    Why do we need

    a Corridor Plan?

    INTRODUCTION1Across America, the commercial corridors we know today

    emerged from historic streetcar commercial districts and high-traffic commercial arterial streets. Typically linear in nature and

    oriented along one or more streets, these corridors often neglect

    adjacent neighborhoods and function as quick pass-through areasfor automobiles. In recent years, there has been a resurgence

    of planning to address common issues facing todays corridors

    as more and more studies show that careful management andbalancing of automobiles, land use and the entire transportation

    system including walking and biking is directly related to the

    long-term commercial vitality of these corridors.

    The Nicholson Corridor Plan integrates years of planningefforts along the Nicholson Corridor, recommends robusttransit options between Downtown and LSUs Campus,

    and supports connectivity for Baton Rouge. Previous areaplans have consistently depicted the future of NicholsonCorridor as a place transformed by new development,pedestrian-friendly amenities and new, multi-modaltransportation options. The Nicholson Corridor Planprovides a clear and meaningful path forward.

    The Plan will help Baton Rouge to attract and retain a critical

    mass of young, creative workers who prefer to drive less, walkmore and use public transit to arrive at nearby work, socialand cultural destinations. It addresses existing plans, public

    infrastructure investments and developments, describes the need

    for and benefits of a high-capacity transit system, and outlinesoptions and next steps.

    DRAFT RECOMMENDATIONS FOR A HIGH CAPACITY TRANSIT SYSTEM 1

  • 8/11/2019 Nicholson Corridor Plan

    6/38

    What is the role ofa high-capacitytransit system?A high-capacity transit system (HCTS) along

    the Nicholson Corridor will connect Louisiana

    State University (LSU) to Downtown and many

    public attractions, as well as provide muchneeded transportation options for residents and

    employees along the entire Corridor.

    HCTSs are typically found in areas with a higher

    density of housing units, jobs and commercial

    buildings similar to the those found along

    Nicholson Corridor. HCTS vehicles typically make

    fewer stops, travel at higher speeds, have more

    frequent service and carry more people than

    local-service transit such as typical bus lines. In

    some instances, HCTSs have an exclusive right

    of way or a combination of exclusive and non-

    exclusive right of way. HCTS options include light

    rail, bus rapid transit (BRT), modern streetcars, or

    standard buses.

    The Mode Alternatives section on Page 25

    discusses the HCTS options, including their

    benefits and challenges, in more detail.

    Proposed Route for High-Capacity Transit

    : INTRODUCTION

    NICHOLSON CORRIDOR PLAN JULY 2014 DRAFT2

  • 8/11/2019 Nicholson Corridor Plan

    7/38

    Visualization of Nicholson Corridor from FUTUREBRComprehensive Plan.

    Visualization of a new River District depicting Nicholson Streetlooking toward Garner.

    Visualization of a new River District depicting Nicholson Streettoward Garner, taken from the River District Master Plan.

    A high-capacity transit systemwould provide much needed

    transportation options forresidents and employees along

    the entire corridor.

    1: INTRODUCTI

    A high-capacity transit systemwould synthesize the momentum

    in Baton Rouge to create anattractive and well-designeddowntown corridor.

    DRAFT RECOMMENDATIONS FOR A HIGH CAPACITY TRANSIT SYSTEM 3

  • 8/11/2019 Nicholson Corridor Plan

    8/38

    Why is this plan,

    and high-capacity transit,important forBaton Rouge?A SOLUTION FOR CURRENT ANDFUTURE TRAFFIC CHALLENGES

    Currently, Nicholson Drive is a four-lane road

    carrying approximately 30,000 vehicles a day.There are no public transit options for those

    wishing to travel efficiently and quickly between

    LSU and the Capitol. Current bus routes utilize

    heavily congested Highland Road.

    Running north-south along the river, a HCTS

    between Tiger Stadium and the State Capitol

    two major Baton Rouge institutions will serve

    the surge of development that the Nicholson

    Corridor is experiencing along its 3-mile stretch

    running parallel to the Mississippi River. With

    more than 3,700 housing units and two million

    square feet of new commercial and office already

    planned and under construction along the

    proposed route, solutions are needed to address

    issues such as constrained road space and

    limited parking options.

    Long traffic delays indicate a need to increase the capacityto move peoplefrom place to place, not just their cars.

    Parking is at a premium downtown and on LSUs campus.

    The Nicholson Corridor HCTSwill be a major amenity for theCity-Parish and will play a rolein further stimulating economic

    development in this area byproviding new, comfortabletransportation options withoutadding more vehicles to the road

    The HCTS will provide more access to the existing bicycleand pedestrian facilities along the Mississippi River.

