    QUALITY ASSURANCEPROJECT PLANS

    Overview

  • 7/31/2019 Qapp Student

    2/74

    qapp 2

    Course Schedule

  • 7/31/2019 Qapp Student

    3/74

    qapp 3

    Course Objectives

    After this training, you will be able to:

    Discuss what information is required in aQA

    Project Plan

    Describe your role and responsibility in the

    QA Project Plan development, review, and

    approval process

  • 7/31/2019 Qapp Student

    4/74

    qapp 4

    What is meant by environmentaldata?

    Information that describes environmental

    processes, locations or conditions, and

    health effects or consequences. It can be:

    Collected directly from measurements

    (primary data) Produced from models, or

    Compiled from other sources (existing

    or secondary data)

  • 7/31/2019 Qapp Student

    5/74

    qapp 5

    What is a Quality System?

    A structured and documentedmanagement system which has a system

    in place for ensuring the quality of its workprocess, products and services.

    The QMP describes the policies,

    objectives, principles, organizationalauthority, responsibilities, accountability,and implementation plan of theorganization

  • 7/31/2019 Qapp Student

    6/74

    qapp 6

    Where can I find this information?

    INTERNAL

    EPA Order 5360.1 A2 (the Order)

    EPA Order 5360 A1(the Quality Manual)

    ANSI/ASQC E-4-1994 Specifications and

    Guidelines for Quality Systems forEnvironmental Data Collection and

    Environmental Technology Programs

  • 7/31/2019 Qapp Student

    7/74

    qapp 7

    Extramural Regulations QADocumentation

    48 CFR 46 Quality Management Plan (or

    equivalent) and a QA Project Plan (or

    equivalent)

    40 CFR 30 Quality Management Plan and a QAProject Plan

    40 CFR 31 Quality System must conform to the

    American National Standard(ANSI/ASQC-E-4, 1994). Submit a

    Quality Manual and a QA Project Plan

    40 CFR 35 Comply with 40 CFR 31

  • 7/31/2019 Qapp Student

    8/74

    qapp 8

    What is a QA Project Plan?

    A document that describes the technical

    and quality activities of an environmental

    data operations project that should beimplemented to ensure that the results of

    the work performed will satisfy the data

    users needs.

  • 7/31/2019 Qapp Student

    9/74

    qapp 9

    Why should I write a QA Project Plan?

    QA Project Plans are prepared for all EPA

    projects and tasks involving

    environmental data operations (generatingor using).

    Non-EPA organizations which receive EPA

    funds need to satisfy those requirements

    defined in the Code of Federal

    Regulations.

  • 7/31/2019 Qapp Student

    10/74

    qapp 10

    ProblemIdentification

    Proposal

    Plan

  • 7/31/2019 Qapp Student

    11/74

    qapp 11

    QA Project Planning andQA Project Plan Preparation

    A Team Effort

  • 7/31/2019 Qapp Student

    12/74

    qapp 12

    Project/QA Project Plan Development

    Scope

    Assemble a team

    Systematically plan Write the Plan

    Submit the Plan for review and approval

    Once approved, distribute the plan Start work, following the plan

    Revise when needed, get approval,

    then re-distribute the plan

  • 7/31/2019 Qapp Student

    13/74

    qapp 13

    Systematic Planning

    (e.g., DQO Process)

    QA

    Project Plan

    Standard

    Operating

    Procedures

    Conduct Study/

    Experiment

    Technical

    Assessments

    Data Verification

    & Validation

    Data Quality

    Assessment

    Planning Implementation Assessment

  • 7/31/2019 Qapp Student

    14/74

    qapp 14

    Four Main Topics:

    A. Project Management 9

    elements

    B. Data Generation/Acquisition 10elements

    C. Assessment and Oversight 2

    elementsD. Data Validation and Usability 3

    elements

    24

  • 7/31/2019 Qapp Student

    15/74

    qapp 15

    References

    Existing Documentation can beReferenced and/or Attached!

  • 7/31/2019 Qapp Student

    16/74

    qapp 16

    Different Types of QA Project Plans

    Task-Specific QA Project Plans: those

    projects for which the environmental data

    operation is task, site or project specific.

    Generic or Programmatic QA Project

    Plans: those projects for environmentaldata operations conducted at multiple

    locations and/or over a long period of

    time.

