Page 1 ODOT DESIGN BUILD SCOPE OF SERVICES OHIO BRIDGE PARTNERSHIP PROGRAM PID # 97109 Package # 9 County: Highland Route: T0144 Section: 01.50 Table of Contents 1 PROJECT IDENTIFICATION ........................................................................................................................... 2 2 PRE-BID MEETING .......................................................................................................................................... 3 3 ADDENDA PROCESS ...................................................................................................................................... 3 4 PRE-QUALIFICATION ..................................................................................................................................... 3 5 DESIGN CONSULTANT .................................................................................................................................. 3 6 SCOPE OF WORK ............................................................................................................................................. 4 7 FIELD OFFICE .................................................................................................................................................. 4 8 GENERAL PROVISIONS FOR THE WORK ................................................................................................... 4 9 HAZARDOUS MATERIALS ............................................................................................................................ 8 10 ENVIRONMENTAL .......................................................................................................................................... 9 11 RIGHT OF WAY (ROW) ................................................................................................................................. 11 12 UTILITIES ....................................................................................................................................................... 11 13 DESIGN AND CONSTRUCTION REQUIREMENTS: MAINTENANCE OF TRAFFIC (MOT) ............... 16 14 DESIGN AND CONSTRUCTION REQUIREMENTS: LOCATION & DESIGN ......................................... 17 15 DESIGN AND CONSTRUCTION REQUIREMENTS: STRUCTURES ....................................................... 19 16 DESIGN AND CONSTRUCTION REQUIREMENTS: TRAFFIC CONTROL............................................. 21 17 PROJECT SCHEDULE REQUIREMENTS .................................................................................................... 22 18 PLAN SUBMITTALS AND REVIEW REQUIREMENTS ............................................................................ 22 19 BUILDABLE UNITS (BU) .............................................................................................................................. 25 20 ATTACHMENTS............................................................................................................................................. 26

ODOT DESIGN BUILD SCOPE OF SERVICES OHIO … · ans are inclu d CIE SP E D COO R HIGHWA ATION e Project # Route: ad & Federal Ai d ... Specificatio n ring Standard s lletin ment Process

  • Upload
    vuthuan

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

Page 1

ODOT

DESIGN BUILD

SCOPE OF SERVICES

OHIO BRIDGE PARTNERSHIP PROGRAM

PID # 97109

Package # 9

County: Highland Route: T0144 Section: 01.50

Table of Contents

1 PROJECT IDENTIFICATION ........................................................................................................................... 2

2 PRE-BID MEETING .......................................................................................................................................... 3

3 ADDENDA PROCESS ...................................................................................................................................... 3

4 PRE-QUALIFICATION ..................................................................................................................................... 3

5 DESIGN CONSULTANT .................................................................................................................................. 3

6 SCOPE OF WORK ............................................................................................................................................. 4

7 FIELD OFFICE .................................................................................................................................................. 4

8 GENERAL PROVISIONS FOR THE WORK ................................................................................................... 4

9 HAZARDOUS MATERIALS ............................................................................................................................ 8

10 ENVIRONMENTAL .......................................................................................................................................... 9

11 RIGHT OF WAY (ROW) ................................................................................................................................. 11

12 UTILITIES ....................................................................................................................................................... 11

13 DESIGN AND CONSTRUCTION REQUIREMENTS: MAINTENANCE OF TRAFFIC (MOT) ............... 16

14 DESIGN AND CONSTRUCTION REQUIREMENTS: LOCATION & DESIGN ......................................... 17

15 DESIGN AND CONSTRUCTION REQUIREMENTS: STRUCTURES ....................................................... 19

16 DESIGN AND CONSTRUCTION REQUIREMENTS: TRAFFIC CONTROL ............................................. 21

17 PROJECT SCHEDULE REQUIREMENTS .................................................................................................... 22

18 PLAN SUBMITTALS AND REVIEW REQUIREMENTS ............................................................................ 22

19 BUILDABLE UNITS (BU) .............................................................................................................................. 25

20 ATTACHMENTS ............................................................................................................................................. 26

1 PRO

PI

Count

Local

Highw

D1.1

Route:

Current AD

Design Ye

Peak Hour

Directiona

Distributio

Trucks:

Design Spe

Legal Spee

Design Fun

Classificat

NHS Rout

E1.2

The follow

Project

HIG-T014

1A P

N

1B R

N

1C A

N

OJECT ID

ID # 9710

ty: Highland

Route Name:

way Functional

Design Desig

DT:

ar ADT:

r Factor:

l

on:

eed:

ed:

nctional

ion:

e:

Existing Plan

wing existing pl

4-0150

PRIMA FA

Not Applicable

RAILROA

Not applicable

AIRWAY/

Not applicable

DENTIFIC

9 Stat

d

Fenwick Ro

l Classification

gnation:

0T095

352 (2004)

400 (2034)

N/A

0.55

0.01

55 MPH

55 MPH

Local Road-

Rural

No

ns

lans are includ

ACIE SPE

AD COOR

/HIGHWA

CATION

te Project #

Route:

oad

n & Federal Aid

ded in Attachme

EED LIMI

RDINATIO

AY CLEA

Page 2

499043

T0144

d System: L

ent H :

Year / Pro

Number /

---

IT

ON

ARANCE

Federal Pro

Local Road-Ru

oject

/ PID / Etc.

oject Number:

Section: 01

ural

Project Descr

No Existing P

E140139

.50

ription

Plans Provided

Page 3

2 PRE-BID MEETING

Not applicable

3 ADDENDA PROCESS

Direct all questions prior to the letting date to the Pre-Bid Website at

http://www.dot.state.oh.us/Divisions/ContractAdmin/Contracts/Pages/PBQs.aspx

4 PRE-QUALIFICATION

It is required that the bidder be an ODOT pre-qualified Contractor who has engaged the services of an ODOT pre-

qualified Consultant to perform all the design and construction work required in these Conceptual Documents. If

the Consultant and/or the Sub-Consultant(s) submitted do not meet all the required qualifications, the Office of

Contracts may reject the bid.

5 DESIGN CONSULTANT

The Contractor must name the Consultant and all Sub-Consultant(s) in the space(s) provided below. If the

Contractor is going to submit an electronic bid, then the Consultant and all Sub-Consultant(s) must be listed on the

following web-page: http://www.dot.state.oh.us/Divisions/ContractAdmin/Contracts/Pages/Scope.aspx . The

Contractor must list relevant prequalification categories for prime and sub-consultants to show that the

prequalification requirements listed below are satisfied. All Consultant names and addresses must be the same as

that on file with the Department. The following work types must be performed by members of the Consultant Team

(combination of Consultant and Sub-Consultant(s)):

Non-Complex Roadway Design; Level 2 Bridge Design; Sub-Surface Utility Engineering, Level

A&B; Steel Fabricator per CMS Item 513.03 (as necessary)

Consultant

Firm Name:

Address:

List Work the Consultant will perform:

Sub-Consultant

Firm Name:

Address:

List Work the Consultant will perform:

Sub-Consultant

Firm Name:

Address:

List Work the Consultant will perform:

Restriction

Any Consu

proposal or

project, eit

6 SCO

H

A

W

A

W

Th

plans for th

The Contra

work descr

H

Pr

C

W

The Contra

The calend

structures w

No work sh

7 FIE

Field offic

prior to the

8 GEN

G8.1

All service

subcontrac

Guidelines

The fact th

the require

ns on Particip

ultant who prov

r Scope of Serv

ther as a prime

OPE OF W

HIG-T0144-01.

Approximate

Work Limits:

Approximate

Work Length:

he Consultant

he construction

actor will prov

ribed in the Co

HIG-T0144-01.

roject Descript

ompletion date

Warranties:

actor will perfo

Pr

HI

dar days shown

with all require

hall start prior

ELD OFFI

e Type A , as

e start of constr

NERAL P

Governing R

es, including bu

ctors (including

s.

hat the bid item

ement that all w

pation in Desig

vided services

vices documen

consultant or a

WORK

.50

From: 2+

275’±

will provide fo

n of the propos

ide for the furn

onceptual Docu

.50

tion: This pr

bridge

span st

Minim

e: June 3

N/A

orm the work a

roject

IG-T0144-01.5

n in the Work C

ed safety items

to January 1, 2

ICE

s required by C

ruction work.

PROVISIO

Regulations:

ut not limited t

g sub-consultan

ms for this Desi

work performed

gn-Build Cont

to the Departm

nt will NOT be

as a sub-consu

+50±

or the engineer

sed project.

nishing of mate

uments in order

roject includes

(single span st

tructure over P

mal approach ro

0, 2015

according to Pr

50

Contract Table

s installed and

2015.

CMS 619, will

ONS FOR

:

to survey, desig

nts), will be in

gn-Build proje

d and all mater

Page 4

tracts: ment that have

e eligible to par

ultant.

Final

ring services, d

erials, construc

r to fulfill the i

s the removal a

teel beam brid

Plum Run in ac

oadway work w

roposal Note 12

Calenda

Work o

150 w

include time f

functional at a

be available an

R THE WO

gn and constru

compliance w

ect are general

rials furnished

been directly u

rticipate in this

To: 5

l Work Length

design, and prep

ction and comp

intent of the co

and replacemen

dge on concrete

ccordance with

will be required

29 and the Win

ar Days to Co

on Project

w/ a max. 90 da

for the removal

all project locat

nd completely

ORK

uction work, pe

with all applicab

rather than spe

will be in reas

utilized in this

s design-build c

5+25±

h will be determ

paration of det

pletion in every

ontract.

nt of a structura

e abutments) w

h this scope/bid

d.

ndow Contract

omplete All

ay closure

l and replacem

tions.

functional no

erformed by the

ble ODOT Man

ecific will not r

onable conform

design-build

contract for thi

mined by the D

tail constructio

y detail of all th

ally deficient

with a new sing

dding documen

t Table below.

ment of the exis

later than 1 we

e DBT and all

nuals and

relieve the DB

mity with the

is

DBT.

on

he

le

nts.

sting

eek

T of

specificatio

Specificati

The attenti

Specificati

It will be th

and constru

The curren

and Guidel

this project

B

O

L

A

Pa

Sp

C

Pr

Su

It

M

Pa

St

St

Pl

Tr

O

R

En

W

D

C

G

Pr

A

B8.2

All Items c

Provision n

unless a un

ons. The Cont

ions Item Num

ion of the Bidd

ions as modifie

he responsibili

uction work re

nt edition, inclu

lines will be m

t:

ridge Design M

ODOT Standard

ocation and De

Volume On

Volume Tw

Volume Th

AASHTO Guide

avement Desig

pecifications fo

onstruction an

roposal Notes

upplemental Sp

em Master

Manual for Aba

avement Desig

tate Highway A

tandard Constr

lan Insert Shee

raffic Engineer

Ohio Manual of

Real Estate Adm

Apprai

Acquis

Propert

Reloca

ROW P

Utilitie

Wirele

nvironmental S

Waterway Perm

Design Mapping

ADD Enginee

Geotechnical Bu

roject Develop

AASHTO LRFD

Basis of Paym

covered by Con

notes with unit

nit line price ite

tractor’s Consu

mber for all wor

der is directed t

ed in the design

ity of the DBT

quired to comp

uding updates r

met or exceeded

Manual

d Bridge Drawi

esign Manuals

ne - Roadway

wo - Drainage

hree - Plan Pre

elines of Geom

gn & Rehabilita

or Geotechnica

d Material Spe

for Constructio

pecifications fo

andoned Under

gn and Rehabil

Access Manage

ruction Drawin

ets

ring Manual

f Uniform Traf

ministration Po

sal

sition

ty Managemen

ation

Plan

es

ss Communica

Services Handb

mit Manual

g Specification

ring Standards

ulletin

pment Process M

D Design Spec

ment:

nstruction and

t price as a basi

em has been es

ultant will refer

rk to be perform

to the provision

n-build proposa

to acquire and

plete this proje

released on or b

d in the perform

ings

y Design

e Design

eparation

metric Design o

ation Manual

al Explorations

ecifications

on and Materia

for Construction

ground Mines

itation Manual

ement Manual

ngs

ffic Control De

olicies and Proc

nt

ation Tower M

books and Gui

ns

s Manual

Manual (Appe

cifications, 6th E

Material Speci

is of payment w

stablished in th

Page 5

rence in the pla

med and all ma

ns of section 10

al.

d utilize the nec

ect.

before the adve

mance of the de

of Very Low-V

s

al Specification

n and Material

- Inventory an

l

vices

cedures Manua

anual

delines

ndix B)

Edition, 2013,

ifications, Sup

will be paid fo

he Scope Of Se

ans the appropr

aterials to be fu

00 of the Cons

cessary ODOT

ertising date, o

esign and cons

Volume Local R

ns

l Specifications

nd Risk Assessm

al:

including all in

pplemental Spe

or under the app

ervices.

riate Construct

urnished.

struction and M

T manuals that a

of the following

struction work r

Roads (ADT

s

ment

nterims and OD

ecifications, Pro

propriate Lump

tion and Mater

Material

apply to the de

g ODOT Manu

required to com

400)

DOT Exceptio

oposal and Spe

p Sum bid item

rial

esign

uals

mplete

ns

ecial

m,

The Consu

The breakd

a means to

F8.3

The DBT w

1.