    : INTRODUCTION

    NICHOLSON CORRIDOR PLAN JULY 2014 DRAFT4

  • 8/11/2019 Nicholson Corridor Plan

    9/38

    SUPPORTS LSU, DOWNTOWN ANDTHE CITYS GROWING MOMENTUM

    Since the mid-1990s the Nicholson Corridor has

    had some of the most actively growing institution

    and uses in the region. LSU, the southern anchor

    of the Corridor, has 30,000 students and 6,500faculty and staff. In addition to being a center of

    employment for faculty, staff and service workers,

    the campus also hosts the popular Tiger Stadium

    (with an attendance capacity of over 100,000) as

    well as other major athletic facilities including

    the Pete Maravich Assembly Center, a 13,200-

    seat multi-purpose arena hosting LSUs Division I

    basketball, gymnastics and volleyball teams. Othe

    LSU athletic facilities include:Alex Box Stadium and Skip Bertman Field

    for the LSU baseball team (seats 10,000)

    Carl Maddox Field House - indoor facilities

    for the LSU track and field team (seats 3,000)

    Bernie Moore Track Stadium - outdoor facilities fo

    the LSU track and field team

    (seats 5,700)

    Downtown Baton Rouge, encompassing theState Capitol and State office and administrative

    buildings, has seen substantial investment since

    the adoption of Plan Baton Rougein 1998, and h

    steadily grown through civic improvements and

    development of new office, housing, restaurants

    and entertainment venues. Recent public

    investments in the area include:

    A Downtown Greenway comprised of parks,

    plazas and multi-use pathwaysA faade improvement program

    A new public library

    Complete Streets policy resulting in new sidewalk

    crosswalks, signalized intersections, and bike

    lanes

    Downtown Baton Rouge has a burgeoning entertainmentdistrict and nightlife on 3rd Street.

    Downtown is a center of civic life for the whole community,containing arts, theaters, public squares, museums, the new

    main library, and celebrations throughout the year.

    Tiger Stadium boasts an attendance capacity over 100,000.

    Effectively, this three-milestretch between the Capitoland LSU contains the mostimportant places in this region.

    1: INTRODUCTI

    DRAFT RECOMMENDATIONS FOR A HIGH CAPACITY TRANSIT SYSTEM 5

  • 8/11/2019 Nicholson Corridor Plan

    10/38

    Nicholson Drive Master Plan for the LSU Campus.

    The Onyx Residences, an apartment and condominiumproject under construction on Third Street in DowntownBaton Rouge, one block from a proposed transit stop.

    The proposed Van Buren Grocery store in the River Districtproject, near a transit stop on Nicholson Drive.

    SUPPORTS CORRIDORREVITALIZATION: PLANNED ANDPOTENTIAL DEVELOPMENT

    The proposed Nicholson Corridor transit

    system connects the dots between several of

    the citys major attractions. It passes through

    the central business district, surmounts the

    I-10 barrier, is adjacent to vibrant, historic

    neighborhoods to the east, and hugs the

    banks of the Mississippi to the west. All

    of these destinations provide a reason for

    movement along the Corridor people going

    to and from work, or out for a walk on the

    riverfront and an opportunity to stimulate

    private development along the proposedHCTS route due to increased pedestrian

    activity and attention to the area.

    Along with new housing and commercial/

    retail development thats already planned or

    under construction directly adjacent to the

    proposed route, theres also another 120 acres

    of nearby vacant or re-developable parcels

    which provide more attractive opportunities

    for private development, redevelopment and

    adaptive reuse.

    Within mile of the proposedtransit route, there are more thansix planned construction projects,

    expected to bring an estimatedtwo million square feet ofcommercial and office buildings,thousands of new jobs and 3,700new housing units to the area.

    : INTRODUCTION

    NICHOLSON CORRIDOR PLAN JULY 2014 DRAFT6

  • 8/11/2019 Nicholson Corridor Plan

    11/38

    NICHOLSON CORRIDOR TODAY2Nicholson CorridorExistingConditions

    POPULATION AND EMPLOYMENT

    The Nicholson Corridor is home to over 33,000

    jobs, of which 41% are in the public sector and

    26% in education. The Corridor is also hometo over 11,000 residents, with three quarters of

    those residents renting their homes. Over half

    the area residents are between the ages of 18

    and 39, and their median household income is

    $28,000, less than half the Baton Rouge Metro

    median of $65,000.

    This data characterizes the Nicholson Corridor a

    a community of young, lower-income residents

    who will greatly benefit from increased access to

    jobs, educational opportunities, and high-qualit

    affordable housing that will accommodate a

    range of household sizes and types. Given the

    makeup of the employment and resident base

    in the Corridor, the use of a high-capacity transit

    system is expected to be high.

    Employment within mile of theProposed HCTS Route

    Total: 33,359

    26%Education

    4%Hotel

    41%Public

    19%Office

    4%Retail

    6%Industrial

    Source: 2010 U.S. Census Block-level data for EastBaton Rouge Census tracts 24, 28.01, 51 and 52.