  • 7/31/2019 Qapp Student

    17/74

    qapp 17

    Level of Detail -the Graded Approach

    The level of detail in each QA Project

    Plan will vary according to the nature of

    the work being performed and theintended use of the data.

    high road

    low road

  • 7/31/2019 Qapp Student

    18/74

    qapp 18

    QA Project Plan Review

    For EPA projects, the Project Manager and

    QA Manager, or designee, review the QA

    Project Plan.

    For extramural projects, the funded

    organization reviews the plan, as well as

    the

    EPA organization.

  • 7/31/2019 Qapp Student

    19/74

    qapp 19

    Review to ensure that:

    The plan is accurate and complete,

    Sufficient data will be collected using

    appropriate measurement and dataacquisition methods,

    Planned assessment procedures will be

    adequate to evaluate the project, and There is a process to identify any

    limitations on the data use.

  • 7/31/2019 Qapp Student

    20/74

    qapp 20

    Reviewers should:

    Be timely in their review,

    Be consistent in their review,

    Have a process established to deal withrevisions, and

    Have expertise in technical areas and

    recognize where they need advice.

  • 7/31/2019 Qapp Student

    21/74

    qapp 21

    QA Project Plan Approval

    Is the responsibility of the EPA Project

    Manager and QA Manager, and

    Indicates that the QA Project Plan is

    accurate and complete, and that it

    provides sufficient detail to identify theproject's technical and quality objectives.

  • 7/31/2019 Qapp Student

    22/74

    qapp 22

    Conditional Approval

    May be given in situations where the

    project may be started while "non-critical

    deficiencies" are being resolved.

  • 7/31/2019 Qapp Student

    23/74

    qapp 23

    QA Project Plan Implementation

    Data collection may not be started until the

    QA Project Plan has been reviewed,

    approved and signed.

    The QA Project Plan should be

    implementedas approved.

  • 7/31/2019 Qapp Student

    24/74

    qapp 24

    Revisions - After Approval

    When changes are needed, the QA Project

    Plan should be revised and re-approved by

    the approving official(s) prior to the changebeing made.

  • 7/31/2019 Qapp Student

    25/74

    qapp 25

    Regular Reviews

    QA Project Plans for multi-year projects

    should be reviewed annually and revised

    when necessary.

  • 7/31/2019 Qapp Student

    26/74

    qapp 26

  • 7/31/2019 Qapp Student

    27/74

    qapp 27

  • 7/31/2019 Qapp Student

    28/74

    qapp 28

  • 7/31/2019 Qapp Student

    29/74

    qapp 29

    Project #/Name ___________

    Revision No. ___________Date ___________Page ____ of ____

  • 7/31/2019 Qapp Student

    30/74

    qapp 30

    List key personnel of all organizations who

    need a copy of the approved QA Project

    Plan and revisions

  • 7/31/2019 Qapp Student

    31/74

    qapp 31

    Identify individuals and state their roles

    and responsibilities in the project

    Attach an organizational chart and

    indicate lines of communication

    (include data users and

    subcontractors)

  • 7/31/2019 Qapp Student

    32/74

    qapp 32

    Describe the underlying issue that led to

    this project, including background/

    historical information indicating the needfor this study.

  • 7/31/2019 Qapp Student

    33/74

    qapp 33

    Summarize work to be performed, products

    to be produced, and the schedule for

    implementation

  • 7/31/2019 Qapp Student

    34/74

    qapp 34

    Time

    People

    Materials

  • 7/31/2019 Qapp Student

    35/74

    qapp 35

    State the quality objectives for the project

    and the performance criteria to achieve

    these objectives, i.e., the quality of data

    needed to support your decision

    - Decision quality is based on data/

    information quality

  • 7/31/2019 Qapp Student

    36/74

    qapp 36

    Precision

    Accuracy/Bias

    Representativeness

    Comparability

    Completeness

    Sensitivity

  • 7/31/2019 Qapp Student

    37/74

    qapp 37

    Representati eness

  • 7/31/2019 Qapp Student

    38/74

    qapp 38

    Representativeness

    Comparability

    Completeness

  • 7/31/2019 Qapp Student

    39/74

    qapp 39

    Relative Positions of

    MDLs and CC Consequence

    MDL CC Non-Detects and Detects

    Useable

    MDL CC Possibility of False Positives

    and False Negatives

    CC MDL Non-Detects Not Useable

    Detects Useable

    Possibility of False Negatives

    lower concentr at ion higher

  • 7/31/2019 Qapp Student

    40/74

    qapp 40

    0

    - - - - - - - - - - - - - - - - - - - - - - - - - - - - MDL

    C

    O

    NC

    E

    N

    T

    R

    A

    T

    I

    O

    N

    SAMPLES

    ------------------------------------------------ Action Level?

