page 38: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

F

F

OR PROPOSED

Figure 2.3 G

MANUFACTU

Google Ima

EIA REPORT

RING OF SYNT

Page 38

age of the

THETIC ORGAN

project site

NIC CHEMICAL

e (5 & 10 K

LS

M/s.VISH

Km radius)

HWA CHEMIICALS

Page 39: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

Land requi

Total land a 810.75 sq

Sr

Plant Layo

 

 

F

irement de

area of the mtr. The t

r. No.

1 Net

1 Ma2 Sto3 Util4 Adm5 Lab6 Op

7 Gre8 ET

out: The pla

OR PROPOSED

etails

plant isg118total area re

t Plot Area

ain plant Buorage Area lity area ( Bministrationbourroom &en space /

een belt AreP

To

ant layout is

MANUFACTU

8 equirements

Details of

a

ilding (Prod

Boiler &Cooln buildings&Security

Road

ea

otal Area

s given in be

Fig

EIA REPORT

RING OF SYNT

Page 39

s are given

Table 2.1 A

Land

duction Area

ling Tower)

elow figure:

gure 2.4 Pl

THETIC ORGAN

in the below

Area Detai

a)

lant Layout

NIC CHEMICAL

w table:

ls

After p

t

LS

M/s.VISH

Area proposed (m810.75

205 84.22 68.75 24.32 50.53

100.75

257 20.18

810.75

HWA CHEMI

m2)

ICALS

Page 40: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

2.6.2.

Sr.

No.

1

2

3

4

5

6

7

8

9

10

11

2.6.3.

F

Environm

E

N

N

Ecologic

Historic

Nationa

List of

. Site Ph

OR PROPOSED

mental Setti

Table

Particu

Elevation ab

Climatic Co

(As per

Nearest v

Nearest To

Nearest Fire

Nearest Wa

cally sensiti

10-km dis

cal/ Archae

l Parks/Wild

major Indus

Km

Seismic

hotograph

MANUFACTU

ings

2.2 Enviro

ulars

bove MSL

onditions

IMD)

village

own/City

e Station

ater Body

ive zones w

stance

ological pla

d Life Sanct

stries within

m

Zone

hs

EIA REPORT

RING OF SYNT

Page 40

nmental Se

An

A

Sa

within No

aces

tuary

n 10

THETIC ORGAN

ettings of t

72.0 ft

nnual Mean

nnual Mean

Annual a

Hifaza

Ankle

Ankl

abarmati Ri

o eco-sensi

Not prese

Not prese

Meghm

NIC CHEMICAL

the Project

Detail

t above Mea

n Maximum

n Minimum T

average Ra

tnagar (2.4

eshwar (2.5

eshwar –

ver (9.38 km

tive areas a

km rad

ent within th

ent within th

mani, Indoc

Zone -

LS

M/s.VISH

t Site

ls

an Sea Lev

Temperatu

Temperatu

ainfall : 852

48 km, NNE

57 km, NW

8.9 Km, W

m) in NNW

are present

ius

he 10 Km ra

he 10 Km ra

col Chem Et

- III

HWA CHEMI

vel

ure: 42° C

re: 20° C

mm

E )

W)

W

direction

within 10

adius

adius

tc.

ICALS

Page 41: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 41

B. S. RANA M/s.VISHWA CHEMICALS

2.7. Size or magnitude of operation

2.7.1. Products and Production Capacities

Proposed products for the new plant with capacity are shown in below table;

Table 2.3 Products and Production Capacities

Sr. No.

Name of Product CAS no. /CI no. etc.

Existing Proposed Total Quantity MT/Month

End-use of product

1. Zinc Sulphate (Existing Product As Per GPCB CCA NO: AWH-74769

773302-0 200 0.0 200

Fertilizer etc.

2. Sodium Nitrate (Existing Product As Per GPCB CCA NO: AWH-74769)

763199-4 200 0.0 Firework etc.

3 Ammonium Formate

540-692

0.0 30 Pharmaceutical Raw Material

4 Ammonium Acetate 631-618 0.0 30 Pharmaceutical Raw Material

5 Ammonium Propionate 1749608-1

0.0 30 Pharmaceutical Raw Material

6 Methyl 3 — Amino Crotonate

1420539-1

0.0 30 Amlodepine Intermediate

7 Sodium 2. Ethyl Hexonate

1976689-3

0.0 30 Drug Intermediate

8 Sodium formate 141-537 0.0 30 Pharmaceutical Raw Material

9 Methanolic ammonia 766441-7 0.0 60 Pharmaceutical Raw Material

10 Methanolic MMA 80-62-6 0.0 60 Pharmaceutical Raw Material

11 Propyl propionate 106-365 0.0 50 fragrance agent

12 1 Chloromthyl Na hthalene

86-52-2 0.0 30 Drug Intermediate

13 N-Ethyl-2nitrometh lene rrolidine

617104-4 0.0 4.9 Drug Intermediate

Page 42: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 42

B. S. RANA M/s.VISHWA CHEMICALS

2.7.2. Details of By-products:

There will be no generation of By-Product from the proposed Expansion Unit.

Sr.No   Name of byproducts   Existing byproduct  

Proposed byproduct  

Quantity (MT/Month)  

1   HCL 22%   0.0   Proposed   30.00  

2.7.3. Raw Materials Requirement

List of raw materials required are given in below table:

Sr.  No  Name of Raw Material  

Qunatity MT/Month  

1   Ammonium Formate      

    Formic Acid   24.3  

    Ammonia   9.0  

2   Ammonium acetate    

    Acetic Acid   26.0  

    Ammonia   7.4  

3   Ammonium Propionate  

    Propionic Acid   15.9  

    Ammonia   3.7  

    Water   10.4  

4   Methyl 3 Amino Crotonate  

    Methyl Acetoacetate 33.3  

    Ammonia   4.9  

5   Sodium 2 Ethyl Hexanoate  

    2-Ethyl Hexanoic Acid 26.0  

    Caustic soda   7.2  

6   Sodium Formate  

    Formic Acid   21.9  

    Sodium hydroxide 19.1  

7   Methanolic Ammonia  

    Methanol   52.9  

    Ammonia   7.1  

8   Methanolic MMA  

14 Barbituric acid 67-52-7 0.0 4.9 Drug Intermediate

15 N-methyl-l Naphthalene methaneamine

6547313—4

0.0 4.9 MEMP

Terbinafine Intermediate

16 Veratraldehyde 120-149 0.0 4.9 flavor and fragrance a ent

Page 43: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 43

B. S. RANA M/s.VISHWA CHEMICALS

    Methanol   48.0  

    Monomethyl amine 12.0  

9   Propyl propionate  

    Propanoic acid   32.8  

    Propanol   26.7  

10  1 Chloro Methyl Naphthalene in toluene  

 

    Naphthalene   21.0  

    Para Formaldehyde 4.9  

    HCl (34%)   52.5  

    Toluene   21.0  

11   N-ethyl-2-nitromethylenepyrrolidine  

    1-ethyl-2-pyrrolidinone 4.5  

    dimethyl sulfate   5.1  

    sodium methoxide 7.3  

    nitromethane   3.3  

    MDC   18.1  

    Toluene   2.3  

12   Barbituric acid    

    Methanol   29.6  

    sodium   1.2  

    Diethyl melonate   7.2  

    urea   2.8  

    Water   17.2  

    HCl 6.5  

13   N‐methyl‐1Naphthalene methaneamine  

    1-chloromethyl naphthalene 4.5  

    N-methyl formamide 2.2  

    Sodium hydride (50% in parafin) 1.4  

    N,N-Dimethylformamide 10.5  

    Toluene   54.5  

    Water   48.8  

  Sodium hydroxide   6.6  

  Hydrochloric acid   32.0  

  Carbon   0.23  

14   Veratraldehyde    

    Vanillin   5.3  

    Water   9.3  

    Sodium hydroxide 2.8  

    Dimethyl sulphate 4.4  

    Sulphuric Acid-50% 0.8  

Page 44: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 44

B. S. RANA M/s.VISHWA CHEMICALS

   

Table 2.4 MSDS of Raw Materials

Full name Of the raw materials

State B.P. °C

F.P. °C

LEL UEL

%

TLV ppm or

mg/m3

LD50 mg/Kg

LC50 mg/l

Specific Gravity (water

=1)

Vapor density (air=1)

Odour threshold

ppm or mg/m3

Formic Acid Liquid 100 69

N.A. N.A. 729

1.21 1.59 0.625 ppm

Ammonia Gas -33.4 N.A. N.A. N.A.

7338

N.A. N.A. N.A.

Acetic Acid Liquid 118.1 39 N.A. N.A. 1060/5620 1.049 2.07 0.48

Propionic Acid Liquid. 140.99 53 N.A. N.A. 3500/ 500 0.9954 : 2.56 N.A.

Water Liquid. 100 N.A N.A. N.A. > 90 1 0.62 N.A

Methyl Acetoacetate

Liquid 164 63.5

N.A. N.A. 2,580/ 2,000

1.08 4.0 N.A

2-Ethyl Hexanoic Acid Liquid 223 118.3 N.A. N.A.

2,043/ 2,000

0.908 5.0 N.A

Caustic soda

liquid 142 - 144

N.A. N.A. N.A.

240 ug/L/ 330000-1000000

ug/L

N.A.

N.A. N.A.

Sodium hydroxide Solid 1388 N.A. N.A. N.A. N.A. 2.13 N.A. N.A. Hydrochloric Acid

30% Liquid 100 N.A. N.A. N.A.

1108/ 3124

1.03 0.62 N.A.

Methanol Liquid 65 N.a. N.A. 1mg/NM3 N.A. 1.992 N.A. N.A.

Monomethyl amine Liquid 100 N.A N.A N.A N.A 0.85 0.62 N.A.

Propanoic acid Liquid 140.99 53 N.A N.A 3500/ 500 0.9954 2.56 N.A

Propanol Liquid 97.22 15 N.A N.A 1870/

67882.3 0.8053 2.07 5.3 ppm

Naphthalene Solid 218 88 N.A N.A 490/ 170 1.162 4.4 0.038

ppm Para Formaldehyde Solid N.A 70 N.A N.A 800/ 1070 1.46 1.03 N.A

Toluene Liquid 110.6 4.4444 N.A N.A 636/ 440 0.8636 3.1 1.6 ppm

1-ethyl-2-pyrrolidinone liquid

97 90.8 N.A N.A

N.a N.a N.a N.A

Page 45: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 45

B. S. RANA M/s.VISHWA CHEMICALS

2.8. Proposed schedule for Approval and Implementation

In order to control and regulate the development of chemical project, a legal framework has been

developed by Govt. of India. Accordingly, several clearances and approvals shall be required to be

obtained from different Government and Statutory Agencies at various stages of development and

operation at phase of the project. Indicative list of Approvals /Clearances to be obtained from Govt.

Authorities for this project are as below:

1. Clearance for air and water pollution : GPCB

2. Water availability and use : GIDC Ankleshwar

3. Boiler pressure parts : Chief Inspector of Boiler

dimethyl sulfate Liquid 188 83.3 N.A N.A 140/ 45 1.3322 4.35 N.A

sodium methoxide Solid N.A 33 N.A N.A 2037 1.1 1.1 N.A

nitromethane Liquid  100.8  35  N.A  N.A  940  1.14  2.11  N.A 

MDC Liquid  39.75  N.A  N.A  N.A  1600/ 

52000 1.3266  2.93  214 ppm 

sodium Solid  881.4  N.A  N.A  N.A  N.A  0.97  N.A  N.A 

Diethyl melonate Liquid  199  93  N.A  N.A  6400  1.055  5.52  N.A 

urea Solid  N.A  N.A  N.A  N.A  8471  1.323  2.07  N.A 

1‐chloromethyl 

naphthalene  solid 167 to 16 

112  N.A  N.A  890/ 2000  N.A  N.A  N.A 

N‐methyl formamide liquid  199‐

201 111  N.A  N.A  100/ 4  1.003  N.A  N.A 

Sodium hydride (50% 

in parafin)  liquid 142 ‐ 144 

N.A  N.A  N.A  N.A  1.52  N.A  N.A 

N,N‐

Dimethylformamide  Liquid 153  57.778  N.A  N.A  2800/9400  0.949  2.51  100 ppm 

Hydrochloric acid Liquid  108.58  N.A  N.A  N.A  900/1108  1.1‐ 

1.19 1.267  0.25 to 10 

ppm 

Carbon powder 4826.6  N.A  N.A  N.A  N.A  2 to 2.5  NIF  N.A 

Vanillin Solid  285  N.A  N.A  N.A  1400/>5010  1.056  5.2  N.A 

Sulphuric Acid‐50% Liquid  100  N.A.  N.A.  N.A.  4280  1.3  3.4  N.A. 

Page 46: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

4. Pla

5. Ele

6. Co

2.9. Manu

2

In SS reacooling cirreaction mcentrifugenext batch

MATE

RAW

Formic

Ammon

Total

 

FLOW 

 

F

ant Installati

ectricity Inst

onstruction L

ufacturing

2.9.1. Amactor, formrculation tilmixture at . Collect th

h and pack

ERIAL BALA

INPUT QU

W MATERIA

Acid

nia

W DIAGRAM

OR PROPOSED

ion

tallation

Labour

Process w

mmoniummic acid is

l pH is raisroom tem

he mother the wet ca

ANCE FOR

UANTITIES

ALS Q

7

2

10

M:

MANUFACTU

with Mass

Formatecharged.

sed up to 7mperature liquor as s

ake as finis

R PRODUC

QTY

30.0 Kg A

70.0 Kg M

00.0 Kg T

EIA REPORT

RING OF SYNT

Page 46

s Balance

e Start amm

7.0 to 7.5. to crysta

solution ofshed produ

T:

Ammonium

ML (ammon

Total

THETIC ORGAN

: Facto

: Electr

: Labou

monia gasKeep the llize & thef ammoniuuct ammon

OUTPUT

PRODUC

Formate

ium formate

NIC CHEMICAL

ry Inspector

ical Inspect

ur Commiss

s purging areaction men filter th

um formatenium forma

QUANTITI

CTS

e-Recycle)

LS

M/s.VISH

rate

torate

sioner

at 30 to 4mass for 1 he reactioe and it is ate.

IES

1

HWA CHEMI

400C undehr. cool the

on mass inrecycled in

QTY

900.0 Kg

100.0 Kg

1000.0 Kg

ICALS

er e n n

Page 47: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

In SS reaccirculationmixture at Collect theand pack trequireme                 

MATE

RAW

Acetic A

Ammon

Total

FLOW

F

2.9.2.

ctor, aceticn till pH is r

room teme mother liqthe wet ca

ent.

ERIAL BALA

INPUT QU

W MATERIA

Acid

nia

W DIAGRAM

OR PROPOSED

Ammonc acid is chaised up toperature toquor as soke as finis

ANCE FOR

UANTITIES

ALS Q

7

2

10

M:

MANUFACTU

nium Acetarged. Stao 7.0 to 7.5o crystallizeolution of ahed produc

R PRODUC

QTY

79.0 Kg A

21.0 Kg M

00.0 Kg T

EIA REPORT

RING OF SYNT

Page 47

tate

art ammoni5. Keep thee & then fimmonium ct ammoni

T:

Ammonium

ML (ammon

Total

THETIC ORGAN

ia gas purge reaction lter the reaacetate anium acetat

OUTPU

PRODUC

acetate

ium acetate

NIC CHEMICAL

ging at 30 tmass for 1

action masnd it is recye or dry it

T QUANTIT

CTS

e-Recycle)

LS

M/s.VISH

to 400C un1 hr. cool thss in centrifycled in ne& pack it a

TIES

1

HWA CHEMI

nder coolinhe reactionfuge. ext batch as per

QTY

900.0 Kg

100.0 Kg

1000.0 Kg

ICALS

ng n

Page 48: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

2.9

Charge prcomplies.

CHEM

 

MATE

IN

RAM

Propion

Ammon

Water

Total

FLOW

F

9.3   Ammo

opionic acUnload the

MICAL REA

ERIAL BALA

NPUT QUAN

AW ATERIALS

nic Acid

nia

W DIAGRAM

OR PROPOSED

onium Prop

id & water e liquid fini

ACTION:

ANCE FOR

NTITIES

S

6

1

4

11

M:

MANUFACTU

pionate

in reactorish produc

R PRODUC

QTY

09.0 Kg A

40.0 Kg

00.0 Kg

49.0 Kg T

EIA REPORT

RING OF SYNT

Page 48

. Start addct Ammoniu

T:

OUTPU

PRODU

Ammonium

Total

THETIC ORGAN

dition of amum Propion

UT QUANTI

UCTS

Propionate

NIC CHEMICAL

mmonia gasnate in car

ITIES

LS

M/s.VISH

s till the rearboys and p

1

1

HWA CHEMI

action pack it.

 

QTY

1149.0 Kg

1149.0 Kg

ICALS

Page 49: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

 

 

 

2.9

Charge meat 30°-40°and dry th

CHEM

MATE

RAW

Methyl

Ammon

Total

FLOW

F

9.4. MET

ethyl acetoC till reacte wet cake

MICAL REA

ERIAL BAL

INPUT QU

W MATERIA

Acetoaceta

nia

W DIAGRAM

OR PROPOSED

HYL 3 AMI

oacetate intion over. Ce. Pack the

ACTION:

LANCE FOR

UANTITIES

ALS Q

ate 11

16

12

M:

MANUFACTU

NO CROTO

n reactor atCool the ree dry mate

R KG PROD

QTY

26.0 Kg M

5.0 Kg M

E

91.0 Kg T

EIA REPORT

RING OF SYNT

Page 49

ONAT

t room temeaction masrial in bags

DUCT:

Methyl 3 Am

Mother Liquo

Evaporation

Total

THETIC ORGAN

mp. Start chss to crystas as finish

OUTPUT

PRODUC

mino Crotona

or (M3AC-R

Loss

NIC CHEMICAL

harging of aallize. Cenproduct.

T QUANTIT

CTS

ate

Recycle)

LS

M/s.VISH

ammonia intrifuge the

IES

1

1

1

1

HWA CHEMI

in reactor e mass

QTY

1013.0 Kg

75.0 Kg

03.0 Kg

1291.0 Kg

ICALS

 

 

Page 50: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

 

2.9.5. SO

Charge 2-at 30° to 4the reactio

 

CHEM

MATE

RAW

2-Ethyl

Caustic

Total

FLOW

F

ODIUM-2-E

Ethyl Hexa40°C till pHon mass to

MICAL REA

ERIAL BALA

INPUT QU

W MATERIAL

Hexanoic Ac

soda

W DIAGRAM

OR PROPOSED

ETHYL HEX

anoic acid H is raised uo crystallize

ACTION:

ANCE FOR

UANTITIES

LS Q

cid 2

3

M:

MANUFACTU

XANOATE

in SS reacup to 9.0 toe. Then mu

R KG PROD

QTY

289.0 Kg S

80.0 Kg E

369.0 Kg T

EIA REPORT

RING OF SYNT

Page 50

ctor and ado 9.5. Afteultimill the

DUCT:

Sodium 2 Eth

Evaporation L

Total

THETIC ORGAN

dd caustic r completiopowder an

OUTPU

PRODUC

hyl Hexanoat

Loss

NIC CHEMICAL

soda (Sodon of the rend pack it.

UT QUANTIT

TS

e

LS

M/s.VISH

dium Hydroeaction vac

TIES

HWA CHEMI

 

oxide) in it cuum dry

QTY

333.0 Kg

36.0 Kg

369.0 Kg

ICALS

Page 51: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

 

2.9.6 SO

In SS 400C ufor 1 hreactioand itsodium CHEM

 

MATE

RAW

Formic

Sodium

F

ODIUM FO

reactor, founder coolhr. cool theon mass int is recyclem formate.

MICAL REA

ERIAL BAL

INPUT QU

W MATERIA

Acid

m hydroxide

OR PROPOSED

ORMATE  

ormic acid ing circulae reaction n centrifuged in next

ACTION:

LANCE FOR

UANTITIES

ALS Q

7

e 6

MANUFACTU

is chargeation till pH

mixture age. Collect t batch. D

R PRODUC

QTY

30.0 Kg S

35.0 Kg M

EIA REPORT

RING OF SYNT

Page 51

d. Add So is raised u

at room tem the mothe

Dry the we

CT:  

Sodium Form

ML (Recycle

THETIC ORGAN

odium hydrup to 7.0 tomperature er liquor aet cake an

OUTPUT

PRODUC

mate

e)

NIC CHEMICAL

roxide flakeo 7.5. Keepto crystall

as solution nd pack th

T QUANTIT

CTS

LS

M/s.VISH

 

es lot wisep the reactize & then of sodiumhe finished

IES

1

HWA CHEMI

e at 30 to tion mass

n filter the m formate d product

QTY

1000.0 Kg

330.0 Kg

ICALS

Page 52: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

 

B. S. RANA

Total

 

FL

2.9.7 ME

In SS reacwater circuunload the

CHEM

 

MATE

RAW

Methan

Ammon

Total

F

LOW DIAGR

ETHANOLIC

ctor, methaulation till ie mass to p

MICAL REAC

ERIAL BALA

INPUT QU

W MATERIA

nol

nia

OR PROPOSED

13

RAM

C AMMONI

anol is chat compliespack in car

CTION:  

ANCE FOR

UANTITIES

ALS Q

8

1

10

MANUFACTU

2E

65.0 Kg T

IA

rged. Startthe perce

rboys or dr

R PRODUC

QTY

81.0 Kg M

19.0 Kg

00.0 Kg T

EIA REPORT

RING OF SYNT

Page 52

251 Kg wateEvaporation

Total

t ammoniantage. Oncrum.

T:

Methanolic A

Total

THETIC ORGAN

er, 79 Kg soloss

a gas purgice the des

OUTPUT

PRODUC

Ammonia

NIC CHEMICAL

odium forma

ng at 10-1ired perce

T QUANTIT

CTS

LS

M/s.VISH

ate

1

50C underntage ach

IES

1

1

HWA CHEMI

35.0 Kg

1365.0 Kg

r chilled ieved

 

QTY

1000.0 Kg

1000.0 Kg

ICALS

Page 53: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

FLOW

2.9.8 ME

In SS reacunder chillachieved u

CHEMICA

 

MATERIAL

RAW

Methan

Monom

Total

F

W DIAGRAM

 

ETHANOL

ctor, methaled water cunload the

AL REACTIO

L BALANCE

INPUT QU

W MATERIA

nol

methyl amine

OR PROPOSED

M:

LIC MONO

anol is chacirculation mass to p

ON:

E FOR PRO

UANTITIES

ALS Q

8

e 2

10

MANUFACTU

METHYLA

rged. Starttill it comp

pack in carb

ODUCT:

QTY

00.0 Kg M

00.0 Kg

00.0 Kg T

EIA REPORT

RING OF SYNT

Page 53

AMINE

t Monometlies the peboys or dru

Methanolic M

Total

THETIC ORGAN

thyl amine ercentage. um.

OUTPUT

PRODUC

MMA

NIC CHEMICAL

gas purginOnce the d

T QUANTIT

CTS

LS

M/s.VISH

ng at 10-15desired pe

IES

1

1

HWA CHEMI

50C ercentage

QTY

1000.0 Kg

1000.0 Kg

ICALS

 

Page 54: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

FLOW DIA

 

 

 

 

2.9.10. P

Charge prcomplies. carboys or

  

CHEMICA

MATERIA

RAW

Propan

Propan

Total

 

F

AGRAM:

PROPYL P

opanoic acCool the mr drum.

