31
Portofolio Lenny POL

Portofolio Lenny pol

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Portofolio Lenny pol

Portofolio Lenny POL

Page 2: Portofolio Lenny pol

Urban projectsTerritorial projectsTerritorial and urban analyzesArchitectural projects

1234

Summery

Page 3: Portofolio Lenny pol

LENNY POLMaster landscape architecture student

Ganzemüllerstrasse 285354 Freising(Germany)

+49 [email protected]

24 years oldFrench/dutch nationality

Roudayres46360 Saint Martin de Vers(France)

Study

Internschip

Expériences profesionnelles

Competences/qualities

Free time activitiesTennis (9 years), piano (8 years), badminton (1 year), reading, cinema, visual arts.

Eté 2014 : Receptionist Camping Le Sainte Marie à Sainte Marie la Mer (Pyrénées Orientales)Eté 2012 : Réceptionniste au camping Le Sainte Marie à Sainte Marie La Mer (Pyré-nées Orientales)Eté 2011 : Receptionist : Camping Le Tedey, Lacanau (Aquitaine)Eté 2009 : Receptionist : Camping Les Pins, Payrac (Midi-Pyrénées)Eté 2006,2007,2008 : Jobs on farms

Juillet/août 2013 : CAUE du Lot (Conseil d’architecture de l’urbanisme et de l’envi-ronnemet), Cahors (Midi-Pyrénées)Septembre 2012 : Tree nursery, Pépinière des Causses, Nuzéjouls (Midi-Pyrénées)

2014/2015 : Master in landscape architecture at the TUM (Munich)2013/2014 : Third year : Landscape architecture at the Ensap (Bordeaux)2012/2013 : Second year : Landscape architecture at the Ensap (Bordeaux)2011/2012 : First year : Landscape architecture at the Ensap (Bordeaux)2010/2011 : Second Bachelor year : Architecture at the Ensap (Bordeaux)2009/2010 : First Bachelor year : Architecture at the Ensap (Bordeaux)2006/2009 : Lycée général Clément Marot à Cahors (Lot, Midi-Pyrénées) Literary Degree (art option) 2002/2006 : Collège Saint Hélène à Gramat (Lot, Midi-Pyrénées)

CV

LANGUAGESDutch : Native languageFrench : BilingualEnglish : GoodGerman : B2 level

PROGRAMSPhotoshop, Illustrator, Indisign, Autocad, vectorworks, Sketchup, Word

Page 4: Portofolio Lenny pol
Page 5: Portofolio Lenny pol

1/Urban projects

> Urban densification in Gradignan (Bordeaux)> Urban densification in Blanquefort (Bordeaux)> Vacant plots speculations in Ensanche de Vallecas (Madrid)

Page 6: Portofolio Lenny pol

Urban densification in Blanquefort (Bordeaux)

Lieu de «départ» et d’«arrivée»

Traversée

Traversée

Carrefour

bâti

«parc»

liens

imperméabilitéperméabilitévoies entrée de ville

interpénétration

Blanquefort is a district in the North-West of Bor-deaux which takes part of the CUB (Communauté urbaine de Bordeaux).

Within the framework of the project «50 000 nou-veaux logement» (50 0000 new houses around the public transport axes), in combination with the project «Bordeaux Euratlantique» a new focal point is put on the conurbation and on the contri-bution to a new vision and position for Bordeaux in Europe.

A better connection is planned between the cen-ter of Bordeaux and Blanquefort, espacially with the new tram/train stop.

The south of the city, which is close to the «parc des Jalles» is one of the areas where new housing could be planned in the next few years. The «jalles» area is protected and deemed non-constructible. The southern edge of Blanquefort is directly rela-

Between «jalles» and urban fabric, materialization of a limit

Densification around the parc. Important treshold between private and public space.

Schematic project intentions

Penetrating green axis

ted to this vast natural area that separates the city from Bordeaux.The visuel relationship is increased by the topo-graphie which allows a wide view over the whole area.

The project provides an interpenetration between the parc and the urban grid. The green space or-ganise different small neighborhoods.We can find here one example of a neighborhood organised around a green central axis.

