Production Managemnt Set1 Taha

Embed Size (px)

Citation preview

  • 8/14/2019 Production Managemnt Set1 Taha

    1/21

    SET -1 MB0028 Page 1

    1

    DINA BUSINESS SCHOOL

    DINA INSTITUTE OF HOTEL AND BUSINESS MANAGEMENT

    PUNE 411 028

    CENTRE CODE 02758

    ASSIGNMENT SET 1 / SET 2

    NAME : TAHA MOHAMMED DHILAWALA

    ROLL.NO. : 520850852

    PAPER / SUBJECT :PRODUCTION & OPERATIONS

    MANAGEMENT

    CODE : MB0028

    SEMESTER : I / II / III / IV

    SIKKIM MANIPAL UNIVERSITY

  • 8/14/2019 Production Managemnt Set1 Taha

    2/21

    SET -1 MB0028 Page 2

    2

  • 8/14/2019 Production Managemnt Set1 Taha

    3/21

    SET -1 MB0028 Page 3

    3

    1. EXPLAIN WHAT IS MENT BY CAPITAL

    PRODUCTIVITY?

    ANS.CAPITAL PRODUCTVITY

    Capital deployed in plant, machinery, buildings and the

    distribution system as well as working capital are components of the costof manufacture and need to be productive. Demand fluctuation,

    uncertainties of productivity down. Therefore, strategies are needed to

    maximize the utilization of the funds allotted towards capital. Adapting tonew technologies, outsourcing and balancing of the workstations to

    reduce the proportion of idle times on equipment are the focus of thissection.

    OUTSOURCING STRATEGIES

    When capacity requirement are determined it will be easy

    to determine whether some goods or services can be outsourced sothat the capital and manpower requirement can be reduced and theavailable capacities are used to augment core competencies thus

    reducing the cost of the product or services to the customer. However,the following factors may restricts outsourcing.

    I. Lack of expertise the outsourcing firm may not have the

    requisite expertise to do the job requiredII. Quality considerations- loss of control over operationsmay result in lower quality. This is risk that the firm gets

    exposed to.

    III. Nature of demand- when the load is uniform and steady, it

    may not be worthwhile to outsourcing. Absence ofsupervisions and control may be a hindrance to meet anyurgent requirements of the customer. This affects the

    business especially if no production facilities bare built inthe organization

    IV. Cost- when the fixed costs that go along with making theproduct does not get reduced considerably

    MATHODS IMPROVEMENTMethods improvement start with methods analysis.

    The focus of this process is to find out how a job is done breaking it downto elemental tasks so that they are amenable for analysis. This is done for

    both running jobs and new jobs.

  • 8/14/2019 Production Managemnt Set1 Taha

    4/21

    SET -1 MB0028 Page 4

    4

    For the new job, the description becomes the inputs for analysis. For

    current jobs, the analyst depends on observation, records and suggestionsof the persons involved in the job. When improved methods are

    suggested, they are implemented and records created for assessing the

    consequences of the methods improvement procedures. The analyst

    should involve all concerned persons in the process so that acceptance becomes possible and opportunities open up for further improvements.Moreover, the people actually involved would be interested in improving

    their productivity and will help the analyst in the process.

    BALANCING OF WORKSSATIONS

    Assembly lines necessitate out stringing togetherworkstations which carry out operations in a sequence so that the product

    gets completed in stages. Since the workflows has to be uniform andoperation may require different periods for completion the necessity of

    line balancing is felt. Capacities at workstation and the workforce to manso adjusted that a products in the process of assembly almost

    approximately the same amount of time.

    RATIONALIZATION OF PACKAGING METHODS

    With logistics becoming an important function of the

    supply chainAnd outsourcing becoming the norm, packaging has become an important

    aspect, packaging has become important. Space is at a premium andtherefore stacking and storing have to more scientific. Movement inside

    the premise from one location to another location are being done withautomated systems and they need that the packaging system are designedfor safe transit, continuous monitoring-both for quantities and operations.

    In case of outsourcing product the material used and their design should

    facilitate reuse of the same, which brings in economy.

