24
1 Powerware ® 5125 (9910 P33) Quick Start for IBM ® Applications : 164950139 B POWERWARE 5125 (9910 P33) QUICK START FOR IBM APPLICATIONS NOTE The following procedure is for an IBM pSeriesZ rack only. If you have another type of rack, contact your service representative (see page 4). Step 1. UPS Setup Qty. Powerware Part Number Description 2 Mounting Handles 4 Mounting Handle Screws 1 157604171-001 Left Fixed Mounting Rail Assembly 1 157604171-002 Right Fixed Mounting Rail Assembly 4 10-32 Clip Nuts 8 10-321/22 Pan-Head Screws 2 157604172-001 Rear Hold-Down Brackets 4 10-321/22 Flat-Head Screws 1 164201357 Powerware 4-Post Rail Kit User’s Guide 1 164201356 Powerware 5125 Installation Guide for IBM Applications 1. Attach the supplied mounting handles to the mounting brackets. NOTE The UPS and optional Extended Battery Modules (EBMs) MUST be installed at the bottom of the rack. If placed in a rack with existing equipment, the rack must be reconfigured to allow the UPS installation at the bottom of the rack. NOTE The EBMs must be installed below the UPS. 2. Install the clip nuts over the holes on the back of the rack. NOTE The clip nuts for the first set of rails go over the holes in position 2 and 4. If you are installing additional rails, the next set of clip nuts should be placed 4 and 6 holes above the last installed clip nut. Position 2 Position 4 Position 8 Position 10 Position 10 Second Set of Clip Nuts First Set of Clip Nuts

POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

1Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B

POWERWARE 5125 (9910 P33) QUICK START

FOR IBM APPLICATIONS

NOTE The following procedure is for an IBM9 pSeriesZ rack only. If you have another type of rack, contact your servicerepresentative (see page 4).

Step 1. UPS Setup

Qty. Powerware Part Number Description

2 — Mounting Handles

4 — Mounting Handle Screws

1 157604171-001 Left Fixed Mounting Rail Assembly

1 157604171-002 Right Fixed Mounting Rail Assembly

4 — 10-32 Clip Nuts

8 — 10-32�1/22 Pan-Head Screws

2 157604172-001 Rear Hold-Down Brackets

4 — 10-32�1/22 Flat-Head Screws

1 164201357 Powerware 4-Post Rail Kit User’s Guide

1 164201356 Powerware 5125 Installation Guide for IBM Applications

1. Attach the supplied mounting handles to themounting brackets.

NOTE The UPS and optional Extended Battery Modules(EBMs) MUST be installed at the bottom of the rack. If placedin a rack with existing equipment, the rack must bereconfigured to allow the UPS installation at the bottom ofthe rack.

NOTE The EBMs must be installed below the UPS.

2. Install the clip nuts over the holes on the back of therack.

NOTE The clip nuts for the first set of rails go over the holesin position 2 and 4. If you are installing additional rails, thenext set of clip nuts should be placed 4 and 6 holes above thelast installed clip nut.

Position 2

Position 4

Position 8

Position 10Position 10Second Set of Clip Nuts

First Set of Clip Nuts

Page 2: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B2

3. Secure both rails to the back of the rack withpan-head screws. Insert the screws through the clipnuts installed in Step 2.

4. Secure both rails to the front of the rack withpan-head screws. Insert the screws through thecenter holes of the rail.

NOTE Do not tighten the screws until the UPS or EBM isinstalled.

5. Slide the UPS and any optional EBMs into the rack.

C A U T I O NThe UPS and EBM are heavy. A minimum of two people arerequired to lift the UPS into the rack.

6. To secure the back of the UPS to the rack, loosen thewing nut on the rear hold-down bracket and slide thebracket over the rear of the UPS. Tighten the wingnut.

7. Secure the front of the UPS to the rack usingflat-head screws.

Rear Hold-DownBracket

Page 3: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

3Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B

Step 2. Cord Connections

Qty. PowerwarePart Number

Description

1 103003074-002 IEC 320-C20 to L6-30P Input Power Cord (6 ft)

1 152507429-013 IEC 320-C19 to L6-30R Output Power Cord (6 ft)

3 60420055 IEC 320-C13 to C14, 10A Equipment Power Cords (6 ft/1.8m)

1 Bag — Cord Retention Clips

1 164201355 Powerware 5125 User’s Guide

1 164201356 Powerware 5125 Installation Guide for IBM Applications

1. If you are using a power distribution bus (PDB),continue to Step 2; otherwise, skip to Step 7.

2. Plug the output power cord into the outputconnector on the UPS rear panel.

3. Plug the other end of the output power cord into thePDB.

NOTE If you are using more than one UPS in a rack, verifythat the UPS output power cords are plugged into separatePDBs.

4. Plug the detachable UPS power cord into the inputconnector on the UPS rear panel.

Secure the power cord to the rack.

NOTE If your UPS input power cord is 6-ft long, skip toStep 6.

5. Plug the UPS power cord into a customer-suppliedpower cord.

6. Plug the power cord into a power outlet.

7. Connect the rack interconnect cords supplied withIBM rack devices.

For additional P33 rack connection information, go towww.oem.powerware.com/ibm-ups/pdf/p33details.pdf.

Page 4: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B4

8. Insert the supplied cord retention clips by eachoutput receptacle that will be used.

9. Plug the equipment to be protected into theappropriate UPS output receptacles.

DO NOT protect laser printers with the UPS becauseof the exceptionally high power requirements of theheating elements.

10. Bend and twist the cord retention clips around theequipment power cords to secure the cordconnections.

11. To complete startup, refer to Powerware 5125Installation Guide for IBM Applications.

Step 3. Communication Options

Qty. PowerwarePart Number

Description

1 05146745-31 Powerware Software Suite CD

3 124102022-002 UPS to Server Communication Cables(DB-9 to DB-9, 6 ft/1.8m)

1 164201359 Multi-Server Card User’s Guide

The following communication options are available with theUPS:

: One to three servers serially connected to the P33 UPS

: More than three servers serially connected to the P33UPS

: Network (WebServer) with the P33 UPS as a node

For additional information, go towww.oem.powerware.com/ibm-ups/pdf/p33details.pdf.

Service and Support

In the United States and Canada, call 1-800-IBMSERV (1-800-426-7378). In Europe, the Middle East, and Africa (EMEA); LatinAmerica; or Asia-Pacific, call the IBM office that services your account.

Page 5: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

5Guide de démarrage rapide Powerware® 5125 (9910 P33) pour applications IBM® : 164950139 B

GUIDE DE DÉMARRAGE RAPIDE POWERWARE 5125 (9910 P33)POUR APPLICATIONS IBM

REMARQUE La procédure suivante s’applique à une baie IBM9 pSeriesZ uniquement. Pour tout autre type de baie, contactezvotre représentant du service (voir page 8).

Etape 1. Installation de l’onduleur

Qté Numéro de piècePowerware

Description

2 — Poignées de montage

4 — Vis de poignées de montage

1 157604171-001 Ensemble de rails de montage fixes de gauche

1 157604171-002 Ensemble de rails de montage fixes de droite

4 — Ecrous de clips 10-32

8 — 10-32�1/22 Vis à tête cylindrique large

2 157604172-001 Supports de fixation arrière

4 — 10-32�1/22 Vis à tête plate

1 164201357 Guide de l’utilisateur de l’ensemble de rails pour 4 postes Powerware

1 164201356 Guide d’installation Powerware 5125 pour applications IBM

1. Fixez les poignées de montage fournies aux supports defixation.

REMARQUE L’onduleur et tout Module de batterie étendu(EBM) optionnels DOIVENT être installés dans le fond de labaie. Si la baie contient déjà des appareils, elle doit êtreréorganisée afin de permettre l’installation de l’onduleur aufond de la baie.

REMARQUE Les EBM doivent être installés sous l’onduleur.

2. Posez les écrous de clips sur les trous à l’arrière de labaie.

REMARQUE Posez les écrous de clips du premier ensemblede rails sur les trous des positions 2 et 4. Si vous installezd’autres rails, le prochain ensemble d’écrous de clips doitêtre placé 4 et 6 trous au-dessus du dernier écrou de clipposé. Position 2

Position 4

Position 8

Position 10Position 10 Second ensembled’écrous de clips

Premier ensembled’écrous de clips

Page 6: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

6 Guide de démarrage rapide Powerware® 5125 (9910 P33) pour applications IBM® : 164950139 B

3. Fixez les deux rails à l’arrière de la baie à l’aide de visà tête cylindrique large. Insérez les vis dans les écrousde clips posés à l’étape 2.

4. Fixez les deux rails à l’avant de la baie à l’aide de vis àtête cylindrique large. Insérez les vis dans les trouscentraux du rail.

REMARQUE Ne serrez les vis que lorsque l’onduleur oul’EBM est installé.

5. Insérez l’onduleur et les EBM optionnels dans la baie.

A T T E N T I O NL’onduleur et l’EBM sont lourds. Deux personnes au minimumsont requises pour soulever l’onduleur et le placer dans labaie.

6. Pour fixer l’arrière de l’onduleur à la baie, desserrezl’écrou papillon du support de fixation arrière etfaites glisser le support par-dessus l’arrière del’onduleur. Serrez l’écrou papillon.

7. Fixez l’avant de l’onduleur à la baie à l’aide de vis àtête plate.

Support defixation arrière

Page 7: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

7Guide de démarrage rapide Powerware® 5125 (9910 P33) pour applications IBM® : 164950139 B

Etape 2. Connexion des cordons

Qté Numéro de piècePowerware

Description

1 103003074-002 Cordon d’alimentation d’entrée IEC 320-C20 vers L6-30P (1,8m)

1 152507429-013 Cordon d’alimentation de sortie IEC 320-C19 vers L6-30R (1,8m)

3 60420055 Cordons d’alimentation pour appareils IEC 320-C13 vers C14, 10A (1,8m)

1 sachet — Clips de rétention du cordon

1 164201355 Guide de l’utilisateur Powerware 5125

1 164201356 Guide d’installation Powerware 5125 pour applications IBM

1. Si vous utilisez un bus de distribution d’alimentation(PDB), passez à l’étape 2. Sinon, passez à l’étape 7.

2. Branchez le cordon d’alimentation de sortie dans leconnecteur de sortie situé sur le panneau arrière del’onduleur.

3. Branchez l’autre extrémité du cordon de sortie dansle PDB.

REMARQUE Si vous utilisez plusieurs onduleurs dans unebaie, vérifiez que les cordons d’alimentation de sortie desonduleurs sont raccordés à des PDB distincts.

4. Branchez le cordon d’alimentation amovible del’onduleur dans le connecteur d’entrée situé sur lepanneau arrière de l’onduleur.

Fixez le cordon d’alimentation à la baie.

REMARQUE Si votre cordon d’alimentation d’onduleurmesure 1,8m, passez à l’étape 6.

5. Branchez le cordon d’alimentation de l’onduleur surun cordon d’alimentation fourni par le client.

6. Branchez le cordon d’alimentation sur une prisesecteur.

7. Branchez les cordons de raccordement de la baiefournis avec les équipements connexes à la baie IBM.

Pour des informations supplémentaires sur leraccordement de la baie au P33, consultez le sitewww.oem.powerware.com/ibm-ups/pdf/p33details.pdf.

Page 8: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

8 Guide de démarrage rapide Powerware® 5125 (9910 P33) pour applications IBM® : 164950139 B

8. Insérez les clips de rétention du cordon fournis prèsde chacune des prises de sortie qui sera utilisée.

9. Branchez l’équipement à protéger aux prises de sortieappropriées de l’onduleur.

NE PAS protéger les imprimantes laser avecl’onduleur car les besoins en énergie des élémentschauffants sont exceptionnellement élevés.

10. Courbez et tordez les clips de rétention du cordonautour du cordon d’alimentation des appareils afind’assurer les connexions.

11. Pour effectuer la mise en route, voir Guided’installation Powerware 5125 pour applications IBM.

Etape 3. Options de communication

Qté Numéro de piècePowerware

Description

1 05146745-31 CD de la Suite logicielles Powerware

3 124102022-002 Câbles de communication Onduleur vers Serveur (DB-9 vers DB-9, 1,8m)

1 164201359 Guide d’installation de la Carte multi-serveur pour applications IBM

Options de communication disponibles avec l’onduleur :

: Jusqu’à trois serveurs branchés en série à l’onduleur P33

: Plus de trois serveurs branchés en série à l’onduleur P33

: Réseau (WebServer) avec onduleur P33 en guise denoeud

Pour des informations supplémentaires, consultez le sitewww.oem.powerware.com/ibm-ups/pdf/p33details.pdf.

Service après-vente et assistance technique

Aux Etats-Unis et au Canada, appelez le 1-800-IBMSERV (1-800-426-7378). En Europe, au Moyen-Orient, en Afrique, enAmérique latine ou en Asie-Pacifique, appelez le centre IBM qui est responsable de votre compte.1-800-IBMSERV

Page 9: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

9Powerware® 5125 (9910 P33) Schnelle Inbetriebnahme für IBM®-Anwendungen : 164950139 B

POWERWARE 5125 (9910 P33) SCHNELLE INBETRIEBNAHME

FÜR IBM-ANWENDUNGEN

HINWEIS Das folgende Verfahren bezieht sich nur auf ein Gestell des Typs IBM9 pSeriesZ Wenn Sie eine andere Art vonGestell verwenden, wenden Sie sich an Ihren Kundendienstmitarbeiter (siehe Seite 12).

Schritt 1: Einrichten der USV

Menge Powerware Teilenummer Bezeichnung

2 — Montagegriffe

4 — Schrauben für Montagegriffe

1 157604171-001 Links montierter Befestigungsschienensatz

1 157604171-002 Rechts montierter Befestigungsschienensatz

4 — 10-32 Clipsmuttern

8 — 10-32�1/22 Flachkopfschrauben

2 157604172-001 Hintere Haltebügel

4 — 10-32�1/22 Senkkopfschrauben

1 164201357 Benutzerhandbuch für Powerware Schienensatz für 4 Stützpfosten

1 164201356 Powerware 5125 Installationsanleitung für IBM-Anwendungen

1. Mitgelieferte Montagegriffe an den Halterungenmontieren.

HINWEIS Die USV und die optionale ErweiterteBatteriemoduls (EBMs) MÜSSEN unten in das Gestelleingebaut werden. Beim Einbau in ein Gestell mitvorhandenen Geräten ist das Gestell so zu konfigurieren, daßder Einbau der USV unten in das Gestell möglich ist.

HINWEIS Die EBMs müssen unter dem USV installiertwerden.

2. Bringen Sie die Clipsmuttern über den Bohrungenauf der Rückseite des Gestells an.

HINWEIS Die Clipsmuttern für den ersten Schienensatzgehören über die Bohrungen in Position 2 und 4. Sind weitereSchienen zu installieren, muss der nächste Satz Clipsmuttern4 und 6 Bohrungen über der letzen montierten Clipsmutterplatziert werden.

.

Position 2

Position 4

Position 8

Position 10Position 10 Zweiter SatzClipsmuttern

Erster SatzClipsmuttern

Page 10: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

10 Powerware® 5125 (9910 P33) Schnelle Inbetriebnahme für IBM®-Anwendungen : 164950139 B

3. Beide Schienen an der Rückseite des Gestells mitFlachkopfschrauben befestigen. Die Schrauben durchdie in Schritt 2 installierten Clipsmuttern einfügen.

4. Beide Schienen an der Vorderseite des Gestells mitFlachkopfschrauben befestigen. Die Schrauben durchdie mittleren Bohrungen der Schiene stecken.

HINWEIS Die Schrauben nicht anziehen, bevor die USVbzw. das EBM montiert ist.

5. Die USV und etwaige optionale EBMs in das Gestellschieben.

A C H T U N GDie USV und das EBM sind schwer. Zum Hineinheben derUSV in das Gestell sind mindestens zwei Personenerforderlich.

6. Zur Befestigung der Rückseite der USV im GestellFlügelmutter am hinteren Haltebügel lösen und denBügel über die Rückseite der USV schieben.Flügelmutter anziehen.

7. Vorderseite der USV mit Senkkopfschrauben amGestell befestigen.

HintererHaltebügel

Page 11: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

11Powerware® 5125 (9910 P33) Schnelle Inbetriebnahme für IBM®-Anwendungen : 164950139 B

Schritt 2: Kabelanschlüsse

Menge PowerwareTeilenummer

Bezeichnung

1 103003074-002 Eingangsstromkabel IEC 320-C20 zu L6-30P (1,8m)

1 152507429-013 Ausgangsstromkabel IEC 320-C19 zu L6-30R (1,8m)

3 60420055 Gerätestromkabel (1,8m) von IEC 320-C13 zu C14, 10A

1 Tüte — Kabelbinder

1 164201355 Powerware 5125 Benutzerhandbuch

1 164201356 Powerware 5125 Installationsanleitung für IBM-Anwendungen

1. Wenn Sie einen Stromverteilungsbus (PDB)verwenden, fahren Sie mit Schritt 2 fort; fahren Sieandernfalls mit Schritt 7 fort.

2. Das Netzausgangskabel in den Ausgangsanschluss aufder Rückwand der USV stecken.

3. Das andere Ende des Netzausgangskabels in den PDBstecken.

HINWEIS Wenn mehrere USVs in einem Gestell verwendetwerden, ist zu prüfen, dass die Netzausgangskabel der USVsan separaten PDBs angeschlossen sind.

4. Das abnehmbare Netzkabel der USV in denEingangsanschluss auf der Rückwand der USVstecken.

Netzkabel am Gestell befestigen.

HINWEIS Wenn das USV-Eingangsstromkabel sechs Fuß(1,8m) lang ist, mit Schritt 6 fortfahren.

5. Netzkabel der USV mit kundenseitig bereitgestelltemNetzkabel verbinden.

6. Das Netzkabel in eine Netzsteckdose stecken.

7. Die mit den IBM-Gestellgeräten mitgeliefertenVerbindungskabel anschließen.

Weitere Informationen zum Anschluss von P33-Gestellenfinden Sie unterwww.oem.powerware.com/ibm-ups/pdf/p33details.pdf.

Page 12: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

12 Powerware® 5125 (9910 P33) Schnelle Inbetriebnahme für IBM®-Anwendungen : 164950139 B

8. Mitgelieferte Kabelbinder an jeder der zuverwendenden Ausgangssteckdosen einfügen.

9. Die zu schützenden Geräte an die entsprechendenAusgangssteckdosen der USV anschließen.

Laserdrucker wegen des außerordentlich hohenLeistungsbedarfs der Heizelemente NICHT mit derUSV schützen.

10. Kabelbinder um die Gerätestromkabel biegen unddrehen, um die Kabelverbindungen zu sichern.

11. Informationen zum Abschließen der Inbetriebnahmefinden Sie im Powerware 5125 Installationsanleitungfür IBM-Anwendungen.

Schritt 3: Kommunikationsoptionen

Menge PowerwareTeilenummer

Bezeichnung

1 05146745-31 CD mit der Powerware Software-Reihe

3 124102022-002 Datenübertragungskabel USV-Server (DB-9 zu DB-9, 1,8m)

1 164201359 Multi-Server-Karte - Installationsanleitung für IBM-Anwendungen

Die folgenden Kommunikationsoptionen sind für die USVverfügbar:

: Ein bis drei seriell am USV P33 angeschlossene Server

: Mehr als drei seriell am USV P33 angeschlossene Server

: Netzwerk-Server (Web-Server) mit USV P33 als Knoten

Weitere Informationen finden Sie unterwww.oem.powerware.com/ibm-ups/pdf/p33details.pdf.

Kundendienst und Unterstützung

Rufen Sie in den Vereinigten Staaten und in Kanada1-800-IBMSERV (1-800-426-7378) an. In Europa, im NahenOsten und in Afrika (EMEA) sowie in Lateinamerika oder inAsien/im Pazifikraum rufen Sie das IBM-Büro an, das für IhrKonto zuständig ist.

Page 13: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

13Powerware® 5125 (9910 P33) Guida rapida per le applicazioni IBM® : 164950139 B

POWERWARE 5125 (9910 P33)GUIDA RAPIDA PER LE APPLICAZIONI IBM

NOTA La procedura descritta di seguito si riferisce solo ai rack IBM9 pSeriesZ Per rack di tipo diverso, è necessario rivolgersial il vostro rappresentante per l’assistenza (vedere la pagina 16).

Passo 1. Installazione dell’UPS

Qtà Powerwarenumero parte

Descrizione

2 — Maniglie per il montaggio

4 — Viti per le maniglie per il montaggio

1 157604171-001 Guida di montaggio fissa sinistra

1 157604171-002 Guida di montaggio fissa destra

4 — Dadi di fermo 10-32

8 — Viti con testa universale 10-32�1/22

2 157604172-001 Staffe di bloccaggio posteriori

4 — Viti con testa piatta 10-32�1/22

1 164201357 Kit Powerware 4, manuale per l’utente

1 164201356 Powerware 5125 Guida all’installazione per le Applicazioni IBM

1. Collegare le maniglie di montaggio fornite alle staffe dimontaggio.

NOTA L’UPS e i Moduli batteria di espansione opzionaleDEVONO essere installati nella sezione inferiore del rack. Seil rack contiene già altre attrezzature, è necessarioriconfigurarlo in modo da consentire l’installazione dell’UPSnella sezione inferiore del rack.

NOTA Gli EBM devono essere installati sotto l’UPS.

2. Inserire i dati di fermo nei fori sul retro del rack.

NOTA I dadi di fermo per il primo gruppo di guide devonoessere inseriti nei fori corrispondenti alle posizioni 2 e 4. Sesi installano guide aggiuntive, installare i dadi di fermoaggiuntivi nei fori corrispondenti alle posizioni 4 e 6, sopral’ultimo dado di fermo installato.

.

Posizione 2

Posizione 4

Posizione 8Secondo gruppo di dadi

Primo gruppo di dadi

Posizione 10

Page 14: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

14 Powerware® 5125 (9910 P33) Guida rapida per le applicazioni IBM® : 164950139 B

3. Bloccare entrambe le guide sul retro del rackutilizzando le viti a testa universale. Inserire le vitinei dadi di fermo installati nel punto 2.

4. Bloccare entrambe le guide sul lato frontale del rackutilizzando le viti a testa universale. Inserire le vitinei fori centrali della guida.

NOTA Serrare le viti solo dopo aver installato l’UPSo l’EBM.

5. Far scorrere l’UPS e tutti gli EBM opzionali nel rack.

A T T E N Z I O N EL’UPS e l’ EBM ssono pesanti. Per spostare l’UPS è richiestol’intervento di almeno due persone.

6. Per bloccare il retro dell’UPS sul rack, allentare ildado ad alette sul retro della staffa di bloccaggio e farscorrere la staffa sul retro dell’UPS. Serrare il dado adalette.

7. Bloccare il lato frontale dell’UPS sul rack utilizzandole viti a testa piatta.

Staffa dibloccaggioposteriore

Page 15: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

15Powerware® 5125 (9910 P33) Guida rapida per le applicazioni IBM® : 164950139 B

Passo 2. Connessione dei cavi

Qtà Powerwarenumero parte

Descrizione

1 103003074-002 Cavo di alimentazione in ingresso da IEC 320/C20 a L60-30P (1,8 metri)

1 152507429-013 Cavo di alimentazione in uscita da IEC 320-C19 a L6-30R (1,8 metri)

3 60420055 Cavi di alimentazione apparecchiatura da IEC 320/C13 a C14, 10E (1,8 metri)

1 Borsa — Fascette di ritegno cavi

1 164201355 Manuale per l’utente Powerware 5125

1 164201356 Powerware 5125 Guida all’installazione per le Applicazioni IBM

1. Se si utilizza un bus per la distribuzionedell’alimentazione (PDB), passare al punto 2.Altrimenti, passare al punto 7.

2. Collegare il cavo di alimentazione in uscita alconnettore di uscita sul pannello posteriore dell’UPS.

3. Collegare l’altra estremità del cavo di alimentazionein uscita nel PDB.

NOTA Se si utilizzano più UPS sul rack, verificare che i cavidi alimentazione in uscita dell’UPS siano collegati a PDBdiversi.

4. Collegare il cavo di alimentazione amovibile dell’UPSal connettore d’ingresso del pannello posterioredell’UPS.

Fissare il cavo di alimentazione al rack.

NOTA Se il cavo di alimentazione in ingresso dell’UPS hauna lunghezza maggiore di 1,8 metri, passare al punto 6.

5. Collegare il cavo di alimentazione dell’UPS nel cavodi alimentazione del cliente.

6. Collegare il cavo di alimentazione ad una presa amuro.

7. Collegare i cavi di interconnessione del rack fornitecon i rack IBM.

Per ulteriori informazioni sulla connessione dei rack P33,visitare il sito Webwww.oem.powerware.com/ibm-ups/pdf/p33details.pdf.

Page 16: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

16 Powerware® 5125 (9910 P33) Guida rapida per le applicazioni IBM® : 164950139 B

8. Inserire le fascette di ritegno cavi in prossimità diciascuna presa che si prevede di usare.

9. Collegare l’apparecchiatura da proteggere alle presedi uscita dell’UPS appropriate.

NON proteggere le stampanti laser con l’UPS a causadella potenza estremamente elevata richiesta daglielementi riscaldanti.

10. Piegare e attorcigliare le fascette di ritegno del cavoattorno ai cavi d’alimentazione delle apparecchiatureper bloccare le connessioni dei cavi.

11. Per completare l’installazione, consultare laPowerware 5125 Guida all’installazione per leApplicazioni IBM.

Passo 3. Opzioni per le comunicazioni

Qtà Powerwarenumero parte

Descrizione

1 05146745-31 CD contenente il pacchetto software Powerware

3 124102022-002 Cavi di comunicazione da UPS al server (DB-9/DB-9, 1,8 metri)

1 164201359 Guida all’installazione della Scheda Multi-Server per le Applicazioni IBM

Per l’UPS sono disponibili le seguenti opzioni dicomunicazione:

: Da uno a tre server connessi all’UPS P33 tramite lineaseriale

: Più di tre server connessi all’UPS P33

: Rete (WebServer) con l’UPS P33 utilizzato come nodo

Per ulteriori informazioni, consultare il sito Webwww.oem.powerware.com/ibm-ups/pdf/p33details.pdf.

Assistenza e supporto

Per gli Stati Uniti e Canada, chiamare il numero1-800-IBMSERV (1-800-426-7378). In Europa, Medio Orientee Africa (EMEA), America Latina, o Asia del Pacifico,chiamare il numero Ufficio IBM, per l’assistenza clienti.

Page 17: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

17Powerware® 5125 (9910 P33) - Guia Rápido para Aplicações IBM® : 164950139 B

POWERWARE 5125 (9910 P33) - GUIA RÁPIDO

PARA APLICAÇÕES IBMOBSERVAÇÃO Os procedimentos a seguir se referem somente a chassi IBM9 pSeriesZ Se você tiver outro tipo de chassi,contate a assistência técnica de sua região (consulte a página 20).

Passo 1. Configuração do no-break

Qtde. Número de referênciaPowerware

Descrição

2 — Alças de montagem

4 — Parafusos para alça de montagem

1 157604171-001 Conjunto do trilho de montagem fixo à esquerda

1 157604171-002 Conjunto do trilho de montagem fixo à direita

4 — Porcas autotravantes 10-32

8 — Parafusos philips 10-32�1/22

2 157604172-001 Suportes de contenção traseiros

4 — Parafusos de cabeça chata 10-32�1/22

1 164201357 Guia do Usuário do Kit de 4 Colunas de Trilhos Powerware

1 164201356 Guia de Instalação do Powerware 5125 para Aplicações IBM

1. Fixe as alças de montagem fornecidas aos suportes demontagem.

OBSERVAÇÃO O no-break e os Módulos Estendidos deBaterias (EBMs) opcionais DEVEM ser instalados na parteinferior do chassi. Se forem instalados em um chassi que jácontém algum equipamento, o chassi deverá serreconfigurado para permitir a instalação do no-break na suaparte inferior.

OBSERVAÇÃO Os EBMs devem ser instalados abaixo dono-break.

2. Instale as porcas autotravantes nos orifícios da partede trás do chassi.

OBSERVAÇÃO As porcas autotravantes destinadas aoprimeiro conjunto de trilhos devem ser instaladas nosorifícios nas posições 2 e 4. Se você estiver instalando trilhosadicionais, o próximo conjunto de porcas autotravantesdeverá ser instalado 4 e 6 orifícios acima da última porcainstalada.

.

Posição 2

Posição 4

Posição 8

Posição 10Segundo conjunto deporcas autotravantes

Primeiro conjunto deporcas autotravantes

Page 18: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

18 Powerware® 5125 (9910 P33) - Guia Rápido para Aplicações IBM® : 164950139 B

3. Fixe ambos os trilhos no fundo do chassi comparafusos philips. Rosqueie os parafusos através dasporcas autotravantes instaladas no passo 2.

4. Fixe ambos os trilhos na parte frontal do chassi comparafusos philips. Rosqueie os parafusos através dosorifícios centrais do trilho.

OBSERVAÇÃO Não aperte os parafusos até que o no-breakou o EBM esteja instalado.

5. Deslize o no-break e quaisquer EBMs opcionais paradentro do chassi.

P E R I G OO no-break e o EBM são pesados. São necessárias pelomenos duas pessoas para colocar o no-break no chassi.

6. Para fixar a parte de trás do no-break no chassi,afrouxe a porca borboleta no suporte traseiro edeslize este suporte sobre a parte traseira dono-break. Aperte a porca borboleta.

7. Fixe a parte frontal do no-break no chassi usandoparafusos de cabeça chata.

Suporte decontençãotraseiro

Page 19: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

19Powerware® 5125 (9910 P33) - Guia Rápido para Aplicações IBM® : 164950139 B

Passo 2. Conexões dos cabos

Qtde. Número de referênciaPowerware

Descrição

1 103003074-002 Cabo de alimentação de entrada IEC 320-C20 para L6-30P de 1,8 m

1 152507429-013 Cabo de alimentação de saída IEC 320-C19 para L6-30R de 1,8 m

3 60420055 Cabos de alimentação do equipamento IEC 320-C13 para C14, 10A, de 1,8 m

1 emba-lagem

— Presilhas para cabos

1 164201355 Guia do Usuário do Powerware 5125

1 164201356 Guia de Instalação do Powerware 5125 para Aplicações IBM

1. Se você estiver usando um barramento de distribuiçãode energia (PDB - power distribution bus), siga para opasso 2; caso contrário, avance para o passo 7.

2. Conecte o cabo de alimentação de saída no conectorde saída, que se encontra no painel traseiro dono-break.

3. Conecte a outra extremidade do cabo de alimentaçãode saída no PDB.

OBSERVAÇÃO Se você estiver usando mais do que umno-break em um único chassi, certifique-se de que os cabosde alimentação de saída estejam conectados em PDBsseparados.

4. Conecte o cabo de alimentação removível dono-break no conector de entrada, que se encontra nopainel traseiro do no-break.

Fixe o cabo de alimentação no chassi.

OBSERVAÇÃO Se o cabo de alimentação de entrada de seuno-break tiver comprimento de 1,8 m, avance para o passo 6.

5. Conecte o cabo de alimentação do no-break a outrocabo de alimentação (não fornecido).

6. Conecte o cabo de alimentação a uma tomada.

7. Conecte os cabos de ligação do chassi, fornecidoscom os dispositivos de chassi da IBM.

Para obter informações adicionais sobre conexões emchassi P33, visitewww.oem.powerware.com/ibm-ups/pdf/p33details.pdf.

Page 20: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

20 Powerware® 5125 (9910 P33) - Guia Rápido para Aplicações IBM® : 164950139 B

8. Insira as presilhas para cabos em cada receptáculo desaída que será usado.

9. Conecte o equipamento a ser protegido aosreceptáculos apropriados de saída do no-break.

NÃO proteja impressoras laser com o no-breakdevido às exigências de energia excepcionalmentealtas dos componentes de aquecimento.

10. Incline e gire as presilhas dos cabos em torno doscabos de alimentação do equipamento para darsegurança às conexões dos cabos.

11. Para completar o procedimento de inicialização,consulte o Guia de Instalação do Powerware 5125 paraAplicações IBM.

Passo 3. Opções de comunicação

Qtde. Número de referênciaPowerware

Descrição

1 05146745-31 CD-ROM do Pacote de Software Powerware

3 124102022-002 Cabos de comunicação entre no-break e servidor (DB-9 para DB-9, 1,8 m)

1 164201359 Guia do Usuário da Placa Multi-Servidor para Aplicações IBM

As seguintes opções de comunicação estão disponíveis como no-break:

: De um a três servidores conectados serialmente aono-break P33

: Mais do que três servidores conectados serialmente aono-break P33

: Em rede (WebServer), com o no-break P33 como umdos nós

Para obter informações adicionais, visitewww.oem.powerware.com/ibm-ups/pdf/p33details.pdf.

Assistência e suporte

Nos Estados Unidos e no Canadá, ligue para 1-800-IBMSERV(1-800-426-7378). Na Europa, no Oriente Médio e na África(EMEA), na América Latina ou Ásia-Pacífico, entre emcontato com o escritório IBM que lhe fornece assistência.

Page 21: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

21Inicio rápido de Powerware® 5125 (9910 P33) para aplicaciones de IBM® : 164950139 B

INICIO RÁPIDO DE POWERWARE 5125 (9910 P33)PARA APLICACIONES DE IBM

NOTA El siguiente procedimiento es solamente para un estante IBM9 pSeriesZ Si tiene otro tipo de estante comuníquese consu representante de servicio (consulte la página 24).

Paso 1. Configuración del SIE

Cant. Número de partede Powerware

Descripción

2 — Agarraderas de montaje

4 — Tornillos para las agarraderas de montaje

1 157604171-001 Ensamblaje de rieles de montaje fijado a la izquierda

1 157604171-002 Ensamblaje de rieles de montaje fijado a la derecha

4 — Tuercas sujetadoras 10-32

8 — Tornillos de cabeza plana 10-32�1/22

2 157604172-001 Soporte de fijación posterior

4 — Tornillo de cabeza fresada 10-32�1/22

1 164201357 Guía del usuario del juego de riel de 4 postes Powerware

1 164201356 Guía de instalación de Powerware 5125 para aplicaciones de IBM

1. Fije las agarraderas de montaje suministradas a lossoportes de montaje.

NOTA El SIE y los Módulos de batería extendida (EBMs)opcional se TIENEN que instalar en la base del estante. Si secolocan en un estante con equipo existente, el estante sedebe configurar de nuevo para permitir la instalación del SIEen la base del mismo.

NOTA Los EBMs se deben instalar bajo el SIE.

2. Instale las tuercas sujetadoras sobre los orificios en laparte posterior del estante.

NOTA Las tuercas sujetadoras para el primer conjunto derieles van sobre los orificios en la posición 2 y 4. Si instalarieles adicionales, el siguiente conjunto de tuercassujetadoras debe colocarse en los orificios 4 y 6 sobre laúltima tuerca sujetadora que se instaló.

