Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
SCHEDULE A
ROAD NETWORK CLASSIFICATION
Version:
Final Draft
Job No.
H-90530.00
CLEARWATER ROAD NETWORK
CLASSIFICATION RATIONALIZATION
FRONT/BACKAGE PREFERRED OPTION
NTS
Date:
August, 21 2013
Clearw
ater Valle
yRoad
Greer Road
Mo
un
tain
vie
w R
oa
d
Downie Road
Birch Drive
Bo
hil
l P
lace
Ke
nn
ed
y R
oa
d
Archibald
Road
Faw
nR
oa
d
Driv
e
Wyndhaven
Buck Road
Connects to
Hydro Road
NORTH
MoTI Highway
Urban Collector
Rural Collector
Local
Dedicated Roadway
Planned Future Urban Collector
Planned Future Rural Collector
Planned Future Local Collector
Proposed Road ClassificationExisting Roundabout
Legend
Urban Collector
Rural Collector
Local
Proposed Auto
Network ConnectionsActive Network
Corridors
Active
Network
Proposed Roundabout
Right in Right Out Access
Only
Proposed Right in Right Out
Access Only (none shown)
Version:
Final Draft
Job No.
H-90530.00
MoTI Highway
Urban Collector
Rural Collector
Local
Richie Road
Gill Creek Road Ell
iot
Ro
ad
Dunlevy RoadWa
dle
gg
er
Ro
ad
Og
de
nR
oa
d
OldNorth
Thompson Highway Kershaw
Road
Do
nch
i Place
Schmidt Road
Lodge Drive
Tarren Drive
Glen
Road
Mil
ee
n D
riv
e
Du
tch
Road
Lake
Riv
erv
iew
Crescent
Be
ach
Ro
ad
Ro
y
Road Harby
Road
Bla
ir P
lace
Mu
rtle
Cre
sce
nt
Mu
rtle
R
oa
d
Robson Place
Road
Azu
reD
riv
e
Helmcken
Street
Robson Street
Park Drive
Clearwater Village Road
Grant Road
Webber Road
RoadW
hit
e
Defosses
Road Ca
po
stin
sky
Rd
Clearwater Village Road
Swanson Road
Bla
nch
ard
Ro
ad
Ca
me
ron
Ro
ad
Trutch
Ro
ad
Eve
rgre
en
Pla
ce
Ho
spita
lA
ccess
No
rfo
lkR
oa
d
Woreby Road
Candle Cree
k Road
Hil
lsid
eR
oa
d
Ca
nd
leC
ree
kR
oa
d
Hay
wo
od
Ro
ad
Hydro Road
Wildwood Road
Eden Road
Joy
ceLa
ne
Cle
arwate
r Station
Ro
ad
Old
Nort
hThompson Highway
Murtle Crescent
Vill
age
Ro
ad
Clearwater
Du
nn
LakeR
oa
d
Clearwater Station Road
Russell RoadSouthern
Yellowhead Highway No. 5
Sunshine Valley Road
Dedicated Roadway
Planned Future Urban Collector
Planned Future Rural Collector
Planned Future Local Collector NTS
Proposed Road Classification
Connects to
Fawn Road
Existing Roundabout
WEST
Legend CLEARWATER ROAD NETWORK
CLASSIFICATION RATIONALIZATION
FRONT/BACKAGE PREFERRED OPTION
Urban Collector
Rural Collector
Local
Proposed Auto
Network Connections
1
Active Network
Corridors
A proposed collector road intersection at Highway 5 will require an offset between the service road/collector road intersection and the collector road/Highway 5 intersection.
The service road should be designed to mitigate impacts to properties by following as close as possible to the property line; however, the offset is subject to MoTI
Intersection Spacing and Geometric Design.
2 Consider realigning intersection and changing major direction of travel to maintain Candle Creek Road and Norfolk Road as local roads providing residential access
Smal
l Ro
ad
3 Consider connecting Small Road in a loop to Roy Road - Spacing between Roy Road and Highway 5 needs to be reviewed
4 Connecting this propsed collector road to Hydro Road may be difficult due to topography - feasibility should be reviewed including the benefits it would bring to
the community.
Active
Network
3
Future Intersection Improvements
5 Active Corridor could follow the Hydro Utility Right of Way
5
12
6 There is an existing active network connection between Donchi Place and the Provincial Park; however, it is across private property.
2
6
4
7
7 Active Corridor could follow the Kinder Morgan Pipeline Right of Way or another route
Right in Right Out Access
Only
Proposed Right in Right Out
Access Only (none shown)
8
8 A connection between Harby Road and Eden Road is desired; however, the topography may make this difficult for designing a roadway for automobile usage.
Lakeview Road
Date:
August 21, 2013
Version:
Final Draft
Job No.
H-90530.00
MoTI Highway
Urban Collector
Rural Collector
Local
Proposed Road Classification
Clearwater Village Road
Bo
ldu
c R
oa
d
Raft R
iver R
oa
d
Scott D
rive
BainRoad
Miller Road
De
eg
Ro
ad
Dedicated Roadway
NTS
Planned Future Urban
Collector
Planned Future Rural
Collector
Planned Future Local
Collector
Date:
August 21, 2013
EAST
CLEARWATER ROAD NETWORK
CLASSIFICATION RATIONALIZATION
FRONT/BACKAGE PREFERRED OPTION
Urban Collector
Rural Collector
Local
Proposed Frontage/Backage Roads
1
2
3
1 Active Corridor could follow the Kinder Morgan Pipeline Right of Way and connect to Raft River Road or follow
another similar path
2 A pedestrian and cyclist bridge could be constructed and incorporated into the existing Interactive Salmon
Centre on the east side of Raft River Road to connect the Active Corridor across the District
3 Consider Connecting Miller Road and Bain Road together for Active Modes
Existing Roundabout
Active Network
CorridorsActive
Network
Right in Right Out Access
Only
Proposed Right in Right Out
Access Only (none shown)
Future Intersection
Improvements
SCHEDULE B
ROAD CROSS-SECTION FRAMEWORK
Version:
Draft
Job No.
H-90530.00
CLEARWATER BYLAW FRAMEWORK
CONTEXT ZONESMoTI Highway
Urban Collector
Rural Collector
Local NTS
Clearw
ater Valle
yRoad
Greer Road
Mo
un
tain
vie
w R
oa
d
Downie Road
Birch Drive
Bo
hil
l P
lace
Ke
nn
ed
y R
oa
d
Archibald
Road
Faw
nR
oa
d
Driv
e
Wyndhaven
Buck Road
Dedicated Roadway
Planned Future Urban Collector Date:
July, 2013
Planned Future Rural Collector
Planned Future Local Collector
Proposed Road Classification
Connects to
Hydro Road
NORTH
Context Zones
Natural, Rural
Suburban
Core Area
Village Center
Version:
Draft
Job No.
H-90530.00
MoTI Highway
Urban Collector
Rural Collector
Local
Richie Road
Gill Creek Road Ell
iot
Ro
ad
Dunlevy RoadWa
dle
gg
er
Ro
ad
Og
de
nR
oa
d
OldNorth
Thompson Highway Kershaw
Road
Do
nch
i Place
Schmidt Road
Lodge Drive
Tarren Drive
Glen
Road
Mil
ee
n D
riv
e
Lakeview Road
Du
tch
Road
Lake
Riv
erv
iew
Crescent
Smal
l Ro
ad
Ro
y
Road Harby
Road
Bla
ir P
lace
Mu
rtle
Cre
sce
nt
Mu
rtle
R
oa
d
Robson Place
Road
Azu
reD
riv
e
Helmcken
Street
Robson Street
Park Drive
Clearwater
Grant Road
Webber Road
RoadW
hit
e
Defosses
Road Ca
po
stin
sky
Rd
Clearwater Village Road
Swanson Road
Bla
nch
ard
Ro
ad
Ca
me
ron
Ro
ad
Trutch
Ro
ad
Eve
rgre
en
Pla
ce
Ho
spita
lA
ccess
No
rfo
lkR
oa
d
Woreby Road
Candle Cree
k Road
Hil
lsid
eR
oa
d
Ca
nd
leC
ree
kR
oa
d
Hay
wo
od
Ro
ad
Hydro Road
Wildwood Road
Eden Road
Joy
ceLa
ne
Cle
arwate
r Station
Ro
ad
Old
Nort
hThompson Highway
Murtle Crescent
Vill
age
Ro
ad
Clearwater
Du
nn
LakeR
oa
d
Clearwater Station Road
Russell RoadSouthern
Yellowhead Highway No. 5
Sunshine Valley Road
Dedicated Roadway
Planned Future Urban Collector
Planned Future Rural Collector
Planned Future Local Collector NTS
Proposed Road Classification
Connects to
Fawn Road
Date:
July, 2013
WEST
Context Zones
Natural, Rural
Suburban
Core Area
Village Center
Village Road
CLEARWATER BYLAW FRAMEWORK
CONTEXT ZONES
Version:
Draft
Job No.
