12
Monday 23 to Sunday 29 March 2020 Line Select the line for more info Day(s) affected Special Train Notices (STN) Mobile devices must be connected via VPN Bussing View timetable WD WE No trackwork scheduled Weekend STN 0586 Weekend STN 0586 Weekend STN 0586 Monday Wednesday Weekend STN 1305 STN 0490 STN 0586 Weekend STN 0586 Monday – Tuesday Weekend STN 0594 STN 0586 No trackwork scheduled Weekend STN 0586 Weekend STN 0586 Weekend STN 0586 Weekend STN 0586 Weekend STN 0586 Wednesday STN 0801 Monday – Thursday Monday & Tuesday Weekend STN 0658 STN 0594 STN 0586 No trackwork scheduled Trackwork Bussing Map Special Events extract Key: Next week’s trackwork Feedback form Click to view the bus timetable Scope of work: Configuration 04 Bus timetable is not available Please use this guide to advise Sydney Metro, Sydney Trains and NSW TrainLink Intercity customers of trackwork affecting their journey. Please make this guide available to all staff at your location. Easy access alternate transport Staff should contact ROC Customer & Information on 7 7039 if alternate transport is required for customers requiring easy access transport when travelling through areas affected by trackwork.

Monday 23 to Sunday 29 March 2020 - Transport for NSW€¦ · 200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Monday 23 to Sunday 29 March 2020 - Transport for NSW€¦ · 200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork

Monday 23 to Sunday 29 March 2020 Line Select the line for more info Day(s) affected Special Train Notices (STN)

Mobile devices must be connected via VPN

Bussing View timetable

WD WE

No trackwork scheduled

Weekend STN 0586

Weekend STN 0586

Weekend STN 0586

Monday Wednesday Weekend

STN 1305 STN 0490 STN 0586

Weekend STN 0586

Monday – Tuesday Weekend

STN 0594 STN 0586

No trackwork scheduled

Weekend STN 0586

Weekend STN 0586

Weekend STN 0586

Weekend STN 0586

Weekend STN 0586

Wednesday STN 0801

Monday – Thursday Monday & Tuesday Weekend

STN 0658 STN 0594 STN 0586

No trackwork scheduled

Trackwork Bussing Map Special Events extract Key: Next week’s trackwork Feedback form Click to view the bus timetable

Scope of work: Configuration 04 Bus timetable is not available

Please use this guide to advise Sydney Metro, Sydney Trains and NSW TrainLink Intercity customers of trackwork affecting their journey. Please make this guide available to all staff at your location.

Easy access alternate transport Staff should contact ROC Customer & Information on 7 7039 if alternate transport is required for customers requiring easy access transport when travelling through areas affected by trackwork.

Page 2: Monday 23 to Sunday 29 March 2020 - Transport for NSW€¦ · 200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork

200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork Information Team Ph: 57 038

Trackwork Altered transport arrangements Sydney Metro, Sydney Trains and NSW TrainLink Intercity services Monday 23 to Sunday 29 March

00:50 Saturday 28 to 02:00 Monday 30 March Reference: STN 0586 Work: Configuration 4 • Trains run in one direction only, from Central first stop Town Hall.• Some City Circle trains run to a changed timetable and leave from different platforms.• You may need to change trains at Central to continue your journey.• If you are travelling from Circular Quay to Wynyard you can catch the light rail.

Home

00:50 Saturday 28 to 02:00 Monday 30 March Reference: STN 0586 Work: Configuration 4 • Trains may run to a changed timetable due to trackwork between Lidcombe and Central.

• From 23:20 Saturday until 06:30 Sunday, trains run between Hornsby and Wynyard only.• City Circle trains run in one direction only, from Wynyard, first stop Circular Quay.• From 23:20 Saturday until 04:00 Sunday, buses replace all trains between Central and Strathfield

or Lidcombe. Bus routes Bus routes were unavailable at time of publication

Home

00:50 Saturday 28 to 02:00 Monday 30 March Reference: STN 0586 Work: Configuration 4 • All weekend, Richmond trains run between Richmond and Lidcombe, then continue to Olympic

Park. Please change at Parramatta if you are travelling to or from the City.

