UNISA LIBRARY MASTER PLANS | MASTER PLAN REPORT 1
LIBRARY MASTER PLANS CITY EAST, MAGILL & MAWSON LAKES CAMPUSES
PREPARED BY MPH ARCHITECTS AND WILSON ARCHITECTS FOR UNISADECEMBER 2016
2
The Library Master Plans have been prepared by MPH Architects and Wilson Architects for the University of South Australia.
ACKNOWLEDGEMENTS
UniSA Team
Facilities Management Unit (FMU)
UniSA Library
Information Strategy & Technology Services (ISTS)
Student & Academic Services (SAS)
Student Engagement Unit (SEU)
ArchitectureMPH Architects
Education SpecialistWilson Architects
Services EngineerSystem Solutions Engineering - City East CampusLucid - Mawson Lakes CampusLucid - Magill Campus
Structural EngineerWallbridge & Gilbert - All campuses
Cost PlannerRider Levett Bucknall - All campuses
Contact:Tony Materne 08 8418 1600 [email protected]
MPH Architects 5 Vardon Avenue, Adelaide South Australia, 5000
www.mpharchitects.com.au
LIBRARY MASTER PLANSCITY EAST, MAGILL & MAWSON LAKES CAMPUSESUNIVERSITY OF SOUTH AUSTRALIAMASTER PLAN DESIGN REPORTUNISA PROJECT NO. 14-054 | DECEMBER 2016
Cover image: Jeffrey Smart Building, photo by Sam Noonan
UNISA LIBRARY MASTER PLANS | MASTER PLAN REPORT 3
CONTENTS APPENDICES
1.0 Executive Summary & Introduction 42.0 Methodology 63.0 Benchmarking 84.0 Design Principles 185.0 Campus Master Plans 20
5.1 City East Campus 225.2 Magill Campus 285.3 Mawson Lakes Campus 32
6.0 Cost Plan 36
Appendix A Benchmarking and Supporting DataAppendix B Student SurveyAppendix C Library ComponentsAppendix D City East Campus DrawingsAppendix E Magill Campus DrawingsAppendix F Mawson Lakes Campus DrawingsAppendix G Services ReportsAppendix H Structural ReportAppendix I Cost Plans
4
Image: Jeffrey Smart Building, photo by Sam Noonan
1.0 EXECUTIVE SUMMARY & INTRODUCTION
UNISA LIBRARY MASTER PLANS | MASTER PLAN REPORT 5
The UniSA Library Master Plans for the City East, Magill and Mawson Lakes campus libraries have been developed as a strategic framework to upgrade all UniSA libraries to a consistent accommodation standard and amenity which align to the Digital Learning Strategy.
1.1 EXECUTIVE SUMMARY
EXECUTIVE SUMMARY
UniSA is moving towards a more integrated and digital service delivery model for its libraries and physical collections are being reduced in favour of online resources. As result, our libraries are changing as they increasingly support student led learning, whether as individuals or in groups.
The Library Master Plans for City East, Magill and Mawson Lakes Campuses will allow the UniSA Library to:
- Improve the amenity of the library learning and service environment, maximising natural light - Enhance wayfinding and circulation within the library - Enable an integrated service delivery model within all libraries, with student services areas adjacent to entries and high flow areas
- Give space priority to students and locate open plan staff accommodation in discreet, less public areas - Provide flexible learning settings for group and quiet study - Zone study spaces from loud to quiet with social learning and group study spaces near circulation (loud) and individual study zones in remote areas (quiet) - Locate reduced library collections in quieter zones to create buffers for individual study settings
At City East we will:
- Reinstate the Brookman Building as a North Terrace entrance into the campus, with the Library as the link between the two - Introduce a new lift to service all floors of the building - Upgrade base building facilities - Strengthen the link to Centenary Building through appropriate spaces
At Magill we will:
- Increase the presence of the Library and strengthen entry legibility and wayfinding on the Campus - Increase the amount of natural light into study spaces - Create space to be utilised as future teaching and learning spaces
At Mawson Lakes we will:
- Convert Levels 1 and 2 into student focused learning areas - Allow space for future expansion - Consolidate all staff to the top floor, with room for expansion
6
The UniSA Library Master Plans for the City East, Magill and Mawson Lakes campus libraries have been developed as a strategic framework to upgrade all UniSA libraries to a consistent accommodation standard and amenity which align to the Digital Learning Strategy.
1.2 INTRODUCTION
BACKGROUND
As UniSA moves towards a more integrated and digital service delivery model for its libraries and with physical collections being reduced in favour of online resources, the role of the Library within the University is changing. Libraries increasingly becoming spaces that support student led learning, whether as individuals or in groups. This is supported with staff, online resources and flexible but defined library learning spaces.
The Jeffrey Smart Building is the most contemporary UniSA library facility and included many of the principles which inform the Digital Learning Strategy and is a hub of activity for academic, social and cultural activities. It has been evaluated, and in moderated form, establishes a benchmark for the other libraries.
MPH Architects and Wilson Architects in association, were commissioned to undertake the consultancy and lead a range of professional disciplines to deliver holistic designs, budgets and staging strategies for the upgrade of UniSA’s libraries.
OBJECTIVESThe key project objectives include: - Improve the amenity of the library learning and service environment - Enhance wayfinding and circulation within the library - Enable an integrated service delivery model within all libraries - Give space priority to students - Rationalise all collections in accordance with the service delivery model as follows:
City East - 25,000 volumes Magill - 50,000 volumes Mawson Lakes - 50,000 volumes - Co-locate all staff in efficient, open plan accommodation in accordance with the UniSA space guidelines
KEY REFERENCE MATERIAL
- Library Enquiry Service Delivery for the Future- UniSA Digital Learning Strategy - Brookman Building Conservation Management Plan (2001) - UniSA Space Management & Planning Guidelines
UniSA Digital Learning Strategy 2015-2020 document
2015-2020
Digital Learning Strategy
UNISA LIBRARY MASTER PLANS | MASTER PLAN REPORT 7
Image: Jeffrey Smart Building, photo by Sam Noonan
8
2.0 METHODOLOGY
Image: Jeffrey Smart Building, photo by Sam Noonan
UNISA LIBRARY MASTER PLANS | MASTER PLAN REPORT 9
2.0 METHODOLOGY
PHASE 1 – PROJECT BRIEF
- Start-up workshop to confirm objectives UniSA standards, policies and project requirements - Identify data collection and benchmarking strategy - Establish program and consultancy methodology
PHASE 2 – CONTEXT
- Obtain existing digital drawing files and review - Undertake inspections and audits of the existing library facilities - Analyse and appraise existing library and campus infrastructure - Survey existing building services - Review existing structural drawings and information
PHASE 2 – LIBRARY COMPONENTS
- Audit the range of social learning settings at the Jeffrey Smart Building and map the arrangement and area - Develop standard Library Components
PHASE 2 – LEARNING SPACE BENCHMARKING
Student Survey - Develop student survey instrument - Release online survey to students at City West and City East campuses - Collect and analyse survey data
Benchmark Moderation - Determine percentage floor area for each Jeffrey Smart Building learning setting - Apply findings and pro rata areas of campus libraries based on campus EFTSL - Identify shortfall or excess of each Library usable floor areas
PHASE 3 – CAMPUS MASTER PLANS
- Define key generic design principles - Develop concepts for each campus based on components, benchmark ratios, services and structure upgrade requirements - Develop cost plans based on concept plans and engineering input
PHASE 4 - IMPLEMENTATION
- Identify and prioritse staging opportunities - Develop staging budgets
The following approach was adopted to ensure that each campus library provides an equivalent range of facilities, spaces and services appropriate to the number of students using the facility.
PROJECT BRIEF
IMPLEMENTATION
CONTEXT COMPONENTS BENCHMARKING
MASTER PLAN
Project Methodology
10
3.0 BENCHMARKING
Image: Jeffrey Smart Building, photo by Sam Noonan
UNISA LIBRARY MASTER PLANS | MASTER PLAN REPORT 11
3.0 BENCHMARKING
The benchmarking phase validated and moderated the key statistical data associated with the Jeffrey Smart Building and applied the findings to the other UniSA campus libraries.
Campus CITY EAST MAGILL MAWSON LAKES
Existing Collection Length (lin. m) Length (lin. m) Length (lin. m)Size (total footprint) 1,731 2,279 3,186
Collection type: Length (lin. m) Length (lin. m) Length (lin. m)General Loan 1,611 2,236 3,186 High Demand 33 43.2 IntegratedArchive/Rare 87 IntegratedTotal 1,731 2,279 3,186
Number of Volumes (end 2015) 63,000 85,000 142,000
Target Volumes (end 2018) 25,000 50,000 50,000Shelf Length (34 volumes per 0.9m) 662 lin. M 1,323 lin. M 1,323 lin. MShelf Modules (2 sided, 5 shelves high) 74 147 147
Users People m2 People m2 People m2
FTE Staff Library 13 156 13 156 66 792ISTS 11 132 10 120 23 276SAS 10 120 6 72 7 84SEU 14 168 10 120 13 156Total 48 576 39 468 109 1308
Number of Equivalent Full Time Student Load(Program on Campus only) 6,445 4,890 2,867 Student Population (Program on Campus Only) 8,659 6,378 3,690
Campus Collection and Population Data
Collections
For purposes of defining area requirements for the briefed collections, the following criteria was adopted based on the Jeffrey Smart Building collection arrangement: - 900mm long modular shelf units - Reduce to 5 shelves per unit (currently 6 in other libraries) - 1.2m clear spacing between shelving - 34 volumes stored per 900mm shelf length
Staff Accommodation Areas
UniSA’s Space Management & Planning Guidelines allow a total office area of 12sqm per workspace. This allowance includes all offices, work stations, breakout spaces, meeting rooms, utility and storage spaces.Staff numbers for each campus have been provided by UniSA.
Student Services
The service delivery areas at both the Jeffrey Smart Building and the Sir Eric Neal Library (Mawson Lakes) were benchmarked for functional and spatial requirements for proposing new student services areas. Space has been provisioned for these areas in the Master Plans with detailed requirements to be reviewed at the time of design.
12
STUDENT SURVEY
The objective of the student online survey of the Jeffrey Smart Building was to assess the suitability of the range of learning settings (Library Components) as part of a Post Occupancy Evaluation.
The data collected from the student survey assisted in determining adjustments to the percentage of each library area occupied in the ‘Library Kit-of-Parts’.
The criteria for the survey included: - Usage and occupancy of learning spaces - Individual and group mix - Technology requirements to support learning
Students were shown images of various learning spaces within the Jeffrey Smart Building and were asked the following questions for each setting:Q1 How often would you use this space/area as an individual per week?Q2 How often would you use this space/area as a group per week?Q3 In groups, what is the size of the group?Q4 What technology do you use in this space to support learning?
SURVEY KEY FINDINGS
519 responses were received from both under graduate and post graduate students at City East and West Campuses. Notably 17% of responses were from the Division of Health Sciences (third highest) based at the City East Campus. The complete results from the Student Survey can be found in the appendices.
