K‐stage System Scaffold
Coronet Group Suzhou Col,Ltd 1
Email : Coronet@coronet‐scaffold.com
TEL :+86‐512‐85557000 400‐770‐9995
FAX :+86‐512‐85557111
Addres:#1505 SIFC,SIP,SUZHOU,CHINA
Product Manual
Coronet Group Suzhou Co.,Lt
Standards
Item No. Description Weight
CSKV99 9' 9"standard w/spigot 2971.8mm 17.5kg
CSKV81 8' 1‐1/2" standard w/spigot 2476.5mm 15.0kg
CSKV66 6' 6"standard w/spigot 1981.2mm 12.5kg
CSKV410 4' 10‐1/2" standard w/sigot 1485.9mm 9.5kg
CSKV33 3' 3" standard w/spigot 990.6mm 6.4kg
CSKV17 1' 7‐1/2" standard w/sigot 485.3mm 3.6kg
Marking: AS/NZS1576.1 MMYY MM =Month of manufacture YY =Year of manufacture
1.Kwikstage Components
★ K‐Stage is a modular system scaffold with wedge fixing for all access scaffold requirements
★ The Wedge fixing of the ledgers and transoms gives a simple and fast means of erecting access scaffolding
without loose parts.
★ Spigot and wedge fitting on the standard to give guaranteed vertical alignment
The standard is the vertical member of the scaffold with a spigot at one end for accurate alignment.
Photo
★ Quality primed & painted or hot dipped galvanised finish for maintenance free use
★ Conforms to BS1139 Part 5, HD1000, OSHA, AS/NZS 1576.2:2009 & 1576.3:1995 & AS1577:1993 Standards
Coronet Group Suzhou Col,Ltd 2
Banana Ledgers
Item No. Description Weight
CSKH80 8' banana ledger 2438.4mm 10.30kg
CSKH60 6' banana ledger 1828.8mm 7.67kg
CSKH42 4' 2"banana ledger 1270mm 5.75kg
CSKH28 2' 8" banana ledger 812.8mm 4.15kg
CSKH26 2' 6" banana ledger 762mm 3.73.kg
Marking: AS/NZS1576.1 MMYY MM =Month of manufacture YY =Year of manufacture
Transom
Item No. Description Weight
CSKT80 8' transom series 2438.4mm 24.5kg
CSKT60 6' transom series 1828.8mm 17.25kg
CSKT42 4' 2" transom series 1270mm 10.01kg
CSKT34 3' 4‐1/2" transom series 1028.7mm 9.69kg
CSKT26 2' 6" transom series 762mm 5.96kg
CSKT110 1'10'' transom series 558.8mm 4.58kg
Marking: AS/NZS1576.1 MMYY MM =Month of manufacture YY =Year of manufacture
Diagonal Brace
The ledger is used to connect the standard in a longitudinal direction or used as a guardrail.
It is made from scaffold tube with wedge "Banana Type" fixing at each end which fits in the "V" locating lugs on
the standard.
Photo
The transom is made of back‐to‐back angle steel with the same fixing device on each end as the ledger.
They are used to carry 3 or 5 numbers of steel or trimber battens and toeboard.
Photo
The diagonal brace is used to the full height of the scaffolding in a longitudianl direction.
Coronet Group Suzhou Col,Ltd 2
Item No. Description Weight
CSKB8081 8'*8' 1/2" diagonal brace 15.69kg
CSKB8066 8'*6' 6" diagonal brace 13.99kg
CSKB6066 6'*6'6" diagonal brace 12.19kg
CSKB4266 4' 2"*6' 6" diagonal brace 9.54kg
CSK42410 4'2"*4' 10‐1/2" diagonal brace 9.54kg
CSKB26410 2'6"*4' 10‐1/2" diagonal brace 8.69kg
Marking: AS/NZS1576.1 MMYY MM =Month of manufacture YY =Year of manufacture
Tie Bar
Item No. Description Weight
CSKTB80 8' tie bar 5.57kg
CSKTB60 6' tie bar 4.38kg
CSKTB42 4' 2" tie bar 2.93kg
CSKTB34 3' 4‐1/2" tie bar 2.50kg
CSKTB26 2' 6" tie bar 1.80kg
CSKTB110 1'10'' tie bar 1.35kg
Marking: AS/NZS1576.1 MMYY MM =Month of manufacture YY =Year of manufacture
Steel Batton
Photo
For connecting the access brackets along the length of the platform. This ensures correct spacing so that the
battens are not dislodged.