H-90530.00
MoTI Highway
Urban Collector
Rural Collector
Local
Proposed Road Classification
Clearwater Village Road
Bo
ldu
c R
oa
d
Raft R
iver R
oa
d
Scott D
rive
BainRoad
Miller Road
De
eg
Ro
ad
Dedicated Roadway
NTS
Planned Future Urban
Collector
Planned Future Rural
Collector
Planned Future Local
Collector
Date:
July, 2013
EAST
Context Zones
CLEARWATER BYLAW FRAMEWORK
CONTEXT ZONES
Natural, Rural
Suburban
Core Area
Village Center
Total Walking Space
(one Side)
Clear Walking
Width2 Adjacent Space Types
(metres) (metres) Public Side Private Side Public Side Private Side Public Side
W1 Natural, RuralAgricultural, Rural Residential, Industrial,
Public & InstitutionalAccess
5 Local Active 2.8 1.5 Asphalt3 C1, C3, D1, D2, D4, CD-S1, CD-
S3, CD-S50.65 0.65
0.15 m Concrete edging,
0.5 m Grass3
0.15 m Concrete
edging, 0.5 m Grass3
W2Suburban, Core
Area
Urban Residential, Industrial, Public, &
Institutional
Access5 or
Mobility4
Arterial Active,
Collector Active,
Local Active
2.1 1.8Concrete (preferred),
Asphalt (alternate)
C2, C4, D1, D2, D3, D4, CD-
S1, CD-S2, CD-S3, CD-S4, CD-
S5, CD-S6,
0.3 0 Pavers or Concrete N/A
W3Core Area, Village
Center
Urban Residential, Commercial, Public &
InstitutionalMobility or Access
5 Arterial Active,
Collector Active3.5 2.5
Concrete (preferred),
Asphalt (alternate)
C2, C4, C5, D2, D3, D4, CD-
S1, CD-S2, CD-S3, CD-S4, CD-
S5, CD-S6
0.5 0.5Paved offset with Urban
Braille
Paved Clearance with
Urban Braille
W4 Village CenterUrban Residential, Commercial, Public &
Institutional, Health District
Access5 or
Destination6
Collector Active,
Local Active4.7 3.2
Pavers (preferred),
Concrete (alternate)
C4, C5, D2, D3, D4, CD-S1, CD-
S2, CD-S3, CD-S4, CD-S5, CD-
S6
1 0.5Paved offset with Urban
Braille
Paved Clearance with
Urban Braille
Footnotes for Walking Spaces
1
2
3
4
5
6
Note: Any land use, that does not have any access to a road Right of Way and is fully separated/barricaded, can be treated as rural residential or urban residential depending upon the surrounding context zone.
Gravel may be used under certain circumstances.
Mobility: uninterrupted maximum speed movements over long distances.
Access: partially interrupted moderate speed movements over short distances.
Destination: Substantially interrupted low speed movements over short distances.
Pedestrians &
Wheelchairs
Framework for Walking Spaces
District of Clearwater
Interface Space (metres) Interface Character
Space Types Surface MaterialDesign UsersFunctional
Classification
Primary
FunctionAdjacent Land Use
1Context Zones
Clear Walking Width is meant to be free of all obstructions including lighting poles, fire hydrants, traffic signals, signs, mailboxes, and other street hardware; Basic Physically Occupied Space plus no Touch Zone = 0.9 m; Basic Wheelchair Dimensions = 0.75 m wide, 1.27 m long, 0.56 m high; A minimum clear sidewalk width
of 1.5 m is required to allow two pedestrians to pass without physically touching each other; A minimum clear sidewalk width of 1.8 m is required for each pedestrian to feel unimpeded or in situations where one of the pedestrians is carrying shopping bags or pushing a stroller; Each additional lane of pedestrian travel to
pass stopped or moving pedestrians and to walk to or more abreast requires a minimum 0.7 m clear sidewalk width (Source: TAC).
Comprehensive Development Zone can be used as per the most relevant land use that is available.
Posted Design
On
e-W
ay
Tw
o-W
ay
Tw
o-W
ay
+
On
e-W
ay
Tw
o-W
ay
Tw
o-W
ay
+
Space
(metres)Character
C1 Natural, Rural
Agricultural, Rural Residential,
Industrial, Public &
Institutional
Mobility3 Arterial Active 50 50
Advanced Commuter &
Recreation Cyclists5.2 6.4 N/A 2.4 3.6 N/A
W1, WC-S1 (Private Side) and
D1, D2, D4 (Public Side)2.8
1.5 m drainage swale / boulevard on private
side, 0.5 gravel / natural grass clearance on each
side & 0.15 m flush concrete curbs on each side.
C2Suburban, Core
Area
Urban Residential, Industrial,
Public & InstitutionalMobility
3 Arterial Active 40 40Advanced Commuter &
Recreation Cyclists3.9 5.1 N/A 2.4 3.6 N/A
W2, W3, WC-S1, WC-S2 (Private
Side) and D1, D2, D3, D4 (Public
Side)
1.5
1.2 m boulevard / planter separation on private
side & 0.15 m barrier concrete curbs on each
side.
C3 Natural, Rural
Agricultural, Rural Residential,
Industrial, Public &
Institutional
Mobility3 or
Access4
Arterial Active,
Collector
Active
30 30
Intermediate
Commuter &
Recreation Cyclists
4.6 5.8 N/A 1.8 3 N/AW1, WC-S1 (Private Side) and
D1, D2, D4 (Public Side)2.8
1.5 m drainage swale / boulevard on private
side, 0.5 gravel / natural grass clearance on each
side & 0.15 m flush concrete curbs on each side.
C4
Suburban, Core
Area, Village
Center
Urban Residential, Industrial,
Commercial, Public &
Institutional
Mobiltiy3 or
Access4 or
Destination5
Arterial Active,
Collector
Active
20 20
Intermediate
Commuter &
Recreation Cyclists
3 4.2 4.8 1.8 3 3.6
W2, W3, W4, WC-S1, WC-S2
(Private Side) and D1, D2, D3,
D4 (Public Side)
1.2
0.9 m delineation (grass / flower / shrub planter,
raised median or bollard) on private side & 0.15
m flush concrete curbs on each side.
C5 Village Center
Urban Residential,
Commercial, Public &
Institutional
Destination5 Collector
Active20 20
Intermediate
Commuter &
Recreation Cyclists
2.7 4.2 4.8 1.5 3 3.6W3, W4, (Private Side) and D2,
D3 & D4 (Public Side)1.2
0.9 m delineation (grass / flower / shrub planter,
raised median, bollard or rollover curb) from
parking or traffic lane (painted lines alone are
not acceptable).
Footnotes for Cycling Spaces
1
2
3
4
5
Note:
Mobility: Uninterrupted high speed movements over long distances.
Access: Partially interrupted moderate speed movements over medium distances.
Destination: Substantially interrupted low speed movements over short distances.
Any land use, that does not have any access to a road Right of Way and is fully separated/barricaded, can be treated as rural residential or urban residential depending upon the surrounding context zone.
Framework for Cycling Spaces
District of Clearwater
Adjacent land Use1Context Zones
Space
Types
Asphalt
Comprehensive Development Zone can be used as per the most relevant land use that is available.
Clear Cycling Width is meant to be free of all obstructions including lighting poles, fire hydrants, traffic signs, mailboxes, and other street hardware; Bicycle Design Envelope = 1 m wide, 2.2 m high & 1.75 m long; Bicycle Clearance Requirements (horizontal) = 0.2 - 0.5 m to the wall,
fence, barrier or other fixed objects, 1 m to unfenced drop-off such as embankment, river, etc, additional 0.5 m to 60 km/hr traffic, additional 1 m to 80 km/hr, additional 1.5 m to 100 km/hr traffic, additional 0.5 m to 10% or more truck traffic; Bicycle Clearance Requirements
(overhead) = 0.2 m; In-Line Skater Envelope = 1.5 m wide, 2 m high; In-Line Skating Clearance Requirements = 0.4 m lateral, 0.5 m overhead (Source: TAC): Minimum width requirements for In-Line Skating = 2.45 m for one-way, 3.7 m for two-way (Source: International In-Line Skating
Association); Minimum width requirement for In-line Skating = 1.8 m for one way, 2.8 - 3.7 m for two-way (Source: Lorne Milne's Inline Skating, Vancouver).
Speed (km/hr) Interface RequirementsClear Cycling Width
2
(metres)
Total Cycling Space
(metres)
Adjacent Space TypesSurface
MaterialDesign Users
Functional
ClassificationPrimary Function
Posted DesignThrough Traffic
Lane
Right Turn
Lane
Left Turn Lane
w/ Raised
Median
Left Turn Lane
without Raised
Median
Two-Way Left
Turn Lane
(TWLTL)
Gravel
Shoulder3
Parking13
(optional)
Space2
(metres)Character
D1.1Natural,
Rural
Agricultural, Rural Residential, Public &
Institutional3.35 3 3 N/A 4.2 0.5 N/A W1, C1, C3, WC-S1 2.05
Planted Boulevard with drainage swale and 0.5 m grass /
gravel clearance on each side.
D1.2 SuburbanIndustrial, Urban Residential, Public &
Institutional3.35 3 3 N/A 4.2 0.5 N/A W2, C2, C4, WC-S1 2.1
Planted boulevard with barrier curb & gutter or planted
boulevard with drainage swale and 0.5 m gravel/grass
clearance on each side.
D1.3 Core AreaIndustrial, Urban Residential, Public &
Institutional3.35 3 3 N/A 4.2 0.5 N/A W2, W3, C2, C4, WC-S2 2.1 Planted boulevard with barrier curb & gutter.
D2.1Natural,
Rural
Agricultural, Rural Residential, Public &
Institutional3.35 3 3 3.3 3.5 0.5 N/A W1, C1, C3, WC-S1 1.7
Planted boulevard with drainage swale and 0.5 m
grass/gravel clearance on each side.
D2.2 SuburbanIndustrial, Urban Residential, Public &
Institutional3.35 3 3 3.3 3.5 0.5 2.1 W2, C2, C4, WC-S1 1.75
Planted boulevard with barrier curb & gutter or planted
boulevard with drainage swale and 0.5 gravel/grass
clearance on each side.
D2.3 Core AreaIndustrial, Urban Residential, Public &
Institutional3.35 3 3 3.3 3.5 0.5 2.1 W2, W3, C2, C4, WC-S2 1.75 Planted boulevard with barrier curb and gutter.