• On Saturday, the 03:45 and 03:58 Penrith to the City services will be replaced by buses fromLidcombe to Strathfield. 107B 139A from Lidcombe trains continue to Olympic Park

• From 23:20 Saturday until 04:00 Sunday, buses replace all trains between Lidcombe and Central.• Trains run between Penrith and Lidcombe, then continue to Olympic Park.• Please change at Lidcombe for express and all-stations buses towards the City. Buses do not leave

from Olympic Park. 825V first UP train in to Oly Pk

• On Sunday from 04:00 until 06:30, Penrith trains start and end at Central, platforms 1-12. If youare travelling to T1 North Shore Line stations please change at Central for a City Circle train toWynyard.

Bus routes Bus routes were unavailable at time of publication

Home

Page 3: Monday 23 to Sunday 29 March 2020 - Transport for NSW€¦ · 200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork

200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork Information Team Ph: 57 038

Monday 23 March Reference: STN 1305 Work: Central - Ashfield From 21:40 until 02:00 • Buses replace the all-stations Homebush trains from Central to Ashfield, in that direction only.• Homebush trains from the City continue to run, stopping Redfern, then express to Ashfield,

Croydon, Burwood, Strathfield, Homebush then Olympic Park.• Trains towards the City start from Olympic Park, then run as normal from Homebush to the City.Bus routes51T2 Central, Newtown, Summer Hill, then all stations to Ashfield (one direction only)52T2 Central, then all stations to Ashfield (except Macdonaldtown – one direction only)55T2 Macdonaldtown, then Redfern and return

Wednesday 25 March Reference: STN 0490 Work: Strathfield - Ashfield From 23:00 until 01:30 • Buses replace the all-stations Homebush trains between Strathfield and Ashfield.• Trains run between Ashfield and the City to the normal timetable.• Leppington trains will not stop at Ashfield but will make an extra stop at Homebush.• T1 Western Line Penrith trains also make an extra stop at Homebush.Bus route43T2 Strathfield, then all stations to Ashfield and return

00:50 Saturday 28 to 02:00 Monday 30 March Reference: STN 0586 Work: Configuration 4 • Buses replace the all-stations Homebush trains between Strathfield and Central.• Trains between Leppington and the City via Granville make an extra stop at Homebush and do not

stop at Ashfield.

• On Saturday, the 03:33 Leppington to the City via Granville service will be replaced by bus fromLidcombe to Strathfield. 13-A

• From 23:20 Saturday until 04:00 Sunday, buses replace all trains between Lidcombe and Central.• Trains run between Leppington and Lidcombe, then continue to Olympic Park.• Please change at Lidcombe for express and all-stations buses towards the City. Buses do not leave

from Olympic Park. 716N first UP train in to Oly Pk• On Sunday from 04:00 until 06:30, Leppington trains start and end at Central, platforms 1-12.Bus routes50T2 Lewisham, Petersham, Stanmore then Central and return 53T2 Strathfield, then all stations to Summer Hill, then Newtown, Central and return 54T2 Strathfield, then all stations to Central (except Macdonaldtown) and return 55T2 Macdonaldtown, then Redfern and return (minibus)

Suggested Station Announcements Good morning/afternoon/evening customers, Due to trackwork this weekend, buses replace all stations Homebush trains between Strathfield and Central. Check the station trackwork poster, use one of our apps or plan your trip at transportnsw.info to see how these changes affect you.

Home

00:50 Saturday 28 to 02:00 Monday 30 March Reference: STN 0586 Work: Configuration 4 • Trains may run to a changed timetable due to trackwork between Sydenham and Central.Trains between Sydenham and Central run to a changed timetable due to trackwork on the Illawarra local lines.Additional T8 services also operate via the Up Illawarra Main Line between Sydenham and Erskineville.