    QUALITY CIRCLESKaoru is generally considered to have promoted the

    concept of quality circles. It is well known that he is the originator offishbone diagrams to identify the root cause of any problem. The causes

    for the existence of a problem are classified as pertaining to the material,processes or method or any factor that goes into production. The matter isfurther investigated and pursued till the exact is determined. Quality

    circles use these principal in solving problems. The teams select projectselected on the above basis and implement action to achieve improvement

    in the process with a view to improve quality. Since these activities arecarried out without affecting the regular day to day work and involve

  • 8/14/2019 Production Managemnt Set1 Taha

    5/21

    SET -1 MB0028 Page 5

    5

    little continuous improvement in methods and quality. The capital

    deployed is minimal, if at all, and therefore productivity is enhanced.

    2. WRITE A DETAILED NOTE ON SPLIT-CASE ORDER

    FULFILLMENT METHODS AND MECHANIZATION.ANS. This system looks at situations when bulk supplies in full cases toone or more destination are not done. Fulfilment of order which need

    different merchandise in different quantities requires that cases willhave to be split, and pieces picked, repacked in cartons and ship to the

    customer. Mechanisation helps in improving identification, pick-up and

    repacking the material in addition to relieving monotony of the workers.A few strategies of achieving this objective optimally are discussed here.

    ORDER PICKING METHODS

    Items as per customer requirement have to be picked and packed in alogical manner and assigned to personnel so that their productivity is

    maximized.

    Accuracy of fulfilment of order is ensured by basic factors:I. Order extent- it is defined as the number of order to be

    picked simultaneously by a picker in an assignment. This is

    categorized as discrete order picking in which case a singleorder is selected at a time; and batch order picking in which

    case the merchandise requirements of many orders are puttogether and selected for pick up in the geographical area

    which is covered in single pass.II. Coverage extent it is the physical area to be traversed bythe picker in selecting merchandise for an assignment within

    the picking system. The personnel pick up the merchandise

    from a zone, the being a contiguous area with different

    picking location. The boundaries may be fixed ordynamically adjusted to accommodate either personnel orcustomers. This zone is identified within the picking area is

    considered for picking merchandise. Either of strategies isadopted to meet the constraints or opportunities which

    maximize employee productivity and the customers needs.

    SORTING AND ROUTING

    Sorting is done for the purpose of easing theoperation of matching orders, merchandise and the customers for whom

    they done. This activity can be done as when order are picked i.e. sortimmediate or by merging a number of order and batches are made to

    consolidate the priorities for execution. This methods is called merge and

  • 8/14/2019 Production Managemnt Set1 Taha

    6/21

    SET -1 MB0028 Page 6

    6

    sort. The strategy used depends on the total area of the zone, the number

    of order, and the type of merchandise. And the economics of balancingall the above.

    When order are routed among those zones where

    picks are required, we call them routing the picks. When order are routed

    from zone to zone, in a particular order, whether any picks are there ornot, we call them chaining. When multiple zones are coveredsimultaneously in different zones we call them parallel routing. As can be

    discerned, no one single method is suitable for actual situations on site.They are formulated as a strategy for optimization of resources in view of

    the constraints.

    ORDER PACKING METHODS

    Order fulfilling methodology cover one moreaspects i.e. the order pacing methods. When split-case is executed it

    becomes necessary that the merchandise is repackaged for shipment tomeet the requirement of the customers. In the first method they

    merchandise is usable by the customer directly and when the tools and

    packaging materials are available with the picker and he can packthroughout the picking area.

    CLASSIFICATION SCHEMESIn this section you will come to know about the coding of various

    methods of splits picking and packing. The letters will uniquely identifythe method intended to be used and all personnel in the process will know

    disposition status of the merchandise.Discrete order picking or batch order picking- letter D or B is usedzone picking or tour picking

    Pack immediate assemble and pack

    BS BATCH ORDER PICKING SORT IMMEDIATE

    BM BATCH ORDER PICKING - MERGE& SORTZR ZONE PICKING WITH ROUTINGZP ZONE PICKING IN PARALLEL

    For example, BSDZCA means batch order picking, sort immediate-discrete order packing, zone picking with chaining and assemble.

    With this type of coding 24 ways representing the type of split orderpicking and packing are identifiable.

