34
Workshop “Innovations in PPP” Thursday May 27 th 2010 “PPPs on top of the road” Main author: Ansgar Kauf, SWARCO INNOVIA SE 2 nd author: Tibor Schlosser, SWARCO INNOVIA SE

“PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

Embed Size (px)

Citation preview

Page 1: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

Workshop “Innovations in PPP”Thursday May 27th 2010

“PPPs on top of the road”Main author: Ansgar Kauf, SWARCO INNOVIA SE2nd author: Tibor Schlosser, SWARCO INNOVIA SE

Page 2: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

OVERVIEW: �The financial challenge�SWARCO INNOVIA�NEW: Urban PPPs� Key concept

Case studies: �Rare bird: Integrated Urban Road PPPs� PPPs on top of the road: ITS & Public lighting

Page 3: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

After the financial crisis, there is not only a need to invest in road infra and maintenance to promote econ. recovery. There is equally a vital need to improve and invest in efficient traffic management (TM) solutions.

As public deficits impede on traditional public procurement / finance, stronger private participation is needed as a way out. To deliver urgently needed infra-structure and new TM technology, a partnership

Innovative Delivery: Technology & PPP

urgently needed infra-structure and new TM technology, a partnership between the Public and Private sectors (PPP) is needed with increased private involvement into:

� Technological Innovation: state of the art ITS (= Intelligent Transport Systems); System Engineering & Integration; traffic safety solutions

� Public Private Partnerships (PPP): public sector seeks private sector participation in finance & operation: for whole project life.

Page 4: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

Revenue source?

Projects are needed that use public funds more efficiently (thanks to performance orientation); and are, self-financing through users and private investors. Economic PPPsare the way out for public clients that stretched their budgets to the limits. But PPPs cannot

Innovative Delivery: Technology & PPP

Tax payers

Budget

Users

Charges

their budgets to the limits. But PPPs cannot only mobilize finance, they

• lower life-cycle cost and

• increase operational efficiency.

Invest & operate efficiently !

0 to 1 y

5 to 10 y

15 to 35 y

-

O & M

Public procurement & funding

PPP procurement Publicly - financed - Privately

Page 5: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

Revenue source

Public sector Private sector

equity

0

From public to Private Finance & Procurement

Pre-Planning, Acquisition

Finance

Tax payers

Budget

Users

Charges

Time

Banks« Bridge finance »

Loan

Loan

0 to 1 y

5 to 10 y

15 to 35 y

-

O & M

Design, / Syst. Integration

Build / Turnkey

Finance

Public procurement & funding

PPP procur ement Publicly - financed - Privately

Rehabilitate &

Modernize

Operation & Maintenance

Page 6: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

SWARCO INNOVIA: Public Private Partnerships & Innoviations Public Private Partnerships & Innoviations

within SWARCO group

Page 7: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

SWARCO: European & global leader in Traffic Solutio ns

SWARCO is a growing

international group with

headquarters in Austria.

The SWARCO companies

provide the complete

range of road marking,

“SWARCO has developed into a strong corporate group that is among today's leading international traffic technology suppliers. We want to continue this path of success together with you, our partners, and be your first choice in road safety and intelligent traffic management worldwide.”

range of road marking,

signalling and traffic

management products,

services and solutions.

Manfred SwarovskiChairman and founder of SWARCO

Swarco Innovia SE was founded in 2008 by Manfred Swarovski and is a wholly owned subsidiary of Swarco AG. The company is registered in Wattens.

Page 8: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

Innovia: Mission, Set up, Focus

Mission SWARCO INNOVIA S.E. is a Europe founded, global provider of ITS solutions (= Intelligent Transport system) via PPP (Finance & Operation), Project Consulting & Engineering, System Integration, Turnkey delivery & Services.

Our systems offer covers: Advanced Traffic Management Solutions (urban & interurban), Tolling (advisory), Parking (systems and operations), Public Transport and Fleet Management, Infomobility, Public Lighting. We build on Transport and Fleet Management, Infomobility, Public Lighting. We build on SWARCO’s over 40 years of experience in ITS & road safety and its comprehensive product, system & service portfolio (B2B & B2C).