2.

R8.4

A. Genera

furnish the

Consultant

Record-Dr

shown on t

http://www

In addition

A

ty

A

an

U

el

Th

un

A

N

co

Th

E

Two paper

completion

Record-Dr

and the ass

Acceptanc

the work b

The delive

Volume III

B. CADD F

If marked y

CADD Eng

provisions

web site. T

line weight

URL addre

ht

ht

ultant will be re

down will inclu

o check partial p

Final Payme

will prepare an

. All original

the project

. Record-Dra

Record-Draw

al: At the com

e Department R

t will professio

rawing plans w

the ODOT We

w.dot.state.oh.u

n to the informa

All deviations fr

ype or size of w

Any utilities, pip

nd remaining in

Underground fe

levation.

he final option

nder the specif

Additional plan

Notation will als

onstruction (ro

he Plan index w

ach plan sheet

r half-size copi

n of the physica

rawing plans, th

sociated electro

e of these plan

being accepted

red Record Dr

I (Section 1200

Files will be su

yes, the Consu

gineering Stan

as detailed und

This includes, b

ts, cells, placem

ess:

ttp://www.dot.

ttp://www.dot.

equired to furn

ude materials t

payment reque

ent:

nd submit the fo

l project files a

awings Plans as

wing Plans:

mpletion of the

Record-Drawin

onally endorse

will be submitte

eb Site at:

us/DIVISIONS

ation shown on

rom the origina

work

pes, wellheads

n place which

atures will be s

n and specificat

fication (e.g., c

sheets may be

so be made of

ck, broken con

will show the p

will have its la

es of the Recor

al work but pri

he Record Dra

onic files will b

ns and delivery

and the final e

rawing Plans w

0 - Plan Prepar

upplied by DB

ultant will comp

ndards Manual.

der the approp

but is not limit

ment of text an

state.oh.us/Div

state.oh.us/Div

ish the Departm

o be used in th

ests.

ollowing prior

and notes utiliz

s required in S

work, prior to

ng construction

(sign and seal)

ed as TIFF Ima

S/CONTRACT

n the constructi

al approved co

, abandoned pa

are not shown,

shown and lab

tion number se

onduit).

needed if nece

locations and t

ncrete without r

plan sheets wh

ast revised date

rd-Drawing pla

ior to the reque

awings (TIFF Im

be delivered to

of the original

stimate approv

will be prepared

ration).

BT:

ply with ODOT

All data will

riate CADD lin

ted to, the leve

nd file naming

visions/Engine

visions/Engine

Page 6

ment with a co

he work, and w

to the request

ed in the prepa

ection 8.4 belo

final acceptan

n plans. When t

) the title sheet

ages as per the

TADMIN/CON

ion plans, the R

nstruction plan

avements, foun

, or do not con

eled on the Re

elected for thos

essary to show

the extent of us

reinforcing ste

hich have chang

e noted on the

ans will be del

est for final pay

mage Files, inc

the District Pl

l tracings and t

ved.

d in conforman

Yes

T’s CADD Sta

be provided to

nks accessed fr

l assignments,

conventions. T

ering/CaddMa

ering/CaddMa

omplete breakd

will be in suffici

for final paym

aration of the s

ow.

nce of the const

the Record-Dra

.

Electronic Plan

NTRACTS/Pag

Record-Drawin

ns which result

ndations or oth

form to locatio

ecord-Drawing

se items which

w work not inclu

se of materials

eel, etc.).

ges appearing o

sheet and clear

livered to the P

yment. After t

cluding the orig

lanning & Eng

the associated e

nce with the Lo

No

andards, and su

o the County En

from the Depar

symbols, lines

The web site c

apping/CADD/

apping/Pages/d

down of the lum

ient detail to p

ment:

survey, design a

truction, the Co

awing plans ar

n File Submiss

ges/TIFF.aspx

ng plans will sh

t in a change o

her major obstru

ons or depths s

plan in terms o

allow several

uded in the con

s, other than so

on them.

rly marked ‘As

Project Enginee

the Departmen

ginal half-size

gineering Admi

electronic files

ocation and De

upply files in ac

ngineer accord

rtment’s Office

s and line style

an be accessed

/Pages/default.a

default.aspx

mp sum bid item

rovide ODOT

and constructio

onsultant will

re completed th

sions Guideline

how the follow

f location, mat

uctions discov

hown in the pl

of station, offs

material option

nstruction plan

il, for embankm

s Built’.

er for approval

t has approved

signed Title S

inistrator.

s is required pr

sign Manual

ccordance with

ding to the

e of Production

es that are to be

d at the followi

aspx

ms.

with

on of

he

es as

wing:

terial,

vered

lans.

set and

ns

ns.

ment

l upon

d the

heet)

rior to

h the

n’s

e used,

ing

The follow

1. ODOT

2. ODOT

The Depar

1. The C

inform

This re

CADD

compl

2. The C

Volum

and th

a. D

b. A

c. A

da

d. A

ce

e. A

f. A

m

A sepa

Standa

3. The C

proces

These requ

Reference

http://www

are using th

files.

P8.5

Within 10

will be hel

estimate w

wing can be acc

T CADD Stand

T’s Location an

rtment will acc

Consultant will

mation will be s

Proje

HIG-T

equirement ens

D systems with

lete CADD dat

Consultant will

me 3, Section 1

hese files shall i

Digital terrain m

ASCII text files

ASCII text files

ata if any)

ASCII text file(s

enterline of con

ASCII text file(s

ASCII text files

monuments.

arate file name

ards Manual pr

Consultant shall

ss of plan deve

a.

b.

c.

uirements and p

Resource Cent

w.dot.state.oh.u

he current vers

Post-Letting

days after bid

d with the Esti

with the Departm

cessed from the

dard files by se

nd Design, Vol

ept CADD file

submit all CAD

submitted in th

ect

T0144-01.50

sures that High

hout additional

ta rests with the

submit all info

500. The subm

include but are

models (*.tin)

containing all

containing all

s) listing chain

nstruction, the

s) listing vertic

listing the Nor

e should be use

rovides specifi

l submit the fol

elopment. The

Three-dimen

DTM data w

3D AutoCad

planimetric,

An “.ASC” f

procedures may

ter (DRRC) we

us/DRRC/. Org

sion of these re

Conference

opening, the D

imating Office

ment or design

e above URL a

electing the “M

lume 3 by sele

es on CD ROM

DD informatio

he following fo

hland County r

work. The res

e consultant.

ormation produ

mission shall in

e not limited to

raw point data

adjusted point

n data for all ex

centerline of r

cal alignment d

rthing, easting,

ed for each hori

c requirements

llowing aerial p

submission sh

nsional (3D) A

which were util

d Land Desktop

ground contro

file for mass po

y be updated fr

ebsite which is

ganizations ex

equirements, C

e:

DBT will attend

of the Division

nated representa

Page 7

address:

MicroStation Do

cting the “L&D

M or DVD ROM

on produced in

rmat as indicat

CADD form

AutoCad (.dw

eceives an end

sponsibility to

uced in the proc

nclude all files

o the following

a (PT #, X, Y, Z

t data (PT #, X

xisting and prop

ight of way an

data for all exis

, station, offset

izontal or verti

s for the conten

photography an

hall contain the

AutoCad Land D

ized to create t

p or Civil 3D d

ol points, grids

oints and break

from time to tim

s located at the

changing ODO

ADD referenc

d a mandatory p

n of Contract A

ative.

ownloads” link

D Manual Volu

M electronic m

the process of

ted below:

mat

wg) 201

d product that i

provide the De

cess of plan de

generated as t

:

Z, Linking Cod

X, Y, Z, Linking

posed horizont

nd ramp baselin

sting and propo

t and elevation

ical alignment.

nt of the requir

and/or mapping

e following file

Desktop or Civ

the surface for

design file cont

and legends.

k lines (ASCII

me with notific

following UR

OT CADD data

e manuals, OD

post-award me

Administration

k

ume 3" link

media only.

f plan developm

Version

12 (Civil3D)

is directly usab

epartment with

evelopment acc

the result of the

de/Mapping C

g Code/Mappin

tal alignments;

nes.

osed profiles.

n for all existin

. The CADD E

red ASCII repo

g information p

es:

vil 3D design f

the project (or

taining all topo

format).

cation in the (D

RL,

a are responsib

DOT cell files a

eeting. This co

n to discuss the

ment. All CAD

ble on County

h correct and

cording to L&D

e plan processi

ode)

ng Code, Attrib

; including the

g and proposed

Engineering

orts.

produced in the

file containing

r section)

ographic,

DRRC) Design

ble for ensuring

and ODOT see

onfidential mee

e Lump Sum

DD

D

ing

bute

d

e

all

g they

ed

eting

P8.6

The Contra

this project

source of p

conditions

C8.7

All commu

Engineer.

The Distric

At the pre-

and the De

P8.8

Contractor

non-constr

E8.9

The DBT,

inspecting,

survey auth

and Section

said survey

owners no

with 102.6

ODOT’s P

being perfo

ODOT’s P

the crop da

ODOT’s P

survey or s

in this sect

9 HA

The follow

ASBE

AN A

RUN,

HAZA

PRESE

A COP

DEMO

BRID

COMP

Partnering A

actor is invited

t. The objectiv

pride to both th

of the contract

Communicat

unication durin

District

Phone n

E-mail:

ct Project Engi

-design meeting

epartment.

Permits:

r will be requir

ruction work w

Entry on Pri

acting as The D

, surveying, lev

horized by the

n 102.6 (inclus

y, the DBT wil

less than forty

6 of ODOT’s Su

Project Manage

ormed will be n

Project Manage

amage reimbur

Project Manage

soil information

tion.

AZARDOU

wing Asbestos

ESTOS NOTIF

SBESTOS SU

SCHEDULED

ARD EVALUA

ENT ON THE

PY OF THE O

OLITION AND

GE OWNER,

PLETE THE F

Agreement:

d to enter into a

ve of this proce

he Department

t. It is solely in

tion

ng design and c

9 Project Man

number:

ineer will be na

g, the Contract

ed to obtain a p

within the existi

ivate Proper

Department’s a

veling, digging

Director of Tr

sive of Section

ll send notifica

y-eight hours no

urvey Manual.

er. Any subseq

negotiated betw

er. Crop and pr

rsement formul

er. Any subseq

n prior to the s

US MATER

Notification N

FICATION

URVEY OF TH

D FOR REPLA

ATION SPECI

E BRIDGE STR

OHIO ENVIRO

D RENOVATI

WILL BE PRO

FORM AND SU

a self-facilitated

ess is the timely

and the Contra

ntended to esta

construction wi

nager’s Name:

amed at the pre

tor will name a

permit from th

ing Right of W

rty:

agent, may ent

g, drilling, or do

ransportation in

ns 102.61 throu

ation letters ind

or more than 3

The DBT wil

quent claims fo

ween the DBT

roperty damag

la and Special

quent entries on

submission of t

RIALS

Note is to appe

HE TOWNSHIP

ACEMENT, W

ALIST. THE

RUCTURE.