    Housing Tenure in the Corridor

    12%

    75%

    13%

    Rent

    Own with a mortgage

    Own free and clear

    Population by Age in the Corridor

    Total population: 11,043

    70+

    55-69

    40-54

    25-39

    18-24

    10-17

  • 8/11/2019 Nicholson Corridor Plan

    12/38

  • 8/11/2019 Nicholson Corridor Plan

    13/38

  • 8/11/2019 Nicholson Corridor Plan

    14/38

    Related Planning

    in the CorridorProviding a HCTS along the Nicholson Corridor

    implements the goals and principles of the numerouspast and current plans for this area. Two separate

    plans the FUTUREBR Strategic Implementation Plan

    and LSUs Nicholson Gateway Plan even include a

    high-capacity transit strategy to tie corridor assets

    together while addressing vehicle congestion and

    multi-modal access. The Corridor goals include:

    Create a more vibrant, commercially viable

    downtown, accessible via multiple modes of travel.

    Revitalize the edge of LSUs campus to transform itinto a University Gateway.

    Provide enhanced connections to nearby

    residential neighborhoods so they can thrive and

    realize their own community goals.

    Numerous plans have been completed for this area since 1998. They all support the kinds of improvements that a HCTS would bring.

    2. THE CORRIDOR TODAY

    NICHOLSON CORRIDOR PLAN JULY 2014 DRAFT10

  • 8/11/2019 Nicholson Corridor Plan

    15/38

    REGIONAL TRANSIT VISION

    It is important to consider local corridor transit

    in the context of a larger, high-capacity transit

    system that will connect Baton Rouge to other

    regionally significant locations and facilitate

    faster, more efficient and affordable movementof people, business and culture across the city,

    Parish and state.

    The Nicholson Corridor is an integral part of

    FUTUREBRs transit vision, which integrates

    three primary components a robust bus

    system based on multiple transit hubs, a HCTS

    from the State Capitol to the Mall of Louisiana,

    and a regional rail connection to New Orleans

    with one stop Downtown and one stop at the

    Mall of Louisiana.

    CATS BUS SYSTEM

    The Parish transit system, CATS, has recently

    implemented a revised bus route system based

    upon the recommendations in FUTUREBR.

    Several new transit hubs have been created,

    including one at the Town Square on North

    Boulevard and one at the Mall of Louisiana.

    These new routes are part of a service area

    expansion. Improvements include new express

    and limited-stop service, more frequent peak-hour service, reduced wait times, and improved

    on-time performance. In addition to routing,

    CATS is in the process of adding new buses,

    some with free WIFI, new shelters, signage,

    new performance metrics, and a bus-tracking

    system with an online trip planning tool. The

    bus system will have several lines that connect

    to the regional rail stops to New Orleans.

    REGIONAL PASSENGER RAILPlanning for the regional rail system has

    proceeded apace a coalition of Baton Rouge

    and New Orleans stakeholders is proceeding

    with a detailed study and a concrete proposal

    has emerged. Passenger rail services in the

    Baton RougeNew Orleans corridor would

    provide a safe and efficient transportation

    2. THE CORRIDOR TOD

    Proposed Passenger Rail Corridor and Station Locations

    Source: Baton Rouge New Orleans Intercity Rail Feasibility Study, FinalReport (March 2014) http://connect.cpex.org/files/2014/03/BR-NOLARail_StrategicBusinessPlan_FINAL_February2014.pdf

    DRAFT RECOMMENDATIONS FOR A HIGH CAPACITY TRANSIT SYSTEM 11

  • 8/11/2019 Nicholson Corridor Plan

    16/38

  • 8/11/2019 Nicholson Corridor Plan

    17/38

  • 8/11/2019 Nicholson Corridor Plan

    18/38

    HIGH-CAPACITY TRANSIT SYSTEMCONCEPT PLAN3High-Capacity TransitProposed AlignmentThe transportation goal for Nicholson Corridor is to

    provide an accessible, frequent and reliable transit

    solution that can carry many people quickly between

    the Capitol Park and LSU, with high-quality stations at

    convenient and logical waypoints in between. An effectivetransit solution will be one that improves transit ridership

    rates, contributes to a safe and vibrant pedestrian

    atmosphere, and stimulates continued revitalization of

    Baton Rouges central city, through public and private

    development in concert with the communitys vision.

    This proposed alignment for a high capacity transit system

    would send the transit route south along River Road.

    Such an alignment capitalizes on the citys investments in

    creating quality green and open spaces along the riverbanks. This route would also provide excellent riverfront

    access, and connections to the levee bike and pedestrian

    paths. Views of the river and I-110 bridge would visually

    reinforce the relationship between the city and the

    Mississippi River for residents, workers and visitors. This

    alignment is also compatible with the existing right of way

    beneath the I-110 overpass.

    This specific alignment is a proof of concept alignment.

    It shows that a HCTS, including a streetcar, could be built

    within the existing curbs of the streets in the alignment.

    More detailed studies will be necessary before a final

    alignment can be chosen.

    NICHOLSON CORRIDOR PLAN JULY 2014 DRAFT14

  • 8/11/2019 Nicholson Corridor Plan

    19/38

  • 8/11/2019 Nicholson Corridor Plan

    20/38

  • 8/11/2019 Nicholson Corridor Plan

    21/38

    Nicholson Drive today.

    Nicholson Drive near Magnolia Mound today.

    2. Chimes to Johnson

    Features one stop at Aster Street.