D2.4Village
Centre
Urban Residential, Commercial, Public &
Institutional3.35 3 3 3.3 3.5 0.5 2.1 W3, W4, C4, C5, WC-S2 1.75 Planted boulevard with barrier curb and gutter.
D3.1Suburban,
Core Area
Urban Residential, Commercial, Public &
Institutional3.05 N/A N/A 3 3.3 N/A In Interface W2, W3, C2, C4, WC-S1, WC-S2 2.75
Alternate planted boulevard / parking with barrier curb,
gutter & 0.25 m concrete or paver splash alongside
parking.
D3.2Village
Centre
Urban Residential, Commercial, Public &
Institutional3.05 N/A N/A 3 3.3 N/A In Interface W3, W4, C4, C5, WC-S2 2.75
Alternate planted boulevard / parking with barrier curb,
gutter & 0.25 m concrete or paver splash alongside
parking.
D4.1Natural,
Rural
Agricultural, Rural Residential, Public &
Insitutional3.05 N/A N/A 3 3.3 0.5 N/A Asphalt W1, C1, C3, WC-S1 1.45 Planted Boulevard with drainage swale.
D4.2Suburban,
Core Area
Urban Residential, Commercial, Public &
Institutional3.05 N/A N/A 3 3.3 N/A 2.1 W2, W3, C2, C4, WC-S1, WC-S2 1.5 Planted boulevard with barrier curb & gutter.
D4.3Village
Centre
Urban Residential, Commercial, Public &
Institutional3.05 N/A N/A 3 3.3 N/A 2.1 W3, W4, C4, C5, WC-S2 1.5 Planted boulevard with barrier curb & gutter.
Footnotes for Driving Spaces
1
2
3
4
5
6
7
8
9
10
11
12
13
Note:
Note:
Note:
Note:
60 with 70
sight-lines
Asphalt or
Concrete
Asphalt
Asphalt or
Pavers
WB207, B12
8,
HSU9, MSU
10,
LSU11
P12
P1240
40 40
40, 5040, 50
Framework for Driving Spaces
District of Clearwater
Speed km/hr Interface Requirements
Adjacent Space TypesSurface
Material
Space
Types
Context
ZonesAdjacent Land Use
1 Functional
Classification
Primary
FunctionDesign Users
Clear Driving Width (m)
Comprehensive Development Zone can be used as per the most relevant land use that is available; Any land use that doesn't have any access to a road ROW is fully separated/barricaded, can be treated as rural residential or urban residential depending upon the surrounding context zone.
0.5 m interface space should be added for every additional through/TWLT traffic lane; 0.45 hard surface splash should be provided on boulevard adjacent to curb & on central median for design speeds 80 km/hr or more.
Required only where drainage swale is provided without any curb & gutter.
Mobility: Uninterrupted maximum speed movements over long distances.
Mobility4 or
Access5
Collector AutoWB20
7, B12
8,
HSU9, MSU
10
Asphalt or
Concrete60
Mobility4 or
Access5
Access5
Access5 Collector Auto,
Local Auto
Collector Auto,
Local Auto
Collector Auto
40
Access: partially interrupted moderate speed movements over medium distances.
Destination: Substantially interrupted low speed movements over short distances.
WB20: Tractor Semitrailer Truck (L = 22.7 m, W = 2.6 m, H = 4.1 m, R = 10.7 m for 90 degree Outer Front Wheel Turn with 0-15 km/hr Turning Speed).
B12: Standard Single Unit Bus (L = 12.2 m, W = 2.4 m, H = 4.1 m, R = 12.9 m for 90 degree Outer Front Wheel with 0-15 km/hr Turning Speed).
HSU: Heavy Single Unit Truck (L = 11.5 m, W = 2.6 m, H = 4.1 m, R = 14.1 for 90 degree Outer Front Wheel with 0-15 km/hr Turning Speed).
On-Street parking is always optional (by default, parking is not an essential component of any driving spaces except D$); No on-street parking shall be allowed with posted (design) speed 50 km/hr or more; No angular parking is allowed on City right of way.
D3 with design speeds 40 km/hr & D5 can have an option for 2.1 m (excluding gutter) on-street parking; Boulevard width for D4 can be reduced to 1.5 m, if alternative parking is not required; if there is no on-street parking, traffic lane width adjacent to gutter can be reduced by 0.15 m.
Gutter Width = 0.3 m, Curb Width = 0.15 m, Minimum Raised Median Width = 1.2 m; Additional land may be required to accommodate steep side slopes or driveway transition (no driveway transition will be allowed on public right of way).
MSU: Medium Single Unit Truck (L = 10 m, W = 2.6 m, H = 4.1 m, R = 11.1 m for 90 degree Outer Front Wheel with 0-15 km/hr Turning Speed).
LSU: Light Single Unit Truck (L = 6.4 m, W = 2.6 m, H = 4.1 , R = 6.3 m 90 degree Outer Front Wheel with 0-15 km/hr Turning Speed).
P: Passenger Car (L = 5.6 m, W = 2.1 m, H = 1.3 m, R = 6.3 m 90 degree Outer Front Wheel with 0-15 km/hr Turning Speed).
Curb extensions must be provided at intersections, laneways, driveways & mid-block pedestrian crossings, where on-street parking exists.
Vehicles larger than design vehicles can be assumed to encroach opposing / adjacent lanes to make turning movements on roads with design speed 50 km/hr or less; For design speeds > 80 km/hr, Provincial / national standards should be used.
Posted Design17
Through
Traffic
Lane
Right
Turn Lane
Left Turn
Lane w/
Raised
Median
Left Turn Lane
without Raised
Median
Minimum Two-
Way Left Turn
Lane (TWLTL)
Bike
Lane
Gravel
Shoulder3
Parking13
(optional)Space
2 (metres) Character
CD-S1.1 (40 or 50) Natural,
Rural
Agricultural, Rural Residential,
Public & Institutional3.35 3 3 3.3 3.5 1.8 0.5 N/A W1, WC-S1 1.7
Planted boulevard with drainage swale
and 0.5 m grass/gravel clearance on each
side.
CD-S1.2
(40) (40)
CD-S1.3
(30) (30)
CD-S1.4Village
Centre
Urban Residential,
Commercial, Public &
Institutional
3.35 3 3 3.3 3.5 1.8 N/A 2.1 W3, W4, WC-S2 1.75Planted boulevard with barrier curb &
gutter.
CD-S2.1Suburban,
Core Area
Urban Residential,
Commercial, Public &
Institutionalt
3.05 N/A N/A 3.3 3.3 1.65 N/A In InterfaceW2, W3, WC-S1,
WC-S22.75
Alternate planted boulevard / parking
with barrier curb, gutter, & 0.25 m
splash alongside parking.
CD-S2.2Village
Centre
Urban Residential,
Commercial, Public &
Institutional
3.05 N/A N/A 3.3 3.3 1.65 N/A In Interface W3, W4, WC-S2 2.75
Alternate planted boulevard / parking
with barrier curb, gutter, & 0.25 m
splash alongside parking.
CD-S3.1Natural,
Rural
Agricultural, Rural Residential,
Public & Institutional3.05 N/A N/A 3 3.3 1.65 0.5 N/A Asphalt W1, WC-S1 1.45
Planted boulevard with drainage swale
and 0.5 m grass/gravel clearance on both
sides.
CD-S3.2Suburban,
Core Area
Urban Residential,
Commercial, Public &
Institutional
3.05 N/A N/A 3 3.3 1.65 N/A N/AW2, W3, WC-S1,
WC-S21.5
Planted boulevard with barrier curb &
gutter.
CD-S3.3Village
Centre
Urban Residential,
Commercial, Public &
Institutional
3.05 N/A N/A 3 3.3 1.65 N/A 2.1 W3, W4, WC-S2 1.5Planted boulevard with barrier curb &
gutter.
CD-S4.1Suburban,
Core Area
Urban Residential,
Commercial, Public &
Institutional
2.9 2.9 N/A N/A N/A N/A N/A In InterfaceW2, W3, WC-S1,
WC-S22.75
Alternate planted boulevard / parking
with barrier curb, gutter, & 0.25 m
splash alongside parking
CD-S4.2Village
Centre
Urban Residential,
Commercial, Public &
Institutional
2.9 2.9 N/A N/A N/A N/A N/A In Interface W3, W4, WC-S2 2.75
Alternate planted boulevard / parking
with barrier curb, gutter, & 0.25 m
splash alongside parking.
CD-S5.1Natural,
Rural
Agricultural, Rural Residential,
Public & Institutional2.9 N/A N/A N/A N/A N/A 0.5 N/A Asphalt W1, WC-S1 1.45
Planted boulevard with drainage swale
and 0.5 m gravel/grass clearance on both
sides.
CD-S5.2Suburban,
Core Area
Urban Residential,
Commercial, Public &
Institutional
2.9 N/A N/A N/A N/A N/A N/A 2.1W2, W3, WC-S1,
WC-S21.5
Planted boulevard with barrier curb &
gutter.
CD-S5.3Village
Centre
Urban Residential,
Commercial, Public &
Institutional
2.9 N/A N/A N/A N/A N/A N/A 2.1 W3, W4, WC-S2 1.5Planted boulevard with barrier curb &
gutter.
CD-S6.115 Suburban,
Core AreaUrban Residential 2.1
W2, W3, WC-S1,
WC-S21.5
Planted boulevard with barrier curb &
gutter.
CD-S6.215 Village
CentreUrban Residential 2.1 W3, W4, WC-S2 1.5
Planted boulevard with barrier curb &
gutter.
