42
www.siemens.com/drives Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual Edition 05/2020 Tests carried out on drives This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28

Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

  • Upload
    others

  • View
    3

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

www.siemens.com/drives

Medium-Voltage Drive

SINAMICS SM150Type 6SL38107

Reference Manual

Edition 05/2020

Tests carried out on drivesThis documentation pertains to

SM150 luftgekühltG20 F03 F72 F79 F76 F28

Page 2: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

18.05.2020 13:33V9.00

Page 3: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

Medium-Voltage Drive

SINAMICS SM150Type 6SL38107

Reference Manual

This documentation pertains toSM150 luftgekühlt

G20 F03 F72 F79 F76 F28

Edition 05/2020

Introduction 1

General scope of services 2

Tests 3

Page 4: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

Legal informationWarning notice system

This manual contains notices you have to observe in order to ensure your personal safety, as well as to prevent damage to property. The notices referring to your personal safety are highlighted in the manual by a safety alert symbol, notices referring only to property damage have no safety alert symbol. These notices shown below are graded according to the degree of danger.

DANGERindicates that death or severe personal injury will result if proper precautions are not taken.

WARNINGindicates that death or severe personal injury may result if proper precautions are not taken.

CAUTIONindicates that minor personal injury can result if proper precautions are not taken.

NOTICEindicates that property damage can result if proper precautions are not taken.If more than one degree of danger is present, the warning notice representing the highest degree of danger will be used. A notice warning of injury to persons with a safety alert symbol may also include a warning relating to property damage.

Qualified PersonnelThe product/system described in this documentation may be operated only by personnel qualified for the specific task in accordance with the relevant documentation, in particular its warning notices and safety instructions. Qualified personnel are those who, based on their training and experience, are capable of identifying risks and avoiding potential hazards when working with these products/systems.

Proper use of Siemens productsNote the following:

WARNINGSiemens products may only be used for the applications described in the catalog and in the relevant technical documentation. If products and components from other manufacturers are used, these must be recommended or approved by Siemens. Proper transport, storage, installation, assembly, commissioning, operation and maintenance are required to ensure that the products operate safely and without any problems. The permissible ambient conditions must be complied with. The information in the relevant documentation must be observed.

TrademarksAll names identified by ® are registered trademarks of Siemens AG. The remaining trademarks in this publication may be trademarks whose use by third parties for their own purposes could violate the rights of the owner.

Disclaimer of LiabilityWe have reviewed the contents of this publication to ensure consistency with the hardware and software described. Since variance cannot be precluded entirely, we cannot guarantee full consistency. However, the information in this publication is reviewed regularly and any necessary corrections are included in subsequent editions.

Siemens AGLarge Drives ApplicationsVogelweiherstr. 1-1590441 NÜRNBERGGERMANY

Document order number: 8888888888-000088Ⓟ 05/2020 Subject to change

Copyright © Siemens AG 2020.All rights reserved

Page 5: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

Table of contents

1 Introduction...................................................................................................................................................7

2 General scope of services ............................................................................................................................9

2.1 Routine test ............................................................................................................................11

2.2 Visual inspection ....................................................................................................................12

2.3 Function tests.........................................................................................................................13

2.4 Insulation test .........................................................................................................................14

2.5 Interface test ..........................................................................................................................15

3 Tests...........................................................................................................................................................17

3.1 Visual inspection ....................................................................................................................183.1.1 Rating plate ............................................................................................................................183.1.2 Housing degree of protection .................................................................................................183.1.3 Electrical cabinet components ...............................................................................................193.1.4 Cable installation....................................................................................................................193.1.5 Cable markings ......................................................................................................................203.1.6 Setting values of circuit breakers, if used...............................................................................203.1.7 Dimensions ............................................................................................................................20