    ------------------------------------------------- Action Level?

  • 7/31/2019 Qapp Student

    41/74

    qapp 41

    Identify any special training or

    certifications needed by personnel to

    conduct project activities

    State how this training will be

    provided, assured and documented

  • 7/31/2019 Qapp Student

    42/74

    qapp 42

    Describe process to ensure project

    personnel have most current Plan

    Itemize information/records to be includedin data report package

    Identify any other reports/documents

    to be produced

    State specifications for final disposition

    of records and documents

  • 7/31/2019 Qapp Student

    43/74

    qapp 43

    B. Data Generation and Acquisition

  • 7/31/2019 Qapp Student

    44/74

    qapp 44

    1. Sampling Process Design

    (Experimental Design)Describe the data generation or datacollection

    design for the project:

    measurement parameters of interest,

    indicating those critical and those

    secondary

    to the study

  • 7/31/2019 Qapp Student

    45/74

    qapp 45

    1. Sampling Process Design

    (Experimental Design)Describe the data generation or datacollection

    design for the project:

    measurement parameters of interest,

    rationale for the sampling design

  • 7/31/2019 Qapp Student

    46/74

    qapp 46

    Sampling Design Testing &Estimation

    - is the sampling matrix homogenous or

    heterogeneous?

    - do you care about average contaminationlevels, hot spots, or the proportion of site

    contaminated?

    - do you want composites samples or

    grabs?

    - are you looking for trends over time?

    - will there be a reference site?

  • 7/31/2019 Qapp Student

    47/74

    qapp 47

    1. Sampling Process Design

    (Experimental Design)Describe the data generation or datacollection

    design for the project:

    measurement parameters of interest,

    rationale for the sampling design,

    sampling locations and frequencies,

    types and numbers of samples needed, an

    sources of variability

  • 7/31/2019 Qapp Student

    48/74

    qapp 48

    2. Sampling Methods

    Describe sample collection and

    preservation methods, and equipment

    preparation and decontamination

    procedures

    Indicate any performance specifications

    Identify sample equipment and support

    facilities needed

    Address what to do when things go wrong.

  • 7/31/2019 Qapp Student

    49/74

    qapp 49

    3. Sample Handling and Custody

    Describe how samples are to be handled

    in the field, in the lab, and during

    transport,and who is responsible

    Detail how samples are to be transported

    so maximum holding time conditions are

    met

    Indicate sample identification scheme

    and chain of custody specifications

  • 7/31/2019 Qapp Student

    50/74

    qapp 50

    4. Analytical Methods

    Identify all analytical methods and

    equipment

    needed for both field and lab List method performance standards, such

    as

    MDL, Precision, Accuracy, PQL, %

    recovery

  • 7/31/2019 Qapp Student

    51/74

    qapp 51

    4. Analytical Methods (continued)

    Include method validation information for

    nonstandard methods

    State what to do when a failure occurs

    Describe sample disposal procedures

    Specify laboratory turnaround time

  • 7/31/2019 Qapp Student

    52/74

    qapp 52

    5. Quality Control

    Identify QC activities for each sampling,

    analysis, or measurement technique

    State the frequency and control limits of

    each QC activity, and how corrective

    actions will be documented

    Describe procedures and formulas for

    calculating QC statistics

  • 7/31/2019 Qapp Student

    53/74

    qapp 53

    Examples of Quality Control Samples

    Replicates

    Splits

    Blanks

    Reference MaterialsMatrix Spikes

  • 7/31/2019 Qapp Student

    54/74

    qapp 54

    6. Instrument/Equipment Testing,Inspection, and Maintenance

    Identify equipment requiring periodic

    maintenance, the schedule for such, and

    availability of critical spare parts

    Describe inspection and acceptance

    testing

    to be performed, and how documented

    Identify how deficiencies will be resolved,

    and

    effectiveness determined and documented

    Identify who will do it

  • 7/31/2019 Qapp Student

    55/74

    qapp 55

    7. Instrument/Equipment Calibration

    and Frequency Identify all equipment and instrumentationrequiring calibration in field or lab