  • 8/14/2019 Production Managemnt Set1 Taha

    7/21

    SET -1 MB0028 Page 7

    7

    CHOICE OF OPTIMAL FULFILLMENT STRATEGIES

    The choice of order fulfilment strategy depends upon the predominant

    order characteristics and category of distribution. They are determined bygeneral order characteristics such as-

    a) Number of line- items;

    b) Quality of pieces per line itemGeneral order categories are

    a) Wholesale distribution usually large number of pieces of a

    few items; b) Retail distribution-order for large quantities for a large

    number of items;c) Direct marketing order for a small quality;

    d) Consumer distribution small quantities of different items for purposes of evaluation promotion and consumption

    The performance measures to be satisfied by the choice of strategy are to

    minimize the costs involved and maximize desirable characteristics

    They are

    a) Minimize the cost of pick and pack for every order;b) Minimize the cost of shipping per order;

    c) Reduce the time required per cycle;d) To increase the fill rate;

    e) Improve accuracy of the elements of the process;f) Traceability and accountability of all transaction.Advance technology involving bar coding, feeding on line data ,high

    speed processing an distribution of information across all nodes of the

    supply chain help in improving efficiency, reduce costs and improve

    customer satisfaction.

  • 8/14/2019 Production Managemnt Set1 Taha

    8/21

    SET -1 MB0028 Page 8

    8

    3. EXPLAIN STRATEGIC MANAGEMENT PROCESS AND

    STRATEGIC DECISION MAKING IN DETAIL.

    ANS.STRATEGIC MANAGEMENT PROCESS

    Most of organization process depend upon the structure

    of the organisation, the hierarchical level, decision arrival mechanisms,communication system, authorization process, implementation

    procedures, feedback and monitoring devices to formulate and implement

    strategies. It is necessary to ensure that the process is effective andefficient and avoid loss of control. In essence, the purpose of strategies is

    to leverage the companys advantages, prepare of strategies is to leveragethe companys advantages, prepare for the eventualities of uncertain

    external happening and maximize the chances of success in itsendeavours. Organizational goals necessitate the adoption of certain

    strategies, which are converted to function goals in the areas of finance,

    marketing and operations. These goals are achieved by adoptingstrategies arrived at using organizational processes mentioned above.When these long term strategies are being implemented tactics may have

    to be employed to meet short term challenges depending upon situations.The actual activities which result in out comes are called operations.

    A business strategy is the result of a decision taken at the highest level.They are specific programme of action which outline hoe the resources

    are deployed to achieve goals in an environment. A general framework toguide and activate think-tanks in the organization to come up withproposals. Action plans with time frames, authority hierarchies and feed-

    back mechanisms are formulated and designed. At this stage detailed

    scenarios as to the likely consequences are considered and contingency

    plans worked out for implementation, if situations call for the same.Being in readiness with alternatives is a good way assuring the success ofany plan.

    For example the production of a model of motor cycle is to be increasedby 25% and possibly reduce the price by 10%. This decision would have

    been taken as strategy to meet the increasing demand which are e real- to enter a niche market of the competitor- to augment marketing departments claim after a vigorous

    sales campaign- or any other reason.

    The strategy for the marketing function would be many like promisingfreebies, make the commission attractive for the dealer, to open more

    service outlets. The operations strategy would consider the following

  • 8/14/2019 Production Managemnt Set1 Taha

    9/21

    SET -1 MB0028 Page 9

    9

    - additional machinery or sub-contracting

    - methods to improve productivity- revamping assembly lines

    - measures to improve motivation

    - promoting existing employees new suppliers

    look for opportunities to reduce costs as scaling up providesscope.

    The above measures will be under consideration at all times. When a

    change is considered, identification of areas of cooperation andcollaboration become visible. Opportunities arise for understanding and

    resolution of problems. Setting up visible targets to meet deadlines

    encourages application of constancy of purpose as per Deming. This initself would be strategy for improvement quality and productivity.

    STRATEGIC DECISION MAKING

    Decision making is the most crucial management function. Decision

    commit the organisation and its member to activities which have financialrepercussions and affect the functioning of other who are connected withthose. Therefore decisions are taken after lot of deliberation which

    involve data gathering, analysis and the predicting outcome. Accuracy ofdata, their relevance for the matter under consideration are matter which

    affect the quality of decision. In addition, the following also form thebasis of decision making:

    a) environmental scanning the business environment in whichthe firm exists and has to compete continually exhibits potentialfor opportunities and threats. Becoming aware of those and

    their impact on the firm by a process of scanning is called

    environmental scanning. The environment include the industry,

    the marketplace, the governmental agencies, society, ecology,technology, etc. competitors may be gaining edge bydiversification, making forays into the firms niche market

    making by new and better products; supplier could be formingcartel and preparing to drive hard bargains; the government

    could be passing laws and issuing order which could affect thesupply of materials or restrictions on import and export or evenemployment conditions. adaptation to these dynamic factors by

    environment scanning and basic strategy decisions is vital. b) Core competencies each organisation is started by an

    entrepreneur or a small group of them who believed in someunique strengths which would give them a place in market.

