PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN : 756-80 Time History of Events and Macroscale Interactions during Substorms (THEMIS) PROJECT MANAGER Peter Harvey INSTRUMENT MANAGER William Davis LRD October 2006 PHASE C/D GSFC PROJECT SCIENTIST David Sibeck

PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: 756-80 Time History of Events

Embed Size (px)

Citation preview

Page 1: PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: 756-80 Time History of Events

PARTNER / MAJOR CONTRACT

Swales Aerospace

MISSION MANAGERFrank Snow

PRINCIPAL INVESTIGATORVassilis Angelopolos (UCB)

UPN: 756-80

Time History of Events and Macroscale Interactions during Substorms (THEMIS)

PROJECT MANAGERPeter Harvey

INSTRUMENT MANAGERWilliam Davis

LRD October 2006PHASE C/D

GSFC PROJECT SCIENTISTDavid Sibeck

Page 2: PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: 756-80 Time History of Events

THEMIS Probe 2 at Swales 11/03/05

Page 3: PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: 756-80 Time History of Events
Page 4: PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: 756-80 Time History of Events

LEGENDGOOD SHAPE

MINOR PROBLEM

MAJOR PROBLEMRY

THEMIS PROJECT SUMMARYLAUNCH VEHICLE

LAUNCH VEHICLE

LAUNCH SITE

BUSINESS

R & D BUDGET

MPS BUDGET

MANPOWER

PROCUREMENT

SCHEDULE

MASS

RESERVES

POWER

COSTSUMMARY

COST

TECHNICAL

SCHEDULE

OVERALL

YYY

MISSION ANALYSIS

PROJECT MGT

SYSTEMS ENGR

EXT INTERFACES

SR&QA

GENERAL

FGM

IDPU

EFI

SST

ESA

INSTRUMENTS

SCM

MECHANICAL

THERMAL

PROPULSION

ELECTRICAL

AUG

GN&C

SEP

SPACECRAFT

COMMUNICATIONS

SOFTWARE

GSE

SYSTEMS

MOC

SODA

GROUND SYSTEMS

GBO

ANTENNA

Y

4

Y

OCT

AUG SEP OCT

AUG SEP OCT

AUG SEP OCT

AUG SEP OCT

AUG SEP OCT

AUG SEP OCT

AUG SEP OCT

Y

Y

Y

Y

Y

R

Y

Y

Page 5: PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: 756-80 Time History of Events

LIKELIHOOD

CONSEQUENCES 1 2 3 4 5

5

4

3

2

1

ApproachM – MitigateW – WatchA – AcceptR - Research

*

Criticality

Trend ID

Diplexer Multipaction Testing

Risk TitleAppr.Rank

Decreasing (Improving)Increasing (Worsening)UnchangedNew since last month

L x C Trend

10/28/05

Med

High

Low

THEMIS Top RisksTHEMIS

3

6M

1

M

M

5 Orbit Debris Analysis

6

M Insufficient Schedule Reserves

for October 2006 Launch

Probe Dry Mass Reserves

Insufficient support during Mission I & T

2 4 Transponder lost of lockM

2 M3

5

1

4

5

Page 6: PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: 756-80 Time History of Events

Risk FocusTHEMIS 10/28/05

CommentsApproach & PlanRisk StatementRank, Title, Criticality

6

3. Probe Dry Mass Reserves <15%

Criticality

If: The Probe dry mass reserve is below the recommended margin of 15%, Then: Fuel propellant and delta-V capability is reduced and secondary science will be impacted.Med

Mitigate:All mass changes approved at THEMIS Project level.

90% of Probe 1 mass has been weighed.

Mass budget reserves is 7.7%.

No changes to mass reserves

1. Insufficient Schedule Reserves

Criticality

If: The project cannot develop a robust resource loaded schedule for the production mode of delivering 5 spacecraft buses and 25 instruments,Then: The project schedule reserves will quickly erode.

Mitigate:Organize schedule reviews with AETDStatus and review project schedules on weekly basis

Project schedule reserves is 22 days (1.1 mo/yr).

First Probe bus will be delivered to UCB in mid November.

Med

Code 500 and APL are reviewing multipaction test margins.

Mitigate:Work with Code 560 to develop appropriate diplexer acceptance tests.

If: Diplexer is not properly tested for multipactionThen: Diplexer performance maybe compromised.