ONMENTAL P

ION FORMS,

OVIDED TO T

UBMIT IT TO

Page 8

d partnering pr

y completion o

actor. This Par

ablish an enviro

ill be with the D

Matt Hauc

(740) 774-

Matt.Hauc

e-design meetin

a Project Mana

e State or loca

Way and/or limi

ter upon any la

oing any work

n accordance w

ugh 102.66) of

dicating the dat

0 days prior to

ll forward copi

or compensatio

and the affecte

e minimization

Waiver of Dam

nto private prop

the bid will be

ear in the Con

P ROAD #144

WAS CONDUC

SURVEY DET

PROTECTION

PARTIALLY

THE SUCCES

O:

rocess with the

of the work and

rtnering Agree

onment of coo

District Projec

ck

-9055

[email protected]

ng.

ager who will a

al government h

ited access.

ands within the

k deemed neces

with Section 55

ODOT’s Surv

te and duration

o the date of en

ies of all notifi

on due to damag

ed property ow

n and reimburs

mage form, wil

perty for the pu

made in accor

nstruction Pla

4 (HIG-T0144-

CTED BY A CE

TERMINED T

N AGENCY (O

COMPLETED

SFUL BIDDE

e Department p

d a quality pro

ement will not a

operation betwe

ct Manager and

h.us

act as a liaison

having jurisdic

State for the p

ssary in the exe

517.01 of the O

ey Manual. Pr

n of entry to the

ntry for said sur

ication letters d

ges incurred w

wners with fina

sement informa

ll be provided

urpose of obta

rdance with the

ns:

-0150) BRIDG

ERTIFIED AS

THAT NO ASB

OEPA) NOTIFI

D AND SIGNE

ER. THE CON

per CMS 108.0

duct that will b

affect the term

een the parties.

d the District P

between the D

ction, to perform

purpose of

ecution of any

Ohio Revised C

rior to perform

e affected prop

rvey in accord

distributed to

while said surve

al approval from

ation, together

to the DBT by

aining additiona

e procedures ou

GE OVER PLU

SBESTOS

BESTOS IS

ICATION OF

ED BY THE

NTRACTOR SH

02 on

be a

ms and

.

roject

DBT

m any

Code

ming

perty

ance

ey was

m

with

y

al

utlined

UM

HALL

OHIO

401 E

DAYT

TOM

(937)

FAX:

AT LE

REHA

THE E

INFOR

ADDR

REMO

TO BE

LOCA

DISTR

THE C

COMP

10 ENV

W10.1

A permit d

General Pe

DBT will b

notes and d

will be ma

location at

N10.2

The DBT s

both off pr

required. T

Approval f

days will b

All tempor

disturbing

must be in

SWPPP if

http://www

are paid fro

the unit pri

will be ma

the contrac

O EPA, SWDO

. FIFTH STRE

TON, OHIO 45

SCHNEIDER,

285-6357

(937) 285-624

EAST TEN (10

ABILITATION

ENGINEER.

RMATION RE

RESS, 2) THE

OVAL AND 3)

E USED. A CO

ATION:

RICT 9 OFFIC

CONTRACTO

PLETE AND S

VIRONM

Waterway P

determination w

ermit, prior to s

be responsible

design the proj

de available to

all times durin

National Pol

shall submit to

roject and on pr

The NOI will b

from the OEPA

be counted for i

rary erosion co

activity is not

place prior to

required will b

w.epa.state.oh.u

om an encumb

ices for the ero

de by an Extra

ct and may not

EET

5402-2911

, APC MANAG

49

0) WORKING

N, THE CONTR

EQUIRED ON

SCHEDULED

) A DESCRIPT

OPY OF THE O

CE, 650 EASTE

OR SHALL FU

SUBMIT THE

MENTAL

ermits:

will be complet

start of constru

for ensuring al

ect to meet the

o the DBT upon

ng construction

lutant Disch

the ODOT Pro

roject work in

be submitted to

A takes 21 days

in the project.

ontrol is the res

permitted prio

the initiation o

be per SS832.

us/dsw/storm/in

ered amount in

osion control ite

a Work Change

be negotiated

GER

DAYS PRIOR

RACTOR SHA

N THE FORM W

D DATES FOR

TION OF THE

OEPA FORM

ERN AVE, PO

URNISH ALL F

E OEPA NOTIF

ted and ODOT

uction, in order

ll special provi

ese requiremen

n completion. A

n activities.

harge Elimi

oject Manager

a timely mann

o the OEPA wi

s and the ODO

ponsibility of t

r to the OEPA

of any earth dis

For informatio

ndex.html. Item

ncluded in the p

ems. Payment

e Order using th

or adjusted for

Page 9

R TO THE STA

ALL PROVID

WILL INCLU

R THE START

E PLANNED D

IS AVAILAB

O BOX 467 – C

FEES, LABOR

FICATION FO

T will issue the

r to perform the

isions and cond

nts to avoid hav

A copy of the p

ination Syst

the total numb

ner. This inform

ithin 10 days af

OT Project Man

the Contractor

permit approv

sturbing activit

on about OEPA

ms used to imp

proposal as a n

ts for erosion c

he specified un

r inflation or cl

ART OF ANY

E A COPY OF

UDE: 1) THE C

T AND COMP

DEMOLITION

BLE FOR INSP

CHILLICOTHE

R, AND MATE

ORM.

applicable Na

e work require

ditions of the p

ving to modify

permit will be

tem (NPDE

ber of acres of

mation will be u

fter this inform

nager has 10 da

even if a SWP

val. For projec

ty. All tempora

A's NPDES per

plement the DB

non-bid referen

control items th

nit prices. The

laimed change

Y DEMOLITIO

F THE COMPL

CONTRACTOR

PLETION OF T

N WORK AND

PECTION AT

E, OHIO 4560

ERIAL NECES

ationwide Perm

d in this Scope

permit are impl

the permit, if p

located at the p

S) permit:

earth disturban

used to develo

mation is receiv

ays to file the N

PPP is not requ

cts that require

ary erosion con

rmit requireme

BT's Erosion C

nce number. Th

hat exceed the

specified unit

d condition.

ON AND/OR

LETED FORM

RS NAME AN

THE BRIDGE

D THE METHO

THE FOLLOW

01

SSARY TO

mit or Regional

e of Services. T

lemented as pla

possible. The p

proposed proje

nce activities fo

p the NOI if

ved from the D

NOI so these 3

uired. Earth

an NOI, the SW

ntrol work and

ents see

Control requirem

he proposal spe

encumbered am

prices are fixe

M TO

ND

OD(S)

WING

The

an

permit

ect

for

DBT.

1

WPPP

d the

ments

ecifies

mount

ed for

The follow

BEST

SPECI

AND

DRAW

ALON

PROP

IMPA

PRAC

SEDIM

ANY

STRU

COMP

ALSO

R10.3

All tempor

become the

specificatio

S10.4

The DBT s

upstream w

Manual an

downstream

100-year e

recommen

structure. I

plain analy

Initial cont

follow-up

The follow

ENDANG

THIS PRO

SODALIS

HABITAT

DEAD TR

BRANCHE

WILL BE

PRIOR TO

BE CAREF

SEPTEMB

UNITED S

OFFICE O

BE CONT

IF SUITAB

CUTTING

THE SUM

PRIOR TO

wing plan note

T MANAGEM

IFICATIONS

MATERIAL S

WINGS" SHAL

NG WITH ADD

PERTIES AND

ACTS SHALL B

CTICES FOR S

MENT CONTR

EXCAVATIO

UCTURES OR

PLETE AND T

O COMPLY W

Removal of T

rary erosion co

e property of th

ons.

tream Cros

shall perform a

water surface e

nd The Bridge D

m, to the greate

vent. The resu

dations shall b

If the proposed

ysis shall be sub

tact with the Fl

coordination w

wing plan note

GERED SPECI

OJECT IS WIT

) AND NORT

T FOR THE IN

REES OR SNA

ES OR CAVIT

PERFORMED

O ANY REHAB

FULLY EXAM

BER 30. IF AN

STATES FISH

OF ENVIRONM

ACTED OR P

BLE TREE HA

G MUST OCCU

MMER MONTH

O CUTTING. N

e is required:

MENT PRACT

SET FORTH I

SPECIFICATIO

LL BE USED

DITIONAL PR

D WETLANDS

BE KEPT TO

SOIL EROSIO

ROL MEASUR

ON, GRADING

UTILITIES. T

THE AREA IS

WITH ODOT'S

Temporary

ontrol items sha

he Contractor a

ssing Investi

a detailed flood

levations durin

Design Manual

er of either one

ults of the detai

e submitted to

d crossing is loc

bmitted concur

lood Plain Adm

with the Flood P

e is required:

IES HABITA

HIN THE RAN

HERN LONG

NDIANA BAT

GS WITH EX

TIES. THEREF

D ONLY AFTE

BILITATION/

MINED FOR T

NY BATS ARE

H AND WILDL

MENTAL SER

PROVIDED W

ABITAT IS ID

UR BETWEEN

HS, A NET SU

NET SURVEY

TICES FOR SO

IN THE MOST

ONS, LOCAT

TO ENSURE

ROTECTIVE M

S FROM CONS

A MINIMUM

N AND SEDIM

RES AS SPEC

G OR FILLING

THEY SHALL

S STABILIZED

"HANDBOOK

Erosion Co

all be removed

and shall be dis

igations (flo

d plain analysis

ng a 100 year s

l and as follow

e bridge openin

iled flood plain

the District fo

cated in a spec

rrently to the lo

ministrator has

Plain Administ

AT-INDIANA B

NGE OF THE

-EARED BAT

AND NORTH

FOLIATING,

FORE, ANY U

ER SEPTEMB

/REMOVAL, T

THE PRESENC

E FOUND ROO

LIFE SERVICE

RVICES AND

WITH INFORM

DENTIFIED W

N OCTOBER

URVEY MUST

YS SHALL INC

Page 10

OIL EROSIO

T CURRENT V

ION AND DE

ADEQUATE

MEASURES T

STRUCTION

M THROUGH T

MENTATION

CIFIED IN THE

G OPERATION

L REMAIN IN

D AS ACCEPT

K FOR SEDIM

ontrol Items

before the pro

sposed of in ac

ood plain an

s for the waterw

storm event. Th

ws : The extent

ng/width upstre

n study, suppor

or review and c

ial flood hazar

ocal flood plain

been performe

trator.

BAT AND NO

FEDERALLY

T (MYOTIS SE

HERN LONG-E

PEELING OR

UNAVOIDABL

BER 30 AND B

THE UNDERS

CE OF BATS,

OSTING ON T

E, ECOLOGIC

ODOT DISTR

MATION.

WITHIN THE P

1 AND MARC

T BE CONDUC

CORPORATE

ON AND SEDI

VERSION OF

ESIGN MANU

EROSION AN

TO AVOID IM

ACTIVITIES.

THE USE OF B

N CONTROL.

E PLAN SHAL

NS AND INST

N PLACE UNT

TED BY THE

MENT AND ER

s

oject is accepte

ccordance with

nalysis)

way crossing to

he analysis sha

of the analysis

eam, or to the

rting hydraulic

comment prior

rd area as defin

n coordinator.

ed. The DBT s

ORTHERN L

Y ENDANGER

EPTENTRION

EARED BAT

R LOOSE BAR

LE CUTTING

BEFORE APRI

SIDE OF THE

, ESPECIALLY

THE UNDERS

CAL SERVICE

RICT 9 ENVIR

PROJECT ARE

CH 31. IF TRE

CTED BETWE

E EITHER TWO

IMENTATIO

F ODOT'S "CO

UAL AND STA

ND SEDIMEN

MPACTS TO A

. EROSION/S

BEST MANAG

ALL SOIL ER

LL BE IN PLA

TALLATION O

TIL CONSTRU

ENGINEER.