    3. CONCEPT PLA

    DRAFT RECOMMENDATIONS FOR A HIGH CAPACITY TRANSIT SYSTEM 17

  • 8/11/2019 Nicholson Corridor Plan

    22/38

    Cross section for Chimes to Johnson

    Streetcar in travel lanes

    ROW acquisition needed for stations

    Streetcar travels within existing 80 ROW and will exceed existing 80 ROW by 19 at station locations

    Cross section for Johnson to Garner: River District

    Wide median

    Exceeds existing 80 ROW by 31 through River District property

    New ROW is 111

    2. Chimes to Johnson Cross Sections

    3. CONCEPT PLAN

    NICHOLSON CORRIDOR PLAN JULY 2014 DRAFT18

  • 8/11/2019 Nicholson Corridor Plan

    23/38

  • 8/11/2019 Nicholson Corridor Plan

    24/38

  • 8/11/2019 Nicholson Corridor Plan

    25/38

  • 8/11/2019 Nicholson Corridor Plan

    26/38

  • 8/11/2019 Nicholson Corridor Plan

    27/38

    4th Street looking north today.

    7. River Road from NorthBoulevard to Government Street

    Features connections to RiverCenter and Old State Capitol.

    Cross section for River Road from NorthBoulevard to Government Street (southbound)

    Within 72 ROW

    (&)*"(,

    3. CONCEPT PLA

    DRAFT RECOMMENDATIONS FOR A HIGH CAPACITY TRANSIT SYSTEM 23

  • 8/11/2019 Nicholson Corridor Plan

    28/38

    St. Phillip Street looking south today.

    8. St. Phillip Street fromGovernment Street to SouthBoulevard (Southbound)

    Features connections from thedowntown business district, pastthe Belle of Baton Rouge towardthe Water Campus

    Cross section for St. Phillip Street (southbound)

    Within 52 ROW

    10

    3. CONCEPT PLAN

    NICHOLSON CORRIDOR PLAN JULY 2014 DRAFT24

  • 8/11/2019 Nicholson Corridor Plan

    29/38

    3. CONCEPT PLA

    High-Capacity Transit

    Mode AlternativesA Nicholson Corridor HCTS can take the form of

    a modern streetcar, corridor bus rapid transit, or

    high-frequency bus. Each option varies in terms of

    capital costs, operating costs, carrying capacity, and

    known ability to generate increased ridership rates

    and stimulate additional private investment in statio

    areas. Moving forward with implementation of this

    plan will require a more in-depth analysis of the cos

    and benefits of each alternative in order to design t

    transit solution that will be most effective in achievi

    community goals for the Nicholson Corridor.

    However, the general characteristics of each of the

    three options are outlined briefly below.

    MODERN STREETCAR

    Streetcars provide attractive short-trip urban

    circulation and help establish street life and public

    spaces. Service is frequent and stations may bespaced every 2-3 blocks up to1/2 mile and the

    streetcar serves as a pedestrian accelerator,

    facilitating trips that are part walking, part streetcar

    Since streetcars can more easily be mixed with cars

    bikes, buses, and pedestrians in a multi-modal stree

    they typically share the track lanes with other vehicl

    such as cars and buses. Similar to light rail, streetca

    attract choice riders (those who have ready acces

    to a car and are not transit dependent), a significanadvantage over rubber-tired alternatives. Streetcars

    are highly visible, have easily understood routes an

    the vehicles add to the areas vibrancy.

    In the case of the Nicholson Corridor, it is

    recommended that streetcar rails be placed in the

    Streetcars had a major role in shaping many cities in theperiod from 1890 to the late 1930s.

    Today many American cities are planning or building newstreetcar lines.

    A modern streetcar can handlemany more people than ahistoric trolley or standardbus, up to 92 passengers.

    In addition, it has modernamenities such as low-floor carsand air conditioning.

    DRAFT RECOMMENDATIONS FOR A HIGH CAPACITY TRANSIT SYSTEM 25

  • 8/11/2019 Nicholson Corridor Plan

    30/38

    3. CONCEPT PLAN

    roadway lanes rather than the median. This is

    common practice in major and mid-sized cities

    because the shared-lane placement can further

    enhance the corridor while improving access to

    streetcar stops and shelters.

    Advantages of Modern Streetcar

    Streetcars catalyze private development along

    routes because of the attention and foot traffic

    they draw to adjacent properties. Further, the

    modern streetcar proposed for the corridor

    does not require additional roadway, and can

    be constructed within the existing right-of-way,

    making it more financially feasible than othertransit alternatives.

    A streetcar would provide a visible and easy-

    to-understand route and a convenient, reliable,

    air conditioned ride. Streetcars are known to

    attract from 23% to 50% more riders than a

    bus, all other things being equal. In addition

    they attract development along their route,

    which has a very positive impact on ridership.