The key findings are: - There is a high usage of University supplied fixed PCs (78%) and personal laptops (86%)
- Individual and group areas need to be better signposted and defined.
- Lounge study booths are the most popular space but are inflexible as they are fixed - Frequently used by individuals and therefore frequently hard to access by groups
- 72% of individual study is in computer barns for an average of 2.9hrs - 33% groups of 3 are also using the space for average 2.0hrs per week
- The games in the Technology Hub are disruptive and would be better relocated to student lounge.
- Study rooms are highly utilised but hard to book - Utilised by an average group size of 4-5 people
- Post graduates frequently work in groups in the library - Group sizes average 4-5, favoring study rooms
SURVEY RECOMMENDATIONS
- Offer flexibility of study settings to cater for individuals and groups and their varying modes of study - Improve separation and management of group and quiet individual zones is required
- Vary individual and group zones based on demand throughout each study period
- Review number of fixed PCs available for students - Increase digital capabilities and power to all spaces to enable BYOD
- Consider more open group spaces with flexible access to computers and whiteboards to reduce study room demand
- Factor in post graduate students demand for group settings
- Create a diverse range of open study settings - Flexible furniture settings for a range of learning formats
3.0 BENCHMARKING CONT.
UNISA LIBRARY MASTER PLANS | MASTER PLAN REPORT 13
3.0 BENCHMARKING CONT.
“It is a fantastic view and I love to study here however, it is too loud and people dont respect other individuals trying to study.”
“This space is always too crowded and louder than other study areas.”
“Not always easy to get a spot to study, but those that use the space are generally respectful and quiet.”
“Good for individual study. There should be more clarification on whether these spaces are Quiet Zones or not.”
“Nice sun light, needs more computers”
The average time used for individual work is 3.12 hours per week.
The average time used for group work is 1.89 hours per week.
The average group in this space is 3 – 4 people.
Technology:• Laptop 78.14%• Paper based 49.40%• PC (university property) 42.81%• Tablet 22.46%• Whiteboard 6.89%
Laptop bench (Window)
“Fantastic to use and easy to get access to.”
“I prefer to use the PC’s near the windows or with more space around them, but I use these spaces when other PC’s are in use. These spaces are very popular though, and are often fully used.”
“More library computers are needed, there have been times where I have not been able get one.”
“Noisy. Dirty. Rarely computer available when needed. Students goofing off watching cat videos when I need to use a computer to study.”
The average time used for individual work is 2.91 hours per week.
The average time used for group work is 1.99 hours per week.
The average group in this space is 3 people.
Technology:• PC (university property) 87.50%• Paper based 41.02%• Laptop 29.30%• Tablet 13.67%• Whiteboard 1.95%
Computer barn
Student Survey OF JSB study settings
Teaching Infrastructure Gap Masterplan 26 November 2015
Stakeholder ConsultationOnline Survey
“Have never used this space. Not sure where this is.”
“I never choose to use it as it’s nearby campus central. Prefer quiet place. Drawings on whiteboard are disturbing.”
“You certainly don’t want to study with someone playing FIFA behind you.”
“I don’t use this space much. It feels a bit dark and crowded, but I have used it when I wanted a Uni PC for a short time and others were in use.”
Of the 348 responses, 90.52% of respondents don’t use this space.
The average time used for individual work is 1.26 hours per week.
The average time used for group work is 1.23 hours per week.
The average group in this space is 2 - 3 people.
Technology:• PC (university property) 64.00%• Paper based 36.00%• Laptop 38.67%• Whiteboard 16.00%• Tablet 14.67%
Tech Hub - Computer barn
Teaching Infrastructure Gap Masterplan 26 November 2015
Stakeholder ConsultationOnline Survey
“This space was used this week for practice run of a presentation. Was very good.”
“I don’t even know where that is”
“Great space for single person study and comfy chair. Some standing desks around here would be great”
“It’s a busy spot, never free, but chairs are not very comfortable after a while.”
“Good for a quick group meeting.”
Study Booth with Tech
Of the 320 responses, 85.94% of respondents don’t use this space. This may be due to unavailablity.
The average time used for individual work is 1.29 hours per week.
The average time used for group work is 1.32 hours per week.
The average group in this space is 3 - 4 people.
Technology:• Laptop 69.33%• Paper based 46.67%• PC (university property) 38.67%• Tablet 29.33%• Whiteboard 4.00%
Teaching Infrastructure Gap Masterplan 26 November 2015
Stakeholder ConsultationOnline Survey
“I love how there is a massive table with seats to study. I prefer this type of space and when during busy hours, there are hardly any spaces left...”
“It’s too secluded for me”
“Great for group work and lots of talking.”
“Too distracting, would prefer separate desks”
“Need better control of who uses this area, large groups can be noisy and should use closed rooms.”
Of the 333 responses, 78.98% of respondents don’t use this space.
The average time used for individual work is 1.47 hours per week.
The average time used for group work is 1.57 hours per week.
The average group in this space is 3 - 4 people.
Technology:• Laptop 77.48%• Paper based 56.76%• Tablet 24.32%• PC (university property) 16.22%• Whiteboard 7.21%
Compactus Room Group Study
Teaching Infrastructure Gap Masterplan 26 November 2015
Stakeholder ConsultationOnline Survey
“Great for groups of 2-3, I enjoy doing group study in these areas. Annoys me when one person is using them, they should find a space else where as these are limited.”
“This is the space I use most in the library. It’s really good for individual time to study.”
“I don’t find this a convenient study space and avoid this area.”
“These spaces seem to be pretty popular so are usually hard to get - but definitely one of the best causal spots!”
“Not enough of these booths”
Of the 341 responses, 51.03% of respondents don’t use this space. This may be due to unavailablity.
The average time used for individual work is 2.05 hours per week.
The average time used for group work is 1.99 hours per week.
The average group in this space is 3 - 4 people.
Technology:• Laptop 79.31%• Paper based 66.09%• Tablet 31.61%• PC (university property) 9.20%• Whiteboard 2.87%
Lounge study booth
14
3.0 BENCHMARKING CONT.LIBRARY COMPONENTS
Key to the master planning process has been the development of ‘Library Components.’ These components identify the key learning spaces and features that are required across all UniSA libraries. These spaces were identified as part of the post-occupancy benchmarking of the Jeffrey Smart Building.
The spaces that formed the library components are grouped into three main categories; - Student led spaces - a range of self-directed study settings available to students, whether they be social, group or individual environments - Teacher led spaces - focuses on group learning within interactive environments - Support facilities - include resources available to students and staff spaces including student interface and offices
Each components setting is categorised through the following: - Ambiance/zoning (noisy-quiet) - Furniture type - AV requirements - Capacity
UNISA LIBRARY MASTER PLANS | MASTER PLAN REPORT 15
LOUNGE
CASUAL LEARNING
FOOD + STUDY
STANDUP PC
SELF SERVICE POINT
COLLECTION
INDIVIDUAL FLEXIBLE TUTORIAL
INDIVIDUAL + PC
STUDY ROOM + PC / W.B.
OPEN STUDY
STAFFRESOURCESGROUP LEARNING INDIVIDUAL LEARNING
UTILITY
LIBRARY MASTERPLAN: KIT OF PARTS
GROUP TEACHING
COLLABORATIVETEACHING SPACE
OPEN STUDY + PC
OPEN STUDY (2 PERSONS + PC)PRIVATE INDIVIDUAL STUDY
VIDEO BOOTH AND AskLibIT
STUDENT LED TEACHER LED SUPPORT
Lounge settingslocated nearcirculation hubs
InformalNear EntriesResilient floorfinishes
Near confluenceof circulationShort termtransactions
With digitalscreen & PC.Potential forwhiteboardproximate
Gives sense ofprivacy4x people
Layout tablesGroup workNear CollectionsIndividuals6x people
In quieter areaswith computers.One chair percomputer
In noiser areasOption to workindependentlybut also in pairs
Quiet studywithout fixedcomputers.Provision forBYOD
Study on largetable formatwithoutcomputers.Potential forsome noise fromgroupdiscussions
Very quietindividual studycarrels
Use by indidualsand groupswhen nottimetabled
Arrangement withPC and 2 chairsto encourageteam work
With PC/ Digitalscreen andwhiteboardDocumentcamera6x people
HIGH EXPOSURE/NOISY LOW EXPOSURE/QUIET
STAFF
STUDENT SERVICES
COMPUTER POOL
UniSA Library Masterplan - Kit of Parts1384 UniSA Library Masterplan
3/02/2016 scale 1 : 200 @ A1 SK001(A)
Library Components
3.0 BENCHMARKING CONT.
16
BENCHMARK MODERATION
In addition to defining the settings for the library components, the Jeffrey Smart Building was used as a benchmark for the ratio of each component within the libraries. This ratio was then moderated to determine the quantity of learning space required on each campus based on their Equivalent Full-Time Student Load (EFTSL) as a comparison to the benchmark of City West
The moderation only applies to the learning components as both collection size and staff areas are fixed quantities of space on each campus.
Refer to Appendix 1: Supporting Data for details of Data Collection and graphs.
Across all campus the following are typical findings from benchmarking:
- All campuses have more space allocated to lounge than required - None of the libraries have any standup PCs for short-term student use - Open study space is too generous, except at City East - Study rooms are greatly undersupplied, except at Mawson Lakes - All campuses require more individual study spaces with fixed PCs
3.0 BENCHMARKING CONT.
Jeffrey Smart Building Benchmark
Level 1 Level 2 Level 3 Level 4 Level 5 Level 6 Level 7 Total (m2)Lounge 0 0 0 0 0 0 0 0Café study 0 0 49 0 48 9 0 106Standup PC 0 22 0 0 0 0 0 22Informal Multipurpose 178 0 0 0 0 0 0 178Collaborative Teaching 0 190 205 258 204 0 0 857Flexible Tutorial 0 0 0 0 0 0 0 0Classroom 0 60 0 0 59 72 0 191Open Study 91 96 99 124 94 48 0 552Study room 0 22 61 85 61 177 0 406Individual PC 0 100 161 178 177 151 0 767Individual 0 77 358 241 111 190 0 977Adaptive Technology 0 0 14 0 0 0 0 14Collection 0 48 85 99 223 67 0 522Service/Video 0 6 0 0 0 0 0 6Utility 0 21 38 38 38 29 0 164Staff 197 0 0 0 0 0 1217 1414Student Services 0 193 0 0 0 0 0 193Store 0 0 0 0 0 0 0 0Amenities 48 43 55 55 55 55 56 367Total 514 878 1125 1078 1070 798 1273 6736
UNISA LIBRARY MASTER PLANS | MASTER PLAN REPORT 17
3.0 BENCHMARKING CONT.City East requires approximately 700sqm of additional space on campus. This is due to the area required for staff accommodation as well as the restrictions of the Brookman Building. The benchmarking also indicates that the existing library has significantly less space for Study Rooms and Individual Study than what is required.
