Page 1: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

MIDDLETOWN STATION CHARRETTEWORK-IN-PROGRESS PRESENTATION

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 2: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

Station Context

Plan the Keystone is a study to identify infrastructure investments for the Keystone stations and their surrounding areas with the goal of enhancing the transit service and strengthening the communities served by the Keystone Line. This effort is being done in close collaboration with municipalities along the Keystone Line.

Why improve the Middletown Station?

FY Ridership

2004 24,257

2005 29,047

2006 33,340

2007 39,319

2008 51,149

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 3: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

What are we designing?To select a station, each location must have a schematic station plan that can be used to develop cost information and measure the potential impacts and benefits in the area surrounding the station. The plans will show access, parking, pedestrian circulation, platform locations, and potential sidewalk and streetscape improvements outside the station itself.

Purpose of the Charrette

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 4: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

Charrette Process

Drawn for The Washington Post, 1988, by Roger K. Lewis, FAIA,

Professor, U. Maryland School of Architecture

What do you value in a train station?

Free and ample parkingAccess and mobility options Safety and security Access for Penn State Harrisburg studentsEase of accessEconomic development Good designHandicap accessWayfinding“Green”

What things do you want at or near the train station?Post officeRestaurant/bar/coffee shopRestroomAdvertising/business directories/bus and taxi informationADA complianceTransportation links: HIA, downtown, Penn StateLighting and safetyMulti-purpose facility (offices, meeting space, performance facility)BakeryLottery machineDrycleanersFree parkingLighted/visible/accessible emergency call boxesMultimodal connections: bus, taxis/ bicycle routes, sidewalksCovered bicycle parkingPosted train schedule and directions for using the trainReal time schedule clockContext-sensitive and history-sensitive station designTicket kioskOverflow parking Bike lockersMinimize carbon footprint

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 5: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

Station Architecture

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 6: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

• There is widespread support for keeping the Middletown Station within Middletown Borough.

• It is important that the station serve both regional and local customers by incorporating free parking and allowing direct pedestrian access from adjacent neighborhoods.

• Station should have 500’ center platform or two side platforms.

• Any station location should leverage redevelopment in the surrounding community.

• There is support for an Ann Street location, since it supports the redevelopment of the AP Green property and serves PSU-Harrisburg, HIA, and downtown Middletown.

What We’ve HeardGeneral Comments

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 7: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

What We’ve HeardProposed HIA Location

Design Challenges

• Accommodation of existing railroad infrastructure in and around station

• Station has been designed previously to sufficient level

• Future connection to potential transit-oriented development north of Route 230

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 8: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

5 & 10-Minute Drive from StationProposed HIA Location

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 9: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

HIA Station Context

Airport Multi-modal Center

Linden Center

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 10: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

HIA Station Overview

Station Building and

Access to Platforms

Elevated Pedestrian Walkway Access to Station

RelocatedNS Alignment

Potential Development

Station Parking

Linden Center Redevelopment

Airport Multi-modal Center

StormwaterManagement

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 11: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

HIA Station Plan ViewFuture Development Plan Station Only Plan

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 12: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

HIA Station SummaryIssue Design Response

Platform type Two Side Platforms

Railroad pedestrian crossing Overpass

Parking configuration Surface lot

Number of spaces 115

Distance from parking to platform 200 feetMobility options Auto

CAT BusTaxi

Community access HIAVisibility/natural surveillance

PlatformParking lot

From stationFrom Rte 230

Land requirements Linden Center (partial)

Rail infrastructure issues Norfolk Southern rail relocation

Roadway infrastructure issues Rte 230 alignmentRte 230 pedestrian overpass

Development potential Lot 29 and Linden CenterJuly 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 13: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

What We’ve HeardLot 29 Location

Design Challenges

• Accommodation of existing railroad infrastructure in and around station

• Avoidance of key airport infrastructure (electric substation on south side of rail

• Access to and from Route 230• Future connection to potential transit-oriented development north of Route 230

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 14: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

5 & 10-Minute Drive from StationLot 29 Location

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 15: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

Lot 29 Context

Existing Tunnel Under 230 and

Railroad

Airport Electric Substation

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 16: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

Lot 29 OverviewExisting Tunnel Under 230 and

Railroad

Airport Electric Substation

Station Building and

Access to Platforms

Station Parking

RelocatedNS Alignment

Potential Development

StormwaterManagement

Potential Development

Potential Development

MiddletownHome

Existing Residential

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 17: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

