15
International Telecommunication Union Maritza Delgado – Programme Officer BDT/LSE - ITU

Maritza Delgado – Programme Officer International BDT/LSE ... › ITU-D › cyb › events › 2009 › moscow › docs... · Maritza Delgado – Programme Officer BDT/LSE - ITU

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Maritza Delgado – Programme Officer International BDT/LSE ... › ITU-D › cyb › events › 2009 › moscow › docs... · Maritza Delgado – Programme Officer BDT/LSE - ITU

International Telecommunication Union

Maritza Delgado – Programme Officer BDT/LSE - ITU

Page 2: Maritza Delgado – Programme Officer International BDT/LSE ... › ITU-D › cyb › events › 2009 › moscow › docs... · Maritza Delgado – Programme Officer BDT/LSE - ITU

2

The human and economic losses caused by natural disasters in 2008 were devastating. More than 235.000 people were killed, 214 million people were affected and economic costs were over 190 billion US$.

Page 3: Maritza Delgado – Programme Officer International BDT/LSE ... › ITU-D › cyb › events › 2009 › moscow › docs... · Maritza Delgado – Programme Officer BDT/LSE - ITU

3

In 2008, 354 natural disasters were recorded in the EM-DAT database. The death toll was three times higher than the annual average of 66.813 for 2000-2007, mainly caused by two major events: Cyclone Nargis which killed 138.366 people in Myanmar and the Sichuan earthquake in China which caused the deaths of 87.476 people.

In 2008, China (29), the United States (22) and the Philippines (20) were most often hit by natural disasters. These three countries, together with India and Indonesia, have occupied the top ranking of disaster occurrence during the last

three years.

Page 4: Maritza Delgado – Programme Officer International BDT/LSE ... › ITU-D › cyb › events › 2009 › moscow › docs... · Maritza Delgado – Programme Officer BDT/LSE - ITU

4

ITU is the leading United Nations agency for information and communication technology issues, and the global focal point for governments and the private sector in developing networks and services.

Page 5: Maritza Delgado – Programme Officer International BDT/LSE ... › ITU-D › cyb › events › 2009 › moscow › docs... · Maritza Delgado – Programme Officer BDT/LSE - ITU

5

ITU has been defining and adopting the globally agreed technical standards to have the information and communication technologies interconnecting people all around the world, using different equipment, regulating the use of the radio-frequency spectrum and ensuring all international wireless communications remain interference-free to ensure the relay of vital information around the earth.

Page 6: Maritza Delgado – Programme Officer International BDT/LSE ... › ITU-D › cyb › events › 2009 › moscow › docs... · Maritza Delgado – Programme Officer BDT/LSE - ITU

6

ITU-T: Telecommunication standardization network and service aspects

ITU-R: Radiocommunication standardization and global radio spectrum management

ITU-D: Assistance delivery and implementation of telecommunications in developing countries

Page 7: Maritza Delgado – Programme Officer International BDT/LSE ... › ITU-D › cyb › events › 2009 › moscow › docs... · Maritza Delgado – Programme Officer BDT/LSE - ITU

7

Phases:

Emergency Telecommunication Plan

1. PREPAREDNESS

Emergency Preparedness consists of actions, arrangements and procedures taken in anticipation of an emergency to ensure a rapid, effective and appropriate response that may save lives and livelihoods

• Assess country needs

•  Identify the vulnerable areas (GIS)

•  Establish early warning systems integrating ICTs

•  Monitoring systems, satellite and earth observations

Page 8: Maritza Delgado – Programme Officer International BDT/LSE ... › ITU-D › cyb › events › 2009 › moscow › docs... · Maritza Delgado – Programme Officer BDT/LSE - ITU

8

Phases:

Emergency Telecommunication Plan

1. PREPAREDNESS

•  Develop standard operating procedures

Communications Protocols between: - stakeholders -community and stakeholders - stakeholders and community - community

Page 9: Maritza Delgado – Programme Officer International BDT/LSE ... › ITU-D › cyb › events › 2009 › moscow › docs... · Maritza Delgado – Programme Officer BDT/LSE - ITU

9

•  Make an evaluation on damages and needs assessments

Phases:

Emergency Telecommunication Plan

2. RESPONSE

Disaster response is a phase of the disaster management cycle. Its preceding cycles aim to reduce the need for a disaster response, or to avoid it altogether.

Page 10: Maritza Delgado – Programme Officer International BDT/LSE ... › ITU-D › cyb › events › 2009 › moscow › docs... · Maritza Delgado – Programme Officer BDT/LSE - ITU

Scientific Community

Space Agencies

Technical autorities

Disaster Prevention Commission

Other Humanitarian

Actors

UN Agencies

Humanitarian entities

NGOs Emergency

Disaster

Satellite Communication

Companies

ITU Provision of satellite images to identify damage magnitude

ITU Deployment of Satellite Equipment •  Basic Communications •  Telemedicine

ITU Assessment of Telecommunication Network Damage

Phases:

Emergency Telecommunication Plan

2. RESPONSE

•  Ask for humanitarian assistance at local, regional, national and international level

Page 11: Maritza Delgado – Programme Officer International BDT/LSE ... › ITU-D › cyb › events › 2009 › moscow › docs... · Maritza Delgado – Programme Officer BDT/LSE - ITU

11

•  Reconstruction of the tele communication systems that had been damaged

Phases:

Emergency Telecommunication Plan

3. REHABILITATION AND RECONSTRUCTION

•  ITU helps developing this task

Following a disaster and when the initial crisis is over, people affected and the communities that support them are still in a state of heightened vulnerability. Post-emergency rehabilitation programmes are frequently needed.

Page 12: Maritza Delgado – Programme Officer International BDT/LSE ... › ITU-D › cyb › events › 2009 › moscow › docs... · Maritza Delgado – Programme Officer BDT/LSE - ITU

12

• Bangladesh, Floods, July 2007 • Suriname, Floods, May 2006 • Indonesia, Earthquake, May 2006 • Pakistan, Earthquake, October 2005 • South East-Asia, Tsunami, December 2004

• Uganda, Floods, August 2007

• Peru, Earthquake, August 2007 • Suriname, Floods , May 2006

Zambia, Floods, February 2008

China, Earthquake, May 2008 Myanmar, Cyclone, May 2008

Most recent ITU Deployments

Page 13: Maritza Delgado – Programme Officer International BDT/LSE ... › ITU-D › cyb › events › 2009 › moscow › docs... · Maritza Delgado – Programme Officer BDT/LSE - ITU

Partnering for Humanitarian Work

UN Agencies/UNWGET (UN Working Group on Emergencies Telecommunications)

&

ITU Membership

Page 14: Maritza Delgado – Programme Officer International BDT/LSE ... › ITU-D › cyb › events › 2009 › moscow › docs... · Maritza Delgado – Programme Officer BDT/LSE - ITU

Conclusions: Encourage of the countries to Ø Develop their own emergency

telecommunication plan; Ø Design an early warning system depending

on natural phenomena that can affect the region;

Ø Include ICTs on early warning systems; Ø Ask for help and advise to ITU; Ø Integrate emergency telecommunication

plan to national emergency plan.

Page 15: Maritza Delgado – Programme Officer International BDT/LSE ... › ITU-D › cyb › events › 2009 › moscow › docs... · Maritza Delgado – Programme Officer BDT/LSE - ITU

Maritza Delgado

15

PROGRAMME OFFICER EMERGENCY TELECOMMUNICATION, LEAST DEVELOPED

COUNTRIES AND SMALL DEVELOPING STATES