26
November 16, 2021 McKim Master Plan Central Library Board of Trustees Boston Public Library Janette Blackburn, Managing Principal Kelly Brubaker, Library Planning Principal

McKim Master Plan Central Library

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

November 16, 2021

McKim Master Plan Central Library

Board of Trustees

Boston Public Library

Janette Blackburn, Managing Principal

Kelly Brubaker, Library Planning Principal

▪ Project Goals

▪ Project Process and Community Engagement

▪ Challenges and Opportunities

▪ Recommendations

Agenda

Project ScopeMcKim Building & Dartmouth St. Plaza

McKim Entrance

View towards Copley SquareAerial View

McKim Building

Dartmouth St. Plaza

Johnson Building

Copley Square

Project Process

Master Plan

Project Authorized:

July 2018

Planning Team Engaged: 2020

Review & Strategy

Funding Strategy & Campaign Design Construction

Community Engagement Community Advisory Committee, External Stakeholder Groups, and Community Meetings

External Stakeholder GroupsCommunity Advisory Committee

• Back Bay Association, Meg Mainzer-Cohen

• Neighborhood Association of Back Bay, Jackie Yessian

• Boston Chamber of Commerce, Beyazmin Jimenez

• Tourism Industry, Martha Sheridan

• Boston University Dean of Libraries, K. Matthew Dames

• Boston Arts Academy Librarian, Rose Marz

• Company One Theatre, Summer L. Williams

• Arts & Special Collections

• Social and Cultural

• Youth Educators

• Higher Education

• Tourism

• Now and There, Kate Gilbert

• Mayor’s Youth Council, Minh Mai and Deborah Adebanjo

• SPARK Boston, Sarah Abkowitz

• Historic Boston, Derek Lumpkins

• Boston Preservation Alliance

• Project Place, Aaryn Manning

• Accessibility Advocate, Carol Steinberg

Supplemental Meetings

• Boston Preservation Alliance

• Boston Landmarks Commission

• Neighborhood Association of Back Bay

1. Presentation

2. Optional Break-Out Group

Q&A Sessions

3. Paper & Digital Surveys

Community Engagement CAC, External Stakeholder Groups, and Community Meetings

Building Improvement

& SustainabilityCollections Services

McKim Master PlanProject Focus

Accessibility: Justice,

Equity, Diversity &

Inclusion

Improve

Wayfinding

Stewardship &

Scholarship

McKim Master PlanCommunity Priorities

Bolyston St.

Dart

mo

uth

St.

1

Discontinuous

Vertical MovementFloor level

differencesInterconnected rooms

Pinchpoints at corners

McK

im

McK

im

McK

im

Johns

on

Johns

on

Johns

on

Boylston

Steet

Boylston

Steet

Boylston

Steet

Blagden

Steet

Blagden

Steet

Blagden

Steet

Courty

ard

Courty

ard

Courty

ard

Dart

mouth

Str

eetP

laza

Dart

mouth

Str

eetP

laza

Dart

mouth

Str

eetP

laza

Challenges

• Accessibility limitations

• Confusing way-finding

• Outdated building systems

• Poor climate control

• Preservation of historic art and architecture - including water infiltration

• Third Floor closed to public, except for Sargent Gallery

June 03,2021

McKim Proposed Strategies

• Improve accessibility and way-finding inside and outside

• Connect to Dartmouth Street Plaza + Copley Square

• Restore and renovate to improve the public experience

• Utilize the courtyard to support preservation, circulation, and increase space use by enclosingit