ROSION CON

ed. Removed m

h the appropria

o assure that th

all be as per the

s shall be from

limits of the ar

c calculations, a

to construction

ned by FEMA,

shall be respon

ONG-EARED

RED INDIANA

NALIS). THE R

CONSISTS O

RK, SPLIT TR

G OF SUCH TR

IL 1.

E EXISTING B

Y FROM APR

SIDE OF A BR

ES DIVISION,

RONMENTAL

EA AND TREE

EES MUST BE

EEN JUNE 15

O NET SITES

ON CONTROL

ONSTRUCTIO

ANDARD

NT CONTROL,

ADJACENT

SEDIMENTAT

GEMENT

ROSION AND

ACE PRIOR T

OF PROPOSE

UCTION IS

THEY SHALL

NTROL".

materials shall

ate C&MS

here is no incre

e Location & D

m a minimum of

rea inundated b

and

n of the drainag

the detailed fl

sible for all req

D BAT

A BAT (MYO

ROOSTING

OF LIVING OR

RUNKS AND/O

REES OR SNA

BRIDGES SHA

RIL 1 TO

RIDGE, THE

, THE ODOT

L SECTION SH

ES MUST BE

E CUT DURIN

5 AND JULY 3

S PER SQUAR

L

ON

,

TION

D

TO

ED

L

ease in

Design

f 500'

by the

ge

lood

quired

TIS

R

OR

AGS

ALL

HALL

CUT,

NG

31,

RE

KILOMET

USED FOR

THE PROJ

TWO CON

IMPACT T

11 RIG

All necessa

way. High

plans, show

shall not en

plans. Prop

award.

The new p

37 of the O

Revised Co

the establis

The DBT w

DBT will b

request fro

way limits

The Consu

Review Su

Should the

re-evaluate

impacts. O

12 UTI

Utilities Sp

section 153

E12.1

The Distric

Undergrou

and other u

utilities are

AEP Colum

850 Tech C

Gahanna, O

Attn: Paul

(614) 883-

Highland C

P.O. Box 9

Hillsboro,

Attn: Frank

TER OF PROJE

R TWO CONS

JECT LIMITS

NSECUTIVE N

THIS SPECIES

GHT OF W

ary constructio

hland County w

wing these new

nter into negot

perty acquisitio

ermanent right

Ohio Revised A

ode (Regulatio

shment of the n

will stake and f

be responsible

om the property

.

ultant will ident

ubmission.

e Design Build

e to determine

ODOT will then

ILITIES

pecial Provisio

3.64 of the Ohi

Existing Util

ct Utility Coord

und Protection

utility owners t

e located in the

mbus Southern

Center Drive

OH 43230

Paxton

6831

County Water C

940

OH 45133

k Gilletty

ECT AREA W

SECUTIVE NI

WITH EACH

NIGHTS. IF N

S.

WAY (RO

on work for the

will acquire all

w permanent an

iations for purc

ons required fo

t of way lines w

Administrative

on Laws). The “

new permanent

flag the new pe

for the mainten

y owners, withi

tify and show a

Team require

if that work wi

n conduct addit

ons in addition

io Revised Cod

lities:

dinator, in con

Service (OUPS

that are non-me

e area of the pr

n Power

Co

WITH EACH N

IGHTS, OR ON

H NET SITE CO

NO TREE REM

OW)

e project will b

right of way n

nd/or temporary

chase of any pr

or the construct

will be located

Code (Board R

“As Acquired”

t and temporar

ermanent right

nance of said s

in the project l

all right of way

work to be don

ill require addi

tional agency c

n to the Govern

de.

ncurrence with

S) and Oil and

embers of any

oject :

Page 11

NET SITE CON

NE NET SITE

ONTAINING

MOVAL IS PRO

e performed w

necessary for th

y limits are inc

roperty or prop

tion of this proj

by the DBT ba

Rules) governe

” right of way p

ry right of way

t of way in the

stakes and flag

imits, the DBT

y encroachmen

ne outside of th

itional field inv

coordination, if

ning Regulation

the registered U

Gas Producers

utility protecti

Fron

1315

Ports

Attn

(740

(304

High

138 B

P.O.

Hills

Attn:

NTAINING A

E PER KILOM

A MINIMUM

OPOSED, THE

within the new p

he construction

cluded with thi

perty rights ide

ject are under w

ased on require

ed by regulation

plans necessary

y will be includ

field prior to th

gs throughout th

T will stake and

nts on the const

he Environmen

vestigation to d

f necessary, pr

ns listed in sec

Underground U

s Underground

ion services, ha

ntier Communic

5 Albert St.

smouth, Ohio 4

: Joe Wheeler

) 354-0678 or

) 962-8962

hland County E

Bowers Ave.

Box 297

sboro, Ohio 45

: Jerry Miller

MINIMUM O

METER OF STR

M OF TWO NE

E PROJECT IS

permanent and

n of the project

is Bid Package

entified within

way and will b

ements specifi

ns outlined in

y to provide an

ded with this Bi

he start of cons

he duration of

d maintain the

truction plans

ntally Cleared A

document resou

rior to permit ap

ction 8.1 of this

Utility Protecti

d Protection Se

as determined

cations

45662

Engineer

133

OF TWO NETS

REAM WITHI

ETS USED FOR

S NOT LIKEL

d temporary rig

t. Right of way

e. The Contract

the Right of W

be completed b

ed in Chapter 4

Chapter 4733,

n accurate basi

id Package.

struction and th

the project. Up

temporary righ

at the Stage 2

Area, ODOT w

urces and poten

pplication subm

s document and

ion Services- O

ervice (OAGPU

that the follow

S

IN

R

LY TO

ght of

y

tor

Way

by

4733-

Ohio

s for

he

pon

ht of

will

ntial

mittal.

d

Ohio

UPS)

wing

Environme

Plant)

3575 Colum

Lebanon, O

513-934-15

The cost o

G12.2

The DBT s

affected by

shall be the

The follow

utilities im

A

B

C

D

E

F

G12.3

All utility w

must meet

23 CFR 63

and 8200 P

This utility

methods, a

The Utility

requiremen

Existing to

utility relo

design sub

All utility d

ODOT stan

U12.4

Utility con

minimize t

ental Engineeri

mbia Rd.

Ohio 45036

512

of all utility co

General Req

shall be respon

y the project. T

e responsibility

wing list further

mpacted by the p

A. DBT shall c

encountered

with the res

. All effort re

the DBT’s r

Delays). Th

. The Departm

modificatio

respective u

made to the

D. No addition

by the DBT

. The DBT sh

does not int

. All new util

process.

Governing R

work performe

the Federal Hi

35.410. Utility

Procedure for U

y work shall co

as well as any a

y Relocation Pl

nts of the Cont

opography, righ

cation plans, th

mittal requirem

design, relocat

ndards or accep

UTILITY CO

nflicts shall be i

the scope and e

ing Service (EE

ordination wi

quirements:

nsible for coord

The resolution o

y of the DBT.

r describes the

project:

coordinate with

d on the projec

spective utility

equired to reso

risk, regardless

he Department

ment will solel

on and construc

utility owner di

e DBT.

nal compensati

T due to interfe

hall be respons

terfere with oth

lity installation

Regulations

ed by the DBT

ighway Admin

y work shall be

Utility Relocati

omply with the

applicable Dep

lans prepared b

tract Document

ht-of-way, lane

hey shall be su

ments of the Co

tion, modificati

pted industry s

OORDINAT

identified and

extent of utility

ES) (Sewer

ill be bid as a L

dination with th

of any conflicts

assignment of

h the utility ow

ct. The DBT sh

owners and sta

lve utility conf

s of the entity p

is not responsi

ly determine co

ction for each c

irectly as outlin

on will be mad

rence from the

sible for inspec

her proposed co

n requests with

for Utility D

shall be consis

nistration (FHW

in accordance

ions, Adjustme

utility owner’s

partment or LPA

by the DBT for

ts for plan prep

es of travel, and

ubject to review

ontract Docum

ion and constru

standards as ap

TION

located by the

y conflicts and

Page 12

Lump Sum It

he owners of al

s between utili

f responsibilitie

wners and stake

hall also coord

akeholders, inc

flicts shall be in

performing wo

ible for any sch

ompensable rig

conflict. When

ned in Section

de to the DBT f

e utilities or uti

ction of all utili

onstruction act

hin L/A right of

Design and

stent with the D

WA) “Buy Ame

with ODOT’s

ents and Reimb

s specifications

A and/or railro

r the design of

paration and sh

d the location o

w and approval

ments.

uction shall be

pplicable.

DBT. The DB

relocations. T

em.

ll public and p

ity facilities an

es with respect

eholders to reso

dinate the comp

cluding all railr

ncluded in the

ork, except as d

hedule delay ca

ghts related to

n warranted, th

12.3.7. No ad

for delays, inco

ility work.

ity relocation t

tivities, includi

f way shall be

Constructio

Department’s U

erica” policy r

s 8100 Policy f

bursement.

s, standards of

oad permit requ

the utility relo

how, at a minim

of the existing

by the utility o

performed in

BT shall design

The work shall

private/investor

nd the construct

t to various issu

olve all utility

pletion of all ut

roads. (Refer t

DBT’s schedu

described in 12

aused by utility

utility design,

he Department

dditional comp

onveniences, o

to ensure that t

ing relocations

subject to the O

on:

Utility Relocat

equirements of

for Accommod

f practice and c

uirements.

ocation work sh

mum, the follow

utilities. Whe

owner in accor

accordance wi

n the project co

not be designe

r utility facilitie

tion of the proj

ues related to

conflicts

tility relocation

to Railroad Sec

ule and is entire

2.3.4 (Deadline

y-related issue

relocation,

will compensa

ensation will b

or damages sus

the relocation w

s of other utiliti

ODOT permitt

tion Manual an

f 23 USC 313

dation of Utiliti

construction

hall meet

wing informati

en the DBT dev

rdance with the

ith the applicab

onstruction wo

ed to preclude l

es

ject

ns

ction)

ely

es and

s.

ate the

be

stained

work

ies.

ting

nd

and

ies

ion:

velops

e

ble

rk to

legal

occupancy

and schedu

minimize p

Only those

permanent

with the ut

schedule im

The DBT s

The DBT s

and giving

N12.5

According

may affect

(OUPS) an

U12.6

The DBT i

complexity

in advance

generating

the Departm

S12.7

The DBT s

owner for i

utility own

If the DBT

incurred by

If the DBT

the DBT n

agreed to b

Departmen

correct the

fourteen (1

When a uti

ensure that

other utiliti

y of the highwa

uling of these r

potential delay

e utilities affect

relocation or a

tility owners an

mpacts from th

shall perform a

A. Co

pro

ex

B. Ide

C. Pro

en

D. Co

E. Sc

pro

shall be respon

that informati

NOTIFICAT

g to ORC 153.6

t underground u

nd the utility ow

UTILITY CO

is responsible f

y of each utility

e of each of the

meeting minu

ment.