    Utilizing those strengths the venture would have succeeded and

  • 8/14/2019 Production Managemnt Set1 Taha

    10/21

    SET -1 MB0028 Page 10

    10

    development and expansion take place either laterally or

    vertically or in both ways. However, additional strengths orcompetences would have been acquires to augment of the

    workforce an d additional facilities created, would be

    continuously demanding and satisfying new needs. investor and

    suppliers would be wiling to back an enterprise, who, theyhave, seen grow in strength. the developments andimprovement both in knowledge and skills make the core

    strengths better. This tends to make these an advantage over thecompetencies. Using these advantages would from a part of the

    decision strategy of the firm.

    Core process of an organisation are determined by core competencies.Four main core process are customer relationship, new product/services

    development, supplier relationship and order fulfilment. The emphasison these process depends on the order of industry, the length of its

    existence and the consequent strengths built up in certain areas, the wayearlier successes have been achieved and the reinforcement they have

    given to the organisation. One should remember that the environment is

    always dynamic and the strategy formulation needs to be constantlyupdated for making implementation effective. Ultimately everyorganisation depends on the core compete cities which gives it an

    advantage over the competitors.

  • 8/14/2019 Production Managemnt Set1 Taha

    11/21

    SET -1 MB0028 Page 11

    11

    4. WHAT IS TQM? EXPLAIN QULITY APPROACHES OF

    DEMING WHEEL AND JURANS QUALITY TRIOLOGY.

    ANS. INTRODUCTION TO TQM

    TQM is viewed from many angels as a philosophyas an approach and journey toward excellence. The main thrust is toachieve customer satisfaction by involving every body in the

    organisation, across all functions with continuous improvement drivingall activities. TQM systems are designed to prevent poor quality from

    occurring. The following steps are implemented to achieve total quality.

    a) Take all measures to know what the customer wants voice ofthe customer. Develop methods that generate facts which can be

    used for decision making. do not ignore the internal customer the next person in the process.

    b) Convert the wants in to design specification, that meet orexceed customer expectation.

    c) Process are to be designed so that they facilitate doing the job

    right the first time. Incorporate elements that make it impossibleto make mistake. It is called fail sating or fool proofing. TheJapanese call it POKAYOKE.

    d) Keeping record of all occurrences, procedures followed andconsequences. They help in validating the processes so that

    continuous improvement becomes possible. More importantlyany gaps can be seen and rectified immediately.

    One of the basic tenets of TQM is just because something is workingwell improvement is not necessary. The search must be continuous to findways and means to improve every aspects of the business process finance,

    operation and management. Complacency should never be allowed to

    creep in at any time. In this aspects, culture plays an important role. All

    these require top management commitment

    APPROACHES TO TQM:

    Being practiced worldwide by different organisation, TQM has differentapproaches towards its achievement. The basic thrust of each of these is

    realising excellence. All the approaches have a lot in common, but theemphasis shifts from one other. Needless to say, each organisation willuse any of these or even a combination to suit its structure, culture and

    need. Some emphasise on the philosophy of TQM and the role ofmanagement and employees in being aware, committed and act. Some

    expect us to use statistics more intensely. Some give us an integratedapproach.

  • 8/14/2019 Production Managemnt Set1 Taha

    12/21

    SET -1 MB0028 Page 12

    12

    DEMING WHEEL:

    Demings approach is summarised in his 15 points.

    1. constancy of purpose for continuous improvement

    2. adopt the TQM philosophy for economic purposes3. do not depend on inspection to deliver quality4. do not award any business based on price alone

    5. improve the system of production and service constantly6. conduct meaningful training on the job

    7. adopt modern method of supervision and leadership

    8. remove fear from the mind of everyone connected with theorganisation

    9. remove barriers between department and people10.do not exhort, repeat slogan and put up poster.

    11.do not set up numerical quotas and work standards12.give pride of workmanship to the workmen

    13.education and training to be given vigorously

    14. sate and exhibit top managements commitment for quality andproductivity

    15.using the above principles, Deming gave a four step approach to

    ensure a purposeful journey of TQM. The slope is shown to indicatethat if efforts are let up the programme will roll back.

    DEMING CYCLE PLAN DO - CHECK ACT

    PLAN means that a problem is identified, process are determined andrelevant theories are checked out.