AL REACTIO

L BALANC

INPUT QU

W MATERIA

noic acid

nol

OR PROPOSED

PROPIONAT

cid and promass to 25

ON:

CE FOR PR

UANTITIES

ALS Q

10

8

19

MANUFACTU

TE

opanol in a°C. separa

ODUCT:

QTY

50.0 Kg P

53.0 Kg W

E

03.0 Kg T

EIA REPORT

RING OF SYNT

Page 54

a reactor. Hate out wat

Propyl propi

Water ( Reu

Evaporation

Total

THETIC ORGAN

Heat the mter. Remai

OUTPUT

PRODUC

onate

se)

loss

NIC CHEMICAL

ass to refluning produ

T QUANTIT

CTS

LS

M/s.VISH

ux till reactuct to pack

IES

1

1

HWA CHEMI

tion k in

QTY

1600.0 Kg

255.0 Kg

48.0 Kg

1903.0 Kg

ICALS

Page 55: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

FLOW DIA

2.9.11. C 

Charge namaintain ti(22%) layemethyl nap

CHEMICAL

MATERIAL

RAW

Naphth

Para Fo

F

AGRAM:  

Chloro Met

aphthaleneill reaction er to other phthalene

L REACTIO

L BALANCE

INPUT QU

W MATERIA

halene

ormaldehyd

OR PROPOSED

hyl Naphth

e, paraformcompletesvessel. Ch80% finish

ON:

E FOR PRO

UANTITIES

ALS Q

8

de 1

MANUFACTU

halene In To

maldehyde s. Cool theharge Toluh product. P

ODUCT:

QTY

00.0 Kg 1

87.5 Kg H

EIA REPORT

RING OF SYNT

Page 55

oluene

and HCl (3e reaction muene to remPack it to H

Chloro Me

HCl (22%)

THETIC ORGAN

34%) in reamass and smaining reaHDPE Dru

OUTPUT

PRODUC

ethyl Naphth

NIC CHEMICAL

actor. Heatsettle and saction masm.

T QUANTIT

CTS

halene in to

LS

M/s.VISH

t to 800C aseparate t

ss to make

IES

luene 1

1

HWA CHEMI

 

and he HCl 1 chloro

QTY

1903.0 Kg

1884.5 Kg

ICALS

Page 56: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 56

B. S. RANA M/s.VISHWA CHEMICALS

HCl (34%) 2000.0 Kg

Toluene 800.0 Kg

Total 3787.5 Kg Total 3787.5 Kg

 

Page 57: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

2.9.12.

 

Charge NEreaction mremaining the reactiobags as fin

CHEM 

 

MATE 

RAW

1-ethyl-

dimethy

sodium

nitrome

MDC

Toluen

Total

F

N-ETHY

E2P,DMS, mass at 25°

methanol.on mass. Cnish produ

MICAL REA

ERIAL BALA

INPUT QU

W MATERIA

-Z-pyrrolidin

yl sulfate

m methoxide

ethane

e

OR PROPOSED

YL -2 –NITR

Sodium m°C for 8 hrs. Distill out

Centrifuge tct.

ACTION:

ANCE FOR

UANTITIES

ALS Q

none 3

3

e 4

2

12

1

26

MANUFACTU

ROMETHY

methoxide &s. Charge dichloro m

the mass a

R KG PROD

QTY

00.0 Kg N

36.0 Kg M3e

86.0 Kg 3

20.0 Kg M1lo

00.0 Kg T1M

50.0 Kg D

92.0 Kg T

EIA REPORT

RING OF SYNT

Page 57

LENEPYRR

& Nitro meDichloro m

methane coand dry the

DUCT:

N-ethyl-2-nit

Methanol 350 kg methevaporation 377 kg sodiu

MDC 120 kg reco

oss Toluene ML

40 kg tolueMDC Drying loss

Total

THETIC ORGAN

ROLIDINE

ethane in remethane toompletely. e wet cake

OUTPUT

PRODUC

tromethylen

hanol recoveloss, 122 k

um sulphate

overy, 60 kg

ene, 40 kg N

NIC CHEMICAL

eactor. Mixthe reactoAdd toluen. Pack the

T QUANTIT

CTS

nepyrrolidine

ery, 20 kg kg dimethyl ee, 73 kg imp

g evaporatio

NE2NMP, 2

LS

M/s.VISH

x and mainor & separane to react

e dry mater

TIES

e

ether. purity

1on

0 kg

2

HWA CHEMI

ntain the ate out tor.mix rial in

QTY

325.0 Kg

492.0 Kg

450.0 Kg

1180.0 Kg

200.0 Kg

45.0 Kg

2692.0 Kg

ICALS

Page 58: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 58

B. S. RANA M/s.VISHWA CHEMICALS

FLOW DIAGRAM:

NEAP – 300 Kg   DMS - 336 Kg  

Sodium methoxide – 486 Kg   Nitro methane – 220 Kg  

 

MDC – 1200 kg

942 kg Methanol layer 1120 kg MDC Recovery, 60 kg evap. loss

Recovery, 60 kg evap. loss

200 kg toluene ML (to be recover & reuse)

45 kg evaporation loss

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1 342 kgMix heat & Cool &

MeOH recovery

Centrifuge

Wet cake  KG 370

Drying 

kg 325Packing 

2542 kgseperation &

MDC recovery

570 kgMix

Page 59: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 59

B. S. RANA M/s.VISHWA CHEMICALS

2.9.13. BARBITURIC ACID  

Charge methanol to reactor then charge sodium metal to it lot wise while chilling water circulation to jacket.mix the mass. Now charge diethyl melonate & urea to it.heat the reaction mass to 70-80°C & maintain for 8 hours.Distill out methanol completely.Now charge water & then HCl to the reaction mass to recrystallize the product. Centrifuge the mass and dry the wet cake. Pack the dry material in bags as finish product.  

 

CHEMICAL REACTION: C7H12O4 + CH4N2O + CH3ONa + HCl C4H4N2O3 + C2H6O + CH3OH + NaCl

Diethyl Urea sodium Hydrochloric Barbituric Ethanol Methanol Sodium malonate Methoxide Acid Acid Chloride

MATERIAL BALANCE FOR KG PRODUCT:

INPUT QUANTITIES OUTPUT QUANTITIES

RAW MATERIALS QTY PRODUCTS QTY

Methanol 2176.0 Kg Barbituric acid 360.0 Kg

sodium 85.0 Kg Mix solvent

2502.0 Kg 2102 kg methanol,275 kg ethanol, 125 kg evaporation loss

Diethyl melonate 531.0 Kg Mother Liquor 1798.0 Kg 1245 kg water, 359 kg HCl, 194 kg

sodium chloride urea 208.0 Kg Drying Loss 80.0 Kg

Water 1260.0 Kg HCl 480.0 Kg

Total 4740.0 Kg Total 4740.0 Kg

 

 

 

 

 

 

 

Page 60: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 60

B. S. RANA M/s.VISHWA CHEMICALS

FLOW DIAGRAM:

Methanol – 2176 Kg sodium - 85 Kg  

Diethyl melonate – 531 Kg   Urea – 208 Kg    

 

2502 kg Methanol+ethanol Recovery water – 1260 kg  

  HCl – 480 kg    

 

1798 kg ML separation by dist process    

80 kg evaporation loss     

 

 

 

 

 

3000 kgMix heat & Cool &

MeOH recovery

Centrifuge

Wet cake 440 KG 

Drying 

kg 360Packing 

2238 kgChilling &

Recrystellization

Page 61: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 61

B. S. RANA M/s.VISHWA CHEMICALS

2.9.14. N-METHYL-1-NAPHTHALENE METHANEAMINE

 

Step-1: Charge N,N-Dimethylformamide to reactor then charge sodium hydride (50% inparafin oil) to it lot wise while chilling water circulation to jacket.mix the mass. Now charge N-methyl formamide to it. Maintain the reaction mass at 25-30°C. Now charge 1chloromethylnaphthalene solution in toluene. Maintain the reaction mass at 40-45°C.Once the reaction is over quench the mass to water. Add toluene to reaction mass & extract with toluene. Separate organic layer & distill out toluene completely to get N-methyl-N(1-Naphthylmethyl)-formamide which is directly used in next step. Step-2: To the reactor containing N-methyl-N-(1-naphthylmethyl)-formamide charge 20% aqueous sodium hydroxide and heated at 60-70°C for a period of 7hr. Cool the reaction mass and extract with toluene. Separate organic layer and extract with Hydrochloric acid. Decolorize the aqueous layer with activated charcoal. Filter the mass & collect the filtrate. Add 20% aqueous sodium hydroxide and toluene to it. Separate the organic layer. Distill out toluene completely to get Methyl-1-naphthalene-methaneamine. Pack to carboys.

 

CHEMICAL REACTION:

C11H9Cl + C2H5NO + NaH C13H13NO + NaCl + H2  

1-chloromethyl N-methyl Sodium N-methyl-N-(1-naphthyl Sodium Hydrogen naphthalene formamide hydride methyl)-formamide chloride

MATERIAL BALANCE FOR KG PRODUCT:  

INPUT QUANTITIES OUTPUT QUANTITIES

RAW MATERIALS QTY PRODUCTS QTY

1-chloromethyl naphthalene

100.0 Kg N-methyl-N-(1-Naphthylmethyl)-formamide

132.0 Kg

N-methyl formamide 50.0 Kg

Aqueous layer

785.0 Kg 500 kg water, 236 kg DMF, 16 kg paraffin oil, 33 kg sodium chloride

Sodium hydride (50% in parafin)

32.0 Kg Toluene recovery 493.0 Kg

N,N-Dimethylformamide

236.0 Kg Evaporation Loss 26.0 Kg

Toluene 519.0 Kg Hydrogen gas 1.0 Kg Water 500.0 Kg

Total 1437.0 Kg Total 1437.0 Kg

Page 62: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 62

B. S. RANA M/s.VISHWA CHEMICALS

 

FLOW DIAGRAM:

 

  DMF – 236 Kg   Sodium hydride - 32 Kg ( 50% in paraffin oil)   N-methyl formamide – 50 Kg   1-CMN – 100 Kg   Toluene – 86.5 Kg    

  1 kg Hydrogen gas evolved water – 500 kg   toluene – 432.5 kg

  785 kg Aq. Layer separation by dist. Process.  

 

519 kg toluene recovery

              132 Kg N-methyl-N-(1-Naphthylmethyl)-formamide directly used in next stage   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

504.5 kgMix heat & Cool

1436 kglayer

separation

651 kgDistillation

132 kgStage-1

Page 63: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 63

B. S. RANA M/s.VISHWA CHEMICALS

2.9.15. VERATRALDEHYDE Charge water and vanillin to reactor. Add sodium hydroxide and dimethyl sulfate.Mix the reaction mass. Add sulphuric acid to the reaction mass.Once the reaction completes settle down the mass for one hour. Discard the water layer and crystallize the organic layer. Centrifuge the mass & dry it. Pack the product.

CHEMICAL REACTION:

C8H8O3 + 2NaOH + (CH3)2SO4 C9H10O + CH3OH + Na2SO4 + H2O

Vanillin Sodium Dimethyl Veratraldehyde Methanol Sodium Water hydroxide sulphate sulphate

MATERIAL BALANCE FOR KG PRODUCT:

INPUT QUANTITIES OUTPUT QUANTITIES

RAW MATERIALS QTY PRODUCTS QTY

Vanillin 325.0 Kg 3,4-dimethoxybenzaldehyde 300.0 Kg

Water 571.0 Kg Aquous Layer

1009.0 Kg 65 kg methanol,304 kg sodium sulphate, 590 kg water, 50kg sulphuric acid

Sodium hydroxide 171.0 Kg Mother Liquor 37.0 Kg 10 kg water, 2 kg methanol, 25 kg

3,4dimethoxybenzaldehyde Dimethyl sulphate 269.0 Kg Drying Loss 42.0 Kg

Sulphuric Acid-50% 52.0 Kg Total 1388.0 Kg Total 1388.0 Kg

Page 64: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 64

B. S. RANA M/s.VISHWA CHEMICALS

FLOW DIAGRAM:  

 

 Vanillin – 325 Kg 

Water - 571 Kg   Sodium hydroxide – 171 Kg  

Dimethyl sulphate – 269 Kg    

 

  

 

   

   

   

   

1336   kgMix &  heat   

Centrifuge

Wet cake 342  KG 

Drying 

300  kg  Packing 

1388   kgMix, Settle & Seperate

Page 65: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 65

B. S. RANA M/s.VISHWA CHEMICALS

2.10. Plant Infrastructure And Basic Requirements

2.10.1. List of plant machinery

Table 2.5 Details of plant machinery

SR  No   Name of Equipment  

Equipment ID   Capacity  

Quantity    

1   Glass line Recactor with Column & H.E   GLR-1   3.00 KL   01  

2   SS Reactor   SSR-1   2.00 KL   01  

3   SS Reactor with vapour column & HE   SSR-2   2.00 KL   01  

4   Glass Assembly   GA-1   50 Ltr   01  

5   SS Centrifuge   SCF-1   36”   01  

6   SS Centrifuge   SCF-2   48”   01  

7   Tray Dryer   TD-1   48 trays   01  

8   SS Tray Dryer   TD-2   48 trays   01  

9   Vacuum Tray Dryer   VTD-1   24 trays   01  

10   Multi mill   MM-1   -   01  

11   SS Tray Crystallizer   SSTC-1   1.5 KL   01  

12   SS Bowl Vaporizer with blower   SSV-1   1.0 KL   01  

13   Boiler   BOI-1   400 Kg   01  

14   Cooling Tower   CT-1   150TR   01  

15   Water jet Vacuum System   WV-1   10HP   01  

16   Air Compressor   AC-1   -   01  

17   Storage Tank   HT-1   10 KL   01  

18   Scrubber   SCR-1   -   01  

2.10.2. Water requirement

During Operation phase:

The total fresh water requirement during the operation phase for the proposedproject will be 5.0

KLD.Main source of water supply will meet through Ankleshwar GIDC.

Page 66: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 66

B. S. RANA M/s.VISHWA CHEMICALS

Table 2.6 Water Consumption& wastewater generation details

Sr.

No. Purpose

Water Consumption, KLD Wastewater Generation, KLD

Existing Proposed Recycled

Water Total Existing Proposed Total

1.

Domestic

(Including

Flushing)

2.0 0.0 - 2.0 1.5 1.5 3.0

2. Gardening 1.0 1.0 - 2.0 0.0 0.0 0.0

3. Industrial

a Industrial

Processing 2.5 2.0 - 4.5 0.0 0.0 0.0

b. Industrial

cooling 0.5 0.2 - 0.7 0.0 0.0 0.0

c. Boiler 1.0 1.5 - 2.5 0.0 0.0 0.0

d.

Washing

(Equipment

+Floor

Washing)

0.05 0.35 0.35* 0.35 0.05 0.35 0.35*

e. Others 0.95 0.0 - 0.95 0.0 0.0 0.0

Total (Industrial) 5 4 - 9 0.0 0.0 0.0

Total (1+2+3) 8 5 - 13 1.5 1.5 3

Notes

*The water comes from washing process. it will be collected in the collection tank and stored water is

being reused in production process.  

Page 67: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

All figures a

2.1

The Total p

back-up wil

additional e

F

are express

10.3. Pow

power requi

ll be provide

electricity w

Sr. No

1

2

OR PROPOSED

ed in KLD.

wer requirem

rement will

ed from DG

ill be requir

o.

T

MANUFACTU

W

Figure 2

ment

be 50HP.T

G Sets havin

ed for propo

Table

Particular

Total Dema

Back-up

EIA REPORT

RING OF SYNT

Page 67

WATER BAL

2.5 Water B

The main so

ng capacity

osed projec

e 2.7 Powe

rs

and T

THETIC ORGAN

LANCE

Balance Dia

ource of pow

of 65 KVA

ct.

er requirem

Source

Torrent Pow

Ltd

D.G. set

NIC CHEMICAL

agram

wer is Torre

in case of p

ent

wer

t

LS

M/s.VISH

ent Power a

power failur

Powerin

KVA

50 HP

65

Reuse 

HWA CHEMI

ahmedabad.

e. Therefore

ICALS

. The

e, no

Page 68: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 68

B. S. RANA M/s.VISHWA CHEMICALS

2.10.4. Fuel requirement

Natural Gas being used as a fuel for Boiler.Diesal is being used in D.G set. Therefore, no additional

fuel will be required for proposed project. In rainy season / at night online heater is used to enhance the

temperature of water as per requirement.

Table 2.8 Fuel Consumption Details

Sr No

Details Stack Height (Mtr)

Fuel Used

Fuel Consumption

Rate

APCM

1 Boiler 9.0 Natural

Gas

300 M³/Day -

2.10.5. Manpower requirement

During Operation phase:

There is 2 nos. of people currently working and there will be around 3 people requirement for the

proposed new manunfaturing project.

Thus total man power will be 5 nos.

2.11. Emission, Effluent Generation & Waste Generation with Control System

2.11.1. Air Emission

Scrubber is installed for process gaseous emissions. Adequate stack heights are provided for flue gas

emissions from boiler. Details of stack are shown in below table:

Table 2.9 Details of Flue gas Stacks

Sr. No Stack attach to

Stack Height (Mtr)

Fuel Used

Fuel Consumption rate

APCM Pollutants

1. Boiler 9.0 Natural Gas

300 M3/day N.A. SPM < 150 mg/Nm3 SO2 < 100 ppm NOx < 50 ppm

Page 69: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

2.11.

Source of

The effluen

i) Pro

ii) Bo

iii) C

iv) P

2.11.3

 

 

 

Sr.No

F

Sr. No.

1.

P(apo

.2. Efflue

Effluent wa

nt is generat

ocessing

iler Blow Do

Cooling Tow

Plant Floor W

3. Efflue

TheprocessTank m

o.

OR PROPOSED

T

Stack Attached to

Process Sta(From reactand vacuumpump outlet)

ent generat

ater:

ted from so

own

wer Purging

Washing

ent Treatm

e effluent wis again. He

meter will be

MANUFACTU

Table 2.10

StackHeigh(m)

ack tors m

9.0

tion and its

urces:

ment Plan

ll generate nce only coprovided.

ETP Pr

Name

EIA REPORT

RING OF SYNT

Page 69

Details of

ht APC

Dip pipeand then

pass

s managem

n:

@ 0.35 KLollection cum

rocess Flow

THETIC ORGAN

Process ga

CM System

e in to watern

es through

chiller

ment

D as washim neutraliza

w Diagram

S

NIC CHEMICAL

as Stacks

Pol

r ----

ng water anation tank, N

Size (m)

LS

M/s.VISH

llutants

nd it will be Notch filter a

Ca

HWA CHEMI

reused in and Holding

apacity (m2)

ICALS

g

Page 70: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

SN

1

2

3

4

B. S. RANA

1

2

2.11.4

Details of H

Sr. No.

TypHawa

1 DisCoBa

2 Us

Solvdisti(MDMethe,acIPAacetexanHCI

2.11.

Sr.No

1.

2.

3.

F

Collec

Nutch

4. Details

Hazardous W

pe/Name ozardous

aste

scarded ontainers/ rrels/ Liners

ed oil

vent llation

DC, hanol,toluenc etone, ,ethyl tate,THF,nhne) 22%

.5. Detail

o Nam

.

.

. W

OR PROPOSED

ction cum N

h filter

s of the Haz

Waste gene

of Sourcgenera

s

From RMateriFinishepackin

From Gand otmachin

n

h

From P

From prbyprodu

ls of the No

T

me of Non

M.S, HDPE

Plas

Wooden, Met

s

MANUFACTU

Neutralizat

zardous W

eration, stor

Table 2.1

ce of ation

Raw als And ed product

ng

Gear box her nery

rocess

rocess uct

on- Hazardo

Table 2.12 N

Hazardous

E, Fiber dru

stic bags

tal, Plastic,

scrap

EIA REPORT

RING OF SYNT

Page 70

tion Tank

Waste

rage and dis

11 Hazardo

Categorand Scheduas per Rules.

33.1

5.1

dous Waste

Non- Hazar

s Waste

ums

Paper

THETIC ORGAN

sposal facil

ous Waste

ry

le

Qua(MT/

6.0

0.1

360

360

e

rdous Was

Quan

0.050 MT

0.005 MT

0.2 MT/M

NIC CHEMICAL

1 x1 x 1

1 x1 x 1

ity are show

Details

ntity /Annum)

ste Details

tity

T/Month

T/Month

Month

LS

M/s.VISH

wn in below

Dispos

CollectioStorageTranspodisposaregistereCollectioSale to r cler / remachine

Distillatio

Selling tovenders

Dispo

Sold to au

vendo

HWA CHEMI

1.0

1.0

table:

al Method

on, e, ortation andl by selling ed rec cler.on, Storageregisteredeuse for e lubricantson and

o Registered

osal

utorised

ors.

ICALS

to

e,

.

d

Page 71: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 71

B. S. RANA M/s.VISHWA CHEMICALS

2.11.6. Details of Solids Waste

During Operation Phase:

Total domestic waste will be generated during the operation phase is about 2.5 kg/day. The generated

waste that is bio-degradable waste (1.5 kg/day) and Non bio degradable waste (1.0 kg/day) will be

handed over to authorized vendors or sent to disposal site as per Solid Waste Management Rules,

2016.

2.12. Green Belt Development

Total 257 m2 area will be earmarked as green belt in premises. Suitable local plants of variety of

species are planted with adequate spacing.

2.13. Rain Water Harvesting

Rainwater harvesting is already provided in the project to conserve the storm water. Adequate care

has been taken while making efficient planning for percolation of rainwater into the sub- surface

without directly draining it outside and conserving maximum extent of rain water within the facility.

In order to allow percolation of rainwater into the ground, rainwater harvesting structures along the

boundary of the project has been provided to enhance the groundwater potential while raising the

water table in the area.

Run off from the proposed project site is calculated using rational formula:

Q= C x I x A

Q = Run-off in m3/hr

A = Catchment Area (sq.mt) C = Coefficient of Run-off

I = intensity of Rainfall in m/hr

Table 2.13 Annual Runoff

Land use type Area (m2) Coefficient runoff Rainfall (m)Quantity of rain

water (M3)

Roof top area 289 0.8 0.852 196.98

Paved Area 264.75 0.6 0.852 135.34

Green Area/Open

space 257

0.3

0.85265.69

Total 810.75 - 0.852 398.01

Harvested water is collected in underground tank with capacity of 15 m3 (5 m x 1.5 m x 2 m) & used for

gardening and firefighting purpose

Page 72: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 72

B. S. RANA M/s.VISHWA CHEMICALS

CHAPTER 3. DESCRIPTION OF ENVIRONMENT

3.1. Introduction

The baseline environmental qualities of various environmental components like air, noise, water, land,

flora and fauna and socio-economic form an important and integral part of any environmental study. The

baseline data forms the basis for predicting/assessing the environmental impacts of the proposed

project. The baseline environmental quality is assessed through field surveys within the impact zone as

well as secondary data for various components of the environment, viz., air, noise, water, land and

socio-economics.

M/s Vishwa Chemicals is proposing manufacturing of new products in existing facility at Plot No

4801/A/13, G.I.D.C. Ankleshwar, Dist: Bharuch .The coordinates of site are Latitude 21°61'80.22" N and

Longitude 73°03'81.92" E.

The present report comprises the data collected during the sampling period of three months, from

March’17 to May’17. Various environmental components were monitored and samples were analyzed.

