Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 1 ITU-BDT Regional Network Planning Workshop ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Cairo – Egypt, 16 - 27 July 2006 Session Session 3.2 3.2 Network planning Network planning at different time scales, at different time scales, long, medium and short term long, medium and short term

ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Embed Size (px)

DESCRIPTION

ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2 Network planning at different time scales, long, medium and short term. Network planning at different time scales:. · Long term network planning (Target network). - PowerPoint PPT Presentation

Citation preview

Page 1: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 1

ITU-BDT Regional Network Planning ITU-BDT Regional Network Planning WorkshopWorkshop

Cairo – Egypt, 16 - 27 July 2006Cairo – Egypt, 16 - 27 July 2006

SessionSession 3.23.2

Network planningNetwork planning at different time scales,at different time scales,

long, medium and short termlong, medium and short term

Page 2: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 2

Network planning at different time scales:

     Long term network planning (Target network)

Target network planning as bases for preparing of comprehensive master plans - master plans are usually based on long term assessments.

Page 3: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 3

Network planning at different time scales:

      Medium term network planning:

      Short term network planning :

To identify intermediate steps from present to target network

Short-term plans can be made up on regional or local bases

Page 4: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 4

85%

15%

52%

25%

9%

9%5%

Planning of telecommunication networksPlanning of telecommunication networks

CAPEX Sensitive OPEX Intensive

PLAN BUILD RUN

CapEx sensitive

OpEx intensive

Crit

ical

Critical

Purchase / Build

Operate &Maintain

Re-Optimization

Plan New Build

DemandForecast

Networkplanning

Service Definition / Market Capture

Business CaseAnalysis

ATM

SS7

SONET / SDH Optical Ring Optical Mesh

Synchronization

WDM Links

Bandwidth Requirements

LinkRequirementsService Mix,

Geographical Traffic Demand

Traffic DemandGeneration / Distribution

Access TechnologySelection / Roll-Out

Voice IP / MPLS

nodes

Page 5: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 5

Access network : broadband access alternatives

xDSLxDSL

FTTxFTTxHFCHFC

WirelessWireless

SATSAT

Power line

Page 6: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 6

PlanningPlanning process for planning of process for planning of wireless BB access networkwireless BB access network

TargetGeography

VPIaccessMaker

Define and Characterize the

Market DataBB services Design Wireless

Access Network

VPIaccessMakerVPIaccessMaker

Perform Techno Economic Analysis

Design Parameters and.Rules

Wireless Network

components

Economic factors

Customers demand

Market Evolution Data

Intermediate Network Design

BB market Economic Analysis of Wireless Network

Design Wireless Access Network(Radio planning)

LStelcom MULTILINK

Wireless Network Design

Design Parameters and Rules

Radio Network components

Page 7: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 7

85%

15%

52%

25%

9%

9%5%

Planning of telecommunication networksPlanning of telecommunication networks

no. of exchanges

Optimum

Total

Exchanges

Subscribers

Circuits

Costs

NODES

CORE

ACCESS

nodesOptimization of the telecom networkOptimization of the telecom network

Page 8: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 8

bridging

long-term forecast

medium-termforecast

Demand

Time

Demand forecasting as bases for network planning

Page 9: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 9

FFindings of the United Nations :indings of the United Nations :

all growth in population will concentrate all growth in population will concentrate in in urbanurban areas, no growth in rural areasareas, no growth in rural areas

most of the growth will concentrate in urban most of the growth will concentrate in urban areasareas of less developed regionsof less developed regions

Population and usage development trendsPopulation and usage development trends

Users will concentrate in urban areas; as urban areas put higher pressure on the individual to "do what the others do" and from technical point it is easier to connect people in urban areas

27%

71%75%

71%

LatinAmerica

Sub-Saharan

Africa

EastAsia &Pacific

SouthAsia

Source: The World Bank(1992)