Page 7: Portofolio Lenny pol

0m 4m

Section AA’

Transversal crossing of the central parc

On the edge of the water stream, below the parc

General plan of the projected neighborhood

Page 8: Portofolio Lenny pol

Légende

0 10 20 30m

Intentions de projet Socle topographique

Strate herbacéePelouseStrate arbustive basseGraminées et arbustes

Strate arbustive hauteArbustes

Jardins partagés

Espaces minéraux

Cheminements

Lignes d’eau et bassinsNoues et canaux

« Peigne urbain à la rencontre du végétal »

Lenny Pol - Lucie Cha Juin 2013 - C8-1 Gradignan - Ilot de la cité jardin

Traversée du parc

Accès au parc depuis le centre ville

page 1

Surface vierge à urbaniser : 20 ha

Surface du parc : 13,24 ha

Nombre de logements : 617(logements individuels : 219logements semi-collectifs : 316logements collectifs : 82)

Densité : 31 log/ha

Urban densification in Gradignan (33)An urban comb meeting a green grid

Gradignan is located in the south of Bordeaux. The project area is characterised by an old garden city wich has lost its identity over the last decades. The neighborhood has a strategic location since it’s situated on the crossroad between several districts of the town and many different urban typologies as well.There is a large green space in the center of the district which could federate the neigh-borhood whith the surrounding areas but which is unfortunately poorly invested. The request of the city was to add 300 more accomodations for different types of house-holds.

Our proposal was to connect the area with the rest of the city in a better way and to make the area attractive by improving the quality of the open public space which aimed to be more porous.

The main characteristics of our design are the progressive transition between the private and the public space, the interaction between a mineral and a vegetal grid, the balance between the number of individual and collective houses and provide appropriate urban ser-vices.

General plan of the project

Page 9: Portofolio Lenny pol

Schémas de fonctionnement de l’ilôt

0 5 10 15 m

RouteDesserte bâti et accès habitatPelouse (bande plantée ou clairière)

Voie piétonne et cyclableJardins partagés

Jardins privés

Haies Noue et ripisylveHabitat individuel R+1 et mur aveugleHabitat individuel R+2Logement collectif R+2

Toit terrasse

Acer platanoides

Betula

Malus everest

Acer rubrum

Statut des espacesEspace collectifEspace privéEspace public Ecoulement des eaux

Circulation et stationnements

0 5 10 15mDu public au privé

Plan de l’ilôt test

« Peigne urbain à la rencontre du végétal »

Lenny Pol - Lucie Cha Juin 2013 - C8-1 Gradignan - Ilot de la cité jardin

page 2

Traversée des masses végétalesChambre végétale

Entrée de quartier Jardins partagés en limite de l’emprise bâtie

Organisation de l’espace public 0 5m

Surface de l’ilot : 1,41 ha

Surface du parc : 0, 31 ha

Nombre de logements : 69(29 logements individuels et 40 semi-collectifs)

Densité : 49,3 log/ha

Schémas de fonctionnement de l’ilôt

0 5 10 15 m

RouteDesserte bâti et accès habitatPelouse (bande plantée ou clairière)

Voie piétonne et cyclableJardins partagés

Jardins privés

Haies Noue et ripisylveHabitat individuel R+1 et mur aveugleHabitat individuel R+2Logement collectif R+2

Toit terrasse

Acer platanoides

Betula

Malus everest

Acer rubrum

Statut des espacesEspace collectifEspace privéEspace public Ecoulement des eaux

Circulation et stationnements

0 5 10 15mDu public au privé

Plan de l’ilôt test

« Peigne urbain à la rencontre du végétal »

Lenny Pol - Lucie Cha Juin 2013 - C8-1 Gradignan - Ilot de la cité jardin

page 2

Traversée des masses végétalesChambre végétale

Entrée de quartier Jardins partagés en limite de l’emprise bâtie

Organisation de l’espace public 0 5m

Surface de l’ilot : 1,41 ha

Surface du parc : 0, 31 ha

Nombre de logements : 69(29 logements individuels et 40 semi-collectifs)

Densité : 49,3 log/ha

Schémas de fonctionnement de l’ilôt

0 5 10 15 m

RouteDesserte bâti et accès habitatPelouse (bande plantée ou clairière)