2. Diplexer Multipaction Testing

Criticality

Med

Page 7: PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: 756-80 Time History of Events

Risk FocusTHEMIS 10/28/05

CommentsApproach & PlanRisk StatementRank, Title, Criticality

7

GSE modified so this anomaly can be isolated to either the GSE or transponder.Transponder #3 and #4 have completed ATP without repeating the failureTransponder #5 has initiated ATP

Mitigate:Monitor transponders 2-5 for repeat of failure.Code 500 performing a system of communication system

If: Transponder is the cause of the anomolyThen: Project schedule will be impacted

4. Lost of lock during ATP (non repeatable) believed to be a GSE anamoly

Criticality

Med

If: The reliability for S/C post-mission disposal being less than .99 is deemed unacceptable,Then: Significant cost, schedule, and mission impact can result.

Mitigate:Obtain early approval from NASA/HQ for the current reliability value.

Swales incorporating Boeing/KSC launch vehicle data for final report.

ODA rev B will be submitted 11/30.

Low

5. Orbit Debris Analysis (spacecraft)

Criticality

Low

6. Insufficient support during Mission I & T

Criticality

If: UCB SSL has inadequate spacecraft bus support during mission I & TThen: Problem and failures during testing will impact project schedule reserve

Mitigate:Develop a detailed resource (personnel, facility, GSE) loaded schedule for mission I &T.Obtain needed commitments from support groups (i.e. Swales, JPL, SSL etc.)

Code 300 will provide additional QA and Safety support at both UCB and JPL.

Code 500 is reviewing Mission I&T plan and will provide recommendations

Page 8: PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: 756-80 Time History of Events

THEMIS RFA’s

8

Review (just examples) Date Total # of

RFA'sResponses submitted by Project

RFA's closed by Review Team

Open RFA's Comments

Mission SRR J uly 2003. 44 44 44 0 All closed

S/C PDR October 2003. 51 51 51 0 All closed

Mission PDR November 2003. 39 39 39 0 All closed

S/C CDR June 2004. 43 43 43 0 All closed

Inst CDR June 2004. 12 12 12 0 All closed

Mission CDR June 2004. 5 4 4 1 Project preforming attitude manuever analysis to determine link margins.

MOR March 2005. 28 24 18 10 RFA's will be closed at FOR 2/06

P1 Instrument PER May 2005. 9 9 8 1 Closed all liens against the initiation of enviromental tests.

FOR April 2006.

Mission PSR April 2006.

LRD/FRD October 2006.

Totals 231 226 219 12

Page 9: PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: 756-80 Time History of Events

CY 2005MILESTONESCY 2004

THEMIS INSTRUMENT TOP LEVEL SCHEDULE STATUS AS 11/01/05MISSION MGR. : FRANK SNOW

1

MAJOR REVIEWS IDPU DEVELOPMENT

IDPU ETU DESIGN, FAB, I&T

IDPU FLIGHT FABRICATION & I&T

2 EFI SPB / AXB DEVELOPMENT

EFI SPB DESIGN, FAB, I&T (ETU & FLT)

EFI AXB DESIGN, FAB, I&T (ETU & FLT)

3 ESA DEVELOPMENT

ESA ETU DESIGN, FAB, I&T

ESA FLIGHT FABRICATION & I&T

4 SST DEVELOPMENT

SST ETU DESIGN, FAB, I&T

SST FLIGHT FABRICATION & I&T

5 FGM DEVELOPMENT

FGM ETU DESIGN, FAB, I&T

FGM FLIGHT FABRICATION & I&T

6 SCM DEVELOPMENT

SCM EM DESIGN, FAB, I&T

SCM FLIGHT FABRICATION & I&T

8 INSTRUMENT I&T

INSTRUMENT INTEGRATION & TEST

MAGBOOM FLIGHT FAB & I&T

FLT 1 BD FAB/ASSY COMPL

BOARD I&T COMPL.IDPU ETU I &T COMPL

1/14

11/1910/06

4/07 6/20 10/26

1 2 3 4 5

INSTRU. CDR 4/19-20MISSION CDR 6/14-18

4/22CR

A S O NS JO N D J

6

9/211

ETU INSTRU. I &T COMPL12/10

START FLT INSTRU I&T w/ IDPU, ESA, SST ETU

7

MISSION MGR. : FRANK SNOWPROJECT MGR. : PETER HARVEY

F M

2-3

11/22

11/10

PCB/FGE ETU I &T COMPL

3/1812/24

1-2 3-4FLT TO IDPU

FGE FLT 1-2 DEL to GER.

