Rehabilitation and Modernization of the Temascal Hydroelectric Power Plant Units 1-4 The Temascal Hydroelectric Plant is located in the Municipality of San Miguel Soyaltepec in the State of Oaxaca. The project consists of the rehabilitation and modernization of this hydroelectric plant’s electric generators and hydraulic turbines. These works are planned to increase the efficiency of the hydraulic turbines, by optimizing their specific water consumption, consequently improving the availability of the units. These generating units have a gross effective capacity of 28.5 MW each. They provide the energy generated on the Eastern side of the National Interconnected System. The project includes the engineering, design, manufacturing, construction, testing and commissioning of the hydraulic turbines and the electric generators of the four units located in this plant. Specific turbine water consumption will be reduced from 10.06 to 8.86 m3/kWh, thereby increasing availability by 9.38%. The estimated project implementation period is 42 months. Project Details: Geographic location State of Oaxaca Relevant Facts: Estimated investment: 27 million U.S. dollars Pre-bid Docs Publication: Final Docs Publication: Proposals Filing: Awarding of Contract: COD: June 25,2014 August 19, 2014 February 19, 2015 March 9, 2015 September 2018 Comisión Federal de Electricidad

Rehabilitation and Modernization of the Temascal ... · Hydroelectric Power Plant Units 1-4 The Temascal Hydroelectric Plant is located in the Municipality of San Miguel Soyaltepec

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Rehabilitation and Modernization of the Temascal ... · Hydroelectric Power Plant Units 1-4 The Temascal Hydroelectric Plant is located in the Municipality of San Miguel Soyaltepec

Rehabilitation and Modernization of the Temascal Hydroelectric Power Plant Units 1-4The Temascal Hydroelectric Plant is located in the Municipality of San Miguel Soyaltepec in the State of Oaxaca.

The project consists of the rehabilitation and modernization of this hydroelectric plant’s electric generators and hydraulic turbines.

These works are planned to increase the efficiency of the hydraulic turbines, by optimizing their specific water consumption, consequently improving the availability of the units.

These generating units have a gross effective capacity of 28.5 MW each. They provide the energy generated on the Eastern side of the National Interconnected System.

The project includes the engineering, design, manufacturing, construction, testing and commissioning of the hydraulic turbines and the electric generators of the four units located in this plant.

Specific turbine water consumption will be reduced from 10.06 to 8.86 m3/kWh, thereby increasing availability by 9.38%.

The estimated project implementation period is 42 months.

Project Details:

Geographic locationState of Oaxaca

Relevant Facts:Estimated investment: 27 million U.S. dollars

Pre-bid Docs Publication:Final Docs Publication:Proposals Filing:Awarding of Contract:COD:

June 25,2014

August 19, 2014

February 19, 2015

March 9, 2015

September 2018

Comisión Federal de Electricidad