Percentage of the population living in rural areas

Page 10: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 10

Millennium Development GoalsMillennium Development Goals

Telephone lines and cellular

subscribers per 100 population

Personal computers in use

per 100 population

Internet users per 100 population

1990 2003 1990 2003 1990 2003

World 10 41 2 10 <1 11

Developed regions

38 125 9 45 <1 45

Developing regions

2 25 <1 3 0 5

Source: World Telecommunication Indicators Database

Page 11: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 11

Worldwide fixed and mobile subscribersWorldwide fixed and mobile subscribers

0

500

1,000

1,500

2,000

2,500

2000 2001 2002 2003 2004 2005

Fixed

Mobile

Worldwide fixed-line and mobile telephone subscribers, millions

Source: TMG, Inc. (2004 estimate and 2005 forecast).

• Mobile passed fixed in 2002 globally; since then the gap has grown

• Today almost every country has more mobile than fixed line subscribers

Page 12: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 12

Network planning at different time scales as seen in the evolution steps to NGN

In respect to strategies for introduction of the new equipment

In respect to strategies for coexisting of the present and future technology

Page 13: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 13

Strategies for introduction of the new equipment

Consolidation: Optimize the installed PSTN to reduce capital

(CAPEX) and operational expenses (OPEX). Consolidation can be combined with a selection of future-safe products to prepare migration to NGN  Expansion:

Keep the existing PSTN infrastructure and services, but introduce an overlay NGN (based on broadband access) for addressing new customers and introducing new services (e.g., multimedia).  Replacement:

Replace PSTN components (at their end-of-life) with equivalent NGN components.

Page 14: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 14

Evolution steps to NGNEvolution steps to NGN

POTS,ISDN

Local

VoiceDataSignaling

I nternet

PacketNetwork

Dial-upModem

DSLAM

BAS

DSLModem

‘PINT’, ‘SPIRITS’

Parlay, JAIN, SIP

ApplicationServers

WWWServers

SS7

Local

Transit

TDM

STPINA

P

ISUP

Access Node

SCP

ISUP

Transit

NAS

ISDN/PRA

ApGW

Early Introduction of Broadband Access

ITU-D/SG2-Q19/2ITU-D/SG2-Q19/2

Page 15: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 15

Next Generation NetworkNext Generation Network NGNNGN

Multimedia Services and New User/Network Interaction

ITU-D/SG2-Q19/2ITU-D/SG2-Q19/2

I nternet

WWWServers

PacketNetwork

SS7

Local

SCP

STP

AN

TransitTDM

MultimediaSoftswitch

DSLAM

BAS

ApplicationServers

Portal

SIPParlayJAIN

SIP

SI P, H.323

HTTP

VoiceDataVoice/PacketSignaling

INAP

ISUPISUP

ISUP

H.248

Page 16: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 16

Strategies for coexisting of the present and future technology

 

Overlay strategy

Old technology

New technology

Old technology

New technology

Island strategy

Pragmatic strategy

Old technology

New technology

Page 17: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 17

Strategies for coexisting of the present and future technology

 

Overlay strategy

Old technology

New technology

Deployment of overlay NGN access network Residential gateways RGW and access gateways

AGW are being deployed in the areas served by existing TDM equipment for new and business subscribers to meet their demands on new state-of-the-art services

Overlay NGN access network with Class 5 softswitches is created.