Voie piétonne et cyclableJardins partagés

Jardins privés

Haies Noue et ripisylveHabitat individuel R+1 et mur aveugleHabitat individuel R+2Logement collectif R+2

Toit terrasse

Acer platanoides

Betula

Malus everest

Acer rubrum

Statut des espacesEspace collectifEspace privéEspace public Ecoulement des eaux

Circulation et stationnements

0 5 10 15mDu public au privé

Plan de l’ilôt test

« Peigne urbain à la rencontre du végétal »

Lenny Pol - Lucie Cha Juin 2013 - C8-1 Gradignan - Ilot de la cité jardin

page 2

Traversée des masses végétalesChambre végétale

Entrée de quartier Jardins partagés en limite de l’emprise bâtie

Organisation de l’espace public 0 5m

Surface de l’ilot : 1,41 ha

Surface du parc : 0, 31 ha

Nombre de logements : 69(29 logements individuels et 40 semi-collectifs)

Densité : 49,3 log/ha

The project had several steps, by developping the de-sign in graduated scales.

After proposing a global masterplan, the intention was to design a typical part of the neighborhood in link with the park.

Here we see the progressive transition from the hou-sing space until the public park. The inhabitants cross a mineral area, go through the shared garden by small pedestrian paths, and can then appropriate clear inti-mate green spaces with a specific attention paid to the change of levels. This spaces are separate from the main public park by a setting of low dense vegetation, punctuated by several higher trees.

So the inhabitants are confronted by different garden scales ; the neighborhood scale (park), the street scale (private gardens) and the housing scale (balconies for example).

Zoom

Page 10: Portofolio Lenny pol

Betula alba

Acer platanoides

Espace enherbé

revêtement foncé : trottoir

revêtement clair : place

Un avant-goût étagé

Typologies de calepinage

Plan de l’esplanade d’entrée de ville nord-est

Plan du calepinage

0 5 10 15 m

L’esplanade d’entrée de ville

Coupe sur l’esplanade

Espace piéton le long de l’avenue Charles de Gaulle

Dalles en pierre reconstituée couleur calcaire sur la place

Dalles en pierre reconstituée grise sur le trottoir le long de l’avenue

0.5 m1 m

0 m

1.5 m

1 m

0.5m

1 m0.5 m

1 m

0 m

0 2 4 6 m0 2 4 6 m

Plaça de la Font, Banyoles, Espagne Mias Arquitectes

Opéra d’Oslo, Norvège, Snøhetta, 2008

Tilia sylvestris

20 cm

50 cm

50 cm

60 cm

20 cm 30cm

30 cm

50 cm

Vue de nuit

Lenny Pol Juin 2013 - C8-1 Gradignan - Ilot de la cité jardin

The last scale of intervention is a square in the North-East of the project area.The square marks the entrance into the town. Again we can see the highlighting of the layers of the topogra-phie, which give the main structure to the urban space.

The program requested to provide a place for a cultu-ral building according to the neighborhood. The dialogue between architectur and public open space is impor-tant. The building serves the design of the square, it guides and gives the main structure. The mineral square gives strength and highlights the buiding.

Page 11: Portofolio Lenny pol
Page 12: Portofolio Lenny pol

Vacant plots in Ensanche de Vallecas (Madrid)Experiment : Backbone

Ensanche de Vallecas is a district in the South-East of Madrid. The construction of an enormous quantity of housing, as well as infras-tructure and commercial areas, linked to investment and specu-lation between 2005 and 2010, caused a lot of empty flats and a poor and low invested urban public space.

The task was to look for a futural concept for the suburb of En-sanche de Valleca which strengthens its identity. A landscape ar-chitectural approach was needed which reframes the vacancy and informality of the waste land to a recreational area with a positive connotation.

The chosen area of intervention is located on an existing planned public space in which there is a important potential in terms of connections to already existing nodes and structures.

The aim of the project is to create a strategy for putting non-func-tional public space to productive and activ land.

Vision, Avenida Villa de Vallecas, viewing east

Economic• Financial crisis: no money to finish project.• High maintenance design: large vulnerability.

How can we save / gain money?• Use vegetation fit for site:lower maintenance costs.• Use planting as investment:economic gain from harvest.