3.2 Function test...........................................................................................................................223.2.1 Auxiliary voltages ...................................................................................................................223.2.2 Temperature monitoring in the control cabinet.......................................................................223.2.3 Door limit switches .................................................................................................................233.2.4 Door interlocking system........................................................................................................233.2.5 Ground fault monitoring..........................................................................................................243.2.6 DC link pre-charging and undervoltage monitoring................................................................243.2.7 Actual value sensing of the DC link voltage ...........................................................................253.2.8 Output current measurement .................................................................................................253.2.9 Overvoltage monitoring in the DC link....................................................................................263.2.10 Failure of a power semiconductor module .............................................................................263.2.11 Safety shutdown.....................................................................................................................27

3.3 Cooling system test................................................................................................................283.3.1 Air flow direction.....................................................................................................................283.3.2 Fan failure .............................................................................................................................28

3.4 Insulation test .........................................................................................................................293.4.1 High-voltage test ....................................................................................................................293.4.2 Measuring the insulation resistance.......................................................................................30

3.5 Interface test ..........................................................................................................................313.5.1 PROFIBUS communication....................................................................................................313.5.2 Signals to the customer's system...........................................................................................313.5.3 Additional interfaces...............................................................................................................32

3.6 Additional optional tests .........................................................................................................333.6.1 Noise measurement without load...........................................................................................33

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F28Reference Manual Rev.202005181333 SM150 luftgekühlt 5

Page 6: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

Index...........................................................................................................................................................35

Table of contents

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F286 Reference Manual Rev.202005181333 SM150 luftgekühlt

Page 7: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

Introduction 1This document describes the preconditions when testing drives. The fulfillment of these preconditions is the basis for achieving the smoothest possible testing process and maximum possible customer satisfaction.

The following drive tests are described:

● Routine tests

● Tests that are offered as standard

Note

If the scope of testing and inspection cannot fulfill all customer requirements, please consult your Siemens sales advisor at head office.

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F28Reference Manual Rev.202005181333 SM150 luftgekühlt 7

Page 8: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

Introduction

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F288 Reference Manual Rev.202005181333 SM150 luftgekühlt

Page 9: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

General scope of services 2A variable-speed drive can include the following components:

● Induction motor, synchronous motor or PEM motor with or without speed encoder

● SINAMICS drives

● Drive transformer

● Cooling unit for water-cooled drives

● Small PLCs with drive functionality.

The factory offers adapted test systems adapted to address such systems.

Note

Contact your sales person if additional components must be taken into account for your particular project.

Scope of services offeredUnless otherwise stated in the quotation, the scope of tests ordered includes all activities, equipment, materials and expendables required.

Additional activities, services and provisions - for example, the use of third-party converters - must be coordinated well in advance.

The deadline and testing period stated, and the quoted cost, can be met only if all the test and inspection procedures are clarified in detail in advance. Due to the high capacity utilization of the associated equipment, it might not be possible to carry out individual inspections and tests that are requested late if the planned test is already in progress.

If you have received specific requirements from your customer, please send these as soon as possible – with the necessary key data – to the system test facility.

Test equipmentSiemens ensures the availability of the equipment required for the agreed tests and inspections, including test couplings for load runs.

Customer couplings, coupling dummies and coupling jigs for non-cylindrical shaft extensions are excluded.

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F28Reference Manual Rev.202005181333 SM150 luftgekühlt 9

Page 10: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

Sequence of a customer acceptanceA customer acceptance test is generally executed in the sequence:

1. Installation and commissioning of the components before the customer arrives.

2. Kickoff with presentation of the test schedule and discussion of individual steps in the acceptance test workflow.

3. Execution of the tests according to the test schedule

4. Discussion of the test results

5. Preparation of test documentation for the customer. The test documentation is created before or after the customer leaves depending on the scope of testing and the time schedule.

Components provided by customerComponents provided by the customer must be available in plenty of time so that tests can be carried out on time. The factory has no access to components, which are not part of the scope of supply of PD LD. This also applies to components ordered from other Siemens' Groups. The technical data for these components is required at the latest eight weeks before the start of the acceptance test, e.g.:

● Dimensions

● Weights

● Energy Requirement

● Interfaces

Location of the customer acceptanceAll customer acceptance tests in the test fields for drives are performed as part of the manufacturing process.

