A HIGHLY RELIABLE METHOD FOR JOINING METALLIC TUBING 1 2 The LOKRING Tube Connection allows a fast and reliable connection of tubes, even of different material. This tube connection system is a cold, clean method that eliminates brazing, burn permits, damage due to flame, and the need for nitrogen flow during installs. Reports from the field indicate Labor savings of between 30% and 50% on various Ductless System Installations. 3 The Simple Steps To Making LOKRING Connections 4

Citation preview

Page 1: LOKRING Training 2011

LOKRING TUBING CONNECTORS

A HIGHLY RELIABLE METHOD FOR JOINING METALLIC TUBING

1

Page 2: LOKRING Training 2011

LOKRING HISTORY

In the late 1960’s, LOKRINGs were invented to solve braze joint problems in the B-1 bomber program.By the late 1970’s, the patent rights for refrigerant applications were secured by the VULKAN-HackforthGroup in Germany. VULKAN LOKRING was integrated into the VULKAN Hackforth Group and design, manufacturing and sales were launched in 1979.Due to the extensive use of ISO-Butane, LOKRINGs quickly dominated the OEM and service markets in Europe. In 1992, VULKAN-Hackforth purchased rights to the US market.More than 90 Million OEM rings are being installed annually by Appliance, HVAC & Automotive manufacturers. 2

Page 3: LOKRING Training 2011

Speed and Ease of Installation

The LOKRING Tube Connection allows a fast and reliable connection of tubes, even of

different material. This tube connection system is a cold, clean method that

eliminates brazing, burn permits, damage due to flame, and the need for nitrogen flow

during installs.

Reports from the field indicate Labor savings of between 30% and 50% on various

Ductless System Installations. 3

Page 4: LOKRING Training 2011

The Simple Steps To Making LOKRING Connections

4

Page 5: LOKRING Training 2011

Tube Ends• Tubing should be cut using a wheel

type cutter equipped with sharp wheels.

• Ream all cut tube ends to the full inside diameter of the tube to remove the small burr created by the cutting operation.

• If this rough, inside edge is not removed by reaming, erosion & corrosion may occur due to local turbulence and increased local flow velocity in the tube. Noise, sounds like water running and pressure drop can occur at this point

5

Page 6: LOKRING Training 2011

Tube Cleaning

Tubes should be cleaned using a radial

motion with an abrasive mat or similar fine abrasive product.

6

Page 7: LOKRING Training 2011

Stabilization Inserts

Stabilization Inserts should always be used on copper tube sizes 3/8 inch thru 1 3/8 inch, as the insert not only gives stability but increases the pull out strength of the

connector.7

Page 8: LOKRING Training 2011

Visual Aid for Proper Tube Insertion1. Remove ring from

LOKRING body.

2. Place ring over tube chamfered side toward tube end.

3. Place Stabilization Insert in tube and then the LOKRING body over tube end until fully seat against internal stop and mark tube. Then remove LOKRING body and apply required dosage of Lokprep.

4. After completing connection, marks aligning with LOKRING body end indicate tube is correctly inserted.

1

8

3

2

44

Page 9: LOKRING Training 2011

LokprepLokprep is an anaerobic sealer used to fill leak paths created by small imperfections, scratches, & extrusion lines that are present on all manufactured tubing and is a very important part of the LOKRING process. Lokprep is designed to stay semi pliable and thermal cycle with the tubing between temperature extremes of -58 F to 302 F. Temperatures above 302F may burn out the Lokprep and cause leaks. Such as a torch too close to the connector! 9

Page 10: LOKRING Training 2011

Lokprep Application

The correct dose of Lokprep is enough to

create a thin layer over the complete exterior of the tube that comes in

contact with the inside of the LOKRING

connector.

10

Page 11: LOKRING Training 2011

Dispersing LokprepThe LOKRING

should be placed over the end of the

tube and turned 360 degrees to evenly disperse

Lokprep.

Once Lokprep is applied the

connection should be completed

within 4 minutes.11

Page 12: LOKRING Training 2011

Tube must be inserted fully to

LOKRING internal stop.

Wrong

Correct 12

Page 13: LOKRING Training 2011

LOKRING Assembly Tool

Position the tool with the correct jaws sizes over the LOKRING connector as shown and operate the tool ensuring the tube remains fully inserted and

jaws are properly seated.

Continue to operate the tool until the ring is fully seated against the

stop. Use the same steps to complete the other side of the

LOKRING connector.

13

Page 14: LOKRING Training 2011

Completed Connection

Both rings fully seated against stops.

LOKRING connection is ready for service.

14

Page 15: LOKRING Training 2011

Allow Lokprep a minimum of 10 minutes set up time before applying radial torque, stress, vacuum or pressure to the connection. (Note in temperatures below 55 F allow 30 minutes)

15

Page 16: LOKRING Training 2011

EURO FLARE CONNECTIONEURO FLARE CONNECTION

R410A LOKRING Euro Flares are available in

sizes ¼ inch thru ¾ inch.

These connections are used at Outdoor Units, Branch Selector Boxes,

and Indoor Units. Mechanical connections should always be made 1st, then the LOKRING

connector !

16

Page 17: LOKRING Training 2011

R410A systems require exacting flare specifications and forming procedures. These specs are

different than standard 45 degree SAE flares.

Failure to follow manufacture’s specs on flare connections is the Number 1 cause of System Leaks

R410A Euro Flares take the Failure Modes Out!

Lokring Euro Flares include replaceable preformed flare

inserts, nut and Lokring connector half body, and are designed for use on R410A

system.

17

Page 18: LOKRING Training 2011

Installing a Lokring R410A Euro Flare

A drop of oil compatible with the system oil should be applied to the seal and back of the flare body to ensure accurate torque reading.

No joint compound or sealer should be applied to mating surfaces of flare faces. Threaded connection should be tightened to manufactures specs before completing Lokring connection.A new flare insert should be used each time the connection is loosened or taken apart for service.

18

Page 19: LOKRING Training 2011

LOKRING Basics Recap

1. Clean tube ends with abrasive mat or fine emery cloth & deburr as necessary.

2. Install stabilization inserts for 3/8” thru 1 3/8” tube.3. Place the ring (chamfered edge facing tube end) over the tube

if not pre-mounted on the LOKRING body.4. Apply sufficient Lokprep to create a thin layer over the

complete exterior of the tube that comes in contact with the inside the LOKRING connector. Place LOKRING over tube to internal stop and rotate tube or LOKRING to distribute Lokprep.

5. Using appropriate jaws and LOKRING assembly tool, push the 1st ring onto the LOKRING body until fully seated to stop.

6. Repeat steps 3 thru 6 for second side of LOKRING connector.7. Allow Lokprep a minimum of 10 minutes set up time before

applying stress, vacuum or pressure to the connection. (Note in temperatures below 55 F allow 30 minutes) 19

Page 20: LOKRING Training 2011

THE COLD CLEAN CONNECTIONTHE COLD CLEAN CONNECTION

Internal Cleanliness comparison of a LOKRING Connection and a Brazed Joint.

20