3.5
3
Asphalt or Pavers
3.5
3.5
Asphalt, Concrete,
or Pavers
3.35
1.8
1.83.53.33
Asphalt or
Concrete
Asphalt
Asphalt
Asphalt or Pavers
40
4040
3.3333.35
WB207, B12
8, HSU
9, MSU
10,
LSU11
, Advanced Intermediate
Commuter & Recreation
Cyclists
3014
, 40,
50
30, 40,
50
Destination6
Local Auto, Local
Active
Collector Auto,
Local Auto,
Collector Active,
Local Active
Destination6
Mobility4 or
Access5 or
Destination6
Access5
Access5
Destination6 Local Auto, Local
Active
Collector Auto,
Local Auto,
Collector Active,
Local Active
Collector Auto,
Local Auto,
Collector Active,
Local Active
40
P12
, Advanced / Intermediate
Commuter & Recreation
Cyclists
301430
Local Auto, Local
Active
P12
, Advanced / Intermediate
Commuter & Recreation
Cyclists
301430
P12
, Advanced / Intermediate
Commuter & Recreation
Cyclists
301430
P12
, Advanced / Intermediate
Commuter & Recreation
Cyclists
P12
, Advanced / Intermediate
Commuter & Recreation
Cyclists
Industrial, Urban Residential,
Public & Institutional
Industrial, Urban Residential,
Public & Institutional
Core Area
Suburban
Planted boulevard with barrier curb &
gutter.1.75W2, W3, WC-S22.1N/A
Planted boulevard with barrier curb &
gutter or planted boulevard with
drainage swale and 0.5 grass/gravel
clearance on each side.
1.75W2, WC-S12.10.5
Framework for Shared Cycling and Driving Spaces
District of Clearwater
Space TypesContext
ZonesAdjacent Land Use
1 Primary
Function
Functional
Classification
Speed km/hr
Design Users
Clear Driving Width (m)
Surface MaterialAdjacent Space
Types
Interface Requirements
Posted Design Two WayTwo Way plus
PassingTwo Way Two Way plus Passing Private Side Public Side
WC-S1 Natural, Rural, SuburbanAgricultural, Rural Residential, Industrial,
Public & InstitutionalMobility
4 or Access
5 Arterial Active,
Collector Active30 30
Pedestrians & Advanced / Intermediate /
Novice commuter & Recreation cyclists4.3 N/A 3 N/A
C1, C2, C3, C4, D1, D2, D3, D4, CD-
S1, CD-S2, CD-S3, CD-S4, CD-S5,
CD-S6 (Public Side)
0.65 0.65 0.15 m flush curb, 0.5 m clearance.
WC-S2Core Area, Village
Centre
Industrial, Urban Residential, Commercial,
Public & Institutional
Mobility4 or Access
5 or
Destination6
Arterial Active,
Collector Active20 20
Pedestrians & Advanced / Intermediate /
Novice commuter & Recreation cyclists3.45 4.05 3 3.6
C2, C4, C5, D1, D2, D3, D4, CD-S1,
CD-S2, CD-S3, CD-S4, CD-S5, CD-
S6
0.3 0.15
0.3 offset with 0.15 m flush curb
(private side) & 0.15 m flush curb
(public side).
WC-S3 Any Any Mobility4 or Access
5 Arterial Active,
Collector Active30 30
Pedestrians & Advanced / Intermediate /
Novice commuter & Recreation cyclists6 6.6 3 3.6 1.5 1.5
Flush curb, streetscaping, planted
boulevard & fencing / railing as
necessary (outside of road ROW).
WC-S4 Any Any Access5 Collector Active 20 20
Pedestrians & Intermediate / Novice
Commuter and Recreation cyclists4 N/A 2.5 N/A 0.75 0.75
Hard surface, fencing / railing as
necessary (outside of road ROW).
Posted Design
WCD-S1Rural, Natural, Suburban,
Core Area
Rural Residential, Industrial, Urban Residential,
Public & Institutional
WCD-S216 Rural, Natural, Suburban,
Core Area
Rural Residential, Industrial, Urban,
Residential, Public & Institutional
WCD-S3 Suburban, Core Area Urban Residential, Public & Institutional
WCD-S416 Village Centre Commercial, Public & Institutional
WCD-S516 Village Centre Commercial, Public & Institutional
Footnotes for Shared Spaces
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Note:
Note:
Note:
Parking may be allowed where width is 8 m.
Maximum 2.5 m space for parking; Traffic calmed both in terms of speed &
volume; Landscaping as required.
Maximum 6 m space for parking; Traffic calmed both in terms of speed &
volume; Landscaping as required.
Total Shared Space (metre)
6 - 8
8 - 10
> 10
Surface Material
Compact Gravel or Asphalt
Concrete or Pavers
5.8 Asphalt and Compacted Gravel3.0 m paved and shared traffic lane with 1.4 m compacted gravel (both sides).
No parking.
13.2 Asphalt
5.8 m of paved traffic lane with 1.0 m planter, concrete, or hatch marking and
bollard buffer between traffic lane and 2.5 m two way shared walking and cycling
lane. 1.45 m drainage swale with 0.5 m grass/gravel clearance on both sides or
1.5 m planted boulevard with curb and gutter both sides.
Destination6 Local Auto, Local Active 20 20
MSU10
, LSU11
, P12
, Advanced /
Intermediate / Novice commuter and
Recreation cyclists, pedestrians
Framework for Shared Walking and Cycling Spaces
Asphalt
N/A
Space Types Context Zones Adjacent Land Use1 Primary Function
Functional
Classification
Speed km/hrDesign Users
Framework for Shared Walking, Cycling, and Driving Spaces
Interface Requirements
Speed km/hr
Design Users Surface Type Adjacent Space Types
Interface Space (metre)Total Shared Space (metre) Clear Shared Space (metre)
Space Types Context Zones Adjacent Land Use1 Primary Function
Functional
Classification
If there is no on-street parking, traffic lane width adjacent to gutter can be reduced by 0.15 m; On-Street parking is always optional (by default, parking is not an essential component of any shared driving & cycling spaces except CD-S3, CD-S5, & CD-S7); No on-street parking shall be allowed with posted (design) speed 50 km/hr or more; no angular parking is allowed on City ROW).
LSU: Light Single Unit Truck (L = 6.4 m, W = 2.6 m, H = 4.1 , R = 6.3 m 90 degree Outer Front Wheel with 0-15 km/hr Turning Speed).
P: Passenger Car (L = 5.6 m, W = 2.1 m, H = 1.3 m, R = 6.3 m 90 degree Outer Front Wheel with 0-15 km/hr Turning Speed).
Curb extensions must be provided at intersections, laneways, driveways & mid-block pedestrian crossings where on-street parking exists.
Traffic calmed with regards to speed & volume (exception: Natural/Rural context zones) & no bike lanes are needed for posted (design) speeds 30 km/hr or less.
Must have parking at least on one side and applicable only to cul-de-sacs or non-through local roads with intersection spacing 150 m or less & serving not more than 250 dwellings.
District of Clearwater
Applicable to laneways & roadways with restricted vehicular access and cross-section design customized.
Maximum speed for cycling = 50 km/hr.
CD-S2 with design speeds 30 & 40 km/hr, CD-S4 & CD-S6 can have an option for 2.1 m (excluding gutter) on-street parking; boulevard width for CD-S3 & CD-S5 can be reduced to 1.5 m, if alternative parking is not required.
Gutter + Curb Width = 0.45 m; Minimum Raised Median Width = 1.2 m; Vehicles larger than design vehicles can be assumed to encroach 50 km/hr or less opposing/adjacent lanes to make turning movements; Additional land may be required to accommodate steep side slopes or driveway transition (no driveway transition will be allowed on public ROW).
Destinations: Substantially interrupted low speed movements over short distances.
WB20: Tractor Semitrailer Truck (L = 22.7 m, W = 2.6 m, H- 4.1 m, R = 10.7 m for 90 degree Outer Front Wheel Turn with 0-15 km/hr Turning Speed.
B12: Standard Single Unit Bus (L = 12.2 m, W = 2.4 m, H = 4.1 m, R = 12.9 m for 90 degree Outer Front Wheel with 0-15 km/hr Turning Speed).
HSU: Heavy Single Unit Truck (L = 11.5 m, W = 2.6 m, H = 4.1 m, R = 14.1 for 90 degree Outer Front Wheel with 0-15 km/hr Turning Speed).
MSU: Medium Single Unit Truck (L = 10 m, W = 2.6 m, H = 4.1 m, R = 11.1 m for 90 degree Outer Front Wheel with 0-15 km/hr Turning Speed).
Comprehensive Development Zone can be used as per the most relevant land use that is available; Any land use, that does not have any access to a road ROW and is fully separated/barricaded, can be treated as rural residential or urban residential depending upon the surrounding context zone.
0.5 metre interface space should be added for every additional through/TWLT traffic lane.
Required only where drainage swale is provided without any curb and gutter.
Mobility: Uninterrupted maximum speed movements over long distances.
Access: Partially interrupted moderate speed movements over medium distances.
