Sources of Requests
Sources of systems projects: User requests
Top-management directives System Analysis Information systems department Outside group
8/3/2019 Preliminary Investigation SSAD
3/18
Preliminary Investigation
Problem Definition
DevelopmentSchedulingProgrammingTesting
ImplementationTraining
ConversionEvaluation
Maintenance AnalysisGather dataAnalyze dataDevelop requirements
DesignPreliminary designDetail design
Ongoing ActivitiesProject ManagementFeasibility Assessment
DocumentationInformation Gathering.
Systems Development Life Cycle
8/3/2019 Preliminary Investigation SSAD
4/18
Preliminary Investigation
Whatever may be the reason of a request submitted by the Users orManagers to the IS department a system analyst is assigned to make a
preliminary investigation.The objective of this activity is to review all requests and identify
those proposals that are most beneficial to the organization. But thisshould be noted that this is neither a designed study nor it includescollection of details to completely describe the business system.
Preliminary Investigation object can be achieved in following steps:
Request Clarification
Feasibility study
Estimating Costs and Benefits
Request Approvals
Preliminary Investigation
8/3/2019 Preliminary Investigation SSAD
5/18
Defining the Problem
Two points that must be agreed
upon The nature of the problem The scope (boundaries) of theproblem
Agreeing on the problem helpsdefine the objectives of the system
8/3/2019 Preliminary Investigation SSAD
6/18
Define the project scope and
constraints
Project scope Define the range or extent of the project
Set project boundariesConstraints
Identify conditions, restrictions, orrequirements
Present vs. future Internal vs. external
Mandatory vs. desirable
8/3/2019 Preliminary Investigation SSAD
7/18
What are three basic documents used to summarizetechnical specifications?
Less formal method
that uses standard
form to request
information about
product or service
Vendor quotes
price(s) for
listed
product(s)
Vendor selects
product(s) that
meet(s) your
requirements andthen quotes
price(s)
Identifies
product(s)
you want
Request for information (RFI)
Request for proposal (RFP)
Request for quotation (RFQ)
8/3/2019 Preliminary Investigation SSAD
8/18
Presented tosteeringcommittee,
which decideshow system
will be
developed
The System Development Life
Cycle
What is thesystem request?
Assesses
feasibilityof each
alternativesolution
Recommends the most
feasiblesolution forthe project
8/3/2019 Preliminary Investigation SSAD
9/18
Request Clarification
Defining the Scope and Objective of Request:
An analyst has to define for which objective a request for development is
submitted. Conducting the Investigation
This is nothing but the Collection of data / inputs by:
Reviewing internal documents (i.e Organizational Charts, operatingprocedures etc.
Conducting interviews of User, Supervisory Personal and Managers
Identify viable option:
Analyst has to identify the viable option by applying his common sense andintuitions on his investigation.
Preliminary Investigation
8/3/2019 Preliminary Investigation SSAD
10/18
Evaluation of Systems Requests
Responsibility for evaluating systems requests:
A group of key managers and users Systems review committee Steering committee Computer resources committee Computer policy committee
A single individual
Typical in smaller companies Must consult with users & managers
8/3/2019 Preliminary Investigation SSAD
11/18
Feasibility (Possibility) Study
Evaluation of alternative systems through cost and benefit analysis:
Technical Feasibility: Hardware and software availability, Technical Guaranteeof Accuracy, Reliability, Easy to Access, Data security, technical capacity to holddata and future expansion.
Economical Feasibility: Evaluation of cost & Benefits expected. Operational Feasibility:Finding views of workers, employees, customers &
suppliers about the use of new system.
Time Feasibility:Estimation of time to take new system to become operational. Legal feasibility:Testing whether new system will comply financial reporting
requirements & Companys contractual obligations.
Social feasibility: Determination of whether a proposed project will be acceptableto the people or not.
Management Feasibility:Acceptable to the management or not.
Preliminary Investigation
8/3/2019 Preliminary Investigation SSAD
12/18
Estimating Cost & Benefit
COSTS:
Development Costs: This includes cost of testing, training, start up costs, salaryto designers, acquisition cost of hardware & software.
Operation Costs: This includes operator salary, maintenance costs, etc. Intangible Costs: Loss of employee productivity, self confidence etc.BENEFITS:
Tangible Benefits: Increase in sales / Contribution / Profits
Decrease in investment, operating and processing cost.
Improved information availability, analysis, Management Decision skill
Intangible Benefits: Increase in Goodwill / Improved Image of Business
Preliminary Investigation
8/3/2019 Preliminary Investigation SSAD
13/18
Request Approval
The outcome of feasibility study is recommendation of new systemproposal.
This new information system proposal is to be sanctioned by the highermanagement in consultation with the department managers.
In short, based on the Observation and Findings of the Analyst, selectedrequests are put up for the approval of management
Preliminary Investigation
8/3/2019 Preliminary Investigation SSAD
14/18
The Final Systems
Analysis Report
The final procedure in systems analysis is to communicate theconsultants systems survey work in a Final Systems Analysis Report
.Report should be submitted to steering committee.
The report should contain all information needed by managementto make a sound decision concerning the proposed design.
8/3/2019 Preliminary Investigation SSAD
15/18
Requirement Analysis and System Analysis
After the selection of a request for development analyst study in depththePresent and Proposed New System. This is the study of weakness &Problems in the present system and management requirements of new system.
This phase of System Development is completed in following step:
Collection of data and facts
Analysis of Present System
Analysis of Proposed system
Requirement Analysis & System Analysis
8/3/2019 Preliminary Investigation SSAD
16/18
Collection of Data & Facts
Every system is built to meets some set of needs and to assess these needs,the analyst often interact extensively with the people, who will be benefited fromthe system In order to determine the requirement of those peoples he can use
following facts finding techniques:
Record Inspection:This includes the Manuals, diagrams, forms, organizationalcharts etc. It should be ensured that all documents are accurate & up to date
Questionnaires:These are skillfully drafted group of standard question whichcan be given to all personal and can be analyze quickly.
Interviews:To get a complete picture of problems and opportunities. Observation: Surprise Visit of users work palace to get a clear picture of usersenvironment.
Requirement Analysis & System Analysis
8/3/2019 Preliminary Investigation SSAD
17/18
Analysis of Present System
Detailed investigation of the present system involves collecting, organizing andevaluating facts about the present system and the environment in which itoperates by studying following areas in depth:
Review of Historical Aspects of organization
Analyze Present inputs to the system
Review of all data file maintained irrespective of online or offline
Review methods, procedures & data communications
Analyze Present outputs of system
Review internal controls
Model the existing physical system and logical system
Undertake overall analysis of present system
Requirement Analysis & System Analysis
8/3/2019 Preliminary Investigation SSAD
18/18
Analysis of Proposed System
After each functional area of present system is defined the proposed systemspecification must be defined.
These specification will be based on the strength and weakness of present system.
System Specification which should be in conformity with the Project Objective andAreas Coveredshould be following:
Output / Reports
Maintenance of Database
Data Inputting Process
Methods and Procedures to show the relationship between Input andOutput
Work volume including peak period work volume
Requirement Analysis & System Analysis