SWARCO INNOVIA S.E. is your international partner in ITS projects. • Private-Public Partnership Project Financing• ITS Systems Design, Engineering & Integration• International Project Operations• ITS Concession Management• Project Services & Maintenance

Page 9: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

Advanced Traffic Management Systems

�Traffic Management: Urban and InterurbanWith our well established and proven Urban Traffic Control (UTC) and Traffic Management (TM) systems we provide safe and improved mobility on urban and interurban networks. Our Interurban Advanced Traffic Management System (ATMS) integrates Message Signs and traffic safety monitoring and control equipment

�Tolling: Congestion Management and Toll ConcessionsUsing our depth of experience in urban traffic applications and our advisory roles in PPP concessions, we are able to develop turnkey tolling and congestion management systems. Tolling breaks down into 2 distinct applications: urban charging and motorway tolls. Both balance two distinct objectives: demand management (“cutting congestion”) and revenue generation.

�Parking: Systems and Operational ManagementWe offer the latest ‘state of the art’ on and off street parking systems along with the associated operation and management. This integrated approach enables efficient use of the infrastructure in order to maximise revenues

�Public and Fleet Transport: RTPI and Fleet ManagementOur Public Transport and Fleet Management systems provide user and operator information in real time. These systems can be integrated into Traffic management and Fleet Logistic operational centres.

Page 10: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

Advanced Traffic Management Systems

�Infomobility (Traffic and traveller information) for road and transport users

�Lighting: Urban and InterurbanUsing latest technology we increase the lighting quality and considerably reduce cost, in the form energy consumption and maintenance works. Thus, we create budgetary relief and increase the safe and durable availability of the system.

�Cooperative mobilityWe can design and roll out systems using vehicle to infrastructure commu-nication for improving fluidity, environmental sustainability and safety of traffic.

Electromobility (Vehicle Charging Points) is part of this concept including recharging infrastructure.

�Safety Cameras: Red Light and Speed EnforcementWe offer a complete solutions for Red Light and Speed enforcement system along with the associated operation and management. This integrated approach can help fund addition infrastructure improvements

Page 11: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

NEW: Urban PPPs Urban PPPs

Page 12: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

So far, highway PPPs put the accent on interurban and single structures as complete package / integrated contract:

• Greenfield construction or rehabilitation with O&M for thelife-cycle (according to contract)

• Motorways, bottleneck projects (tunnels & bridges)

New: Urban PPPs

(tunnels & bridges)

-> > 90% of capital expenditure(= CAPEX) invested in infra, 5-8% in traffic equipments and road safety

Page 13: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

Service model interurban / bottleneck PPP

Banks

Highway Authority (Government)

Private ConsortiumConcession company

Shareholders

Operator (O&M)

Mainten. subcontractor

Techn.

Advisor

* Often Operator nego-tiates & integrates FOE / ITS supplies

*

Construction JV

Systems- Products / equipment

Sub-contractors

Designer

Page 14: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

However, particularly in urban areas Intelligent Transport Systems (ITS) androad safety equipment are growing out of their limited scope of around 5% of CAPEX and OPEX (= operating expenditure).

New: Urban PPPs

expenditure).

They become complex systems. Often, they are subject to separate contract, even as PPP, covering over 90% of CAPEX & requiring OPEX of over 10 years.

Page 15: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

Obstacle to integrated urban PPPs

City administrations generally not able to plan ahead in coordination with public utilities that frequently open the road surface, in order to carry out installation and repair works on their grids (electricity, gas, water and communications).

Leading practitioner and academic in PPPs, Prof.H.W. Alfen, Weimar (D) concludes: uncertainty for planning urban road maintenance very high (80% !). This jeopardizes set up of maintenance very high (80% !). This jeopardizes set up of economically efficient PPPs. While, he estimates the “forecast certainty” for traffic systems on top of the road , including ITS, sufficiently high and, recommends the transfer of their long term management to private providers.

Difficulty to reconcile road management planning with utilities is controversial, but partly confirmed by IRF discussion paper “PUBLIC/PRIVATE PARTNERSHIPS (2008)”

Page 16: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

The traditional approach

Traditionally, private sector participation has been limited to separate planning, design or construction contracts on a fee for service basis – designed to the public agency’s specifications.

ITS, Traffic Management

Other Equipment

Equipment maintenance

Road safety Equipment

ETC (toll) equipment

maintenance

Road Construction

Road Maintenance

UTC

IUTC

VMS

Parking

Infomobility

Pub.Transport

Page 17: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

Urban PPP: new concession “on top”

New Concession Traffic Systems

Road safety equipment

ITS, Traffic management

Other services(parking, …)

ETC equipment

Road Construction

O& M ---> life cycle approach

Road concession

Page 18: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

Key conceptUrban PPPs Urban PPPs

Page 19: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

1. Finance concept

Create finance for cash poor public administrations, by

“liberating” existing electricity & O&M budget (Operation & Mainten.), to finance modernization and other measures:

� through energy saving technology

� more cost-efficient O&M , thanks to optimized invest-mentover life-cycle, also due to maintenance friendly technology

� road user charges , creating a complementary revenue � road user charges , creating a complementary revenue stream, unburdening the budget

Savings in energy / maintenance cost may no not free enough budget. User charges may not be enough. Therefore, public client provides additional funds , paying less anyway, thanks to PPP

Private provider pre-finances project (CAPEX and OPEX)* via specially created project company (SPV = special purpose vehicle).

*CAPEX = Capital expenditure; OPEX = Operating expenditure

Page 20: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

2. Management & maintenance concept

This long term PPP contract optimizes not only the system integration of this project modernization. But the private sector maximizes the savings throughout a 10 to 15 years contract duration, improving management and maintenance .

A 2nd energy saving measure that is not linked to the financing via electricity budget is the use of traffic manage-ment solutions that make vehicles more energy efficient, by reducing congestion and optimizing trips from A to B.

Page 21: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

Sustainable & Energy Efficient Traffic Systems� Urban Traffic Control: For Traffic lights electricity savings of up

to 90% possible thanks to modernization (low voltage & LED)

� Public lighting : up to 60% of electricity savings possible thanks

to modernization (efficient lighting, LED in development)

Urban PPP: financial & environmental efficiency

� Vehicles: strong decrease in fuel consumption possible, thanks to traffic management & more efficient use of individual motorized and public transport

• -> Strong cuts in Energy and CO2 emmissions !!! Reduce Carbon footprint by up to 60% !

• Due to severe budget problems of public sector, only financeable . solutions are implemented -> PPP (private finance & operation) . - realistic environmentalism needed !!!

Page 22: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

UTC service model: urban PPP

City Admin

Management Company

Consulting & Advisory

Shareholderspublic –private

or fully private

Banks

PPP

Public sector in tradit. public project

Operator (O&M)

System integrator + Turn Key

Products / Technolgy

Services, Maintenance

Public lighting- Energy saving - technology- other hardware & - needed equipment

PPP

Private sector in tradit. public project

Road safety equip.- horizontal- vertical

Overall- Control room- Telecom

- Civil Works

Urb.Traffic Managem.- Signal heads - controllers detectors- CCTV, VMS- PKG, PT

ll

Parking solutions.- On street- Parking garages

Page 23: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

Asset SaleBOO: Build-Own-Operate

BOT: Build-Operate-Transfer

DBFO/M: Design-Build-Finance-Operate/Maintain

Contracting model (incl. modernization)

Generally not in transport / traffic

Concession(private finance

/ equity)

High Risk

Long Term

FullyPrivatize

Approach Contract type Risk &Duration

Range of Contracts: from tradit. procurement to PPP

Contracting model (incl. modernization)

DBOM: Design-Build-Operate-Maintain

O&M: Operation & Maintenance

DB-W: Design-Build with Warranty

DB: Design-Build = Design & Construct (DC)

CM@Risk: Construction Manager at Risk

Contract MaintenanceFee-Based Contract Services(consulting, installation, technical)

B2B

Long Term Contract(“pre-finance”, no equity)

Works contracts(including turnkey)

Services contracts

Product DeliveryShort term

Low Risk

PPP

Tradit.Public

Page 24: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

Pre-PLANNING

& Acquisition

FINANCEDESIGN/ System

IntegrationBUILD / Turnkey

OPERATION&

MAINTEN.

MODER-NIZE

From 100 % Public to PPP / from short term contracts to long term concessions

INVEST INVEST

Major Phases and Contracts: Development and Delive ry

Specialized

Consulting

D-B CM@Risk

Design-Build Construction Manager at Risk

Preservation

Asset Management

D-B-O-M

Design-Build-Operate-Maintain

D-B-F-O/M BOT/BTO BOO/BOOT

Design-Build-Finance-Operate Build-Operate-TransferBuild-Own-Operate/Build-Own-Operate-Transfer

CAPITAL PROJECTS

LONG-TERMMAINTENANCECONTRACTS

Source: - Finnish Road enterprise - US Fed. Highway Administr.