Home

Page 4: Monday 23 to Sunday 29 March 2020 - Transport for NSW€¦ · 200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork

200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork Information Team Ph: 57 038

Monday 23 and Tuesday 24 March Reference: STN 0594 Work: Waterfall/Cronulla - Sydenham • From 21:50 until 02:00, buses replace trains from Cronulla and Waterfall to Sydenham.• Trains run to a changed timetable from Sydenham to Bondi Junction.• The last train leaves Cronulla at 21:33, arriving Bondi Junction at 22:42. 607J

• From 21:30 until 23:30, buses replace trains from Hurstville to Cronulla and Waterfall.• Trains run to a changed timetable from Bondi Junction to Mortdale.• From 23:30 until 02:00, buses replace trains from Sydenham to Cronulla and Waterfall.• Trains run to a changed timetable from Bondi Junction to Sydenham.• The last train leaves Bondi Junction at 20:45, arriving Cronulla at 21:53. 618K611R first down train to terminate at Hurstville 21:34601K first down train to terminate at Sydenham 22:28615S the first up train busses 21:54 x Waterfall, starts from Sydenham at 22:36Bus routes42T4 Cronulla, then all stations to Sutherland, then Hurstville and return 67T4 Waterfall, then all stations to Hurstville and return 74T4 Hurstville, Kogarah, Rockdale, Sydenham and return 75T4 Waterfall, Hurstville, Wolli Creek, Tempe, Sydenham and return 76T4 Cronulla then all stations to Sutherland, Hurstville, Sydenham and return 87T4 Hurstville, then all stations to Sydenham and return

00:50 Saturday 28 to 02:00 Monday 30 March Reference: STN 0586 Work: Configuration 4 • Trains may run to a changed timetable due to trackwork between Sydenham and Central.

Home

Saturday 28 to Sunday 29 March Reference: STN 0586 Work: Configuration 4 • From 23:20 Saturday until 04:00 Sunday, trains run to a changed timetable between Olympic

Park, Lidcombe and Penrith or Leppington.

Home

00:50 Saturday 28 to 02:00 Monday 30 March Reference: STN 0586 Work: Configuration 4 • Trains run to a changed timetable and stopping pattern.• Revesby trains run between Revesby and Central, platform 23, via the Airport.• Most Macarthur trains towards the City run to the City Circle via Sydenham. If you are travelling

to Airport stations please change trains at Revesby.• Trains from the City Circle run to Macarthur via the Airport.• Some morning and evening Macarthur trains start and end at Central, platform 23, and run via the

Airport.• City Circle trains run in one direction only, from Central first stop Town Hall.

Home

Page 5: Monday 23 to Sunday 29 March 2020 - Transport for NSW€¦ · 200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork

200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork Information Team Ph: 57 038

00:50 Saturday 28 to 02:00 Monday 30 March Reference: STN 0586 Work: Confirmation 4 • Trains may run to a changed timetable due to trackwork between Strathfield and Central.

• From 23:20 Saturday until 04:00 Sunday, trains run between Hornsby and Strathfield only.• Buses replace all trains between Strathfield and Central. 802T first UP train to terminate at Strathfiel

• On Sunday from 04:00 until 06:30, trains start and end at Central, platforms 1-12. If you aretravelling to T1 North Shore Line stations please change at Central for a City Circle train toWynyard.

Bus routes Bus routes were unavailable at time of publication

Home

Until further notice • Due to infrastructure damage caused by bushfires, buses continue to replace trains between

Bathurst, Lithgow and Mount Victoria.• Some trains continue to run between Bathurst and Lithgow, and between Bathurst and Central, to a

changed timetable.• Other trains may also be affected.

00:50 Saturday 28 to 02:00 Monday 30 March Reference: STN 0586 Work: Configuration 4 • Trains may run to a changed timetable due to trackwork between Lidcombe and Central.