The baseline quality of various components of the environment, viz. air, noise, water, land, biology,

meteorological and socio-economic is assessed within the impact zone of about 10 km around the

proposed site. Secondary data has also been incorporated from authentic sources viz.

Government/Non-Governmental Agencies, Universities, Indian Meteorological Department (IMD),

Ground Water Board etc. Various environmental components were monitored and samples analyzed.

3.2. Methodology

The methodology for conducting the baseline environmental survey has been obtained from the

guidelines provided in the “EIA Guidance Manual for Synthetic organic chemicals Industry” issued by the

Ministry of Environment and Forests (MoEF). Environmental attributes and frequency of monitoring is

given in Table 3.1.

Page 73: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 73

B. S. RANA M/s.VISHWA CHEMICALS

Table 3.1 Environmental Attributes & Frequency of Monitoring

Sr. No.

Attribute Parameters No. of

Sampling Locations

Frequency of Monitoring / Data Collection

1 Meteorology Wind speed & direction, temperature, relative humidity, rainfall

Project Site

Data collected from IMD.

2 Ambient air quality

PM10,PM2.5, SO2, NOX, CO, NH3, HC, Pb, Ozone, Benzene, Benzopyrene, Arsenic, Nickel.

8

24 hourly samples twice a week. CO and O3 8 hourly samples twice a week.

3 Noise levels Noise levels in dB (A) Leq.

8

At least one day in a season for day time and night time on a working & nonworking day.

4 Surface water quality

Physical, chemical and bacteriological parameters including pH, temperature, turbidity, magnesium hardness, total alkalinity, chloride, sulphates, fluoride, salinity, DO, BOD, COD, Heavy metals, Total coliforms, fecal coliforms,

3 Once in a season.

5 Groundwater quality

Physical, chemical and bacteriological parameters including pH, temperature, turbidity, magnesium hardness, total alkalinity, chloride, sulphates, fluoride, salinity, DO, BOD, COD, Heavy metals, Total coliforms, Fecal coliforms,

8 Once in a season.

6 Biological environment

Existing flora and fauna. Study Area

Through field visits and substantiated through secondary data sources.

8 Soil characteristics

Physical, chemical and biological parameters to assess agricultural and afforestation potential including pH, Permeability, Electrical conductivity, Nitrites, Phosphates, TPH, Fluorides, Heavy metals, SAR, Total hydrocarbons and cation exchange capacity.

8 Once in a season.

Page 74: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 74

B. S. RANA M/s.VISHWA CHEMICALS

Sr. No.

Attribute Parameters No. of

Sampling Locations

Frequency of Monitoring / Data Collection

9 Land use / Land Cover

Land use for different land use Classifications.

Study Area

Land use / Land Cover Analysis using satellite imaging and GIS Technique

10 Socio-economic

Environment

Socio-economic characteristics, labour force characteristics, population statistics existing amenities in the study area and quality of life.

Study Area

Based on field survey and data collected from Census of India

3.3. Topography

Ankleshwar is located near South side of Gujarat; therefore, most of the land is dry and arid in

nature. Moreover, the topography of Gujarat is characterized by the small hilly tracts especially

around the Rann of Kutch region. Thus spread over a vast area, the topography of Gujarat is

divided into 3 major regions, namely, (1) The Peninsular - the region, which is also known as

Saurashtra, is essentially a hilly tract. (2) The Kutch - It is a barren and rocky area containing

the great Rann. The Rann is further divided into the Greater Rann and the Lesser Rann. (3)

The mainland that extends from the Rann of Kutch and the Aravalli hills to the river

Damanganga. The Gujarat has six major drainage systems namely, (1) Narmada River, (2)

Sabarmati River, (3) Tapi, (4) Purna, (5) Damanganga, (6) Rukmavati, etc.

Page 75: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

(Source: Ope

Observatio

The

The

The

Ank

The

3.4. Geo

The geolo

As per the

Plains. Th

F

n series map,

ons:

ere is no dam

ere is no res

ere are appr

kleshwar city

e nearest vil

ology

gy of the a

e Geo-Env

e average

OR PROPOSED

Figure 3.

Survey of Ind

m reservoir

served fores

rox. 15 num

y is nearer

lage is Jital

area is und

vironmenta

elevation

MANUFACTU

.1 Topogra

dian)

r in the stud

st in the stu

mbers of villa

to the proje

li W Directio

derlain by r

l Regions

of the stud

EIA REPORT

RING OF SYNT

Page 75

aphic Map o

y area.

dy area.

ages in the

ect site.

on.

recently pla

of Gujarat

dy area is a

THETIC ORGAN

of the Stud

study area.

aced alluvi

t, the study

about 72 m

NIC CHEMICAL

dy Area

.

um, brown

y area falls

m above m

LS

M/s.VISH

n sand and

s in the No

mean sea le

HWA CHEMI

d millolite s

orthern Allu

evel. There

ICALS

sand.

uvial

e are

Page 76: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 76

B. S. RANA M/s.VISHWA CHEMICALS

no hills or hillocks in the study area. The entire area of the district is underlain by the basaltic

lava flows of upper Cretaceous to lower Eocene age. The shallow alluvial formation of Recent

age also occurs as narrow stretch along the major rivers flowing in the area. A map depicting

the hydrogeological features is shown in Figure 3.3. Central Ground Water Board monitors

water levels in the district.

Page 77: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

 

F

Fig

OR PROPOSED

igure 3.1: Gro

MANUFACTU

oundwater Le

EIA REPORT

RING OF SYNT

Page 77

evels in Ankle

THETIC ORGAN

eshwar Distri

NIC CHEMICAL

ict

LS

M/s.VISHHWA CHEMI

ICALS

Page 78: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 78

B. S. RANA M/s.VISHWA CHEMICALS

3.5. Geomorphology & Soil types

Soils may be defined as a thin layer of earth crust that serves as a natural medium for the

growth of plants. It is the unconsolidated mineral factors. Soils serve as a reservoir of nutrients

for plants and crops. It also provides mechanical anchorage and favorable filth.

The study area has alluvial sandy loamy soil locally known as Goradu (or Gorat) or Bhatta.

Goradu are nothing but alluvial soils of older origin while Bhatta soils are of recent origin

deposited chiefly along the banks of river. The soils of this group are very deep, well drained,

fine soils on very gently sloping alluvial plain with moderate erosion; associated with deep,

moderately well drained, calcareous, fine-loamy soils with moderate erosion.

3.6. Hydrogeology

The geology of the area is underlain by recently placed alluvium, brown sand and millolite sand.

As per the Geo-Environmental Regions of Gujarat, the study area falls in the Northern Alluvial

Plains.The average elevation of thestudyarea is about 72 m above mean sea level. There are

no hills or hillocks in thestudy area. The entire area of the district is underlain by the

basalticlavaflow so fupper Cretaceousto lower Eoceneage. The shallow alluvial formation of

Recentage also occurs as narrow stretcha long the major rivers flowing in the area.

3.7. Seismology

According to the seismic-zoning map of India, the project area falls in Zone III-Moderate Risk zone of

seismicity. The region has experienced quite of few earthquakes from past decades.

As per the Seismic Zone classification by IS 1893 (Part-I): 2002, Ankleshwar falls under

Seismic Zone III (Figure 3.2) which falls under Moderate Risk Zone.

Page 79: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

3.8. La

The basic

which differ

reliable acc

date inform

A systemat

present stu

analysis of

Used in the

ID, sensor

F

and use

purpose of

rent parts o

curate base

mation of ove

tic digital im

udy was foc

different ty

e land use

P6, LISS III

OR PROPOSED

f land use p

of land in an

eline inform

er a large g

mage interp

cused on d

pes of colou

map prepar

I) of 24 m re

MANUFACTU

Figure 3.

pattern and

n area are

ation for lan

eological ar

pretation ap

demarcating

ur registrati

ration is the

esolution.

EIA REPORT

RING OF SYNT

Page 79

.2 Seismic

d classificat

being utilize

nd use map

rea.

pproach wa

g boundarie

ons of land

e satellite Im

THETIC ORGAN

Zoning Ma

tion in an E

ed or not ut

pping, as it

as used to

es of differe

use/land c

magery of I

NIC CHEMICAL

ap of India

EIA study is

tilized. Rem

is a rapid

delineate t

ent land use

over units f

ndian Rem

LS

M/s.VISH

s to identify

mote sensin

method of

the land us

e/land cove

from satellit

ote Sensing

HWA CHEMI

y the mann

ng data prov

acquiring u

se classes.

er units from

e imagery.

g Satellite (

ICALS

ner in

vides

up-to-

The

m an

Data

(IRS-

Page 80: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

FOR PROPOSED

Figu

Figur

MANUFACTU

ure 3.5: La

re 3.3 Land

EIA REPORT

RING OF SYNT

Page 80

nd Use Cla

d Use Map o

THETIC ORGAN

assification

of the Stud

NIC CHEMICAL

n of Study A

dy Area (10

LS

M/s.VISH

Area

0 km Radia

HWA CHEMI

l Zone)

ICALS

Page 81: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 81

B. S. RANA M/s. vishwa chemicals

3.9. Meteorology

Observation on Meteorology: The meteorological parameters play a vital role in transport and

dispersion of pollutants in the atmosphere.

3.10. Climate: The climate of Gujarat is varied, as it is moist in the southern districts

and dry in the northern region. The Arabian Sea and the Gulf of Khambhat in the west

and the forest-covered hills in the east soften the rigours of climatic extremes,

consequently reducing the temperature and render the climate more pleasant and

healthy. The mean minimum temperature is about 20°C and means maximum

temperature is about 42°C. The normal annual rainfall over the district about 852 mm.

3.11. Relative Humidity: The mean monthly average of Relative Humidity values for

Ankleshwar station was recorded & Relative Humidity is generally high during the

period from March to May, 2017. The diurnal variations are least during monsoon

season. The diurnal variation is highest during summer period. Relative humidity is

maximum 76 % and minimum 28 %.

3.12. Cloudiness: The skies are heavily clouded to overcast during the south-west

monsoon season. In May and October, the clouding is moderate. Clear or very lightly

clouded skies are common in the rest of the year.

Winds: Wind data are as mentioned in table No. 3.2

Regional Meteorology:

https://www.worldweatheronline.com/Ankleshwar-weather-averages/gujarat/in.aspx

Table 3.2 Climatology (Year : 2016)

Month

Mean Daily Maximum

Temperature (0C)

Mean Daily Minimum

Temperature (0C)

Mean Daily Temperature

(0C)

Relative Humidity

(%)

Mean wind

Speed (Km/h)

Average Rainfall

(mm)

January 34 20 28 29 7.4 0

February 36 22 30 28 7.4 0

March 39 27 34 27 7.8 0.6

April 40 29 36 35 9.6 0.6

May 41 30 37 50 13 1.1

June 39 30 35 59 14.1 32.38

Page 82: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 82

B. S. RANA M/s. vishwa chemicals

July 34 27 31 73 12.3 357.05

August 31 26 29 82 11.6 330.32

September 33 26 31 76 7.8 62.31

October 35 24 31 60 6 26.83

November 35 21 29 28 6.5 0

December 34 20 28 28 7.2 0

(Source: IMD,Nashik)

Site Specific Micro-Meteorological Data of the Study Area:

Site specific climatic condition refers to weather conditions comprising of temperature, relative

humidity, wind speed, rainfall, cloud cover etc. This determines the baseline conditions and

probable impacts on environmental parameters with respect to the Project. The site specific

climatic conditions are given below in below table:

Table 3.3 Site Specific Meteorological data

Month

--

Temperature

(°C)

Relative

Humidity

(%)

Wind

Speed

(m/h)

Wind

Direction

(Blowing

from)

Rainfall

(mm)

March ‟17

Min 25 25 7.6 NE to SW

0.0 Max 39

Average 33

April ‟17

Min 27 36 10.3 NE to SW

0.0 Max 41

Average 35

May‟17

Min 30 52 9.6 NE to SW

0.0 Max 38

Average 35

Wind Rose

The wind direction is predominantly from SW to NE. Diurnal shift in wind direction was not observed during studyperiod. The wind rose diagram prepared from data collected at site is shown in Figure.

Page 83: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

 

 

 

 

 

 

 

FOR P

A

PROPOSED MA

Figu

EIAANUFACTURING

ure 3.4 Win

A REPORT G OF SYNTHET

Page 83

nd Rose (W

TIC ORGANIC C

Winter Seas

CHEMICALS

M/

on)

/s. vishwa chemicals

Page 84: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 84

B. S. RANA M/s. vishwa chemicals

 

Wind Speed Data of Study Area

Meteorological Parameter

Month March’17 April’17 May’17

Wind Speed (km/h)

Min. 0 0 0

Max. 10 12 5.03

Avg. 3.5 4 9.5

(Source: Online Surat Airport Station)

Ambient Air Quality

Reconnaissance: The quality of ambient air depends upon the background concentrations of

specific contaminants, the emission sources and meteorological conditions. The study on

baseline ambient air quality status in the project area is an essential and primary requirement

for assessing the impacts on air environment due to any proposed developmental activity.

The baseline studies on air environment include identification of specific air pollution

parameters expected to have significant impacts and assessing their existing levels in ambient

air within the impact zone. To assess the baseline status of ambient air quality in the study

area, monitoring is undertaken to ascertain the baseline pollutant concentrations in ambient air.

Methodology for air Monitoring: AAQM was carried out and AAQM locations were monitored

on 24 hourly average bases twice in a week as per guidelines of CPCB and NAAQS.

Theconventional and project specific parameters such as particulate matter PM10 (size less

than 10 µm), particulate matter PM2.5 (size less than 2.5µm), Sulphur Dioxide (SO2) & Oxides

of Nitrogen (NOx) were monitored.

Selection of Stations for Sampling: For EIA, the purpose is to ascertain the baseline

pollutant concentrations in ambient air. Accordingly, the criterion can be selected to ascertain

quality of air on human settlements or environmentally sensitive areas if any located in the 10

km radius study area.

The locations for AAQM study were selected within the 10 km radius of the proposed plant

installation. Ambient air quality was monitored on 8 locations to generate representative

ambient air quality data.

Page 85: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

(Source: G

Sample

AAQ1

AAQ2

AAQ3

AAQ4

AAQ5

AAQ6

FOR P

A

Google Image

Figure 3

ID Mon

Proje

2 Gadk

3 Dadh

4 Jitali

5 Kond

6 Kosa

PROPOSED MA

e)

.5 Google

Tabl

nitoring Lo

ect Site

khol patiya

hal inam

dh

amdi

EIAANUFACTURING

Image show

le 3.4 Amb

ocation

0

4

9

2

5

3

A REPORT G OF SYNTHET

Page 85

wing Ambi

ient Air Qu

Distanc

Direction

project

0

4.03 NNE 9.92 ESE

2.90 SE

5.58 NNE

3.43 WSW

TIC ORGANIC C

ient Air Mo

uality Monit

ce &

n from

site

CHEMICALS

M/

onitoring Lo

toring Loca

Jus

I

R

Re

Re

R

R

/s. vishwa c

ocations

ations

stification

ndustrial

Residential

esidential

esidential

Residential

Residential

hemicals

Page 86: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 86

B. S. RANA M/s. vishwa chemicals

AAQ7 Kapodra 3.66 W Residential

AAQ8 Piraman 4.32 NNW Residential

AAQ9 motali 3.34 NE Residential

(Source: Analysis during study period, GCI)

Table 3.5: Results for Location of AAQ stations

Parameters ParticularLocation

A1 A2 A3 A4 A5 A6 A7 A8 A9 PM 10 in μg/m3

Max. 79 89 90 92 90 92 83 79 88 Min. 71 75 76 76 71 75 75 71 76

Mean 75 79.29 76.52 84 80.5 80.62 82.15 75 82.02PM 2.5 in μg/m3

Max. 41 42 43 43 40 41 41 40 43 Min. 33 33 34 34 31 32 33 31 34

Mean 37.12 36 38.83 38.5 35.5 36.20 36.41 35.5 38.79SO2 in μg/m3

Max. 34 33 31 34 32 34 32 31 32 Min. 26 26 20 26 24 26 21 26 19

Mean 30 28.81 26.42 30 28 29.35 27.75 23.5 27.50NOx in μg/m3

Max. 48 47 44 48 44 42 48 44 48 Min. 39 39 39 36 38 38 36 38 39

Mean 43.33 42.54 41.03 42 41 40.44 40.86 41 43.27

VOC in μg/m3

Max. 4.5 3.8 3.2 3.9 3.2 2.4 3.9 3.2 3.7 Min. 2.5 2.1 1.8 2.1 2.7 1 2.9 2.1 2.7

Mean 3.55 3.0 2.51 2.55 2.95 1.79 3.25 2.64 3.6 HCl in μg/m3

Max. 8 9 8 9 8 8 9 8 6 Min. 4 1 6 5 5 3 5 3 2

Mean 6.41 6.80 7.20 7 6.5 6.42 7.10 5.5 6.16

National Ambient Air Quality Standards and Methods of Measurement

S. No.

Pollutants Time

Weighted Average

National Ambient Air Quality Standards (NAAQS)

Industrial, Residential, Rural and other area

Ecologically Sensitive

Area

Methods of measurement

1 SO2 (µg/m3) 24 hours 80 80 Improved West and

Gaeke method.

2 NOx (µg/m3) 24 hours 80 80 Modified Jacob

&Hochheiser (Sodium Arsenite).

3 PM10 (µg/m3) 24 hours 100 100 Gravimetric Method

4 PM2.5 (µg/m3) 24 hours 60 60 Gravimetric Method

5 CO (mg/m3) 8 hours 2 2 Non Dispersive Infra Red

Spectroscopy

6 Ammonia 24 hours 400 400 Indophenol Blue Method

Page 87: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 87

B. S. RANA M/s. vishwa chemicals

(µg/m3)

7 Ozone (µg/m3) 8 hours 100 100 UV Photometric

Chemical Method

8 Lead (µg/m3) 24 hours 1.0 1.0 AAS

9 Benzopyrene

(mg/m3) Annual 1.0 1.0 Gas Chromatography

(Source: http://cpcb.nic.in/National_Ambient_Air_Quality_Standards.php)

Observations on Ambient Air Quality:

It could be noticed from the results, the air quality of the study area is within NAAQS November 2009, in µg/m3

Values of PM10 in the background environment ranged from 71 µg/m3 to 92 µg/m3. Average

values of PM10 found to be around 81.5 µg/m3 was observed to be within the permissible limit of

100 µg/m3.

The values of PM2.5 range from 32 µg/m3 to 43 µg/m3. The average value of PM2.5 was 37.5

µg/m3 and found to be within NAAQ standard of 60 µg/m3.

The values of Sulphur dioxide levels were found to vary from 19 µg/m3 to 34 µg/m3. The

average values of SO2 26.5 µg/m3were found to be well within NAAQ standard of 80µg/m3. The

value of Nitrogen oxide ranged from 35 µg/m3 to 48 µg/m3. The average values of oxides of

Nitrogen 41.5 µg/m3were observed to be well within the NAAQ standard of 80µg/m3. The value

of VOC ranged from 1 µg/m3 to 3.9 µg/m3.

The Value of HCL ranged from 1 µg/m3 to 9 µg/m3.

Noise Environment

Noise can be defined as an unwanted sound. It interferes with speech and hearing. If intense

enough, it can damage hearing, or is otherwise irritating. The definition of noise as unwanted

sound implies that it has an adverse effect on human beings and their environment. Noise can

also disturb natural wildlife and ecological system.

The objective of the noise pollution survey in the study area is to identify existing noise sources

and to measure background noise levels.

Reconnaissance

In order to measure the existing noise sources and to identify the background noise levels, the

noise pollution survey around the proposed site was carried out. The collection of baseline noise

environment data included Identification of noise sources and to measure background noise

levels and Measurement of noise levels due to transportation and other local activity.

Methodology for Noise Monitoring

Page 88: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

Noise stan

2000 Not

ambient n

twice a w

location d

Noise Mo

A total of

monitoring

(Source: G

FOR P

A

ndards have

ified by Mi

noise standa

week during

uring day ti

onitoring Lo

9 locations

g locations a

Figure 3.6

Google Image

PROPOSED MA

e been des

nistry of E

ards are pr

g study per

me and nig

ocations

s were iden

are given in

6 Google Im

e)

EIAANUFACTURING

ignated as

nvironment

resented in

riod. The m

ht time.

tified for am

n Table 3.8.

mage show

A REPORT G OF SYNTHET

Page 88

per the Noi

t and Fores

Equivalent

measureme

mbient nois

.

wing Ambie

TIC ORGANIC C

ise Pollution

sts, New D

t noise leve

nts were c

e monitorin

ent Noise M

CHEMICALS

M/

n (Regulatio

Delhi, Febru

els (Leq.) ha

carried out

ng in the stu

Monitoring L

/s. vishwa c

on & Contro

uary 14, 20

ave been m

at each m

udy area. T

Locations

hemicals

ol) Rules,

000. The

measured

monitoring

The noise

Page 89: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 89

B. S. RANA M/s. vishwa chemicals

Table 3.5 Ambient Noise Quality Monitoring Locations

Sample ID Monitoring Location

Distance &

Direction from

project site

Justification

N1 Project Site 0 Industrial

N2 Gadkhol patiya 4.03 NNE Residential

N3 Dadhal inam 9.92 ESE Residential

N4 Jitali 2.90 SE Residential

N5 Kondh 5.58 NNE Residential

N6 Kosamdi 3.43 WSW Residential

N7 Kapodrsa 3.66 W Residential

N8 Piraman 4.32 NNW Residential

N9 motali 3.34 NE Residential

Table 3.6 Ambient Noise Quality in the Study Area

Sr.

No.

Name of

the

Location

Representation

Category

of

Area/zone

Day Time

In Leq

dB (A)

CPCB

standards

in respect

of Noise

(Day time)

Night

Time

In Leq

dB (A)

CPCB

standards in

respect of

Noise

(Nighttime)

1 Project Site 0 Industrial 53-74 75 45-55 55

2 Gadkhol patiya

4.03 NNE Residential 55-74 75 43-55 55

3 Dadhal inam

9.92 ESE Residential 46-55 55 40-53 55

4 Jitali 2.90 SE Residential 51-55 55 41-45 45

5 Kondh 5.58 NNE Residential 55- 74 75 45-55 55

6 Kosamdi

3.43 WSW Residential 53-75 75

43-54 55

7 Kapodra 3.66 W Residential 46-58 75 32-45 45

8 Piraman 4.32 NNW Residential 53-75 75 43-55 55

9 motali 3.34 NE Residential 51-53 55 32-45 45

Page 90: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 90

B. S. RANA M/s. vishwa chemicals

Table 3.7 Applicable Noise Standards

Area Code Category of Area Limit in dB (A) Leq

Day Time Night Time

A Industrial area 75 70

B Commercial area 65 55

C Residential area 55 45

D Silence zone 50 40

(Source: Noise Pollution Rules, 2000)

Note:

Day time is reckoned in between 6 am and 10 pm.

Night time reckoned in between 10 pm and 6 am.

Silence zone is defined as areas up to 10 meters around such premises as hospitals,

education, institutions and courts. The silence zones are to be declared by the

Component Authority.

Mixed categories of areas should be declared as one of the four above-mentioned

categories by the Component Authority and the corresponding standard shall apply.

(Source: The Noise Pollution (Regulation & Control) Rules, 2000)

Observation on Ambient Noise Quality:

Day Time: The noise levels varied in the study area during day time from 42dB (A) Leq to 70

dB (A) Leq and at the project site (industrial area) noise observed was 66 dB (A) Leq. The day

time noise level in the study area is within the noise Limits.

