Open Access Technology International, Inc.
WECC Interchange Tool (WIT) Overview
for
WECC Board of DirectorsDecember 7, 2007
“Your Energy, Our Solutions”Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.
Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.
Open Access Technology International, Inc.
Trade Secret
This document and attachments contain confidential and proprietary information of Open Access Technology International, Inc. This information is not to be used, disseminated, distributed, or otherwise transferred without the expressed written permission of Open Access Technology International, Inc.
Proprietary Notice
All OATI products and services listed are trademarks and service marks of Open Access Technology International, Inc. All rights reserved.
WIT Project Overview
The WECC Interchange Tool (WIT) is a WECC solution providing Interchange Authority (IA) functions for the Western Interconnection. The Project is divided into three phases for implementationPhase I:– Single E-Tag authority for WECC– Enhanced E-Tag validation for WECC– WECC Registry based on NERC TSIN SRD– E-Tag based Balancing Authority (BA) Net Scheduled
Interchange (NSI) calculations and reports– EIDE API– Production Cutover January 24, 2007
Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.
WIT Project Overview
Phase II:–BA Net Actual Interchange (NAI)–BA Inadvertent Interchange (II) calculation–Provide NERC II reporting–Production Cutover October 17, 2007Phase III:–Ramped NSI minute values for BA’s AGC–Estimated Completion February 2008
All Phases have met specification requirements on time and on budget.
Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.
WIT System Overview
Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.
WIT
Sys
tem
WECC Registry
TSIN Registry
OATI Tagging System
WIT EIDE System
WIT Interface
WECC BAs
Tags
Data Exc
hange
WECCValidations
InterchangeSchedules
WECC Registry •Adjacency Definitions•Approval and Notifications
OATI Tagging•WECC Tag Authority Service•Frontend Tag Validations before creation
WIT Interface•Tag based Schedules•Net Checkouts•Reporting
WIT EIDE•PutMeter•PutSchedule•GetSchedule
Includes:•Production Systems•Development Systems•Hot-Standby System•Disaster Recovery System
WIT– Interchange Summary
Adjacent Nets (Schedule & Actual) , GCA/LCA Nets, Path Nets
Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.
WIT Performance to DateWIT Contract 1.7.4 No Single Point of Failure– The WIT system must be fully redundant, including at least dual
internet connections using separate providers. The WIT system must be configured in either a parallel or hot standby configuration unless otherwise mutually agreed upon between WECC and OATI
WIT Contract 1.10.6 Availability– WIT availability will be 99.0% measured over a rolling 30-day period.
The 99.0% availability requirement will apply only to WIT elements that are not part of OATI’s Authority Service. The Authority Service will comply with NERC availability requirements for Authority functions
NERC E-Tag Specification– 99.5% availability per WEQ-004
WECC Registry, WIT and OATI Tag Authority Service all far exceed these minimum requirements.
640 System Users
Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.
WIT – Schedule Creation
WIT Daily Schedule Creation
0
5000
10000
15000
20000
Jan-
07Fe
b-07
Mar
-07
Apr
-07
May
-07
Jun-
07
Jul-0
7A
ug-0
7S
ep-0
7O
ct-0
7N
ov-0
7
# o
f S
ch
ed
ule
s
Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.
WIT – Tie Data Upload
Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.
Daily Tie Data Updates
20002500300035004000450050005500
17-O
ct
24-O
ct
31-O
ct
7-N
ov
14-N
ov
21-N
ov
28-N
ov
# o
f T
ie V
alu
es
WIT Project – BA Tie-Data Transfer StatusAs of 12-04-07:
Providing Production Data– GCPD – Production up and running now– LDWP – Production up and running now– NWMT – Production up and running now– PGE – Production up and running now– PSCO – Production up and running now– SCL – Production up and running now– BCTC – Production up and running now– AVA – Production up and running now– AESO – Production up and running now– CHPD – Production up and running now– IID – Production up and running now– SRP – Production up and running now– SPPC – Production up and running now– NEVP – Production up and running now– WALC – Production up and running now– PNM – Production up and running now– AZPS – Production up and running now– TEPC – Production up and running now– EPE – Production up and running now– IPCO – Production up and running now– BPAT – Production up and running now– PACE – Production up and running now
Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.
– PACW – Production up and running now– DEAA/GRMA/HGMA – Production up and
running now. (Only Providing Data Once a Day - needs to be hourly)
– TIDC – Working on implementation. (Manually uploading data currently - hourly)
– DOPD – Production up and running now
– SMUD – Production up and running now
– WACM – Production up and running now
– CISO – Working on implementation (Manually uploading data currently - once a day)
– CFE – Production up and running now
– PSEI – Production up and running now
Not Providing Data– TWPR – Working on implementation
– WAUW – Working on implementation
WECC Registry – Adjacency Summary
Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.
WECC Registry Statistics
Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.
Adjacency Definitions
16500
2501300 1300
0
2000
4000
6000
800010000
12000
14000
16000
18000
Path BA Source Sink
WIT Project – Future Enhancement Ideas1. Unified WECC Time Error Correction Calculation
2. WECC Reserve Requirement Calculator
3. Provide “Real-time” Nets for System Security Analysis
4. WECC Path OTC Management and Monitoring
5. Additional Tag Validations• Explicit Path Adjacency
Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.
WIT Project Contacts
WECC Point of Contact
– Eric Langhorst (WECC)ESWG Project Team (Phase II)
– Mark Hackney, for general questions (AZPS)
– Jim Hansen, for EIDE questions (SCL)OATI Contact
– Mark Nielson, for technical questions (OATI)
Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.
Open Access Technology International, Inc.
Questions?
“Your Energy, Our Solutions”Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.