• On Saturday, the 04:24 Central to Mount Victoria service will be replaced by bus from Central toLidcombe. This train will run from Lidcombe to Mount Victoria to the normal timetable. W517

• From 22:30 Saturday until 04:00 Sunday, buses replace trains between Lidcombe and Central.• Trains run between Mount Victoria and Lidcombe only, some to a changed timetable.W582 first UP train to terminate at Lidcombe 22:24. W586, W590Down trains affected W595, W597, W099,Bus routesBus routes were unavailable at time of publication

Home

00:50 Saturday 28 to 02:00 Monday 30 March Reference: STN 0586 Work: Configuration 4 • Trains may run to a changed timetable due to trackwork between Strathfield and Central.

• From 23:45 Saturday until 04:00 Sunday, trains run to a changed timetable via the T1 North ShoreLine, making extra stops at Chatswood, North Sydney, Wynyard and Town Hall. 200H first DOWNtrain affected, 217N, 240B

• T9 Northern Line trains run between Hornsby and Strathfield only. 243H only UP train affected• Buses replace all trains between Strathfield and Central.Bus routes50T2 Lewisham, Petersham, Stanmore then Central and return 53T2 Strathfield, then all stations to Summer Hill, then Newtown, Central and return 54T2 Strathfield, then all stations to Central (except Macdonaldtown) and return 55T2 Macdonaldtown, then Redfern and return (minibus)

Home

Page 6: Monday 23 to Sunday 29 March 2020 - Transport for NSW€¦ · 200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork

200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork Information Team Ph: 57 038

Wednesday 25 March Reference: STN 0801 Work: Maitland - Muswellbrook • Buses replace the following trains between Maitland and Muswellbrook:

- 08:14 Newcastle Interchange to Muswellbrook. V625- 10:09 Muswellbrook to Newcastle Interchange. V638

• Trains run to the normal timetable between Newcastle Interchange and Maitland.Bus routes10HU Muswellbrook, then Singleton, Maitland and return15HU Muswellbrook, then all stations to Maitland and return

Home

03:00 Monday 23 to 23:00 Thursday 26 March Reference: STN 0658 Work: Bomaderry - Kiama • Buses replace trains between Bomaderry and Kiama.• Most trains run to the normal timetable between Kiama and Central.Bus route1SC Bomaderry, then all stations to Kiama and return

Monday 23 and Tuesday 24 March Reference: STN 0594 Work: Thirroul - Central Nightly from 21:20 until 01:30 • Buses replace trains between Central and Thirroul.• Trains run between South Coast Line stations and Thirroul only.• Express buses also run between Wollongong, North Wollongong and Central.• At Austinmer and Thirroul, some trains towards Wollongong leave from platform 1, not platform 2.C191 is the first down train to be bussed from Central at 21:23, starts at Thirroul at 22:39C382 is the first UP train to terminate at Thirroul 21:28Bus routes35SC Thirroul, all stations Stanwell Park, Helensburgh Town Centre, Waterfall, Sutherland, then

Central and return 36SC Thirroul, express to Sutherland, then Central and return 48SC Otford, Helensburgh Town Centre, Helensburgh and return (shuttle) 50SC Wollongong, North Wollongong, Central and return

Work: Configuration 4 Saturday 28 and Sunday 29 March Reference: STN 0586 Saturday 28 March From 08:00 until 16:00 • At Bulli, Woonona, Bellambi and Corrimal, trains towards Wollongong leave from platform 1, not

platform 2.

Sunday 29 March From 08:00 until 16:00 • At Corrimal, Towradgi, Fairy Meadow and North Wollongong, trains towards Wollongong leave from

platform 1, not platform 2.