- Food and Study will be located outside the Brookman Building - Standup PC area is introduced into the library - Open study will need extra space on campus - A substantial amount of study room space is required elsewhere on campus - Individual study is the most needed space within the library, with more than double the proposed required elsewhere on campus - Individual with fixed PC requires additional space
City East ExistingBenchmark moderation
ProposedAdditional Required
EFTSL 6,445Number of volumes 63,000 N/A 25,000 N/A Length / size 1,731 N/A Area 573 N/A 213 213 Casual Learning (Lounge + Food) 50 97 0 97 Stand‐up PC 0 20 43 ‐ 23 Group Learning – open study 491 481 398 83 Group Learning – study room 151 370 164 206 Individual Learning 368 890 414 476 Individual Learning w PC 420 699 458 241 Adaptive Tech Suite 30 N/A 30 N/A Area 1,480 2,557 1,477 1,080 Total student area per EFTSL 0.23 0.40 0.23 0.17 Collaborative Teaching 173 N/A 173 N/A Flexible Tutorial 0 N/A 0 N/A Computer Pool 68 N/A 68 N/A Service point / video booth 0 N/A 19 N/A Utility 92 N/A 24 N/A
Student Services Service Pods / interview rooms etc 33 N/A 102 N/A Number of staff 15 N/A 30 18 Area 307 N/A 366 216
Total Library Space (excluding Circulation)
2,726 N/A 2,472 1,080
Total Student Area
Staff Areas
Collection
Teacher Directed
Resources
Student Led
18
Magill has a small amount of space released for other use. As the collection is significantly reduced further space is released for alternate use.
- Standup PC is introduced into the Library - The existing library has excessive open study space which is reduced to less than half - Study rooms are increased - The existing amount of both individual study and individual with fixed PC is fairly close to the required amount
3.0 BENCHMARKING CONT.
Magill ExistingBenchmark moderation
ProposedAdditional Required
EFTSL 4,890Number of volumes 85,000 N/A 50,000 N/A Length / size 2,279 N/A 1,323 N/A Area 588 N/A 282 N/A Casual Learning (Lounge + Food) 161 73 75 ‐ 2 Stand‐up PC 0 15 39 ‐ 24 Group Learning – open study 721 365 313 52 Group Learning – study room 153 281 245 36 Individual Learning 526 675 506 169 Individual Learning w PC 420 530 403 127 Adaptive Tech Suite 20 N/A 20 N/A Area 1,981 1,939 1,581 358 Total student area per EFTSL 0.41 0.40 0.32 0.07 Collaborative Teaching 187 N/A 187 N/A Flexible Tutorial 0 N/A 350 N/A Computer Pool 46 N/A 46 N/A Service point / video booth 0 N/A 0 N/A Utility 117 N/A 15 N/A
Student Services Service Pods / interview rooms etc 236 N/A 212 N/A Number of staff 36 N/A 39 N/A Area 536 N/A 574 N/A
Total Library Space (excluding Circulation)
3,691 N/A 3,267 358
Collection
Teacher Directed
Resources
Staff Areas
Total Student Area
Student Led
UNISA LIBRARY MASTER PLANS | MASTER PLAN REPORT 19
3.0 BENCHMARKING CONT.Mawson Lakes has significant space released for alternative use equivalent to 1335m2 or one and a half building floors.
- The existing lounge and food and study space is more than sufficient - Standup PC is added to the library - Further space is required for Individual study and study rooms
Mawson Lakes ExistingBenchmark moderation
ProposedAdditional Required
EFTSL 2,867Number of volumes 141,951 N/A 50,000 N/A Length / size 3,186 N/A 1,323 N/A Area 751 N/A 278 N/A Casual Learning (Lounge + Food) 748 43 342 ‐ 299 Stand‐up PC 0 9 96 0Group Learning – open study 502 214 369 ‐ 155 Group Learning – study room 175 164 368 ‐ 204 Individual Learning 479 396 768 ‐ 372 Individual Learning w PC 126 311 392 ‐ 81 Adaptive Tech Suite 12 N/A 12 N/A Area 2,030 1,137 2,335 ‐ 1,111 Total student area per EFTSL 0.71 0.40 0.81 ‐ 0.39 Collaborative Teaching 0 N/A 0 N/A Flexible Tutorial 0 N/A 0 N/A Computer Pool 77 N/A 84 N/A Service point / video booth 0 N/A 33 N/A Utility 68 N/A 24 N/A
Student Services Service Pods / interview rooms etc 194 N/A 117 N/A Number of staff 78 N/A 109 N/A Area 2,026 N/A 1,448 N/A
Total Library Space (excluding Circulation)
5,146 N/A 4,331 ‐ 1,111
Collection
Teacher Directed
Resources
Staff Areas
Total Student Area
Student Led
20
4.0 DESIGN PRINCIPLES
Image: Jeffrey Smart Building, photo by Sam Noonan
UNISA LIBRARY MASTER PLANS | MASTER PLAN REPORT 21
4.0 DESIGN PRINCIPLES
The key design principles include:
- Legible wayfinding and internal circulation - Social learning, group study spaces near circulation (loud) - Individual study zones in remote (quiet) areas - Maximise flexible learning arrangements for group and quiet study - Locate collections in discreet low public circulation areas - Locate group learning spaces in visually prominent locations to activate areas - Maximise natural light - Co-locate all staff accommodation to discreet, less public areas - Apply UniSA policy to office accommodation - Fit for purpose upgrade of building services
Key design principles have been identified to inform the approach to master planning the libraries within the context of the unique features of each campus and library building.
Legibility of entries and connection to the campus
Locate Student Services areas adjacent to entries and high flow areas
Prominent presence integrated into the campus
Utilise collection to create buffers to individual study settings
Zone spaces from loud to quiet
Prioritise student space. Staff to peripheries
QUIET LOUD LOUD QUIET
CAMPUSENTRY
ENTRY
ENTRY CAMPUS
STAFF
QUIET INDIVIDUAL
ACTIVE GROUP
INDIVIDUAL STUDY
COLLECTION
GROUP STUDY
STUDENTSERVICES
QUIET LOUD LOUD QUIET
CAMPUSENTRY
ENTRY
ENTRY CAMPUS
STAFF
QUIET INDIVIDUAL
ACTIVE GROUP
INDIVIDUAL STUDY
COLLECTION
GROUP STUDY
STUDENTSERVICES
22
5.0 CAMPUS MASTER PLANS
UNISA LIBRARY MASTER PLANS | MASTER PLAN REPORT 23
Image: Brookman Building, photo by Heidi Who
5.1 CITY EAST CAMPUS
5.2 MAGILL CAMPUS
5.3 MAWSON LAKES CAMPUS
24
5.1 CITY EAST CAMPUS
KEY ISSUES
Architectural
- No access via the library from North Terrace through into the campus - Main entry point within the campus is flanked by services and amenities - Staff offices occupy premium public space on Level 3 - Difficult to locate stairs to circulate up through the building - Amenities and stairs do not comply with building codes and standards - Poor security over several floors - Dispersed collection due to floor loading issues - Noise transfer between Level 4 Mezzanine - Poor sun control to eastern windows - No wet weather entry from campus - Brookman Building not designed to resist contemporary earthquake code - Lack of transparency of main entrance - Egress compliance
Services
- Plant size limitation of roof - Intrusive plant noise - Services are generally exposed to view within both Centenary and Brookman buildings. - Lack of suitable space to locate plant and equipment either externally or internally.
Mechanical - Air conditioning systems of various ages with some areas not served by air conditioning - The Library and Brookman Hall are served by the same air handling unit located in Centenary Building which is switched between the Hall and the Library on a priority basis. - Some areas have only ceiling fans installed - Some areas are served by dilapidated air conditioning plant
Electrical - Poor lighting generally - Lighting alignment to shelves - Poor data/power reticulation - Dated and inefficient lighting installed throughout the Library with no lighting control.
Hydraulic - Some toilet areas within the Library are dated and only include cold water supply - No gas supply to the building for generation of hot water - Some sections of the sewer system are of an ageing material
Fire - Shortage of fire hose reel and hydrant coverage for Brookman building.
The Brookman building is provided with: - Fire detection of addressable operation, relatively new installation - Emergency warning and intercom system - Fire sprinkler system - Fire hose reels and portable fire extinguishers
The Library at City East Campus is accommodated within Levels 3, part Level 4 and the mezzanine of the Brookman Building with a link to part Level 4 Centenary Building. The Brookman Building is listed as a significant heritage building and is the public address for the City East Campus on North Terrace. However its current front entrance is more aesthetic than functional as it lacks purpose and is disconnected from the rest of the campus. Entry to the library is currently only from the southern side.