    ACT PLAN

    A P

    CHECK DO

    C D

  • 8/14/2019 Production Managemnt Set1 Taha

    13/21

    SET -1 MB0028 Page 13

    13

    DO means that the plan is implemented on a trial basis. All inputs are

    correctly measured and recorded.CHECK means that he trial taken according to the are in accordance

    with the expected results.

    ACT when all the above steps are satisfactory regular production is

    started so that quality outcomes are assured

    JURANS QUALITY TRIOLOGY

    - JURANS uses his famous breakthrough sequence toimplement quality programmes. They are

    Proof of need there should be compelling need to

    make changes Project identification here what is to be changed

    is identified. Specific project with time frames andthe resource allocation are decided.

    Organisation with top managements commitmentis made in terms of assignment of persons,

    responsibilities fixed

    Diagnostic journey each team will determine theproblem result from systemic causes or random ordeliberately caused. Root causes are ascertained

    with utmost certainty.

    Remedial action this is the stage when changes

    are introduced. Inspection, testing and validationare also included at this point

    Holding on to the gains the above steps results inbeneficiary results. Having records or all action andconsequences will help in further improvements.

    The action that resulted in the benefits derived

    should be the norm for establishing standards.

    JURAN has categorized cost of quality into four categories1) Failure costs internal these are costs of

    rejection, repairs etc in terms of materials,

    labour, machine time and loss of morale;2) Failure costs external these are costs of

    replacement, on site rework including spareparts and expenses of the personnel, warrantycosts and loss of goodwill;

    3) Appraisal costs costs of inspection, includingmaintenance of records, certification,

    segregation costs, etc.4) Prevention costs the sequence of three sets of

    activities quality planning, quality control

  • 8/14/2019 Production Managemnt Set1 Taha

    14/21

    SET -1 MB0028 Page 14

    14

    and quality improvement from the triology to

    achieve total quality management.

    His arguments are that

    1. Quality is the results of goods planning considering the needs of both internal and external customers and develops processes tomeet them. The processes are also planned to meet them.

    2. Quality is built in to the system of manufacture, inputs andprocesses that are on stream like raw material, spare parts, labour,

    machine maintenance, training, warehousing, inspection

    procedures, packaging, etc . They have to be made to followstandards and control exercised to make sure that mistake does not

    occur often and if they are corrected at the source.3. Quality improvement measures are essential to keep the quality

    culture alive. Newer methods will be founds, some operations can be eliminated, improved technology available. In short as

    experience is gained things can always be done better. It is for the

    management to take the initiative and encourage the employees tobe on the look out for opportunities for improvement.

  • 8/14/2019 Production Managemnt Set1 Taha

    15/21

    SET -1 MB0028 Page 15

    15

    5. COMPARE WORKFLOW WITH BPM. EXPLAIN IN

    DETAIL THE PROJECT DEVELOPMENT PROCESSCYCLES?

    ANS.

    WORKFLOW VS. BPMWorkflow contains a number of entities in a unidirectional path with

    nodes. each of these nodes may contain a number of elements material,

    data, attributes, value. They come together for integration or even fordivision and will have transformation going on. The activities that make

    these transformations are the sub process. So, there changes takingplace along the path and at the end we have a completed process. Every

    detail has been worked out, the outcomes verified and correct broughtinto the flow so that nothing outward cocker. The only thing lacking is

    flexibility that business situation demand all the time and because the

    enterprise has to perform and excel in conditions of uncertainty,improvement and competition. Fortunately these are exceptions. Whilemajority of the humdrum goes on smoothly, we need to manage

    exceptions. Notably, exceptions create new process, opportunities andhelp us get new insight in to the processes. It has been found that 80% of

    process cost arise out of managing exceptions. These happen at many points in the value chain. Managing these is business process

    management. Workflow does not offer option in the way processes areconducted. They have fixed routes, activities and schedules. Actually,there is not much management. BPM goes ahead not on a fixed track,

    but on bumpy roads, swerving sharply to avoid collisions and overtaking

    the vehicles that re ahead. It calls for all management skills.

    THE PROJECT DEVELOPMENT PROCESS CYCLE

    EVERY COMPANY WOULD BE INTERESTED TO IMPROVE

    THEIR PERFORMANCE OVER THE THEIR PERVIOUSPERFORMANCE IN PROJECTS. IN ORDER TO IMPROVE

    PROJECT PERFORMANCE, THE COMPANY MUST ASSUREQUALITY CONTROL AT EVERY STAGE OF THE PROJECTTHROUGHOUT THE PROJECT LIFE CYCLE.

