A

A

REPORT ON

THE CONSTRUCTION

OF

NEW CANTEENIN

PULCHOWK CAMPUS PREMISES

SUBMITTED TO:

RAJ KUMAR YADAV

LECTURER OF ENGLISH

PULCHOWK CAMPUS, LALITPURSUBMITTED BY:

SANGITA NEPAL

O67/BEX/434

SUBMISSION DATE: THURSDAY, JANUARY 10, 2013

PREFACEIn these days Institute of Engineering lacks the canteen. And the previous canteen building was also not organized and there was not sufficient space for students. Due to this reason the students are suffering a lot of problems for food. They have to go to hotels outside the campus during lunch time for food. Taking this issue Deans office of IOE has forwarded the construction of new canteen in pulchowk campus premises.

For the construction of the canteen, it is necessary to design and research the building properly and assign a good contractor for the construction. Due to this reason this report is prepared that carries all the necessary details that are required for the construction of canteen.TABLE OF CONTENTS

AcknowledgementAbstract

Page no1. Introduction 1 2. Analysis 2 the need of canteen

3. Equipments required 34. Structural requirement 35. Management section 46. Cost estimate 57. Conclusion 68. Recommendation 69. Appendix 7ACKNOWLEDGEMENTI express my gratitude to the Dean of the pulchowk campus who helped me greatly while preparing this report. Without his help it would have been very difficult for me to prepare this report.

I am also grateful to Mr. Hariram Sahi, director of Hariram builders, who is responsible for the construction of this project. I am thankful to Mr. Shree Budathoki, director of Shree consultancy for their technical and moral support.I am grateful to KSA consultancy for providing my team members with the logic and the necessary equipment without which the project would be more difficult.

Lately I would like to thank to my team members for their support on this report preparation.

ABSTRACTThe main objective of this report is to provide the proper information of the construction of Canteen in pulchowk campus. This project is of great importance so as to facilitate the students studying in the campus.Pulchowk campus is one of the most reputed colleges in Nepal. Students all over Nepal who have a dream of being a great enginner have a wish to study in pulchowk campus. And the students do great labour to come to pulchowk campus. So in order to fulfill the requirement of the students it is necessary to build a canteen so that it can accommodate all the students and provide better facility of food. So keeping this in mind the Deans office has forwarded the construction process.

The construction of the canteen will provide students with facility of proper food and water. The canteen will have sufficient benches so that it can accommodate nearly 350 students at a time. This construction may approximately require around 2,29,50,000 providing all facility for the comfort of students.INTRODUCTION

Construction of canteen in pulchowk campus premises is at initial phase. But after the completion of this it will provide facilities for all the students of the campus with better food and proper drinking water. And the students who come to the campus for better education will not have to search hotels around the campus for their lunch. This project is also important for campus reputation. After the construction of the canteen, the students will have better and fresh food to eat daily which will not effect their health. The food outside the college cannot be trusted completely and may cause health problems to the students. The contruction of canteen will remove this problem that may affect the students education. And the students will also feel proud of the canteen facilitiy that the college has provided. This will definitely increase e the glory of pulchowk campus. And also the canteen inside the college will provide food at an affordable rate that can cover all level of students in the campus.

ANALYSISThe need of canteen In Nepal, the people are being more aware about the importance of education. And all the parents would want their children to have a better education so that they can do better in their future and give contribution to their nation. Also the students do hard labor so that they can be a respectful citizen of the nation. So education is an important part in any country. In Nepal people from rural areas where there is no facility of higher education, students come to the city areas for their education. And thus it is necessary for the colleges to have a better facility of canteen so that the students can have better and fresh food. Today most of the food on hotels is not so fresh and this may affect the health of students severely. A healty citizen build a healthy nation. Unfresh food can create a lot of health problems and may cause food poisoning. So food is very important part of life. The canteen will also provide facilities for the staff of the campus to have better food so they do not have to search other places.Keeping this in mind , the Deans office of the IOE has forwarded the process of construction of the canteen in pulchowk campus premises. The canteen to be constructed will be managed by a team. The canteen will accommodate most of the students in the campus at a time.EQUIPMENTS REQUIRED

We need to construct the modern infrastructure. The contractor should construct building using following equipments:

1) Steel and Plyboard frame work2) Mechanical concrete mixture

3) Tdippel

4) Reinforcement cutting blades

5) Mechanical and structural testing labs

6) Crane towersSTRUCTURAL REQUIREMENTThe structure of canteen building should support earthquake of upto 8 rectar scale. So keeping this in mind the structural requirement can be:

1. Cement used C22 ordinary grade cement

2. Deformed and old twisted steel bars

3. Tolerance of bar 0.50mm-1 mm

4. Size of bars maximum of 28 mm

5. Size of bars minimum of 8mm for stirrups and 12mm for stabs.

6. the steel bars used shall fulfill the following reqirement ISO: 1556-1967, 9001-2000

MANAGEMENT SECTIONThe construction company that is assigned the project should choose the management having the following requirement:

A structural engineer

The manager for design and construction team must have a masters degree in least for the construction management

Chief engineer with masters degree

Cleaning staffs

An accountant with at least bachelors degree

Construction staffs that are experienced and also medical staffs

Among the above mentioned members the manager will be the head. Under the guidance of the manager the structural engineer, chief engineer, chief of staffs and accountant will work. He will guide them through all the works and throughout the completion of the project. The chief of staffs will guide the cleaning staffs and medical staffs. The construction staffs will also work under the guidance of the chief staff. The cleaning staffs will have to make the construction site clean and the medical staff have to take care of any kind of injury that may occur during the construction of the building.

COST ESTIMATEThe estimation of the cost for the completion of the project is given as below. The management section are to complete the construction within 9 months. COST(Rs)n I. Structural design charges 500000/-II. Transportation 100000/-III. Construction materials Ready mix concrete 500000/- Steel Rod 4000000/- Form work 1000000/- Cement , sand and brick 3000000/-IV. Monthly wages

Manager 800000/- Structural engineer 500000/- Chief engineer 550000/- Chief of staffs 200000/- Accountant 100000/- Cleaning and construction staffs 900000/- Medical staff 400000/-V. Desks and benches 1000000/-VI. Miscellaneous 10000000/- Total 22950000/-CONCLUSION The construction of new canteen in the college is a must. The construction should start as soon as possible and should be completed within given time. The construction of the building should only be given to A grade constructors who will be capable of providing above mentioned facilities and equipments.RECOMMENDATIONS The contractor should be selected in such a way that he/she must have past experience of constructing such building.

The contractor should be able to handle all the above requirement and the materials he uses should be ensured to be of high quality.

They should have at least 6 structural engineers, 150 labourers, 25 overseer, 15 cleaning staffs and 10 medical staffs.

They should have 15 civil engineers, 8 mechanical and at least 3 electrical engineers in their project.

The project should be ensured that it is completed in time and they have to keep this in mind.

APPENDIX

Table 1.

TOLERANCE

nominalsizebars upto 25mm

for bar above 25mmTolerance

(mm) 0.40

0.8Margin total(mm)0.9

1.4

Table 2type of steel

constituents in percent

carbonsulphur phosphorous

mild steel0.3000.0800.050

high tensile 0.800.0630.06

hard drawn-0.080.08