    Other benefits of a modern streetcar option for

    Nicholson Corridor include:

    Increases pedestrian activity

    Permanent streetcar lines make newdevelopment more secure than a bus line

    Attracts tourists and residents to transit

    Catalyzes infill development near rail lines

    Air-conditioned comfort for up to 90

    passengers

    Travel from LSU to State Capitol in 20

    minutes

    Challenges for Modern Streetcar

    Modern streetcar has the highest capital

    costs to construct out of the proposed high-

    capacity transit options. While its operational

    costs are comparable to Corridor BRT and

    lower than a high-frequency or standard bus,

    the need to lay tracks and install overhead

    guidewires in addition to high-quality stations

    is both more time and money intensive than

    the other alternatives.

    Lines similar to the concepts shown here carry 10,000 or more passengers a day.

    NICHOLSON CORRIDOR PLAN JULY 2014 DRAFT26

  • 8/11/2019 Nicholson Corridor Plan

    31/38

    CORRIDOR BUS RAPID TRANSIT

    Corridor bus rapid transit (BRT) is a relatively

    new technology that combines efficiency

    aspects of rail transit with the route flexibilityof buses. It can operate on exclusive transit

    ways, high occupancy vehicle (HOV) lanes,

    expressways, or ordinary streets. Compared to

    typical diesel bus transit systems, a BRT system

    offers potential advantages by combining

    priority transit lanes, alternative fuel technology,

    cleaner and quieter operation, rapid and

    convenient fare collection, and integration with

    land-use policy.

    Corridor BRT has lower capital costs than rail

    transit, including streetcar. The features that

    differentiate Corridor BRT from standard bus

    include innovative approaches to increasing

    frequency and decreasing traffic-related

    delays, as well as high quality, technologically

    advanced stations with numerous pedestrian

    amenities, expedited boarding, and digital wait-

    time displays. Enhanced bus often integrates

    a prominent visual brand with attractive bus

    design and comfortable seating to highlight

    it as a convenient, comfortable and efficient

    transit alternative. Because the line only travels

    up and down one corridor, route maps are

    simple and easily understood by riders.

    Advantages of Corridor BRT

    Innovative and modern bus designs are

    comfortable, air-conditioned, easy to board,and some hybrid or electrical vehicle models

    produce low or no emissions. Enhanced bus

    frequency can be between 10-12 minutes,

    with as little as 3-10 minute headways during

    peak traffic hours. Station-level boarding and

    off-board fare collection reduce boardingtimes, and bus priority at specially designed

    intersections allows lines to move efficiently

    up and down a corridor, even in heavy traffic.

    While standard bus schedules may be limited i

    off-peak hours or on weekends, enhanced bus

    maintains a frequent level of service from early

    morning to late night, including on weekends.

    Effectively, Corridor BRT offers many of the

    same features as a modern streetcar. The

    stations can offer equal amenities, innovation,

    and attractive design elements. Furthermore,

    Corridor BRT does not require installation of

    overhead guidewires or catenaries, reducing

    visual impact and potential conflicts with stree

    trees. In comparison to traditional BRT, which

    often has a dedicated lane, enhanced bus doe

    not require street widening or acquisition of

    additional right-of-way in most cases.

    Including have lower capital costs than streetc

    Corridor BRT is faster to construct and bring

    into operation than streetcar. Though the

    heavy investment in amenity-rich stations does

    3. CONCEPT PLA

    DRAFT RECOMMENDATIONS FOR A HIGH CAPACITY TRANSIT SYSTEM 27

  • 8/11/2019 Nicholson Corridor Plan

    32/38

    not make an Corridor BRT route immediately

    changeable or expandable, it is a relatively

    flexible infrastructure system when compared to

    any form of rail.

    Challenges for Corridor BRT

    Compared to traditional BRT or streetcar,

    corridor BRT does not provide the same level

    of consistency and predictability, as the lack of

    a dedicated lane leaves its schedule somewhat

    vulnerable to delays in heavy auto traffic.

    Capacity is also somewhat lower than traditional

    BRT vehiclesarticulated buses that can hold

    up to 200 passengers. Capacity for Corridor BRT

    a non-articulated vehicle will be closer to 50-

    100 passengers.

    Ridership levels also tend to be lower for

    Corridor BRT than streetcar. This phenomenon

    seems to be largely an effect of perception,

    but must be taken seriously into account

    nonetheless, considering the challenges

    presented by embarking on a campaign to alter

    local culture and attitudes surrounding ridershipof particular modes of transit.

    Though corridor BRT routes are considered to

    be fairly permanent infrastructure, they are not

    always seen by such as potential developers of

    properties adjacent to or in the near vicinity of

    the route. More substantial research is necessary

    to understand the development impacts of all

    transit modes, but initial findings indicate that

    the perception of lacking permanence detersdevelopers who might consider a streetcar or

    fixed rail transit a more stable indicator of local

    market growth and growth potential.

    HIGH-FREQUENCY BUS

    High-frequency bus service operates in mixed

    traffic and has shorter stop spacing. Increased

    efficiency of this service comes from intelligent

    system operations. Priority and preemption isused at intersections and real-time information

    is given at stops through the utilization of global

    positioning satellite (GPS) technology. Capacity

    is lower than with Corridor BRT or Streetcar.