CHEDULIN

shall obtain act

incorporation i

ner’s concurren

T requests an ac

y the utility ow

T prepares a uti

o later than 28

by both parties

nt, in writing, o

design and res

14) calendar da

ility owner pre

t the relocation

ies. This revie

ay right-of-way

relocations with

s and coordina

ted by the proj

adjustment of t

nd pay all costs

hese relocations

all of the follow

onfirm the iden

ovided by the D

isting facilities

entify all utility

ovide all proje

gineering (SUE

oordinate all pr

chedule and con

ocess.

nsible for maint

on available to

TION

64 and at least

utilities, the DB

wners that are n

OORDINAT

for establishing

y’s relocation i

e meetings. Th

utes within two

NG OF UTI

tivity durations

into the DBT’s

nce with the act

cceleration of u

wner. These ac

ility relocation

calendar days

. If a utility ow

of the grounds

submit to the u

ays.

epares a utility

n does not inter

ew shall be com

y by the relocat

h the involved

ate the efficient

ect shall be rel

the utilities for

s associated wi

s or adjustmen

wing:

ntification and

District Utility

s.

y impacts.

ct construction

E) information

roject work and

nduct utility co

taining and upd

o the District U

two (2) days p

BT shall notify

not members o

TION ACT

g a schedule of

issues. The DB

he Department

(2) business d

ILITY REL

s for all utility

s Project Sched

tivity durations

utility relocatio

cceleration cost

plan, the utilit

after its submi

wner rejects an

for rejection an

utility owner fo

relocation [pla

rfere with other

mpleted no late

Page 13

ted utility. Wh

utilities shall b

t relocation of

located or adju

r the DBT’s ben

ith the relocatio

nts.

contact inform

Coordinator to

n documents, o

n, and geotechn

d utility work w

oordination me

dating the utili

Utility Coordina

prior to comme

y the Departme

of the Registere

TIVITIES

f utility coordin

BT shall notify

will participate

days after the m

LOCATION

relocation wor

dule. The DBT

s included in th

on work, the D

ts are NOT elig

ty owner will re

ission to the ut

ny design work

nd suggestions

or review. This

an, the DBT sh

r proposed con

er than fourteen

hen utility reloc

be the responsi

affected utilitie

usted. If the DB

nefit, the DBT

on or adjustme

mation of the ut

o verify the nat

other utility relo

nical informatio

with the affecte

eetings during t

ity coordination

ator.

encing construc

ent, the Registe

ed Utility prote

nation meeting

y the Departme

e as necessary.

meeting and sub

N WORK

rk-related activ

T shall provide

he project sche

DBT shall pay a

gible for reimb

eview and app

tility owner, un

k, the DBT shal

s for correcting

s compliance r

hall review the

nstruction activ

n (14) calendar

cations are nec

ibility of the D

es.

BT desires the

T shall conduct

ent. The DBT

tilities within th

ature, extent an

ocation plans,

on for relocatio

ed utility owne

the project des

n information o

ction operation

ered Utility Pro

ection Service.

gs commensura

ent at least thre

. The DBT is r

bmitting those

vities from the

all documenta

edule.

all related acce

bursement by th

prove/reject the

nless a differen

ll immediately

g the problem.

review is antici

design and/or p

vities, including

r days after its

cessary, coordin

DBT. The DBT

temporary or

all negotiation

shall assume a

he project area

d location of th

subsurface util

on of utilities.

ers.

ign and constru

on a monthly b

ns in an area th

otection Servic

.

ate with the

ee (3) business

responsible for

meeting minut

respective util

ation supportin

leration costs

he Department

e design prepar

nt time period i

notify the

The DBT shal

ipated to take

permit applica

g relocations o

submission to

nation

T shall

ns

all

a as

heir

lity

uction

basis

at

ce

days

r

tes to

lity

ng the

t.

red by

is

ll

tion to

of

the

DBT, unle

written rev

D12.8

The DBT s

Departmen

schedule.

schedule a

Removal N

Obstructio

public road

relocation

The Depar

unless the

or lack of t

C12.9

Once a util

additional

compensat

relocation

relocation

U12.10

The utility

The DBT s

documenta

traffic cont

R12.11

If a utility

the utility r

The Depar

and perform

will work w

If the proje

facilities, t

responsible

C12.12

The DBT s

approved b

interruptio

In the even

premises a

immediate

disruption

work must

until the lo

Where the

ss a different ti

view comments

DEADLINE

shall monitor th

nt when the pro

Upon receipt o

ctivity duration

Notice. The De

n Removal No

d right of way.

delay responsi

rtment will not

DBT is able to

the utility meet

CHANGES T

lity relocation h

relocation of th

tion for One Hu

incurred by the

work.

UTILITY OW

owner may in

shall notify the

ation of all utili

trol, for any uti

REIMBURS

owner notifies

requires an eas

rtment’s Distric

m the Departm

with the utility

ect contains con

he DBT shall w

e for providing

CONTINUIT

shall ensure tha

by the utility ow

ns of service, i

nt of an emerge

as to any emerg

ly notify the ut

and cooperate

t continuously b

ocal fire departm

DBT is respon

ime period is e

s to the Departm

S and DELA

he progress of

ogress of the ac

of sufficient do

ns developed in

epartment will

otice only gove

If a utility is l

ibility is based

be responsible

o provide the D

ting its utility r

TO UTILIT

has begun, the

he utility. If ch

undred (100) p

e utility owner

WNER INS

spect construct

e Department o

ity comments a

ility work insp

SEMENT an

s the DBT that

sement acquisit

ct Utility Coord

ment’s utility re

y if an easemen

nstruction wor

work with the D

g a deposit to c

TY OF UTI

at all utilities re

wner. The DB

including propo

ency involving

gency that the a

tility owner, in

with the said u

be performed u

ment authority

nsible for perfo

expressly agree

ment and the u

AYS

all activities as

ctivity controll

ocumentation c

n Scope Sectio

solely determi

erns the relocat

located within

on the relocati

e for payment o

Department with

relocation sche

TY RELOC

DBT shall not

hanges occur, t

percent of all co

r. The DBT sh

SPECTION

tion of any util

of any such insp

and resolutions

pections perform

nd DEPOSI

it believes any

tion by the Dep

dinator will wo

eimbursement p

nt is needed.

rk to support th

District Utility

over the cost o

ILITY SERV

emain fully op

BT shall obtain

osals for shutd

g utility interrup

accidental brea

n accordance w

utility owner in

until the water

y approves prov

ormance of util

Page 14

ed to by both p

utility owner.

ssociated with

ed by a utility

onfirming that

on 12.3.3, the D

ine if an Obstru

ion process wh

the utility own

ion schedule pr

of delay claims

h sufficient do

edule.

CATION WO

t make any cha

the DBT shall

osts (design an

all provide all

S

lity work perfo

pections. The

s. The DBT sh

med by the util

IT PROCES

y utility relocati

partment, the D

ork with the uti

process. The D

he installation o

y Coordinator to

of that utility in

VICE

perational durin

approvals from

downs and temp

ption, the DBT

akage may crea

with utility com

n the restoratio

service is resto

visions for con

lity relocation w

parties. The DB

utility relocati

owner is not c

t a utility owne

Department wil

uction Remova

hen the utility,

ner’s easement

rovided by the

s associated wi

ocumentation fo

ORK

anges to the pro

absorb the sch

nd construction

documentation

ormed by the D

DBT shall pro

hall provide saf

lity owner.

SSES

tion work is rei

DBT shall imm

ility owner to c

Department’s D

of a private/inv

o determine ho

nstallation supp

ng all phases of

m the applicabl

porary diversio

T shall immedia

ate at or near su

mpany standards

on service. If w

ored. Work ar

ntinued service.

work, the DBT

BT shall compi

ions and promp

consistent with

er has failed to

ll be asked to i

al Notice is to b

in question, is

t, the notice do

utility

ith utility coord

or an Obstructi

oject that woul

hedule impact a

n) associated w

n related to cha

DBT on the util

ovide the Depar

fe access, inclu

imbursable to t

mediately notify

confirm the co

District Real Es

vestor owned u

ow the utility w

port.

f the project, e

le utility owner

ons of affected

ately alert the o

uch premises.

s, and the Depa

water service is

round fire hydr

.

T shall”

ile and provide

ptly notify the

the project

perform within

issue an Obstru

be issued. An

located within

es not apply an

dination/reloca

ion Removal N

ld necessitate a

and provide ful

with the addition

anges in utility

lity owner’s fac

rtment with wr

uding any nece

that utility own

y the Departme

ompensable pos

state Administr

utility company

will be made

xcept as specif

rs for all neces

d utilities.

occupants of n

The DBT will

artment of the

s interrupted, re

rants will not b

e

n the

uction

n the

nd the

ation,

Notice

an

ll

nal

y

cility.

ritten

essary

ner or

ent.

sition

rator

y’s

fically

ssary

nearby

l

epair

egin

E12.13

Existing un

abandoned

in their ent

U12.14

The DBT i

depth.

O12.15

The DBT i

elevation o

U12.16

Additional

verify and

design and

P12.17

The DBT s

and constru

The DBT s

those being

project sha

operations

with the ut

Documents

U12.18

The DBT s

Departmen

A. M

wo

B. Ke

ow

wo

C. Co

D. Ke

the

lea

EXISTING U

nderground uti

d to ground (ab

tirety.

UNDERGRO

is responsible f

OVERHEAD

is responsible f

of lines and all

UTILITY CO

l unknown utili

document all u

d construction w

PROTECTIO

shall take all ne

uction with uti

shall perform w

g served by the

all be properly

. If the DBT e

tility, but shall

s, to coordinate

UTILITY RE

shall coordinat

nt.

Maintain service

ork.

eep the utility o

wner with regar

ork.

oordinate any c

eep the utility o

e utility owner

ast interruption

UTILITY L

ilities to be aba

andoned in pla

OUND UTIL

for verifying th

D UTILITIE

for verifying th

above ground

ONFLICTS

ities may be pr

utility conflicts

work.

ON OF UTI

ecessary precau

lity adjustment

work in a mann

e utility. Existi

protected by th

encounters a pr

take the prope

e the adjustmen

ELOCATIO

te and resolve a

e continuity to

owner fully inf

rd the DBT’s d

changes with th

owner involved

is able to prov

ns practicable.

LOCATION

andoned, includ

ace). Utility po

LITIES

he actual locati

ES

he actual locati

utility facilitie

S

resent that may

s and potential

ILITIES

utions to preve

ts.

ner that will cau

ing, adjusted o

he DBT to prev

eviously unkno

er precautions t

nt of that facili

ONS

all utility confl

Page 15

the extent prac

formed of sche

design, construc

he utility owne

d in making de

vide uninterrup

NS

ding service co

oles and other a

ion of all under

ion of all overh

es.

y or may not co

utility conflict

ent disturbance

use the least re

or new utilities

vent disturbanc

own utility tha

to protect the u

ity.

licts with the af

cticable while p

edules, includin

ction and inspe

er.

ecisions that aff

pted service to i

onnections, mu

above ground u

rground utilitie

head utilities in

onflict with the

ts encountered

e to utility facil

easonable incon

that are to rem

ce or damage r

at requires adju

utility or take ap

ffected utility o

performing the

ng coordinating

ection of the ut

ffect the utility

its customers,

ust be disconne

utility facilities

es including typ

ncluding type, n

e project. The

during the per

lities and coord

nvenience to th

main within the

resulting from p

ustment, the DB

ppropriate acti

owner at no ad

e utility relocat

g with the utilit

tility relocation

owner’s facilit

or be subject to

ected and remo

s shall be remo

pe, number and

number, and

DBT shall iden

rformance of b

dinate project d

he utility owne

right-of-way o

project constru

BT shall not int

ions, per Contr

dditional cost to

tion

ty

n

ties so

o the

ved or

oved

d

ntify,

oth

design

er and

of the

uction

terfere

ract

o the

U12.19The cost of

owner and

betterment

procedures

S12.20

If marked y

undergroun

DBT will

13 DE

OF

Maintenan

this docum

G13.1

All tempor

Hardware r

M13.2

M

M

M

R

R

A13.3

The detour

overlap bet

P

H

UTILITY BEf any ineligible

not the DBT.

t or ineligibility

s shall follow th

ubsurface U

yes, the DBT w

nd utilities prio

l have the SUE

SIGN AN

TRAFFIC

nce of Traffic (M

ment:

General:

rary MOT devi

report.

