Integrated Management and Drill Bit Supply to Companies
of the Oil and Gas Industry
Presentation
September 2003
Smith Eurasia
website: www.smitheurasia.com
Smith Eurasia – Main Areas of Activities
Supply of equipment and technology
Procurement services
Engineering services
Wellsite services
Integrated project management
Smith Eurasia – Supply of Equipment
Drill bits (roller cone, diamond and PDC)
Drilling equipment
Directional drilling tools
Fishing tools
Workover equipment
Completion equipment
Production equipment
Mining equipment
Smith Eurasia – Engineering Services
Well drilling engineering design
Well completion and production engineering design
Technical data review
Technical and engineering recommendations
Field testing of equipment and technology
Development of feasibility studies
Analysis of economic return from introduction
Smith Eurasia – Wellsite Services
Oversight and provision of the following types of services:
Construction
Drilling
Fishing operations
Workovers
Sidetracking
Multilaterals
Milling
Completions
Perforating
• Computer simulation of physical and mechanical rock parameters
• Optimization of use of roller cone and diamond bits
• Statistical analysis of source databases
• Drilling programs and review of previous performance
• Production of work charts
Drill Bit Optimization ProcessUse ofUse of D B O S software D B O S software
Special Features Special Features of the Wellof the Well
Review of Review of Input DataInput Data
DecisionDecision SelectionSelection
Conditions of Conditions of UseUse
SectionalSectional Analysis ofAnalysis of
RecommendationsRecommendationsDiscussionDiscussion
New Products
New Technology
DBOS
Utilization of Experience
DiscussionDiscussion of Newof New
ProposalsProposals
yes
NewNew recommendationsrecommendations
yes
no
no
BitBitOrderOrder
Csg
Muds
ГОБГОБ
Purpose of DrillingPurpose of Drilling
BHA
Utilization of Experience
DH motors
Drill Bit Optimization ProcessBit Selection
South Oman: Deepwater Exploration
$0
$50
$100
$150
$200
$250
Dasimi 1 Har Deep1H1
Sarmad 1 Ghafeer 1H1Sarmad 2H1Ambrah 1h1Ajeeb 1H1 Sakhiya 1H1
$/m
ete
r
Hourly Rate = $1050Tripping = 6 hrs GTXCP03 used in all wells
ASE in
Oman Oil
Control directional drilling during load variation
Increased load
With new BHA
Used asymmetric
nozzle
Reduced RPM and increased circulation volume
ASE Services Use Examples
12.25" Amin Conglomerate Section PerformanceRig 50 Deep Oil Exploration Oct 98 - May 2000
0
50
100
150
200
250
300
350
Me
dia
n m
ete
rs/b
it
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
Me
dia
n m
ts/h
r
Meters/bit
ROP
Meters/bit 98.5 112 117 139 199 304
ROP 2.8 3.7 2.5 2.8 2.8 4.3
Ghafeer 1H1 Sarmad 2H1 Ambrah 1H1 Ajeeb 1H1 Sakhiya 1H1 Ghafeer 2H1
2bits
5 22
7
1
Use harder bits
Limit WOB <20 kdan RPM <80
Use XEM seismic to map sands, conglomerates
Map layers,Trial new bit design
Max WOB, slow RPM
Median bit ROP
Drill ahead
ASE Services Use Examples
Conclusion 1:
1. Optimization of the bit program can significantly reduce drilling time and well costs.
2. A specialized bit company should manage the bit program.
3. Smith Eurasia, an exclusive partner of Smith International, has the expertise and technology required to provide such services in the former Soviet Union.
Specific Features of Drilling Operations in the FSU
а) impossibility to fully optimize drilling parameters due to lack of required drilling equipment;
b) low availability of high-end modern equipment and tools in drilling companies;
c) low quality of drilling muds and their treatment;
d) use of high-RPM turbine drilling;
Conclusion 2:
а) optimal and efficient combination of available equipment and technology with the most advanced Western equipment and technology.
b) optimization of financial and logistical arrangements for equipment.
c) introduction of new types of services and organization of operations.
Services Provided
Establishment and management of drill bit warehouses
Work with bit manufacturers, contracts, placement of orders, financial settlement
Drill bit supply with payment after actual use (consignment basis)
Engineering support
Introduction of advanced technology
Control use and running of drill bits, train drilling contractor’s staff
Logistics and freight forwarding services
Effect from Implementation of the Project
Implementation of the Integrated Drill Bit Management and Supply Project will:
Reduce well drilling time
Reduce well costs
Reduce well construction costs and provide additional oil and gas production
Increase the service life of drilling equipment and services
Improve safety and health status
Additional Effect from Implementation of the Project
Reduction of drilling crews and a corresponding reduction of administrative and operating costs
Improvement of overall drilling technology, reduction of construction time and, as result, quality improvements and start-up of new wells ahead of schedules with receipt of additional
production
Reduction of drilling mud costs due to reduction of the time to drill a well
Reduction of the wear of drilling equipment and its repair costs due to less pipe tripping
Reduction of wear and tear of drilling tools due to less drilling time and amount of pipe tripping
Additional Effect from Implementation of the Project
Savings of considerable amounts of money through reduction of “frozen” warehoused inventory
Improved drilling efficiency through constant engineering control, implementation of new technology and creation of a broad database
Reduction of downhole problems during well drilling through a reduction of drilling time and amount of pipe tripping
Reduction of bit transportation costs an as result a smaller overall amount
Reduction of injuries due to less pipe tripping
•Discussed with the Client• The goals and objectives of the Project• A meeting with the local technical group to establish working contacts. Input Data
• Technical and geophysical data packages on basic operations. (E Logs, Mud logs, Bit run data, Daily Drilling reports, End of well reports)
Selection and Review of Input Data• Processing of input data by D B O S software .• Review of basic bit and drilling programs.• Statistical analysis of base data to determine their average level and development trends• A review of the use of products and bits of different manufacturers.