Interface Character
Collector Auto
(CAU)
Local Auto
(LAU)
Collector Auto
(CAU)
Local Auto
(LAU)
Collector Auto
(CAU)
Local Auto
(LAU)
Collector
Auto (CAU)AAC, CAU AAC, CAU, LAU AAC, CAC, CAU
AAC, CAC,
CAU, LAUAAC, CAU, LAC
AAC, CAU,
LAC, LAU
Local Auto
(LAU)AAC, CAU, LAU AAC, LAU
AAC, CAC,
CAU, LAUAAC, CAC, LAU
AAC, CAU,
LAC, LAUAAC, LAC, LAU
Collector
Auto (CAU)AAC, CAC, CAU AAC, CAC, LAU CAC, CAU CAC, CAU, LAU CAC, CAU, LAC
CAC, CAU, LAC,
LAU
Local Auto
(LAU)
AAC, CAC,
CAU, LAUAAC, CAC, LAU CAC, CAU, LAU CAC, LAU
CAC, CAU, LAC,
LAUCAC, LAC, LAU
Collector
Auto (CAU)AAC, CAU, LAC
AAC, CAU,
LAC, LAUCAC, CAU, LAC
CAC, CAU, LAC,
LAUCAU, LAC CAU, LAC, LAU
Local Auto
(LAU)
AAC, CAU,
LAC, LAUAAC, LAC, LAU
CAC, CAU, LAC,
LAUCAC, LAC, LAU CAU, LAC, LAU LAC, LAU
Intersection Priority MatrixDistrict of Clearwater
Local Active
(LAC)
Collector
Active (CAC)
Arterial
Active (AAC)
Co
rrid
or
I
Intersecting Corridors & Functional
ClassificationLocal Active (LAC)Collector Active (CAC)Arterial Active (AAC)
Corridor II
SCHEDULE C
ROAD CROSS-SECTIONS
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For WalkingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: W1 Date Revisions
Computer File:
Walking Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
W1
Pedestrians and Wheelchairs
Natural, Rural
Agricultural, Rural Residential, Industrial, Public & Institutional
Access
Local Active
Asphalt (preferred), Compact Gravel (alternative)
0.5 m Grass or Gravel Clearances & 0.15 m Concrete Curbs(Private & Public Sides)
Pro
pert
y L
ine
W1 = 2.8 m
0.65 m Private Interface 0.65 m Private Interface1.5 mWalkway
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For WalkingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: W2 Date Revisions
Computer File:
Walking Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
W2
Pedestrians and Wheelchairs
Suburban, Core Area
Access or Mobility
Arterial Active, Collector Active, Local Active
Concrete (preferred), Asphalt (alternative)
Pavers or Concrete (Private Side)
W2 = 2.1 m
0.3 m Private Interface 1.8 mClear Walking Width
Urban Residential, Industrial, Public & Institutional
Pro
pert
y L
ine
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For WalkingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: W3 Date Revisions
Computer File:
Walking Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
W3
Pedestrians and Wheelchairs
Core Area, Village Centre
Mobility or Access
Arterial Active, Collector Active
Concrete (preferred), Asphalt (alternative)
0.5 m Paved Offset with Urban Braille (Private Side) and 0.5 mPaved Offset with Urban Braille (Public Side)
W3 = 3.5 m
0.5 m Private Interface 2.5 m Clear Walking Width
Urban Residential, Commercial, Public & Institutional
0.5 m Public Interface
Pro
pert
y L
ine
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For WalkingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: W4 Date Revisions
Computer File:
Walking Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
W4
Pedestrians and Wheelchairs
Village Centre
Access or Destination
Collector Active, Local Active
Pavers (preferred), Concrete (alternative)
1.0 m Paved Offset with Urban Braille (Private Side) and 0.5 mPaved Offset with Urban Braille (Public Side)
W4 = 4.7 m
1.0 m PrivateInterface
3.2 m Clear Walking Width
Urban Residential, Commercial, Public & Institutional
0.5 m Public Interface
Pro
pert
y L
ine
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For CyclingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: C1 Date Revisions
Computer File:
Cycling Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Design Speed
Interface
C1
Advanced Commuter & Recreation Cyclists
Natural, Rural
Agricultural, Rural Residential, Industrial, Public & Institutional
Mobility
Arterial Active
Asphalt
1.5 m Planted Boulevard or Drainage Swale (Private Side) with 0.5 mGrass or Gravel Clearance & 0.15 Flush Concrete Curbs (Both Sides)
C1 = 5.2 m
1.5 m Swale/Boulevard
2.4 m One WayCycle Track
C1 = 6.4 m
Pri
vate
Sid
e
Pri
vate
Sid
e
1.5 m Swale/Boulevard
3.6 m Two-Way Cycle Track
Surface Type
50 km/hr
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For CyclingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: C2 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
C2
Advanced Commuter & Recreation Cyclists
Suburban, Core Area
Urban Residential, Industrial, Public & Institutional
Mobility
Arterial Active
Asphalt
1.5 m Drainage Swale/Boulevard (Private Side), 0.5 m gravel/naturalgrass clearance each side and 0.15 m flush concrete curb each side
C2 = 3.9 m
1.20 m Boulevard &Barrier Curb
2.4 m One WayCycle Track
C2 = 5.1 m
Pri
vate
Sid
e
Pri
vate
Sid
e
1.20 m Boulevard& Barrier Curb
3.6 m Two-Way Cycle Track
Design Speed 40 km/hr
Cycling Space
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For CyclingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: C3 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
C3
Intermediate Commuter & Recreation Cyclists
Natural, Rural
Agricultural, Rural Residential, Industrial, Public & Institutional
Mobility or Access
Arterial Active, Collector Active
Asphalt
1.5 m Drainage Swale/Boulevard Separation (Private Side) with 0.5 mgravel/natural grass clearance both sides and 0.15 m Barrier Curb (Both Sides)
Design Speed 30 km/hr
C3 = 4.6 m
1.5 m Swale/Boulevard
1.8 m One WayCycle Track
C3 = 5.8 m
Pri
vate
Sid
e
Pri
vate
Sid
e
1.5 m Swale/Boulevard
3.0 m Two-WayCycle Track
0.5 m gravel/natural grass
clearance
0.5 m gravel/natural grass
clearance
0.5 m gravel/natural grass
clearance
0.5 m gravel/natural grass
clearance
Cycling Space
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For CyclingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: C4 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
C4
Intermediate Commuter & Recreation Cyclists
Suburban, Core Area, Village Centre
Urban Residential, Industrial, Commercial, Public & Institutional
Mobility, Access, or Destination
Arterial Active, Collector Active
Asphalt
0.9 m Delineation( grass / flowers / shrub planter / raised median /or bollard) (Private Side), 0.15 m flush concrete curbs (Both Sides)
Design Speed 20 km/hr
C4 = 3.0 m
1.8 m One WayCycle Track
C4 = 4.2 m
Pri
vate
Sid
e
Pri
vate
Sid
e
3.0 m Two-WayCycle Track
0.9 m grass,flower, planter,
median, or bollard
0.9 m grass,flower, planter,
median, or bollard
Cycling Space
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For CyclingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: C5 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
C5
Intermediate Commuter & Recreation Cyclists
Village Centre
Urban Residential, Industrial, Commercial, Public & Institutional
Destination
Collector Active
Asphalt
0.9 m Delineation( grass / flowers / shrub planter / raised median / bollard, orrollover curb) from parking or traffic lane & 0.15 m flush concrete curbs
Design Speed 20 km/hr
C5 = 2.7 m
1.5 m One WayCycle Track
C5 = 4.2 m
Pri
vate
Sid
e
Pri
vate
Sid
e
3.0 m Two-WayCycle Track
0.9 m grass,flower, planter,
median, or bollard
0.9 m grass,flower, planter,
median, or bollard
Cycling Space
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D1 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D1.1
WB-20, B-12, HSU, MSU
Agricultural, Rural Residential, Public & Institutional
Mobility or Access
Collector Auto
Asphalt or Concrete
2.05 m Planted Boulevard with Drainage Swale &0.5 m Gravel / Grass Shoulder
Design Speed 60 km/hr (with 70 km/hr sightlines)
D1 = 11.8 m
3.35 m TrafficLane
3.35 m TrafficLane
0.5 m Gravel/Grass Shoulder
2.05 mdrainage swale
2.05 mdrainage swale
0.5 m Gravel/Grass Shoulder
Natural, Rural
Driving Space
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D1 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D1.2
WB-20, B-12, HSU, MSU
Industrial, Urban Residential, Public & Institutional
Mobility or Access
Collector Auto
2.1 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter or2.05 m Drainage Swale & 0.5 m Gravel / Grass Shoulder
Design Speed 60 km/hr (with 70 km/hr sightlines)
Suburban
Driving Space
D1 = 11.8 m
2.1 mBoulevard
2.1 mBoulevard
3.35 m TrafficLane
3.35 m TrafficLane
0.5 m Gravel/Grass Shoulder
2.05 mdrainage swale
2.05 mdrainage swale
0.5 m Gravel/Grass Shoulder
Asphalt or Concrete
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D1 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D1.3
WB-20, B-12, HSU, MSU
Mobility or Access
Collector Auto
2.1 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
Design Speed 60 km/hr (with 70 km/hr sightlines)
D1 = 11.8 m
2.1 mBoulevard
2.1 mBoulevard
3.35 m TrafficLane
3.35 m TrafficLane
Core Area
Driving Space
Industrial, Urban Residential, Public & Institutional
Asphalt or Concrete
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D2 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D2.1
WB-20, B-12, HSU, MSU, LSU
Natural, Rural
Agricultural, Rural Residential, Public & Institutional
Mobility or Access
Collector Auto
Asphalt or Concrete
1.7 m Drainage Swale & 0.5 m Gravel / Grass Shoulder
Design Speed 40 km/hr, 50 km/hr
Driving Space
D2 = 11.1 m
3.35 m TrafficLane
3.35 m TrafficLane
0.5 m Gravel/Grass Shoulder
1.70 mdrainage swale
1.70 mdrainage swale
0.5 m Gravel/Grass Shoulder
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D2 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D2.2 (No Parking)
WB-20, B-12, HSU, MSU, LSU
Suburban
Industrial, Urban Residential, Public & Institutional
Mobility or Access
Collector Auto
Asphalt or Concrete
1.75 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter or1.7 m Drainage Swale & 0.5 m Gravel / Grass Clearance
Design Speed 40 km/hr, 50 km/hr
D2 = 11.1 m
1.75 mBoulevard
1.75 mBoulevard
3.35 m TrafficLane
3.35 m TrafficLane
0.5 m Gravel/Grass Shoulder
1.70 mdrainage swale
1.70 mdrainage swale
0.5 m Gravel/Grass Shoulder
Driving Space
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D2 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D2.2 (Parking One Side)
WB-20, B-12, HSU, MSU, LSU
Mobility or Access
Collector Auto
Asphalt or Concrete