    Without a high-capacity transit solution, traffic

    congestion will worsen, and bus service will be

    slowed and more severely delayed. Though

    there may be more people living, working

    and recreating in the Corridor, the lack of ahigh-capacity transit connection between LSU,

    Downtown and the Capitol will likely keep transit

    ridership levels low.

    NO BUILD ALTERNATIVE

    Although in the near future there is much

    planned development, potential development

    and redevelopment of vacant or underutilized

    land in the Corridor will be hindered by a lack

    of frequent, high-capacity transit because of the

    need to use larger portions of land for surface

    and/or structured parking. This will diminish

    returns on investment from both the private and

    public sectors.

    Additionally, new public investments and

    Downtowns amenities including the North

    Boulevard Town Square, Riverfront Park and

    pedestrian improvements will be disjointed.Residents and visitors will lack the ability to

    travel quickly and pleasantly between them. A

    high-capacity transit system capitalizes on the

    reality that the Nicholson Corridor as a whole is

    greater than the sum of its parts.

    3. CONCEPT PLAN

    NICHOLSON CORRIDOR PLAN JULY 2014 DRAFT28

  • 8/11/2019 Nicholson Corridor Plan

    33/38

    3. CONCEPT PLA

    High-Capacity Transit

    Funding SourcesThere are multiple private and public

    beneficiaries that can play a role in financially

    supporting implementation of a HCTS. Below isa list of local, state and federal funding sources

    with potential to integrate into a capital costs

    financing package for a HCTS.

    FUNDING SOURCE CRITERIAWhen evaluating potential funding tools, local

    stakeholders should keep in mind the following

    four funding criteria:

    Ease and Speed of Implementation: Canthe tool be used for HCTS financing without

    requiring legal or policy changes? If laws

    or policies must be changed, are these

    amendments likely to be major or minor, and is

    likely that they would be approved?

    Ease of Administration: Are existing

    administrative mechanisms and staff in place?

    Can the tool piggyback on some form of

    existing measurement or collection system?

    Predictability and Reliability of Revenue

    Stream:Does the tool generate an immediate,

    steady, and predictable revenue stream

    operating off an existing resource base? Is it

    dependent on future growth? To what degree is

    it subject to economic cycles?

    Order of Magnitude of Revenue

    Is the amount of revenue the tool can generate

    worth the political and administrative energy

    needed to set it up and maintain it over time?

    LOCAL FUNDING TOOLSTax Increment Financing (TIF) from Sales and

    Property taxes: TIF can come from increasedgeneration of property, sales, and hotel taxes

    via new developments within designated urban

    renewal districts. Annual tax increment collec-

    tions can be applied to 1) pay back TIF revenue

    bonds OR 2) used on a pay as you go basis.

    In addition, the state can inject up to $10 mil-

    lion into a TIF district from its portion of sales

    tax gains. The City/Parish has been successful

    with smaller TIF districts, and larger TIF district

    have been established in other Louisiana citiesSetting up a new TIF district often encounters

    political challenges but the Nicolson corridor

    brings together a significant number of benefit

    ing interests that approving an urban renewal

    district for TIF should be viable. The TIF district

    along the high capacity transit line would in-

    clude many tax-exempt uses (e.g. government

    and educational buildings), and the state provi

    sions for property tax abatements need to befactored into TIF revenues.

    Economic Improvement District (EID): EIDs

    help to fund capital costs for projects that

    provide a special benefit to the properties

    within the boundary of the EID. The EID

    formation allows the use of specified enhanced

    state sales tax for up to an additional 1% within

    a the EID boundary. EID could be blended with

    the TIF district to increase sales tax collectionsthat could be applied to high capacity transit.

    The additional sales tax could support bonds

    for high capacity transit capital improvements.

    The EID assessments become liens on the

    benefitted properties.

    DRAFT RECOMMENDATIONS FOR A HIGH CAPACITY TRANSIT SYSTEM 29

  • 8/11/2019 Nicholson Corridor Plan

    34/38

    While public institutions are not required to

    pay into an EID, it would be useful to explore

    securing participation by LSU since it would be

    a prime beneficiary of a high capacity transit sys-

    tem. Such a system creates a convenient trans-portation link to downtown that allows for stu-

    dent and faculty housing to be developed along

    the line while reducing reliance on cars to get to

    and from campus. It also links LSU faculty and

    researchers with business and policy opportuni-

    ties in downtown. And it can likely reduce the

    need for some very expensive structured park-

    ing garages that LSU may need to construct in

    the future. Possible sources for LSUs participa-

    tion in the EID could include: increased campusparking fees and/or student fees, as well as a 1%

    increase in sales tax from eligible LSU retailers.

    Increase Parking Revenue: Many cities use

    parking funds to help fund large mass transit

    projects because 1) transit can help balance utili-

    zation of parking garages along the high capac-

    ity transit line and 2) transit can help prevent

    the parking system from having to add as many

    structured parking facilities which then enables

    land dedicated for future parking structures to

    be used for a range of other, often taxable uses.

    There are several options to increase parking

    revenue within the high capacity transit cor-

    ridor, including increasing hourly rates for pub-

    licly owned parking garages and street meters,

    increasing hours of service or days of service

    (e.g. weekends), and increasing parking fines.