UNISA LIBRARY MASTER PLANS | MASTER PLAN REPORT 25
Brookman Building - Level 03
UP
RAM
P U
P
UP
UP
28/02/200812:38
14.6
7.1
160.1
40.5
17.6
12.7
28.08.6
62.0
4.5
4.7
2.1
18.1
16.8
12.0
16.611.9
3.6
12.1
32.9
4.85.7
124.6
54.2
21.23.5
10.1
3.1
30.3
46.933.5
204.0
5.27.1
174.3
14.7
2.2 2.6
1.4
20.4
10.2
160.0
17.7
1790.1 1579.7
1.9
B3-23
B3-15
B3-12
B3-21
B3-19
B3-18
B3-17B3-20
B3-22
B3-01
B3-39
B3-13
B3-08
B3-05A
B3-04A
B3-01AB3-38
B3-03
B3-02
B3-07
B3-11B3-11A
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-16
B3-04 B3-29
B3-34B
B3-10
B3-09
B3-05
B3-37
OFFICE
CORRIDOR
OFFICE
OFFICE
OFFICE
MEETING
STAFFMEETING
LIBRARY
A/L
LIFT
A/L
STAIR
STUDY LOUNGE
MALE
FEMALEFOYER
STORE
STAIR
CIRCULATION DESK
SERVERELEC DB
CORRIDOR
LIBRARY
UNISEX TOILETSTORE
MAIN SWITCH
PLANT
ADAPTIVE TECHNOLOGY SUITE
COMPUTER BARNSTUDY ROOM
BOOK STACK
A/LACCESS
BOOK STACK
LOBBY
A/L STORE
CLEANER
HIGH DEMAND COLLECTION
PRINTER ROOM
COMPUTER BARN
CORRIDOR
GBA FECA
UCA
UP
Centenary Building Cafeteria
m²
m²
m²
m²
m²
m²
m²m²
m²
m²
m²
m²
m²
m²
m²
m²m²
m²
m²
m²
m²m²
m²
m²
m²m²
m²
m²
m²
m²m²
m²
m²m²
m²
m²
m² m²
A U audited
m²
m²
m²
m²
m²
m² m²
m²
COLLECTION
STAFF AREAS
OPEN STUDY AREAS
LOUNGE SEATING
INDIVIDUAL STUDY
INDIVIDUAL STUDY + PC
RESOURCES
CAFE / BOOKSHOP
136m2
0m2
307m2
33m2
88m2
37m2
200m2
171m2
65m2
0m2
STORE20m2
TRAINING (INDIVIDUAL STUDY + PC)
STUDY ROOMS
STUDENT SERVICES33m2
CEA Brookman Level 03 - Existing1384 UniSA Library Masterplan
25/08/2016 scale 1 : 200 @ A1 SK100(A)
DOWN
DOWN
DOWN
UP
UP
DOWN
UP
DOWN
UP
DOWN
28/02/200813:21
PHONE1100AFL
RAMP UP
B4-12C
B4-25
B4-24
B4-16
B4-20A
B4-19
B4-18
B4-22
B4-21B4-26
B4-01
B4-04
B4-04C
B4-04D
B4-04E
B4-09
B4-23B4-05
B4-06
B4-06A
B4-07
B4-07E
B4-07DB4-07C
B4-15
B4-11
B4-14
B4-13
B4-12BB4-12A
B4-10A
B4-03B
B4-22A
B4-10B
B4-10
B4-20
B4-20B
B4-03A
B4-03
13.0
14.2
16.8
178.0
68.4
21.0
2.9
24.6
63.353.1
103.5
93.6
13.5
8.7
9.7
6.7
72.74.8
3.1
18.0
85.6
2.7
3.33.7
14.0
303.2
9.8
15.0
19.115.0
30.9
22.8
13.2
5.1
5.8
9.5
47.4
12.9
79.9
1738.0 1601.0
STUDY ROOM
STAIR
STAIR
LIBRARY
TUTORIAL
STAIR
STORE
CORRIDOR
TUTORIALSTAIR
FOYER
MARKETING AND ADMISSIONS
OFFICE
OFFICE
OFFICE
COMMS
CORRIDOR
STORE
A/L
FEMALE
TUTORIAL
A/L
STORETEA ROOM
STUDY ROOM
LIBRARY
STUDY ROOM
STUDY ROOM
STUDY ROOMSTUDY ROOM
MULTI ACCESS
OFFICE
CORRIDOR
ACCESS
LOBBY
CORRIDOR
TUTORIAL
MEETING ROOM
STUDENT SERVICES CENTRE
GBA FECA
LIFT
LINK TOCENTENARYBUILDING LEVEL 04
BUILDING LEVEL 04CENTENARYLINK TO
CENTENARY BUILDING
CAFETERIA
m²
m²
m²
m²
m²
m²
m²
m²
m²m²
m²
m²
m²
m²
m²
m²
m²m²
m²
m²
m²
m²
m²m²
m²
m²
m²
m²
m²m²
m²
m²
m²
m²
m²
m²
m²
A U audited
m²
m²
m² m²
72m2
0m2
0m2
88m2
125m2
0m2
106m2
120m2
12m2
0m2
0m2
COLLECTION
STAFF AREAS
OPEN STUDY AREAS
LOUNGE SEATING
INDIVIDUAL STUDY
INDIVIDUAL STUDY + PC
RESOURCES
CAFE / BOOKSHOP
STORE
TRAINING (INDIVIDUAL STUDY + PC)
STUDY ROOMS
CEA Brookman Level 04 - Existing1384 UniSA Library Masterplan
scale 1 : 200 @ A1 SK101
Brookman Building - Level 04
5.1 CITY EAST CAMPUS CONT.
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
EXISTING
26
Brookman Building - Level 04 Mezzanine
LIFT
28/02/200813:49
BM-02
BM-04
BM-03
BM-01
STAIR
LIFT PLANT
STAIR
MEZZANINE
GBA FECA
11.4
5.8
18.1
367.9
511.6 408.1
DOWN
DOWN
Centenary Building CafeteriaVOID
m²
m²
m²
m²
A U audited
m² m²
104m2
91m2
13m2
70m2
74m2
9m2
COLLECTION
STAFF AREAS
OPEN STUDY AREAS
LOUNGE SEATING
INDIVIDUAL STUDY
INDIVIDUAL STUDY + PC
RESOURCES
CAFE / BOOKSHOP
STORE
TRAINING (INDIVIDUAL STUDY + PC)
STUDY ROOMS
0m2
0m2
0m2
0m2
0m2
CEA Brookman Level 04 Mezzanine - Existing1384 UniSA Library Masterplan
scale 1 : 200 @ A1 SK102
RAMP UP
UP
DN
DN
UP
UP
28/02/200810:01
RAMP UP
105.3
0.412.3
404.5
1.5
0.7
3.2
0.5
0.26.8
37.424.3
14.0
67.5
261.2
1.8
1.4
2.4
10.6
5.8
29.210.9
13.6
32.8
52.5
11.4
12.9
43.4
120.8
18.3
9.4 9.5
83.4
14.5
15.4
37.8
16.7
31.7
187.4
21.5
13.112.011.712.012.012.012.0
0.3
1.212.012.012.015.4
12.1
11.811.9
6.8
0.9
2110.8 2043.0
C4-50
C4-13C4-12
C4-07
C4-06
C4-05
C4-04
C4-03
C4-02C4-04A
C4-46C4-47
C4-01
C4-07A
C4-49
C4-08
C4-09
C4-10
C4-09A
C4-11
C4-07BC4-07C
C4-14
C4-15
C4-20
C4-21
C4-22
C4-19
C4-17
C4-45
C4-16A C4-16B
C4-48
C4-44
C4-43
C4-41
C4-40
C4-39
C4-16
C4-42
C4-38C4-37C4-36C4-35C4-34C4-33C4-32
C4-27
C4-26C4-31C4-30C4-29C4-28
C4-23
C4-25C4-24
C4-14A
C4-49A
CORRIDOR
FHRSTAIR
LIBRARY
ELEC DB
COMMS
A/L
TELECOM RISER
FHRMALE
OFFICEPLANT ROOM
STAIR
LIBRARY COMPUTER POOL
CORRIDOR
CLNR
A/L
CLNR
FEMALE
ACCESS
BASIL HETZEL COLLECTIONSTORE
PRINTING
PLANT ROOM
NURSING PREP LAB
OFFICE
OFFICE
STORE
TUTORIAL
OFFICE
STORE STORE
NURSING SKILLS LAB
OFFICE
OFFICE
BOARDROOM
OFFICE
STUDENT COMMON ROOM
LECTURE
UTILITY
OFFICEOFFICEOFFICEOFFICEOFFICEOFFICEOFFICE
FHR
MECH RISEROFFICEOFFICEOFFICEOFFICE
STAIR
OFFICEOFFICE
COLLECTION
TEA ALCOVE
GBA FECA
LINK TOBROOKMANBUILDING LEVEL 04
LINK TOPLAYFORDBUILDING
BUILDING LEVEL 04BROOKMANLINK TO
BROOKMAN BUILDING
LIFTS
m²
m²m²
m²
m²
m²
m²
m²
m²m²
m²m²
m²
m²
m²
m²
m²
m²
m²
m²
m²m²
m²
m²
m²
m²
m²
m²
m²
m²
m² m²
m²
m²
m²
m²
m²
m²
m²
m²
m²m²m²m²m²m²m²
m²
m²m²m²m²m²
m²
m²m²
A U audited
m²
m²
m² m²
29m2
68m2
0m2
0m2
187m2
0m2
0m2
0m2
0m2
0m2
32m2
COLLECTION
STAFF AREAS
OPEN STUDY AREAS
LOUNGE SEATING
INDIVIDUAL STUDY
INDIVIDUAL STUDY + PC
RESOURCES
CAFE / BOOKSHOP
STORE
TRAINING (INDIVIDUAL STUDY + PC)
STUDY ROOMSCOLLABORATIVETEACHING SPACE
173m2 COLLABORATIVE TEACHING
CEA Centenary Level 04 - Existing1384 UniSA Library Masterplan
25/08/2016 scale 1 : 200 @ A1 SK103(A)
Centenary Building - Level 04
5.1 CITY EAST CAMPUS CONT.
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
EXISTING
UNISA LIBRARY MASTER PLANS | MASTER PLAN REPORT 27
5.1 CITY EAST CAMPUS CONT. DESIGN RESPONSE
- Use the library to link North Terrace and the campus via a new interconnecting stair between levels 3 and 4 - Reinstate a southern entrance to the Library and the campus from North Terrace, via the Brookman Building main entrance and new accessible entry from North Terrace - Relocate all collections to Level 03, including collection in Centenary Building - Remove existing interconnecting stair between Level 3 and Level 4 Mezzanine and fill in remaining void - Fill in void on Level 4 Mezzanine and gaps between level 4 and mezzanine - New lift to service all floors of the building - New toilets to all floors - New fire stair - Move staff to Level 4 and Level 4 Mezzanine - Staff and service point on Level 3 for implementation of an integrated service delivery model - Strengthen link to Centenary Building through appropriate spaces
- New General, emergency and exit lighting - General power points and dedicated power supplies - New data and wireless provisions - Modification of Sprinkler layout to suit new layouts and modification to air conditioning ductwork. - Review extinguishers throughout - New lift and fire stair shafts require underpinning to accommodate the lift pit
The benchmarking and moderation of Jeffrey Smart Building indicates that the Brookman Building is of insufficient size to accommodate the required study space for the student population of the City East Campus. The following will need to be provided elsewhere on campus:
Casual Learning - Lounge -97sqm
Group Learning - Open Study - 83sqm - Study Room - 20sqm
Individual Learning - Individual - 476sqm - Individual with fixed PC - 241sqm
Staff - Open plan offices - 234sqm
Total - 1337sqm
IMPLEMENTATION STRATEGY
Stage 1 - Brookman Building, Northern spine
- Remove toilets from Northern entry, Level 3 - New toilets to all levels - New lift - Fitout student services and individual study spaces - Fill in Level 4 Mezzanine void - Fill in gaps of windows at Level 4 Mezzanine
- Relocate staff to Level 4 Mezzanine
Stage 2 - Brookman Building Level 4, Eastern Wing and Centenary Building Level 4
- Interconnecting stair between Levels 3 & 4 - Relocate remaining staff to Level 4 Mezzanine - Fitout individual and group study spaces - Fitout group study and study rooms in Centenary Building - External entry ramp to Level 4
Stage 3 - Brookman Building Level 3
- Move remainder of collection to Level 3, including Centenary Building collection - Fitout individual and group study spaces, study rooms, computer barn and collection spaces in Brookman Building