11/01

SC/EM I &T COMPL

3/211/05

PA 1-2 4-5

4/11 6/14 8/14

1 2-3 4FLT I&T COMPL

FAB FLT HINGES

12/07

ETU I &T COMPL

12/06

11/155/05 8/19

ETU COMPL

8/149/10 2/04 4/18 5/06 7/29

1 2 3 4FLT I&T COMPL

11/11

FLT FAB/ASSY

2/07 4/13 5/06

1 2 3

FLT 1-6 BD FAB/ASSY COMPL

BOARD I&T COMPL.ESA ETU I &T COMPL

3/30

1/0712/22

FLT I&T COMPL

2/22

1

5

SST ETU I &T COMPL9/17

3/297/07

7/14

1 2 3FLT 1 BD FAB/ASSY COMPL

12/06

A M

8/30

12/10

FGE FLT 3-5 DEL to GER.

2/02

4-5

J

5/06

5-6

6/307/13 10/26 11/15

2 3 4-5 6

FLT IDPU

FLT ESA

2/09

SC 1-2-3

6

8/25

5/06

6FLT I&T COMPL

10/24

6

8/147/29

4FLT I&T COMPL

5

8/25

6

1

7/13

5

7/21

FLT I&T COMPL

10/17 11/15

4-5 6

FLT I&T COMPL

Page 10: PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: 756-80 Time History of Events

CY 2005MILESTONES

CY 2004

THEMIS Bus, Instrument & Mission I&T Schedule STATUS AS OF: 11/01/05MISSION MGR. : FRANK SNOW

MAJOR REVIEWS

CY 2006

1 P1 INTEGRATION & TEST

BUS/INSTRU MECH & ELEC I&T & C/O (UCB)

BUS MECH & AVIONICS BUILD UP (Swales)

N D J F M A

PROBE SUBSYSTEM HARDWARE

2 P2 INTEGRATION & TEST

3 P3 INTEGRATION & TEST

4 P4 INTEGRATION & TEST

5

P5 INTEGRATION & TEST

11/21

MECH BUILDUP

7 SETUP / PROBE VIB / PCA INTEGR. (JPL)

8 PCA VIB / ACOUSTICS / THERMAL (JPL)

9

11 LAUNCH PROCESSING/LAUNCH

INSTRUMENT CDR 4/19-20 MISSION CDR6/14-18

CRR 2/04

4/06-08

CR @ HQ

FGM/SCM CDR

4/22

INSTRU P1 PSR COMPL

INSTRU COMPL

INSTRU COMPL

9/21

11/10

11/22

PROJECT MGR. : PETER HARVEY

5/02

INSTRU COMPL11/22

ENVIRONMENTAL TEST & CLOSEOUTS (JPL)

5/04 P2-P5 PER

7/10/11 PSR

10

MECH H/W

-- Critical Path H/W

-- Project Reserve

-- Instrument Slack

LEGEND-- Intermediate Slack

12 DAYS 10/1910 DAYS

8/11

5/31

8/10

FLT 1 BAU1/12

6 P2- P5 SHIP TO JPL

PROBE SUBSYSTEM HARDWARE

PROBE SUBSYSTEM HARDWARE

M J J A N D J F M A M J J AS O S O

6/09

MECH BUILDUP

INSTRU COMPL11/10

MECH BUILDUP

12/01

MECH H/W

MECH BUILDUP2/03

4/11

MECH BUILDUP

1/10

SHIP to JPL

PROBE SUBSYSTEM HARDWARE

PROBE SUBSYSTEM HARDWARE

5/009

MISSION RESERVE

MAG & MASS PROP (JPL) / SHIP

6/05 PCA INTEGRPROBE VIB

6/146/30 PROBE THERMALPCA VIB/ACOUSTICS

7/07MAG / SPIN BAL./ P1-5 PACK

7/12

FLT 5 BAU

12/23

FLT 2 BAU

FLT 4 BAU

MECH H/W

MECH H/W

MECH H/W

2/20

AVIONICS B/USwap out

7/18

9/23

10/20

11/07

IRUBAU EDU#1 FLT 3 BAU

SHIP to UCB

AVIONICS B/U

P1 Test Review

BUS/INSTRU MECH & ELEC I&T & C/O (UCB)

BUS MECH & AVIONICS BUILD UP (Swales)

BUS/INSTRU MECH & ELEC I&T & C/O (UCB)

BUS MECH & AVIONICS BUILD UP (Swales)

BUS/INSTRU MECH & ELEC I&T & C/O (UCB)

BUS MECH & AVIONICS BUILD UP (Swales)

BUS/INSTRU MECH & ELEC I&T & C/O (UCB)

BUS MECH & AVIONICS BUILD UP (Swales)

