www.consensusdocs.org | [email protected] | 866.925.DOCS (3627) 1 Joel Darrington Contracting Counsel DPR Construction [email protected] Brian Perlberg Executive Director ConsensusDocs bperlberg@consensusdocs .org Tom Richert Principal Lean Project Consulting, Inc. [email protected] Lean Contracting Practices without an IPD Contract and the New ConsensusDocs 305 Lean Construction Addendum

Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

1 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)1

Joel DarringtonContracting CounselDPR [email protected]

Brian PerlbergExecutive Director [email protected]

Tom RichertPrincipal Lean Project Consulting, [email protected]

Lean Contracting Practices without an IPD Contract and the New ConsensusDocs 305 Lean Construction Addendum

Page 2: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

2 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)2

ConsensusDocs 12+ Years

$1,000,000+ In donated free educational licenses.

12Years publishes best practice contracts

100+ Standard contract documents.

40Leading construction associations participating in the Coalition.

3,000+Subscribers.

1 GoalImprove the design and construction industry with Best Practice Contracts

$40+ Billion in Construction Contracts

ZERO Reported Cases

Page 3: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

What is the ConsensusDocs 305?

Owner/Design

ProfessionalContract

CD 305 Lean

ConstructionAddendum

Owner/Constructor

Contract

3 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)3

Page 4: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

Ways to Contract for Lean Design + Construction

• Integrated Project Delivery (IPD) Agreement (a/k/a IFOA)• e.g., CD 300 (2016 edition)

• Custom-created IPD-ish design & construction agreements• Vague references to Lean added to an owner’s standard

contract• Now with CD305, an industry standard form outside of IPD

that addresses a wide spectrum of Lean practices

4 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)4

Page 5: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

Addendum to What?

ConsensusDocs 305 can be used with:• ConsensusDocs 500 Agreement between Owner & CM• Other forms of CM at Risk contracts• Construction contracts under Design-Bid-Build• Owner contracts with Design Professional

• Not intended for Design-Build Prime Contracts, but … • ConsensusDocs 341 will be published this summer.

5 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)5

Page 6: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

How is this Different than IPD?

Owner

CM/GC

Key Trades

Key Design Consultants

IPD

Owner

CM/GC

Design Prof.

Sub-contractors

CD 305

Specialty Designers

CD305

6 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)6

DesignProf.

Page 7: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

Addendum vs. Silence

• Increase alignment among parties• First collaborative act• Parameters for Lean behavior and activities• Some Lean methods will conflict with standard contract

language, so Addendum overrides • Allows enforcement of Lean requirements, but take care

7 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)7

Page 8: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

Using the CD 305

• When? • O/A/C are committed to Lean, but one or more are not

ready or able to enter an IPD Agreement• As early in the Project as the Owner will allow

• How?• Jointly negotiated, separately attached• Check-the-box

8 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)8

Page 9: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

Typical Chronology of IPD Project

Allowable Cost

Preconstruction Phase Construction Phase

Expected Cost & Target Cost

Contract PriceActual Cost

Validation Phase

9 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)9

Page 10: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

CD305 Check-the-Box Example 1

Preconstruction Phase

Construction Phase

Validation Phase

Joint Worksite Investigation (6.1)

Evaluate Owner’s Program (6.2)

Validation Study (6.3)

Continuous Cost Modeling (6.4)

Integrated Design/Target Value Design (6.5)

Risk Identification/Management (6.6)

(Always included; no check boxes)

10 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)10

Page 11: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

CD305 Check-the-Box Example 2

Preconstruction Phase

Construction Phase

Validation Phase

Joint Worksite Investigation (6.1)

Evaluate Owner’s Program (6.2)

Validation Study (6.3)

Continuous Cost Modeling (6.4)

Integrated Design/Target Value Design (6.5)

Risk Identification/Management (6.6)

(Always included; no check boxes)

11 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)11

Page 12: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

CD305 Check-the-Box Example 3

Preconstruction Phase

Construction Phase

Validation Phase

Joint Worksite Investigation (6.1)

Evaluate Owner’s Program (6.2)

Validation Study (6.3)

Continuous Cost Modeling (6.4)

Integrated Design/Target Value Design (6.5)

Risk Identification/Management (6.6)

(Always included; no check boxes)

12 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)12

Page 13: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

What about Incentives?