MOT Restric

Minimum numb

Minimum lane w

Maximum durat

Restrictions on l

Restriction relat

Additional D

r routes for the

tween projects

Project:

HIG-T0144-01

This item w

Manual of U

latest revisi

The 90 days

closures of

Closure of t

The DBT w

eighteen (18

The DBT sh

ETTERMEe, unnecessary

Determination

y costs shall be

he Department

Utilities Eng

will use a state

or to the begin

E perform the fo

D CONST

C (MOT)

MOT) Special

ices will compl

ctions

ber of lanes in e

width: N/A

tion (calendar d

lane closures d

ted to hospitals

Description o

project are list

.

Detou

1.50 TR 14

TR 9

will consist of m

Uniform Traffi

on, the specific

s represents the

smaller duratio

the roadway w

will inform the

8) business day

hall maintain a

ENTS or betterment

n of eligibility

e made by the a

t’s Utilities Re

gineering (S

approved subs

nning of any d

following Quali

TRUCTIO

Provisions in a

ly with the Nat

each direction

days) of detour

during special e

s, fire and polic

of Required

ted below. Th

ur Route:

44 (Fenwick R

5 (Stivers Rd /

maintenance of

ic Control Dev

cations and the

e maximum co

on. The contra

will not be perm

Department, H

ys prior to the b

access to all adj

Page 16

to the utility fa

shall be coordi

appropriate util

location Manu

SUE): Y

surface utilities

design work an

ity Levels:

ON REQU

addition to the

tional Coopera

to remain open

r: 90 days

events (sports e

ce, schools, etc

d Work and

e Contractor is

Rd) / SR 321 / T

/ TR 144 (Fenw

f traffic on exis

vices for Streets

e following:

onsecutive clos

actor is restricte

mitted prior to a

Highland Count

beginning of w

jacent drivewa

acility will be t

inated through

lity owner thro

ual.

Yes No

s engineering l

nd will incorpo

B

UIREMEN

e Governing Re

ative Highway

n during constr

events, fairs, co

c. N/A

d Special Pro

s to schedule al

TR 61 (Wildca

wick Rd)

sting roadways

s and Highway

sure days and c

ed to one closu

approval of the

ty, Emergency

work and/or roa

ays, within the

the responsibil

h the Departmen

ough the Depar

location servic

orate the result

NTS: MAI

egulations liste

Research Prog

ruction: N/A

oncerts, etc.)

ovisions:

ll work so that

at Road) / US 6

s in accordance

ys (OMUTCD)

cannot be split

ure per project

e Final plans.

y Services and

ad closure.

project area, a

lity of the utilit

nt. Payment fo

rtment. Betterm

e to field verify

ts in the design

INTENAN

ed in section 8.

gram (NCHRP)

A

N/A

t there is no det

62 /

e with the Ohio

), current editio

up into multip

site.

School Distric

at all times.

ty

for

ment

fy all

n.

NCE

1 of

) 350

tour

o

on,

ple

ts

14 DES

DES

Location &

document:

S14.1

A. ODOT

The Depar

1. C

2. B

3. A

ou

4. C

5. V

B. Survey

All survey

Reduced p

include: po

available o

Monument

kind, by a

Profession

monument

All control

should reta

The DBT w

1.

2.

3.

4.

5.

6.

The contrac

supports an

Payment fo

Constructio

the Lump S

equipment,

SIGN AND

SIGN

& Design Spec

urvey

T Survey Resp

rtment survey c

enterline contr

eginning and e

At least two ben

ut)

ritical points su

Vertical clearan

y Responsibilit

data will be su

oint data, in co

oint number, x

on the ODOT C

tation will not

Registered Sur

al Engineers an

tation changes

l points, provid

ain the original

will provide th

. Copies of a

a. Date

b. Crew m

c. Weathe

d. Instrum

e. Raw ob

f. Other n

. Copies of a

project inclu

. Listing of a

. Listing of a

ties for reco

. All monum

. Short report

(State of Oh

all associate

ctor will furnish

nd furnish and m

r all items requ

on and Material

Sum payment fo

fuels, lubricati

D CONST

cial Provisions

ponsibilities:

crews have pro

rol and bench m

ending centerlin

nch marks for t

uch as P.C., P.

ces for the ove

ties:

ubmitted using

omma delimite

coordinate, y c

CADD web site

be disturbed. I

rveyor, with a c

nd Surveyors.

will be forwar

ded by ODOT,

l point number

e following ite

ll field notes (w

members

er conditions, i

ment(s) used (S

bservation field

notes as needed

ll Deeds, Plats

uding summar

all found monu

all monumentat

overy.

mentation will b

t indicating adj

hio). The Regi

ed adjustments

h, erect, mainta

maintain all fla

uired by the OM

l Specification

for Item 614, M

ing oils, softwa

TRUCTIO

s in addition to

ovided the nece

marks

ne points for th

the project (the

I., P.T., T.S., C

erhead structure

g ODOT’s stand

d ASCII text f

coordinate, ele

e.

If the Contracto

current registra

Costs associat

ded to the Dist

will be includ

s and coordina

ems prior to fin

written or elect

including temp

Serial Number)

d data

d

, Maps and oth

ies of all parol

mentation (Ho

tion set as part

be located utiliz

justment factor

istered Surveyo

s used.

Page 17

ain and subseq

aggers, watcher

MUTCD, the S

ns, the proposal

Maintaining Tra

are, hardware a

ON REQUI

o the Governing

essary survey re

he project

e datum used w

C.S.

es, to serve as

dard field code

format, will be

evation and poi

or does disturb

ation, recogniz

ted for this item

trict Real Estat

ed in the ASCI

ate values as as

nal acceptance

tronic) which w

perature, barom

her written evid

e evidence acq

orizontal and V

of the project

zing NAD 83 (

rs and methods

or (State of Oh

quently remove

rs and incident

Standard Const

l and this scope

affic and will in

and incidentals

IREMEN

g Regulations

equirements, li

was that by whi

a check for the

es and GEOPA

provided for a

int ID. Custom

b the monumen

zed by the Ohio

m will be borne

te Administrato

II file supplied

ssigned by ODO

of the Record-

will include the

metric pressure,

dence used to e

quired as a part

Vertical).

(Horizontal an

(Horizontal Da

s, signed and c

hio) will includ

e all flags, barr

tals related the

truction Drawi

e of services w

nclude all labo

s to perform th

NTS: LOCA

listed in sectio

isted below:

ich the project

e existing verti

AK’s standard m

all surveyed po

mized GEOPAK

ntation, then it w

o State Board o

e by the Contra

or.

d by the DBT to

OT.

-Drawing plans

e following inf

, etc.

establish point

t of the survey

nd Vertical) inc

ata), NAVD 88

certified by a R

de in the report

ricades, signs, s

reto.

ings, the

will be included

or, materials,

he required wor

ATION &

on 8.1 of this

was originally

ical clearances

mapping codes

oints. This data

K information i

will be replace

of Registration

actor. Copies

o ODOT. They

s:

formation:

s related to the

operation.

cluding referen

(Vertical Data

Registered Surv

t the datum use

sign

d in

rk.

&

y laid

s.

a will

is

ed, in-

n for

of all

y

e

nce

a).

veyor

ed and

V14.2

Th

to

on

H

ad

Th

A

pe

W

Sh

hy

de

ye

th

ap

P14.3

R

30

C

15

R14.4

H

th

W

G

Tr

A

fo

w

W

B

re

If

co

G

an

Vertical and

he horizontal a

o set up the lim

n these limits a

Horizontal align

djustments to th

he vertical alig

Any modificatio

erformed with

Work limits sho

hould the DBT

ydraulic openin

emonstrating th

ear storm even

he ODOT BDM

pproval.

Pavement:

Removed pavem

01 Bituminous

ourse, 407 Tac

5’-0” min App

Roadway:

Horizontal adjus

he DBT must b

Width: Paveme

Graded Shoulde

reated Shoulde

A minimum of t

orward ends of

will be required

Where Type TS

ridge Termina

equired Length

f required, Typ

orner of the pro

Guardrail face to

ny guardrail tra

Horizontal

and vertical alig

mits of disturban

and shall not be

nment shall be

he horizontal a

gnment shown

ons by the DBT

the following r

own will not be

T choose to rev

ng remains unc

he proposed re

nt. Should addi

M as well as the

ment and widen

s Aggregate Ba

ck Coat for Inte

roach Slabs ar

stments to the p

be approved by

ent 22’-0”

er: NO

er: NO

twenty five (25

f the structure a

in all areas wh

ST bridge rail

l Assembly, m

h of Need.

e T Anchor As

oject.

o face dimensi

ansitions will b

l Alignment

gnments shown

nce for the prop

e exceeded dur

maintained as

alignments prop

in the prelimin

T to the existin

restrictions:

e exceeded.

vise the existing

changed or they

evision does no

itional hydraul

e Location and

ning typical sha

ase, 407 Tack C

ermediate Cou

e required.

proposed align

the Engineer.

5) feet of full d

adjacent to the

here profile adj

l is used, guar

minimum of 12.

ssemblies will

on shall be, at

begin at the end

Page 18

t:

n in the attache

posed improve

ring the design

close to the pr

posed must be

nary plan has b

ng alignment sh

g profile they s

y shall provide

ot increase the u

ic calculations

d Design Manu

all consist of 6

Coat, 1.75” of 4

urse and 1.25” o

nment are not a

depth pavement

approach slab.

justment is in e

rdrail will be p

5-feet of MGS

be used in lieu

a minimum, th

d of the Bridge

ed preliminary

ements. Enviro

n/build phase of

reliminary cond

e approved by t

been set to allow

hown in the att

shall provide d

e additional hy

upstream wate

s be completed

ual and shall be

6” of 304 Aggr

448 Type 2 As

of 448 Type 1

anticipated. An

t replacement w

. Additionally

excess of six in

provided as fo

S and Anchor A

u of Type E An

he travelled wa

e Terminal Ass

y plans (Attach

onmental comm

f the project.

ditions as poss

the Engineer.

w for multiple

tached prelimin

documentation

ydraulics calcul

er surface eleva

they shall be i

e submitted to t

regate Base, 40

sphalt Concrete

Asphalt Concr

ny adjustments

will be perform

y, full depth pav

nches.

ollows:

Assembly Type

nchor Assembli

ay width plus 4

semblies.

ment B) were u

mitments are ba

ible. Any

bridge alterna

nary plans shal

that the propos

lations

ations during a

in accordance w

the Engineer fo

08 Prime Coat,

e Intermediate

rete Surface Co

s recommended

med on the rear

vement replace

e E to provide

ies at the south

4-feet on each s

used

ased

ates.

ll be

sed

100

with

or

, 4”

ourse.

d by

r and

ement

the

heast

side;

In

pu

D14.5

R

th

of

Pr

A

re

W

th

D14.6

Previously

Proposed m

accordance

The Consu

Consultant

In14.7

N

L14.8

D

F14.9

A

ow

A14.10

A

Su

15 DES

H15.1

Th

be

Th

w

E15.2

Bridge N

n all other cas

ublication “Gu

Drainage:

Roadside draina

he proposed str

f ditches with b

ractices (BMP)

Any adjustment

equirements of

Where existing

he new structur

Design Excep

y approved Des

mitigation of th

e with the OMU

ultant will advi

t will prepare a

nterchange

N/A

Landscape:

Disturbed areas

Fencing:

Any fence remo

wner.