    Document calibration method and

    frequency, and test criteria and certified

    equipment

    and/or standards to be used

    Identify how deficiencies will be resolved Indicate how records will be maintained

    and

    traceable to the instrument

  • 7/31/2019 Qapp Student

    56/74

    qapp 56

    8. Inspection/Acceptance for Suppliesand Consumables

    Identify all supplies that may directly or

    indirectly affect the quality of the project

    Describe the inspection and acceptance

    testing criteria and procedures

  • 7/31/2019 Qapp Student

    57/74

    qapp 57

    9. Non-Direct Measurements

    Identify data needed from computer

    databases, programs, literature files, and

    historical databases

    Describe the intended use of the data

    Cite acceptance criteria, and anylimitations,

    for their usage

  • 7/31/2019 Qapp Student

    58/74

    qapp 58

    10. Data Management

    Describe data management scheme from

    generation in the field to final use/storage

    Discuss procedures for record-keeping,document control system, and data

    storage/

    retrieval on electronic media

    Discuss methods and equipment for

    detecting/correcting errors, and

    preventing

    data loss

  • 7/31/2019 Qapp Student

    59/74

    qapp 59

    10. Data Management (continued)

    Describe procedures to demonstrate

    acceptability of hardware/software

    configuration

    Identify how applicable information

    resource

    management specifications are met (for

    EPA

    personnel)

  • 7/31/2019 Qapp Student

    60/74

    qapp 60

    C. Assessment and Oversight

  • 7/31/2019 Qapp Student

    61/74

    qapp 61

    Assessment Types Readiness Reviews

    Technical System Audits

    Surveillance

    Performance Evaluations/Proficiency Testin

  • 7/31/2019 Qapp Student

    62/74

    qapp 62

    1. Assessments and ResponseActions Describe each assessment needed,

    including

    frequency and type, information expected,

    andcriteria for success

    Identify potential assessors and theirauthority

    Discuss how and to who findings will be

  • 7/31/2019 Qapp Student

    63/74

    qapp 63

    2. Reports to Management

    Identify frequency and distribution of

    project

    QA status reports

    Identify preparer and recipients of these

    reports

  • 7/31/2019 Qapp Student

    64/74

    qapp 64

    D. Data Validation and Usability

  • 7/31/2019 Qapp Student

    65/74

    qapp 65

    Questions & Answers

    What is the difference between data review,

    verification, and validation?

  • 7/31/2019 Qapp Student

    66/74

    qapp 66

    1. Data Review, Verification, andValidation

    Identify the project's criteria to review, verify,

    and validate the data

  • 7/31/2019 Qapp Student

    67/74

    qapp 67

    2. Verification and Validation Methods

    Describe the process to be used for both

    data verification and validation,

    identifyingany calculations needed

    Discuss how issues will be resolved and

    identify the individuals responsible

    Discuss how these results will be

    conveyed to the data users

  • 7/31/2019 Qapp Student

    68/74

    qapp 68

    3. Reconciliation with UserRequirements

    Describe how the results of the study will

    be evaluated to determine whether the

    project's objectives have been satisfied Outline proposed methods to analyze the

    data

    Describe how limitations in data use will

    be reported

  • 7/31/2019 Qapp Student

    69/74

    qapp 69

    Summary

    I C i i C id f

  • 7/31/2019 Qapp Student

    70/74

    qapp 70

    Important Criteria to Consider forQuality Assured Data

    Anything that compromises data

    representativeness compromises data

    quality.

    Make room for independent checks along

    the

    way, and use them.

    Use methods that have been well

    established and/or well documented.

    I C i i C id f

  • 7/31/2019 Qapp Student

    71/74

    qapp 71

    Important Criteria to Consider forQuality Assured Data (continued)

    Most important: figure out what you need

    to

    know, and how well you need to know it.

    Then, plan how to get it, including all of

    theparticipants in the planning process.

  • 7/31/2019 Qapp Student

    72/74

    qapp 72

    Remember

    There are four basic project groups that

    should be discussed in a QA Project Plan.

    These are:

    - management

    - data generation/acquisition

    - assessment/oversight- data validation and usability

    Wh i h l f h i

  • 7/31/2019 Qapp Student

    73/74

    qapp 73

    What is the value of having anapproved QA Project Plan?

    D i th Ri ht Thi th Ri ht W

  • 7/31/2019 Qapp Student

    74/74

    Doing the Right Things the Right Waythe First Time!