Gradually, this network is expanded till the total replacement of the existing TDM equipment

Page 18: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 18

Strategies for coexisting of the present and future technology

 

Island strategy

Deployment of NGN islands in the access network PSTN exchanges are replaced with AGW and

residential gateways RGW situated at the customer site

NGN class 5 islands are formed in the TDM network, connected via MAN

Trunk gateways TGW are used for interconnection with PSTN

Old technology

New technology

Page 19: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 19

Country Population(in

thousands)

Teledensity [%]

Average house-

hold size

Teledensity per house-hold [%]

Percent of residential

lines

Australia 19,157 53,86 2,64 101,2 75,0

Canada 30,750 63,45 2,65 98,2 63,9

France 58,892 56,89 2,46 94,0 69,2

Germany 82,260 65,08 2,16 95,5 77,0

Italy 57,298 48,07 2,71 96,9 79,2

Japan 126,919 55,83 2,70 116,8 75,8

New Zealand 3,831 44,81 2,91 103,0 78,5

Republic of Korea

47,300 48,86 3,04 105,5 74,1

Spain 40,600 50,62 3,25 100,8 83,5

Sweden 8,881 68,20 2,22 98,7 67,9

Switzerland 7,204 74,42 2,39 99,6 60,0

United Kingdom

59,766 59,086 2,38 93,0 71,0

United States of America

275,130 64,58 2,58 94,1 67,6

• teledensity per house-hold about 100%

•ratio residential to business from 2 / 1 to 3 / 1

Highly developed countries (close to saturation): Fixed network users potential

Page 20: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 20

Mobile subscribersMobile subscribers

75

100

125

Taiwan Hong Kong Israel

OriginalAdjusted

80859095

100

Finland Sweden Norway

Mobile penetration Mobile use

Mobile subscribers per 100 inhabitants, 2003

Important to be precise about subscribers in countries already exceeding 100 %

– Taiwan: 20-30% have 2nd SIM card

– Hong Kong: 24% of prepaid non-active

– Israel: ~ 20% double counted (due to churn and “liberal” counting policies) or non-resident subscribers

• teledensity above 90%

• related to population brake down

Page 21: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 21

Cellular mobile network users potential

Important to be precise about subscribers in countries already exceeding 100 %Age ranges for mobile use: • Finland: 15-74 • Sweden: 16-75 • Norway: 9-79 Source: TMG, Inc. adapted from national regulatory & national statistical agencies.

excluding only unable/unwilling to use

telecommunications, e.g. age below 6 and above 80

Cellular mobile network users potential is related to population brake down by age 6 and above 80

Page 22: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 22

Impact of Cellular mobile on Fixed networkNetwork growth (compound annual growth rate in %)

New telephone lines added 1997-2002

New mobile subscribers added 1997-2002

Low Income 12,5 76,5Lower Middle Income 14,4 67,6Upper Middle Income 4,4 57,4High Income 1,2 29,9Africa 6,0 74,9Americas 2,3 28,7Asia 11,8 43,3Europe 2,6 46,3Oceania 0,4 24,3WORLD 5,3 40,2

World telecommunication/ICT indicators ITU Database

Case of Italy ( 1997-2002 ):

1,4 % CAGR for fixed network ,

35,2 % CAGR for mobile network Year 1997:

fixed network teledensity 44,79 % , residential lines 76,5 %

cellular mobile teledensity 20.46 %  Year 2003: fixed network teledensity 48,40 % , residential lines 79,2 % (2001)

cellular mobile teledensity 101.76 %

Page 23: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 23

Broadband connection – statisticsBroadband connection – statistics

0 10 20 30

JapanS.KoreFrance

SingapoSwedenGerman

UKFinlandNorway

Spain

Top 10 countries by mobile multimedia users as % of

population, 2003

http://reports.tmgtelecom.com/ssmi

Page 24: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 24

Broadband connection – evolutionBroadband connection – evolution

Broadband penetration forecasts for the residential market - EU

Page 25: ITU-BDT Regional Network Planning Workshop Cairo – Egypt, 16 - 27 July 2006 Session 3.2

Network Planning Workshop with Tool Case Studies for the Arab Region – I.S. Session 3.2- 25

CONCLUSION

There is still considerable potential of telecom subscribers in the world, concentrated primarily in the developing countries and after all in the

LDCs

Planning in the developing countries for a long period will primarily have to solve problems of huge network expansion, so long-term (target)

network planning will be essential task