    The various steps which may be considered in the development of theprocess cycle in any project are listed below:

    I. Planning for review: - in this step the main focus is on collection ofdata. Data is the main input requirement of any successful project

    information system and therefore the project. Once the data has

  • 8/14/2019 Production Managemnt Set1 Taha

    16/21

    SET -1 MB0028 Page 16

    16

    been gathered prepare a suitable plan for its analysis. Obtain

    necessary commitment from management and team member toparticipate actively and take action on findings. It is necessary that

    every project member gives his or her commitment to participate

    and deliver the service/product in the project. Reviews are

    necessary for every stage of the project. Prepare schedule for eachproject for each project review.

    II. Conducting the review: - before the review prepare an agenda. The

    agenda should be well structured in terms of time and content.Make necessary arrangement to gather in puts to the review. The

    review leader is the project manager. Incorporate points, which are

    external to the project. These external points have to be wellstructured to be reviewed. A reporter must be designated to

    document key points of the meeting. An automated checklist mustbe formulated for the session. The use of flipcharts may be helpful

    to collect data from participants.III. Take action on findings: - during the meeting, determine the points

    which are critical to the project and its performance. The member

    may have brain storming session to discuss critical points. Make alist of all such items discussed and items suggested and group thedata into categories and then prioritize, either by group discussion

    or voting. Identify action items and assign a project member or ateam the task pertaining to the action planned. For all such action

    and recommendations, prioritize the items depending upon the taskfor execution. After reaching consensus on results, summarize

    project success factor, recommendation for further study and actionitems with responsibilities and due dates. Set expectations of scope,investment, time, etc., for each item and send a copy the team.

    Follow up all the actions. Place review reports in the project

    documents file, in the quality/productivity department and in the

    library. Make reports available to manager of the life process forsimilar projects.

    IV. Do continuous improvement: - continual improvement is one of the

    management mantras. Every organization wants to improvecontinuously. It is not possible to achieve improvement unless

    sufficient measures are adapted to measure improvement.Encourage the quality manager to take for quality themes thatemerge from review meetings. The quality manager should

    highlight trends and de escalate chronic problems. Reviews re acheck process in the PLAN DO CHECK ACT (PDCA)

    cycle of quality cycle. They are not just a one- time events. In thiscontext, act on recommendation from pervious project; plan to

    capture data about project; do continuous. Improvement; check on

  • 8/14/2019 Production Managemnt Set1 Taha

    17/21

    SET -1 MB0028 Page 17

    17

    hoe you are doing write a retrospective analysis. Do periodic

    project review that will trigger mid project corrections. Conductimmediate, informal retrospective after solving unexpected

    obstacles. Understand any impact on the reminder of the project.

    Recognize people for extra efforts and noteworthy contributions.

    Be open to attend review for other project. Learn from similarventures, warranty failures, customer survey and experience ofother division and companies. Be a part of continuous

    organizational learning program that includes experimentation,evaluation and documentation with easy access and retrieval.

    V. Critical success factors:- it is necessary that a company identifies

    factor in a project. These factor may slacken the project if notfocused. Routines tasks may be assigned to lower level team

    members as this may relive the project team from wasting theirskill set on routine matters. In terms of project delivery, the project

    office can relieve project managers of takes, like filling forms andtemplates, getting these forms signed off, mailing, receiving and

    checking items etc. regarding project management skills the project

    office can help the project manager in the project scope definition, project kick off preparation and planning tasks, trough mentoringand coaching services. These are the combining strengths that

    make the project manager to move forward and achieve the projectsuccess.

    Regarding project quality reviews, the project management officeadds value providing processes, tools and project management

    experience but any quality review process can be implemented bythe team without sponsorship from the management level.It is necessary to identify the entire critical success factor. One of

    the critical successes factor for the project quality review process

    implementation is to convince and sell the benefits to the

    management team of the organization. The team should showexhibit better control of their project portfolio and thendemonstrate better control about business profitability.

    VI. Results and benefits of the project quality reviews:- the main benefits of the project quality review are the project status is

    formally visible to the whole organization. It creates awareness androom for improvement. Only reviewing, in a detailed manner,every project we can have a clear idea about the lack of knowledge

    mistakes, errors, deviations, and their reasons.The project quality reviews helps the project manager and his/her

    manager to enable the necessary and taking the action needed toachieve the project goals finishing the project on time, scope and

    budget.