Night Time: The night time noise level in the study area is in the range of 46dB (A) Leq to 68

dB (A) Leq. In industrial site, it was 58-62dB (A) Leq. The night time noise was also within

stipulated standards of CPCB

3.12. Water Quality

Reconnaissance Survey

Reconnaissance survey has been done for water quality monitoring in the Study Area. The

baseline water quality of ground water / surface water in the region is obtained by collecting

sample from villages in the area considering the 5 km radius for the baseline study.

Methodology of Monitoring

Page 91: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

In order tlocations Ground wcharactericonsidere

The samp

Analysis o

Ground W

Ground w

a number

(Source: G

FOR P

A

to establishwere selec

water sampzation of wd as per the

ples collect

of Water and

Water Quali

water sample

of physico-

Figure 3.7

Google Earth

PROPOSED MA

h the basected based

ples were water qualie utilization

ted were p

d Waste Wa

ity:

es were col

-chemical p

7 Google Im

Image)

EIAANUFACTURING

line water d on availacollected frity. Selectiopattern of t

preserved, s

ater.

lected from

arameters.

mage show

A REPORT G OF SYNTHET

Page 91

quality, groability, follorom the idon of surfathe villagers

stored and

m 6 locations

wing Groun

TIC ORGANIC C

ound waterowing standdentified haace water s for domes

analyzed

s during the

d Water Mo

CHEMICALS

M/

r and surfadard normsand pumps

sampling lstic / drinkin

as per sta

e study peri

onitoring L

/s. vishwa c

ace water s and requ

s and wellslocations hg purposes

andards me

od and ana

Locations

hemicals

sampling uirement. s for the has been s.

ethods of

alyzed for

Page 92: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 92

B. S. RANA M/s. vishwa chemicals

Table 3.8 Ground Water sampling locations in the study area

Sr. No. Name of Village Type of Sample Distance (km) &

Direction

GW1 Project Site Ground Water 0

GW2 Jitali Ground Water 2.90 SE

GW3 Kosamdi Ground Water 3.43 WSW

GW4 Kapodrsa Ground Water 3.66 W

GW5  Piraman Ground Water 4.32 NNW

GW6  Motali Ground Water 3.34 NE

Table 3.11: Ground water monitoring Analysis Reports

Parameter Unit GW1 GW2 GW3 GW4 GW5 GW6

Colour Hazen <1 <1 <1 <1 <1 <1

Turbidity NTU <5 <5 <5 <5 <5 <5

pH - 7.58 7.08 8.15 7.09 7.80 7.02

Electric Conductivity

µS/cm 580 1350 3950 1200 2850 1500

TDS mg/l 350 802 1982 721 1786 894

Hardness mg/l 250 190 650 270 750 250

Total Alkalinity mg/l 100 758 432 368 348 348

Calcium mg/l 36 119 410 102 321 184

Magnesium mg/l 21 72 439 153 429 49

Chloride mg/l 84 112 990 120 541 119

Sulphate mg/l 40 157 220 151 72 62

Ieon (Fe) mg/l  0.1 0.2 0.4 0.2 0.2 0.3

Flouide (F) mg/l  0.01 0.01 0.06 0.01 0.02 0.01

Sodium (Na) mg/l  80 110 295 100 280 120

Potassium (K) mg/l  5 15 45 12 40 20

Nitrte (NO2) mg/l  ND ND ND ND ND ND

Chromium (Cr+6) mg/l  ND ND ND ND ND ND

Page 93: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 93

B. S. RANA M/s. vishwa chemicals

Total Coliform MPN/ 100 L

Absent Absent Absent Absent Absent  Absent

Observation of ground water monitoring results:

All the samples were colorless meeting desirable norms(<5Hazen).

All the samples meet the desirable standards (pH ranges from 7.02 to 7.8).

TDS in samples ranges from 350 mg/L (Project site) to 1982 mg/L(Motali).All the

samples meet the permissible limit of 2000 mg/L.

Total Hardness in the water ranges from 190 mg/L(Jitali ) to 750 mg/L(Piraman ).

Calcium content in the water ranges from 36 mg/L (Project site ) to

321 mg/L

Magnesium content in the water ranges from 21.00 mg/L (Parojectsite) to 439.0

mg/L(motali), all the samples meet the permissible limit of 100 mg/L.

Sulfate content in the water ranges from 24 mg/L (jitali) to 157 mg/L (motali). All the

samples meet the permissible limit of400 mg/Lfor drinking water.

Total alkalinity in the water samples ranges from 100 mg/L(projectsite) to 758 mg/L

(jitali).

Chlorides range from 84 mg/L (project site)to 997 mg/L(motali).Which are below

permissible limits(1000mg/L).

Hence, it can be observed that ground water qualities in terms of various essential

and desirable characteristic sare found with in the limits specified by IS 10500:2012

Page 94: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

Surface Wthe study

Figure

(Source: Go

Sr. N

SW

SW

SW

FOR P

A

Water Qualy period an

e 3.8 Goog

oogle Image)

No. Nam

W1 Ga

W2

W3

Param

pH

Electric Co

TD

PROPOSED MA

lity: Surfacd analyzed

gle Image s

Tabl

me of Villa

adkhol Patiy

Kosamadi

Motali

Table 3

meter

H

onductivity

DS

EIAANUFACTURING

e water samd for a num

showing Su

e 3.12 Surf

age T

ya

3.14 Surfac

Un

µS/

m

A REPORT G OF SYNTHET

Page 94

mples wermber of phy

urface Wate

face Water

Type of Sam

Surface Wa

Surface Wa

Surface Wa

ce water An

nit S

-

/cm 1

mg/l

TIC ORGANIC C

re collectedysico-chem

er Monitori

r Sampling

mple

ater

ater

ater

nalysis Rep

SW1

7.02

1250

640

CHEMICALS

M/

d from 3 locmical param

ing Locatio

Locations

DistancDire

4.03

3.43

3.3

ports

SW2

7.12

1100

566

/s. vishwa c

cations dumeters.

ons

s

ce (km) & ection

3 NNE

3 WSW

34 NE

SW3

7.15

2020

1020

hemicals

ring

3

0

0

Page 95: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 95

B. S. RANA M/s. vishwa chemicals

Hardness mg/l 133 189 259

Total Alkalinity mg/l 63 126 166

Calcium mg/l 78 129 93

Magnesium mg/l 70 59 183

Chloride mg/l 62 109 187

Sulphate mg/l 27 16 24 Ieon (Fe) mg/l 0.1 0.08 0.18

Flouide (F) mg/l 0.01 0.01 0.02

Sodium (Na) mg/l 80 70 130

Potassium (K) mg/l 5 15

Nitrte (NO2) mg/l ND ND ND

Chromium (Cr+6) mg/l ND ND ND

Phenolic Coumpound mg/l <0.001 <0.001 <0.001 

Dissololved Oxygen mg/l 8.2 8.5 8.0

Chemical Oxygen Demand (COD)

mg/l 9 6 18

Bio Chemical Oxygen Demand (BOD 27oC 3 days)

mg/l 6 3 6

Total Coliform MPN/ 100 L

Absent Absent Absent

Page 96: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 96

B. S. RANA M/s. vishwa chemicals

Table 3.14 Standard Water Quality Criteria

Class of

Water Designated best use Criteria

A Drinking Water Source

without conventional

treatment but after

disinfection

Total Coliforms Organism MPN/100ml shall be

50 or less

pH between 6.5 and 8.5

Dissolved Oxygen 6mg/l or more

Biochemical Oxygen Demand 5 days 20°C 2mg/l

or less

B Outdoor bathing (Organized) Total Coliforms Organism MPN/100ml shall be

500 or less pH between 6.5 and 8.5

Dissolved Oxygen 5mg/l or more

Biochemical Oxygen Demand 5 days 20°C 3mg/l

or less

C Drinking water source after

conventional treatment and

disinfection

Total Coliforms Organism MPN/100ml shall be

5000 or less pH between 6 to 9

Dissolved Oxygen 4mg/l or more

Biochemical Oxygen Demand 5 days 20°C 3mg/l

or less

D Propagation of Wild life and

Fisheries

pH between 6.5 to 8.5

Dissolved Oxygen 4mg/l or more

Free Ammonia (as N) 1.2 mg/l or less

E Irrigation, Industrial Cooling,

Controlled Waste disposal

pH betwwn 6.0 to 8.5

Electrical Conductivity at 25°C micro mhos/cm

Max.2250

Sodium absorption Ratio Max. 26

Boron Max. 2 mg/L

(Source: http://cpcb.nic.in/Water_Quality_Criteria.php)

Observation on Surface water Quality:

Surface water samples analysed during the study period indicate that All parameters are found within the prescribed limits

Page 97: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 97

B. S. RANA M/s. vishwa chemicals

3.13. Soil Environment

Soil is our most important natural resource and a natural resource is anything that comes from the

earth and is used by us. We depend on the soil for food, clothing, shelter, minerals, clay & water. Soil

is the seat of many macro and micro flora like algae, fungi, earthworms, bacteria etc. These are very

beneficial in promoting soil reactions and decomposing the organic matter by which essential

nutrients for plants are liberated. Most of the soil is made-up of two main parts:

Tiny bits of mineral particles which come from larger rocks, and humus, which is dark brown in color

and consists of decaying remains of plants and animals.

Soil also contains water, air and living organisms, such as fungi, bacteria, earthworms, roundworms,

insects, etc. Actually more living organisms live in the soil than above it.

For general characterization of soil a few random samples from the study area to the depth of about

15-cm may sufficient. Deeper soil samples may be needed only for the study of soil profile.

Methodology

The soil samples were collected from 8 selected locations during monitoring season. The samples

collected were homogeneous representative of each sampling location. At random sub-locations

were identified at each location and soil samples were collected from 5 to 15 cm below the surface. It

was uniformly mixed before homogenizing the soil samples. The samples about 500-gms were

packed in polythene bags labeled in the field with location, number and sent to the laboratory for the

analysis of physicochemical parameters.

Soil Sampling Locations

Soil sampling was conducted once during the study period of monitoring season. 8 soil samples were

collected from selected locations in the vicinity of the proposed project. For studying soil quality

environment in the study area, sampling locations were selected to assess the existing soil conditions

in and around the existing plant area representing various land use conditions. The homogenized

samples were analyzed for physicochemical characteristics.

Analysis of Soil Samples

The soil samples were examined for various physicochemical parameters, to determine the existing

soil characteristics of the study area.

Page 98: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

(Source: G

Sa

FOR

A

Fig

Google Image

ample ID

S1

S2 S3 S4 S5 S6 S7 S8 S9

PROPOSED M

ure 3.9 Goo

e)

Sa

Project S

Gadkhol

Dadhal in

Jitali

Kondh

Kosamdi

Kapodrsa

Piraman

motali

EIMANUFACTURIN

ogle Image

Table 3.1

ampling Lo

ite

patiya

nam

a

A REPORT NG OF SYNTHE

Page 98

e showing

15 -Soil Sa

ocation

ETIC ORGANIC

Soil Monito

mpling Loc

Dist

0 4.03

9.92

2.90

5.58

3.43

3.66

4.32

3.34

CHEMICALS

M

oring Loca

cations

tance & DiProjec

NNE ESE

SE

NNE

WSW

W

NNW

NE

M/s. vishwa

ations

irection frct Site

chemicals

rom

Page 99: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 99

B. S. RANA M/s. vishwa chemicals

Table 3.16 Table: Physiochemical Characteristics of Soil

Para Meter

Unit SS1 SS2 SS3 SS4 SS5 SS6 SS7 SS8 SS9

Moisture Contain in %

% 6 6.9 6.50 13.22 7.50 8.20 5.9 10.70 11.90

pH - 7.8 7.1 7.7 7.6 7.5 7.4 8.1 7.5 7.2

Magnesium mg/ kg

0.231 0.270 0.153 0.251 0.270 0.288 0.271 0.160 0.156

Sodium mg/ kg

0.253 0.225 0.363 0.345 0.225 0.246 0.198 0.315 0.332

Potassium mg/ kg

0.079 0.036 0.128 0.065 0.036 0.052 0.130

0.069 0.089

Phosphate mg/ kg

0.0008 0.0184 0.0059 0.0073 0.0059 0.0061 0.0012 0.0007 0.0009

Nickel % 0.055 BDL 0.038 0.037 0.038 0.049 0.054 0.030 0.028

Zinc mg/ kg

0.031 BDL 0.253 0.022 0.031 0.018 0.015 0.0110 0.0117

Interpretation of Analytical Results & Conclusions

It is observed from the analysis report that;

Particle Size: Particle sizes of the different constituents (clay, silt, sand and gravel)

control the porosity and water holding characteristic of the soil. Clay (size < 0,002mm)

amount in the soil samples is 14% to 15% and Sand (size 0.002 to 0.075mm) in the soil

sample is 68% to 70%. All the samples in the study area are free of gravel (size >

4.75mm). Analysis shows it is sandy soil with less water holding capacity

3.14. Biological Environment.

Biological resources of the area are an indicateor of quality/health of the environment of the area.

Therefore, the study of the same is an omporant aspect to minimize the distribution due to the

intervention of the proposed project to accept in a sustainable approach. To achieve the goal, EIA

study was conducted during the month of March to May, 2017 to cover all the biological parameters.

Nature supports a great variety of living beings under a structural and functional unit called

ecosystem. In any natural ecosystem, there are several components which exist in harmony and

survive only by interdependence. These components may be either biotic or abiotic. Developmental

Page 100: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 100 B. S. RANA M/s. vishwa chemicals

activities often have great impacts on the biodiversity both ecosystems as well as species level.

Present study has been carried out to inventories the biodiversity exist in the study area of present

project, to evaluate the possible impacts on biodiversity due to project activities and suggest effective

mitigation measures against the negative impacts.

The ecological study was undertaken to understand the present status of ecosystem of the area, to

predict changes as a result of proposed activities and to suggest measures for maintaining the

conditions. This carried through primary survey and secondary data collected from various

Government agencies like Forest Department, Agriculture Department, Scientific literatures etc.

For assessment of flora and fauna, study team randomly sampled in 5.0 km radius of the project site.

We collected the data on flora and fauna in each sample plot of 10X10 mtr quadrate. Total 30

quadrates were laid in the study area in order to rapidly study the fauna and flora of the region. No

national Park / Wildlife Sanctuary / Reserve Forest cover was found in 5 Km radius of the project

area. A detailed survey report with the methodology and study is as given in the following section.

a) Flora

Dominant families of plants recorded in the study area are Caesalpiniaceae, Mimosaceae, Euphorbiaceae, Cucurbitaceae, Papilionaceae. The area showed overall 71 plant species from 60 genera and 32 families the list of dominant flora observed in study area given in below Table

Table 3.17 List of Flora in the Study Area

SN Scientific Name Local Name Family

Trees

1 Acacia nilotica Babul Ceasalpiniaceae

2 Albizilebbeck Siras Mimosaceae

3 Azadirachtaindica Neem Balanitaceae

4 Bombaxceiba Shimdo Bombacaceae

5 Bauhinia racemosa - Papilionaceae

6 Buteamonosperma Chola Papilionaceae

7 Cassia fistula Garmalo Ceasalpiniaceae

8 Carica papaya Papaya Caricaeae

9 Cassia siamea Kashid Caesalpiniaceae

10 Casuarinaequisetifolia Sharu Casuarinaceae

11 Coldeniaprocumbens - Ehretiaceae

12 Derris indica - Papilionaceae

13 Eucalyptus species Nilgiri Myrtaceae

14 Ficusbengalensis Vad Moraceae

Page 101: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 101 B. S. RANA M/s. vishwa chemicals

15 Ficusreligiosa Pipdo Moraceae

16 Madhucaindica Mahudo Asteraceae

17 Mangiferaindica Amba Sapindaceae

18 Manilkarahexandra - Sapotaceae

19 Maytenusemarginata vikdo Meliaceae

20 Prosopis cineraria Khijdo,Samdo Mimosaceae

21 Samaneasaman RatoSarasdo Mimosaceae

22 Syzygiumcumunii Jambudo Myrtaceae

23 Tamarindusindica Amli Ceasalpiniaceae

Shrubs

1 Abelmoschusesculentus Bhindi Malvaceae

2 Abubutilonindicum* Khapat Malvaceae

3 Baliospermummentanum Jamalgota ( Danti) Euphorbiaceae

4 Balntiesaegyptiaca Ingorie Balanitaceae

5 Calotropisgigantea Akdo Asclepiadaceae

6 Calotropisprocera Akdo Salvadoraceae

7 Cassia italica Garmalo Ceasalpiniaceae

8 Cordiagharaf - Gentianaceae

9 Cressacretica - Convulvulaceae

10 Crotolariaburhia - Papilionaceae

11 Indigoferalinnaei - Papilionaceae

12 Indigoferaoblongifolia - Papilionaceae

13 Launaeaprocumbens - Asteraceae

14 ProsopisChilensis Khijdo, Mimosaceae

15 Riveahypocrateriformis - Convulvulaceae

16 Vernoniacinerarea sadori Asteraceae

17 Zizyphusnummularia Chanibor Celastraceae

Herbs

1. Alysicarpus sp. - Papilionaceae

2. Capparis decidua Bare Caper Capparaceae

3. Capparissepiaria - Capparaceae

4. Cardiospermumhalicacabum - Rhamnaceae

5. Cassia auriculata Aval Ceasalpiniaceae

6. Cassia tora Kunvandio Ceasalpiniaceae

7. Cleome viscosa Pilitalvani Capparaceae

8. Corchorusaestuans - Malvaceae

Page 102: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 102 B. S. RANA M/s. vishwa chemicals

9. Corchorusfascicularis - Tiliaceae

10. Corchorusolitorius - Tiliaceae

11. Corchorus sp. - Tiliaceae

12. Datura metal Dhanturo Convulvulaceae

13. Ecliptaprostrata - Asteraceae

14. Enicostemahyssopifolium - Asclepiadaceae

15. Evolvulusalsinoides - Convulvulaceae 16. Gilnuslotoides Lotus Sweetjuice, Cucurbitaceae 17. Grangeamaderaspatana - Asteraceae 18. Melilotus alba - Papilionaceae 19. Melilotusindica - Papilionaceae 20. Neptuniaoleracea - Mimosaceae 21. Rhynchosia minima - Papilionaceae 22. Sphaeranthusindicus - Asteraceae 23. Tephrosiapurpurea Sharpunkha Papilionaceae 24. Tribulusterrestris Ghokhru Tiliaceae 25. Tridexprocumbens PardesiBhangaro, Asteraceae 26. Trigonellaocculta - Papilionaceae 27. Xanthium strumarium Godrian Asteraceae

Climbers

1. Cocciniagrandis Tindora Mimosaceae

2. Cocculushirsutus PatalaGarudi Menispermaceae

3. Mukiamaderaspatana - Cucurbitaceae

4. Convolvulus microphyllus - Boraginaceae

5. Trichosanthescucumerina - Cucurbitaceae

b) Fauna:

Methodology

Field observations of fauna were carried out. The commonly available mammals, amphibians, reptiles, butterflies, dragonflies and damselflies within 10 km surroundings were enumerated. List of Dominant Fauna Recorded in Study area are Given in below Table

Page 103: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 103 B. S. RANA M/s. vishwa chemicals

Table 3.18 : List of Dominant Fauna Recorded in Study Area

No. Common Name Scientific Name Scheduled Mammals

1. Common dog Canis lupus familiaris Not enlisted 2. Common cat Felissilvestriscatus Not enlisted 3. Squirrel Funambuluspalmarum Sch-IV 4. Domestic buffalo Bubalusbubalis Not enlisted 5. Cow Bostaurus Not enlisted 6. Goat Capra hircusaegagrus Not enlisted 7. Rat Rattusrattus Sch-V 8. Indian grey mongoose Herpestesedwardsii Sch – II Reptiles 1. Common garden lizard Calotesversicolor Not enlisted 2. Rock lizard Psmmophilusblanfordanus Not enlisted

Avifauna 1. Black kite Milvusmigrans Not enlisted 2. Blue rock pigeon Columba livia Sch – IV 3. Cattle egret Bubulcus ibis Sch – IV 4. Common swallow Hirundsrustica Sch – IV 5. Crow pheasant Centropussinensis Sch – IV 6. House crow Corvussplendens Sch – V 7. House sparrow Passer domesticus Sch – IV 8. House swift Apusaffinus Sch – IV 9. Indian black drongo Dicrurusadsimilis Sch – IV 10. Indian myna Acridotherestristis Sch – IV 11. Koel Eudynamysscolopacea Sch – IV 12. Little swift Apusaffinis Sch – IV 13. Magpie robin Copsychussaularis Sch – IV 14. Purple sunbird Nactariniaasiatica Sch – IV 15. Red wattled lapwing Vanellusindicus Sch – IV 16. Roseringed parakeet Paittaculakrameri Sch – IV 17. Redvented bulbul Pycronotuscafer Sch – IV 18. Small blue kingfisher Alcedoatthis Sch – IV 19. Small green bee eater Meropsorientalis Sch – IV 20. Jungle babbler Turdoidesstriata Sch – IV 21. Common babbler Turdoidescaudatus Sch – IV 22. Indian roller Coraciasbenghalensis Sch – IV

Butterflies 1. Blue mormon Papiliopolymnestor Not enlisted 2. Blue pansy Junoniaorithya Not enlisted 3. Common sailor Neptishylas Not enlisted 4. Common evening brown Melanitisleda Not enlisted 5. Common grass yellow Euremahecabe Not enlisted 6. Common Indian crow Euploea core Sch – IV 7. Common leopard Phalantaphalantha Not enlisted 8. Common mormon Papiliopolytes Not enlisted

Page 104: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 104 B. S. RANA M/s. vishwa chemicals

There are no protected areas in the vicinity of the project area. There are also no monuments of

historical and archaeological importance within the study area.

c) Aquatic

Preamble

Plankton is an important component of ecosystem, which responds to ecosystem alterations

rather rapidly. It is due to the fact that planktonic organisms, which react to different types of

water pollution, play a key role in turnover of organic matter and energy through the ecosystem.

This reaction is very rapid because of relatively short lifetime and high reproduction rates of the

organisms.

Water sample within 10km periphery were collected fromSabarmatiRiver. To enumerate

phytoplankton, unfiltered surface waters were collected from the water bodies. Phytoplankton

samples were immediately fixed after collection in Lugols Iodine solution so as to prevent

adverse effects of light and temperature which might cause rapid decay of organisms. Further

microscopic analysis was undertaken in laboratory. For zooplankton, desired volumes of water

were filtered through plankton net having mesh size of 75µ to represent all the available groups.

Drop count method for the analysis were followed, as prescribed in APHA (1995).

Phytoplankton

Amongst 5 groups, Chlorophyceae dominated over Cyanophyceae and Bacillariophyceae.

Euglenophyceae and Pyrophyceae were rarely present. Genera like, Anabaena sp., Phormidium,

&Oscillatoria from cyanophyceae and Spirogyra, Chlorella, Ankistrodesmus, Pediastrum,

Scenedesmus, Microspora, Cosmarium, Oedogonium, Sorastrum and Ulothrix from

Chlorophyceaewere dominant.