NoteLimited number of persons in the test field

For safety reasons, the number of persons in the test field is limited. In addition to the regional sales partner, only two persons from the customer are permitted in the test field at the same time.

NoteTest without load motors or multipulse infeeds via transformers in the test field

Some tests are simulated or performed in test mode with limited rated data.

NoteTests with the customer's own cooling units or excitation equipment

If the customer's own cooling units or excitation equipment are to be tested, a system test can be ordered with option F97.

General scope of services

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F2810 Reference Manual Rev.202005181333 SM150 luftgekühlt

Page 11: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

2.1 Routine testDuring production, the drive is subject to an internal routine test.

General scope of services2.1 Routine test

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F28Reference Manual Rev.202005181333 SM150 luftgekühlt 11

Page 12: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

2.2 Visual inspectionThe visual inspection is performed to ensure that the equipment complies with the order specifications. The tests are carried out with the drive in a no-voltage condition.

The visual inspection together with the customer – or with the company accepting the equipment – is carried out with the drive installed and labeled. Each test step is documented in the acceptance report with the specific results of the step.

The visual inspection is part of the function test (F72, F73).

Visual inspection Order codesWithout the customer present

With the cus‐tomer present

● Rating plate● Housing degree of protection● Electrical cabinet components● Cable installation● Cable markings● Setting values of circuit breakers, if used● Dimensions

-

F03

See alsoVisual inspection (Page 18)

General scope of services2.2 Visual inspection

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F2812 Reference Manual Rev.202005181333 SM150 luftgekühlt

Page 13: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

2.3 Function testsThe drive functions are tested according to IEC 61800-5-1. In addition, excerpts from additional standards apply, which are listed in the relevant chapters as well as internal Siemens directives within the scope of quality assurance.

The function tests are performed and documented in the Siemens test field by internal test field personnel. For the function test, the drive is in the test mode with restricted monitoring functions.

The successful test is confirmed in a 3.1 certificate – or in the case that the customer has ordered the acceptance test, in a 3.2 certificate.

See alsoFunction test (Page 22)

General scope of services2.3 Function tests

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F28Reference Manual Rev.202005181333 SM150 luftgekühlt 13

Page 14: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

2.4 Insulation testThe insulation resistance is measured before and after the high-voltage test. The insulation test can only be ordered and carried out together with the function test (F72, F73).

Insulation test Order codesWithout the customer present

With the cus‐tomer present

● High-voltage test● Measuring the insulation resistance

F76

F77

The successful test is confirmed in a 3.1 certificate – or in the case that the customer has ordered the acceptance test, in a 3.2 certificate.

See alsoInsulation test (Page 29)

The insulation test is performed on a separate acceptance day prior to the function test.

General scope of services2.4 Insulation test

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F2814 Reference Manual Rev.202005181333 SM150 luftgekühlt

Page 15: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

2.5 Interface testThe analog, digital and serial interfaces between the drive and higher-level control on the customer side are checked. The interface test can only be ordered and performed together with the function acceptance.

During the tests, the drive is only supplied with auxiliary voltage.

Interface test Order codesWithout the customer present

With the cus‐tomer present

● Ethernet communication● Signals to the customer's system● Signals between the drive and cooling unit, if available● Additional interfaces

-

F79

The test is confirmed in a 3.1 certificate – or in the case that the customer has ordered the acceptance test, in a 3.2 certificate.

General scope of services2.5 Interface test

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F28Reference Manual Rev.202005181333 SM150 luftgekühlt 15

Page 16: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

General scope of services2.5 Interface test

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F2816 Reference Manual Rev.202005181333 SM150 luftgekühlt

Page 17: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

Tests 3The tests that have been expressly ordered for the drive with serial number 12345670001001 are listed in the following.