• CD305 does not itself provide for incentive compensation

• Too much variability to standardize incentives

• CD305 does provide for Performance Improvement Program, which individual projects could use as a platform for incentive compensation

• Provide for incentives through amendment to Owner contracts

13 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)13

Page 14: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

Reliable Promises 3.3

• Conditions of satisfaction must be clear

• Competent to perform

• Time estimated and reserved

• Performer sincere

• Performer accepts consequences

14 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)14

Page 15: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

• Owner, Design Professional, and Constructor Reps, plus others invited

• Resolves problems through consensus decisions and best interests of the project

• Selects team• Provides daily leadership for the project• Manages budget and design process• Implements production control• Oversees personnel and team members.

15 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)15

Core Group Owner, Design Professional, Constructor

Page 16: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

• Candor and thick skin

• Enthusiasm for change and improvement

• Commitment to goals and principles

• Ability to decide and commit

• No hierarchy

• Shared accountability and responsibility.

16 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)16

Core Group - Key Attributes

Page 17: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

• 15 performance metrics

• Periodic evaluations

• A focus on team members’ behaviors

• Clear standards for evaluating performance

• Feedback mechanism on improvements.

17 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)17

Performance Improvement Program

Page 18: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

• Aligning Personal, Team and Project Goals

• Focus on Clarity of Requests and Commitments

• Coaching

• Equip the Team for Rapid Learning

18 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)18

Implementing Team Leadership & Culture

Page 19: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

Aligning Personal, Team and Project Goals

19 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)19

Page 20: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

20 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)20

Focus on Clarity of Requests and Commitments

Presenter
Presentation Notes
Action results from conversations – poor conversations result in poor actions – excellent conversations result in excellent actions – clarity is key to excellence
Page 21: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

21 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)21

Coaching

Page 22: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

Where you are.

Where you want to be.

22 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)22

Equip the Team for Rapid Learning

Page 23: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

• Section 5.1• What is a Project Planning System• Weekly Planning Cycle• Daily Adjustments• Implied Practices

23 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)23

Project Planning System

Page 24: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

Source: Ballard, Tommelein. 2016 Benchmark for the Last Planner System®

24 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)24

What is a Project Planning System

®

Page 25: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

25 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)25

Weekly Planning Cycle

Page 26: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

Daily Adjustments

26 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)26

Page 27: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

27 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)27

Implied Practices

Page 28: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

Allowable Cost

Expected Cost & Target Cost

Validation PhaseJoint Worksite Investigation (6.1)

Evaluate Owner’s Program (6.2)

Validation Study (6.3)

Program Services & Validation

28 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)28

Page 29: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

Preconstruction Phase

Expected Cost & Target Cost

Continuous Cost Modeling (6.4)

Integrated Design/Target Value Design (6.5)

Risk Identification/Management (6.6)

29 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)29

Integrated Design & TVD

Page 30: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

Preconstruction Phase: Constructor to:• Provide continuous cost modeling and analysis• Generate periodic cost model reports

Construction Phase: Constructor + Subcontractors to:• Provide cost information and estimates requested by Core Group

Core Group to:• Establish milestones for updating Project cost model• Direct actions if cost model exceeds Allowable Cost

Compare to lower design-assist option in CD 541.

30 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)30

Continuous Cost Modeling

Page 31: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

• Collaborative – DP still in charge and responsible, but must coord. + integrate with Team

• Value, Cost and Schedule and constructability are basic components of design (6.5.1)

• Written Protocols for Target costs [6.5.7.3 (a-h)]

• Add value w/ VAPs, TVD Clusters, A-3s (6.5.8)

• Design phases – planning/programming, design, detailing,

and production planning

• Uses pull based design process to drive innovation

31 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)31

Target Value Design

Page 32: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

Document Review

• Examine Design Documents with reasonable care

• Advise Core Group of issues prompting additional contingency

• Suggest options for additional investigation

Target Value Pricing 6.5.7

• Establish Expected Cost and Target Cost early

• Target Cost only exceeded by express approval of Core Group.