• Update Infrastructure for resiliency and sustainability

• Support modern library services

CUSHMAN

ROOM

READING

ROOM

ONE-STOP

REFERENCE

WIGGIN

SPECIAL

COLLECTION

S

CHEVERUS

ROOM –

PATRON

SEATING

JORDAN

ROOM

PATRON SEATING

SPECIAL COLLECTIONS

CLASSROOM

SEATING +

COLLABORATION

ZONE

MULTIPURPOSE +

DEMONSTRATION/LAB

COLLABORATION

ROOMS

NEW

ELEVATOR

Third FloorReference, Education, and Collaboration

NEW STAFF

ELEVATOR

West Gallery Sketch

Third Floor RenewalOne-Stop Reference and Reading Room

Current ConditionOriginal

Cushman Room SketchCurrent Condition

Third Floor RenewalCushman Room: Engage and Collaborate

Second Floor RenewalGather and Connect

WASHINGTON

ROOM

ELLIOTT

ROOM

BOYLSTON

ROOM

STAFF

BATES HALL

ABBEY

ROOM

CHAVANNES

GALLERY

STAFF

WASHINGTON ROOM

MULTI USE

NEW

ELEVATOR

BOYLSTON ROOM

PATRON SEATING

ELLIOTT ROOM

MULTIPURPOSE CLASSROOM

NORTHWEST

CORRIDOR

NEW STAFF

ELEVATOR

First Floor RenewalConvene and Explore

Commonwealth Salon

COMMONWEALTH

SALON

COURTYARD

RESTAURANTMAP ROOM

TEA LOUNGE

MAP

CENTER

GALLERY

STAFF

LEARNING

CENTERCOMMONWEALTH SALON

MULTI USE

COMMONWEALTH SALONCURRENT CONDITION

PROPOSED

GUASTAVINO

ROOM

MCKIM

EXHIBITION

HALL

COURTYARD

ORIENTATION

ROOM

NEW

ELEVATOR

LOBBY

GUASTAVINO ROOM

FLEXIBLE PATRON SEATING

UPGRADE MCKIM

EXHIBITION HALL

NEW

ELEVATORS

NEW STAFF

ELEVATOR

Preliminary Sketch of Dartmouth Street Lobby Renewal

Current Lobby

Dartmouth Street LobbyWelcome and Reveal

Showroom & Corridor, 2020

New Connector/Elevator Lobby Concept

Courtyard, 2020

Connections at Roof Ridge Line

McKim Building Section

Courtyard Enclosure

• Preservation

• Circulation

• Year-round usage

Courtyard Facades (515 LF)

Exterior Facades (710 LF)

58%of perimeter envelope

42%of perimeter envelope

Johnson

Building

Courtyard EnclosureProtect Courtyard Facades

June -August

[13 weeks]

40 Events

2019 Statistics

Courtyard EnclosureYear-round usage

Courtyard EnclosurePrecedents

Boston Public Library

Boston, MA

Smithsonian American Art

Museum

Washington, DC

Isabella Stewart Gardner

Museum

Boston, MA

Museum of Fine Arts

Boston, MA

120ft x 154ft Roof completed in 2007

130ft x 280ft

Roof completed in 2010

270ft x 105ft

Roof completed in 1903

43ft x 70ft

Dartmouth Street PlazaAccessible and Inviting

View from Dartmouth Street

Proposed Sloped Walkways, Tree Grove, and Seating Area

Dartmouth Street PlazaAccessible and Inviting

Existing Temporary Ramp

Dartmouth Street PlazaCommunity Connection and Programming

McKim

Building

Draft concept design for the reimagined Copley Square Plaza, courtesy of BPRD and

SasakiSeating and lightingOutdoor Concerts

Extension of the Farmer’s

MarketOutdoor Reading Room

Building UpdatesSustainable and Resilient Future

• Stable climate to protect collections

• Meet new climate resiliency standards

• Improved stormwater management

• Healthy materials

• Local and recycled materials

• Improved indoor air quality

• Potential for geothermal heat source

• Potential for all-electric HVAC systems

• Energy efficient LED lighting

• Low-flow fixtures

Implementation Options

• Option to keep McKim operational during construction

• A series of phased projects from $40-$100m

• Estimated budget to complete all recommendations: $325m if completed all at once in today’s dollars

• Funding Sources TBD

Thank you

• Preserve Civic, Democratic and Architectural Masterpiece at one of the premier cultural destinations in the country

• Return the closed off third of the building to public service

• Expand and modernize library services