Source: Ecological evaluation of water of Sabarmati, Ahmedabad Kiran Prajapati

9. Gray pansy Junoniaatlites Not enlisted 10. Lime butterfly Papiliodemoleus Not enlisted 11. Plain tiger Danauschrysippus Not enlisted 12. Common wanderer Pareroniavaleria Not enlisted 13. Common emigrant Catopsiliapomona Not enlisted

Dragonflies 1. Red marsh trotter Trameabasilaris Not enlisted 2. Common clubtail Ictinogomphusrapax Not enlisted

Page 105: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 105 B. S. RANA M/s. vishwa chemicals

Zooplankton

Protozoa was dominant followed by Rotifera and Cladocera. Copepoda and Ostracoda were

rarely present. Genera like Daphnia, Moina, Keratella, Philudinaetc, besidesNauplius larva were

dominant.

3.15. Socioeconomic Environment

Reconnaissance

Reconnaissance has been done to assess socio-economic status in the study area. The study

area is rural however basic amenities were observed to be available.

Methodology

Detailed socio-economic data were collected within 5 km radius of the existing Project site.

Preliminary information was collected during field investigation followed by secondary data from

the census of India 2011.

Socioeconomic Assessment

Socio economic status of the population is the indicator of the change in the life style due to the

developmental activities taking place in the region. The villages which appears within the 5 km

radius from the centre of the proposed Project site are considered for socioeconomic study.

Demography

There are 37 villages in the study area. The demographic pattern of all the settlements as per

2011 census is given in Table 3.22.

Page 106: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

S

1

2

3

4

5

6

FOR

A

Sr.No

1.

2.

3.

4.

5.

6.

PROPOSED M

Fig

Table 3.

N

MOTALI

VALIA CHO

HIFAZATN

BHADKOD

PIRAMAN

ANDADA

EIMANUFACTURIN

gure 3.10 V

19 List of v

ame

OKDI

AGAR

DRA

A REPORT NG OF SYNTHE

Page 106

Villages wit

villages pre

Dist

Pro

ETIC ORGANIC

thin 10 km

esent in the

tance from

oject site

3.34

0.56

2.48

3.17

4.32

4.70

CHEMICALS

M

radius

e study are

Dire

Pr

M/s. vishwa

ea

ection from

roject site

NE

NNE

NNE

NW

NNW

NNE

chemicals

m

Page 107: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 107 B. S. RANA M/s. vishwa chemicals

7. KANSIYA 5.74 NE

8. AMARATPURA 5.23 NE

9. MANDVABUZARD 6.91 NNE

10. MULAD 8.16 ENE

11. KHARCHI BHILVADA 6.38 E

12. UCCHALI 4.05 E

13. BORIDARA 8.23 SW

14. KHARCHI 6.55 E

15. KARAVEL 5.50 ESE

16. AVADAR 5.96 SE

17. SARDARPURA 7.95 ESE

18. PIPLOD 5.47 SSE

19. JITALI 2.90 SE

20. KONDH 5.58 NNE

21. SENGPUR 7.69 SE

22. VATARIYA 9.59 S

23. BORIDRA 8.27 E

24. BHADI 7.15 NE

25. KOSMADI 3.43 WSW

26. SANJALI 9.18 WSW

27. SAFIPURA 9.88 ESE

28. TAIBAH NAGAR 5.82 SE

29. GADKHOL 4.03 NNE

30. KHAROD 7.90 NE

31. BAKROL 5.84 ENE

32. KAPODRA 3.66 W

33. AMBOLI 8.02 NW

34. BORBHATHA BET 7.62 NNE

35. DADHEDI 9.92 ESE

36. PARDI MOKHA 7.54 SE

37. UMARDWAD 7.96 WNW

Page 108: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 108 B. S. RANA M/s. vishwa chemicals

Sex Ratio

With regards to Sex Ratio in Bharuch, it stood at 925 per 1000 male compared to 2001 census figure of 921. The average national sex ratio in India is 940 as per latest reports of Census 2011 Directorate. In 2011 census, child sex ratio is 920 girls per 1000 boys compared to figure of 918 girls per 1000 boys of 2001 census data.

Population

According to the 2011 national census, the population of Bharuch was declared to be 1,551,019.

This figure was only limited to the municipality region. The total population of the Bharuch Urban

Agglomeration came to 7.2 million people. There were 886 females to every 1000 males in 2001.

Now there are 904 women to 1000 men in 2011. Bharuch had a literacy rate of 74.41% in 2001

which rose to 89.62 percent in 2011. Out of this, male and female literacy are 93.96 and 81.51

percent as of 2011 census. According to the census for the ninth plan, there are 30737 rural

families living in Bharuch. Out of those, 5.41% (1663 families) live below the poverty line. There

are 439,843 people who live in slums in the city. The majority of residents of Bharuch are

native Gujaratis and speak Gujarati. There is also a sizable population

of Punjabis, Marathis, Tamils, Sindhis,Malayalis and Marwaris who bring in their native language

and culture to the city. The government institutions and military base near the city also bring

peoples from across India. The city's population has increased in a major way following

increasing economic expansion and modernization.

Literacy

Average literacy rate of Bharuch in 2011 were 81.51 % compared to 74.41 of 2001. If things are

looked out at gender wise, male and female literacy were 87.45 % and 75.09 % respectively. For

2001 census, same figures stood at 82.98 and 65.11 in Bharuch District. Total literate in Bharuch

District were 1,118,276 of which male and female were 623,047 and 495,229 respectively.

3.16. Traffic survey

Reconnaissance

The traffic survey, to ascertain the traffic density in the study area was conducted on the road

near the project site. The composition of Traffic includes Two Wheelers, Three Wheelers

(Goods & Passenger Autos, Four Wheeler (Passenger Cars) and Four Wheeler Heavy

Vehicles like Trucks, Lorries Busses etc, The Ankleshwar GIDC is well connected with

Ahmedabad-Mumbai NH-8. The unitis SSI unit theimpactof traffic dueto the proposed project

will be negligible.

Page 109: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 109 B. S. RANA M/s. vishwa chemicals

Chapter 4. Anticipated Environmental Impacts and Mitigation Measures

4.1 Prelude

Prediction of environmental impacts is the most important component in the impact assessment

study, as it provides quantitative information on anticipated environmental impacts from a project

well in advance. Several mathematical/statistical techniques and methodologies are available for

predicting impacts from developmental projects on the surrounding physicochemical, ecological

and socio-economic components of environment. The results obtained from the predictions are

superimposed over the baseline data (pre-project) to derive the ultimate (post-project) scenario of

environmental quality status in the study area around the proposed project site. The quantitative

impacts derived from predictions are also essential to delineate effective environmental

management plan for minimizing the adverse impacts on the surrounding environment during

construction and operation phases of the project.

The following sections identify the potential impacts on the environment from the proposed

project based on the nature and extent of the various activities associated with the project

implementation and operation, as well as the current status of the environmental quality at the

project site. Both beneficial (positive) and adverse (negative) impacts are considered.

4.2 Valued Environmental Components and Potential Impacts

The project activities will interact with various valued Environmental Components viz., air, water,

soil, land, flora & fauna, etc. The components that may be affected due to the proposed

manufacturing of synthetic organic Chemmicals intermediates and require focused evaluation are

summarized in the following sub-sections, considering both construction phase as well as

operation phase of the project:

4.3.1 Potential Impacts during Project Operation

Impact on Air Environment

Impact on Noise Environment

Impact on Water Environment

Impact due to Solid Waste/ Hazardous Waste

Impact on Terrestrial Ecology

Impact on Land Environment

Impact on Socio-economic Environment

Page 110: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 110 B. S. RANA M/s. vishwa chemicals

4.3 Potential Impacts and Mitigation Measures during Project Implementation (Construction phase)

 

4.3.1 Air Environment, Noise Environment, Land Environment, Solid and Hazardous

waste, Site Security and Safety, Water Environment, Soil Environment, Socio- economic Environment, Health and Well-being of Construction Workers

 

There will not be any significant environmental impacts on the above aspects because there is

minimal construction and/or machenary installation work involved in the proposed project. The

proposed project is a new manufacturing unit of Synthetic Organic chemicals&Intermediates. For

the proposed production capacity, some machinery such as reactors, centrifuge, mill, etc. will be

installed & some foundation work will also be carried out as per requirement.

4.4 Potential Impacts and Mitigation Measures during Operation phase

Some of the potentially significant environmental impacts from the proposed project will be in

Water environment, Land environment, Air environment, Soild- Hazardous waste, Soil quality,

socio-economics, Ecology &biodiversity, Odour problem and Energy conservation.

4.4.1 Air Environment

Air environment is likely to be affected due to emissions from combustion of fuels used in

machineries, vehicles, Boiler and DG Set. Point and non point source of pollutants will be there

which may cause serious threat to the air quality and it can result in many secondary impacts like

occupation & social health, corrosion of metallic structures of area etc.

Mitigation Measures:

DG set will be operated as a power back-up only.

Stack of adequate height as per CPCB norms will be erected.

Periodical monitoring will be carried out.

To control the fugitive emission proper practices regular maintenance of plant and similar

measures will be practiced for proposed project.

Scrubber is installed for process emissions. Another scrubber will also be installed for further

expansion project.

The air quality impacts have been predicted for the proposed plant assuming baseline air quality.

Site-specific meteorological parameters have been recorded by continuous monitoring. Short

term 24 hourly GLC's incremental values were estimated using the site-specific meteorological

conditions.

Page 111: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 111 B. S. RANA M/s. vishwa chemicals

Model and Methodology for Computation

AERMOD View – Lake Environmental Software, which is a Gaussian-Plume atmospheric

dispersion algorithm for estimating concentration of pollutant, has been used to predict the

Ground Level Concentrations (GLC’s) of TSP, SO2 and NOx due to proposed plant activity. The

GLC’s were predicted on 24 hourly average basis keeping in view the prescribed national

ambient air quality standards (NAAQS).

Data used for Modeling

The hourly meteorological data along with emission rate for individual pollutants used for

prediction of air quality impacts as given in chapter 2 has been taken into consideration.

Ground level conc. for PM10

The predicted concentrations of PM10 for the study period are shown below

Table 4.1: Ground level concentration of PM10 in µg/m3

Sr.

No. Name of Village

Distance

&

Direction

Predicted GLC

µg/m3

Baseline result

(Avg.) µg/m3

Incremental result

after development

of Project

1 Project Site 0 0 79.00 79.00

2 Gadkhol patiya 4.03 NNE 0.00224 89.00 89.00

3 Dadhal inam 9.92 SE 0.0621 90.00 90.06

4 Jitali 2.90 SE 0.0515 92.00 92.05

5 Kondh 5.58 NNE 0.0167 90.00 90.02

6 Kosamdi

3.43 WSW 0.0418 92.00 92.04

7 Kapodrsa 3.66 W 0.0520 83.00 83.05

8 Piraman 4.32NW 0.0442 79.00 79.04

9 motali 3.34 NE 0.00514 88.00 88.01

Page 112: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 112 B. S. RANA M/s. vishwa chemicals

Ground level conc. for PM2.5

The predicted concentrations of PM2.5 for the study period are shown below

Table 4.2: Ground level concentration of PM2.5 in µg/m3

Sr. No.

Name of Village

Distance &

Direction

Predicted GLC µg/m3

Baseline result (Avg.) µg/m3

Incremental result after

development of Project

1 Project Site 0 0 41.00 41.00

2 Gadkhol patiya

4.03 NNE 0.0009 42.00 42.00

3 Dadhal inam

9.92 ESE

0.0248 43.00 43.02

4 Jitali 2.90 SE 0.0206 43.00 43.02

5 Kondh

5.58 NNE

0.00667 40.00 40.01

6 Kosamdi

3.43 WSW 0.0167 41.00 41.02

7 Kapodrsa 3.66 W 0.0208 41.00 41.02

8

Piraman

4.32 NNW

0.0177 40.00 40.02

9 motali 3.34 NE 0.00206 43.00 43.00

Ground level conc. for SO2

The predicted concentrations of SO2 for the study period are shown below:

Table 4.3: Ground level concentration of SO2 in µg/m3

Sr.

No.

Name of

Village

Distance

&

Direction

Predicted GLC

µg/m3

Baseline result

(Avg.) µg/m3

Incremental

result after

development of

Project

1 Project Site 0 0 34.00 34.00

2 Gadkhol patiya

4.03 NNE 0.0106 33.00 33.01

Page 113: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 113 B. S. RANA M/s. vishwa chemicals

Sr.

No.

Name of

Village

Distance

&

Direction

Predicted GLC

µg/m3

Baseline result

(Avg.) µg/m3

Incremental

result after

development of

Project

3 Dadhal inam 9.92 ESE 0.292 31.00 31.29

4 Jitali 2.90 SE 0.242 34.00 34.24

5 Kondh 5.58 NNE 0.0784 32.00 32.08

6 Kosamdi 3.43 WSW 0.197 34.00 34.20

7 Kapodrsa 3.66 W 0.244 32.00 32.24

8 Piraman 4.32 NNW 0.208 31.00 31.21

9 motali 3.34 NE 0.0242 32.00 32.02

Ground level conc. for NOx 

The predicted concentrations of NOx for the study period are shown below;

Table 4.4: Ground level concentration of NOx in µg/m3

Sr.

No.

Name of

Village

Distance

&

Direction

Predicted

GLC µg/m3

Baseline result

(Avg.) µg/m3

Incremental result

after development of

Project

1 Project Site 0 0 48.00 48.00

2 Gadkhol patiya

4.03 NNE 0.00378 47.00 47.00

3 Dadhal inam 9.92 ESE 0.104 44.00 44.10

4 Jitali 2.90 SE 0.0867 48.00 48.09

5 Kondh 5.58 NNE 0.0281 44.00 44.03

6 Kosamdi 3.43 WSW 0.0704 42.00 42.07

7 Kapodrsa 3.66 W 0.0875 48.00 48.09

8 Piraman 4.32 NNW 0.0744 44.00 44.07

9 motali 3.34 NE 0.00856 48.00 48.01

Page 114: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

 

 

FOR

A

Figure 4.1

PROPOSED M

: Isopleth

 

EIMANUFACTURIN

for PM10 G

A REPORT NG OF SYNTHE

Page 114

GLC due to

ETIC ORGANIC

operation

CHEMICALS

M

of Propose

M/s. vishwa

ed Project

chemicals

 

Page 115: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

 

FOR

A

Figure 1.1

PROPOSED M

: Isopleth

 

EIMANUFACTURIN

for PM2.5 G

A REPORT NG OF SYNTHE

Page 115

GLC due to

ETIC ORGANIC

operation

CHEMICALS

M

of Propos

M/s. vishwa

ed Project

chemicals

 

Page 116: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

 

FOR

A

Figure 1.2

PROPOSED M

2 : Isopleth

 

EIMANUFACTURIN

for NOx G

A REPORT NG OF SYNTHE

Page 116

GLC due to

ETIC ORGANIC

operation

CHEMICALS

M

of Propose

M/s. vishwa

ed Project

chemicals

 

Page 117: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

FOR

A

Figure 1.3

PROPOSED M

3 : Isopleth

EIMANUFACTURIN

for SOx G

A REPORT NG OF SYNTHE

Page 117

GLC due to

ETIC ORGANIC

operation

CHEMICALS

M

of Propose

M/s. vishwa

ed Project

chemicals

 

Page 118: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 118 B. S. RANA M/s. vishwa chemicals

Summary of Predicted GLC’s

The summary of maximum ground level concentrations (GLC) for the proposed project is listed in Table 1.2.

Table 1.2 : Summary of Maximum 24-hour GLC due to the Proposed Project

Description Concentration (�g/m3)

PM10 PM2.5 NOx SOx

Maximum Rise in GLC 0.33 0.13 0.56 1.56

Distance of occurrence (km)

0.5 0.5 0.5 0.5

Direction of Occurrence ESE ESE ESE ESE

Maximum Baseline Concentration reported

92.0 43.0 48.0 34.0

Total Concentration 92.33 43.13 48.56 35.56

Prescribed Standards 100 60 80 80

 

4.4.2 Noise Environment

Impact:

Operational phase impacts will mainly result from the operation of compressor and transfer

pumps. Noise level near the compressor has been predicted to exceed 75 dB(A), therefore site

workers shall be provided with personal protective equipments (PPEs). Also, it has been

envisaged that noise impacts on local community due to proposed project activities will be

insignificant as noise levels of less than 45 dB(A) have been predicted at a distance of one

kilometerthe impacts will be insignificant. Noise may also be generated due to movement of

heavy vehicles, medium vehicles and automobiles during operational phase. However, it has

been envisaged that increase in noise impacts due to vehicular movement will be temporary and

marginal to be considered for their impacts on nearby human settlement.

Mitigation Measures:

Rubber pads or any other noise absorbing materials will be provided around noise

generating sources like pumps and blowers etc.

Workers will be provided with PPEs like ear plugs, ear mufflers etc.

Page 119: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 119 B. S. RANA M/s. vishwa chemicals

Periodic maintenance of machinery shall be undertaken to reduce the noise impact.

In case of Power failure, DG sets will be used with acoustic enclosures.

Sufficient green area will be maintained in & around the project site, which will act as a

noise barrier.

4.4.3 Water Environment

Total water requirement of the project for domestic & Industrial activity during operation phase

will be 13.0 KLD. Water requirement for the industrial purpose will be 9.0 KLD, for the domestic

purpose will be 2.0 KLD and 2.0 KLD for green belt. Main source of water supply is GIDC Estate.

Waste water will be generated from domestic activities (3.0KLD) and washing activity (0.35 KLD).

Washing water will be collected and reused and domestic wastewater will be disposed in Soak

pit.

4.4.4 Storm Water

Impact: The rain water from the building roofs, paved areas and other areas will be directed

through closed pipeline to natural drainage.

4.5 Mitigation Measures:

It will be ensuring that no plant area water get mixed with storm water drain. Surface run-off from

the site is channelized through storm water drains and treated in new ETP.

4.5.1 Surface Water Quality

Impact: It is proposed to treat all the industrial wastewater generated from the proposed plant in

the ETP which will be reused in different activities. Thus, Zero Liquid Discharge (ZLD) will be

achieved. Hence, proposed project will not have any impact on surface water resources.

4.6.1 Land Environment

Impact:

During operation phase spillage or leakage in any form may destroy the quality of soil around the

plant. Impact of chemicals will be taken into consideration while handling materials. Every

precaution will be taken to prevent spillage. Solid wastes will be segregated and handed over to

authorized vendor. Thus no significant impact is envisaged on soil environment.

Mitigation Measures:

Page 120: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 120 B. S. RANA M/s. vishwa chemicals

The green area development and tree plantation will help in enhancing the aesthetics of the

plant.

4.7.1 Solid and Hazardous Waste

Wastes like process waste and organic waste are to be separately collected & sent for safe

disposal or sold to the authorized vendor. The final hazardous wastes from the plant as classified

under Hazardous and Other Wastes (Management and Transboundary Movement) Rules,

2016will be disposed off in the common hazardous waste secured landfill site or send to the

authorized vendors/to the authorized recycler.

Mitigation Measures:

Hazardous waste generated from the facility shall be disposed off in suitable manner as per the

Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016. The

hazardous wastes generated such as used oil, Distillation residues, Waste residues, spent

solvents, ETP Sludge, Oil & grease skimming, Filter material, discarded product material (R & D

basis) and Discarded containers generated from the proposed project shall be collected and shall

be sold to the authorized recyclers or CHWTSDF site or authorized vendor identified by the

GPCB/CPCB. Authorization from GPCB has already taken for Hazardous Waste disposal to

authorized vendor.

Solid waste management includes following:

Measures to minimize waste generation

Operation of waste handling, treatment and disposal facilities

The hazardous solid wastes generated from the proposed expansion projectwill be sent to

disposal siteas per GPCB/CPCB guidelines. The waste management plan includes:

Waste inventory

Classification of waste

Packaging, storing and transporting wastes to disposal site

Data management and reporting

Contingency plan

Personnel training

Waste minimization

The requirements, which will be specified in the Authorization from MPCB, will be followed. The

manifest system will also be implemented for control and record keeping.

Page 121: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 121 B. S. RANA M/s. vishwa chemicals

Resource Conservation/ Waste Minimization:

The unit shall also implement the concept of waste minimization circle including:

Volatiles in the by-products will be condensed and reused.

Volatile raw materials and solvents will be separated by fractional distillation and will be

recycled into process.

Good House Keeping:

Proper housekeeping practices make the system easier and less costly. Some of these are as

follows:

Solid wastes generated from the process and packaging are to be separately collected

and disposed off instead of allowing these to join effluent streams. This will reduce load

and increase the efficiency of treatment system.

Liquid wastes from various sections such as scrubbing facility, recovery and purification of

final product shall be collected and stored separately and released at a regulated rate so

as to avoid shock loads to the treatment plant.

Minimizing Solid Wastes Disposal:

The following points are suggested to facilitate solid wastes disposal:

Efficient collection and transportation mechanism for disposal of solid wastes.

Search for future recycling schemes and evaluate their worth and implement such

schemes wherever a promise of economic feasibility exists.

Discarded Container/ Barrels/ Liners Management:

Discarded containers/ barrels will be kept at a designated place with paved surface.

These will be decontaminated (washed/cleaned) and after that will be stored in the

designated area in storage yard. Later on these will be sold to the authorized vendors/

recyclers as per the Hazardous and Other Wastes (Management and Transboundary

Movement) Rules, 2016.

The record of discarded containers/ barrels stored in storage yard will be maintained and

also, inventory of their selling to the registered recyclers will be maintained.

 

Page 122: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 122 B. S. RANA M/s. vishwa chemicals

4.8.1 Socio-Economic Environment

Impact:

The proposedproject will have some positive impact on the industrial growth in the region. It is

anticipated that during the operation phase, the proposed project will generate some direct and

indirect employment due todifferent activities.

Mitigation Measures:

The overall project will have a long term benefit and hence no mitigation measure is required.

However, as per the skills, preference to local people shall be given in employment.

4.9.1 Ecology and Biodiversity

Impact:

The project activity does not require tree cutting during land clearing and the plant activities are

not expected to have any impact on the ecology and biodiversity.

Mitigation Measures:

A total of 257 m2area has been earmarked for greenbelt development, which will help in

development of biodiversity. The indigenous plants are planted along with ornamental

trees/shrubs to provide an aesthetic environment within and around the plant. The maintenance

of the greenbelt developed will be ensured and survival rate of the plants will also be studied

every half yearly. Treated water will be used for greenbelt development.

4.10.1 Odour Problem

Impact:

Some of the processes and wastes generated from the plant may release high odour.

Undesirable odourcontributes to air quality concerns and affect human lifestyles. On the

economic front, loss of property value near odour-causing operations/industries and odorous

environment is partly a consequence of offensive odour. Odour is undoubtedly the most complex

of all the air pollution problems. Mainlyodour generated by the industries varies enormously since

they can be generated during the production, processing, or even in the waste water treatment

areas of the plants.

Page 123: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 123 B. S. RANA M/s. vishwa chemicals

Mitigation Measures:

Control of VOCs and fugitive Emissions:

Sampling points will be provided with double valve followed by suction hoods which will

be connected to ducting system leading to scrubbing system.

Odour causing raw materials will be charged in closed chambers with exhaust of

chambers connected to ducting system leading to scrubbing system.

All waste storage tanks and waste preparation and raw material storage tanks will be

connected to vacuum system. These off gases will be connected to scrubbers.

Additional Measures

“Odour rounds” by non-plant personnel will hold regular meetings and odour rounds in the

factory premises for ensuring effective implementation of odour control measures.

As a long term measure to improve the environment, plantation of trees within factory

premises as well as along the nearby roads is done.

