Bingham Wind ProjectApril 18, 2013Exhibit 5: Visual Simulation and Post-Construction Photos
Prepared by LandWorks, Middlebury, VT
Prepared by LandWorks, Middlebury, VTRollins Wind Project
Prepared for Evergreen Wind Power III, LLC
6/17/2011post-construction view FroM MADAGAscAL ponD, BurLinGton
turbine information Model: GE 1.5 MW sle 60Hz
Hub height: 262’-6” (80 m)
Rotor diameter: 252’-11” (77 m)
photograph information Date and time: 6/8/11; 5:04 pm (photo by TJDA)
Location: Madagascal Pond in Burlington; 45˚ 18.3647’ N, 68˚ 20.5555’ W
Camera elevation above sea level: approx. 316’-4” (96.4 m)
Focal length (35mm equivalent): 56mm
Viewing distance: approx. 11” (27.9 cm)
Distance to nearest visible turbine: 2.5 miles (4.0 km)
technical information
project and photograph informationview Location Map
Visual Simulation of Rollins Wind Project from Madagascal Pond
Post-Construction Photo of Rollins Wind Project from Madagascal Pond
Simulation prepared by LandWorksDate and time: 7/29/08; 12:40 pmFocal length: (35 mm equivalent): 56 mm
Photo taken by TJDADate and time: 6/8/11; 5:04 pmFocal length: (35 mm equivalent): unknown
Note: View location is slightly different for post-construction photo
(Sheet 1 of 2)
Rollins from Upper Hot Brook Lake.
From this location, the closest turbine at Rollins is approximately 2.5 miles away. Note that the rotors are difficult to discern from this distance, despite the silhouette effect present with these light
conditions. Photo taken by TJDA, June 6-7, 2011.
Rollins from Upper Pond.
From this location, the closest turbine at Rollins is approximately 2.5 miles away. Note that even with a blue sky, the turbines do not stand out in this photo. Photo taken by TJDA, June 6-7, 2011.
Rollins from Upper Pond.
From this location, the closest turbine at Rollins is approximately 2.5 miles away. Note that even with a blue sky, the turbines do not stand out in this photo. Photo taken by TJDA, June 6-7, 2011.