Rapid Frac Material Handling Beth Nowacki SCMP Intern Final Presentation B.U.M: Thomas Sweeney PGL: Kaci Cook August 4, 2011

Rapid Frac Material Handling

  • Upload
    keon

  • View
    34

  • Download
    0

Embed Size (px)

DESCRIPTION

Rapid Frac Material Handling. Beth Nowacki SCMP Intern Final Presentation B.U.M: Thomas Sweeney PGL: Kaci Cook August 4, 2011. About Me- Elizabeth (Beth) Nowacki. Tables of Contents. HSE project Rapid Frac Material Handling Lessons Learned Thank you!. - PowerPoint PPT Presentation

Citation preview

Page 1: Rapid Frac Material Handling

Rapid Frac Material Handling

Beth NowackiSCMP Intern Final Presentation

B.U.M: Thomas SweeneyPGL: Kaci CookAugust 4, 2011

Page 2: Rapid Frac Material Handling

2FOR INTERNAL USE ONLY

About Me- Elizabeth (Beth) Nowacki

B.S. Industrial Engineering, Minor in

Mathematics

LSU- GEAUX TIGERS!!

Dallas Native

Page 3: Rapid Frac Material Handling

3FOR INTERNAL USE ONLY

Tables of Contents

HSE project

Rapid Frac Material Handling

Lessons Learned

Thank you!

Page 4: Rapid Frac Material Handling

4FOR INTERNAL USE ONLY

HSE: Recommendations to improve Ergonomics in the Send Out Crating Area

Ergonomic Issues:

Back StrainKnee Problems

Page 5: Rapid Frac Material Handling

5FOR INTERNAL USE ONLY

JSA/ RISK ASSESSMENT FORM

• Kneepads• Lifting Table

Page 6: Rapid Frac Material Handling

6FOR INTERNAL USE ONLY

Rapid Frac

Enables continuous pumping of multi-zone treatments

Helps reduce completion cycle time and improve production

Page 7: Rapid Frac Material Handling

7FOR INTERNAL USE ONLY

-Field estimates 1200 assemblies per month

- Takt rate of 72 assemblies per day.

Project Statement: Improve the overall logistics of

handling rapid frac material.

Rapid Frac

Page 8: Rapid Frac Material Handling

8FOR INTERNAL USE ONLY

Introduction to Halliburton Introduction to Rapid Frac

Data Collection Basic Analysis

Weeks 1-6

Page 9: Rapid Frac Material Handling

9FOR INTERNAL USE ONLY

Saws

Crating

Receiving

Warehouse

QM Lot

TRT

Inspection

Manufacturing

Assembly

RF

RF

RF

External Vendor

- In house production only

- In house production, with external finishing's

- External production

Page 10: Rapid Frac Material Handling

10FOR INTERNAL USE ONLY

Saws

Crating

Staging

QM Lot

External Vendor

Staging

Send Out

Organize

Staging

Receiving Dock

1

2

45

78

9

6

WarehouseRF

1110

3

Areas of Improvement Crating (1.5 hours) Receiving (10 days)

Re-palletize (15 mins) Saw Area

Initial State

Page 11: Rapid Frac Material Handling

11FOR INTERNAL USE ONLY

Saws

Crating

Staging

External Vendor

Staging

Send Out

Organize

Staging

Receiving Dock

2

WarehouseRF

3

5

Long Bar Send Out

Pallet Pull System

1

4

6

Ideal Future State

QM Lot

Crating: Before: 1.5 hours After: NONE

Receiving Before: 10 days After: 3 days

Re-palletize Before: 15 mins After: NONE

Page 12: Rapid Frac Material Handling

12FOR INTERNAL USE ONLY

ROI- Receiving Current State (150-300 Assemblies)

Average Number of Pallets Received per day– 5.6 pallets

Time spent Re-palletizing per day (15 min/pallet)– 84 min or 1.4 hours per day– 285 hours per year

Indirect Labor Cost (Labor Burn Rate $56/hour)– $78.40/day– $15,993.80/year

Page 13: Rapid Frac Material Handling

13FOR INTERNAL USE ONLY

ROI- Receiving Future State with Current Pallet System

Average Number of Pallets Received per day– 22.4 pallets

Time spent Re-palletizing per day– 336 min or 5.6 hours per day– 1,442 hours per year

Indirect Labor Cost (Labor Burn Rate $56/hour)– $313/day– $63,974 /year

Page 14: Rapid Frac Material Handling

14FOR INTERNAL USE ONLY

Implementing a standardize pallet will be the most efficient way to improve overall logistics of Rapid Frac.