All critical vessels, pumps and reactors which have potential to generate odour will be

fitted with mechanical seals to prevent leakage and therefore odour.

De-odorizer solution will be sprayed through special network, which will be laid around the

plant. It will help in neutralizing the fugitive emissions.

Beneath all sample points/ drain points, spill control powder containing trays will be kept

so as to adsorb even slightest of leakage, if at all arises from these points. The spill

control powder will then be sent for disposal as a solid waste.

4.11.1 Energy Conservation

During the operation phase of the project, energy resources will be required for operating various

pumping machineries for water & wastewater, internal road lighting, common utilities etc.

The following options can be used for energy conservation:

Energy efficient machineries shall be used during operation phase as per Energy

Conservation Building Code 2007.

Wherever possible in the plant, utilization of renewable sources of energy for

conservation of non-renewable sources of energy shall be ensured.

Sufficient care shall be taken to prevent/ minimize energy losses at each stage of

development.

Page 124: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 124 B. S. RANA M/s. vishwa chemicals

Every year energy audit shall be conducted through competent authority nominated by

Govt. of India.

4.12.1 Safety Provisions

All the provisions as per the Factories Act, 1948, Manufacture, Storage and Import of

Hazardous Chemicals (MSIHC) Rules, 1989 and amendments thereafter and also, the

Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016

to be followed.

M/s Vishwa Chemicalswill provide transport facility for occupational health care at the

premises.

 

Page 125: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 125 B. S. RANA M/s. vishwa chemicals

CHAPTER 5. ANALYSIS OF ALTERNATIVES

5.1 Introduction

It is the best practice that the EIA should consider project alternatives and their relative potential

impact on the environment. Alternatives must, however, be both practical and reasonable, within

the overall constraints of the proposed project development. The project alternative is the way of

action in pace of another, that would meet the same purpose and need, but which would avoid or

minimize negative impacts and enhance project benefits.

Project activities may consume natural resources and discharge wastes, which are likely to have

serious consequence to the environment. A number of alternative options may be available to

carry out many of these activities. An option with least or nil adverse environment impacts is to

be selected. Critical analysis is therefore required for selection of the right alternative. Alternative

Analysis (AA) has been done for critical aspects of the project.

M/s Vishwa Chemicalshasproposedfor manufacturing capacity of synthetic organic chemicals &

Intermediatesat the new facility. While selecting this site for manufacturing of new products,

Vishwa ChemicalsIndustries has considered following factors:

5.2 Analysis of Site Alternative

The project is in proximity of Bharuch district of Gujarat State. Site is located near the Baroda –

Ankleshwar Express Highway. Proponent is very well familiar with the surrounding environment as

it is an expansion project; therefore, it becomes easy for the unit to expand the production

capacityon above said location.

The other supporting features are briefly summarized hereunder,

Availability of all basic facilities like infrastructure, communication, Transportation, medical

facilities, fuel, water, power, unskilled & skilled manpower, raw materials, road network etc.

Nearest town Hifajatnagar 2.48 km away from the project site, which are very well

connected with other parts of the country by road & rail;

Minimal additional construction or plant/ equipment/ machinery are required for proposed

expansion and addition of new products.

As the proposed project is an expansion project, there is no Rehabilitation& Resettlement

involved;

Page 126: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 126 B. S. RANA M/s. vishwa chemicals

Easy availability of manpower for proposed activities;

The location of project is best suited to start above manufacturing activities, so no alternative for

site is analyzed.

5.3 Analysis ofAlternative for technologies

Existing facility have quite enough infrastructure for propose project.

The proposed infrastructure for manufacturing, ancillary operations, transport of raw

material and final products are adequate. Raw material and final products will be

transported through tankers/trucks:

Table 5.1 Alternatives for technologies

Particular Proposed Technology Alternatives

Water ETP Recycle/ Reuse

Air Dip pipe in to water and then passes through chiller

-

Solid/ Hazardous

waste

TSDF Membership available.

-

Page 127: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 127 B. S. RANA M/s. vishwa chemicals

CHAPTER 6. ENVIRONMENTAL MONITORING PROGRAME

6.1 Environmental Monitoring Programme

Environmental Monitoring describe the processes and activities that need to take place to

characterize and monitor the quality of the environment. Environmental Monitoring is used in the

preparation of the environmental impact assessment, as well as in many circumstances in which

human activities carry a risk of harmful effects on the natural environment. All monitoring

strategies and programs have reasons and justifications which are often designed to establish the

current status of an environment and prediction of the impact of future development and/or

alteration in the operation and design of existing installation. Environmental Monitoring Network is

operation phase of the project for monitoring of various Environmental parameters like air, water,

Noise, soil etc.

M/s Vishwa Chemicalsis located at Plot No 4801/A/13, G.I.D.C. Ankleshwar, Bharuch, Gujarat.

Usually, as in the case of the present study, an impact assessment study is carried out over a

short period of time and the data cannot bring out all variations induced by natural or by human

activities. Environmental Monitoring Program will be modified as per requirement after the

proposed expansion at existing plant.

6.2 Objectives of Monitoring

To comply with the statutory requirements of monitoring for compliance with conditions of

EC, NOC and CC&A.

To comply with the provision of factory Act.

To verify the result of the impact assessment study in particular with regards to new

development.

Identification of any significant adverse transformation in environmental condition to plan

additional mitigation measures; if & as required.

To check or assess the efficiency of the controlling measures.

To ensure that new parameters, other than those identified in the impact assessment

study, do not become critical through the commissioning of new project.

To establish a data base for future impact assessment studies for new project.

6.3 Environmental Monitoring Program

Environmental Monitoring should be carried out during construction and operation phase of the

project.

Page 128: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 128 B. S. RANA M/s. vishwa chemicals

6.3.1 Monitoring and Reporting Procedure

Regular monitoring of important and crucial environmental parameters is of immense importance

to assess the status of the environment during an operational phase. With the knowledge of

baseline condition, the monitoring program can serve as an indicator for any deterioration in

environmental conditions due to operational phase and suitable mitigation steps could be taken in

time to safeguard the environment. Monitoring is as important as that of control of pollution since

the efficiency of control measures can only be determined by monitoring. The proposed monitoring

program gives below:

Ambient Air Quality Monitoring

Both ambient air quality and stack emission will be monitored. The ambient air quality with respect

to NOx, SO2, suspended particulate matter (PM10 and PM2.5) will be monitored in at least 3-5

location in and around the project site through a reputed environmental laboratory recognized by

MoEF/NABL. Monitoring will be carried out for quarterly in operation phase. Similarly, all the

stacks in the proposed unit will be monitored once in three months with respect to NOX, SO2,

Suspended particulate matter (SPM) and Carbon Monoxide (CO) level.

Waste water monitoring

The wastewater emanating from the different stream of industry will be monitored once in a month

for physico-chemical characteristics. Ground water monitoring locations will be identified and

periodically check the Physical, chemical as well as biological parameter as per drinking water

standard IS: 10500:2012.

Noise level monitoring

Monitoring of the noise level is essential to assess the effectiveness of Environmental

Management Plan implemented to reduce noise levels. A good quality sound level meter and

noise exposure meter may be procured for the same. Audiometric tests shall be conducted

periodically for the employees working close to the high noise sources. The noise levels due to

machines and equipments will be monitored regularly.

Monitoring Equipment and Consumables

A well-equipped laboratory with consumable items will be provided for monitoring of important

environmental parameters. Alternatively, monitoring can be outsourced from MoEF/NABL

recognized laboratory.

Page 129: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 129 B. S. RANA M/s. vishwa chemicals

Table 6.1 Environmental Monitoring Plan (During Operational Phase)

Component Parameters Location Frequency Duration

Ambient Air

Quality

PM10, PM2.5, SO2,

NOx (Process

specific pollutants)

Minimum 3-5

locations with one

on upwind side,

one on downwind

and one on lateral

side and one at

project site.

Quarterly 24 hrs

Point Source

Emissions

Particulates, SO2,

NOx,

Each stack – for

flue gas and

process emissions

Quarterly As per the CPCB

guidelines

Noise level Leq day, Leq night,

L10, L50, L90

dB(A)

In and around the

work zone

Quarterly 24 hour reading

with a frequency of

10 minutes every

hour

Soil Quality Physico-chemical

characteristics

At relevant

locations

Quarterly Sample every

season

Ecology Survival rate of

plantation

At locations of

compensatory

plantation and

landscaping

Annually For 3 years after

operation starts

Health All relevant

parameters

Every 15 days Regular check

ups

As per requirement

Solid waste Depending on type

of wastes

Solid waste

disposal location

Once during

each season

One-time sample

Ground &

Drinking

water

As per IS: 10500 Adjoining village Quarterly At least at three

locations.

6.3.2. Environmental Budget

For environment protection and management and pollution control and treatment and monitoring

systems, appropriate budgetary provision would be made and provision for recurring expenditure

for environment management of the project would be made. The detail of budget allocation

during operation phase is given in below table:

Page 130: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 130 B. S. RANA M/s. vishwa chemicals

Table 6.1 Budget Allocation for Environmental Management

Total EMP cost Operation phase: Rs.2.0 Lacs.

6.3.3. Emission Monitoring & Evaluation

To achieve standard pollution emission limit suggested by pollution control board,

periodic correction and maintenance of Pollution control equipment will be carried out

and it will be followed by standard operating system concern with safety precaution of

workers.

Each stack will be design as per CPCB guideline for proper dispersion of pollutants.

Operation Phase

S.

No. Pollution Control Measures

Capital Cost (Rs, Lacs)

Recurring Cost per annum (Lacs)

1 Air Pollution Control 1.00 0.3

2 Water Pollution Control 0.50 0.2

3 Noise Pollution Control 0.10 0.1

4 Environment Monitoring and

Management 0.10 0.5

5 Rain Water Harvesting 1.00 0.2

6 Occupational Health 0.10 0.3

7 Green Belt 0.03 0.3

Total 2.83 1.9

Page 131: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 131 B. S. RANA M/s. vishwa chemicals

CHAPTER 7: ADDITIONAL STUDIES

7.1 Risk Assessment

Accidental risk involves the occurrence or potential occurrence of some accident consisting of an

event or sequence of events resulting into fire, explosion or toxic hazards to human health and

environment.

The hazard potential and estimation of consequences in case of its accidental release are the

issues of immediate relevance to be considered. It is therefore, imperative to carry out Maximum

Credible Accident (MCA) analysis at the first stage, which identifies vulnerable areas around the

facility and suggests a set of recommendations to improve safety.

The work undertaken consists of the following stages:

Collection of relevant data on project description and proposed activities.

7.1.1 Hazard Identification& Risk Assessment (HIRA)

The regulations require the employer, in consultation with employees, to identify:

a. All reasonably foreseeable hazards that may cause a major accident; and

b. The kinds of major accidents that may occur, the likelihood of a major accident occurring

and the likely consequences of a major accident.

HIRA must address potentially rare events and situations that ensure the full range of major

accidents and their causes. To achieve this, employers should:

a. Identify and challenge assumptions and existing norms of design and operation to test

whether they may contain weaknesses;

b. Think beyond the immediate experience.

c. Recognise that existing controls and procedures cannot always be guaranteed to work as

expected; and learn lessons from similar organisations and businesses.

The HIRA worksheet is presented as below.

Table 7.1: Hazards and Risk Assessment Worksheet:

Hazard Description Consequences

1. Unloading of raw

materials from Trucks.

1. Fall of material causing injury to person.

2. Leakage/Spillage of chemical causing fire & explosion in

case of flammable chemicals.

3. Exposure to hazardous chemicals such as carcinogenic

Page 132: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 132 B. S. RANA M/s. vishwa chemicals

Hazard Description Consequences

may lead to health hazards.

4. Ergonomic hazards in case of manual handling of

materials

2. Store of Raw Material. 1. Spillage & Leakage

2. Fire & Explosion

3. Fall of containers if stacked high.

4. Inhalation of chemicals.

3. Transportation of

solvents/chemicals to

production area

1. Spill & leak

2. Inhalation of vapours.

3. Fire & Explosion

4. Ergonomichazards to person

5. Chemical/Solvent splash.

4. Charging of Raw

Material in to reactors.

1. Fire & Explosion due to static

2. Inhalation of Vapour.

3. Physical Injury

4. Spill & Leak

5. Boarding & packing of

the Finished product

1. Inhalation of Vapour.

6. Movement of Trucks 1. Hit & run over by Truck (Facility).

2. Properly Damage due to hitting of moving trucks.

3. Fire inside trucks cabin

4. Traffic Hazardous.

Considering the risk with the activities, company will provide the followings in order to mitigate

the risk:

1. Ventilation system

2. Fire Extinguishers

3. Summary of MSDS of chemicals will be displayed.

4. Spill control kit

5. Smoke detectors

Page 133: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 133 B. S. RANA M/s. vishwa chemicals

6. Training to employees

7. Personal Protective Equipment (PPE)

8. Display of cautionary Signboard

9. Dust collection system

10. Speed limit policy within plant area

7.2 Disaster Management Plan

7.2.1. Introduction to Disaster Management Plan

The various controls including engineering, procedural and administrative are provided to control

the manufacturing activities at the industries; however, things may go wrong even with the best

arrangements. The Disaster Management Plan is prepared to control and minimize the effect of

any emergency which may occur within the industrial premises affecting the employees or the

people in the surrounding; it may also affect the environment.

The disaster/emergency may arise as a natural calamity such as Floods, Earthquakes, etc. or

may be a Man-Made Disaster such as a Leakage/Spillage of Hazardous Chemicals/Gases or

Fire and Explosion.

A Disaster Management Plan is an action plan drawn to fix responsibility and actions to be taken

by various groups to contain the disaster/emergencyincident within shortest possible time and

with minimum losses to people, material, property and environment.

It is the responsibility of the establishment/industry that the disaster/emergency plan is widely

circulated for benefit / training of all the employees within the premises and the individuals

residing in the surrounding areas of the premises It is the responsibility of all the individuals in

their respective areas to ensure the success of this plan.

Objective

The main objectives of preparing the On Site / Off Site Emergency Plan are:

1. To define and assess emergencies, including risk and environmental impact assessment.

2. To establish the procedures to handle emergency situation that may arise due to spillage and

fire while handling plant & equipment.

3. To control and contain incidents within shortest possible time and to restore normalcy.

Page 134: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 134 B. S. RANA M/s. vishwa chemicals

4. To safeguard employees and people in vicinity and to minimize damage/loss to property

or/and the environment.

5. To inform employees, the general public and the authority about the hazards/risks assessed,

safeguards provided, residual risk if any and the role to be played by them in the event of

emergency.

6. To be ready for 'mutual aid' if need is arised to help neighboring unit. Normal jurisdiction of

an OEP is the own premises only, but looking to the time factor in arriving the external help or

off-site plan agency; the jurisdiction must be extended outside to the extent possible in case

of emergency occurring outside.

7. To establish procedures to appraise District Administration / Civil authorities/ and mutual aid

centres etc. in order to ensure prompt relief for execution of Emergency Response Plan.

8. To secure the safe rehabilitation of affected areas and to restore normalcy.

9. To provide authoritative information to the news media.

10. To preserve records, equipments etc., and to organize investigation into the cause of the

emergency and preventive measures to stop its recurrence.

11. To ensure safety of the works before personnel re-enter and resume work.

12. To work out a plan with all provisions to handle emergencies and to provide for emergency

preparedness and the periodical rehearsal of the plan.

Definition

An emergency could be defined as any situation which presents a threat to safety of persons

or/and property. It may require outside help also.

A major emergency occurring at a work is one which may affect one or several sections of the

plant and possibly extend beyond the factory boundaries that may cause serious injuries, loss of

life, and extensive damage to property or serious disruption outside the works. It will require the

use of outside resources to handle it effectively.

Disaster is a catastrophic situation in which the day-to-day patterns of life are, in many

instances, suddenly disrupted and people are plunged into helplessness and suffering and as a

result need protection, clothing, shelter, medical and social care and other necessities of life,

such as -

Page 135: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 135 B. S. RANA M/s. vishwa chemicals

1. Disasters resulting from natural phenomena like earthquakes volcanic eruptions, storm,

surges, cyclones, tropical storms, floods, landslides, forest fires and massive insect

infestation. Also in this group, violent drought which will cause a creeping disaster landing to

famine, disease and death must be included.

2. Second group includes disastrous events occasioned by man, or by man's impact upon the

environment, such as armed conflict, industrial accidents, factory fires, explosions and

escape of toxic gases or chemical substances, river pollution, mining or other structural

collapses; air, sea, rail and road transport accidents, aircraft crashes, collisions of vehicles

carrying inflammable liquids, oil spills at sea, and dam failures.

The on-site emergency plan deals with measures to prevent and control emergencies within

the factory and not affecting outside public or environment.

The off-site emergency plan will deal with measures to prevent and control emergencies

affecting public and the environment outside the premises. The manufacturer should provide the

necessary information on the nature, extent and likely effects of such incidents.

Level of disasters

The NDMA Guidelines categorize the levels of disasters, based on the ability of various

authorities to deal with them. In order to facilitate the responses and assistances to States and

Districts, the levels of disasters have been defined as follows.

1. L0 level denotes normal times which will be utilized for close monitoring, documentation,

prevention and preparatory activities. Training on search and rescue, rehearsals, evaluation

and inventory updation for response activities will be carried out during this time.

2. L1 level specifies disaster that can be managed at the District level, however, the State and

Centre will remain in readiness to provide assistance if needed.

3. L2 level disaster situations are those which require assistance and participation of State,

mobilization of its resources for management of resources.

4. L3 level disaster situation is in case of large scale disaster where the State and District

authorities have been overwhelmed and require assistance from the Central Government for

reinstating the State and District machinery as well as for rescue, relief, other response and

recovery measures. In most cases, the scale and intensity of the disaster as determined by

the concerned technical agencies like Indian meteorological department (IMD)/ Indian

Page 136: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 136 B. S. RANA M/s. vishwa chemicals

National Centre for Ocean Information Services (INCOIS) are sufficient for the declaration of

L3 disaster.

Scope

The M/s Vishwa Chemicals has prepared Disaster Management Plan in order to provide proper

guidance to plant operating personnel to confidently handle any accidental spillage or fire /

explosion / bursting of vessel/tank or any natural calamity or sabotage.

With this objective comprehensive information has been gathered and analyzed on the synthetic

organic chemicals & Intermediates handling plant and equipment which includes the hazardous

properties of materials/chemicals, fire hazards, safety appliances, safety measures incorporated

in the plant, emergency procedures and finally regarding the constitution & responsibility of

Emergency Rescue Team (Emergency Response & Management Team / Task Force).

The potential hazards which may cause emergency includes:

Chemical Fire / Explosion in the plant or storage area

Electrical Fire in the plant or storage area.

Accidental spillages and leakages during handling of material and plant / equipment failure

causing severe health hazard due to employees’ exposure to the hazardous substances.

Methodology

A major emergency occurring at a plant is one that may cause serious injuries, loss of life,

extensive damage to property or environment or serious disruption inside or outside the plants.

This may demand the rescue and relief measures on a war footing to handle it effectively and

quickly. Within the high-risk technology industries, the need for well-planned measures should be

self-evident.

No matter how well a process is controlled and safeguarded by instruments and process safety

procedures, it is inevitable that there is a residual risk, which is capable of causing a variety of

emergencies.

The Disaster Management Plan describes the Organization & procedures for dealing with

potential accidents arising from the operations of M/s. Vishwa Chemicals.

Experiences of accidents that have occurred in various other similar plants were considered in

the preparation of DMP especially storing & handling the materials identical to this plant. This

Page 137: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 137 B. S. RANA M/s. vishwa chemicals

plan will need periodic review & modification following emergency exercise, or include any new

information relating to changes to the facilities.

The Factories Act, 1948 as amended in the year 1987 under section 41B requires that every

occupier shall draw up a Disaster Management Plan and detailed disaster control measures for

his plant and make them know to the employees and to the general public living in the vicinity of

the plant.

Its objective is to reduce the severity of loss following particular hazardous incidents. At the same

time, it must be clearly understood that it is not a substitute for maintaining good standards for

working consistence with the requirements of safety and health inside the plants.

7.2.2. Information on risk evaluation preliminary hazard analysis

The DMP is needed to respond to a variety of emergencies / disasters:

i. Disasters due to emergency on account of:

a. Fire or Explosion

b. Electrical Fire

c. Spillages and Leakages

a. Fire or explosion: The organization is storing &handlingbulk drug & intermediates which can

ignite if exposed to source of heat / ignition. The various sources of heat / ignition include hot

work, mechanical frictions, naked flames, static electricity, hot surfaces etc.

b. Electrical Fire: The Electrical fire may be caused due to generation of static charge during

charging of materials. The other reasons for fire include use of faulty or inappropriate

electrical equipment, transformers, DG sets etc. Also dry grass is normally avoided in the

premises and it will be ensured that there is no grass (dry) at any point of time by ensuring

better housekeeping

c. Spillages and Leakages: During handling of material and plant / equipment failure causing

severe health hazard due to employees exposure to the hazardous substances. Spillages

and leakages of flammable substances may also lead to fire.

ii. Disaster due to natural calamities such as:

a. Flood

b. Landslides & Mud flow

c. Earth quake

Page 138: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 138 B. S. RANA M/s. vishwa chemicals

d. Heat Wave:

iii. Disaster due to external factors such as:

Sabotage, Civil Riots or War, Terrorism: No solution can be offered to eliminate either terrorist

threats or planted bombs, but one can be well or badly prepared to cope with them when such

incidents happen. It is essential for organizations to design and implement both good physical

security and a comprehensive bomb threat response plan.

The action plan responding to an emergency situation depends very much on the level of the

emergency which, itself is defined by the consequences arising from the types of hazard

identified.

7.2.3 Disaster preparedness

This section highlights the Organization for disaster preparedness. For an industry storing /

handling flammable substances, it is essential to prepare a good effective disaster plan to control

On Site – Off Site emergencies and to mitigate losses. The disaster management plan

(emergency response plan) ensures that all available resources, facilities etc., are enforced into

services at right time to tackle an emergency.

It is not possible to envisage and detail every action which should be taken in emergency and to

harness the basic elements of emergency preparedness such as Gravity of emergency,

Communication of information, on-site action for process and emergency controls, Mobilization of

internal and external resources for fire and spillage etc.

Emergency Organization is set up specifying duties and responsibilities of all to make best use of

all resources and to avoid confusion while tackling the emergency.

Disaster Management Plan / On-Site Emergency Plan (Emergency Response Plan) highlights

the flow of information and co-operation among various action groups within the factory. Off-site

Emergency Plan indicates various action groups at district levels which will be engaged in case

of off-site emergency.

Emergency organization and arrangement include:

7.2.3.1 Emergency Organization

This section is devised to suggest the organization for emergency preparedness. Key personnel

to combat emergency are nominated with specific responsibilities according to set procedures

and making best use of the resources available and to avoid confusion. Such key personnel

Page 139: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 139 B. S. RANA M/s. vishwa chemicals

include Site Main Controller, Incident Controller: Services Coordination includes Fire & Safety,

Security, Engineering Services (Maintenance), Environment, Lab (QC/QA), HR & Admin,

Account & Finance, Store & purchase and Process.

All such key personnel shall be available in all the office timings and shall be called during

emergency on holidays.

7.2.3.2 Safe Assembly Points

2 No. Assembly Point is provided, opposite to Reception Building and near to Security Cabin.

The safe assembly points are selected considering the distance from the hazardous/flammable

storage, wind direction, capacity to accommodate the required number of people and availability

of other resources in that area.