28
5.1 CITY EAST CAMPUS CONT.
Brookman Building - Level 04 Brookman Building - Level 03
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
DOWN
DOWN
DOWN
UP
UP
DOWN
UP
DOWN
28/02/200813:21
RAMP UP
B4-24
B4-16
B4-19
B4-18
B4-26
B4-01
B4-04
B4-04C
B4-04D
B4-04E
B4-23
B4-07
B4-07E
B4-07DB4-07C
B4-11
B4-03B
B4-03A
B4-03
16.8
178.0
21.0
2.9
53.1
103.5
93.6
13.5
8.7
9.7
72.7
85.6
2.7
3.33.7
303.2
22.8
12.9
79.9
1738.0 1601.0
STAIR
LIBRARY
STAIR
STORE
STAIR
FOYER
MARKETING AND ADMISSIONS
OFFICE
OFFICE
OFFICE
CORRIDOR
TUTORIAL
A/L
STORETEA ROOM
LIBRARY
OFFICE
MEETING ROOM
STUDENT SERVICES CENTRE
GBA FECA
LIFT
LINK TOCENTENARYBUILDING LEVEL 04
BUILDING LEVEL 04CENTENARYLINK TO
CENTENARY BUILDING
CAFETERIA
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²m²
m²
m²
A U audited
m²
m²
m² m²
FUTURESTAIR
TOILETS
NORTH TERRACEENTRY
0m2
0m2
28m2
0m2
0m2
193m2
178m2
107m2
121m2
13m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
LIFT
NEW OPENING ANDDDA RAMP ENTRYFROM NORTH TERRACE(INDICATIVE)
STAGE 2
STAGE 1
STAGE 2
40m2
0m2
STUDENT SERVICES
PRIMARY
CIRCULATION
SECONDARY
0m2
0m2
STAGE 1
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
0m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
CEA Brookman Level 04 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK111(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
PROPOSED
UNISA LIBRARY MASTER PLANS | MASTER PLAN REPORT 29
5.1 CITY EAST CAMPUS CONT.
Brookman Building - Level 04 Mezzanine Centenary Building - Level 04
LIFT
28/02/200813:49
BM-02
BM-04
BM-01
STAIR
LIFT PLANT
MEZZANINE
GBA FECA
11.4
5.8
511.6 408.1
DOWN
Centenary Building Cafeteria
m²
m²
A U audited
m² m²
LOUNGE
CASUAL LEARNING
0m2
CAFE STUDY0m2
STANDUP PC0m2
STAFF366m2
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH0m2
COLLECTION0m2
0m2
0m2
0m2
0m2
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY0m2
0m2
0m2
GROUP TEACHING
FUTURESTAIR
PLANT
LIFT
STAGE 1
0m2
0m2
STUDENT SERVICES
PRIMARY
CIRCULATION
SECONDARY
0m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
0m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
CEA Brookman Level 04 Mezzanine - Proposed1384 UniSA Library Masterplan
3/02/2016 scale 1 : 200 @ A1 SK112(E)
RAMP UP
UP
DN
DN
UP
UP
RAMP UP
105.3
0.412.3
1.5
0.7
3.2
0.5
0.26.8
37.424.3
14.0
67.5
261.2
1.8
1.4
2.4
10.6
5.8
29.210.9
13.6
32.8
52.5
11.4
12.9
43.4
120.8
18.3
9.4 9.5
83.4
14.5
15.4
37.8
16.7
31.7
187.4
21.5
13.112.011.712.012.012.012.0
0.3
1.212.012.012.015.4
12.1
11.811.9
6.8
0.9
C4-50
C4-13C4-12
C4-06
C4-05
C4-04
C4-03
C4-02C4-04A
C4-46C4-47
C4-01
C4-07A
C4-49
C4-08
C4-09
C4-10
C4-09A
C4-11
C4-07BC4-07C
C4-14
C4-15
C4-20
C4-21
C4-22
C4-19
C4-17
C4-45
C4-16A C4-16B
C4-48
C4-44
C4-43
C4-41
C4-40
C4-39
C4-16
C4-42
C4-38C4-37C4-36C4-35C4-34C4-33C4-32
C4-27
C4-26C4-31C4-30C4-29C4-28
C4-23
C4-25C4-24
C4-14A
C4-49A
CORRIDOR
FHRSTAIR
ELEC DB
COMMS
A/L
TELECOM RISER
FHRMALE
OFFICEPLANT ROOM
STAIR
LIBRARY COMPUTER POOL
CORRIDOR
CLNR
A/L
CLNR
FEMALE
ACCESS
BASIL HETZEL COLLECTIONSTORE
PRINTING
PLANT ROOM
NURSING PREP LAB
OFFICE
OFFICE
STORE
TUTORIAL
OFFICE
STORE STORE
NURSING SKILLS LAB
OFFICE
OFFICE
BOARDROOM
OFFICE
STUDENT COMMON ROOM
LECTURE
UTILITY
OFFICEOFFICEOFFICEOFFICEOFFICEOFFICEOFFICE
FHR
MECH RISEROFFICEOFFICEOFFICEOFFICE
STAIR
OFFICEOFFICE
COLLECTION
TEA ALCOVE
LINK TOBROOKMANBUILDING LEVEL 04
LINK TOPLAYFORDBUILDING
BUILDING LEVEL 04BROOKMANLINK TO
BROOKMAN BUILDING
LIFTS
m²
m²m²
m²
m²
m²
m²
m²m²
m²m²
m²
m²
m²
m²
m²
m²
m²
m²
m²m²
m²
m²
m²
m²
m²
m²
m²
m²
m² m²
m²
m²
m²
m²
m²
m²
m²
m²
m²m²m²m²m²m²m²
m²
m²m²m²m²m²
m²
m²m²
m²
m²
COLLABORATIVETEACHING SPACE
0m2
0m2
0m2
0m2
0m2
0m2
0m2
24m2
141m2
4m2
68m2
173m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
STAGE 2
0m2
32m2
0m2
STUDENT SERVICES
PRIMARY
CIRCULATION
SECONDARY
0m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE0m2
0m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
CEA Centenary Level 04 - Proposed1384 UniSA Library Masterplan
3/08/2016 scale 1 : 200 @ A1 SK113(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
PROPOSED
30
5.2 MAGILL CAMPUS
KEY ISSUES
- Library lacks a sense of identity and campus presence - Poor wayfinding to locate the library within the campus - Poor mixing of noisy and quiet learning spaces - Poor light quality in the Eastern wing of Building B - Various floor levels throughout - Poor visual links to the outdoor campus
The library is located on Level 2 across Buildings A and B. Of all of the UniSA campuses it is the only one that does not have a library with a ground floor presence, which results in poor wayfinding.
UNISA LIBRARY MASTER PLANS | MASTER PLAN REPORT 31
Buildings A and B - Level 02
DOWN
DO
WN
DOWN
UP
UP
DOWN
DOWN
UP
UP
0.3
0.4
3.7
1.9
3.7
14.3
0.8
0.4
0.4
0.5
15.5
15.5
1064.3
2.4
85.2
287.2
1.6
8.9
3.2
1.6
385.2
47.2
11.6
116.3
25.0
5.1
0.8
10.6
14.4
27.4
7.9
3.8
2.3
21.4
3.5 9.6
75.2
116.1
17.9
9.9
11.8
10.3
10.9
8.3
10.8
10.3
12.0
48.3
10.7
11.7
12.4
12.5
12.5
66.3
3.1
12.1
12.1
14.1
0.2
0.2
32.7
6.1
14.9
2.1
64.1
12.8
8.7
5.5 5.5
8.4
0.3
0.6
3109.5 2937.6
4.3
B2-50
B2-30A
B2-39C
B2-39A
B2-39B
B2-25
B2-25B
B2-47
B2-46
B2-48
B2-45
B2-44
B2-43
B2-49
B2-26
B2-42
B2-36A
B2-30
B2-03
B2-25A
B2-41
B2-29
B2-31
B2-32
B2-36
B2-39
B2-37A
B2-37
B2-38
B2-34
B2-04
B2-01B
B2-02
B2-02A
B2-01 B2-01A
B2-56
B2-28
B2-24
B2-13
B2-12
B2-11
B2-10
B2-05
B2-06
B2-07
B2-09
B2-08
B2-15
B2-23
B2-22
B2-21
B2-20
B2-14
B2-16
B2-19
B2-18
B2-17
B2-28A
B2-28B
B2-35
B2-33
B2-57
B2-26A
B2-27
B2-29A
B2-58
B2-59 B2-60
B2-38A
B2-36B
B2-36C
FHR
FHR
WC
WC
WC
HUB
ELEC DB
FHR
ELEC DB
ELEC DB
PLANT
PLANT
LIBRARY
PLANT
FRONT DESK
COMPUTER BARN
STORE
CORRIDOR
CLNR
PLANT
LIBRARY
ACADEMIC LIBRARY SERVICES
OFFICE
WORK AREA
STAIR
A/L
ROOF ACCESS
LOUNGE
STAFF ROOM
STUDY ROOM
OFFICE
ACCESS
A/L
FEMALE
A/L MALE
CORRIDOR
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
MEETING ROOM
MECH SERV RISER
STORE
PLANT
OFFICE
OFFICE
LABORATORY
OFFICE
OFFICE
OFFICE
ELEC DB
FHR
MULTI ACCESS SUITE
LOBBY
STAIR
HOIST
BOOK STORAGE
OFFICE
STAIR
STAIR STAIR
KITCHENETTE
FHR
ELEC DB
GBA FECA
UCA
FFL 119.990 FFL 119.990
dp
UP
DOWN
1 5 /0 8 /2 0 08 1 3 :5 3
A2-32A
A2-24
A2-35
A2-03
A2-04
A2-05
A2-06
A2-09
A2-07
A2-01
A2-02
A2-15
A2-14
A2-13
A2-12
A2-30A
A2-21B A2-21A
A2-21
A2-20
A2-21C
A2-30
A2-31B
A2-31A
A2-31
A2-32
A2-25 A2-26 A2-27
A2-28
A2-29
A2-22
A2-36
A2-23
A2-31C
A2-99
0.2
11.9
16.1
15.3
11.2
11.2
11.2
22.7
46.6
336.4
501.4
19.9
10.8
10.6
10.6
1.1
16.4 9.5
3.0
16.5
7.6
4.6
19.1
6.7
3.8
62.7
17.2 15.6 16.6
11.8
12.3
11.7
10.2
11.9
2.1
1672.6 1316.4
93.6
FHR
OFFICE
STAIR
PRINTER ROOM
STUDY ROOM
STUDY ROOM
STUDY ROOM
OFFICE
COMPUTER POOL
COMPUTER BARN
LIBRARY
ADAPTIVE
TECHNOLOGY
SUITE
STUDY ROOM
STUDY ROOM
STUDY ROOM
ROOF ACCESS
FEMALE MALE
A/L
FOYER
CLEANER
STORE
OFFICE
KITCHEN
LOBBY
MEETING
OFFICE OFFICE OFFICE
OFFICE
OFFICE
WAITING ROOM
CORRIDOR
OFFICE
HOIST
GBA FECA
OPEN DECKUCA
UP UPRAMP UP
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m² m²
m²
m²
m²
m²
m²
m²
m²
m²
m² m² m²
m²
m²
m²
m²
m²
A U au d it e d
m²
m² m²
m²m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m² m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m² m²
m²
m²
m²
m² m²
m²
m²
m² m²
197.6
636.7 197.6
B3-01
COMPUTER BARN
GBA FECA
VOID
LIFT
High level windows over.