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F28Reference Manual Rev.202005181333 SM150 luftgekühlt 17

Page 18: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

3.1 Visual inspection

The visual inspection is performed to ensure that the drive complies with the requirements of the order. The individual test steps are performed with the drive in a no-voltage condition.

The test together with the customer – or his representative – is carried out with the drive installed and labeled. The results of all of the tests are documented in the acceptance report.

3.1.1 Rating plate

FundamentalsThe technical data and ordered options on the rating plate and the routine test certificate are checked to ensure that they match up.

Test procedure1. The data on the rating plate and the routine test certificate are visually compared.

ResultThe test is passed if the data match up.

3.1.2 Housing degree of protection

FundamentalsA check is made as to whether the housing degree of protection ordered complies with what is described in the catalog.

Test procedure1. The housing degree of protection is identified based on what is stamped on the rating plate.

2. Depending on the version, the following components are visually checked, e.g.:

– Canopies

– Cooling slots

– Fittings and rubber seals in the doors and between the cabinet units

– Cable entries

– Openings for water pipes, if available

– Additional components, if available

Tests3.1 Visual inspection

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F2818 Reference Manual Rev.202005181333 SM150 luftgekühlt

Page 19: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

ResultThe test is passed if the components required for the specified housing degree of protection are available.

3.1.3 Electrical cabinet components

FundamentalsA visual inspection is made to see whether the electrical cabinet components are installed as defined in the layout diagram and/or circuit diagram.

Test procedure1. The customer selects electrical cabinet components by random sampling.

2. The selected electrical cabinet components are visually checked to ensure that they are correctly installed and marked.

ResultThe test is passed if the selected electrical cabinet components are installed as specified in the layout diagram and/or circuit diagram.

3.1.4 Cable installation

FundamentalsVisual and mechanical checks are made to ensure that cables and conductors have been installed correctly and are connected correctly according to the circuit diagram.

Test procedure1. The customer selects cables or conductors by random sampling.

2. The following is inspected:

– Are the cables firmly connected?

– Have edge protectors been attached to sharp edges?

– Are the cables routed according to the circuit diagram?

ResultThe inspection is passed if the cable installation does not exhibit any deficiencies and matches the information in the circuit diagram.

Tests3.1 Visual inspection

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F28Reference Manual Rev.202005181333 SM150 luftgekühlt 19

Page 20: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

3.1.5 Cable markings

FundamentalsA visual inspection is made to see whether cables and conductors are marked as defined in the circuit diagram.

Test procedure1. The customer selects cables or conductors by random sampling.

– Are the cable end tags and conductor colors of cables and conductors marked as defined in the circuit diagram?

ResultThe test is passed if the cable and conductor markings match what is specified in the circuit diagram.

3.1.6 Setting values of circuit breakers, if used

FundamentalsThe circuit breaker settings are visually checked against what is specified in the circuit diagram.

Test procedure1. The customer selects circuit breakers by random sampling.

2. The circuit breaker settings are visually checked against what is specified in the circuit diagram.

ResultThe test is passed if the circuit breaker settings match what is specified in the circuit diagram.

3.1.7 Dimensions

FundamentalsThe drive dimensions are measured. The basis for the visual inspection is the order-specific dimension drawing.

Test procedure1. The external dimensions, length, width and height of the drive are measured.

Tests3.1 Visual inspection

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F2820 Reference Manual Rev.202005181333 SM150 luftgekühlt

Page 21: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

ResultThe test is passed if the dimensions match with what is specified in the dimension drawing.

Tests3.1 Visual inspection

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F28Reference Manual Rev.202005181333 SM150 luftgekühlt 21

Page 22: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

3.2 Function test

Medium voltage is stored in the DC link

3.2.1 Auxiliary voltages

FundamentalsTests are performed according to DIN EN 60146-1. The auxiliary voltages are visually checked using indicator lights or using a voltmeter.

Test procedure1. The drive power section is switched off.