1.75 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter or1.7 m Drainage Swale & 0.5 m Gravel / Grass Clearance
Design Speed
D2 = 13.2 m
1.75 mBoulevard
1.75 mBoulevard
3.35 m TrafficLane
3.35 m TrafficLane
0.5 m Gravel/Grass Shoulder
1.70 mdrainage swale
1.70 mdrainage swale
0.5 m Gravel/Grass Shoulder
2.1 mParking (opt)
40 km/hr, 50 km/hr
Driving Space
Suburban
Industrial, Urban Residential, Public & Institutional
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D2 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D2.2 (Parking Both Sides)
WB-20, B-12, HSU, MSU, LSU
Mobility or Access
Collector Auto
Asphalt or Concrete
1.75 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter or1.7 m Drainage Swale & 0.5 m Gravel / Grass Clearance
Design Speed
D2 = 15.3 m
1.75 mBoulevard
1.75 mBoulevard
3.35 m TrafficLane
3.35 m TrafficLane
0.5 m Gravel/Grass Shoulder
1.70 mdrainage swale
1.70 mdrainage swale
0.5 m Gravel/Grass Shoulder
2.1 mParking (opt)
2.1 mParking (opt)
40 km/hr, 50 km/hr
Driving Space
Suburban
Industrial, Urban Residential, Public & Institutional
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D2 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D2.3 (No Parking)
WB-20, B-12, HSU, MSU, LSU
Core Area
Industrial, Urban Residential, Public & Institutional
Mobility or Access
Collector Auto
Asphalt or Concrete
1.75 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
Design Speed 40 km/hr, 50 km/hr
D2 = 11.1 m
1.75 mBoulevard
1.75 mBoulevard
3.35 m TrafficLane
3.35 m TrafficLane
Driving Space
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D2 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D2.3 (Parking One Side)
WB-20, B-12, HSU, MSU, LSU
Mobility or Access
Collector Auto
Asphalt or Concrete
Design Speed
D2 = 13.2 m
1.75 mBoulevard
1.75 mBoulevard
3.35 m TrafficLane
3.35 m TrafficLane
2.1 mParking (opt)
40 km/hr, 50 km/hr
Driving Space
Core Area
1.75 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
Industrial, Urban Residential, Public & Institutional
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D2 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D2.3 (Parking Both Sides)
WB-20, B-12, HSU, MSU, LSU
Mobility or Access
Collector Auto
Asphalt or Concrete
Design Speed
D2 = 15.3 m
1.75 mBoulevard
1.75 mBoulevard
3.35 m TrafficLane
3.35 m TrafficLane
2.1 mParking (opt)
2.1 mParking (opt)
40 km/hr, 50 km/hr
Driving Space
Core Area
1.75 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
Industrial, Urban Residential, Public & Institutional
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D2 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D2.4 (No Parking)
WB-20, B-12, HSU, MSU, LSU
Village Centre
Urban Residential, Commercial, Public & Institutional
Mobility or Access
Collector Auto
Asphalt or Concrete
1.75 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
Design Speed 40 km/hr, 50 km/hr
D2 = 11.1 m
1.75 mBoulevard
1.75 mBoulevard
3.35 m TrafficLane
3.35 m TrafficLane
Driving Space
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D2 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D2.4 (Parking One Side)
WB-20, B-12, HSU, MSU, LSU
Mobility or Access
Collector Auto
Asphalt or Concrete
Design Speed
D2 = 13.2 m
1.75 mBoulevard
1.75 mBoulevard
3.35 m TrafficLane
3.35 m TrafficLane
2.1 mParking (opt)
40 km/hr, 50 km/hr
Driving Space
1.75 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
Village Centre
Urban Residential, Commercial, Public & Institutional
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D2 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D2.4 (Parking Both Sides)
WB-20, B-12, HSU, MSU, LSU
Mobility or Access
Collector Auto
Asphalt or Concrete
Design Speed
D2 = 15.3 m
1.75 mBoulevard
1.75 mBoulevard
3.35 m TrafficLane
3.35 m TrafficLane
Urban Urban
2.1 mParking (opt)
2.1 mParking (opt)
40 km/hr, 50 km/hr
Driving Space
1.75 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
Village Centre
Urban Residential, Commercial, Public & Institutional
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D3 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D3.1 (Parking One Side)
P
Access
Collector Auto, Local Auto
Asphalt
Alternate planted boulevard / parking with barrier curb, gutter, & 0.25 mconcrete or paver splash on boulevard alongside parking
Design Speed 40 km/hr
D3 = 11.25 m
2.75 mAlternating Boulevard
and Parking
1.5 mBoulevard Only
3.05 m TrafficLane
3.05 m TrafficLane
Driving Space
Urban Residential, Commercial, Public & Institutional
Suburban, Core Area
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D3 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D3.1 (Parking Both Sides)
P
Suburban, Core Area
Access
Collector Auto, Local Auto
Asphalt
Alternate planted boulevard / parking with barrier curb, gutter, & 0.25 mconcrete or paver splash on boulevard alongside parking
Design Speed 40 km/hr
D3 = 12.5 m
2.75 mAlternating Boulevard
and Parking
2.75 mAlternating Boulevard
and Parking
3.05 m TrafficLane
3.05 m TrafficLane
Driving Space
Urban Residential, Commercial, Public & Institutional
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D3 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D3.2 (Parking One Side)
P
Village Centre
Urban Residential, Commercial, Public & Institutional
Access
Collector Auto, Local Auto
Asphalt
Alternate planted boulevard / parking with barrier curb, gutter, & 0.25 mconcrete or paver splash on boulevard alongside parking
Design Speed 40 km/hr
D3 = 11.25 m
2.75 mAlternating Boulevard
and Parking
1.5 mBoulevard Only
3.05 m TrafficLane
3.05 m TrafficLane
Driving Space
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D3 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D3.2 (Parking Both Sides)
P
Access
Collector Auto, Local Auto
Asphalt
Alternate planted boulevard / parking with barrier curb, gutter, & 0.25 mconcrete or paver splash on boulevard alongside parking
Design Speed 40 km/hr
Driving Space
Village Centre
Urban Residential, Commercial, Public & Institutional
D3 = 12.5 m
2.75 mAlternating Boulevard
and Parking
2.75 mAlternating Boulevard
and Parking
3.05 m TrafficLane
3.05 m TrafficLane
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D4 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D4.1
P
Natural, Rural
Agricultural, Rural Residential, Public & Institutional
Access
Collector Auto, Local Auto
Asphalt
1.45 m Planted Boulevard with Drainage Swale and 0.5 m grass/gravelclearance on each side
Design Speed 40 km/hr
D4 = 10.0 m
1.45 mBoulevard
1.45 mBoulevard
3.05 m TrafficLane
3.05 m TrafficLane
Driving Space
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D4 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D4.2 (No Parking)
P
Suburban, Core Area
Urban Residential, Commercial, Public & Institutional
Access
Collector Auto, Local Auto
Asphalt or Pavers
1.5 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
Design Speed 40 km/hr
D4 = 10.0 m
1.5 mBoulevard
1.5 mBoulevard
3.05 m TrafficLane
3.05 m TrafficLane
Driving Space
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D4 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D4.2 (Parking One Side)
P
Suburban, Core Area
Urban Residential, Commercial, Public & Institutional
Access
Collector Auto, Local Auto
Asphalt or Pavers
1.5 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
Design Speed 40 km/hr
D4 = 12.1 m
1.5 mBoulevard
1.5 mBoulevard
3.05 m TrafficLane
3.05 m TrafficLane
2.1 mParking
Driving Space
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D4 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D4.2 (Parking Both Sides)
P
Suburban, Core Area
Urban Residential, Commercial, Public & Institutional
Access
Collector Auto, Local Auto
Asphalt or Pavers
1.5 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
Design Speed 40 km/hr
D4 = 14.2 m
1.5 mBoulevard
1.5 mBoulevard
3.05 m TrafficLane
3.05 m TrafficLane
2.1 mParking
2.1 mParking
Driving Space
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D4 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D4.3 (No Parking)
P
Village Centre
Urban Residential, Commercial, Public & Institutional
Access
Collector Auto, Local Auto
Asphalt or Pavers
1.5 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
Design Speed 40 km/hr
D4 = 10.0 m
1.5 mBoulevard
1.5 mBoulevard
3.05 m TrafficLane
3.05 m TrafficLane
Driving Space
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D4 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D4.3 (Parking 1 Side)
P
Urban Residential, Commercial, Public & Institutional
Access
Collector Auto, Local Auto
Asphalt or Pavers
1.5 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
Design Speed 40 km/hr
D4 = 12.1 m
1.5 mBoulevard
1.5 mBoulevard
3.05 m TrafficLane
3.05 m TrafficLane
2.1 mParking
Village Centre
Driving Space
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: D4 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
D4.3 (Parking Both Sides)
P
Urban Residential, Commercial, Public & Institutional
Access
Collector Auto, Local Auto
Asphalt or Pavers
1.5 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
Design Speed 40 km/hr
D4 = 14.2 m
1.5 mBoulevard
1.5 mBoulevard
3.05 m TrafficLane
3.05 m TrafficLane
2.1 mParking
2.1 mParking
Village Centre
Driving Space
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S1 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S1.1
WB-20, B-12, HSU, MSU, LSU, Advanced & IntermediateCommuter & Recreation Cyclists
Natural, Rural
Agricultural, Rural Residential, Public & Institutional
Mobility or Access or Destination
Collector Auto, Local Auto, Collector Active, Local Active
Asphalt or Concrete
1.70 m Drainage Swale & 0.5 m Gravel / Grass Clearance on each side
Design Speed 40 or 50 km/hr
CD-S1 = 14.7 m
3.35 m TrafficLane
3.35 m TrafficLane
0.5 m Gravel/Grass Shoulder
1.70 mdrainage swale
1.8 mBike Lane
1.8 mBike Lane 1.70 m
drainage swale
0.5 m Gravel/Grass Shoulder
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S1 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S1.2 (No Parking)