carrels
carrels
FFL 123.100
FFL 123.100
M0.01
M0.01
FALL
FA
LL
FA
LL
dp dp dp dp dp dp
dp dp dp dp dp dp
DOWN DOWN
UP
B1-61
B1-57
B1-58 B1-59B1-62
B1-67A
B1-68
B1-69
B1-70
B1-63
B1-72A
B1-72
B1-66
B1-71
B1-74
B1-73B1-75
B1-76
B1-88
B1-47B
B1-47A
B1-56
B1-48
B1-89
B1-67
0.9
0.6
22.8 14.938.6
13.1
12.2
11.4
12.2
15.7
4.9
20.2
106.7
11.4
10.8
18.973.8
10.5
157.0
16.6
11.6
13.0
12.6
9.1
22.8
FHR
ELEC DB
OFFICE OFFICEOFFICE
OFFICE
OFFICE
UTILITY
OFFICE
MEETING
TEA
ROOM
SECURE STORE OFFICE
INTERVIEW
READER STORE
RECEPTIONCAMPUS CENTRAL
AIR LOCK
CORRIDOR
OFFICE
OFFICE
STORE
OFFICE
CORRIDOR
OFFICE
m²
m²
m² m²
m²m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
588m2
270m2
536m2
90m2
721m2
161m2
526m2
159m2
117m2
8m2
20m2
COLLECTION
STAFF AREAS
OPEN STUDY AREAS
LOUNGE SEATING
INDIVIDUAL STUDY
INDIVIDUAL STUDY + PC
RESOURCES
CAFE / BOOKSHOP
STORE
TRAINING (INDIVIDUAL STUDY + PC)
STUDY ROOMS
236m2 STUDENT SERVICES
COLLABORATIVETEACHING SUITE
STUDY ROOM
STUDY ROOM
MAG Building B - Existing
1384 UniSA Library Masterplan
3/08/2016 scale 1 : 250 @ A1 SK300(A)
1 : 250
M Building B Level 021
1 : 250
M Building B Mezzanine2
1 : 250
M Building B Level 01 - Existing3
5.2 MAGILL CAMPUS CONT.
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
EXISTING
32
5.2 MAGILL CAMPUS CONT.DESIGN RESPONSE
Architectural
- Increase presence of library and strengthen entry legibility through new interconnecting stair in Building B linking from Campus Central - Improve the integration of spaces and physical collections - Consolidate collection into Western Wing of Building B - Zone the Eastern wing of Building B for noisier group study - Remove sections of wall in Building B to introduce natural light - New ramp up to eastern wing - Upgrade study rooms and increase provision - Staff to occupy western end of Building B Eastern Wing - Integrate ISTS within staff space - Additional space utilised as teaching spaces
The benchmarking and moderation of Jeffrey Smart Building indicates that additional space is required on campus:
Group Learning - Open Study - 82sqm - Study Room - 36sqm
Individual Learning - Individual - 169sqm - Individual with fixed PC - 127sqm
Total - 384sqm
Services
- Install additional base building emergency lighting - Install exit and emergency test facility to be installed in distribution board DB-B-2A - Upgrade to T5 fluorescent and LED technology to be considered as part of fitout works - Centralise lighting control and/or lighting control system including local motion sensors and programmable lighting control panels - Additional occupant warning speakers be provided throughout and existing amplifiers be upgraded accordingly. - Upgrade the existing thermal detectors to smoke detectors.
Structural
- New stair will require a new steel member will be required to support the top of the new stair - New ramp of lightweight construction, supported on the existing floor structure - New window openings will require existing girts be cut and re-supported with secondary steelwork
IMPLEMENTATION STRATEGY
Stage 1 - Building B Eastern Wing
- New windows along Northern facade - New interconnecting stair between levels 01 and 02 - Group study, study rooms and individual study with PC to northern edge - Remove collections from eastern wing - Create new floor area on the mezzanine for group study
Stage 2 - Building B Western Wing
- Consolidate majority of collection in Western wing - Fitout individual study - Consolidate staff areas
Stage 3 - Building A
- Fitout individual study and individual with PC
Future Stage - Flexible Tutorial
- Fitout Flexible Tutorial rooms in Eastern Wing
UNISA LIBRARY MASTER PLANS | MASTER PLAN REPORT 33
5.2 MAGILL CAMPUS CONT.
DOWN
DO
WN
DOWN
UP
UP
DOWN
DOWN
UP
UP
0.3
0.4
3.7
1.9
3.7
14.3
0.4
0.5
15.5
15.5
1064.3
2.4
287.2
1.6
8.9
3.2
1.6
385.2
11.6
116.3
25.0
5.1
0.8
10.6
14.4
27.4
7.9
3.8
2.3
21.4
3.5 9.6
75.2
116.1
17.9
9.9
11.8
10.3
10.9
8.3
10.8
10.3
12.0
48.3
10.7
11.7
12.4
12.5
12.5
66.3
3.1
12.1
12.1
14.1
0.2
0.2
32.7
6.1
14.9
8.7
5.5 5.5
8.4
0.3
0.6
3109.5 2937.6
4.3
B2-50
B2-30A
B2-39C
B2-39A
B2-39B
B2-25
B2-47
B2-48
B2-45
B2-44
B2-43
B2-49
B2-42
B2-36A
B2-30
B2-03
B2-25A
B2-41
B2-31
B2-32
B2-36
B2-39
B2-37A
B2-37
B2-38
B2-34
B2-04
B2-01B
B2-02
B2-02A
B2-01 B2-01A
B2-56
B2-28
B2-24
B2-13
B2-12
B2-11
B2-10
B2-05
B2-06
B2-07
B2-09
B2-08
B2-15
B2-23
B2-22
B2-21
B2-20
B2-14
B2-16
B2-19
B2-18
B2-17
B2-28A
B2-28B
B2-35
B2-33
B2-57
B2-58
B2-59 B2-60
B2-38A
B2-36B
B2-36C
FHR
FHR
WC
WC
WC
HUB
FHR
ELEC DB
PLANT
PLANT
LIBRARY
PLANT
COMPUTER BARN
STORE
CORRIDOR
CLNR
PLANT
LIBRARY
OFFICE
WORK AREA
STAIR
A/L
ROOF ACCESS
LOUNGE
STAFF ROOM
STUDY ROOM
OFFICE
ACCESS
A/L
FEMALE
A/L MALE
CORRIDOR
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
MEETING ROOM
MECH SERV RISER
STORE
PLANT
OFFICE
OFFICE
LABORATORY
OFFICE
OFFICE
OFFICE
ELEC DB
FHR
MULTI ACCESS SUITE
LOBBY
STAIR
STAIR
STAIR STAIR
KITCHENETTE
FHR
ELEC DB
GBA FECA
UCAFFL 119.990
dpdpdp dp dpdp dpdpdpdp dp dpdp
dpdpdp dp dpdpdpdpdp dp dpdp dp
UP
DOWN
1 5 /0 8/20 08 1 3:53
A2-32A
A2-24
A2-35
A2-03
A2-04
A2-05
A2-06
A2-09
A2-07
A2-01
A2-02
A2-15
A2-14
A2-13
A2-12
A2-30A
A2-21B A2-21A
A2-21
A2-20
A2-21C
A2-30
A2-31B
A2-31A
A2-31
A2-32
A2-25 A2-26 A2-27
A2-28
A2-29
A2-22
A2-36
A2-23
A2-31C
A2-99
0.2
11.9
16.1
15.3
11.2
11.2
11.2
22.7
46.6
336.4
501.4
19.9
10.8
10.6
10.6
1.1
16.4 9.5
3.0
16.5
7.6
4.6
19.1
6.7
3.8
62.7
17.2 15.6 16.6
11.8
12.3
11.7
10.2
11.9
2.1
1672.6 1316.4
93.6
FHR
OFFICE
STAIR
PRINTER ROOM
STUDY ROOM
STUDY ROOM
STUDY ROOM
OFFICE
COMPUTER POOL
COMPUTER BARN
LIBRARY
ADAPTIVETECHNOLOGY
SUITE
STUDY ROOM
STUDY ROOM
STUDY ROOM
ROOF ACCESS
FEMALE MALE
A/L
FOYER
CLEANER
STORE
OFFICE
KITCHEN
LOBBY
MEETING
OFFICE OFFICE OFFICE
OFFICE
OFFICE
WAITING ROOM
CORRIDOR
OFFICE
HOIST
GBA FECA
OPEN DECKUCA
UP UPRAMP UP
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m² m²
m²
m²
m²
m²
m²
m²
m²
m²
m² m² m²
m²
m²
m²
m²
m²
AU a ud ited
m²
m² m²
m²m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m² m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m² m²
m²
m²
m²
m² m²
m²
m²197.6B3-01
COMPUTER BARNcarrels
FFL 123.100M0.01
FALL
FALL
FALL
dp dp dp dp dp dp
dp dp dp dp dp dp
DOWN DOWN
UP
B1-61B1-57
B1-58 B1-59B1-62 B1-67A
B1-68
B1-69
B1-70
B1-63B1-72A
B1-72B1-66
B1-71
B1-74
B1-73B1-75
B1-76
B1-88
B1-46A
B1-47D B1-47C B1-47B
B1-47 B1-47A
B1-52
B1-67
0.9
0.6
22.8 14.938.6 13.1
12.2
11.4
12.2
15.74.9
20.2106.7
11.4
10.8
18.973.8
10.5
157.0
11.7
17.0 17.0 16.6
24.3 11.6
74.2
22.8
FHRELEC DB
OFFICE OFFICEOFFICE OFFICE
OFFICE
UTILITY
OFFICE
MEETINGTEA
ROOM
SECURE STORE OFFICE
INTERVIEW
READER STORE
RECEPTIONCAMPUS CENTRAL
AIR LOCK
STORE
OFFICE OFFICE OFFICE
LOBBY OFFICE
TUTORIAL
OFFICE
m²
m²
m² m²m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²m²
m²
m²
m²
m² m² m²
m² m²
m²
m²
75m2
0m2
39m2
574m2
18m2
282m2
506m2
403m2
245m2
313m2
STAFF
15m2
350m2
187m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
STAGE 3
STAGE 1
STAGE 2 33m2
12m2
STUDENT SERVICES194m2
PRIMARY
CIRCULATION
SECONDARY
NEW WINDOWS TONORTHERN FACADE
FLEXIBLETUTORIAL
FLEXIBLETUTORIAL
COLLABORATIVETEACHING SUITE
STUDY ROOM
STUDY ROOM
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE20m2
47m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACE
MP0m2
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
127m2
OPEN STUDY52m2
STUDY ROOM36m2
384m2 TOTAL
INDIVIDUAL169m2
52m2 127m236m2
169m2
FUTURE STAGE
HIGH LEVEL CEILING OVERPOTENTIAL FLEXIBLE TUTORIALIN FUTURE STAGE
STAGE 1
Entry Entry
STAGE 1
MAG Building B - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 250 @ A1 SK310(G)
1 : 250M Building B Level 02 - Proposed1
1 : 250M Building B Mezzanine - Proposed2
1 : 250M Building B Level 01 - Proposed3
Buildings A and B - Level 02
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
PROPOSED
34
5.3 MAWSON LAKES CAMPUS
KEY ISSUES
- Two building standards, i.e. Sir Eric Neal Library and the 2005 extension - Heritage features of the original building - Plant noise in original building - Difference in lighting standards and energy efficiency - Poor power and data reticulation - Loose planning, especially staff office areas - Loading variation between original and new buildings - Western section of Level 1 to remain as is due to recent integrated services areas and a social/learning student space upgrade - Staff currently occupy the prime areas with good outlook on Levels 1, 2 and 3 - Staff density low
The Sir Eric Neal Library is accommodated in Levels 1 – 3 of Building C at the Mawson Lakes Campus. The building consists of an original library with a newer extension to the eastern side. The two buildings are very different in fitout quality and standards.