Additional D

Any slopes steep

upplemental Sp

SIGN AND

Hydraulics:

he hydraulic op

eam elevation

he DBT will p

water surface el

Existing Stru

No.: HIG-T0

es, guardrail w

uidelines for Ge

Yes

age shall be ma

ructure. Roads

buried conduit

) according to

s to the existin

f the Location a

Storm outlet pi

re abutment wa

ptions:

sign Exception

he above Desig

UTCD and TE

se of any futur

all future design

Modificatio

Yes

shall be seeded

Yes N

oved or damage

Description o

per than 2:1 sh

pecification 86

D CONST

pening for the

of 952.2± (this

erform a hydra

evations during

uctures Iden

0144-0150

will be required

eometric Desig

No

aintained as exi

side ditches out

may be consid

Location and D

ng drainage sys

and Design Ma

ipes exit throug

alls.

ns: Degree o

gn Exception sh

EM, current edi

re design featur

n exceptions an

on/Justificat

No

d and mulched

No

ed during const

of Required

hall be reinforc

63. Slopes shal

TRUCTIO

structure will r

s elevation shal

aulic analysis t

g a 100 year st

ntification:

Over:

Page 19

d per ODOT L&

gn of Very Low

isting or adjust

tletting to exist

dered. Post-con

Design Manual

stem or installa

anual.

gh the existing

f Curve, K Val

hall include red

itions.

res that does no

nd submit to O

tions Studie

d per ODOT Ite

truction will be

d Work and

ed type soil slo

ll be no steeper

ON REQUI

remain the sam

ll be field verif

o assure that th

torm event. Se

Plum Run

&D Manual Vo

w-Volume Loc

ted accordingly

ting streams ar

nstruction stor

l are to be inve

ation of new dr

g abutment wal

lues, Stopping

duced Stopping

ot meet the min

ODOT for appr

es:

em 659.

e replaced in k

d Special Pro

opes using a ge

er than 1:1.

IREMEN

me and will be

fied by the DB

here is no incre

ee Section 10.4

olume 1 or the

cal Roads”

y to meet an al

re preferred, ho

rm water Best M

estigated and in

rainage structur

lls, they will be

Sight Dist. &

g Sight Distan

nimum design

roval.

kind and to the

ovisions

eogrid material

NTS: STRU

based on the e

BT).

ease in upstrea

4 for additional

Struct

File

AASHTO

ltered profile an

owever replace

Management

nstalled if requ

res will meet th

e incorporated

Superelevation

ce signage in

criteria. The

satisfaction of

l and per ODO

UCTURES

existing bottom

am and downstr

l information.

ture

No.: 363368

nd/or

ement

uired.

he

into

n Rate

f the

OT

S

m of

ream

83

D15.3th

Existing S

L

W

D

Ty

Sp

D

Alignmen

A

Pr

A

pe

Transvers

R

R

Fe

Si

All Shop D

The Depar

investigatio

information

Additiona

A. R

B. C

C. Th

D. Th

w

E. Th

st

F. Pr

pr

G. Su

Design and Che Governing R

Structure Data

ength:

Width o/o:

Design Loading

ype:

pans:

Date Built:

nt & Profile:

Alignment:

rofile:

A preliminary p

ertinent inform

se Sections:

Roadway Width

Railing: Type

ence:

idewalks:

Drawings will

rtment will not

on has been pe

n shall be the r

al Description

Remove existing

onstruct new s

a. New st

b. Multi-c

he superstructu

he new superst

wearing surface

he hydraulic op

teel stringer ele

rior to construc

roposed bridge

uperstructure

a. The sup

i.

ii.

iii.

ConstructioRegulations list

a:

Overall L

22.0’ ±

g: HS15

Single sp

1

1983

Existing

Existing

lan showing ap

mation has been

h: 28’-0” Fac

e: TST-1-99

Yes

Yes

comply with I

provide a foun

erformed and th

responsibility o

of Required W

g superstructur

substructures an

tructure will be

cell/span or Mu

ure shall have a

tructure shall b

of 60 pounds p

pening for the

evation of 952.

ction the DBT

e in accordance

perstructure sh

Prestressed C

specification

Steel Rolled

Slab Bridges

n Requiremted in section 8

Length 32’±

pan steel beam

Relocate

Relocate

pproximate wo

n included in A

ce to Face of R

No Heig

No Widt

Item 501.

ndation recomm

he report is inc

of the DBT and

Work and Spe

re and the subs

nd superstructu

e a single span

ulti-barrel culv

a 28’-0” clear r

be designed for

per square foo

structure will r

2± (this elevat

Consultant sha

e with the requi

hall consist of t

Concrete I-Bea

ns

d Beams

s

Page 20

ments of Stru8.1 of this docu

bridge on con

ed B

ed F

B

ork limits as we

Attachment B.

Railings

ht/Configuratio

th:

mendation, how

cluded in Attac

d considered in

ecial Provision

structures in ac

ures with the fo

verts or pipes ar

roadway width

r AASHTO LR

t (psf).

remain the sam

tion shall be fie

all provide a co

irements of sec

the following:

ams or Box Be

ucture: HIGument:

ncrete abutment

By ODOT

Feathered (Adju

By ODOT

ell as prelimina

Height:

on:

wever prelimin

chment C. Not

ncidental to thi

ns:

cordance with

following span

re not permitte

h, face to face o

RFD HL-93 Br

me and will be

eld verified by

ompleted (Seal

ction 900 of th

eams meeting A

G-T0144-01

t

By DBT (

ustment)

By DBT (

ary vertical alig

nary soil boring

te: collection o

is design effort

ODOT CMS. arrangement c

ed.

of rail.

ridge live loadi

based on the e

the DBT).

led) load rating

he ODOT BDM

AASHTO and

150, in addition

(Final)

(Final)

gnment and oth

gs and a subsur

f additional so

t.

criteria:

ing and future

existing bottom

g report for the

M.

ODOT

n to

her

rface

oils

m of

e

H. Su

I. A

D

J. Ty

w

re

K. A

re

A

to

N15.4

N

16 DES

CO

P16.1R

A

B

C

iv.

b. Deckin

compo

side dra

i.

ii.

c. Stay-in

d. Alterna

A123.

galvani

e. Bridge

Drawin

Assemb

92 shal

ubstructure

a. Abutm

b. All sub

c. All rein

d. All brid

e. Wingw

These w

f. Founda

i.

ii.

All exposed con

Design Manual.

ype B rock cha

width of the righ

emain in place,

An inorganic co

ecommendation

Amber Street, P

o the Highland

Noise Barrie

Not Applicable

SIGN AND

NTROL

Pavement MRegulations liste

A. Pavement M

Existing pav

. Raised Pave

. Delineators

Single span

ng for Prestress

site reinforced

ainage.

Prestressed C

deck in acco

Wood decks

n-place forms w

ates using struc

If shear stud m

izing. Addition

railing shall b

ng TST-1-99. A

blies installed.

ll be used with

ments shall be S

bstructure units

nforcing steel i

dge alternates s

walls will be co

walls will be p

ation type and

Spread footi

Integral or In

Where preca

be used if w

footings will

ncrete surfaces

annel protectio

ht-of-way from

place Type B

opolymer water

ns. Furnish the

Philadelphia, PA

County Engin

er

D CONST

Markings anded in section 8

Markings:

vement markin

ement Marker:

s: Yes

precast 3 or 4

sed Concrete I-

concrete havin

Concrete Box B

ordance with th

s with waterpro

will NOT be al

ctural steel will

mechanical con

nal galvanizing

e Twin Steel T

All 4 corners o

Stainless steel

TST-1-99 rail

emi-Integral o

s shall be reinfo

in the substruct

shall use elasto

onstructed as re

recast concrete

size is to be de

ings not socket

ntegral abutme

ast 3 or 4 sided

arranted by soi

l be armored w

shall be non-e

on with filter fa

m the normal w

RCP from end

rproofing admi

e admixture fro

A 19134, or by

eer.

TRUCTIO

d Delineator.1 of this docum

Yes No

ngs will be repl

: Yes

No

Page 21

sided concrete

-Beam, Steel R

ng a minimum

Beams alternat

he details show

oofing and asph

lowed.

l be hot dip gal

nnectors are sp

g requirements

Tube Rail (TST

of the bridge w

l drip strip in a

ing where requ

r Integral type

orced concrete

ture shall be ep

omeric bearing

equired to perfo

e or cast-in-pla

etermined by th

ted 3-inches int

ents are propos

d concrete struc

ils. When used

with Type A Ro

poxy sealed in

abric shall be in

water edge to th

d of existing ab

ixture shall be

om the followin

y manufacturer

ON REQUI

rs Special Pment:

laced per Item

No

Location:

Loca

Location:

structures

Rolled Beam, o

m slope of 3/16

te shall have a

wn in ODOT St

halt wearing su

lvanized. Galv

ecified, they sh

s are included i

T-1-99) in acco

will have Type

accordance with

uired.

e.

poxy coated.

gs at the substru

orm all work w

ace reinforced c

he DBT.

to rock will NO

sed.

ctures are used

d, the spread fo

ock Channel Pr

n accordance w

nstalled to appr

he abutment fac

butment walls t

added to the co

ng manufacture

r that can furnis

IREMEN

Provisions, i

642

Match existin

lines

ation:

or Slab Bridge a

inch per foot t

reinforced com

tandard Drawin

urfaces are NO

vanizing shall c

hall be installe

in Attachment

ordance with O

1 MGS Bridge

h ODOT Stand

ucture units.

within the exist

concrete type.

OT be permitte

d, spread footin

ootings, includi

rotection.

with the ODOT

roximately a 2

ces. Where exi

to the right of w

oncrete as per

er: IPA System

sh an admixtur

NTS: TRAF

in addition to th

ng centerline a

alternates shall

o allow for ove

mposite concre

ng PSBD-2-07

OT allowed.

comply with A

d prior to

G.

ODOT Standard

e Terminal

dard Drawing D

ting Right of W

ed where Semi

ngs, not on rock

ing wingwall

C&MS and B

:1 slope for the

sting abutment

way limits.

the manufactu

ms, Inc., 2745 N

re that is accep

FFIC

he Governing

and edge of lan

l be

er the

ete

.

ASTM

d

DS-1-

Way.

-

k, may

ridge

e full

ts

urer’s

North

ptable

ne

D

E

S16.2do

U

th

L16.3do

U

th

T16.4th

N

In16.5

N

17 PRO

Constructio

18 PLA

P18.1

All plans s

A. R

Th

in

B. B

C. C

D. L

Th

All flexible

design stand

and any und

D. Barrier Ref

All barrier r

walls, retain

reflectors sh

. Object Mar

All object m

igning Specocument:

Unless noted oth

he work require

Lighting Speocument:

Unless noted oth

he work require

Traffic Signahis document:

Not Applicable

ntelligent T

Not Applicable

OJECT SC

on and Materia

AN SUBM

Plan Compo

submitted by th

Real Estate Poli

he DBT will al

ncluding underg

ridge Design M

ADD Standard

ocation and De

he following s

1302.1

1307.2

1307.3

1307.4

1310.3

delineators sh

dards. Confirm

derground utili

flectors: Y

reflectors shall

ning walls and

hall be installed

rkers: Yes

markers will co

cial Provisio

herwise, all sig

ed and is to be

ecial Provisi

herwise, all lig

ed and is to be

als Special P

ransportati

CHEDUL

als Specificatio

MITTALS

nents:

he DBT will be

cies and Proce

lso identify all

ground utilities

Manual.

ds Manual

esign Manual,

ections of the L

3 Plan

Gen

Sub

Qua

Ear

hall conform to

mation that no c

ities shall be m

Yes No

l confirm to Ite

guardrail, in a

d on the side o

No

onform to Item

ons, in addition

gning on this pr

re-erected onc

ions, in additi

ghting on this p

re-erected onc

Provisions, i

ion Systems

LE REQUI

on 108.03 will

AND REV

e in conforman

edures Manual

topographic fe

s.

Volume 3:

Location and D

n Signatures

neral summary

bsummaries

antity Calculat

rthwork and Se

Page 22

Item 620 and

conflicts exist b

made prior to th

em 626 and sha

accordance with

of the blockout

630, Sign, Fla

n to the Govern

roject is only to

ce work is comp

ion to the Gove

project is only t

ce work is comp

in addition to t

s (ITS)

IREMENT

be met or exce

VIEW RE

ce with the fol

Section 3100.

eatures within

Design Manual

y sheet

tions

eeding Quantiti

Location:

shall be placed

between the pr

he installation o

all be placed on

h current desig

away from tra

at Sheet Sign

rning Regulatio

o be removed a

mplete.

erning Regulat

to be removed

mplete.

the Governing

TS

eeded.

