Management of Air Pollution in Delhi NCR and National Clean Air Program (NCAP)

Ministry of Environment, Forest & Climate Change, Government of India 1st November, 2018

Road and Soil Dust

Mechanical Road

Sweeping Machines (MRSMs)

Water Sprinklers

Greening/ Paving

Towards Greener Delhi : Step-wise Approach

Construction and Demolition Activities

C&D Waste Processing SoPs and dust mitigation

measures,

Biomass /Municipal Solid Waste

Crop Residue

Waste to Energy

Plants

Waste to Compost Plant

Vehicular Pollution Public Transport

EPE and WPE

Industries and Power Plants

Switch over to PNG &

Installation of OCEMS

Meeting New

Emission Norms by Thermal Power Plants

Other Steps Early warning System Brick-kilns

ROAD AND SOIL DUST

ROAD AND SOIL DUST

• Mechanical Road Sweeping Machines

(MRSMs)

• Water Sprinklers • Greening/ Paving

Road And Soil Dust : Mechanised Road Sweeping Machines

Increase in the number and coverage

1st January 2018 15th September 2018 15th November 2018(proposed)

34

52

64

ACTIONS UNDER IMPLEMENTATION

Road And Soil Dust : Water Sprinklers

Increase in the number and coverage

175

215

400

Road And Soil Dust : GREENING / PAVING

• Paving to be completed by 30st September, 2018. • About 213500 sq.m. area brought under paving till date.

• Greening to be completed by 31st October, 2018. • 62% of tree plantation target of 32.27 lakh already achieved against

19.50 lakh last year. • About 94289 sq.m. area brought under greening.

• Greening of spaces below flyovers : 35 places completed, work in progress at 3 places.

• 262 Pillars of flyovers/over-bridges being covered with vertical gardens by 30th Sep, 2018.

KEY STEPS

CONSTRUCTION AND DEMOLITION ACTIVITIES

CONSTRUCTION AND DEMOLITION ACTIVITIES

C&D Waste Processing SoPs and dust mitigation measures

Construction & Demolition Activities : C&D Waste Processing Plants

Increase in the processing capacity

Existing(TPD) Addition(TPD) Remarks

North DMC 2000 (Burari) 1000 (Ranikhera) To be completed by Sep 2018

EDMC 500 (Shastri Park) 500 (Shastri Park) To be completed by Sep 2018

SDMC - 500 (Bakarwala) To be completed by Mar 2019

Grand Total 2500 2000 4500

*Total C&D waste generation - 4000 TPD

Construction & Demolition Activities: SoPs and Dust Mitigation Measures, Inventorisation of C & D waste

Nodal officers have been appointed and various measures taken for prevention of dumping of C&D waste on government lands. E.g. – fencing of govt land, lifting of C&D waste etc

Adherence to SoPs at construction sites and mandatory implementation of dust mitigation measures by all government construction agencies.

KEY STEPS TAKEN

BIOMASS / MUNICIPAL SOLID WASTE

BIOMASS / MUNICIPAL SOLID WASTE

Crop Residue

Waste to Energy Plants

Waste to Compost Plant

Biomass / Municipal Solid Waste: Crop Residue

Distribution of Agricultural Implements under Central Sector Scheme

• National Program for in-situ management of Crop Residue launched this year.

• 40% reduction in stubble burning till date. • Program to continue next year as well.

Biomass / Municipal Solid Waste: Waste to Energy Plants

Increase in the processing capacity

Existing (TPD) Power (MW) Addition (TPD) Power (MW) Remarks

North DMC 2000 (Narela) 24 1500 (Bhalaswa) 15 To be completed by Oct 2020

EDMC 1300 (Ghazipur) 12 1200 (Ghazipur) 8 Expansion to be completed by Dec 2018

SDMC 1800 (Okhla) 16 500 (Okhla) +

2000 (Tekhkhand)

4 + 20

Expansion to be completed at Okhla by Oct 2019 &

New plant at Tekhkhand to be completed by Nov 2019

Grand Total 5100 52 5200 47 10300

Biomass / Municipal Solid Waste: Waste to Compost Plants

Increase in the processing capacity

Capacity of Plant Number of plants Total Capacity Remarks

1 TPD 20(SDMC-4. NorthDMC-6, EDMC-10) 20 TPD To be completed by Oct 2018

5 TPD 10(SDMC-4, North DMC-4, EDMC-2) 50 TPD To be completed by Oct 2018

200 TPD 4(SDMC-2, NorthDMC-1, EDMC-1) 800 TPD To be completed by July 2019

Grand Total 34 870 TPD

* Existing – 200 TPD at Okhla (SDMC)

VEHICULAR POLLUTION

VEHICULAR POLLUTION

Public Transport

EPE and WPE

Vehicular Pollution : Public Transport

Agency / Scheme Addition(No. of Buses) Remarks

DTC 1000

Hon’ble Supreme Court has mandated to complete procurement by December, 2018. Likely to miss the

deadline.