In case of emergency, it will be necessary to evacuate all personnel from effected area, except

personnel who will be directly involved in dealing with the incident. On evacuation people will go

to designated assembly points.

7.2.3.3 Emergency Control Centre (ECC)

During Working Hours, the Emergency Control Centre (ECC) is situated at Reception Building,

and during Non-Working Hours the Emergency Control Centre (ECC) is situated at Security

Cabin from where the operation to handle the emergency are directed and coordinated.

The ECCis equipped with all necessary emergency equipment, communication arrangement to

receive and transmit information and directions from and to the incident controller and areas of

the works as well as outside. 1 Direct Line with Emergency Contact Numbers is available at both

the places.

The emergency contact numbers for the mutual aids like nearest police station, fire station,

hospital, ambulance service etc. & list of emergency team members and various activity

coordinators displayed at the emergency control centre, security gate and other prominent

locations.

Emergency Control Centre has the following facilities:

a. List of telephone numbersfor external & internal communication

b. Plans of the location

c. Stationeries

d. Copies of the on-site and off-site emergency plans

Page 140: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 140 B. S. RANA M/s. vishwa chemicals

e. Details and location plans of firefighting equipment such as fire extinguisher, fire hoses &

nozzles etc.

f. Details and location plans of safety equipment such as SCBA, gum boots, gloves, goggles,

cover all etc.

Emergency Warning System

A siren audible in all parts of the facility, to warn the people for the evacuation with different

sounds for declaration of emergency or emergency call off is provided along with12 No hooters

associated with manual call point are provided at prominent locations. Warning system is always

kept in working order.

The mode of siren for evacuation is wailing pitch. On hearing the siren, people will disperse from

the work area and will evacuate to safe assembly points. Proper instruction is given to all the

employees about the rising of siren and the emergencies. The same instructions are also

displayed at prominent places within the plant area.

The employees will proceed to the predetermined assembly points on hearing the siren and the

support staff / security forces will instruct and divert the people away from the affected

areatowards the assembly points.

Medical Services and First Aid

M/s Vishwa Chemicals has already provided transport for Occupational and Health Centre at the

facility and has services of visiting doctor.

Transportation will be available for emergency evacuation and transportation of people to nearest

Medical College and Hospital from the plant.

The First aid team will play critical role in attending the victims in case of any accident.

First Aid boxes are provided at prominent locations & trained first-aider are available in all

working shifts. The list of trained first aiders is displayed at prominent locations and is also

available at security gate office.

In case of any medical assistance other than first aid, the Admin In-charge/ Site- SHE

representative will arrange for a vehicle to shift the casualty to the company accredited hospital,

or call an ambulance to mobilize the casualty to the medical center/ hospital.

Transport and Evacuation Arrangements

In a major emergency, it is essential to evacuate personnel from affected areas and to further

evacuate non-essential workers from areas likely to be affected, should the emergency escalate.

Page 141: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 141 B. S. RANA M/s. vishwa chemicals

Transportation will available for emergency evacuation and transportation of people and for

Material transport, third party tempo is available.

Communication and help from external emergency services

Communication is a critical factor in handling an emergency. To control the situation by the

earliest possible action. 1 Direct Line with list of emergency contact numbers is provided at

emergency control center as well as at security gate.

The external emergency services which can be contacted for help during emergency include:

Sr. No.

Services/Authorities Telephone no.

1

District Collector (DC)

02642 240 600,

02642 240 602

2

Control Room Ankleshwar GIDC

02646 222 933

3 Police Station, Ankleshwar GIDC

02646 225 551

4 Ankleshwar Police Station 02646 247 802

5 Fire brigade office,Ankleshwar 02646 224 100

6 ESIC Hospital,Ankleshwar 02646 225 275

The above emergency services telephone numbers are displayed at emergency control room

and prominent locations within the plant.

Other Arrangements:

Power Supply Interruption

For Emergency, Plant Operations and Emergency Lighting provisions are made according to

requirements. A DG set of 65 KVA capacity is provided as backup.

Water Drainage

Page 142: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 142 B. S. RANA M/s. vishwa chemicals

Rainwater harvesting is proposed in the project to conserve the storm water. Storm water drains

will be constructed according to municipal regulations. Storm water from the entire plot will be

collected through network of storm drains. Storm water from plot area will be collected in the

rainwater harvesting pits/tank provided for this purpose. The overflow from these pits, if any, will

be then discharged in the proposed drains.

All installations such as utility block, office building, Process plant, warehouses & storage area

has been constructed at an adequate height and provided with individual dyke in order to protect

from storm water/rain water runoff flooding.

Electrical Supply

Electricity is considered as a major cause of fire in industries. To prevent fires due to electricity,

adequate control measures are provided which includes regular inspections and preventive

maintenance. To prevent other electrical accidents such as electric shock etc. the adequate

safety precautions implemented including provision of Fuse, MCB, ELCB, rubber mats in front of

panels, proper laying of cables, etc.

Trade Waste Disposal

Organization will be more concerned for environment protection and pollution abatement at all

times.

Provision will be made to dispose Solid wastes. The company will dispose off all solid waste in

safe manner.

Emergency Action

Though it will be an impractical to describe all the foreseeable scenarios involving

flammable/combustible materials and the suggested action for the same, some important ones

are discussed here briefly. Even in identical incidents the right course of action may not

necessarily be the same every time as the actual action will depend on the several factors, such

as the place of incident, quantity of material involved, the amount of release, the nature of

material, the wind direction, the wind velocity, temperature of surrounding, time of day, prevailing

season and weather condition.

In case of Fire

In case of declaration of onsite emergency (Hearing of emergency siren), evacuate the area as

per evacuation plan & exit signs on instruction of shift in-charge / incident controller as quickly as

possible after safe shutdown of the plant. See that the wind direction is in opposite direction of

assembly point by wind direction indicator. If not, change the assembly point.

Page 143: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 143 B. S. RANA M/s. vishwa chemicals

Following are the general guideline for emergency action.

Raise the alarm through nearest MCP

Inform security and shift in charge.

Carry nearest fire extinguisher & try to extinguish if possible.

Assemble emergency team and inform other emergency members.

Check the wind direction, then decide the assembly point and inform accordingly.

Warn the people nearby.

Attempt to isolate /extinguish the fire with the help of others with available appropriate

extinguishers.

Arrange fire hydrant hose and try to cool surrounding

Cordon the area and try to shift the drum of flammable material.

Used foam generating nozzle and create foam to extinguish fire.

If fire beyond control call fire brigade after consultation with chief controller.

Cool the surrounding or remove flammable material if possible.

Take head count at site and inform to the chief controller.

Also take head count at the assembly point and tally.

Search for missing person if any.

Call for mutual aid members for help, if require.

Arrange for rescue, if required.

Give first aid to the injured person and check for further treatment is required.

Give priority to saving life and preventing further injuries.

Confirm the massage of incident attend to the main controller & raise the all clear siren.

Collect the photograph and other evidence to cause fine.

In Case of spillage of chemicals/materials while unloading & loading activity Tankers/Tanks inside the factory premises:

Page 144: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 144 B. S. RANA M/s. vishwa chemicals

Special instruments for storing, Handling & emergency actions in case of spillage of

chemicals/materials are given separately in MSDS.

Following are the general guideline for action:

Use PPE’s like SCBA/Gas mask/Respirator & evacuate the area.

Designated area will be provided for tanker parking.

In case of declaration of onsite emergency (Hearing of emergency siren), evacuate the area as

per evacuation plan & exit signs on instruction of shift in-charge / incident Controller as quickly as

possible after safe shut down of the plant. See that the wind direction is in opposite direction of

assembly point by wind direction indicator. If not, change the assembly point.

In case of Flood / Earthquake:

In case of natural calamity like flood, Strom or earth quake (remote possibility) the management

may seek outside help. The help may be for firefighting, Evacuation (of surrounding population),

Medical treatment, shelter, food, transport or communications.

Following are the general guideline for emergency action:

Close main valve

In case the cylinders are on the ground the same be shifted to storage shed to ensure that

the floodwater shall not carry the cylinders.

Switch off electricity (main).

Assemble outside the office, away from Electric Poles & Wires.

Evacuate the areas after initiating (communication in working condition) off site organization.

In case of War/Civil riots:

Following are the general guideline for emergency action:

Intimate nearest police station & stimulate off site emergency plan

Stop unloading / loading operations (if any)

Intimate civil defense dept. about the situation

Security persons shall protect & control law & order.

General action plan

Page 145: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 145 B. S. RANA M/s. vishwa chemicals

All personnel handling the emergency should wear PVC suit / alkali suit, gumboot, PVC hand

gloves, PVC goggles.

Isolate the sources of supply.

Cordon off the area.

Avoid the entry of unnecessary people.

Start barricading the area with sand / earth.

Flush the affected body parts with plenty of water and seek medical help.

Evacuation Plan

On hearing the siren all employees shall evacuate the area by safely closing down all operation

as per instructions from their Incident Controller or in nighttime Shift supervisor. After gathering at

assembly points, shift-in-charge should take the roll call & ensure that no person is left trapped.

The Rescue Coordinator or Guard (who is inside the plant for duty) shall ensure that none is

trapped inside the plant. Security guards shall ensure total evacuation.

Main gate will be used for movement of personnel, movement of rescue, medical aid.

Traffic Control

The Security In-charge or Guard shall contact Service Coordinatorand shall make himself

available at main gate for traffic control till local authorities’ help is available.

Unwanted traffic and public gathering shall be controlled & avoided by security personnel till local

help from police is available.

Public Relations

Inevitably a major incident will attract the attention of the press, television and radio services and

anxious inquiries from friends and relatives will be flooding the factory. It is essential to make

arrangements for authoritative release of information to them. SMC/IC who is familiar with

procedures of dealing with such situations, shall take charge of public Relations, information etc.

He will be the sole authoritative source of information to the news media and others.

Declaration of cessation of emergency

Only the Main Site Controller in consultation with Incident Controller and The Service coordinator

(Emergency Fire, Rescue & Security Co-ordinator etc.) will declare the cessation of emergency

Page 146: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 146 B. S. RANA M/s. vishwa chemicals

ensuring that all the spillage is arrested or fires are extinguished and there is no risk of re-ignition

(in case of fire).

In the case of gas, the all clear will be declared only when the source of emission has been

effectively isolated and gas clouds dispersed well below safe level.

Even when the all clear Signal has been given, great care is needed while entering affected

areas and no work in connection with salvage, collection of evidence should be commenced until

a thorough examination of the area has been carried out.

The siren code will follow for declaring the cessation of an emergency.

All clear signed shall be given by SMC / Incident Controller.

Plan appraisal and updating

The Onsite Emergency Plan Mock drills will be conducted for the appraisal and updating the

Onsite Emergency Plan.

The Onsite Emergency Plan Mock drills will review the adequacy and effectiveness of the

arrangements made / provided for emergency planning and will cover:

Awareness and promptness of action taken by the employees.

The adequacy of evacuation routes and safe assembly points.

The adequacy of fire fighting system and equipment.

The adequacy of leak / spillage control system and equipment.

The adequacy of transport and medical arrangements.

The adequacy of personal protective equipment and safety equipment etc.

Any inadequacy observed during the mock drill will be corrected and incorporated, the Onsite

Emergency Plan will be updated and any changes made in the Onsite Emergency Plan will be

made known to all.

7.2.4 Safety and mitigating measures

Safety is major consideration for M/s. Vishwa Chemicals and the industry is committed to

mitigate the ris. Important mitigating measures will be provided to contain and control the

emergency are outlined below: -

Fire Prevention and Protection measures

Page 147: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 147 B. S. RANA M/s. vishwa chemicals

Fire is the major risk at M/s Vishwa Chemicals because of storage handling and use of

flammable substances within the premises as raw material and products. Adequate control

measures are provided to detect and fight fires. The major firefighting arrangements provided

includes

Fire Detection and Alarm system: in Production block, Good Store/Raw Material Store, Q.C.

Building and Solvent Store areas.

Firefighting Arrangement: fire hydrant system consisting of 5 Nos. of fire hydrants have been

installed and 10 Nos. of Fire Extinguishers, consisting CO2 Type, Dry Chemical Powder Type

and Foam Type, are installed at various locations in the premises.

The nearest fire brigade station is situated at Maninagar approx. 10 km north.

The plant will be equipped with a comprehensive fire protection system. Following facilities will be

provided for the fire protection: -

Fire Water Supply

Fire Hydrant system, Fire sprinkler system with smoke/fire detectors

Water Pump (Hydrant Pump)

Portable Fire Extinguishers

Equipments and Process safety

M/s. Vishwa Chemicals will comply the statutory requirements and provide safety measures. The

following points to be considered:

Guard shall be provided on moving parts of machineries.

Adequate ventilation or other engineering controls shall be provided to keep the airborne

contaminants below their respective threshold limit value.

Lifting tools, tackles and machines and pressure systems will be tested and examined as per

statutory requirement.

Proper earthing and bonding shall be provided etc.

7.2.5 Post emergency planning

All evidences should be collected and accident should be investigated.

Before restart up of the activities, assessthe situation and ensure that it is safe to restart the

plant activities.

Page 148: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 148 B. S. RANA M/s. vishwa chemicals

Re-start the plant in the standard sequence.

7.2.6 Health, Safety and Environmental Protection

The policy of the company is to manufacture, handle and dispose off all substances safely and

without creating unacceptable risk to human health or the environment.'

Company is committed to complete safety and accident prevention policies for ensuring the

elimination of risk, accidents by conscientious involvement in Safety and Health Programme. The

industry will;

Establishment and maintain programmes to ensure that laws and regulations applicable to its

products and operations are known as obeyed.

Develop its own standards where laws or regulations may not be adequately protective and

adopt, where necessary, its own standard where laws do not exist.

Stop manufacturing any product or any operation if hazards of the same, to the human

beings and environment are unacceptable.

Each and every employee is expected to adhere to the spirit as well as letters of company

policy.

Any hazards, adverse situation or environmental risk which comes to their attention should be

promptly reported for the corrective measures.

Safety has been accepted as complete and separate functions like other functions such as

production, maintenance, marketing, etc.

Auditing is necessary for an effective health and safety programmes, and periodical auditing

will be carried out.

We believe safety is a team work and each and every employee of the company is

responsible and accountable for the safety.

Employee responsibility

Follow the policy and applicable laws and regulation to protect your own health and safety as

well as that of other workers, the public and the environment.

Present ideas that support the goals of policy.

Promptly report concerns about possible violation of this policy to the persons listed or to your

manager.

Page 149: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 149 B. S. RANA M/s. vishwa chemicals

Managers responsible for a facility, activity, product or service will:

Communicate responsibility with employees, communities, customers and government

agencies regarding environmental health and safety issue.

Cooperate with the public, government and other interested parties to develop appropriate

regulatory and public policies that protect employee and public health and the environment.

Implement effective programs, training and best practices for health, safety and environment

protection and for the elimination or reasonable reduction of materials.

Regularly assess plant operations & management. Establish measurements to ensure

compliance with this policy and applicable laws & regulations, when appropriate; review

assessment results with environmental programs.

Ensure that an employee with EHS responsibilities is appropriately screened before

appointment and that continued appropriateness for their position is periodically reviewed.

Develop appropriate program for safety reviews of new and redesigned products prior to sale

and distribution to customers. Monitor after-sale safety performance to identify and address

significant product safety issues.

Work cooperatively with, contractors, business partners & suppliers to ensure that our

relationships with them are supportive of this policy.

Promptly report to medical Services, Environmental Program & your assigned legal counsel

any,

Emergency evacuation, communicable disease or other serious health indent.

Work related employee facilities & other serious safety incidents requiring a report to a

governmental agency.

Information regarding a report to a governmental agency or any governmental allegations of

substantial violations of environmental laws or regulations.

Legal proceedings alleging significant property damage or personal injury from environmental

contamination or exposure to dust/chemical fumes & other information requested by medical

services or Environmental programs.

Training and rehearsing

All employees should know the details of Disaster Management plan and they must receive initial

training in emergency procedures. At suitable intervals this knowledge must be exercised and the

Page 150: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 150 B. S. RANA M/s. vishwa chemicals

basic plan reviewed and brought up-to-date. It is essential to establish the necessary confident

volunteers and better expertise, so the individuals can carry out their allocated duties. Rehearsal

of evacuation should be regularly carried out efficiently and should cause minimum disruption to

the normal activities. As per MFR, Mock Drill should be conducted six monthly.An after-mock

drill report may be prepared detailing the lacunas & strong points so as to make improvements in

the emergency action plan.

Page 151: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RAN

FOR PROP

NA

POSED MANUFACTU

EIA REPORT URING OF SYNTHETI

Page 151

C ORGANIC CHEMICCALS

M/s. vishwa cchemicals

Page 152: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 152 B. S. RANA M/s. vishwa chemicals

CHAPTER 8. PROJECT BENEFITS

8.1 Introduction

Growth in the industrial sector creates new opportunities for employment and can also help

diversify the economy. This is especially important given the high level of urbanization, and growing

levels of unemployment and poverty in many cities. Unemployment is particularly high and an

important factor in continued levels of low human well-being and slow growth. Synergistic growth in

the chemical industries could have positive spin-offs for the socio-economic development. The use

of chemical further leads to development in field of research and development. This chapter

describes about benefits of the project on improvements in the physical infrastructure, social

infrastructure, Employment potential in the region.

8.2 Improvement in the Social Infrastructure

From the very initial stage of the inception of the project, infrastructure development in and around

the project site has kept in consideration. Infrastructure development will be done based on actual

requirement of socio-economic development of the region. The infrastructure development will be

rolled out as part of company’s CSR activity.

8.3 CSR Activities

Budgetary Cost

Initially CSR budget commitment will be approximately 2 % of company’s annual profit.

Sr. No. Details Year Amount, Rs

1 Proposed Expenses for CSR 2017-18 1,00,000

M/S Vishwa Chemicals has already initiated various CSR activities for the development and

care of the area and people. The various CSR activities undertaken by M/S Vishwa

Chemicalsinclude,

Organized Health check up camp for School children.

Tree Plantation on both side of Village Road from Highway to Village.

Funds will be provided to arrange extracurricular activities for nearby schools.

Plants will be maintained at Roads passing nearby.

School uniforms, notebooks and scholarship will be provided to poor students.

Regular medical camps and eye-camps in the surrounding villages to provide treatment

with free supply of medicines and highlight the aspects of hygiene and good health.

Page 153: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 153 B. S. RANA M/s. vishwa chemicals

8.4 Economic Development

This project will increase the economic activities around the area, creating avenues for

direct/ indirect employment during operation phase of the project. There would be a wider

economic impact in terms of generating opportunities for other business like workshops,

marketing, repair and maintenance tasks etc.

This project will enhance India’s potential of supplying Bulk Drugs &Intermediates to

leading to step-up of India’s position in global market sector and strengthening of Indian

economy.

The continuous inflow of people will require local transport systems like autos, taxis etc

which would help economic boost.

8.5 Employment Potential

The Project will create direct & indirect employment opportunities within the surrounding region.

The Unit will use good faith efforts to employ local people from the nearby villages depending upon

the availability of skilled & un-skilled man-power surrounding the project site. In operation phase,

the proposed project would require significant workforce of non-technical and technical persons.

Migration of highly education and skilled experience will result in increase of literacy in the

surrounding villages.

 

Page 154: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 154 B. S. RANA M/s. vishwa chemicals

CHAPTER 9. ENVIRONMENTAL MANAGEMENT PLAN

9.1 Prelude

Environmental Management is basically resource management and environmental planning is

similar to development planning. The conventional resource management and development

planning look at the issues from narrow micro-economical point of view while environmental

management views the issues from the broader prospective of long term sustainable development

option, which ensures that the environment is not desecrated. An Environmental Management Plan

is prepared for construction phase, post construction phase (commissioning and operation) and for

post project phase. The environmental management plan is prepared to minimize the impact of

atmospheric emissions, liquid effluents, solid wastes & noise generation on the surrounding

environment.

The baseline settings of different relevant environmental components in the study area are

analyzed and potential impacts on those components due to the proposed project are documented.

The impacts on environment are found to be minimal during the study; however additional

measures are documented for operation phase for further improvement of Environmental Quality in

the form of an Environmental Management Plan (EMP).

Environment, Health and Safety (EHS)

It is of utmost concern for a company to conduct its business in a manner that will promote

the protection of the occupational Health & Safety; Welfare of its employees and others

involved in or affected by its business operations and address the environmental concerns

regarding sustainable development.

To be a responsive and responsible corporate citizen, we shall strive to achieve an

organizational culture of Safety, Health and Environmental excellence.

As an integral part of the company’s business performance, the company shall declare full

commitment to achieve high levels of performance in Health, Safety and Environment.

Continual improvements in Safety, Health and Environment shall be recognized as essential

for the future success of the company.

9.2 The Environmental Management Plan

An Environmental Management Plan (EMP) is prepared to mitigate and manage various

environmental impacts identified. The EMP presents the project specific guidelines on:

Environmental management strategies

Spill prevention and control

Page 155: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 155 B. S. RANA M/s. vishwa chemicals

Management of wastes and hazardous chemicals

Air, water and soil quality protection

Noise control

Soil erosion control and slope stabilization

Vegetation, wildlife and habitat protection

Socio-economic and welfare considerations

Risk and disaster management plan

To prepare a checklist for statutory compliance

Due to its complexity and implications, the implementation of the EMP must be executed utilizing a

specific EMS framework. Once an EMP has been approved, it should provide the basis for

environmental considerations of all the activities carried out on the site by the appointed personnel.

With respect to the various environmental impacts identified during the EIA stage, mitigation

measures to prevent or minimize the impacts are suggested for all the environmental components.

The environmental management plan for the proposed project aims to mitigate the potentially

detrimental impacts on the environment, during an operation phase of the project. It is also

necessary that continued compliance with existing environmental regulations is ensured.

9.3 Objectives of Environmental Management Plan

While developing an EMP within the framework of an EMS, it is imperative to have clear

environmental objectives and delineate them. The key environmental management objectives for

this project are to avoid significant adverse environmental impacts and to ensure that where

impacts do occur they are mitigated. In addition, the project proponent aims to meet the following

specific objectives:

To adopt operational methods that will limit environmental degradation.

To protect physical environmental components such as air, water and soil.

To improve workplace conditions for employees by reducing every kind of pollution and

improving workplace environment/atmosphere.

To make budgetary provision and allocation of funds for environment management system

and to timely revision of budgetary provisions.

To implement & ensure effective implementation of research and development program for

the innovative technologies for better environment, resource conservation/

recovery/recycling/reuse.

To eliminate/reduce the possibilityof potential hazard due to operations.

To incorporate the views and perceptions of the local inhabitants in the project.

Page 156: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 156 B. S. RANA M/s. vishwa chemicals

To generate employment opportunities wherever possible and feasible.

To provide advanced sophisticated safety system to ensure safety of the public at large.

To establish a long term program to monitor effects of the project on the environment.

9.4 EMP for Construction Phase

There will not be any Environmental management plan required because there is no construction

and/or machenary installation work involved in the proposed expansion.

9.4.1 Air Environment, Noise Environment, water environmrnt, soil/Land Environment,

management of Solid and Hazardous waste, management of Socio- economic

and cultural Environment.