  • 8/14/2019 Production Managemnt Set1 Taha

    18/21

    SET -1 MB0028 Page 18

    18

    The team can find benefits the project manager, for the customer

    and for the sponsor.For the project manager because that process helps in terma of

    discipline and control for the customer because, in the way that

    process is anticipating results, also create some kind of proactive

    behaviour in the project manager anticipating potential problem tothe customer and finally for the sponsor because this process helpshim to know project details and then to ask the customer upper

    management level for clarifications.Management expectations are crucial for the project success but

    project reviews add value to such expectations.

    The above steps can be represented in the from a diagram to showvarious process items in a project. These diagrams will help in the

    review process es to pin point facts and figures of concern postdelivery. Every flow and process can be studied and reviewed for

    enhancement in the product or service deliverable in future.

  • 8/14/2019 Production Managemnt Set1 Taha

    19/21

    SET -1 MB0028 Page 19

    19

    As an example consider packaging of a tonic bottle in a box;

    ASSEMBLE

    ASSEMBLE

    STICK LABEL

    ON BOX

    BOTTEL TONIC CAP

    OUTLER

    BOX

    PRINTED

    LABEL

    CHECK THE

    FUTMENT OF CAP

    ON BOTTLE

    CHECK THE

    ALIGMENT AND

    POSITION OF LABEL

    PACKED

    TONIC

  • 8/14/2019 Production Managemnt Set1 Taha

    20/21

    SET -1 MB0028 Page 20

    20

    6. WHAT IS JIT? EXPLAIN VALUE ENGINEERING WITH

    EXAMPLES.ANS. INTRODUCTION TO JIT

    JIT can be considered to be philosophy of manufacturing

    founded on the principal of elimination of all waste and therebyincreasing productivity. When the philosophy is applied at workplace, the

    approach results in providing parts in just right quantities at the right

    time, thus lowering the costs and increasing productivity. Since no extraparts are available, production of only good parts is forced on the system.

    JIT has been extended to mean continuous improvement. These principalare being applied to engineering, purchasing, accounting and data

    processing also. We will see how JIT helps in implementing leanproduction systems. In these days when technology is able to provide us

    with highly accurate equipment which have high capacities and the

    business has become global meaning that both suppliers and customersare widely accessible. To remain competitive, cost efficiencies havebecome compulsory. JIT helps in this process. It is extended to the shop

    floor and inventory systems of the vendors also. One of the mainchallenges for JIT is frequent changes in production schedules owing to

    the changes in demand. This causes the procurements plans to changes. Inthe present day scenario where most manufacturing concerns depends

    upon a number of suppliers, who in turn may outsource parts andservices, disruptions have a cascading effect. However, there is a limit tothe agility that a company can build into the system. Communication

    right through the supply chain helps in reducing inventories and keep the

    flow lines smooth. Success of JIT depends upon a lot of preparation and

    committed implementation.VALUE ENGINEERING/ VALUE ANALYSIS

    Basically it is a methodology by which we try to find substitutes for a

    product or an operation. It can be conducted both internally andexternally. The concept took shape during the Second World War. The

    thinking process calls for a deep study of a product and the purpose forwhich it is used, the raw materials used, the processes of transformation,the equipment need etc. and question whether what is being used is the

    most appropriate and economical. This applies to all aspects of theproduct. For examples, let us consider a component needs a round brass

    rod as raw material in size 21.5 mm. diameter. It has seven operations:cutting, drilling, chamfering boring. Milling, a different size, a different

    tool, a different machine, a different cot sequence, a different tool for an

  • 8/14/2019 Production Managemnt Set1 Taha

    21/21

    SET -1 MB0028 Page 21

    21

    operation, a different chemical, a different concentration, a different

    voltage, shorter time or processing. Studies can be conducted to verifywhether any operation can be eliminated. Simplification of processes

    reduces the cost of manufacture. Every piece of material and the process

    should add value to of the product so as to render the best performance.

    Thus there is an opportunity at every stage of the manufacturing anddelivery process to find alternatives which will increase the functionalityor reduce cost in terms of material, process and time. It should be

    remembered that we are not seeking a cost reduction sacrificing quality. Ithas been found that there will be an improvement in quality when

    systematic value engineering principles are employed.