    LSUs potential participation via parking hasbeen cited above. Each of these options could

    be used to direct additional revenues to service

    tax-exempt bonds that pay for a portion of high

    capacity transit.

    Off-site Advertising: Allowing advertising in

    and on public assets such as benches, kiosks,

    and street signs can generate revenue for public

    purposes. Revenue generated can be flexibly

    deployed. These funds could be used for highcapacity transit capital or operating expenses.

    Many cities across the country and around the

    world have embraced this form of revenue

    generation. Revenue from off site advertising

    tends to be more sensitive to economic cycles

    and may not be sufficiently net lucrative or

    stable to provide ongoing revenue to support a

    large project.

    STATE FUNDING SOURCESNicholson Drive Transfer of Ownership: The

    City/Parish has been in discussions to transfer

    Nicholson Drive to City/Parish ownership

    and maintenance. Owning the roads gives

    the City/Parish more control over long-term

    planning for the corridor. With this transfer,

    the City/Parish gains a portion of future state

    maintenance dollars that can be applied to

    capital improvements. This could be significant

    one-time capital funding injection. The City/

    Parish would become responsible for ongoing

    Nicholson Drive maintenance costs, which are

    undetermined.

    Governors Rapid Response Fund: The

    Governors Rapid Response Fund is a

    permanent $10 million annual fund for economic

    development projects that benefit the state of

    Louisiana by providing new jobs and capitalinvestments. The Nicholson high capacity transit

    project could qualify because it provides more

    efficient transportation connections between

    job generators such as LSU, downtown, the

    proposed new IBM and Exxon buildings, and

    the proposed Water Research Campus. The

    3. CONCEPT PLAN

    NICHOLSON CORRIDOR PLAN JULY 2014 DRAFT30

  • 8/11/2019 Nicholson Corridor Plan

    35/38

    City/Parish would need to get private and public

    players on board to create a united front to make

    he case to the Governor.

    State Unclaimed Property Fund: This fund consistsof unclaimed cash, stocks, bonds, securities,

    nsurance benefits, and other property. The fund

    appears to have flexibility to fund a range of

    economic and redevelopment efforts. This is likely

    a very competitive fund source, but the City/Parish

    high capacity transit system project appears well

    positioned to make a strong case for tapping into it.

    Transportation Infrastructure Model for

    Economic Development (TIMED): Fundedby states $.04 additional gas tax, this fund has

    nvested in numerous corridors that offer economic

    development benefits. Most corridors funded have

    been between cities covering larger distances

    han the proposed Nicholson high capacity transit

    ystem. The City/Parish needs to learn whether

    new corridor projects will be allowed and if so, how

    o best position high capacity transit system for

    uccess.

    FEDERAL FUNDING SOURCES

    Department of Transportation

    Transportation Investment Generating Economic

    Recovery (TIGER) Discretionary Grant Program

    Capital Grant). : These funds come from a direct

    earmark of federal funds procured by congressional

    delegation. There is $600 million available for FY

    2014, and each project requires a local match. Many

    of the local and state funding sources identified

    above could address the local match requirements.

    The selection process for these grants is highly

    competitive. Many cities have used the National

    nfrastructure Investment Program to help with

    imilar corridor improvements.

    Federal Transit Administration

    Small Starts/New Starts Programs: These

    programs award grants for capital costs associate

    with new fixed guideway systems, extensions,

    and bus corridor improvements. The Small Startsprogram funds projects with a total project cost o

    no more than $250 million. The New Starts progr

    funds projects with total costs larger than $250

    million, and requires a 20% local match requirem

    (higher matches are encouraged). These funds

    have helped many cities with similar corridor

    improvements. The total allocation in 2014 was $

    billion in the United States. There are new criteria

    project approval aimed at economic developmen

    and land use, as well as traditional measures oftransportation cost-effectiveness.

    Surface Transportation Program: These program

    award grants for capital costs associated with

    new fixed guideway systems, extensions, and bus

    corridor improvements. The Small Starts program

    funds projects with a total project cost of no mor

    than $250 million. The New Starts program funds

    projects with total costs larger than $250 million,and requires a 20% local match requirement (high

    matches are encouraged). These funds have help

    many cities with similar corridor improvements. T

    total allocation in 2014 was $2 billion in the Unite

    States. There are new criteria for project approva

    aimed at economic development and land use, a

    well as traditional measures of transportation cos

    effectiveness.

    Federal Highway Administration

    Congestion Mitigation and Air Quality (CMAQ

    Funds: CMAQ funds go to projects that improve

    air quality and reduce congestion in ozone non-

    attainment and abatement parishes. The City/

    Parishs non-attainment status may make it more

    3. CONCEPT PLA

    DRAFT RECOMMENDATIONS FOR A HIGH CAPACITY TRANSIT SYSTEM 31

  • 8/11/2019 Nicholson Corridor Plan

    36/38

    competitive for these funds. The 2014 allocation

    for Louisiana is $11 million.