BAU EDU#2 AEB IRU

IRU

P1 Test Review

3/21

4/03-14

PROBE I&T

PROBE I&T

4/06

SHIP to UCB

AVIONICS B/U Swap out

AEB

SHIP to UCB

2/21

AEB & IRU

AEB & IRU

MISSION CONTINGENCY IIRT CONTINGENCY

AVIONICS B/U

PROBE I&T & C/O

PROBE I&T & C/O

SHIP to UCB

ASTROTECH

C/O

3/20

2/21

2/21

3/17

ENVIRONMENTALS

P1 PER

11/11

SHIP to JPL

4/144/02

1/26-27

3/06

1/06

4/03PROBE I&T & C/O

11/16

SHIP to UCB

BAU EDU#2

1/10

1/30

3/21

BAU EDU#1

Swap out

3/16

1/31

4/04

Probe1 PSR

1/03 C/O

11/20

1/30

4/03AVIONICS B/U

4/25

5/03

Swap out

10

Page 11: PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: 756-80 Time History of Events

Apr

Sept 2005 THEMIS CRITICAL MILESTONE CHART Critical Milestone

1.

2.

3.

4.

5.

6.

Explanation of Missed Milestones

MayDec Jan

7.

8.

9.

10.

11.

12.

Feb Jun JulAug Sept Oct Nov

Bus Avionics Unit EDU #1 to Probe 2

All Flight 1 Instrument’s CompleteInstrument Milestones

Spacecraft Milestones

Flight 1 Instrument Integration & Test Compl.

P1 Reaction Control System (RCS) Compl.

4/08

P1 BAU Delivery to I&T

Flight 2 Instrument Integration & Test Compl.

Flight 3 Instrument Integration & Test Compl.

Flight 4 Instrument Integration & Test Compl.

Flight 5 Instrument Integration & Test Compl.

5/02

Bus Avionics Unit EDU #2 to FSW 4/25

P1 Transponder Compl. 6/28

1

1

1

3-6) Completing action items from Instrument Suite 1 Pre-Ship Review. (Instru. Suites 2-5 have 2 to 5 months reserve)

11) Power Electronics Unit (PEU) had to changed out resistors during Thermal Characterization .

10) Power Module was used for test set verification & BAU was shared with flatsat.

1

2

2

Mar

P1 Probe Ship to UCB

2

2

3

3

3

2

2

1

3

3

12) Antenna, transponder harness rework.

9/214

4

4

3

3

11/114

4

2

5

5

4

5

5 1/12

3

6

6

11/10

11/10

5

5

4 11/22

11/22

6

6

4 11/20

11

Page 12: PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: 756-80 Time History of Events

THEMIS Missed Milestones 11/01/05

Missed Milestones

Milestone Date Expected Date Need Date

P4 Instrument Suite Integr.

P5 Instrument Suite Integr.

P5 Instrument Suite PER

3)

5)

6)

7)

P1 Mount S/A & Closeouts

P2 Solar Arrays to I&T

8)

9)

10)

P2 IRU to I&T

11)

12)

10/05/05

10/05/05

10/07/05

08/05/05

09/30/05

09/07/05

10/01/05

11/08/05

11/08/05

11/10/05

02/15/06

03/01/06

03/03/06

01/11/06

01/30/06

03/16/06

12/01/05

13)

01/03/06

01/30/06

12/19/05

11/24/05

P4 Instrument Suite PER4) 10/07/05 11/10/05 02/17/06

14)

P2 Instrument Suite PSR1) 09/29/05 11/10/05 01/05/06

P3 Instrument Suite PSR2) 10/10/05 11/10/05 02/20/06

15)

P1 CPT, Closeout, Pack & Ship

P1 BAU Swap Out

P1 Flight BAU 09/21/05

09/28/05

01/12/06

01/13/06

01/12/06

01/13/06

Slack (in work days)

P3 Transponder to I&T 08/16/05 11/14/05 01/10/06

P3 Antenna to I&T 10/07/05 11/25/05 01/10/06

P2 Avionics Build up 10/07/05 12/13/05 12/20/05

71 days

81 days

81 days

6 days

0 days

63 days

5 days

71 days

40 days

72 days

0 days

0 days

41 days

32 days

5 days

Page 13: PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: 756-80 Time History of Events

THEMIS Missed Milestones 11/01/05

Missed Milestones

Milestone Date Expected Date Need Date

P3 IRU to I&T

P3 AEB to I&T

P3 Mechanical Build up 18)

20)

21)

22)

P4 Mechanical Build up

P5 Separation System

P5 Transponder to I&T

23)

24)

25)

26)

27)

10/01/05

10/01/05

09/02/05

10/07/05

10/07/05

10/14/05

11/24/05

11/15/05

11/23/05

01/10/06

01/10/06

01/10/06

02/03/06

12/23/05

02/21/06

28)