Proposals• Review and select bits offered by various suppliers. • Select optimal types of bits for specific well sections. • Complete bit program for the well and its discussion with the local technical service.• Introduction of revisions and changes to the proposals of the local technical people.• Approval of the bit program.
Daily Services• Provision of daily engineering support to drilling crews.• Direct involvement in the process of optimization of drilling.
Review of Drilling Results.• Review of “immediate” drilling data.• Identification of required changes• Provision of a report on each drilled well and its discussion with the local technical group.
Bit Optimization Process
Scope of Services Under the Actual Project
1. Smith Eurasia has established offices and consignment
warehouses in each area of NC drilling operations.
2. Engineering groups are operational in each region; a drill bit program is being produced for each well covering both Western and Russian drill bits.
3. An inventory of both Western and Russian drill bits is being maintained at warehouses on a consignment basis.
4. The drill bits are delivered individually to each well and are paid for at the time of their use.
5. The engineering group provides engineering support of the drilling process, studies used bits and issues the necessary recommendations.
Time-basis comparison of technical and economic drilling performance calculated on the basis of the current Bit Program and the Bit Program
Proposed by Smith Eurasia
4734
3614
2618
2255
732
189
75
18
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
1 2 3 4
Цикл строительства скважины, час.
Время бурения, час. Время СПО, час. Количество долот на
скважину, шт.
Фактическая Предлагаемая
Comparison of Technical and Economic Drilling Performance Estimated on the Basis of the Actual Drill Bit Program vs.
the Drill Bit Program Proposed by Smith Eurasia, in $ Value Terms
$213029 $215950
$318,01
$245,67
$1 590 535
$1 267 683
$ 0 , 0 0
$ 1 0 0 0 0 0 , 0 0
$ 2 0 0 0 0 0 , 0 0
$ 3 0 0 0 0 0 , 0 0
$ 4 0 0 0 0 0 , 0 0
$ 5 0 0 0 0 0 , 0 0
$ 6 0 0 0 0 0 , 0 0
$ 7 0 0 0 0 0 , 0 0
$ 8 0 0 0 0 0 , 0 0
1 2 3
Стоимость долот на скважину,$$
Стоимость метра проходки, $$
Стоимость бурения, $$
actual proposed
Bit Costs, US$Costs per Meter, US$ Drilling Costs, US$
Economic Benefits Achieved On Drilling SectionsWith Service Support on Completed Wells
Well No.Field
986 Growth
1026 Growth
3813 Леб
188 Ток
2713 Давыд
Well Depth, m 4320 4520 4160 2356 4620
Depth at Start of Provision of Services, m 1200 2915 2549 0 3615
Length of the Section Serviced by Smith Eurasia, m 3120 1605 1611 2356 1005
Drilling Time for the Well Section as per NC’s Plan Schedule, days 149 120 96 82 92
Actual Drilling Time for the Well Section Serviced by Smith Eurasia, days 107 92 52 37 68
Time Savings Relative to the NC’s Plan Schedule, days (%) 42 (28%) 28 (23%) 44 (46%) 45 (55%) 24 (26%)
Cost Savings vs. NC’s Plan Schedule, доллары США $293 328 $195 552 $307 296 $314 280 $167 616
Bit Costs on the Section Based on NC’s Earlier Wells $143 520 $73 830 $74 106 $108 376 $46 230
Actual Bit Costs on the Section $98 211 $118 964 $88 285 $83 326 $41 416
Actual Additional Savings / Overspend, $ $45 309 -$45 134 -$14 179 $25 050 $4 814
Actual Savings on Drilled Sections of Wells, $ $338 637 $150 418 $293 117 $339 330 $172 430
Smith Eurasia
Selection of the optimal range of bits
1. Bit Life
2. Rate of Penetration
Drilling Parameters
Drilling Mud Quality
Quality of pay-zone tapping
Working culture
Drilling operations economics
Increased overall oil production due to quicker introduction of wells into production
Smith Eurasia
THANK YOU FOR
YOUR ATTENTION
USA: 11767 Katy Freeway, Suite 645Houston, Texas 77079phone: + 1-281-556 9596fax: +1-281-556 9277e-mail: [email protected]
Russia:65/4 Leninsky ProspektMoscow 117917 phone: + 7-095-135 0163fax: +7-095-935 8621e-mail: [email protected]
Smith Eurasia – Contact Information: