24
1 Powerware ® 5125 (9910 P18) Quick Start for IBM ® Applications : 164201421 A POWERWARE 5125 (9910 P18) QUICK START FOR IBM APPLICATIONS NOTE The following procedure is for an IBM pSeriesZ rack only. If you have another type of rack, contact your service representative (see page 4). Step 1. UPS Setup Qty. Powerware Part Number Description 2 Mounting Handles 4 Mounting Handle Screws 2 Mounting Brackets 4 Mounting Bracket Screws 1 157604171-001 Left Fixed Mounting Rail Assembly 1 157604171-002 Right Fixed Mounting Rail Assembly 4 10-32 Clip Nuts 8 10-321/22 Pan-Head Screws 2 157604172-001 Rear Hold-Down Brackets 4 10-321/22 Flat-Head Screws 1 164201357 Powerware 4-Post Rail Kit User’s Guide 1 05147305 Powerware 5125 Two-in-One (1000–1500 VA) User’s Guide 1. Attach the supplied mounting handles to the mounting brackets. Align the mounting brackets with the screw holes on the side of the UPS and secure with the supplied screws. NOTE The UPS and Extended Battery Modules MUST be installed at the bottom of the rack. If placed in a rack with existing equipment, the rack must be reconfigured to allow the UPS installation at the bottom of the rack. NOTE The EBMs must be installed below the UPS. 2. Install the clip nuts over the holes on the back of the rack. NOTE The clip nuts for the first set of rails go over the holes in position 2 and 4. If you are installing additional rails, the next set of clip nuts should be placed 4 and 6 holes above the last installed clip nut. Position 2 Position 4 Position 8 Position 10 Position 10 Second Set of Clip Nuts First Set of Clip Nuts

POWERWARE 5125 (9910 P18) Q START FOR

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

1Powerware® 5125 (9910 P18) Quick Start for IBM® Applications : 164201421 A

POWERWARE 5125 (9910 P18) QUICK START

FOR IBM APPLICATIONS

NOTE The following procedure is for an IBM9 pSeriesZ rack only. If you have another type of rack, contact your servicerepresentative (see page 4).

Step 1. UPS Setup

Qty. Powerware Part Number Description

2 — Mounting Handles

4 — Mounting Handle Screws

2 — Mounting Brackets

4 — Mounting Bracket Screws

1 157604171-001 Left Fixed Mounting Rail Assembly

1 157604171-002 Right Fixed Mounting Rail Assembly

4 — 10-32 Clip Nuts

8 — 10-32�1/22 Pan-Head Screws

2 157604172-001 Rear Hold-Down Brackets

4 — 10-32�1/22 Flat-Head Screws

1 164201357 Powerware 4-Post Rail Kit User’s Guide

1 05147305 Powerware 5125 Two-in-One (1000–1500 VA) User’s Guide

1. Attach the supplied mounting handles to themounting brackets.

Align the mounting brackets with the screw holes onthe side of the UPS and secure with the suppliedscrews.

NOTE The UPS and Extended Battery Modules MUST beinstalled at the bottom of the rack. If placed in a rack withexisting equipment, the rack must be reconfigured to allowthe UPS installation at the bottom of the rack.

NOTE The EBMs must be installed below the UPS.

2. Install the clip nuts over the holes on the back of therack.

NOTE The clip nuts for the first set of rails go over the holesin position 2 and 4. If you are installing additional rails, thenext set of clip nuts should be placed 4 and 6 holes above thelast installed clip nut.

Position 2

Position 4

Position 8

Position 10Position 10Second Set of Clip Nuts

First Set of Clip Nuts

Powerware® 5125 (9910 P18) Quick Start for IBM® Applications : 164201421 A2

3. Secure both rails to the back of the rack withpan-head screws. Insert the screws through the clipnuts installed in Step 2.

4. Secure both rails to the front of the rack withpan-head screws. Insert the screws through thecenter holes of the rail.

NOTE Do not tighten the screws until the UPS or EBM isinstalled.

5. Slide the UPS and any optional EBMs into the rack.

C A U T I O NThe UPS and EBM are heavy. A minimum of two people arerequired to lift the UPS into the rack.

6. To secure the back of the UPS to the rack, loosen thewing nut on the rear hold-down bracket and slide thebracket over the rear of the UPS. Tighten the wingnut.

7. Secure the front of the UPS to the rack usingflat-head screws.

Rear Hold-DownBracket

3Powerware® 5125 (9910 P18) Quick Start for IBM® Applications : 164201421 A

Step 2. Cord Connections

Qty. PowerwarePart Number

Description

2 60420055 IEC 320-C13 to C14, 10A Equipment Power Cords (6 ft/1.8m)

1 05147305 Powerware 5125 Two-in-One (1000–1500 VA) User’s Guide

1. If you are using a power distribution bus (PDB), plugthe equipment into the appropriate UPS outputreceptacles using the interconnect cords suppliedwith the IBM rack.

NOTE DO NOT protect laser printers with the UPS becauseof the exceptionally high power requirements of the heatingelements.

If you are using two PDBs for redundancy, plug inthe equipment as shown.

2. Plug the output power cord (IEC 320-C13 to C-14)into the output connector on the UPS rear panel.

3. Plug the other end of the output power cord into thePDB.

NOTE If you are using more than one UPS in a rack, verifythat the UPS output power cords are plugged into separatePDBs.

For additional P18 rack connection information, go towww.oem.powerware.com/ibm-ups/pdf/p18details.pdf.

4. To complete startup, refer to Powerware 5125Two-in-One (1000–1500 VA) User’s Guide.

Powerware® 5125 (9910 P18) Quick Start for IBM® Applications : 164201421 A4

Step 3. Communication Options

Qty. Powerware PartNumber

Description

1 05146745-31 Powerware Software Suite CD

1 124102022-002 UPS to Server Communication Cables (DB-9 to DB-9, 6 ft/1.8m)

The following communication options are available with theUPS:

: One server serially connected to the P18 UPS

: Network (WebServer) with the P18 UPS as a node

For additional information, go towww.oem.powerware.com/ibm-ups/pdf/p18details.pdf.

Service and Support

In the United States and Canada, call 1-800-IBMSERV(1-800-426-7378). In Europe, the Middle East, and Africa(EMEA); Latin America; or Asia-Pacific, call the IBM officethat services your account.

5Guide de démarrage rapide Powerware® 5125 (9910 P18) pour applications IBM® : 164201421 A

GUIDE DE DÉMARRAGE RAPIDE POWERWARE 5125 (9910 P18)POUR APPLICATIONS IBM

REMARQUE La procédure suivante s’applique à une baie IBM9 pSeriesZ uniquement. Pour tout autre type de baie, contactezvotre représentant du service (voir page 8).

Etape 1. Installation de l’onduleur

Qté Numéro de piècePowerware

Description

2 — Poignées de montage

4 — Vis de poignées de montage

2 — Supports de fixation

4 — Vis de supports de fixation

1 157604171-001 Ensemble de rails de montage fixes de gauche

1 157604171-002 Ensemble de rails de montage fixes de droite

4 — Ecrous de clips 10-32

8 — 10-32�1/22 Vis à tête cylindrique large

2 157604172-001 Supports de fixation arrière

4 — 10-32�1/22 Vis à tête plate

1 164201357 Guide de l’utilisateur de l’ensemble de rails pour 4 postes Powerware

1 05147305 Guide de l’utilisateur Powerware 5125 deux en un (1000–1500 VA)

1. Fixez les poignées de montage fournies aux supports defixation.Alignez les supports de fixation avec les trous pourvis sur la face latérale de l’onduleur et fixez lessupports à l’aide des vis fournies.

REMARQUE L’onduleur et tout Module de batterie étendu(EBM) optionnels DOIVENT être installés dans le fond de labaie. Si la baie contient déjà des appareils, elle doit êtreréorganisée afin de permettre l’installation de l’onduleur aufond de la baie.

REMARQUE Les EBM doivent être installés sous l’onduleur.

2. Posez les écrous de clips sur les trous à l’arrière de labaie.

REMARQUE Posez les écrous de clips du premier ensemblede rails sur les trous des positions 2 et 4. Si vous installezd’autres rails, le prochain ensemble d’écrous de clips doitêtre placé 4 et 6 trous au-dessus du dernier écrou de clipposé. Position 2

Position 4

Position 8

Position 10Position 10 Second ensembled’écrous de clips

Premier ensembled’écrous de clips

6 Guide de démarrage rapide Powerware® 5125 (9910 P18) pour applications IBM® : 164201421 A

3. Fixez les deux rails à l’arrière de la baie à l’aide de visà tête cylindrique large. Insérez les vis dans les écrousde clips posés à l’étape 2.

4. Fixez les deux rails à l’avant de la baie à l’aide de vis àtête cylindrique large. Insérez les vis dans les trouscentraux du rail.

REMARQUE Ne serrez les vis que lorsque l’onduleur oul’EBM est installé.

5. Insérez l’onduleur et les EBM optionnels dans la baie.

A T T E N T I O NL’onduleur et l’EBM sont lourds. Deux personnes au minimumsont requises pour soulever l’onduleur et le placer dans labaie.

6. Pour fixer l’arrière de l’onduleur à la baie, desserrezl’écrou papillon du support de fixation arrière etfaites glisser le support par-dessus l’arrière del’onduleur. Serrez l’écrou papillon.

7. Fixez l’avant de l’onduleur à la baie à l’aide de vis àtête plate.

Support defixation arrière

7Guide de démarrage rapide Powerware® 5125 (9910 P18) pour applications IBM® : 164201421 A

Etape 2. Connexion des cordons

Qté Numéro de piècePowerware

Description

2 60420055 Cordons d’alimentation pour appareils IEC 320-C13 vers C14, 10A (1,8m)

1 05147305 Guide de l’utilisateur Powerware 5125 deux en un (1000–1500 VA)

1. Si vous utilisez un bus de distribution d’alimentation(PDB), raccordez vos appareils aux prises de sortiecorrespondantes de l’onduleur UPS à l’aide descordons de raccordement fournis avec la baie IBM.

REMARQUE NE PAS protéger les imprimantes laser avecl’onduleur car les besoins en énergie des élémentschauffants sont exceptionnellement élevés.

Si vous utilisez deux PDB pour la redondance,raccordez-les aux appareils comme indiqué.

2. Branchez le cordon d’alimentation de sortie(IEC 320-C13 vers C-14) sur le connecteur de sortiedu panneau arrière de l’onduleur UPS.

3. Branchez l’autre extrémité du cordon de sortie dansle PDB.

REMARQUE Si vous utilisez plusieurs onduleurs dans unebaie, vérifiez que les cordons d’alimentation de sortie desonduleurs sont raccordés à des PDB distincts.

Pour des informations supplémentaires sur leraccordement de la baie au P18, consultez le sitewww.oem.powerware.com/ibm-ups/pdf/p18details.pdf.

4. Pour effectuer la mise en route, voir Guide del’utilisateur Powerware 5125 deux en un(1000–1500 VA).

8 Guide de démarrage rapide Powerware® 5125 (9910 P18) pour applications IBM® : 164201421 A

Etape 3. Options de communication

Qté Numéro de piècePowerware

Description

1 05146745-31 CD de la Suite logicielles Powerware

1 124102022-002 Câbles de communication Onduleur vers Serveur (DB-9 vers DB-9, 1,8m)

Options de communication disponibles avec l’onduleur :

: Un serveur branché en série à l’onduleur UPS P18

: Réseau (WebServer) avec onduleur P18 en guise denoeud

Pour des informations supplémentaires, consultez le sitewww.oem.powerware.com/ibm-ups/pdf/p18details.pdf.

Service après-vente et assistance technique

Aux Etats-Unis et au Canada, appelez le 1-800-IBMSERV(1-800-426-7378). En Europe, au Moyen-Orient, en Afrique,en Amérique latine ou en Asie-Pacifique, appelez le centreIBM qui est responsable de votre compte.

9Powerware® 5125 (9910 P18) Schnelle Inbetriebnahme für IBM®-Anwendungen : 164201421 A

POWERWARE 5125 (9910 P18) SCHNELLE INBETRIEBNAHME

FÜR IBM-ANWENDUNGEN

HINWEIS Das folgende Verfahren bezieht sich nur auf ein Gestell des Typs IBM9 pSeriesZ Wenn Sie eine andere Art vonGestell verwenden, wenden Sie sich an Ihren Kundendienstmitarbeiter (siehe Seite 12).

Schritt 1: Einrichten der USV

Menge Powerware Teilenummer Bezeichnung

2 — Montagegriffe

4 — Schrauben für Montagegriffe

2 — Halterungen

4 — Schrauben für Halterungen

1 157604171-001 Links montierter Befestigungsschienensatz

1 157604171-002 Rechts montierter Befestigungsschienensatz

4 — 10-32 Clipsmuttern

8 — 10-32�1/22 Flachkopfschrauben

2 157604172-001 Hintere Haltebügel

4 — 10-32�1/22 Senkkopfschrauben

1 164201357 Benutzerhandbuch für Powerware Schienensatz für 4 Stützpfosten

1 05147305 Benutzerhandbuch für Powerware 5125 Two-in-One (1000 – 1500 W)

1. Mitgelieferte Montagegriffe an den Halterungenmontieren.Die Halterungen nach den Schraubenlöchern auf derSeite der USV ausrichten und mit den mitgeliefertenSchrauben sichern.

HINWEIS Die USV und die optionale ErweiterteBatteriemoduls (EBMs) MÜSSEN unten in das Gestelleingebaut werden. Beim Einbau in ein Gestell mitvorhandenen Geräten ist das Gestell so zu konfigurieren, daßder Einbau der USV unten in das Gestell möglich ist.

HINWEIS Die EBMs müssen unter dem USV installiertwerden.

2. Bringen Sie die Clipsmuttern über den Bohrungenauf der Rückseite des Gestells an.

HINWEIS Die Clipsmuttern für den ersten Schienensatzgehören über die Bohrungen in Position 2 und 4. Sind weitereSchienen zu installieren, muss der nächste Satz Clipsmuttern4 und 6 Bohrungen über der letzen montierten Clipsmutterplatziert werden.

.

Position 2

Position 4

Position 8

Position 10Position 10 Zweiter SatzClipsmuttern

Erster SatzClipsmuttern

10 Powerware® 5125 (9910 P18) Schnelle Inbetriebnahme für IBM®-Anwendungen : 164201421 A

3. Beide Schienen an der Rückseite des Gestells mitFlachkopfschrauben befestigen. Die Schrauben durchdie in Schritt 2 installierten Clipsmuttern einfügen.

4. Beide Schienen an der Vorderseite des Gestells mitFlachkopfschrauben befestigen. Die Schrauben durchdie mittleren Bohrungen der Schiene stecken.

HINWEIS Die Schrauben nicht anziehen, bevor die USVbzw. das EBM montiert ist.

5. Die USV und etwaige optionale EBMs in das Gestellschieben.

A C H T U N GDie USV und das EBM sind schwer. Zum Hineinheben derUSV in das Gestell sind mindestens zwei Personenerforderlich.

6. Zur Befestigung der Rückseite der USV im GestellFlügelmutter am hinteren Haltebügel lösen und denBügel über die Rückseite der USV schieben.Flügelmutter anziehen.

7. Vorderseite der USV mit Senkkopfschrauben amGestell befestigen.

HintererHaltebügel

11Powerware® 5125 (9910 P18) Schnelle Inbetriebnahme für IBM®-Anwendungen : 164201421 A

Schritt 2: Kabelanschlüsse

Menge PowerwareTeilenummer

Bezeichnung

2 60420055 Gerätestromkabel (1,8m) von IEC 320-C13 zu C14, 10A

1 05147305 Benutzerhandbuch für Powerware 5125 Two-in-One (1000 – 1500 W)

1. Wenn Sie einen Stromverteilungsbus (PDB)verwenden, schließen Sie das Gerät amentsprechenden Ausgangsanschluss der USV an,indem Sie die mit dem IBM-Gestell geliefertenVerbindungskabel verwenden.

HINWEIS Laserdrucker wegen des außerordentlich hohenLeistungsbedarfs der Heizelemente NICHT mit der USVschützen.

Wenn Sie aus Redundanzgründen zwei PDBsverwenden, schließen Sie die Geräte gemäß derAbbildung an.

2. Das Netzausgangskabel (IEC 320-C13 zu C-14) inden Ausgangsanschluss auf der Rückwand der USVstecken.

3. Das andere Ende des Netzausgangskabels in den PDBstecken.

HINWEIS Wenn mehrere USVs in einem Gestell verwendetwerden, ist zu prüfen, dass die Netzausgangskabel der USVsan separaten PDBs angeschlossen sind.

Weitere Informationen zum Anschluss von P18-Gestellenfinden Sie unterwww.oem.powerware.com/ibm-ups/pdf/p18details.pdf.

4. Informationen zum Abschließen der Inbetriebnahmefinden Sie im Benutzerhandbuch für Powerware 5125Two-in-One (1000 – 1500 W).

12 Powerware® 5125 (9910 P18) Schnelle Inbetriebnahme für IBM®-Anwendungen : 164201421 A

Schritt 3: Kommunikationsoptionen

Menge PowerwareTeilenummer

Bezeichnung

1 05146745-31 CD mit der Powerware Software-Reihe

1 124102022-002 Datenübertragungskabel USV-Server (DB-9 zu DB-9, 1,8m)

Die folgenden Kommunikationsoptionen sind für die USVverfügbar:

: Ein seriell am USV P18 angeschlossener Server

: Netzwerk-Server (Web-Server) mit USV P18 als Knoten

Weitere Informationen finden Sie unterwww.oem.powerware.com/ibm-ups/pdf/p18details.pdf.

Kundendienst und Unterstützung

Rufen Sie in den Vereinigten Staaten und in Kanada1-800-IBMSERV (1-800-426-7378) an. In Europa, im NahenOsten und in Afrika (EMEA) sowie in Lateinamerika oder inAsien/im Pazifikraum rufen Sie das IBM-Büro an, das für IhrKonto zuständig ist.

13Powerware® 5125 (9910 P18) Guida rapida per le applicazioni IBM® : 164201421 A

POWERWARE 5125 (9910 P18)GUIDA RAPIDA PER LE APPLICAZIONI IBM

NOTA La procedura descritta di seguito si riferisce solo ai rack IBM9 pSeriesZ Per rack di tipo diverso, è necessario rivolgersial il vostro rappresentante per l’assistenza (vedere la pagina 16).

Passo 1. Installazione dell’UPS

Qtà Powerwarenumero parte

Descrizione

2 — Maniglie per il montaggio

4 — Viti per le maniglie per il montaggio

2 — Staffe il montaggio

4 — Viti per le staffe il montaggio

1 157604171-001 Guida di montaggio fissa sinistra

1 157604171-002 Guida di montaggio fissa destra

4 — Dadi di fermo 10-32

8 — Viti con testa universale 10-32�1/22

2 157604172-001 Staffe di bloccaggio posteriori

4 — Viti con testa piatta 10-32�1/22

1 164201357 Kit Powerware 4, manuale per l’utente

1 05147305 Powerware 5125 Due in uno (1000–1500 VA) Manuale dell’utente

1. Collegare le maniglie di montaggio fornite alle staffe dimontaggio.Allineare le staffe di montaggio con i fori delle viti sullato dell’UPS e serrarle con le viti fornite indotazione.

NOTA L’UPS e i Moduli batteria di espansione opzionaleDEVONO essere installati nella sezione inferiore del rack. Seil rack contiene già altre attrezzature, è necessarioriconfigurarlo in modo da consentire l’installazione dell’UPSnella sezione inferiore del rack.

NOTA Gli EBM devono essere installati sotto l’UPS.

2. Inserire i dati di fermo nei fori sul retro del rack.

NOTA I dadi di fermo per il primo gruppo di guide devonoessere inseriti nei fori corrispondenti alle posizioni 2 e 4. Sesi installano guide aggiuntive, installare i dadi di fermoaggiuntivi nei fori corrispondenti alle posizioni 4 e 6, sopral’ultimo dado di fermo installato.

.

Posizione 2

Posizione 4

Posizione 8Secondo gruppo di dadi

Primo gruppo di dadi

Posizione 10

14 Powerware® 5125 (9910 P18) Guida rapida per le applicazioni IBM® : 164201421 A

3. Bloccare entrambe le guide sul retro del rackutilizzando le viti a testa universale. Inserire le vitinei dadi di fermo installati nel punto 2.

4. Bloccare entrambe le guide sul lato frontale del rackutilizzando le viti a testa universale. Inserire le vitinei fori centrali della guida.

NOTA Serrare le viti solo dopo aver installato l’UPSo l’EBM.

5. Far scorrere l’UPS e tutti gli EBM opzionali nel rack.

A T T E N Z I O N EL’UPS e l’ EBM ssono pesanti. Per spostare l’UPS è richiestol’intervento di almeno due persone.

6. Per bloccare il retro dell’UPS sul rack, allentare ildado ad alette sul retro della staffa di bloccaggio e farscorrere la staffa sul retro dell’UPS. Serrare il dado adalette.

7. Bloccare il lato frontale dell’UPS sul rack utilizzandole viti a testa piatta.

Staffa dibloccaggioposteriore

15Powerware® 5125 (9910 P18) Guida rapida per le applicazioni IBM® : 164201421 A

Passo 2. Connessione dei cavi

Qtà Powerwarenumero parte

Descrizione

2 60420055 Cavi di alimentazione apparecchiatura da IEC 320/C13 a C14, 10E (1,8 metri)

1 05147305 Powerware 5125 Due in uno (1000–1500 VA) Manuale dell’utente

1. Se si utilizza un bus per la distribuzionedell’alimentazione (PDB), è necessario collegarel’attrezzatura alla presa di uscita dell’UPS appropriatautilizzando i cavi di interconnessione forniti con il rack.

NOTA NON proteggere le stampanti laser con l’UPS a causadella potenza estremamente elevata richiesta dagli elementiriscaldanti.

Se si utilizzano due PDB a scopo di ridondanza,effettuare le connessioni come mostrato nella figura.

2. Collegare il cavo di alimentazione in uscita (daIEC 320-C13 a C-14) al connettore in uscita sulpannello posteriore dell’UPS.

3. Collegare l’altra estremità del cavo di alimentazionein uscita nel PDB.

NOTA Se si utilizzano più UPS sul rack, verificare che i cavidi alimentazione in uscita dell’UPS siano collegati a PDBdiversi.

Per ulteriori informazioni sulla connessione dei rack P18,visitare il sito Webwww.oem.powerware.com/ibm-ups/pdf/p18details.pdf.

4. Per completare l’installazione, consultare laPowerware 5125 Due in uno (1000–1500 VA) Manualedell’utente.

16 Powerware® 5125 (9910 P18) Guida rapida per le applicazioni IBM® : 164201421 A

Passo 3. Opzioni per le comunicazioni

Qtà Powerwarenumero parte

Descrizione

1 05146745-31 CD contenente il pacchetto software Powerware

1 124102022-002 Cavi di comunicazione da UPS al server (DB-9/DB-9, 1,8 metri)

Per l’UPS sono disponibili le seguenti opzioni dicomunicazione:

: Un server collegato all’UPS P18 tramite linea seriale

: Rete (WebServer) con l’UPS P18 utilizzato come nodo

Per ulteriori informazioni, consultare il sito Webwww.oem.powerware.com/ibm-ups/pdf/p18details.pdf.

Assistenza e supporto

Per gli Stati Uniti e Canada, chiamare il numero1-800-IBMSERV (1-800-426-7378). In Europa, Medio Orientee Africa (EMEA), America Latina, o Asia del Pacifico,chiamare il numero Ufficio IBM, per l’assistenza clienti.

17Powerware® 5125 (9910 P18) - Guia Rápido para Aplicações IBM® : 164201421 A

POWERWARE 5125 (9910 P18) - GUIA RÁPIDO

PARA APLICAÇÕES IBMOBSERVAÇÃO Os procedimentos a seguir se referem somente a chassi IBM9 pSeriesZ Se você tiver outro tipo de chassi,contate a assistência técnica de sua região (consulte a página 20).

Passo 1. Configuração do no-break

Qtde. Número de referência Powerware Descrição

2 — Alças de montagem

4 — Parafusos para alça de montagem

2 — Suportes de montagem

4 — Parafusos para suportes de montagem

1 157604171-001 Conjunto do trilho de montagem fixo à esquerda

1 157604171-002 Conjunto do trilho de montagem fixo à direita

4 — Porcas autotravantes 10-32

8 — Parafusos philips 10-32�1/22

2 157604172-001 Suportes de contenção traseiros

4 — Parafusos de cabeça chata 10-32�1/22

1 164201357 Guia do Usuário do Kit de 4 Colunas de Trilhos Powerware

1 05147305 Guia do Usuário do Powerware 5125 Two-in-One (1000–1500 VA)

1. Fixe as alças de montagem fornecidas aos suportes demontagem.Alinhe os suportes de montagem com os orifíciospara parafusos na parte lateral do no-break e fixe-oscom os parafusos fornecidos.

OBSERVAÇÃO O no-break e os Módulos Estendidos deBaterias (EBMs) opcionais DEVEM ser instalados na parteinferior do chassi. Se forem instalados em um chassi que jácontém algum equipamento, o chassi deverá serreconfigurado para permitir a instalação do no-break na suaparte inferior.

OBSERVAÇÃO Os EBMs devem ser instalados abaixo dono-break.

2. Instale as porcas autotravantes nos orifícios da partede trás do chassi.

OBSERVAÇÃO As porcas autotravantes destinadas aoprimeiro conjunto de trilhos devem ser instaladas nosorifícios nas posições 2 e 4. Se você estiver instalando trilhosadicionais, o próximo conjunto de porcas autotravantesdeverá ser instalado 4 e 6 orifícios acima da última porcainstalada.

.

Posição 2

Posição 4

Posição 8

Posição 10Segundo conjunto deporcas autotravantes

Primeiro conjunto deporcas autotravantes

18 Powerware® 5125 (9910 P18) - Guia Rápido para Aplicações IBM® : 164201421 A

3. Fixe ambos os trilhos no fundo do chassi comparafusos philips. Rosqueie os parafusos através dasporcas autotravantes instaladas no passo 2.

4. Fixe ambos os trilhos na parte frontal do chassi comparafusos philips. Rosqueie os parafusos através dosorifícios centrais do trilho.

OBSERVAÇÃO Não aperte os parafusos até que o no-breakou o EBM esteja instalado.

5. Deslize o no-break e quaisquer EBMs opcionais paradentro do chassi.

P E R I G OO no-break e o EBM são pesados. São necessárias pelomenos duas pessoas para colocar o no-break no chassi.

6. Para fixar a parte de trás do no-break no chassi,afrouxe a porca borboleta no suporte traseiro edeslize este suporte sobre a parte traseira dono-break. Aperte a porca borboleta.

7. Fixe a parte frontal do no-break no chassi usandoparafusos de cabeça chata.

Suporte decontençãotraseiro

19Powerware® 5125 (9910 P18) - Guia Rápido para Aplicações IBM® : 164201421 A

Passo 2. Conexões dos cabos

Qtde. Número de referênciaPowerware

Descrição

2 60420055 Cabos de alimentação do equipamento IEC 320-C13 para C14, 10A, de 1,8 m

1 05147305 Guia do Usuário do Powerware 5125 Two-in-One (1000–1500 VA)

1. Se você estiver usando um barramento de distribuiçãode energia (PDB - power distribution bus), conecte oequipamento aos receptáculos de saída apropriadosusando os cabos de ligação fornecidos com o chassiIBM.

OBSERVAÇÃO NÃO proteja impressoras laser com ono-break devido às exigências de energia excepcionalmentealtas dos componentes de aquecimento.

Se você estiver usando dois PDBs para conexõesredundantes, conecte o equipamento conformeilustrado.

2. Conecte o cabo de alimentação de saída(IEC 320-C13 a C-14) no conector de saída, que seencontra no painel traseiro do no-break.

3. Conecte a outra extremidade do cabo de alimentaçãode saída no PDB.

OBSERVAÇÃO Se você estiver usando mais do que umno-break em um único chassi, certifique-se de que os cabosde alimentação de saída estejam conectados em PDBsseparados.

Para obter informações adicionais sobre conexões emchassi P18, visitewww.oem.powerware.com/ibm-ups/pdf/p18details.pdf.

4. Para completar o procedimento de inicialização,consulte o Guia do Usuário do Powerware 5125Two-in-One (1000–1500 VA).

20 Powerware® 5125 (9910 P18) - Guia Rápido para Aplicações IBM® : 164201421 A

Passo 3. Opções de comunicação

Qtde. Número de referênciaPowerware

Descrição

1 05146745-31 CD-ROM do Pacote de Software Powerware

1 124102022-002 Cabos de comunicação entre no-break e servidor (DB-9 para DB-9, 1,8 m)

As seguintes opções de comunicação estão disponíveis como no-break:

: Um servidor conectado serialmente ao no-break P18

: Em rede (WebServer), com o no-break P18 como umdos nós

Para obter informações adicionais, visitewww.oem.powerware.com/ibm-ups/pdf/p18details.pdf.

Assistência e suporte

Nos Estados Unidos e no Canadá, ligue para 1-800-IBMSERV(1-800-426-7378). Na Europa, no Oriente Médio e na África(EMEA), na América Latina ou Ásia-Pacífico, entre emcontato com o escritório IBM que lhe fornece assistência.

21Inicio rápido de Powerware® 5125 (9910 P18) para aplicaciones de IBM® : 164201421 A

INICIO RÁPIDO DE POWERWARE 5125 (9910 P18)PARA APLICACIONES DE IBM

NOTA El siguiente procedimiento es solamente para un estante IBM9 pSeriesZ Si tiene otro tipo de estante comuníquese consu representante de servicio (consulte la página 24).

Paso 1. Configuración del SIE

Cant. Número de partede Powerware

Descripción

2 — Agarraderas de montaje

4 — Tornillos para las agarraderas de montaje

2 — Soportes de montaje

4 — Tornillos para los soportes de montaje

1 157604171-001 Ensamblaje de rieles de montaje fijado a la izquierda

1 157604171-002 Ensamblaje de rieles de montaje fijado a la derecha

4 — Tuercas sujetadoras 10-32

8 — Tornillos de cabeza plana 10-32�1/22

2 157604172-001 Soporte de fijación posterior

4 — Tornillo de cabeza fresada 10-32�1/22

1 164201357 Guía del usuario del juego de riel de 4 postes Powerware

1 05147305 Guía del usuario Powerware 5125 Dos en uno (1000–1500 VA)

1. Fije las agarraderas de montaje suministradas a lossoportes de montaje.Alinee los soportes de montaje con los orificios de lostornillos en la parte lateral del SIE y asegúrelos conlos tornillos que se proporcionan.