12/16/05

11/04/05

11/28/05

19)

16)

17)

P4 Antenna to I&T

P4 IRU to I&T

P4 AEB to I&T

10/14/05

10/14/05

10/14/05

12/06/05

11/30/06

11/28/05

02/03/06

02/03/06

02/03/06

P4 Transponder to I&T 10/01/05 11/16/05 02/03/06

P1 Bus/Instru Test (Funct, CPT) 10/13/05 12/16/05 01/06/06

P1 Bus/Instrument Integr. 10/04/05 12/02/05 12/23/05

P1 Closeout Activities 10/17/05 01/04/06 01/25/06

34 days

43 days

47 days

49 days

61 days

15 days

15 days

57 days

33 days

40 days

35 days

35 days

15 days

Slack (in work days)

Page 14: PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: 756-80 Time History of Events

Status Instrument Status Charts

IDPU Board ETU F1 F2 F3 F4 F5 FS DAP Complete Complete Complete Complete Complete Complete Complete DFB Complete Complete Complete Complete Complete Complete Mod BEB Complete Complete Complete Complete Complete Complete Complete DCB Complete Complete Complete Complete Complete Complete Complete FGE Complete Complete Complete Complete Complete Complete Complete PCB Complete Complete Complete Complete Complete Complete Test LVPS Complete Complete Complete Complete Complete Complete Assy BKPLN Complete Complete Complete Complete Complete Complete CompleteChassis Complete Complete Complete Complete Complete Complete CompleteAssy/Test Complete Complete Complete Complete Complete CompleteVib Complete Complete Complete Complete 12/9/2005 12/9/2005TV Complete Complete Complete Complete 12/12/2005 12/12/2005

Instruments ETU F1 F2 F3 F4 F5 FSEFI Complete Complete Complete Complete Complete Complete SciCalESA Complete Rework Complete Rework Complete Complete AssySST Complete Complete Complete Complete Complete Complete ReWorkFGM Complete Complete Complete Complete Complete Complete CompleteSCM Complete LDO Complete LDO Complete Complete LDOMagBoom Complete Complete Complete Complete Complete Complete CompleteIntegration Complete Complete Complete Complete Complete CompleteTest Complete Complete Complete Complete Complete CompleteEMC X CompleteTV Complete Complete Complete Complete 12/19/2005 12/19/2005Run Hours 405 131 277 65 0

Page 15: PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: 756-80 Time History of Events

Probe Status Probe Status Charts

BAU EDU#1 EDU#2 F1 F2 F3 F4 F5DPM Complete Complete Complete Test Assy Assy AssyCIM Complete Complete Complete FPGA FPGA FPGA FPGAPCM Complete Complete Tcycle Hold Hold Hold HoldACM Complete Complete Tcycle Hold Hold Hold HoldPRM Complete Complete Tcycle Hold Hold Hold HoldAssy/Test Complete CompleteVibTVEMC

EGSE SET1 SET2 SET3 SET4EGSE - UMB CompleteEGSE - BASE CompleteEGSE - RF Complete TestEGSE - BATT PWBs

Page 16: PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: 756-80 Time History of Events

Probe Status Probe Status Charts

Probe EDU P2 P3 P4 P5 P1Structures Complete Complete Complete Complete CompleteSep Systems Complete I&T Assy Fab CompleteSolar Arrays Complete Fiber Pull AssyBAU Complete EDU#1FSW V2.504RCS Complete Complete Complete PreShip PT1Transponder Complete w/Diplexor LVPS w/Diplexor CMDsDiplexor Complete Complete Corona Corona VentingAntenna Complete Complete PreShip Assy AssyBattery Complete Complete Complete Complete Complete CompleteHarness Complete Assy Assy CompleteIRU Complete Complete TV AEB Complete CompleteCPT Test CompleteCTV TestRun Hours 0 0 0 0 0 0

Page 17: PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: 756-80 Time History of Events

Schedule Recovery Plan

Code 560 Schedule Recovery Review• (J. Shue, C. Kellenbenz, R. Schnurr)• Review schedule for completeness• Provide recommendation to maintain or accelerate schedule• Provide additional resources including civil servants or contractors

UCB• Provide FOT for testing support• Provide engineers and technicians as needed

Code 568 MI&T review• Review UCB Mission Integration Plan• Identify ways to accelerate schedule • Provide resources

Payload Processing at Astrotech• MIWG/GOWG (11/2-11/4) identified ways to increase schedule reserves• 5-10 days • Astrotech/UCB/Boeing will develop a detailed integrated schedule by January