Social• Only 40 % of apartments in area occupied.• Large spatial and mental distance betweenNew Vallecas and other Madrid areas..

How can we make people meet?• Engage citizens: in spatial development,through events and information.• Provide space and spatial use thatencourage social interaction.

Spatial• Scale of public space overdimensioned.• No difference or hierachy regarding design orintended use.

How can we create public space thatinvites people to stay?• Reduce scale, provide space of differentsize and level of intimacy.• Allow change: create areas with flexible uses.

Proposed area of intervention : Vallecas Backbone Important connection points and space typologies in link with the surrounding buidings/areas

Solution on 3 levels

Identification of the problems

Page 13: Portofolio Lenny pol

The acupuncture intervention is the first level of intervention. Dif-ferent experiments take place in several specifics locations, to make people aware of something that could happen in this area. The location and categorization of these temporary actions are based on our analy-sis of the area, proposing cer tain actions in combination to residential structures and others in close to the agricultural landscape or the com mercial centre. The actions are organized in three categories: Spatial action test : involving the inhabitants in the design of the area by providing movable furniture for example to analyse where people want to have the shadow or providing temporary urban farming with planting trays or mobable trees to involve people in a new activity. Connection emphasis : highlighting certain important linking points such as the road between the Villa and the Ensanche or the bridge over the motorway; Temporary experiences : introducing the inhabitants of Vallecas to the possible qualities of their neighborhood, such as the con nection to the landscape or the ecological functions of a certain place.

These different actions are planned to take place in a varying time-frame. Some of the temporary actions are operating for a few weeks, others for half a year. Based on the response of the inhabitants from the area and from local companies or organisations, like the PAU for example, decisions are made on how to develop this action further. These evaluations will have to be done through interviews, observations and events with key persons collecting information and analysing its content.This process is not an ending system especially because of the uncer-tain future of the area.

Spatial action test

Connection emphasis

Temporary experience

ACUPUNCTURE

INTERVENTION

ACUPUNCTURE

INTERVENTION

ACUPUNCTURE

INTERVENTION

ACUPUNCTURE

INTERVENTION

4 – 8 WEEKS

6 MONTHS

1–3 MONTHS

1–6 MONTHS

3–6 MONTHS

4 – 8 WEEKS

1–3 MONTHS

PERMANENT DESIGN

PERMANENT DESIGN

PERMANENT DESIGN

PERMANENT DESIGN

Acupuncture interventions

Time fraim

MOVABLE FURNITURE Metro station Las Suertes

TEMPORARYURBAN FARMING

EXPERIMENTAL PLANTATION

ECOLOGICAL INFOPOINT

LANDSCAPE EXPERIENCE

MOVABLE FURNITUREMetro station La Gavia

TEMPORARYURBAN FARMING

EXPERIMENTAL PLANTATION ECOLOGICAL

INFOPOINT

GUIDING POINTAv. Cerro Milano bridge

GUIDING POINT Vallecas

GUIDING POINTCentro commercial La Gavia

1.

2.

3.

Page 14: Portofolio Lenny pol

Assuming that some of this acupunctural actions might work, we developed a design pro-posal in which we differentiate the permanent structure from a more flexible structure. The basic permanent design, gives hierarchie in the spatial situation and gives different levels of intimity at the open public space.

The permanent structure are the pedestrian paths, the trees planted and the framework of the community gardens and ecological intervention areas. This permanent framework for the plots can be appropriated variously, based on the interest and the economic situa-tion.The flexible elements are the actual size and quantity of the gardens, the production fields and the ecological innovation plots.

The intention of this design is to work in symbiosis with the temporary interventions. The strategy does not work only one way but is to be understood as a cycle of interventions, design actions, permanent solutions and dynamic and creative maintenance.

2. Basic frame proposal

1. SHARED GARDENS

2. ECOLOGICAL INNO- 3. EXPERIMENTAL AGRICULTURE 4. URBAN NODE

Experimental agricultureConnection landscape

Area of Ecological innovationConnection park

area of Ecological innovationConnection school/Sport

Ecological innovationConnection school/sport

Community gardensConnection residential

Community gardensConnection residential

Flexible structure

Urban node Las suertas

Urban node La gavia

Community gardensFramework

treesEmphasizing structurePermanent structure

Current situation

Proposal in context

Page 15: Portofolio Lenny pol

1. Community gardens Avenida Villa de VallecasPurpose: Offer an active public space area in connection to residential quarters in both Villa- and Ensanche de Vallecas. Owner: Municipality, run by local organisation.