32 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)32

Target Value Design Processes

Page 33: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

Continuing refinement of cost models

Cost analysis not to be deferred• Byproduct of continuing TVD process• Core Group jointly manages

Escalation addressed in:• Estimates• Expected Cost• Target CostExpected Cost and Target Cost adjusted• At Final Completion• Reflecting difference between escalation allowance and actual escalation

33 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)33

Target Value Pricing

Page 34: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

• BIM (verb) as a process not a software application

• Interconnected models and databases

• The power of BIM makes the payoff of lean greater –Provide continuous, immediate, and

reliable informationRegarding design, scope, schedule,

and cost.

34 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)34

Building Information Modeling (B.I.M.)

Page 35: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

Design Model As-Built

Design Model Vs As-Built

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

Presenter
Presentation Notes
Notice in the trade model is how steel plate connections are shown and systems are offset to avoid. Corridor is much more dense, systems are rerouted to get all to fit
Page 36: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

Design As-Built

Des

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

Presenter
Presentation Notes
AE’s show one line for most systems, ignoring the reality that Pumps, valves, connections are all bigger. Then add in structural connections, hangers, and support steel…it gets ugly quick. Doug
Page 37: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

• Identify material risks in early workshops

• Create risk identification report• Rank and focus on higher priority risksLikelihood of occurrenceTime and cost impacts

• Develop Risk Management Plan withContingency plansAssignment of primary responsibilityAddress roles of others in managing risk

37 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)37

Risk Assessment and Management 6.6

Page 38: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

Article 7

• 5S Plan• Quality, Standardized Work, PDCA• Material Flow• Information Flow

38 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)38

Construction Phase Lean Features

Page 39: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

5S Plan

39www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)39 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)39

Sort Set in Order Shine/Sweep

Standardize Sustain

Page 40: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

40 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)40

Quality, Standardized Work, PDCA

Page 41: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

41 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)41

Material Flow

Presenter
Presentation Notes
7.3 LOGISTICS PLAN Constructor shall order the material and equipment in accordance with an agreed- upon material logistics plan and the current phase plan and look ahead plan in an effort to promote just- in-time deliveries to the site and minimize handling costs and provide the least obstruction of the premises and any adjoining property.
Page 42: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

42 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)42

Information Flow

Page 43: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

ConsensusDocs 541 Design Assist Addendum• Addendum to prime agreements, consultant and subs• Optional tools from CD 305:

• BIM• Owner’s program evaluation• Value Analysis• Cost modeling• Optional risk analysis• Optional production planning

• Constructability (in 541 only) • Manpower analysis, design-build packages early

procurement packages, etc. (in 541 only) • Design Coordination (in 541 only).

43 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)43

Presenter
Presentation Notes
Design coordination, D-B packages, code review, schedule and manpower analysis, early procurement of materials and equip, prefabrication. Optional life cycle cost analysis, sustainability.
Page 44: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

How do you Structure the ConsensusDocs 305 & 541?

Owner

Constructor

Key Trades

Key Design Consultants

DesignProf.

IPDCD 300

Owner

CM/GCDesign

Prof

Sub-contractors

CD 305CD 541

Specialty Designers

CD305

44 www.consensusdocs.org| [email protected] | 866.925.DOCS (3627)44

CD 541or both

Page 45: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

TheCollabometer

DesignAssist

“Collabometer” Courtesy of Jack Mumma Michigan State University

45

Page 46: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

Design-Assist can help Prevent Against

www.consensusdocs.org| [email protected] | 866.925.DOCS (3627)

Page 47: Lean Contracting Practices without an IPD Contract and the ... · Escalation addressed in: ... • Optional tools from CD 305: • BIM • Owner’s program evaluation • Value Analysis

47 www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)47

Joel DarringtonContracting CounselDPR [email protected]

Brian PerlbergExecutive Director [email protected]

Tom RichertPrincipal Lean [email protected]

Lean Contracting w/o IPD & the New ConsensusDocs 305Download a sample by registering at www.consensusdocs.org.

Questions?