Page 25: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

Case studies: Rare bird: Integrated Urban Road PPPs Rare bird: Integrated Urban Road PPPs

Page 26: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

Integrated Urban PPPs: very rate

� Portsmouth City Streets Colas subsidiary Ensign Highways was awarded in 2006 a 25-year, GBP 689 million contract to manage and maintain the roads of Portsmouth, UK. This Private Financing Initiative (PFI) contract includes associated assets and services such as lighting, inspection and maintenance of traffic lights and traffic management technology, drainage and response maintenance. technology, drainage and response maintenance.

� Sheffield: A £663.8 million PFI concession, for a period of 25 years, entailing the rehabilitation and ongoing maintenance of carriageways, footways, streetlights, signs, traffic signals, bridges and street furniture, in addition to the related environmental maintenance of the highway, design and build of improvement schemes.

Page 27: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

PPPs on top of the road: ITS solutions and lightingITS solutions and lighting

Page 28: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

a. Modernization of Traffic lights to energy saving LED technology, with additional measures for optimization. Thus, up to 90% of electricity savings can be achieved (depending on the state of the currently used technology that is changed, best for old high

Energy saving technology ITS: Urban Traffic Control

that is changed, best for old high voltage installations);

Page 29: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

b. Increasing energy efficiency of vehicles through Tr affic Management,• starts with the programming of Traffic lights (adaptive traffic control) and • may also include additional traffic management solutions (traffic guidance

Energy saving technology ITS: Urban Traffic Control

• may also include additional traffic management solutions (traffic guidance or access control / pricing), which remove congestion and fluidity traffic.

• an additional measure is fleet management for public transport. • even measures to encourage the shift from individual motorized traffic to

public transport, provided the solution is environmentally efficient, linked to “Infomobility”.

This presentation focuses on urban networks, but also include ITS (Intelligent Transport Systems), in the interurban area.

Page 30: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

Energy saving technology and ITS: Public Lighting

a. Modernization to energy saving LED technology, following the “Ecolight Regulation” of the Europ.Kommission. Up to 60% savings in electricity can be achieved (depending on the state of the currently used technology that is changed). There is even a link to the illumination of public buildings and „industrial illumination“, when rendering it more energy efficient.

b. Programming public lighting with e.g. Cooperative Mobility Systems. This means, street lighting is dimmed, in case there are no users (pedestrians, vehicles) on the road / sidewalk. Or in the opposite case, when users turn up on the road, lighting is switched on or increased by vehicle actuated power supply.

Page 31: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

Financial profile of Management contract (PPP)

Source : SL presentation at Energie-kongress Rhein-Ruhr, 11 Sept. 2009 : „Öffentliche Beleuchtung: Effizienz rauf, Kosten runter“

Page 32: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

References & Pilot projects

Budapest, Hungary, 2006

Replaced: 33.000 LED signal heads and 220 controllersFinancing through energy saving and optimized service and maintenance - Project financed itself over 8 year period !!!

€ 20'800'000

Prague, Czech Republic, 2009Financing, installation, rehabilitation, service and maintenance of the whole city traffic management system

€165'000'000

Public lighting:See good results of projects in NL & De (subsidiari es of Alliander), A (E-Werke Wels)

- Project financed itself over 8 year period !!!- Electricity savings of 85% guaranteed, 90% achieved !

Page 33: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

Ansgar Kauf Tibor SchlosserBusiness Development Director Chief Technical OfficerSWARCO INNOVIA SE SWARCO INNOVIA SEEmail: [email protected] [email protected]: +41 792857270Mobile: +41 792857270

Operational offices:Mühlgasse 86A-2380-Perchtoldsdorf (Vienna)Austria

Page 34: “PPPs on top of the road” - CRP · PPPs on top of the road: ITS & Public lighting After the financial crisis, there is not only a need to invest in road infra and maintenance

SWARCO INNOVIA Service models

SWARCO INNOVIA Mobility Systems

Consulting, Engineering &

Design

ITS Systems Integration

Services, Maintenance &

Project Managmt

Finance / Legal & Operator

Govern-UTC: TM, Parking

Devices

IUTC: motorways,

tunnels

Tolling

Public Transport

Applications

Mobility Services

Systems

Govern-ment

Private (B2C)

Private

Public

Concession-naire

Public Lighting