WB-20, B-12, HSU, MSU, LSU, Advanced & IntermediateCommuter & Recreation Cyclists
Suburban
Mobility or Access or Destination
Collector Auto, Local Auto, Collector Active, Local Active
Asphalt or Concrete
Design Speed 40 km/hr
CD-S1 = 14.7 m
3.35 m TrafficLane
3.35 m TrafficLane
0.5 m Gravel/Grass Shoulder1.70 m
drainage swale
1.8 mBike Lane
1.8 mBike Lane
1.70 mdrainage swale
0.5 m Gravel/Grass Shoulder
Industrial, Urban Residential, Public & Institutional
1.75 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter or1.70 m Drainage Swale & 0.5 m Gravel / Grass Clearance
1.75 mBoulevard
1.75 mBoulevard
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S1 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S1.2 (Parking One Side)
WB-20, B-12, HSU, MSU, LSU, Advanced & IntermediateCommuter & Recreation Cyclists
Suburban
Mobility or Access or Destination
Collector Auto, Local Auto, Collector Active, Local Active
Asphalt or Concrete
Design Speed 40 km/hr
CD-S1 = 16.8 m
3.35 m TrafficLane
3.35 m TrafficLane
0.5 m Gravel/Grass Shoulder1.70 m
drainage swale
1.8 mBike Lane
1.8 mBike Lane
1.70 mdrainage swale
0.5 m Gravel/Grass Shoulder
Industrial, Urban Residential, Public & Institutional
1.75 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter or1.70 m Drainage Swale & 0.5 m Gravel / Grass Clearance
1.75 mBoulevard
1.75 mBoulevard
2.1 mParking
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S1 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S1.2 (Parking Both Sides)
WB-20, B-12, HSU, MSU, LSU, Advanced & IntermediateCommuter & Recreation Cyclists
Suburban
Mobility or Access or Destination
Collector Auto, Local Auto, Collector Active, Local Active
Asphalt or Concrete
Design Speed 40 km/hr
CD-S1 = 18.9 m
3.35 m TrafficLane
3.35 m TrafficLane
0.5 m Gravel/Grass Shoulder1.70 m
drainage swale
1.8 mBike Lane
1.8 mBike Lane
1.70 mdrainage swale
0.5 m Gravel/Grass Shoulder
Industrial, Urban Residential, Public & Institutional
1.75 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter or1.70 m Drainage Swale & 0.5 m Gravel / Grass Clearance
1.75 mBoulevard
1.75 mBoulevard
2.1 mParking
2.1 mParking
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S1 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S1.3 (No Parking)
WB-20, B-12, HSU, MSU, LSU, Advanced & IntermediateCommuter & Recreation Cyclists
Core Area
Mobility or Access or Destination
Collector Auto, Local Auto, Collector Active, Local Active
Asphalt or Concrete
Design Speed 30 km/hr
CD-S1 = 14.7 m
3.35 m TrafficLane
3.35 m TrafficLane
1.8 mBike Lane
1.8 mBike Lane
Industrial, Urban Residential, Public & Institutional
1.75 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
1.75 mBoulevard
1.75 mBoulevard
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S1 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S1.3 (Parking One Side)
WB-20, B-12, HSU, MSU, LSU, Advanced & IntermediateCommuter & Recreation Cyclists
Core Area
Mobility or Access or Destination
Collector Auto, Local Auto, Collector Active, Local Active
Asphalt or Concrete
Design Speed 30 km/hr
CD-S1 = 16.8 m
3.35 m TrafficLane
3.35 m TrafficLane
1.8 mBike Lane
1.8 mBike Lane
Industrial, Urban Residential, Public & Institutional
1.75 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
1.75 mBoulevard
1.75 mBoulevard
2.1 mParking
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S1 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S1.3 (Parking Both Sides)
WB-20, B-12, HSU, MSU, LSU, Advanced & IntermediateCommuter & Recreation Cyclists
Core Area
Mobility or Access or Destination
Collector Auto, Local Auto, Collector Active, Local Active
Asphalt or Concrete
Design Speed 30 km/hr
CD-S1 = 18.9 m
3.35 m TrafficLane
3.35 m TrafficLane
1.8 mBike Lane
1.8 mBike Lane
Industrial, Urban Residential, Public & Institutional
1.75 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
1.75 mBoulevard
1.75 mBoulevard
2.1 mParking
2.1 mParking
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S1 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S1.4 (No Parking)
WB-20, B-12, HSU, MSU, LSU, Advanced & IntermediateCommuter & Recreation Cyclists
Village Centre
Mobility or Access or Destination
Collector Auto, Local Auto, Collector Active, Local Active
Asphalt or Concrete
Design Speed 30, 40, 50 km/hr
CD-S1 = 14.7 m
3.35 m TrafficLane
3.35 m TrafficLane
1.8 mBike Lane
1.8 mBike Lane
Urban Residential, Commercial, Public & Institutional
1.75 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
1.75 mBoulevard
1.75 mBoulevard
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S1 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S1.4 (Parking One Side)
WB-20, B-12, HSU, MSU, LSU, Advanced & IntermediateCommuter & Recreation Cyclists
Mobility or Access or Destination
Collector Auto, Local Auto, Collector Active, Local Active
Asphalt or Concrete
Design Speed 30, 40, 50 km/hr
CD-S1 = 16.8 m
3.35 m TrafficLane
3.35 m TrafficLane
1.8 mBike Lane
1.8 mBike Lane
1.75 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
1.75 mBoulevard
1.75 mBoulevard
2.1 mParking
Village Centre
Urban Residential, Commercial, Public & Institutional
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S1 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S1.4 (Parking Both Sides)
WB-20, B-12, HSU, MSU, LSU, Advanced & IntermediateCommuter & Recreation Cyclists
Mobility or Access or Destination
Collector Auto, Local Auto, Collector Active, Local Active
Asphalt or Concrete
Design Speed 30, 40, 50 km/hr
CD-S1 = 18.9 m
3.35 m TrafficLane
3.35 m TrafficLane
1.8 mBike Lane
1.8 mBike Lane
1.75 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
1.75 mBoulevard
1.75 mBoulevard
2.1 mParking
2.1 mParking
Village Centre
Urban Residential, Commercial, Public & Institutional
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S2 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S2.1 (Parking One Side)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Suburban, Core Area
Access
Collector Auto, Local Auto, Collector Active, Local Active
Asphalt
Design Speed
CD-S2 = 14.55 m
3.05 m TrafficLane
3.05 m TrafficLane
1.65 mBike Lane
1.65 mBike Lane
Urban Residential, Commercial, Public & Institutional
1.5 mBoulevard Only
2.75 mAlternating Boulevard
and Parking
Alternate planted boulevard / parking with barrier curb, gutter, & 0.25 mconcrete or paver splash on boulevard alongside parking
40 km/hr
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S2 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S2.1 (Parking Both Sides)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Suburban, Core Area
Collector Auto, Local Auto, Collector Active, Local Active
Asphalt
Design Speed 40 km/hr
CD-S2 = 15.8 m
3.05 m TrafficLane
3.05 m TrafficLane
1.65 mBike Lane
1.65 mBike Lane
Urban Residential, Commercial, Public & Institutional
2.75 mAlternating Boulevard
and Parking
Alternate planted boulevard / parking with barrier curb, gutter, & 0.25 mconcrete or paver splash on boulevard alongside parking
2.75 mAlternating Boulevard
and Parking
Access
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S2 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S2.2 (Parking One Side)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Village Center
Access
Collector Auto, Local Auto, Collector Active, Local Active
Asphalt
Design Speed
CD-S2 = 14.55 m
3.05 m TrafficLane
3.05 m TrafficLane
1.65 mBike Lane
1.65 mBike Lane
Urban Residential, Commercial, Public & Institutional
1.5 mBoulevard Only
2.75 mAlternating Boulevard
and Parking
Alternate planted boulevard / parking with barrier curb, gutter, & 0.25 mconcrete or paver splash on boulevard alongside parking
40 km/hr
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S2 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S2.2 (Parking Both Sides)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Collector Auto, Local Auto, Collector Active, Local Active
Asphalt
Design Speed 40 km/hr
CD-S2 = 15.8 m
3.05 m TrafficLane
3.05 m TrafficLane
1.65 mBike Lane
1.65 mBike Lane
Urban Residential, Commercial, Public & Institutional
2.75 mAlternating Boulevard
and Parking
Alternate planted boulevard / parking with barrier curb, gutter, & 0.25 mconcrete or paver splash on boulevard alongside parking
2.75 mAlternating Boulevard
and Parking
Access
Village Center
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S3 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S3.1
P, Advanced & Intermediate Commuter & Recreation Cyclists
Natural, Rural
Access
Collector Auto, Local Auto, Collector Active, Local Active
Asphalt
Design Speed
CD-S3 = 13.3 m
3.05 m TrafficLane
3.05 m TrafficLane
1.65 mBike Lane
1.65 mBike Lane
Agricultural, Rural Residential, Public & Institutional
1.45 mDrainage Swale
40 km/hr
1.45 mDrainage Swale
0.5 m Gravel/Grass Shoulder
0.5 m Gravel/Grass Shoulder
1.45 m Drainage Swale & 0.5 m Gravel / Grass Clearance
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S3 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S3.2
P, Advanced & Intermediate Commuter & Recreation Cyclists
Suburban, Core Area
Access
Collector Auto, Local Auto, Collector Active, Local Active
Asphalt
Design Speed
CD-S3 = 13.3 m
3.05 m TrafficLane
3.05 m TrafficLane
1.65 mBike Lane
1.65 mBike Lane
Urban Residential, Commercial, Public & Institutional
1.5 mBoulevard Only
40 km/hr
1.5 mBoulevard Only
1.5 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S3 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S3.3 (No Parking)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Village Centre
Access
Collector Auto, Local Auto, Collector Active, Local Active
Asphalt
Design Speed
CD-S3 = 13.3 m
3.05 m TrafficLane
3.05 m TrafficLane
1.65 mBike Lane
1.65 mBike Lane
Urban Residential, Commercial, Public & Institutional
1.5 mBoulevard Only
40 km/hr
1.5 mBoulevard Only
1.5 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S3 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S3.3 (Parking One Side)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Village Centre
Access
Collector Auto, Local Auto, Collector Active, Local Active