Lot 29 Plan ViewFuture Development Plan Station Only Plan

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 18: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

Lot 29 Station SummaryIssue Design Response

Platform type Two Side Platforms

Railroad pedestrian crossing Underpass

Parking configuration Surface lot

Number of spaces 140

Distance from parking to platform 400 feetMobility options Auto

CAT BusHIA Shuttle

Community access PSU-HHIA

Visibility/natural surveillancePlatformParking lot

From Route 230From access road

Land requirements Lot 29 (partial)

Rail infrastructure issues Norfolk Southern Relocation

Roadway infrastructure issues Route 230 alignmentRoute 230 pedestrian underpass

Development potential Lot 29 and Linden CenterJuly 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 19: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

What We’ve HeardAnn Street Location

Design Challenges

• Accommodation of existing railroad infrastructure in and around station, including M&H

• Efficient access and parking• Integration with proposed adjacent development

• Connection of station to downtown Middletown and Penn State - Harrisburg

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 20: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

5 & 10-Minute Drive from StationAnn Street Location

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 21: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

Ann Street Station Context

AP Green Site

Route 230

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 22: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

Ann Street Station Overview

HotelSite

New Traffic Signal at Emaus Street

Extension

Shopping Center

Expansion

Station Parking (Top Level of Structure)

Station Building

M&H Yard Relocation

Sidewalk Improvements

Elevated Pedestrian Walkway Access to Station

Maintain NS Alignment

Connection to PS-H

Airport Shuttle Route

Route 230

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 23: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

Ann Street Plan View

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 24: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

Ann Street Plan View

An

n S

treet

Station Building

Station Parking(Top level of deck at Main Street Level)

Entries to Station Parking

Elevated Pedestrian Walkway Access to Station

Station Platform

Relocated M&H Yard

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 25: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

Ann St. Station SummaryIssue Design Response

Platform type Single Center Platform

Railroad pedestrian crossing Overpass

Parking configuration Parking deck

Number of spaces 115+

Distance from parking to platform 250 feetMobility options Auto

Bike/PedCAT BusHIA Shuttle

Community access NeighborhoodsDowntownPSU-HHIA

Visibility/natural surveillancePlatformParking lot

From station (partial)From Route 230

Land requirements AP Green site (partial)

Rail infrastructure issues Amtrak rail relocationM&H rail relocation

Development potential AP Green siteJuly 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 26: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

What We’ve HeardExisting Location

Design Challenges

• Provision of sufficient amount of parking to allow growth in ridership

• Access from parking area• Accommodation of existing railroad infrastructure in and around station, including rework of bridge to allow station platform

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 27: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

5 & 10-Minute Drive from StationExisting Location

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 28: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

Existing Station Context

Existing Station Parking

Existing Station Platform

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 29: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

Existing Station Overview ‘A’

Potential Development

Station Parking

Station Building and

Access to Platforms

New Bridge Structure (Platform

Only)

Interlock to WB Track

Maintain NS Alignment

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 30: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

Existing Station Overview ‘B’

Potential Development

Station Parking

Station Building and

Access to Platforms

New Bridge Structure (WB Track

and Platform)

Maintain NS Alignment

Shift WB Track

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 31: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

Existing Station Plan View

July 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 32: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

Existing Station SummaryIssue Design Response

Platform type Two side platforms

Railroad pedestrian crossing Underpass

Parking configuration Surface lot

Number of spaces 104

Distance from parking to platform 150 feetMobility options Auto

Bike/PedCAT Bus

Community access NeighborhoodsDowntown

Visibility/natural surveillancePlatformParking lot

From station (partial)From Mill St

Land requirements Moose Lodge

Rail infrastructure issues Amtrak relocationSwatara Creek bridgeUnion Street underpass

Development potential Next to stationExisting downtown businessesJuly 30, 2009 Middletown Charrette Work-in-Progress Presentation

Page 33: MIDDLETOWN STATION CHARRETTE WORK-IN ... - Work in...2009/07/30  · July 30, 2009 Middletown Charrette Work-in-Progress Presentation Charrette Process Drawn for The Washington Post,

MIDDLETOWN STATION CHARRETTEWORK-IN-PROGRESS PRESENTATION

July 30, 2009 Middletown Charrette Work-in-Progress Presentation