2. The auxiliary voltages are switched on.

3. The auxiliary voltages are checked.

ResultThe test is passed if all of the auxiliary voltages are available.

3.2.2 Temperature monitoring in the control cabinet

FundamentalsThe control cabinet is equipped with temperature sensors to monitor the internal cabinet temperature. The switching thresholds of the temperature monitoring function are checked. The selected switching thresholds are specified in the circuit diagram. The temperatures are monitored on the test station computer.

Test procedure1. The auxiliary voltage is present.

2. The temperature sensor is warmed up to the appropriate switching thresholds:

– Tfan: The auxiliary fans switch on.

– Tfault: A fault message is displayed on the test station computer.

ResultThe test is passed if the drive manifests the described responses at the switching thresholds. The tolerance range at the switching thresholds is ±5 K.

Tests3.2 Function test

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F2822 Reference Manual Rev.202005181333 SM150 luftgekühlt

Page 23: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

3.2.3 Door limit switches

FundamentalsTests are performed in accordance with IEC 61800-5-1

The doors of the drive power section are monitored using limit switches. This monitoring function ensures that when the doors are open, the drive cannot be switched on.

Test procedure1. The auxiliary voltage is present. All drive doors are closed.

2. One door of the drive power section is opened.

ResultThe test is passed if the appropriate message is displayed on the test station computer.

3.2.4 Door interlocking system

FundamentalsTests are performed in accordance with IEC 61800-5-1

To avoid accidents, the drive doors must be closed during operation. This is guaranteed by the electromagnetic door interlocking system. The doors of the power section remain interlocked until the DC link has been completely discharged and a safety wait time has elapsed.

Test procedure1. The auxiliary voltage is present.

2. All drive doors have been closed.

3. The DC link voltage is set to a specified value.The electromagnetic door interlocking system locks the power section doors.

4. The power section doors cannot be opened.

5. The power section power supply is switched off. The DC link completely discharges itself. The safety wait time elapses.

6. If a grounding switch is installed, it is closed manually.

7. The power section doors can be opened.

ResultThe test is passed if the door interlocking system functions as described.

Tests3.2 Function test

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F28Reference Manual Rev.202005181333 SM150 luftgekühlt 23

Page 24: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

3.2.5 Ground fault monitoring

FundamentalsThe ground fault monitoring is tested according to EN 60204-1.

Test procedure1. The auxiliary voltage is present.

2. The DC link is discharged and grounded. The ground fault message is displayed at the test station computer.

3. The grounding is withdrawn.

ResultThe test is passed if the appropriate message is no longer displayed at the test station computer.

3.2.6 DC link pre-charging and undervoltage monitoring

FundamentalsWhen switching on the drive, the DC link is first charged. Only then is the circuit breaker closed. The DC link must be charged in a specified time to 85 % of the DC link voltage.

Test procedure1. The auxiliary voltage is present.

2. The pre-charging test mode is activated. The time measurement starts.The DC link is charged.

3. When 85 % of the DC link voltage is reached, the charge time is measured. The pre-charging transformer shuts down.The signal to close the circuit breaker is active. The main supply is not switched in. The DC link discharges itself.

4. When 75 % of the DC link voltage is reached, the drive shuts down due to undervoltage.An appropriate message is displayed on the test station computer.

ResultThe test is passed if the DC link was charged within the specified time – and when the undervoltage switching threshold is reached, the drive shuts down.

Tests3.2 Function test

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F2824 Reference Manual Rev.202005181333 SM150 luftgekühlt

Page 25: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

3.2.7 Actual value sensing of the DC link voltage

FundamentalsThe actual value sensing of the DC link voltage UDC+ and UDC- is checked. The calibrated measuring equipment is used as reference.

Test procedure1. The DC link is charged up to the rated voltage.

2. The actual value sensing devices in the drive measure the voltage. The values UDC+ and UDC- are measured and displayed at the test station computer in the appropriate parameters.