Photo
Coronet Group Suzhou Col,Ltd 3
Steel Batton
Item No. Description Weight
CSKP80 Steel Batton 2420mm 14.8kg
CSKP60 Steel Batton 1810mm 12.8kg
CSKP42 Steel Batton 1250mm 10.9kg
CSKP26 Steel Batton 790mm 6.0kg
Marking: MMYY 1577 WLL 230Kg MM =Month of manufacture YY =Year of manufacture
Stage Bracket
Item No. Description Weight
CSKSB03 3 Board Stage Bracket 9.5kg
CSKSB02 2 Board Stage Bracket 5.8kg
CSKSB01 1 Board Stage Bracket 2.3kg
Marking: AS/NZS1576.1 MMYY MM =Month of manufacture YY =Year of manufacture
Hop up Bracket
Item No. Description Weight
CSKB0003 3 Board Hop Up Bracket 10.6kg
CSKB0002 2 Board Hop Up Bracket 6.1kg
CSKB0001 1 Board Hop Up Bracket 2.34KG
To extend the scaffold by cantilevering for an additional 1,2 or 3 board platform.
Photo
Photo
To extend the scaffold by cantilevering for an additional 1,2 or 3 board platform.
Photo
The steel platform batton spans between the transoms giving a non‐slip level surface and applicable in kwikstage
Coronet Group Suzhou Col,Ltd 3
Marking: AS/NZS1576.1 MMYY MM =Month of manufacture YY =Year of manufacture
Screw JackItem No. Description Weight
SJB Screw Jack Base 6.25kg
SJS Swivel Screw Jack 6.65kg
SHUJ Screw U Jack Head 6.62kg
Marking: AS/NZS1576.1 MMYY MM =Month of manufacture YY =Year of manufacture
Toe Board Clamp
Item No. Description Weight
CSTBC Toe Board Clamp 0.9kg
Marking: AS/NZS1576.1 MMYY MM =Month of manufacture YY =Year of manufacture
End Board Bracket
Photo
Photo
Clamps to the standard with a captive wedge to hold the batton toe board vertically in position.
Coronet Group Suzhou Col,Ltd 4
End Board Bracket
Item No. Description Weight
CSEBB End Board Bracket 1.25kg
Marking: AS/NZS1576.1 MMYY MM =Month of manufacture YY =Year of manufacture
Aluminum StairItem No. Description Weight
CSAS80 Aluminum Stair 2420*1485*562mm 34kg
Marking: AS/NZS1576.1 MMYY MM =Month of manufacture YY =Year of manufactureFits into " V" locating lugs on the standard at the end of
Figure 1.0
Coronet Group Suzhou Col,Ltd 4
2.1 Tie Plan
2. Tie Plan and Bracing Plan
e) The distance between longitudinally adjacent ties at any level shall not exceed three bays;
f) The vertical distance between the supporting surface and the first level of ties shall be no more than three times t
base width, subject to a maximum of 4 metres;
Where the scaffold is erected to a height exceeding three times the least base width, the scaffold shall be
supporting structure (see Figure 2.1) in accordance with the following procedure:
a) Each tie must be rigidly connected to the supporting structure and secured to prevent inwards and outwards move
of the scaffold. Drilled‐in anchors and other methods relying on friction between components and the supporting str
are not to be used;
b) Each tie shall be connected to not less than two standards or two ledgers with right‐angle couplers;
The tests reported herein have been performed in accordance with approved MTS procedures.
This document shall not be reproduced except in full.
c) All tie tubes must be of full length tube without joints or couplers;
g) Ties fitted to adjacent bays must be offset in a staggered pattern by a maximum one lift
d) The distance between the end of the scaffold and the first tie at any level shall not exceed —
i. One bay in the case of a scaffold with no return; or
ii. Three bays in the case of a scaffold with a tied return;
Coronet Group Suzhou Col,Ltd 5
i) The location of ties shall not obstruct clear access along the full length of any working platform or access platform.
g) Ties fitted to adjacent bays must be offset in a staggered pattern by a maximum one lift.
h) The vertical offset distance between adjacent levels of ties shall not exceed 2 metres; and
Figure 2.1: Tie Plan
Coronet Group Suzhou Col,Ltd 5
2.2 Bracing Plan
a) The braces must extend from the base to the full height of the scaffold;
Figure 2.3:–
2.21 Longitudinal Bracing:
2.22 Transverse Bracing:
Each end of scaffold shall be diagonally braced according to the following conditions and as shown in
d) The brace fixings/connectors are fixed to the V‐pressing points with a maximum spacing of 0.5m between intercon
node points (the nominal spacing between welded V‐pressings on standards);
e) The maximum horizontal distance between intermediate braced panels in any lift must not exceed three bays. Wh
possible and where access to the building is not required at end bays of linear scaffold structures (with‐out 90o retur
b) Braces must be fitted at both ends regardless of the scaffold length and number of bays;
c) Diagonal braces must be arranged forming a heel and toe configuration up end bays at nominal angles of ≈45o to
d) The brace fixings/connectors are fixed to the V‐pressing points with a maximum spacing of 0.5m between intercon
diagonal bracing maybe fitted at one or both end bays on the building side to improve stability.
