6
INGAS 18 months Meeting, Paris, 20-21 May 2010 INGAS 18 months Meeting, Paris, 20-21 May 2010 INGAS INtegrated GAS Powertrain INGAS INtegrated GAS Powertrain 1 18 Month Meeting Paris, Subproject A2, Status (month 13-18) K. Roessler, Daimler AG INGAS Subproject SPA2

INGAS 18 months Meeting, Paris, 20-21 May 2010 INGAS INtegrated GAS Powertrain 1 18 Month Meeting Paris, Subproject A2, Status (month 13-18) K. Roessler,

Embed Size (px)

Citation preview

Page 1: INGAS 18 months Meeting, Paris, 20-21 May 2010 INGAS INtegrated GAS Powertrain 1 18 Month Meeting Paris, Subproject A2, Status (month 13-18) K. Roessler,

INGAS 18 months Meeting, Paris, 20-21 May 2010INGAS 18 months Meeting, Paris, 20-21 May 2010

INGAS INtegrated GAS PowertrainINGAS INtegrated GAS Powertrain

1

18 Month Meeting Paris,Subproject A2,

Status (month 13-18)K. Roessler, Daimler AG

INGAS Subproject SPA2

Page 2: INGAS 18 months Meeting, Paris, 20-21 May 2010 INGAS INtegrated GAS Powertrain 1 18 Month Meeting Paris, Subproject A2, Status (month 13-18) K. Roessler,

INGAS 18 months Meeting, Paris, 20-21 May 2010INGAS 18 months Meeting, Paris, 20-21 May 2010

INGAS INtegrated GAS PowertrainINGAS INtegrated GAS Powertrain

2

• WPA2.3 WP-Title: Hardware Procurement

• Main objectives of WPA2.3:

– Completion of all multi-cylinder engines.– Achievement of a uniform configuration of all engines.– Layout of crankcase ventilation system and procurement.

• Status Summary of WPA2.3: All three engines completed and tested.– Conversion of engines 2 and 3 from CR = 13 to CR = 12.– Layout crankcase ventilation system completed and tested.

INGAS Subproject SPA2

Page 3: INGAS 18 months Meeting, Paris, 20-21 May 2010 INGAS INtegrated GAS Powertrain 1 18 Month Meeting Paris, Subproject A2, Status (month 13-18) K. Roessler,

INGAS 18 months Meeting, Paris, 20-21 May 2010INGAS 18 months Meeting, Paris, 20-21 May 2010

INGAS INtegrated GAS PowertrainINGAS INtegrated GAS Powertrain

3

• Task A2.3.3 Multi cylinder engines generation 2 - Status:• Third multi-cylinder engine (gen. 2, engine number: YK0003173)

was completed.

• Initial test on engine test bench.

• Conversion from CR = 13 to CR = 12 (piston InGAS-V1).

• Handed over to Continental in March 2010.

• Layout of crankcase ventilation system completed and tested. Final test including piping on engine test bench or vehicle still outstanding.

• Investigations on engine test bench to improve cam phaser behavior carried out. A solution for satisfactory stationary operation was found. Transient behavior is still insufficient.

INGAS Subproject SPA2

Page 4: INGAS 18 months Meeting, Paris, 20-21 May 2010 INGAS INtegrated GAS Powertrain 1 18 Month Meeting Paris, Subproject A2, Status (month 13-18) K. Roessler,

INGAS 18 months Meeting, Paris, 20-21 May 2010INGAS 18 months Meeting, Paris, 20-21 May 2010

INGAS INtegrated GAS PowertrainINGAS INtegrated GAS Powertrain

4

INGAS Subproject SPA2

Connecting of Ventilation Device

2 blow-by outlets at the engine (above camshaft and on the side of the crankcase )

2 blow-by connections at the ventilation device

1 oil return from ventilation device into oil pan

Specification

Measurement on AVL engine test bench

Blow-by: max. 70 dm³/min,

Separated oil: approx. 115 g/h,

(at n = 2000 rpm, 300 Nm, pcyl = 120 bar)

Gas outlet without oil

Status

- function tested on engine test bench: OK

- mounting/piping for vehicle in preparation

- final test including piping on engine test

bench or vehicle still outstanding

gas outlet

crankcase outlet

oil return

outlet above camshaft

blow-by

gas

oil

Page 5: INGAS 18 months Meeting, Paris, 20-21 May 2010 INGAS INtegrated GAS Powertrain 1 18 Month Meeting Paris, Subproject A2, Status (month 13-18) K. Roessler,

INGAS 18 months Meeting, Paris, 20-21 May 2010INGAS 18 months Meeting, Paris, 20-21 May 2010

INGAS INtegrated GAS PowertrainINGAS INtegrated GAS Powertrain

5

• Next Steps (month19-24)– Redesign of slide rails with different material. Procurement of parts and

retrofit of engines.

– Repair of engine no. 1.

INGAS Subproject SPA2

Page 6: INGAS 18 months Meeting, Paris, 20-21 May 2010 INGAS INtegrated GAS Powertrain 1 18 Month Meeting Paris, Subproject A2, Status (month 13-18) K. Roessler,

INGAS 18 months Meeting, Paris, 20-21 May 2010INGAS 18 months Meeting, Paris, 20-21 May 2010

INGAS INtegrated GAS PowertrainINGAS INtegrated GAS Powertrain

6

• Problems / Changes compared to plan

– Engine damage due to wear of slide rail. • Engine No. 2 was sent to AVL as replacement.• Redesign of slide rails with different material is in progress.

– Adjustment of cam phaser too slow.• Measurement of oil pressure in preparation.

INGAS Subproject SPA2