EQUIREM

llowing ODOT

the existing an

l, Volume 3 are

ies

d in accordanc

roposed locatio

of the delineato

n bridge parape

gn standards. G

affic.

ons listed in sec

and stored if n

tions listed in s

and stored if n

Regulations li

MENTS

T manuals:

nd proposed Ri

e NOT require

e with current

ons of delineato

ors.

ets, concrete b

Guardrail block

ction 8.1 of thi

necessary to per

section 8.1 of th

necessary to pe

sted in Section

ight-Of-Way li

ed:

ors

arrier

kout

is

rform

his

erform

n 8.1of

imits,

Units of m

Simplified

Q18.2

The DBT w

Regulation

The DBT w

constructio

Unless stat

request for

In the even

preclude a

document,

plan. No t

or issue rev

In the even

scope of th

receipt of t

concerning

S18.3

Not Applic

M18.4

Not Applic

S18.5

For each B

Volume 3

Each Plan

The Depar

Holidays, S

Day and N

required Pr

Following

NOTED’ o

DBT will c

supporting

Plan Revie

below or T

ODOT

ODOT

ODOT

measure are NO

plans (section

Quality Cont

will be respons

ns listed in sect

will immediate

on manuals and

ted otherwise, r

r changes beyo

nt the Departm

meaningful re

the Departmen

ime extension

view comment

nt the DBT beli

he agreed work

the comments o

g the reasons w

tage 1 Plan

cable

Major Desig

cable

tage 2 Plan

Buildable Unit t

for review by O

Sheet will be c

rtment will hav

Saturdays, Sun

New Year’s Day

rogress Schedu

the review the

or ‘NOT ACCE

correct errors, i

g documents pr

ew Distribution

TIFF Images, a

T District LPA

T District Cons

T Central Offic

OT required.

n 1301.2) are N

trol:

sible for the pro

tion 8.1 of this

ely notify the D

d the Conceptu

review comme

nd the current

ent determines

view, or does n

nt will advise t

will be granted

ts as appropriat

ieves that any r

k, the DBT will

or orders, prov

why the DBT be

Review Sub

n Decision:

Review Sub

the Consultant

ODOT. All su

clearly marked

ve ten (10) Wor

ndays, Friday a

y) from receipt

ule.

e Department w

EPTED’ as des

incorporate ch

ior to submittin

n Table: The D

s noted below,

A

struction

ce of Local Pro

NOT allowed, e

ofessional qual

document, for

Department of a

ual Documents.

ents do not revi

contracted Sco

s that any requi

not adhere to th

the DBT of the

d as a result of

te.

review comme

l first contact th

vide written not

elieves the sco

bmission:

bmission:

t will submit St

ubmissions mus

d “Stage 2 – No

rk Days (the fo

after Thanksgiv

t to review com

will return to th

scribed in secti

anges, perform

ng construction

DBT will suppl

simultaneousl

ograms

Page 23

except as noted

lity, technical a

r all plan submi

any apparent d

.

ise the scope o

ope of Services

ired submission

he Governing R

e shortcomings

f such action. T

ent, or orders is

he Department

tice to the Dist

pe has been ch

tage 2 detailed

st be shown on

ot for Construc

ollowing are ex

ving Day, day b

mplete submiss

he DBT marked

ion 105.02 of th

m investigations

n plans.

ly the number o

ly to the parties

TIFF Imag

TIFF Imag

TIFF Imag

d in other sectio

accuracy and a

ittals required

discrepancy bet

or intent of the

s

n is incomplete

Regulations lis

s and direct the

The Departmen

ssued by the D

t for clarificatio

trict Project Ma

hanged.

d design plans a

n the required P

ction”.

xcluded as Wor

before Christm

sions. This revi

d plans noted ‘

he Constructio

s and make rel

of half size (11

s indicated bel

Number o

ges on Electron

ges on Electron

ges on Electron

ons of the Scop

adherence to th

under this con

tween the vario

project and do

e, contains ina

sted in section

e DBT to revise

nt will schedul

Department, req

on and will, w

anager and Pro

as per Location

Progress Sched

rk Days: State

mas Day, days b

iew time must

ACCEPTED’,

on and Materia

lated changes t

1" x 17") paper

low.

of half size Sets

nic Media [i.e.

nic Media [i.e.

nic Media [i.e.

pe of Services.

he Governing

ntract.

ous design and

o not constitute

ccuracies whic

8.1 of this

e and resubmit

le a review mee

quire a change

ithin 10 days o

oject Engineer

n & Design Ma

dule.

Holidays, Fed

between Christ

be shown on th

, ‘ACCEPTED

l Specification

to the plans and

r prints as indic

s

CD, DVD, etc

CD, DVD, etc

CD, DVD, etc

.

d

a

ch

the

eting

to the

of

anual,

deral

tmas

he

D AS

ns. The

d

cated

c]

c]

c]

ODOT

Highla

Each a

C18.6

After the re

the design

resolved in

Each plan

The ‘Appr

Physical co

on the Plan

the plan di

Plans Distr

TIFF Imag

ODO

ODO

ODO

ODO

ODO

Feder

ODO

High

Each

P18.7

Ohio Depa

650 Easter

Chillicothe

Attn: Matt

Dan B

Ohio Depa

Office of L

1980 West

Columbus,

Attn: Andr

Jeff P

Ohio Depa

Structural E

1980 West

Columbus,

Attn: Tim

Highland C

138 Bower

P.O. Box 2

Hillsboro,

Attn: P. D

T Central Offic

and County En

affected utility

Construction

eview commen

documentation

n writing by the

sheet will have

roved For Con

onstruction wil

n Distribution T

stribution is no

ribution Table

ges, as noted be

OT - District 9 P

OT - District 9 C

OT Central Offi

OT Central Offi

OT Central Offi

ral Highway A

OT Central Offi

land County E

affected utility

Plan Distribu

artment of Tran

rn Avenue, P.O

e, Ohio 45601

Hauck, Projec

Beasley, Const

artment of Tran

Local Programs

t Broad Street

, Ohio 43223

rea Stevenson,

Peyton, Local P

artment of Tran

Engineering

t Broad Street

, Ohio 43223

Keller, Admin

County Engine

rs Ave.

297

Ohio 45133

Dean Otworth P

ce of Structura

ngineer

y company

n Plans:

nts for the Stag

n, the DBT wil

e DBT to the s

e its last revise

nstruction’ pla

ll not begin unt

Table below. N

ot completed an

: The DBT wil

elow, of the eac

Project Manag

Construction

ice of Local Pr

ice, Division o

ice of Structura

Administration

ice, Division o

Engineer

y

ution Addre

nsportation, Di

O. Box 467

ct Manager

truction Admin

nsportation Cen

s

Administrator

Projects Coord

nsportation Cen

nistrator

eer

P.E., P.S. (Coun

l Engineering

ge 2 review sub

ll prepare plan

atisfaction of t

d date noted on

an set shall be

til the plans ma

No time extens

nd project dela

ll supply full si

ch plan submis

ger

rograms

f Construction

al Engineering

f Environment

esses:

strict 9

n.

ntral Office

r

dinator

ntral Office of

nty Engineer)

Page 24

TIFF Imag

TIFF Imag

bmission have b

sets for use du

the Department

n the sheet and

e signed, dated

arked ‘Approv

sions will be ap

ays occur as a r

ize (22" x 34")

ssion simultane

n Management

tal Services

Ohio

Divis

1980

Colu

Attn

Ohio

Offic

1980

Colu

Attn

Utilit

(As s

ges on Electron

ges on Electron

been complied

uring construct

t before the DB

d clearly marke

d and sealed b

ved For Constru

pproved by the

result.

) and/or half si

eously to the p

# of Full Se

1

o Department o

sion of Constru

0 West Broad S

umbus, Ohio 43

: Eric Kahlig

o Department o

ce of Environm

0 West Broad S

umbus, Ohio 43

: Tim Hill

ity Companies

shown in sectio

nic Media [i.e.

nic Media [i.e.

2

d with, and foll

tion. All review

BT submits the

ed ‘Approved

by a Profession

uction’ are deli

e District Cons

ize (11" x 17")

parties indicated

ets # of Half

3

2

0

Notify O

0

1

3

of Transportati

uction Manage

Street

3223

of Transportati

mental Services

Street

3223

on 12)

CD, DVD, etc

CD, DVD, etc

lowing approva

w comments wi

e construction p

d For Construct

nal Engineer.

ivered to each

truction Engin

) paper prints o

d below :

f Sets TI

Only

on Central Off

ement

on Central Off

s

c]

c]

al of

ill be

plans.

tion’.

party

neer if

or

FF

fice

fice

Page 25

19 BUILDABLE UNITS (BU)

Definition: Buildable Units are portions of the projects which can be designed, reviewed and built with only limited

controls and assumptions coming from the design of other portions of the project. Often a Buildable Unit will be

defined by a geographic area within the plan, but it may also be defined by types of work or construction stages

which may require or permit similar, nearby work to be divided into separate Buildable Units. All Buildable Units

will summarize the materials required to construct that portion of the project. The summary will include the

Construction and Material Specifications Item Number, and a description of the materials to be used.

General: The DBT may break the project work into two or more separate BU which can be progressed through

design and construction with minimal or known effect on each other and/or which can be dealt with sequentially

such that sufficient data is available for design and review of each BU. In order that the design and construction of

one BU may proceed without significant approved information from an associated BU, the DBT may develop and

propose assumptions which will allow for the first BU to proceed through design and/or construction. These

assumptions will be submitted for review and comment but their accuracy and effort upon the Stage 2 design are the

sole responsibility of the DBT. Should error in these assumptions result in additional work, remedial work or other

changes to assure an acceptable design or should they result in the need to remove work and substitute additional

work, the Contractor will be responsible for all such costs including, removal of unacceptable materials from the

site, modification, additional work, repairs, etc. as necessary to produce an acceptable result.

If the DBT elects to develop Buildable Units, the DBT will prepare, for review by the Department, a table of

Buildable Units for the project with each BU described in detail. If the table is approved, the DBT will modify the

Progress Schedule to show a separate group of activities for BU and these activities will encompass all of the design

and construction work in each BU. Work activities will be further separated in the Progress Schedule to show a

meaningful completion status (i.e. separate activities comprising the placement of a bridge deck on steel beams will

describe; shoring, form building, steel placement, placement of conduit & joints, pouring concrete, forming

parapets, pouring or slip forming parapets, provision of membranes, provision of wearing surfaces, curing, repair,

form removal, cleaning, etc.)

The Stage 2 Review Submission and construction plans will specifically be identified by the Buildable Unit code. If

the design of a BU requires input information from an adjacent or related BU, the source for that information in

previously approved plans will be cited or the DBT will provide an estimated value of the data. The input data will

also be carefully identified. In the same way any assumption, calculations or results from the stage and BU which

are used as input to another BU will be similarly identified, and where appropriate, compared back to that BU to

verify previous assumptions. Should assumptions not match values calculated later, the DBT will re-analyze all

affected components and determine appropriate changes. Should those elements have already been constructed; the

DBT will recommend repairs, adjustments, modifications or replacement of the existing work as necessary to

comply with the Scope of Work. All costs for re-design, re-submissions, modifications, removals, disposal of

materials and new work needed to remedy the project and bring it to compliance will be borne by the Contractor and

no time extensions will be approved for this.

Page 26

20 ATTACHMENTS

ATTACHMENT A – Location Map(s)

ATTACHMENT B – Preliminary Plan(s)

ATTACHMENT C – Preliminary Subsurface Investigation(s)

ATTACHMENT D – Design Exception(s) (if applicable)

ATTACHMENT E – Asbestos Inspection Report(s)

ATTACHMENT F – Airway/Highway Clearance Letter (if applicable)

ATTACHMENT G – Galvanizing Coating System for Structural Steel Bridges

ATTACHMENT H – Existing Plans and Photos