Home

Page 7: Monday 23 to Sunday 29 March 2020 - Transport for NSW€¦ · 200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork

200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork Information Team Ph: 57 038

Special Events extract Updated Special Event details can be accessed on the Sydney Trains intranet

Page 8: Monday 23 to Sunday 29 March 2020 - Transport for NSW€¦ · 200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork

200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork Information Team Ph: 57 038

Page 9: Monday 23 to Sunday 29 March 2020 - Transport for NSW€¦ · 200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork

200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork Information Team Ph: 57 038

Page 10: Monday 23 to Sunday 29 March 2020 - Transport for NSW€¦ · 200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork

200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork Information Team Ph: 57 038

Weekend scope of work: Configuration 4

This weekend a combination of capital works programs, major periodic and routine maintenance will take place. Some of the work scheduled is as follows:

- Sydney Metro Sydenham Junction stage works - Platform Reconstruction works at Redfern - Train Stop Renewal at various locations - Turnout Removal stage works at Strathfield - Turnout Removal of 606A/B points at Homebush - Rerailing at Croydon, Ashfield - Rail and Turnout Grinding - Plain Track and Turnout Resurfacing - Overhead wiring, signal and track inspections and other preventative maintenance - Corridor Presentation: vegetation maintenance and graffiti removal at various locations

Home

Page 11: Monday 23 to Sunday 29 March 2020 - Transport for NSW€¦ · 200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork

200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork Information Team Ph: 57 038

Next week’s trackwork Sydney Metro, Sydney Trains and NSW TrainLink Intercity services Monday 30 March to Sunday 5 April

Monday 30 March to Thursday 2 April Nightly from 22:00 until 01:30 • Some trains run to a changed timetable due to trackwork between Strathfield and Central.

Monday 30 March to Thursday 2 April Nightly from 22:00 until 01:30 • Trains run to a changed timetable with most making extra stops between Ashfield and

Macdonaldtown.

Monday 30 March to Thursday 2 April Nightly from 21:45 until 01:30 • The all-stations Homebush trains will not run. Saturday 4 April From 05:00 until 09:00 • Leppington trains will not stop at Ashfield.

Tuesday 31 March and Wednesday 1 April Nightly from 23:50 until 01:30

• Some trains run to a changed timetable between Richmond and Granville, and between Granville and Leppington only.

Sunday 5 April From 05:30 until 09:00

• Some trains run to a changed timetable between Richmond and Granville, and between Granville and Leppington only.

Monday 30 March to Thursday 2 April Nightly from 22:00 until 01:30 • Trains run to a changed timetable with most making extra stops between Ashfield and

Macdonaldtown. Saturday 4 April From 05:00 until 09:00 • Trains make an extra stop at Ashfield.

04:00 Tuesday 31 March to 07:00 Friday 3 April • Buses replace trains between Scone and Maitland. Tuesday 31 March and Wednesday 1 April Nightly from 19:30 until 04:30 • Buses replace trains between Scone, Telarah and Newcastle Interchange.

Sunday 5 April From 08:00 until 16:00 • At Helensburgh and Otford, trains towards Wollongong leave from platform 1, not platform 2.

Home

Page 12: Monday 23 to Sunday 29 March 2020 - Transport for NSW€¦ · 200323 Trackwork Reference Guide 23 - 29 March Current as of Wednesday, March 18, 2020 Produced by the CIU Trackwork

Feedback form Please use this internal feedback form to advise of any issues in regards to trackwork information advertised internally to staff or externally to our Sydney Metro, Sydney Trains and NSW TrainLink Intercity customers.

Feedback is sought in regards to trackwork signage, Special Train Notices (STN), website information, customer train or bus timetables or alternative transport arrangements.

The purpose of this trackwork debrief is to improve the service we provide to our customers during future track possessions. All staff are encouraged to complete this form when required.

Station/location: ________________________ Date: ________________________

Your name: ______________________________ Phone number: _______________

Feedback Please provide as much information as possible: - what went well, what didn't, how this affected our customers or how you feel we could improve- include STN, bus route number, bus company, trackwork poster/signage details or URL details

Please add additional pages if required.

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

Please scan and email the completed feedback form to [email protected]