3. The measured values of the calibrated measuring equipment are compared with the values provided by the actual value sensing of the drive.

ResultThe test is passed if the displayed values at the test station computer match the reference values with a tolerance of ±10 %.

3.2.8 Output current measurement

FundamentalsThe internal current measurement of the drive is checked for an inductive load. Three reactors connected in a star connection are used as load. The calibrated measuring equipment is used as reference.

● For SINAMICS GM150, the inverter is tested.

● For SINAMICS SM150, either the line-side or the motor-side drive is tested in inverter mode.

● For SINAMICS GH150, the Motor Module is tested in inverter mode.

● For SINAMICS SM120, the Active Line Module and the Motor Module are tested in the inverter mode.

Test procedure1. The drive is switched on.

2. The DC link is charged up to the rated voltage.

3. The inverter is enabled.

4. The rms values of output currents IL1, IL2, IL3 are measured for max. 10 minutes at the specified frequency and communicated to the test station computer.

Tests3.2 Function test

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F28Reference Manual Rev.202005181333 SM150 luftgekühlt 25

Page 26: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

ResultThe test is passed if the values displayed on the test station computer match the reference values with a tolerance of ±5 %.

3.2.9 Overvoltage monitoring in the DC link

FundamentalsFluctuations in the power supply can result in short-term changes to the DC link voltage.

The overvoltage monitoring senses the actual value of the DC link voltage, and switches off the drive at a defined rated voltage.

Test procedure1. The auxiliary voltage is present.

2. The DC link is charged up to 100 %.

3. The drive is operated with a load current ILoad = 50 ±5 A.

4. By controlling the DC voltage supply, the DC link voltage is slowly increased. A message is displayed on the test station computer when the overvoltage limit is reached. The drive is switched off.

5. The voltage value at the time of the message is calculated on the test station computer.

ResultThe test is passed if the value calculated is 123 % of the nominal voltage of the DC link.

3.2.10 Failure of a power semiconductor module

FundamentalsThe power section must shut down if a power semiconductor module fails. The failure is simulated by withdrawing the fiber-optic cable connector from the gating module of a power semiconductor module. This interrupts the control.

Test procedure1. The auxiliary voltage is present.

2. The fiber-optic cable connector of a gating module is withdrawn.A message is displayed on the test station computer.

ResultThe test is passed if the appropriate message is displayed on the test station computer and the inverter is inhibited.

Tests3.2 Function test

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F2826 Reference Manual Rev.202005181333 SM150 luftgekühlt

Page 27: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

3.2.11 Safety shutdown

FundamentalsThe tests are performed in accordance with IEC 60146-1-1 and IEC 60204-11.

The safety shutdown of the power section shuts down the inverter if the button is pressed.

Test procedure1. The auxiliary voltage is present.

2. The drive is operated with a load current ILoad = 50 ±5 A.

3. The button is pressed.

ResultThe test is passed if the inverter is shut down and the appropriate message is displayed on the test station computer.

Tests3.2 Function test

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F28Reference Manual Rev.202005181333 SM150 luftgekühlt 27

Page 28: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

3.3 Cooling system test

3.3.1 Air flow direction

FundamentalsIt is only guaranteed that the drive is correctly cooled when the fan rotates in the correct direction of rotation.

Test procedure1. The auxiliary voltage is present.

2. The drive is switched on.The fans switch on.

3. The air flow direction is checked at the ventilation grilles.

ResultThe test is passed if the air flows from the doors up to the roof section.

3.3.2 Fan failure

FundamentalsA check is made that if one of the fan fails, the redundant fan is switched on – or, if the fans fail, the drive shuts down.

Test procedure1. The drive is switched on.

2. The fan power supply is interrupted. For versions with redundant fan (option M61)

– The redundant fan switches on.

– A fan failure message is displayed on the test station computer. The drive does not switch itself off.

For standard versions without redundant fan:

– The drive switches itself off.

– The appropriate fault message is displayed on the test station computer.