Sir Eric Neal Library - Level 01
Rol
ler S
hutte
r
FHR
FHR
FHR
UP
UP
UP
UP
C1-11A
C1-09
C1-15
C1-14
C1-23
C1-02
C1-10
C1-12
C1-01
C1-11
C1-08
C1-08A
C1-02B
C1-05
C1-13
C1-26
C1-25 C1-46
C1-03
C1-04
C1-41
C1-42
C1-40
C1-30
C1-29A
C1-28 C1-27
C1-31
C1-32
C1-29
C1-16 C1-18 C1-19
C1-22
C1-02A
C1-09B
C1-45
C1-07
C1-02C
C1-07A
C1-06A
C1-32A
C1-17
C1-40A
C1-40B
C1-66
C1-01A
C1-27A
C1-06
C1-21 C1-20
C1-24
C1-22B C1-22A
MALE
PLANT
OFFICE
STAFF LOUNGE
OFFICE
LIBRARY
STORE
SWITCHBOARD
ENTRY
A/L
A/L
FEMALE
COMMS
CLNR
LIFT
MAIL ROOM
STORE LIFT
LIBRARY SERVICE DESK
CHECK IN
OFFICE
HIGH DEMAND COLLECTION
OFFICE
MALE
ACCESS
ADAPTIVE TECH A/L
FEMALE
MULTI ACCESS SUITE
CLNR
QUIET ROOM INTERVIEW INTERVIEW
SAS/LTU RECEPTION
FIRE HYDRANT
DUCT
STAIR
CORRIDOR
RISER
FHR
KITCHEN
BABY CHANGE
UTILITY
KITCHENETTE
KITCHENETTE
STAIR
FHR
STORE
SEATING AREA
INTERVIEW INTERVIEW
STORE
WAITING UTILITY
GBA FECA
UCA
UCA
UCA
19.5
24.6
111.9
44.1
104.9
653.6
41.8
8.7
89.1
5.1
5.6
19.5
0.6
5.5
6.3
80.4
33.1 4.6
26.3
46.9
15.1
4.0
356.6
9.1
7.7
12.4 11.1
12.6
14.3
2.7
10.1 14.0 14.0
47.8
0.6
3.4
16.7
59.4
1.5
0.6
14.0
6.2
15.4
3.9
3.2
15.8
0.7
4.9
213.8
9.8 9.8
11.9
9.3 6.9
2392.3 2343.2
29.5
366.2
42.2
FHR
bulk
head
ove
r
bulk
head
ove
r
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m² m²
m²
m²
m²
m²
m²
m²
m²
m² m²
m²
m²
m²
m² m² m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m² m²
m²
m² m²
m² m²
m²
m²
m²
GuillotineComputers
Computers
MFDMFD
IT HelpDesk
PC
TV
PCPCPCPC
BeanBags
BeanBags
42m2
0m2
684m2
73m2
54m2
349m2
49m2
126m2
24m2
51m2
76m2
STUDENT SERVICES194m2
COLLECTION
STAFF AREAS
OPEN STUDY AREAS
LOUNGE SEATING
INDIVIDUAL STUDY
INDIVIDUAL STUDY + PC
RESOURCES
CAFE / BOOKSHOP
STORE
TRAINING (INDIVIDUAL STUDY + PC)
STUDY ROOMS
MLK Sir Eric Neal Level 01 - Existing1384 UniSA Library Masterplan
scale 1 : 200 @ A1 SK200
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UNISA LIBRARY MASTER PLANS | MASTER PLAN REPORT 35
UP DN
DNUP
UP
DN UP
DN
UP
C2-01
C2-13
C2-10
C2-03
C2-06C2-08
C2-09
C2-09a
C2-08a
C2-01c
C2-01b
C2-02
C2-14C2-19
C2-21
C2-18 C2-17a
C2-17b
C2-17
C2-16a
C2-16
C2-15
C2-22
C2-24
C2-25
C2-23
C2-20
C2-26
C2-12
C2-11
C2-05
C2-04
C2-07
C2-07a
C2-01a
C2-35
C2-19A
C2-19E
C2-19B C2-19C C2-19D
C2-19F
C2-23A
C2-36LIBRARY
STUDY
READING
STAIR
CORRIDORPLANT
A/L
MALE
DUCT
FHR
COMMS
CLNR
STAIROFFICE
OFFICE
CLNR MALE
FEMALE
A/L
RISER
CORRIDOR
LOUNGE
MEETING
COMMS
STUDY
STAFF
OFFICE
STUDY
STUDY
STUDY
STUDY
STUDY
A/L
FEMALE
FHR
STAIR
MEETING
OFFICE
OFFICE OFFICE OFFICE
KITCHENETTE
KITCHENETTE
STAIR
GBA FECA
1159.9
19.0
87.1
15.6
21.024.7
5.6
19.5
3.3
0.6
0.6
5.6
15.5
320.5
13.0
3.5 6.6
12.0
3.4
1.3
103.7
89.3
61.2
13.0
13.2
90.5
12.8
12.5
13.2
14.0
12.4
12.1
5.6
19.5
0.6
15.8
15.1
23.1
15.1 14.7 14.7
2.7
3.8
34.6
2731.2 2435.2
LIFT
VOID
LIFT
FHR
FHR
VOID
m²
m²
m²
m²
m²m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m² m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m² m² m²
m²
m²
m²
m² m²
PC
bin
Self-Loan
AV
AV
AV
375m2
0m2
598m2
102m2
448m2
288m2
76m2
0m2
21m2
0m2
0m2
STUDENT SERVICES0m2
COLLECTION
STAFF AREAS
OPEN STUDY AREAS
LOUNGE SEATING
INDIVIDUAL STUDY
INDIVIDUAL STUDY + PC
RESOURCES
CAFE / BOOKSHOP
STORE
TRAINING (INDIVIDUAL STUDY + PC)
STUDY ROOMS
MLK Sir Eric Neal Level 02 - Existing1384 UniSA Library Masterplan
scale 1 : 200 @ A1 SK201
Sir Eric Neal Library - Level 02
DN
UP
DN
DN
DN
C3-01
C3-06
C3-15
C3-15A
C3-16
C3-10
C3-07
C3-23
C3-03
C3-45
C3-29
C3-27
C3-26 C3-25A
C3-25
C3-25B
C3-04
C3-01C
C3-16A
C3-12
C3-14
C3-13
C3-14A
C3-13A
C3-09
C3-08
C3-17
C3-18 C3-19 C3-20 C3-21 C3-22
C3-24C3-30
C3-31
C3-11
C3-01B C3-01A
C3-33
C3-29A
C3-33A
C3-46
LIBRARY
CLNR
A/L
MALE
COLLECTION
COMMS
STAIR
STAIR
TRAINING
STAIR
OFFICE
ROOF ACCESS
CLNR MALE
A/L
FEMALE
OFFICE
FHR
STORE
ROOF ACCESS
PLANT
A/L
DUCT
FEMALE
STUDY
STUDY
STUDY
STUDY STUDY STUDY STUDY STUDY
CORRIDOROFFICE
MEETING ROOM
CORRIDOR
COMMS RISER
SERVER
KITCHENETTE
SERVICES RISER
STAIR
GBA FECA
5.6
5.6
19.5
71.2
12.6
15.6
15.6
76.6
15.2
604.9
6.1
3.5 6.6
3.4
12.0
107.3
0.6
7.4
5.1
24.7
5.6
3.4
19.5
11.2
11.4
21.7
13.6 14.3 14.3 14.3 14.3
90.613.1
13.1
21.9
0.6 0.6
24.7
2.8
2.4
34.6
2731.9 2349.5
LIFT
VOID
VOID
VOID
LIFT
VOID
FHR
FHR
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m² m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m² m² m² m² m²
m²m²
m²
m²
m² m²
m²
m²
m²
m²
m² m²
Atlases
PC Copy
PC
Guillotine
334m2
77m2
744m2
121m2
0m2
60m2
354m2
0m2
23m2
0m2
81m2
STUDENT SERVICES0m2
COLLECTION
STAFF AREAS
OPEN STUDY AREAS
LOUNGE SEATING
INDIVIDUAL STUDY
INDIVIDUAL STUDY + PC
RESOURCES
CAFE / BOOKSHOP
STORE
TRAINING (INDIVIDUAL STUDY + PC)
STUDY ROOMS
MLK Sir Eric Neal Level 03 - Existing1384 UniSA Library Masterplan
scale 1 : 200 @ A1 SK202
Sir Eric Neal Library - Level 03
5.3 MAWSON LAKES CAMPUS CONT.EXISTING
36
5.3 MAWSON LAKES CAMPUS CONT.DESIGN RESPONSE
Architectural
- Consolidate collection to Level 02 - New student-led learning spaces on Levels 01 and 02 - Staff areas relocated to Level 03 - The collection at Mawson lakes includes material that may be relocated to Magill. Final determination of the size and distribution of collections at Mawson Lakes will need to consider the nature and likely timing of developments at Magill
Services
Mechanical
- Relocate Level 01 Western Wing plant room switchboard currently obstructing the passage of outside air to the Air Conditioning plant - Acoustic treatment to plant rooms and/or revised services corridor partitions to be considered surrounding plant room
Electrical
- Replace existing distribution boards in West Wing installed with HRC protection technology - New circuit breaker and residential current device (RCD) - Consider the replacement of ‘halogen’ with ‘LED’ emergency lighting technology
throughout West Wing - Consider the replacement of older T8 and compact fluorescent lighting technology installed throughout West Wing on Levels 2 and 3 - Upgrade to T5 and LED lighting
IMPLEMENTATION STRATEGY
Stage 1 - Level 02, Western Wing
- Fitout student-led learning spaces including group and individual study and study rooms on Level 01 - Relocate all staff from Levels 01 and 02 to temporary Level 03 open plan accommodation
Stage 2 - Level 03
- Consolidate collection to Level 02 - Fitout individual study, group study and study rooms on Level 02 - Fitout staff spaces on Level 03
Stage 3 - Level 02, Western Wing
- Fitout student space on Level 02 Western Wing
Future Stage - Level 02, Eastern Wing
- Fitout student space on Level 02 Eastern Wing
Sir Eric Neal Library - Level 01
PROPOSED
Rol
ler S
hutte
r
FHR
FHR
FHR
UP
UP
UP
UP
C1-11A
C1-09
C1-15
C1-14
C1-23
C1-02
C1-10
C1-12
C1-01
C1-11
C1-08
C1-08A
C1-02B
C1-05
C1-13
C1-26
C1-25 C1-46
C1-30
C1-29A
C1-28 C1-27
C1-31
C1-32
C1-29
C1-16 C1-18 C1-19
C1-22
C1-02A
C1-09B
C1-45
C1-07
C1-02C
C1-07A
C1-06A
C1-32A
C1-17
C1-66
C1-01A
C1-27A
C1-06
C1-21 C1-20
C1-24
C1-22B C1-22A
MALE
PLANT
OFFICE
STAFF LOUNGE
OFFICE
LIBRARY
STORE
SWITCHBOARD
ENTRY
A/L
A/L
FEMALE
COMMS
CLNR
LIFT
MAIL ROOM
STORE LIFT
MALE
ACCESS
ADAPTIVE TECH A/L
FEMALE
MULTI ACCESS SUITE
CLNR
QUIET ROOM INTERVIEW INTERVIEW
SAS/LTU RECEPTION
FIRE HYDRANT
DUCT
STAIR
CORRIDOR
RISER
FHR
KITCHEN
BABY CHANGE
UTILITY
STAIR
FHR
STORE
SEATING AREA
INTERVIEW INTERVIEW
STORE
WAITING UTILITY
GBA FECA
UCA
UCA
UCA
19.5
24.6
111.9
44.1
104.9
653.6
41.8
8.7
89.1
5.1
5.6
19.5
0.6
5.5
6.3
80.4
33.1 4.6
9.1
7.7
12.4 11.1
12.6
14.3
2.7
10.1 14.0 14.0
47.8
0.6
3.4
16.7
59.4
1.5
0.6
14.0
6.2
15.4
15.8
0.7
4.9
213.8
9.8 9.8
11.9
9.3 6.9
2392.3 2343.2
29.5
366.2
42.2
FHR
bulk
head
ove
r
bulk
head
ove
r
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m² m²
m²
m²
m² m²
m²
m²
m²
m² m² m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m² m²
m²
m² m²
m² m²
m²
m²
m²
271m2
50m2
37m2
304m2
33m2
0m2
190m2
171m2
92m2
118m2
12m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
STAGE 1
20m2
42m2
STUDENT SERVICES117m2
PRIMARY
CIRCULATION
SECONDARY
TO BE RETAINEDRECENT UPGRADE
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
84m2
12m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
MLK Sir Eric Neal Level 01 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK210(G)