2. Ecological innovation area Avenida Cerro MilanoPurpose: Reduce maintenance costs, provide habitat fo local wildlife, increase biodi-versity and promote educational use in connection to adjacent school.Owner: Municipality, partly run by local organisation or institution.

3. Urban node Las SuertesPurpose: Offer a place for meetings, events, markets and for distribution of people. The urban node is concentrated around the metro station, withing walking distance from the commercial centre in the north. Owner: Municipality, run by local companies, organisations, institutions.

Page 16: Portofolio Lenny pol
Page 17: Portofolio Lenny pol

2/Territorial projects

> The «Pointe du Médoc» (33)> The valley of the Dordogne and the Isle (33)

Page 18: Portofolio Lenny pol

Espaces boisés

Digue actuelle

Digue ancienne

Liens

traversées

Port majeur

Cheminements piétons existants Cheminements piétons à créer

Pistes cyclables existantesPistes cyclables à créer

Chenal du Guâ

Agrafes

Espaces urbains

CulturesMilieu humide

Développement de l’activité aquacole

Espaces en eau à marais haute

Entrée d’eau

Transversale écologique

Transversale urbaine

Route des lacs

Résaux de cheminements doux à conforter

Grandes dynamiques

Villes balnéaires majeures

Dépoldarisation sur la côté estuarienne au service d’un projet de territoire

Le Chenal du Guâ comme lien écologiqueet touristique entre le littoral et l’estuaire

Daugagnan

Grayan-l’Hôpital

L’Hôpital

Saint-Vivien-en-Médoc

Talais

Soulac

Vensac

Montalivet

Euronat

Vendays-Montalivet

L’Amélie

Le Verdon

The natural risk factors as project motor«La pointe du Médoc» (33)

«La pointe du Médoc», is an area located in between two waters. The Atlantic ocean and the estuary of the Gironde. This territory is fragile because of the many risks that it has to face. The withdrawel of the coastline in the west and the risk of flooding in the east are the most impor-tant of them.

The touristic pressure is more and more influan-cing the landscape organisation.

In a first time, the aim of the project is to conso-lidate the connection between East and west by using the already existing crossing corridors.

By using the risk factor, the project wants to de-velop the local economy by providing a new type of tourism in link with new naturel areas. So the proposal combines the management of waterflood on the east coast, with new types of accommodation for tourists.Three intervention areas has been selected, each one in link with the other.- Propose a new habitat in a flood area on t h e estuarine coast.- Depolderise a part of the estuarine coast for a new natural system- Develop an old harbor to make it more attrac-tive.

Proposal in context

Page 19: Portofolio Lenny pol

Three intervention areas in context

New acccommodations in floodplain land

Habitat on dam Habitat on dam

Page 20: Portofolio Lenny pol

An agricultural parc at the confluence between the Isle and the Dordogne (33)The valley of the Dordogne and the Isle (33)

La Dordogne : a maritime river

Bec d’Ambès

Libourne

Coutras

Bergerac

The project area concerns the downstream parts of the valleys from the Dordogne (from Bergerac to the Bec d’Ambès) and from the Isle (from Coutras to the confluence with the Dordogne in Libourne).

The request is from EPIDOR (établissement public territorial du bassin de la Dordogne) a public institution which is in charge of the running of the public waterways. The state provides the transfer of the running public waterways from the Dordogne, the Isle and the Vézère to the local authorities.

the project has a double aim ; - Provide a complete landscape analysis on which will be based the future new running actions. Change the look that people can have on the waterways, and change their behaviour in link with these spaces.- Help the local actors to put the riparian landscape in the centre of their territorial projects.

The global issue concerns the reflection about the implementation of new territorial policies reviving the river by taking in considaration the social practices which explain the evolution of the river landscapes and the symbolic values according to it over the last few decades.