ResultThe test is passed if the appropriate messages are displayed on the test station computer, and the drive responds as described above.

Tests3.3 Cooling system test

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F2828 Reference Manual Rev.202005181333 SM150 luftgekühlt

Page 29: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

3.4 Insulation test

3.4.1 High-voltage test

FundamentalsThe test is carried out according to the following standards:

● IEC 61800-5-1

● EN 50178

● For marine applications, additional requirements from the marine classification societies may apply.

The high-voltage test verifies the voltage strength (test voltage) for overvoltage conditions specified in the standard.

Test equipmentA calibrated test instrument is used for the test.

Test procedure1. The circuits to be tested are separately short-circuited corresponding to the individual

voltage levels.

– Power circuit/circuits

– Various auxiliary circuits

2. The circuits that are presently not connected to the test instrument are connected to ground potential.

3. The test voltage is adjusted for each circuit corresponding to the insulation test report.

4. The circuits are tested with respect to one another and with respect to the PE protective conductor at the electrical cabinet.The test duration is 1 s, for marine applications, 60 s.

5. The test is repeated with 80% test voltage.

ResultThe test is passed if the test instrument is not switched off (tripped) during the test as a result of flashover.

Tests3.4 Insulation test

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F28Reference Manual Rev.202005181333 SM150 luftgekühlt 29

Page 30: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

3.4.2 Measuring the insulation resistance

FundamentalsThe test is conducted according to EN 50178, EN 60204-1 and IEC 60146-1-1.

The insulation resistance of the individual circuits is measured before and after the high-voltage test, and the following value must be obtained:

Rated operating voltage Insulation resistanceBelow 1000 V At least 1 MΩ Above 1000 V At least 10 MΩ

Test equipmentA calibrated test instrument is used for the test.

Test procedure1. The circuits to be tested are separately short-circuited corresponding to the individual

voltage levels.

– Power circuit/circuits

– Various auxiliary circuits

2. The circuits that are presently not connected to the test instrument are connected to ground potential.

3. The test voltage is adjusted for each circuit corresponding to the insulation test report.

4. The circuits are tested with respect to one another and with respect to the PE protective conductor at the electrical cabinet.

ResultThe test is passed if the insulation resistances lie within the tolerance specified by the standard.

Tests3.4 Insulation test

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F2830 Reference Manual Rev.202005181333 SM150 luftgekühlt

Page 31: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

3.5 Interface test

3.5.1 PROFIBUS communication

FundamentalsThe communication between the test station computer and the drive is established via PROFIBUS and its correct functioning is checked.

Test procedure1. The connection between the drive and the test station computer is established using an

PROFIBUS cable.

2. The auxiliary voltage is switched on.

3. The connection is established via the test station computer. The operating software is in online mode.

4. The customer selects up to ten signals, which are read in and read out on the test station computer. This procedure checks the communication.For bus connections, it is crucial that communication is established.

ResultThe test is passed if the signals are displayed on the test station computer.

3.5.2 Signals to the customer's system

FundamentalsThe signals defined in the "Functional test plan" are simulated on the test station computer, which also tests signal transfer to the customer's system.

Test procedure1. The auxiliary voltage is present.

2. The connection is established via the test station computer.

3. The signals are simulated.

ResultThe test is passed if the appropriate states relating to the signals are displayed on the test station computer.

Tests3.5 Interface test

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F28Reference Manual Rev.202005181333 SM150 luftgekühlt 31

Page 32: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

3.5.3 Additional interfaces

FundamentalsThe customer or its representative parameterize and test the communication of selected interfaces with their own test equipment. Factory personnel are available to operate the test station. The interface test is limited to four hours.

Test procedure1. Using his own test equipment, the customer establishes the hardware connection to the

drive.

2. Factory personnel switch on the auxiliary voltage.

3. The customer establishes the software connection to the drive.

4. The customer parameterizes and tests the communication of selected interfaces.

ResultThe interface test has been completed after four hours.