UNISA LIBRARY MASTER PLANS | MASTER PLAN REPORT 37
5.3 MAWSON LAKES CAMPUS CONT.
UP DN
DNUP
UP
DN UP
DN
UP
C2-01
C2-13
C2-10
C2-03
C2-06C2-08
C2-09
C2-09a
C2-08a
C2-01c
C2-01b
C2-02
C2-14
C2-21
C2-18 C2-17a
C2-17b
C2-17
C2-16a
C2-16
C2-15
C2-24
C2-25
C2-20
C2-26
C2-12
C2-11
C2-05
C2-04
C2-07
C2-07a
C2-01a
C2-35
C2-19A C2-19B C2-19C C2-19D
C2-19F
C2-36LIBRARY
STUDY
READING
STAIR
CORRIDORPLANT
A/L
MALE
DUCT
FHR
COMMS
CLNR
STAIR
OFFICE
CLNR MALE
FEMALE
A/L
RISER
CORRIDOR
LOUNGE
COMMS
STUDY
OFFICE
STUDY
STUDY
STUDY
STUDY
STUDY
A/L
FEMALE
FHR
STAIR
MEETING OFFICE OFFICE OFFICE
KITCHENETTE
STAIR
GBA FECA
1159.9
19.0
87.1
15.6
21.024.7
5.6
19.5
3.3
0.6
0.6
5.6
15.5
13.0
3.5 6.6
12.0
3.4
1.3
103.7
89.3
13.0
13.2
12.8
12.5
13.2
14.0
12.4
12.1
5.6
19.5
0.6
15.8
15.1 15.1 14.7 14.7
2.7
34.6
2731.2 2435.2
LIFT
VOID
LIFT
FHR
FHR
VOID
m²
m²
m²
m²
m²m²
m²
m²
m²
m²
m²
m²
m²
m²
m² m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m² m² m² m²
m²
m²
m² m²
71m2
0m2
59m2
0m2
0m2
278m2
578m2
221m2
276m2
251m2
12m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
STAGE 2
0m2
0m2
STUDENT SERVICES0m2
PRIMARY
CIRCULATION
SECONDARY
STAGE 3
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
0m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
FUTURE STAGE
MLK Sir Eric Neal Level 02 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK211(G)
DN
UP
DN
DN
DN
LIFT
VOID
VOID
VOID
LIFT
VOID
FHR
FH
R
DN
UP
DN
DN
DN
C3-01
C3-06
C3-15
C3-15A
C3-10
C3-07
C3-23
C3-45
C3-29
C3-27
C3-26C3-25A
C3-25
C3-25B
C3-01C
C3-12
C3-14
C3-13
C3-14A
C3-13A
C3-24
C3-30
C3-31
C3-11
C3-01B C3-01A
C3-33
C3-29A
C3-33A
C3-46
LIBRARY
CLNR
A/L
MALE
COMMS
STAIR
STAIR
STAIR
OFFICE
ROOF ACCESS
CLNRMALE
A/L
FEMALE
FHR
ROOF ACCESS
PLANT
A/L
DUCT
FEMALE
CORRIDOR
OFFICE
MEETING ROOM
CORRIDOR
COMMS RISER
SERVER
KITCHENETTE
SERVICES RISER
STAIR
GBA FECA
#####
5.6
5.6
19.5
12.6
15.6
15.6
15.2
604.9
6.1
3.56.6
3.4
12.0
0.6
5.1
24.7
5.6
3.4
19.5
90.6
13.1
13.1
####
0.6 0.6
24.7
2.8
2.4
34.6
2731.9 ######
LIFT
VOID
VOID
VOID
LIFT
VOID
FHR
FH
R
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m² m²
m²
m²
m²
m²
m² m²
0m2
0m2
0m2
1144m2
0m2
0m2
0m2
0m2
0m2
0m2
0m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
0m2
0m2
STUDENT SERVICES0m2
PRIMARY
CIRCULATION
SECONDARYINDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
VACANT
INFORMAL MULTIPURPOSESPACE
MP0m2
STAGE 2
MLK Sir Eric Neal Level 03 - Proposed
1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK212(G)
Sir Eric Neal Library - Level 02 Sir Eric Neal Library - Level 03
PROPOSED
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
UP
28/02/200812:38
B3-15
B3-12
B3-22
B3-39
B3-13
B3-02
B3-31
B3-06
B3-13AB3-14
B3-26A
B3-26
B3-27
B3-30B3-32
B3-33
B3-34B3-34A
B3-35
B3-34B
UP
Centenary Building Cafeteria
A U audited
NORTHERNENTRY
FUTURESTAIR
TOILETS
LIFT
STAGE 3
STAGE 1Excluding newstair, to be Stage 2
0m2
0m2
15m2
0m2
213m2
221m2
280m2
33m2
136m2
11m2
0m2
0m2
LOUNGE
CASUAL LEARNING
CAFE STUDY
STANDUP PC
STAFF
STORE
AMENITIES
SERVICE POINT/VIDEO BOOTH
COLLECTION
STAFF
SERVICES
RESOURCES/SUPPORT
UTILITY
GROUP TEACHING
32m2
0m2
STUDENT SERVICES102m2
PRIMARY
CIRCULATION
SECONDARY
INDIVIDUAL
INDIVIDUAL + PC
ADDITIONAL REQUIRED ON CAMPUS
284m2
245m2
OPEN STUDY55m2
STUDY ROOM197m2
781m2 TOTAL
19m2
INDIVIDUAL
INDIVIDUAL + PC
STUDY ROOM
OPEN STUDY
GROUP LEARNING
INDIVIDUAL LEARNING
COLLABORATIVETEACHING
FLEXIBLE TUTORIAL
COMPUTER POOL
ADAPTIVE TECH SUITE
0m2
30m2
LO
CS
SP
CT
FT
CP
OS
SR
IPC
IN
AT
CO
SE
UT
ST
SS
St.
AM
INFORMAL MULTIPURPOSESPACEMP0m2
83m2 206m2 234m2
STAFF
INDIVIDUAL + PC
ADDITIONAL SPACEREQUIRED ON CAMPUS
241m2
234m2
OPEN STUDY83m2
STUDY ROOM20m2
1337m2 TOTAL
241m2 476m2
INDIVIDUAL476m2
LOUNGE97m2
97m2
CEA Brookman Level 03 - Proposed1384 UniSA Library Masterplan
26/10/2016 scale 1 : 200 @ A1 SK110(G)
38
6.0 COST PLAN
Image: Jeffrey Smart Building, photo by Sam Noonan
UNISA LIBRARY MASTER PLANS | MASTER PLAN REPORT 39
ASSUMPTIONS
- The buildings are structurally sound - Normal hours access will be granted
EXCLUSIONS
Scope - High Load Floor Areas - Murals and Works of Art - Works outside of boundaries
Works by Others - Active ICT including printers, computers etc. - Telephone Systems - Library computer systems - Specialist Equipment - Staff Relocation and Decanting - Temporary accommodation for staff
Risk - Relocation and upgrade of existing services - Asbestos and Hazardous Materials Removal - Escalation as the program is yet to be determined - Seismic upgrades
Other Project Cost - Legal Fees - Marketing, sales and leasing costs - Goods and Services Taxation
Detailed cost plans for each campus can be found in the appendices.
CITY EAST
Stage 1
Decommissioning $91,200
Fitout Works $4,861,200
Total Stage 1 ex GST $4,952,400
Stage 2
Decommissioning $48,200
Fitout Works $1,314,000
External Works $37,800
Total Stage 2 ex GST $1,400,000
Stage 3
Decommissioning $60,200
Fitout Works $1,882,300
Total Stage 3 ex GST $1,942,500
Expected Project Total ex GST $8,294,900
Services Infrastructure (optional) $188,400
The following budgets are inclusive of associated project costs including; Builders Preliminaries, Builders Margin including overheads and profit, Professional Fees, Statutory and Authority Fees and Charges.
6.0 COST PLAN
40
MAGILL
Stage 1
Decommissioning $136,000
Fitout Works $1,703,600
Total Stage 1 ex GST $1,839,600
Stage 2
Decommissioning $57,200
Fitout Works $1,508,000
Total Stage 2 ex GST $1,565,200
Stage 3
Decommissioning $66,000
Fitout Works $1,454,000
Total Stage 3 ex GST $1,520,000
Expected Project Total ex GST $4,924,800
External Upgrade $149,900
Future Stage $738,000
Services Infrastructure (optional) $765,900
MAWSON LAKES
Stage 1
Decommissioning $57,600
Fitout Works $1,686,200
Total Stage 1 ex GST $1,743,800
Stage 2
Decommissioning $28,000
Fitout Works $1,523,100
Total Stage 2 ex GST $1,551,100
Stage 3
Decommissioning $71,600
Fitout Works $2,081,900
Total Stage 3 ex GST $2,153,500
Expected Project Total ex GST $5,448,400
Future Stage $949,500
Services Infrastructure (optional) $385,600