There will not be any significant environmental impacts on the above aspects because there is

minimal construction and/or machenary installation work involved in the proposed expansion

project. The proposed project is an expansion of existing products as well as addition of new

products to the existing manufacturing unit of Synthetic Organic Chemicals& Intermediates. For

the expansion of production capacity, existing facilitieswill be utilized and some machinery such

as reactors, centrifuge, mill, etc. will be installed & some foundation work will also be carried out

as per requirement. Adequate mitigation measures will be taken wherever feasible.

9.5 EMP for Operational Phase

Routine operational activities of the project would be associated with the following potentially

significant environmental impacts. These activities associated with the impacts as listed hereunder:

Routine production activities:

Domestic and industrial waste water treatment

Management of Air, noise, land, water environment

Transport of material

Storage of raw material

Fire/Explosion

The operational phase activities due to proposed expansion project have the potential to cause

long-term environmental impacts. Cumulative impacts due to the air pollution are predicted using

simulation models as discussed in chapter 4.

Several control measures have been incorporated to minimize the generation of wastes and

subsequent environmental impacts during the operational phase. Strict adherence to these pollution

prevention and control measures will moderate the environmental impacts to the minimum possible

level during an operational phase. In general, the environmental management plan during

operational phase of the plant will be directed to the following:

Page 157: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 157 B. S. RANA M/s. vishwa chemicals

It will be ensured that all the pollution control/environment management systems are

commissioned before the commencement of operation of the project.

Wherever possible, the control systems will be interlinked with the operational units, so that

failure of the control system will shut down the respective operational unit.

Regular performance evaluation of the control systems will be undertaken to ensure their

optimum performance.

Preventive maintenance schedule of the control systems will be matching with that of the

respective operational unit.

Regular monitoring for various components of environment will be undertaken to ensure

effective functioning of pollution control measures as well as to safe guard against any

unforeseen changes in environment.

Efforts will be made to ensure the maximum utilization of wastes generated.

During the operational phase, there will not be any significant impacts on various

environmental components. Hence, the following Management Plan is recommended to

mitigate adverse impacts during operation phase:

9.5.1 Management of Air Environment

Emission at M/s Vishwa Chemicals will be in the form of the particulate matters and gases from

stack attached to Boiler, Scrubber, DG Sets.

A) To control gaseous emissi.ons following measures are recommended:

Regular monitoring of stacks and vent will be carried out to check the emissions. In case

emission exceeds, the corrective measures shall immediately be taken and records of the

same will be maintained.

Regular ambient air quality monitoring shall be carried out within premises and nearby area

for PM2.5, PM10, SO2, NOx, HCl and VOCs.

Emergency process Shut-down existence in case of any pollution control system deviation.

B) To control fugitive emissions following measures are recommended:

Controlled emissions and provision of PPEs for the workers.

Provision of mechanical seal in pumps.

Regular inspection of tank roof seals.

Adequate measures for the minimization/prevention of the fugitive emission.

Regular maintenance of valves, pumps and other equipment to prevent leakage.

Entire process is carried out in the closed reactors with proper maintenance of pressure and

temperature.

Regular periodic monitoring of work area to check the fugitive emission.

Page 158: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 158 B. S. RANA M/s. vishwa chemicals

The unit will also provide adequate stack monitoring facilities for the periodic

monitoring of the stack to verify the compliance of the stipulated norms.

Adequate stack heights as per the CPCB estimation will be provides at all locations to

reduce GLCs of pollutants.

Greenbelt development shall be implemented to mitigate impacts from fugitive emissions.

About 12 % of the total area of project area is developed as a greenbelt.

The air quality surveillance program will be undertaken for proposed and the program may

be strengthened properly keeping in view the combined maximum impacts from post-project

activities particularly in critical downwind directions. Moreover, in view of the industrialization

in the region, the possibility of an integrated ambient air quality-monitoring program together

with surrounding industries may be explored in consultation with GPCB.

Air Pollution Control System is already installed in the plant.

9.5.2 Management of Noise Environment

To minimize the noise pollution, the unit proposes the following noise control measures:

Manufacturers/suppliers of major noise generating machines/equipments like air

compressors, feeder pumps, etc. shall be instructed to make required design modifications

wherever possible before supply and installation to mitigate the noise generation and to

comply with the regulatory norms with respect to noise generation.

Periodic maintenance of machinery and vehicles should be undertaken to reduce the noise

impact.

Employees should be provided with Personal Protective Equipments like earplugs or

earmuffs, wherever required.

Extensive oiling, lubrication and preventive maintenance will be carried out for the

machineries and equipments to reduce noise generation.

Areas with high noise levels will be identified and will include prominently displayed caution

boards.

The green belt area is developed within industrial premises and around the periphery to

prevent the noise pollution in surrounding area.

Noise monitoring shall be carried out to check the efficacy of maintenance schedules

undertaken to reduce noise levels and noise protection measures.

Good quality digital sound level meter isin place to monitor noise level.

The sources of intermittent noise generating equipment (water pumping equipment, DG set,

compressor etc.) are provided with appropriate acoustic barriers so that the noise level

within prescribed limits of CPCB.

Implementation of greenbelt development/landscaping will reduce noise impacts within the

Page 159: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 159 B. S. RANA M/s. vishwa chemicals

project premises to a great extent.

It is recommending to measure and maintain records of noise level at various places within

and outside factory premises.

9.5.3 Management of Water Environment

Water conservation measures shall be taken to optimize the fresh water requirement in proposed

project activities. Total fresh water requirement at M/s Vishwa Chemicals shall meet through GIDC,

Ankleshwar. Total Water requirement of the proposed project for domestic & Industrial activity

during operation phase will be 13.0 KLD.

The mitigation measures for minimizing the impacts on water environment in general includes

following:

Optimum utilization of water resource.

Minimize waste generation and facilitate treatment.

Reuse/recycle and disposal.

Use of high-pressure hoses for cleaning the floor to reduce the amount of wastewater

generated.

Reducing the actual process water consumption by way of improvement in operation of

processing units.

Ensuring proper operation and maintenance schedule for the ETP.

Advance controls and instrumentation for operations and control and leak detection

techniques shall be implemented for this project.

Record of the inlet water & wastewater outlet quantity and treated water/disposal

quantity shall be maintained.

Treated water will be reused in flushing, gardening, colling and washing to minimize the

fresh water consumption.

9.5.4 Management of Land Environment

The management plan for this component of environment lays emphasis on development of

greenbelt comprising of appropriately selected species of shrubs and trees. Plantation has been

made on sites, road sides and around waste treatment units. Such a development of greenbelt and

plantation of shrubs and trees will not only significantly reduce or mitigate adverse impacts due to

aerosols and gaseous pollutants, noise, odournuisance etc, but also, serve as shelter belts for

avifauna, stabilize and improve soil permeability and aesthetic environment.

9.5.5 Management of Solid and Hazardous Waste

Waste is an unavoidable byproduct of human activity. Economic development, rapid urbanization &

improved living standards have led to the increase in quantity & complexity of the waste generated.

Page 160: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 160 B. S. RANA M/s. vishwa chemicals

Proper disposal of waste is essential for preservation and improvement of public health.

Solid waste management is one of the most essential services for maintaining the quality of life in

the plant and for ensuring better standards of health and sanitation. Solid waste generated in the

plant area can be handled under two main categories, namely domestic wastes and industrial

wastes. Effective measures will be taken to effectively implement the solid waste management

systems in the plant. Solid waste will be handed over to authorized vendor for disposal.

The Hazardous waste will be handled as per Hazardous and other Wastes (Management and

Transboundary Movement) Rules, 2016.

The hazardous wastes generated such as used oil, Distillation residues, Waste residues, spent

solvents, Hydrobromic acid, Ammonium Chloride, ETP Sludge, Oil & grease skimming, Filter

material, discarded product material (R & D basis) and Discarded containers generated from the

proposed project shall be collected in barrels and shall be sold to the authorized recyclers or

CHWTSDF site or authorized vendor identified by the GPCB/CPCB.

General Guidelines for Waste Management:

1. Solid Waste The solid waste shall be segregated as bio-degradable and non-biodegradable.

The organic waste will be segregated and handed over to outside agency for disposal.

The non-biodegradable (inorganic) waste shall be handed over to authorized recycler for

further handling and disposal.

Reuse of paper and plastic waste.

Planned system for waste collection, segregation and disposal.

2. Hazardous waste

Hazardous waste will be stored in proper storage room and handed over to authorized

vendor for final disposal.

The collection, storage and disposal of hazardous waste will be as per Hazardous and other

Wastes (Management and Transboundary Movement) Rules, 2016, and hence no adverse

impact on land environment is envisaged.

9.5.6 Management of Hazardous Raw materials

The Hazardous raw materials will be handled with every care and precautions. SOP will be followed

for handling the chemicals. The list of raw materials and storage is given in chapter-2.

9.5.7 Management of Biological Environment

Wastewater (Effluents) generated by industry and domestic wastewater (sewage) will be

treated adequately. No contaminated water will be allowed to enter the surrounding

Page 161: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 161 B. S. RANA M/s. vishwa chemicals

environment or surface water body.

Green beltis developed all along the boundary of the installation by choosing fast growing

and resistant varieties suitable to the soil conditions in the site (native plants) and special

care will be taken to maintain it.

Survival rate of the planted trees will be closely monitored in the green belt and the trees

which could not survive should be counted.

There will be a waste management plan developed for categorization and handling of

wastes.

9.5.8 Management of Socio-economic factors

In order to mitigate the impacts likely to arise out of the proposed project and also to

maintain goodwill of local people for the proposed project, it is necessary to take steps for

improving the social environment. Necessary social welfare measures by the industry will be

useful in gaining public confidence depending on local requirement.

Some basic amenities, viz. safe drinking water supply, regular medical checkup in the

villages will be taken up.

Formal and informal training to be provided to the employees of the effected villages due to

the project will be taken up on priority basis. Job oriented skill training, courses may be

organized.

Personal protective facilities like helmets, safety (gas) mask/safety dress, shoes etc. are

ensured for all workers, engaged in operation.

9.5.9 Management of Traffic

Two gates, one for entry and the other for exit are provided with 8m wide approach roads.

Convex mirror placed along all critical points for visibility.

Adequate Ramp Feeds will be provided.

Flow of traffic is eased out by providing adequate entries and exits space.

Zebra crossings shall be provided on the existing road for pedestrian access.

Entry and exit is managed by security personnel who also regulate the traffic.

Thus the traffic management will be easily and smoothly monitored without any hindrances

to the regular flow of traffic on the main road.

9.6 Additional Mitigation Measures

In addition to the above suggested measures for management of air, water, soil, traffic etc following

additional measures shall be provided.

Page 162: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 162 B. S. RANA M/s. vishwa chemicals

9.6.1 Water Conservation

Water conservation will be practiced to the extent possible by use of reclaimed water for all non

potable application like gardening, lawns, floor washing, flushing toilets etc.

A. Minimizing Water Consumption

Combination of water saving appliances and water management measures will be planned in the

plant. The message of water conservation will be spread to all occupiers on site by way of

awareness campaigns and circulars. Specific measures that will be implemented include the

following:

B. Management Measures

Reduce toilet cistern volume in single flush models.

Promote awareness on water conservation and reducing water wastage.

Quick fixing of leaking taps pipes and toilet cisterns.

Sweep with a broom and pan where possible, rather than hose down external areas.

C. Water Saving Investments

Reduce water delivery in taps and showers, through the installation of low flow devices or

aerators on showerheads.

Spring-loaded taps.

Installation of sub-meters on key areas of water use-monitoring is a precursor for

management.

Water Efficient Plumbing Fixtures.

9.6.2 Energy Conservation

Energy conservation measures are often the easiest, quickest and cheapest way to reduce costs

and be environmentally pro-active. Energy conservation will be one of the focuses during planning

and operation stages. The conservation efforts would consist of the following:

A. Architectural design

Public areas will be cooled by natural ventilation as opposed to air-conditioning.

Maximize the use of natural lighting through design.

B. Energy Saving Practices

Purchase of energy efficient appliances.

Constant monitoring of energy consumption and defining targets for energy conservation.

Adjusting the settings and illumination levels to ensure minimum energy used for desired

comfort levels.

Condensates are recovered and send back to boiler.

Page 163: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 163 B. S. RANA M/s. vishwa chemicals

Proper temperature controls are provided to reduce load on heating systems.

Proper load factor is maintained by the company.

Company will adopt good maintenance practices and will maintain good housekeeping

which will help in better illumination levels with least number of fixtures.

On most of roofs transparent acrylic sheets are provided to use day light and to stop use of

lights during day time.

CFL/LED lamps are provided, wherever applicable.

To the extent possible and technically feasible, energy efficient equipment is selected.

Gravity flow is preferred wherever possible to save pumping energy.

Recycling of water will have done.

C. Behavioral change on consumption

Awareness on energy conservation.

Training to staffs on methods of energy conservation.

D. Solar Architectural Features

The proposed project will provide enough day light factors in the building to permit maximum day

light to interior to minimize overall energy consumption.

These features will also minimize the impact of climate both in summer and in winter and as a

result, the use of electricity will likely to be reduced.

E. Thermal Characteristics of Building Envelope

Focusing on the high performance energy efficient U & R values can bring down the building energy

consumption i.e. the operational cost for any commercial buildings. To evaluate the energy

performance, the heat transfer coefficient (U-value) and Resistance (R) factors are to be considered

for the building.

9.6.3 Storm Water Management

Surface drainage has designed based on the maximum rainfall intensity prevalent in the area.

Storm water drains is already constructed & channelized to existing ETP. Storm water from the

entire plot is collected through network of storm drains. The dimension of the existing drain is 100

mm x 100 mm.

9.6.4 Green Belt Development

An ideal green belt always imparts scenic beauty besides providing roosting/perching place for

birds and ground surface for naturally available reptiles, other flora and fauna species, to make the

area more natural and hazard free.

Most of the existing trees will be retained at site so as to minimize adverse impact on flora and

fauna. It is proposed to add local fast growing species for landscaping. Development of green belt

Page 164: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 164 B. S. RANA M/s. vishwa chemicals

with carefully selected native plant species is of prime importance due to their capacity to reduce

noise and air pollution impacts by attenuation/assimilation and for providing food and habitat for

local macro and micro fauna. This not only overcomes the problem but also enhances the beauty of

area that will attract bird and insect species and by this way ecology of the area will maintain to a

great extent. For developing the greenbelt in and around proposed project sites care need to be

taken to plant the evergreen species. The planting of evergreen species may have certain

advantages that may reduce the environmental pollution.

Preparation of Greenbelt Plan

The greenbelt is of a suitable width where addition saplings will be provided along the periphery of

project site area including unit complex, space between the units located within the project, along

the roads, storage areas, loading / unloading areas of products etc.

Greenbelt Area Details

A. Within project site

Green belt will be developed in 257 m2 area of the total plot area. Additional saplings will be

planted on the periphery of the boundary of the plot.

B. Roadside Plantation

Roadside plantation plays a very important role for greening the area, increasing the shady area,

increasing aesthetic value and for eco-development of the area. The approach roads to project site

will be planted with flowering trees.

The trees should be tall in peripheral curtain plantation and with large and spreading canopy in

primary and secondary attenuation zone. It is also recommended to plant few trees, which are

sensitive to air pollution as air pollution indicator.

Green belt Development in premises

Unit has proposed Environment

A total of 257 m2 of greenbelt area will develop within plant premises of the total area) as per CPCB

norms. It is proposed to plant additional local, fast growing species with adequate spacing and

density for their fast growth and survival for landscaping.

9.6.5 Odour Management Plan

Odour Problem and Sources of Emissions

Causes of odour can be bad sanitation, bacterial growth in the interconnecting pipes &

unattended drains etc.

Remedial Measures

Better management to avoid staling.

Page 165: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 165 B. S. RANA M/s. vishwa chemicals

Use of sanitation biocides to minimize the growth of aerobic/anaerobic micro–organisms.

Steaming of major pipe lines.

Proper cleaning of drains.

Regular use of bleaching powder in the drains to avoid growth of sulphur decomposing

micro-organisms to control H2S generation.

Following Additional methods can also be used to reduce odour nuisance:

Green belt development in the buffer zone may help at least partially to mitigate / obfuscate

the odour.

Ensuring that the operation is carried out under the best management practices.

If still the odour persists then the nozzles, sprayers and atomizers that spray ultra-fine

particles of water or chemicals can be used along the boundary lines of area sources to

suppress odour.

9.6.6 Safety measures to prevent the Occupational Health Hazards

Pollution Control system will be installed.

Proper storage tanks will be designed.

Electrical equipments will be properly earthed & lock out/tag out, electrical isolation method

shall be developed & displayed at required locations.

Proper training shall be given to all the employees at regular time period to bring

awareness among the employees.

9.6.7 Social welfare measures for future planning

To provide materials and monetary aid to schools, primary health centers, hospitals and places of

worship.

Planning to create more effective medical, educational and recreational facilities for our

employees.

Rural Development Programmers for up liftmen of people in the form of de-addiction, self-

help, vocational training and guidance etc.

Contributed in any welfare society.

Adoption of Local School/Slum for up liftmen of locals.

9.7 Summary of Environment Management Plan and Actions

A summary of the recommended measures or actions proposed with respect to the various

envisaged impacts as a part of Environment Management Plan is given inbelow table:

Page 166: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 166 B. S. RANA M/s. vishwa chemicals

Table 9.1: Summary of Environmental Management Plan

Sr.

No.

Environmental

Component

Potential

Impacts

Potential

source of

Impact

Controls though EMP

and Design

Impact

Evaluation

1. Water Water

contamination

Operation

phase:

Discharge of

domestic

wastewater

Domestic waste water

will be disposed in soak

pit.

No adverse

impact

Surface runoff

from site

Storm Water

Management has already

been provided to prevent

runoff and water logging.

Positive

impact

Generation of

industrial waste

water

Waste water from

washing activity will be

collected and reused.

No adverse

impact

2. Air Quality Particulate &

gaseous

emissions of

SPM, SO2,

NOx

Operation

Phase:

DG Set

Applicable height of

stack will be maintained.

Periodic maintenance

of DG set & monitoring

will be carried out.

No

significant

impact

Particulate &

gaseous

emissions of

SPM, SO2,

NOx

Emissions from

vehicular traffic.

Adequate wide

approach road is

proposed for smooth

vehicular movement.

Approach road side

plantation will further act

as sink to gaseous

emission.

No

significant

impact

Flue gas

emissions &

process

gaseous

emissions

Boiler, Process

reactor

Adequate stack height

is provided for flue gas

emissions.

is provided for process

gaseous emissions.

No

significant

impact

Page 167: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 167 B. S. RANA M/s. vishwa chemicals

Sr.

No.

Environmental

Component

Potential

Impacts

Potential

source of

Impact

Controls though EMP

and Design

Impact

Evaluation

3. Noise Increase in

noise level

Operation

Phase:

Vehicles

movement

Wide road and ample

parking space are

provided. Vehicles with

inbuilt silencer shall be

allowed in the site.

No

significant

impact

Pumps,

compressors &

other

machineries

Adequate baffling and

mufflers are provided.

No

significant

impact

D.G. sets

operations

Generator with inbuilt

muffleris provided.

Ear plugs shall be

provided to operators of

DG set.

Periodic maintenance

& monitoring of DG set

for noise level.

No impact.

4. Land Land

contamination

Operation

Phase:

Municipal solid

waste like

rubbish, paper,

plastic garbage

etc.

Efficient solid waste

collection and storage

facility is proposed.

No

significant

impact

Segregation of waste as

biodegradable and non

biodegradable waste will

be done and shall be

handed over to

authorized

vendor/recycler.

No

significant

impact

Hazardous

wastes like

used oil,

discarded

containers,

used filter cloths

etc.

All the hazardous

waste will be properly

stored & disposed off to

CHWTSDF site or sold to

the authorized vendor for

reuse/recycling.

No

significant

impact

Page 168: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 168 B. S. RANA M/s. vishwa chemicals

Sr.

No.

Environmental

Component

Potential

Impacts

Potential

source of

Impact

Controls though EMP

and Design

Impact

Evaluation

5. Biodiversity

Impact on

Flora &

Fauna

Operational

Phase:

Increase of

green cover

Green belt is already

developed as per

landscaping plan at site

and periphery of the

boundary.

Positive

impact

6. Traffic Pattern

Increase of

vehicular

movements

Operational

Phase:

Traffic due to

commercial

once the site is

operational

Vehicular movement

will be regulated inside

the site with adequate

roads and parking shall

be provided.

Insignificant

impact

7. Socio-

Economic

Increase in

Job

opportunities

Operational

Phase

Socio-economic

development through

CSR activity will be made

Positive

impact

The Environmental Management Plan shall be effectively implemented so that optimum benefit

could be achieved. The Environmental Management and Monitoring Plan shall be synchronized

with the operational schedules.

9.8 Findings

From the foregoing sections it is clear that environmental considerations are foremost during

operational phase of the project.

The following findings are to be mentioned:

The Project will have no significant environmental impacts during operational phase.

Project risks will be minimized through rigorous enforcement of international design and

operational standards.

The environmental and safety aspects of the project are straightforward and well

understood.

A detailed environmental impact study is carried out and EMP will be implemented. No

further studies are required to elaborate these subjects.

Page 169: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 169 B. S. RANA M/s. vishwa chemicals

The EMP also provides for establishing, and maintaining a system of environmental monitoring

and auditing to ensure strict compliance of all the measures identified in the EMP, and minimize

adverse environmental and social impacts.

9.9 Conclusions

During operation phase of the project, none of the routine activities will cause any noticeable

impact on any component of the environment, including the socio-economic component. Provision

of green belt, storm water management and energy conservation shall further facilitate in overall

scenario management of Environment.

Thus, it can be concluded on a positive note that after the implementation of the mitigation

measures and Environmental Management Plan, the proposed project shall have negligible impact

on environment and will benefit the local people and economy.

Page 170: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

EIA REPORT

FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS

Page 170 B. S. RANA M/s. vishwa chemicals

CHAPTER 10. CONCLUSION

The present report is based on the work carried out by M/s. B. S. RANA baselinedata collection

carried out by them only. The EIA report contains in depth study on Environmental quality and

EnvironmentalManagement Plan to mitigate the impacts including Risk Assessment and

DisasterManagement Plan. The project is technically, environmentally and

socioeconomicallyviable and is beneficial at local level, state level and national level.

The project M/s Vishwa Chemicalsseems to be safety conscious and awareabout impacts of

industrial projects and is environment friendly.

We may conclude as under:

The project proponent will follow all the statutory norms and guidelines as per EPA, 1986 to

safeguard environment.

Industrial & domestic wastewater generated fromthe proposedproject will be treated in ETP

& treated water shall be recycled in plant operations & reused in gardening, flushing, cooling

& washing. Thus, will achieve Zero Liquid Discharge (ZLD).

Ambient Air Quality of the project site are concerned viz. SPM (PM10& PM2.5), SO2 and

NOx, their concentrations in the ambient air at the proposed site were observed to be well

within the prescribed limits.

The operational phase noise shall be within industrial premises which will not exceed 75 dB

(A).

No significant impact is seen on flora and fauna.

The project will generate employment opportunities during an operational stage. The

standard of living of local people due to employment is likely to be better, so we may say

that it is positive socio-economic impact. The region will get economic boost.

Overall, the project will have positive impact for socio-economic and cultural development.

 

Page 171: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/EIA...EIA REPORT FOR PROPOSED MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS Page 1 B. S. RANA M/s.VISHWA

B. S. RANA

FOR P

A

PROPOSED MA

EIAANUFACTURING

A REPORT G OF SYNTHET

Page 171

TIC ORGANIC CCHEMICALS

M/

/s. vishwa chemicals