The outside row of scaffold standards shall be diagonally braced according to the following conditions and as shown
Figure 2.2:–
a) The braces must extend from the base to the full height of the scaffold;
b) Braces must be fitted at both end bays regardless of the scaffold length and number of bays;
c) Diagonal braces must be arranged forming a heel and toe configuration up one bay at nominal angles of ≈45o;
Coronet Group Suzhou Col,Ltd 6
Figure 2.2: Longitudinal Bracing Plan Figure 2.3: Transverse Bracing Plan
g p g p p g
node points (the nominal spacing between welded V‐pressings on standards);
Coronet Group Suzhou Col,Ltd 6
3.Maximum Assembled Height
maximum assembled Height can reach 36m; if fully Planked, the maximum assembled height can reach 26m.
Refer to AS1576.1, Clause1.6.1, 1.6.2 and 1.6.3 and the testing of MTS, For single working platfrom, if partially plank
Details provided on Pages 10 and 11 of MT‐037‐B of the test report from MTS
Coronet Group Suzhou Col,Ltd 7Coronet Group Suzhou Col,Ltd 7
Coronet Group Suzhou Col,Ltd 8
Fully Planked
Coronet Group Suzhou Col,Ltd 8
Coronet Group Suzhou Col,Ltd 9
Partially Planked
Coronet Group Suzhou Col,Ltd 9
Before starting to erect a scaffold the following important items have to be considered:
a. Be aware of the function of the scaffold
b. Check all the loads that are imposed on the scaffold construction
c. Be aware of the line up of the scaffold
d. Be convinced that all the loads can be supported by the scaffold construction
f. Check the position of the scaffold in relation to the surroundings
g. Be aware of all the safety regulations
h. Be aware that the erection people are skilled to build the scaffold construction
i. Be aware that the erection people are completely instructed
j. Check all the tools that are used during erection
k. Check all the materials that are used in the scaffold construction
No damaged material is allowed to be used in any scaffolding construction!
ERECTION PROCEDURE
4.Erection and dismantling of the scaffold
e. Be convinced that all the vertical loads of the scaffold can be supported by the ground and that all
horizontal loads can be taken over by the anchors and the building
Coronet Group Suzhou Col,Ltd 10
3.1 Check the ground condition and provide plates as necessary
Figure 3.1
Figure 3.3
Figure 3.2
3.4 Insert a transom between the two standard at the
lowest level, Do not tighten the wedges yet. See
Figure 3.3
3.2 Start setting out from the highest point and place four adjustable base jacks in their approximate position for
the first bay. see figure 3.1
3.3 Place a standard onto each of the two adjustable bases at one end of the bay,
ensuring that the lower oockets are on the same and opposite side to the wall. See
Figure 3.2
Coronet Group Suzhou Col,Ltd 10
3.5 Insert the upper transom 3 pockets higher then the previous one, see Figure 3.4
Figure 3.4
Coronet Group Suzhou Col,Ltd 11
Figure 3.5
Figure 3.6
Figure 3.7
3.6 On the outside face of the standard link a third standard to the frame
by inserting a ledger into the pockets 2 above the bottom transom, this
acts as a guardrail,see Figure 3.5
3.7 On the inside face of the scaffold link the fourth standard with 2
ledgers inserted at the same height as the previous transoms ,See Figure
3.6
3.8 Complete the bay by joining the two standards
with two transoms, see Figure 3.7
Coronet Group Suzhou Col,Ltd 11
3.9 Level up using a spirit level, on uneven ground, always start from the standard on the highest ground. Figure 3.8
Figure 3.8
Figure 3.9
3.10 Once levelled, drive all wedges home,See Figure 3.9
Coronet Group Suzhou Col,Ltd 12
Figure 3.10
Figure 3.11
3.12 Further transoms are inserted in the same way as the first bay, see
Figure 3.11
3.13 Ensure
everything
is level
before
drving
wedges
home, Do
this as each
bay is
competed.
See Figure
3.12
Figure 3.12
3.11 A second bay can now be added in a simillar manner, by adding additional standards and ledgers.
see Figure 3.10
Coronet Group Suzhou Col,Ltd 12
3.15 To form a scaffold return form the first scaffold,
Place two return transoms on adacent ledges.
See Figure 3.14
Figure 3.13
3.14 Before proceeding any higher, battens should be
Placed between transoms to provide a working platform.
(These can be moved up as the scaffold progresses if
decking is not needed at this level) See Figure 3.13
3.16 Add two standards on adjustable beases
Then proceed with ledges and transoms as
normal. See figure 3.15
Figure 3.14
Coronet Group Suzhou Col,Ltd 13
3.17 If additional platform width is required. Attached
stage brackets to standards on the inside of the scaffol
at both ends of a bay, see FIgure 3.16
Figure 3.15
3.23 Connect the stage brackets by slotting
in a tie bar and appropriate battens.
Figure 3.15
Figure 3.14
Coronet Group Suzhou Col,Ltd 13