NOTA El SIE y los Módulos de batería extendida (EBMs)opcional se TIENEN que instalar en la base del estante. Si secolocan en un estante con equipo existente, el estante sedebe configurar de nuevo para permitir la instalación del SIEen la base del mismo.

NOTA Los EBMs se deben instalar bajo el SIE.

2. Instale las tuercas sujetadoras sobre los orificios en laparte posterior del estante.

NOTA Las tuercas sujetadoras para el primer conjunto derieles van sobre los orificios en la posición 2 y 4. Si instalarieles adicionales, el siguiente conjunto de tuercassujetadoras debe colocarse en los orificios 4 y 6 sobre laúltima tuerca sujetadora que se instaló.

.

Posición 2

Posición 4

Posición 8

Posición 10 Segundo conjunto detuercas sujetadoras

Primer conjunto detuercas sujetadoras

22 Inicio rápido de Powerware® 5125 (9910 P18) para aplicaciones de IBM® : 164201421 A

3. Asegure ambos rieles a la parte posterior del estantecon los tornillos de cabeza plana. Inserte los tornillosa través de las tuercas sujetadoras instaladas en elPaso 2.

4. Asegure ambos rieles a la parte delantera del estantecon los tornillos de cabeza plana. Inserte los tornillosa través de los orificios del centro del riel.

NOTA No apriete los tornillos hasta que haya instalado elSIE o el EBM.

5. Coloque el SIE y cualquier EBMs opcional en elestante.

P R E C A U C I Ó NEl SIE y el EBM son pesados. Se necesita como mínimo dospersonas para colocar el SIE en el estante.

6. Para asegurar la parte posterior del SIE al estante,afloje la tuerca de mariposa en el soporte de fijaciónposterior y deslice el soporte sobre la parte posteriordel SIE. Apriete la tuerca de mariposa.

7. Asegure la parte delantera del SIE al estante con lostornillos de cabeza fresada.

Soporte defijaciónposterior

23Inicio rápido de Powerware® 5125 (9910 P18) para aplicaciones de IBM® : 164201421 A

Paso 2. Conexiones de los cables

Cant. Número de partede Powerware

Descripción

2 60420055 IEC 320-C13 a Cables de potencia del equipo C14, 10A (1.8 m)

1 05147305 Guía del usuario Powerware 5125 Dos en uno (1000–1500 VA)

1. Si utiliza un bus de distribución de energía (BDE), conecteel equipo a los receptáculos de salida de SIE adecuados,utilizando los cables de interconexión que seproporcionan con el estante IBM.

NOTA NO proteja impresoras láser con el SIE pues tienenrequisitos de energía excepcionalmente altos para loselementos de calentamiento.

Si utiliza dos BDE para redundancia, conecte el equipocomo se muestra.

2. Conecte el cable de potencia de salida (IEC 320-C13a C14) en el conector de salida en el panel posteriordel SIE.

3. Conecte el otro extremo del cable de potencia desalida en el BDE.

NOTA Si utiliza más de un SIE en un estante, verifique quelos cables de potencia de salida del SIE estén conectados enBDE separados.

Para obtener información adicional sobre la conexión delestante P18, visitewww.oem.powerware.com/ibm-ups/pdf/p18details.pdf.

4. Para completar la puesta en marcha, consulte laGuía del usuario Powerware 5125 Dos en uno(1000–1500 VA).

24 Inicio rápido de Powerware® 5125 (9910 P18) para aplicaciones de IBM® : 164201421 A

Paso 3. Opciones de comunicación

Cant. Número de partede Powerware

Descripción

1 05146745-31 CD de Suite de software Powerware

1 124102022-002 SIE a Cables de comunicación del servidor (DB-9 a DB-9, 1.8 m)

Las siguientes opciones de comunicación se encuentrandisponibles con el SIE:

: Un servidor conectado en forma serial al SIE P18

: Red (WebServer) con el SIE P18 como un nodo

Para obtener información adicional, visitewww.oem.powerware.com/ibm-ups/pdf/p18details.pdf.

Servicio y soporte técnico

En los Estados Unidos y Canadá, llame al 1-800-IBMSERV(1-800-426-7378). En Europa, el Medio Oriente y África(EMEA); Latinoamérica o Asia Pacífico, llame a las oficinasde IBM, las cuales proporcionan servicio a su cuenta.