LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012

LCLS-II Project Overview - Stanford University · 2012-04-10 · LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director . ... dumps . Slide. 7 . LCLS-II New Construction

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LCLS-II Project Overview - Stanford University · 2012-04-10 · LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director . ... dumps . Slide. 7 . LCLS-II New Construction

LCLS-II Project Overview

David Schultz LCLS-II Deputy Project Director

March 19, 2012

Page 2: LCLS-II Project Overview - Stanford University · 2012-04-10 · LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director . ... dumps . Slide. 7 . LCLS-II New Construction

Outline

Slide 2

• Project priorities and status • Key features • Project overview & layout • Project schedule and path forward

LCLS-II New Instruments Workshops, March 19-22, 2012

Page 3: LCLS-II Project Overview - Stanford University · 2012-04-10 · LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director . ... dumps . Slide. 7 . LCLS-II New Construction

LCLS-II Project Priorities

• Build a highly productive scientific user facility Maximize technical capabilities for the longer-

range future • Simultaneous SXR and HXR operation • Experiment hall capacity • Undulator hall length

• Control the Project Cost/Schedule DOE Guidance is $405M Total Project Cost Formal Project completion (CD-4) in 2019

LCLS-II New Instruments Workshops, March 19-22, 2012 Slide 3

Page 4: LCLS-II Project Overview - Stanford University · 2012-04-10 · LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director . ... dumps . Slide. 7 . LCLS-II New Construction

• Conceptual Design (CD-1) approval 10/14/11 • Long-lead procurements approval 3/14/12

• Injector system and support facility • Fully funded for FY12 • DOE Preliminary Design (CD-2) Review as early as

August, 2012 • Establish Project baseline schedule and budget

LCLS-II Project Status

LCLS-II New Instruments Workshops, March 19-22, 2012 Slide 4

Page 5: LCLS-II Project Overview - Stanford University · 2012-04-10 · LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director . ... dumps . Slide. 7 . LCLS-II New Construction

• Second 120 Hz injector and 1km LINAC section LCLS-1 and LCLS-II operate independently

• Two New Undulator sources with variable gap In a new undulator tunnel Electrons to two undulators in parallel, 60 Hz each Soft (250 - 2,000 eV) Hard (2,000 - 13,000 eV)

New underground experiment hall, two floors

Key Features of LCLS-II

LCLS-II New Instruments Workshops, March 19-22, 2012 Slide 5

Page 6: LCLS-II Project Overview - Stanford University · 2012-04-10 · LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director . ... dumps . Slide. 7 . LCLS-II New Construction

Slide 6

DOE CD-3a Review of the LCLS-II Project, Dec 6-7, 2011

Linac Coherent Light Source II Injector @ 1-km point

Sectors 10-20 of Linac (1 km)

CD-0 10 April 2010, CD-1 14 October 2011

X-ray Transport Optics/Diagnostics

New Underground Experiment Hall

Bypass LCLS Linac in PEP Xport Line

New Beam Transport Hall

SXR, HXR Undulators

Page 7: LCLS-II Project Overview - Stanford University · 2012-04-10 · LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director . ... dumps . Slide. 7 . LCLS-II New Construction

Electron Systems Schematic Layout

LCLS-II New Instruments Workshops, March 19-22, 2012

0

• Electron Systems largely copied from LCLS-1 • Gun, BC’s, diagnostics, e- dumps

Slide 7

Page 8: LCLS-II Project Overview - Stanford University · 2012-04-10 · LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director . ... dumps . Slide. 7 . LCLS-II New Construction

LCLS-II New Construction Layout

LCLS-II New Instruments Workshops, March 19-22, 2012

Experimental Hall 2 Undulator Hall 2 Beam Transport Hall 2

Slide 8

Page 9: LCLS-II Project Overview - Stanford University · 2012-04-10 · LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director . ... dumps . Slide. 7 . LCLS-II New Construction

LCLS-II Undulator Hall

• Undulator tunnel is 286 meters in length Space for baseline 114 m HXR and 66 m SXR undulators Room allocated for seeding and tapering extensions

LCLS-II New Instruments Workshops, March 19-22, 2012 Slide 9

Page 10: LCLS-II Project Overview - Stanford University · 2012-04-10 · LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director . ... dumps . Slide. 7 . LCLS-II New Construction

Undulator Magnets

• LCLS-II Undulators are based on undulators designed at LBNL for the ALS.

Servo Motor

Strongbacks

Compensating Springs

Linear Encoder

Linear Slide

Magnetic Structure

LCLS-II New Instruments Workshops, March 19-22, 2012

Undulator Hall Cross Section

• Undulator tunnel is similar in cross section to the LCLS tunnel.

Slide 10

Page 11: LCLS-II Project Overview - Stanford University · 2012-04-10 · LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director . ... dumps . Slide. 7 . LCLS-II New Construction

Experimental Hall 2 Layout

• Space for 4 experimental stations in an 80m long cavern. • Full size second floor for HVAC, racks, control rooms

LCLS-II New Instruments Workshops, March 19-22, 2012

Front End Systems Area for Soft X-rays Area for Hard X-rays

80m

14m

Slide 11

Page 12: LCLS-II Project Overview - Stanford University · 2012-04-10 · LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director . ... dumps . Slide. 7 . LCLS-II New Construction

LCLS-II Project Schedule

Slide 12 LCLS-II New Instruments Workshops, March 19-22, 2012

First Light

Install Instruments

EH2 complete

Page 13: LCLS-II Project Overview - Stanford University · 2012-04-10 · LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director . ... dumps . Slide. 7 . LCLS-II New Construction

2012 plans

• Start Injector facilities construction in July • Start Injector technical system fabrication • Complete Construction designs by the end of the

year. • Develop the Project baseline schedule and

budget for presentation to DOE in August.

LCLS-II New Instruments Workshops, March 19-22, 2012 Slide 13

Page 14: LCLS-II Project Overview - Stanford University · 2012-04-10 · LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director . ... dumps . Slide. 7 . LCLS-II New Construction

Summary

• LCLS-II will add capacity and capability to the LCLS scientific program, and will provide space for expansion.

• To minimize cost and risk, electron systems rely heavily on LCLS-1 designs.

• LCLS-II will dovetail with the LUSI-II project. First light in 2018.

LCLS-II New Instruments Workshops, March 19-22, 2012 Slide 14

Page 15: LCLS-II Project Overview - Stanford University · 2012-04-10 · LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director . ... dumps . Slide. 7 . LCLS-II New Construction

End of Presentation