La Dordogne : a river in the center of the valley

La Dordogne : a hill-food river

L’Isle : a winding river in a narrow valley

La Dordogne : a river crossing a vineyard landscape

Page 21: Portofolio Lenny pol

Libourne

Arveyres

Fronsac

les Billaux

Carte du PPRI

DORDOGNE

ISLE

The intervention area is located on the confluence between two rivers ; The Dordogne and The Isle, it is a floodable land. Nowadays, the territory has no link with the river anymore while a few decades ago, this relationship was very important (agricultural irrigation, different flows, ...)The aim of the project is to work on the dialogues between the territory and the river and to develop them again.- Dialogue between the wetlands and the river- Dialogue between the gravel beds and the river- Dialogue between the river and its history

These different interfaces are used and put together to create a suburban agricultural park on the confluence. The aim is to develop and take advantage of the agronomic potential and tourism which exceeds the admistratives limits and would establish consistency on a territorial level.

Gravières

Peupleraies

naissantes

Promenade dans les vignes

Cultures maïs

LIBOURNE

MaraîchageZone inondable Cultures céréalières Pâtures

Urbain Peupleraies

Loisirs Pêche

Vignes

uses that turn their backs on the river

1

2

3

4

5

Boisements

Contexte

Périmètre du parc

Préconisations au sein du parc

Limites du parc

Jardins maraîchers

Patures sous peupleraie

Jonçaies

Prairie de fauche/pacage

Marais

Maraîchage

Cheminement piéton

Page 22: Portofolio Lenny pol
Page 23: Portofolio Lenny pol

3/Territorial and urban analyzes

> Bachelor thesis : Landscape analysis in the East of the Pyrenees> Internship assignment : The riverbanks of Cahors : the dialogues between the river and the city

Page 24: Portofolio Lenny pol

>Bachelor thesis : Landscape analysis in the East of the Pyrenees

The chosen area for my bachelor thesis is located in the Eastern Pyre-nees. A small valley called «vallée des Garrotxes». The aim of the study of this area was to understand the actual landscape by analysing the landscape and its evolution over the last 100 years. This analysis provi-ded subsequently issue prospects for the future of the area.

http://issuu.com/lennypol/docs/le_territoire_des_garrotxes._lenny_

Page 25: Portofolio Lenny pol

The riverbanks of Cahors : the dialogues between the river and the city

During the two months of internship at the CAUE (Conseil d’architec-ture d’urbanisme et de l’environnement) of the Lot (46), the aim was to analyze the riverbanks of the city of Cahors. This study aimed to help the city to specify the request for the future design and organisation of these banks.This task, proposed by the CAUE, is part of a contempory dynamic which is popular in many big cities : the return of urban space toward their river.

http://issuu.com/lennypol/docs/dossier_stage_caue

Page 26: Portofolio Lenny pol
Page 27: Portofolio Lenny pol

4/Architectural projects

> The «Cité Frugès», Reinvesting an already existing frame.> Historical monument analysis

Page 28: Portofolio Lenny pol

Reinvesting an already existing frame

The «Cité Frugès», in Pessac (33) from Le Corbusier.

A social heterogenity explains a two-tier neighborhood.

Ruined houses alongside restored houses.

A dilapidated «skyscraper house» is reinvested. The frame is kept in its current state, so the identity is conserved. The program is designed for artists. Autonomous volumes fit in the house with less impact as possible on the existing house.

An enveloping and penetrating outer structur supports the public and the private circulations.The architecture becomes inhabited and visited.

A new face is given to the house and new points of view are provided on the whole neighborhood.

Page 29: Portofolio Lenny pol

Model experimentation

Used materials : wax, balsa wood and wooden sticks

Page 30: Portofolio Lenny pol

Historical monument analysis

Historical and structural analysis of the church «Notre Dame de Raincy», located near Paris in the department of Seine-Saint-Denis. The modern church was build in 1922-23 by the architects Auguste and Gustave Perret. The building is considered as an emblematic monument of the modern architecture and is the first church build in reinforced concrete in France. As such it has been classified as national historical monument.

Materials used for the model : Cardboard, pained plexiglass and wooden sticks

Page 31: Portofolio Lenny pol