• Reduce the number of Touches• Reduce time in Receiving

• Reduce time in Crating• Integrate into the Pull Systems• Ergonomically and Cost Effect

Introduction to Halliburton

Introduction to Rapid Frac

Data Collection Basic Analysis

Research Solutions

Ergonomic Assessment

Container Comparisons Action Plan

Weeks 1-6 Weeks 7-12

Page 15: Rapid Frac Material Handling

15FOR INTERNAL USE ONLY

Requirements For Standardize PalletGood

Ergonomics: Lifting

Good Ergonomics: Transportation

Under $350 each

Reduce Time in Receiving

Reduce Time in Crating

Forklift Accessible

Weight Capacity of 2000 lbs

Ability to stack at least 3 high

Pallets

Wire Basket

Steel Corrugated

Bin

Metal Pallet with

Removable Doors

Page 16: Rapid Frac Material Handling

16FOR INTERNAL USE ONLY

Metal Pallet (Wooden Replica)

Good Ergonomics: both Transporting and Lifting

$276 2000 lbs static load Stackable (3) Forklift Accessible 2 Removable Doors Lined with cardboard or

corrugated plastic

Page 17: Rapid Frac Material Handling

17FOR INTERNAL USE ONLY

Sustainability

Management of Change

Standard Work

10 metal pallets on order– 3 week lead time

Jason Besly- EPIC Project Manager - Rapid Frac

Page 18: Rapid Frac Material Handling

18FOR INTERNAL USE ONLY

Initial State Future State

# of Touches (Specifically in the Send out Process) 11 touches 6 touches

Reducing time in Crating 1.5 hours None

Waiting time in Receiving 10 days15 min

3 daysNone

Integrate into Pull System 0 2

By Implementing a the metal pallet with two removable doors:

$63,974 ROI

Page 19: Rapid Frac Material Handling

19FOR INTERNAL USE ONLY

Lessons Learned

Ask Questions!

Don’t wait for something to happen, make it happen yourself!!

Network!!!!

Good communication is essential!

Page 20: Rapid Frac Material Handling

20FOR INTERNAL USE ONLY

Thank You! Ryan Arrington Jason Besly Mark Bregenzer Kaci Cook David Dockweiler Gary Freet Joe Haddad Bryan Hensley Dean Wynia Jimilee McCleskey Susan Price Lynsey Ritchie

Cheri Rogers Shannon Sixkiller Tom Sweeney Dan Swofford Donna Willis Chad Woodward Carrollton Interns

– Austin Baltes– Kimberly Caleon– Haley Helweg– Lee Smiley– Javier Penaflor– Aditya Mittal

Page 21: Rapid Frac Material Handling

21FOR INTERNAL USE ONLY

Questions?

Page 22: Rapid Frac Material Handling

22FOR INTERNAL USE ONLY

Action Plan People

– Overall Manager: Jason– To finish ergonomic testing of metal samples: (Epic: Jason or Dean)– Updating Vendors on how to properly load parts (Jim Gilmore with Standard

Work from Beth)– Inform Receiving and Crating on new pallets (Mark Bregenzer)– Pallet included in PO (Joy)

6 star documents (SOP) standard work– Instructions put parts in bin/pallet– MOC– ROI(completed)

Page 23: Rapid Frac Material Handling

23FOR INTERNAL USE ONLY

Saws

Crating

Receiving

Warehouse

QM Lot

TRT

Inspection

Manufacturing

Assembly

RF

RF

RF

External Vendor

11 touches

Page 24: Rapid Frac Material Handling

24FOR INTERNAL USE ONLY

Saws

Crating

Receiving

Warehouse

QM Lot

TRT

Inspection

Manufacturing

Assembly

RF

RF

RF

External Vendor Long Bar

Send Out

Bin Pull

6 touches

Page 25: Rapid Frac Material Handling

25FOR INTERNAL USE ONLY

Saws

Crating

Receiving

Warehouse

QM Lot

TRT

Inspection

Manufacturing

Assembly

RF

RF

RF

External Vendor

23 touches

Page 26: Rapid Frac Material Handling

26FOR INTERNAL USE ONLY

Saws

Crating

Receiving

Warehouse

QM Lot

TRT

Inspection

Manufacturing

Assembly

RF

RF

RF

External Vendor

22 touches

Page 27: Rapid Frac Material Handling

27FOR INTERNAL USE ONLY

Saws

Crating

Receiving

Warehouse

QM Lot

TRT

Inspection

Manufacturing

Assembly

RF

RF

RF

External Vendor

16 touches

Page 28: Rapid Frac Material Handling

28FOR INTERNAL USE ONLY

Manufacturing Process