.

Posición 2

Posición 4

Posición 8

Posición 10 Segundo conjunto detuercas sujetadoras

Primer conjunto detuercas sujetadoras

Page 22: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

22 Inicio rápido de Powerware® 5125 (9910 P33) para aplicaciones de IBM® : 164950139 B

3. Asegure ambos rieles a la parte posterior del estantecon los tornillos de cabeza plana. Inserte los tornillosa través de las tuercas sujetadoras instaladas en elPaso 2.

4. Asegure ambos rieles a la parte delantera del estantecon los tornillos de cabeza plana. Inserte los tornillosa través de los orificios del centro del riel.

NOTA No apriete los tornillos hasta que haya instalado elSIE o el EBM.

5. Coloque el SIE y cualquier EBMs opcional en elestante.

P R E C A U C I Ó NEl SIE y el EBM son pesados. Se necesita como mínimo dospersonas para colocar el SIE en el estante.

6. Para asegurar la parte posterior del SIE al estante,afloje la tuerca de mariposa en el soporte de fijaciónposterior y deslice el soporte sobre la parte posteriordel SIE. Apriete la tuerca de mariposa.

7. Asegure la parte delantera del SIE al estante con lostornillos de cabeza fresada.

Soporte defijaciónposterior

Page 23: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

23Inicio rápido de Powerware® 5125 (9910 P33) para aplicaciones de IBM® : 164950139 B

Paso 2. Conexiones de los cables

Cant. Número de partede Powerware

Descripción

1 103003074-002 IEC 320-C20 a Cable de potencia de entrada L6-30P (1.8 m)

1 152507429-013 IEC 320-C19 a Cable de potencia de salida L6-30R (1.8 m)

3 60420055 IEC 320-C13 a Cables de potencia del equipo C14, 10A (1.8 m)

1 Bolsa — Sujetadores de retención de cables

1 164201355 Guía del usuario Powerware 5125

1 164201356 Guía de instalación de Powerware 5125 para aplicaciones de IBM

1. Si utiliza un bus de distribución de energía (BDE),continúe con el Paso 2; de lo contrario vaya hasta elpaso 7.

2. Conecte el cable de potencia de salida en el conectorde salida en el panel posterior del SIE.

3. Conecte el otro extremo del cable de potencia desalida en el BDE.

NOTA Si utiliza más de un SIE en un estante, verifique quelos cables de potencia de salida del SIE estén conectados enBDE separados.

4. Conecte el cable de potencia desprendible del SIE enel conector de entrada que se encuentra en el panelposterior del SIE.

Asegure el cable de potencia al estante.

NOTA Si su cable de potencia de entrada del SIE es de1.8 m de longitud, vaya hasta el paso 6.

5. Conecte el cable de potencia del SIE en un cable depotencia proporcionado por el cliente.

6. Conecte el cable de potencia en el tomacorriente.

7. Conecte los cables de interconexión del estanteproporcionados con los dispositivos del estante deIBM.

Para obtener información adicional sobre la conexión delestante P33, visitewww.oem.powerware.com/ibm-ups/pdf/p33details.pdf.

Page 24: POWERWARE 5125 (9910 P33) Q START FORoem.powerware.com/ibm-ups/pdf/p33quick.pdf · 2004. 11. 17. · Powerware® 5125 (9910 P33) Quick Start for IBM® Applications : 164950139 B 1

24 Inicio rápido de Powerware® 5125 (9910 P33) para aplicaciones de IBM® : 164950139 B

8. Inserte los sujetadores de retención del cable que seproporcionan por cada receptáculo de salida que seutilizará.

9. Conecte el equipo que va a proteger en losreceptáculos de salida del SIE adecuados.

NO proteja impresoras láser con el SIE pues tienenrequisitos de energía excepcionalmente altos para loselementos de calentamiento.

10. Doble y tuerza los sujetadores de retención de cablesalrededor de los cables de potencia del equipo paraasegurar las conexiones de los cables.

11. Para completar la puesta en marcha, consulte la Guíade instalación de Powerware 5125 para aplicaciones deIBM.

Paso 3. Opciones de comunicación

Cant. Número de partede Powerware

Descripción

1 05146745-31 CD de Suite de software Powerware

3 124102022-002 SIE a Cables de comunicación del servidor (DB-9 a DB-9, 1.8 m)

1 164201359 Guía de instalación de la Tarjeta de Servidores Múltiples para aplicaciones IBM

Las siguientes opciones de comunicación se encuentrandisponibles con el SIE:

: Uno a tres servidores conectados en forma serial alSIE P33

: Más de tres servidores conectados en forma serial alSIE P33

: Red (WebServer) con el SIE P33 como un nodo

Para obtener información adicional, visitewww.oem.powerware.com/ibm-ups/pdf/p33details.pdf.

Servicio y soporte técnico

En los Estados Unidos y Canadá, llame al 1-800-IBMSERV(1-800-426-7378). En Europa, el Medio Oriente y África(EMEA); Latinoamérica o Asia Pacífico, llame a las oficinasde IBM, las cuales proporcionan servicio a su cuenta.