    Economic Development Administration

    (EDA) Fund allocation: These up-front grants

    fund projects that support the implementationof regional economic development strategies

    designed to create jobs, leverage private

    capital, and encourage economic development.

    The 2014 allocation for Louisiana is up to

    $500,000. A high capacity transit line linking

    education, research, and employment centers

    should be a good candidate for EDA funds.

    HUD Section 108: The City/Parish gets $4

    million per year in Community Development

    Block Grant (CDBG) funds, which translates to

    $20 million in Section 108 low-interest loans for

    eligible projects. The City/Parish would need to

    designate loan repayment source(s) for these

    funds, such as EID assessments and parking

    revenue from City/Parish and LSU. A key benefit

    of Section 108 in the recent past has been the

    very low interest rates (often under 1%).

    Federal business energy tax credit: As of

    January 2013, businesses can receive a credit

    equal to 30% of total costs for solar energy

    projects that use solar energy to generate

    electricity, to heat or cool a structure, or to

    provide solar process heat. These tax credits

    function as an effective grant for the project. The

    City/Parish could take an innovative approach

    and consider using solar panels at high capacity

    transit stops to provide electricity for real-time

    schedule information and lights. Any excess

    energy could be directed to power the high

    capacity transit system.

    OPERATING COSTS ALTERNATIVESFarebox recovery : Many corridor transit lines

    have a set fare, which can cover a portion of

    overall operating costs.

    Bulk user agreements: Private businessesand institutions pre-pay for a set number of

    riders, usually at a discount. The high capacity

    transit system operation benefits from up front

    cash payments. The City/Parish, state, and LSU

    could use these agreements to generate more

    ridership and provide benefits to employees

    and students.

    Off-site advertising: Allowing advertising inand on public benches, kiosks, and street signs

    can generate revenue for public purposes.

    Sponsorships: These funds include private and

    public sponsorship of high capacity transit stops

    and sometimes the transit vehicles themselves.

    Transit agency funds:Transit agency operating

    funds, as available, could be used to support the

    high capacity transit system.

    LSU operation transfer: LSU could redirect

    existing funds that it currently uses for

    operations on its route linking its campus

    to downtown (Downtown-Vet Trail ) to high

    capacity transit operations.

    Transient room tax increase: A small increase

    on the hotel room tax could help supportoperations if hotels within the general use

    boundary of the transit system find their users

    will directly benefit from proximity to it. Hotels

    guests could benefit from prepaid tickets, which

    could be worked into the operations agreement

    tied to the hotel tax increase.

    3. CONCEPT PLAN

    NICHOLSON CORRIDOR PLAN JULY 2014 DRAFT32

  • 8/11/2019 Nicholson Corridor Plan

    37/38

    Project

    DevelopmentFollowing this Plan, the City-Parish will movento project development which will provide the

    necessary details to get the project ready for

    construction. The next steps in this phase include:

    DEVELOP & IMPLEMENT PUBLICENGAGEMENT STRATEGYPublic input will continue to play a key role in

    he design and implementation of high-capacityransit in the Corridor. The transit system needs to

    upport residents and workers, as well as enhance

    he existing character of adjacent neighborhoods.

    Local community members are most knowledgeable

    about the assets and opportunities in the Corridor

    and how high-capacity transit can be integrated to

    upport them. Public engagement will include a

    ange of engagement activities, such as workshops,

    open houses, online participation opportunities,and design charettes.

    DETERMINE PROJECT PARTNERSThe City-Parish has received significant support

    or the Nicholson Corridor HCTS Plan from key

    agencies, organizations, businesses and legislators.

    Some combination of these individuals and

    agencies, in additional to community members

    and stakeholder groups, will collaborate to move

    orward with planning and implementation.

    CONDUCT ALTERNATIVES ANALYSISAn alternatives analysis will compare the costs and

    benefits of different modes and alignments for a

    HCTS in the Corridor. Criteria will be determined

    by community members and project partners, an

    feasibility of implementation. Alternatives analysi

    will also take into consideration ridership andrevenue forecasts that will be modeled by planne

    and transportation engineers.

    DEVELOP A FINANCE PACKAGEProject partners will select a combination of the

    funding options-as described in the previous

    section- that will best meet need for both capital

    and operational costs. Criteria for selecting fundi

    options include: ease and speed of implementati

    ease of administration, predictability and reliabiliof revenue stream, and order of magnitude of

    revenue.

    MAKE FINAL PROJECT DECISIONA final decision to move forward or not with

    a HCTS will be made based on public input, the

    alternatives analysis and available financing.

    PREPARE DESIGN AND 30%ENGINEERING PLANSIf a decision to move forward with high capacity

    transit is made, a team of experts will collaborate

    to develop a more detailed design including

    streetscape, stop location and layout, and vehicle

    transit interface features will be developed into

    the initial phase of construction planning.

    DEVELOP AN OPERATIONS ANDMAINTENANCE PLANThe operations and maintenance plan will establi

    which entity will operate and maintain the high

    capacity transit system.

    NEXT STEPS44. NEXT STEPS

    DRAFT RECOMMENDATIONS FOR A HIGH CAPACITY TRANSIT SYSTEM 33