Cluster Bus Scheme 1000

Approval for 500 buses received. To expedite the approval for remaining 500. Likely to miss Hon’ble Supreme

Court mandated deadline of December 2018.

DMRC (Last Mile Connectivity) 427 AC buses (198 Electric + 229 CNG)

Tender submitted. Finalisation of contractors by 30th November, 2018.

Process needs to be expedited.

GNCT of Delhi

1000 Electric Buses To be procured by July, 2019

Increase in the number of public buses

Vehicular Pollution : EPE and WPE

Construction of Western Peripheral Expressway (WPE) – Likely to be completed by 31st October, 2018.

Opening of Eastern Peripheral Expressway (EPE) in May, 2018. About 20,000 non-destined trucks using it.

KEY STEPS

INDUSTRIES AND POWER PLANTS

INDUSTRIES AND POWER PLANTS

Switch over to PNG & Installation of OCEMS

New Emission Norms of Power Plants

Industries and Power Plants: Switch over to PNG & Installation of OCEMS

• To shift all industries to PNG by 30th September, 2018

Total Units – 1131

Number of units running on PNG/under process – 1018.

• To install Online Continuous Emission

Monitoring System (OCEMS) linked to a central server for 24 * 7 monitoring in all red-category industrial units by 30th June, 2018.

To install Online Continuous Emission Monitoring System (OCEMS) linked to a central server for 24 * 7 monitoring in all red-category industrial units

by 30th June, 2018.

Progress

Meeting New Emission Norms Thermal Power Plants

• Stringent norms. • To be met by December 2019 in Delhi and NCR. • To be met by December 2022 in rest of the country.

OTHER STEPS

OTHER STEPS

Early warning System

Brick-kilns

Early Warning System

Key Actions

An operational early warning system has been put in place.

A website has been developed to facilitate sharing all real time data of air pollutants and also air pollution forecast products.

1

2

* The early warning system will give forecasts for the next 2 days and outlook for 2 more days.

BRICK KILNS

Brick Kilns which have not converted to Zig-Zag technology will not operate from 30.06.2018.

In NCR, total 4247 Brick Kilns were operational in July 2017.

722 Brick Kilns in NCR converted to Zig-Zag technology.

State government to ensure that no brick kilns operate without converting to Zig-Zag technology.

NCAP • For 102 non attainment cities. • To bring PM 10 and PM 2.5 levels down in definite % terms

by 2024. • Time bound, national level strategy. • It will derive co benefits of initiatives under National Action

Plan on Climate Change and air pollution mitigation measures comprising of sectoral interventions.

• To have knowledge sharing and technology transfer.

NCAP

Sectoral Interventions Vehicular Emissions • BS VI fuel norms operational in Delhi from 1st April this year. • To expand in the entire country from 1st April 2020. • Vehicles to be BS VI compliant by 1st April, 2020. • National E-mobility Program launched in 2018- to take

steps to have more than 30% of electric vehicles. • FAME for early adoption and market creation of hybrid and

electric vehicles – already being implemented.

NCAP • National Biofuel Policy- To have 20% of ethanol

blending in petrol and biodiesel blending target of 5%.

• Promotion of 2G ethanol refineries through national scheme announced this year.

• This will consume agricultural stubble and urban waste as well.

• Further, production of ethanol is also being enhanced in a great way through molasses as well.

NCAP Industrial Emissions • Approved fuels to be used. • Sale and use of pet coke banned in Delhi and

NCR States. • Promotion of clean fuels(PNG)- city gas

distribution network being expanded. • Real time monitoring of emissions in highly

polluting industries. Waste Management • Several measures being taken. • Single use plastic to be banned by 2022.

National Action Plan on Climate Change

• Green India Mission • To create 2.5 to 3 billion tonnes of CO2 equivalent of

additional tree and forest cover as carbon sink. • Forest cover has increased. • 40% of installed electricity generation capacity to be

from renewables. • India to reduce the Emissions Intensity of its GDP by

33 to 35 Per Cent by 2030 from 2005 level.

NCAP

• 175 GW of renewable energy capacity by 2022. • Smart Cities Mission – public transport and green

cities. • Swacch Bharat Mission-( Clean India Mission)

Household Air Pollution

• PMUY to provide access to clean cooking fuel to 80 Million households

• Started in 2016 • More than 50 million households have been

covered

National Environment Health Profile

• To be conducted in 20 cities. • To study the trends in air pollution and mortality/

morbidity. • To evaluate quantum of health manifestations

and identify gaps.

Challenges

• Enforcement of rules and regulations • Meeting the timelines under various

plans/schemes • Collaboration with regard to long range transport

of air pollutants.