Tests3.5 Interface test

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F2832 Reference Manual Rev.202005181333 SM150 luftgekühlt

Page 33: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

3.6 Additional optional tests

3.6.1 Noise measurement without load

Fundamentals The noise measurement is conducted in operation without load, but with the main fans running according to EN ISO 3744.

Test procedure1. The drive is switched on.

2. The measuring points defined are documented in the report and evaluated.

ResultThe results of the noise measurement are separately recorded and documented together with the "Functional test plan".

Tests3.6 Additional optional tests

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F28Reference Manual Rev.202005181333 SM150 luftgekühlt 33

Page 34: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

Tests3.6 Additional optional tests

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F2834 Reference Manual Rev.202005181333 SM150 luftgekühlt

Page 35: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

Index

AA06, 31

CComponents provided by customer, 10Cooling system test

Air flow direction, 28Fan failure, 28

Customer acceptance inspection, 10

FF03, 12F28, 33F29, 33F72, 31, 32F73, 31, 32F76, 14F77, 14F79, 15, 31, 32Function tests, 13

Actual value sensing of the DC link voltage, 25Auxiliary voltages, 22DC link pre-charging and undervoltage monitoring, 24Door interlocking system, 23Door limit switches, 23Failure of a power semiconductor module, 26Ground fault monitoring, 24Output current measurement, 25Overvoltage monitoring in the DC link, 26Safety shutdown (optional), 27Temperature monitoring in the control cabinet, 22

GG20, 32G21, 32G22, 32G23, 32G24, 32G25, 32G26, 32G28, 32

G30, 32G34, 32G35, 32

IInsulation test, 14

High-voltage test, 29Measuring the insulation resistance, 30

Interface test, 15Additional interfaces, 32PROFIBUS communication, 31Signals to the customer's system, 31

NNoise measurement without load, 33

VVisual inspection, 12, 18

Cable installation, 19Cable markings, 20Dimensions, 20Electrical cabinet components, 19Housing degree of protection, 18Rating plate, 18Setting values of circuit breakers, if used, 20

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F28Reference Manual Rev.202005181333 SM150 luftgekühlt 35

Page 36: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

Index

SINAMICS SM150 6SL38107 G20 F03 F72 F79 F76 F2836 Reference Manual Rev.202005181333 SM150 luftgekühlt

Page 37: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020
Page 38: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

8888888888 000088 01 EN 01

*888888888800008801EN01* 888888888800008801EN01

Further Informationwww.siemens.com/LDASiemens AGLarge Drives ApplicationsVogelweiherstr. 1-1590441 NÜRNBERGGERMANY

Page 39: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

Large Drives Applications

Siemens AG, DI MC CBMF MF-NMA LDA EN, Postfach 47 43, 90025 Nürnberg

Department DI MC CBMF MF-NMA LDA ENTel. +49 (911) 433-6422Fax +49 (911) 433-6921Email [email protected]

mOur ref. 8888888888000088Date 18.05.2020

Documentation for 6SL38107Your order no. - 000010

AL: N ECCN: N UL: DEStWanr (CD): 85234045, StWanr (Print): 49011000

Dear Sir / Madam,

Many thanks for your order, the documentation for which is enclosed.

Yours very truly,

*888888888800008801EN01*

Page 40: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020
Page 41: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020

Spine label for binder 50 mm (120 g/m2)

SINAMICS SM1506SL38107

SM150 luftgekühlt

G20 F03 F72 F79 F76 F28

Tests carried out on drives

Spine label for binder 145 mm (120 g/m2)

SINAMICS SM150 6SL38107SM150 luftgekühlt

G20 F03 F72 F79 F76 F28

Tests carried out on drives

Page 42: Medium-Voltage Drive · Medium-Voltage Drive SINAMICS SM150 Type 6SL38107 Reference Manual This documentation pertains to SM150 luftgekühlt G20 F03 F72 F79 F76 F28 Edition 05/2020