Asphalt
Design Speed
CD-S3 = 15.4 m
3.05 m TrafficLane
3.05 m TrafficLane
1.65 mBike Lane
1.65 mBike Lane
Urban Residential, Commercial, Public & Institutional
1.5 mBoulevard Only
40 km/hr
1.5 mBoulevard Only
1.5 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
2.1 mParking
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S3 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S3.3 (Parking Both Sides)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Village Centre
Access
Collector Auto, Local Auto, Collector Active, Local Active
Asphalt
Design Speed
CD-S3 = 17.5 m
3.05 m TrafficLane
3.05 m TrafficLane
1.65 mBike Lane
1.65 mBike Lane
Urban Residential, Commercial, Public & Institutional
1.5 mBoulevard Only
40 km/hr
1.5 mBoulevard Only
1.5 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
2.1 mParking
2.1 mParking
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S4 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S4.1 (Parking One Side)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Suburban, Core Area
Destination
Local Auto, Local Active
Asphalt or Pavers
Design Speed
CD-S4 = 10.95 m
2.90 m TrafficLane
2.90 m TrafficLane
Urban Residential, Commercial, Public & Institutional
1.5 mBoulevard Only
2.75 mAlternating Boulevard
and Parking
Alternate planted boulevard / parking with barrier curb, gutter, & 0.25 mconcrete or paver splash on boulevard alongside parking
30 km/hr
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S4 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S4.1 (Parking Both Sides)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Suburban, Core Area
Destination
Local Auto, Local Active
Asphalt or Pavers
Design Speed
Urban Residential, Commercial, Public & Institutional
Alternate planted boulevard / parking with barrier curb, gutter, & 0.25 mconcrete or paver splash on boulevard alongside parking
30 km/hr
CD-S4 = 12.2 m
2.90 m TrafficLane
2.90 m TrafficLane
2.75 mAlternating Boulevard
and Parking
2.75 mAlternating Boulevard
and Parking
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S4 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S4.2 (Parking One Side)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Village Centre
Destination
Local Auto, Local Active
Asphalt or Pavers
Design Speed
CD-S4 = 10.95 m
2.90 m TrafficLane
2.90 m TrafficLane
Urban Residential, Commercial, Public & Institutional
1.5 mBoulevard Only
2.75 mAlternating Boulevard
and Parking
Alternate planted boulevard / parking with barrier curb, gutter, & 0.25 mconcrete or paver splash on boulevard alongside parking
30 km/hr
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S4 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S4.2 (Parking Both Sides)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Village Centre
Destination
Local Auto, Local Active
Asphalt or Pavers
Design Speed
Urban Residential, Commercial, Public & Institutional
Alternate planted boulevard / parking with barrier curb, gutter, & 0.25 mconcrete or paver splash on boulevard alongside parking
30 km/hr
CD-S4 = 12.2 m
2.90 m TrafficLane
2.90 m TrafficLane
2.75 mAlternating Boulevard
and Parking
2.75 mAlternating Boulevard
and Parking
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S5 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S5.1
P, Advanced & Intermediate Commuter & Recreation Cyclists
Natural, Rural
Destination
Local Auto, Local Active
Asphalt
Design Speed
CD-S5 = 9.7 m
2.90 m TrafficLane
2.90 m TrafficLane
Agricultural, Rural Residential, Public & Institutional
1.45 mDrainage Swale
30 km/hr
1.45 mDrainage Swale
0.5 m Gravel/Grass Clearance
0.5 m Gravel/Grass Clearance
1.45 m Drainage Swale & 0.5 m Gravel / Grass Clearance
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S5 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S5.2 (No Parking)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Suburban, Core Area
Destination
Local Auto, Local Active
Asphalt, Concrete, or Pavers
Design Speed
CD-S5 = 9.7 m
2.90 m TrafficLane
2.90 m TrafficLane
Urban Residential, Commercial, Public & Institutional
30 km/hr
1.5 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
1.5 mBoulevard Only
1.5 mBoulevard Only
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S5 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S5.2 (Parking One Side)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Suburban, Core Area
Destination
Local Auto, Local Active
Design Speed
CD-S5 = 11.8 m
2.90 m TrafficLane
2.90 m TrafficLane
Urban Residential, Commercial, Public & Institutional
30 km/hr
1.5 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
1.5 mBoulevard Only
1.5 mBoulevard Only
2.1 m Parking
Asphalt, Concrete, or Pavers
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S5 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S5.2 (Parking Both Sides)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Suburban, Core Area
Destination
Local Auto, Local Active
Design Speed
CD-S5 = 13.9 m
2.90 m TrafficLane
2.90 m TrafficLane
Urban Residential, Commercial, Public & Institutional
30 km/hr
1.5 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
1.5 mBoulevard Only
1.5 mBoulevard Only
2.1 m Parking2.1 m Parking
Asphalt, Concrete, or Pavers
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S5 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S5.3 (No Parking)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Village Centre
Destination
Local Auto, Local Active
Design Speed
CD-S5 = 9.7 m
2.90 m TrafficLane
2.90 m TrafficLane
Urban Residential, Commercial, Public & Institutional
30 km/hr
1.5 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
1.5 mBoulevard Only
1.5 mBoulevard Only
Asphalt, Concrete, or Pavers
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S5 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S5.3 (Parking One Side)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Village Centre
Destination
Local Auto, Local Active
Design Speed
CD-S5 = 11.8 m
2.90 m TrafficLane
2.90 m TrafficLane
Urban Residential, Commercial, Public & Institutional
30 km/hr
1.5 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
1.5 mBoulevard Only
1.5 mBoulevard Only
2.1 m Parking
Asphalt, Concrete, or Pavers
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S5 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S5.3 (Parking Both Sides)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Village Centre
Destination
Local Auto, Local Active
Design Speed
CD-S5 = 13.9 m
2.90 m TrafficLane
2.90 m TrafficLane
Urban Residential, Commercial, Public & Institutional
30 km/hr
1.5 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
1.5 mBoulevard Only
1.5 mBoulevard Only
2.1 m Parking2.1 m Parking
Asphalt, Concrete, or Pavers
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S6 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S6.1 (No Parking)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Suburban, Core Area
Destination
Local Auto, Local Active
Asphalt or Pavers
Design Speed
CD-S6 = 10.9 m
3.5 m TrafficLane
3.5 m TrafficLane
Urban Residential
30 km/hr
1.5 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
1.5 mBoulevard Only
1.5 mBoulevard Only
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S6 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S6.1 (Parking One Side)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Suburban, Core Area
Destination
Local Auto, Local Active
Design Speed
CD-S6 = 13 m
3.5 m TrafficLane
3.5 m TrafficLane
Urban Residential
30 km/hr
1.5 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
1.5 mBoulevard Only
1.5 mBoulevard Only
2.1 mParking
Asphalt or Pavers
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S6 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S6.1 (Parking Both Sides)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Suburban, Core Area
Destination
Local Auto, Local Active
Design Speed
CD-S6 = 15.1 m
3.5 m TrafficLane
3.5 m TrafficLane
Urban Residential
30 km/hr
1.5 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
1.5 mBoulevard Only
1.5 mBoulevard Only
2.1 mParking
2.1 mParking
Asphalt or Pavers
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S6 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S6.2 (No Parking)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Village Centre
Destination
Local Auto, Local Active
Design Speed
CD-S6 = 10.9 m
3.5 m TrafficLane
3.5 m TrafficLane
Urban Residential
30 km/hr
1.5 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
1.5 mBoulevard Only
1.5 mBoulevard Only
Asphalt or Pavers
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S6 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S6.2 (Parking One Side)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Village Centre
Destination
Local Auto, Local Active
Design Speed
CD-S6 = 13 m
3.5 m TrafficLane
3.5 m TrafficLane
Urban Residential
30 km/hr
1.5 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
1.5 mBoulevard Only
1.5 mBoulevard Only
2.1 mParking
Asphalt or Pavers
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Cycling and DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S6 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
CD-S6.2 (Parking Both Sides)
P, Advanced & Intermediate Commuter & Recreation Cyclists
Village Centre
Destination
Local Auto, Local Active
Design Speed
CD-S6 = 15.1 m
3.5 m TrafficLane
3.5 m TrafficLane
Urban Residential
30 km/hr
1.5 m Planted Boulevard with 0.15 m Barrier Curb & 0.3 m Gutter
1.5 mBoulevard Only
1.5 mBoulevard Only
2.1 mParking
2.1 mParking
Asphalt or Pavers
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Walking and CyclingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: WC-S1 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
WC-S1
Pedestrians & Advanced / Intermediate / Novice Commuter& Recreation Cyclists
Natural, Rural, Suburban
Agricultural, Rural, Residential, Industrial, Public & Institutional
Mobility or Access
Arterial Active, Collector Active
Asphalt
0.15 m flush curb and 0.5 m clearance (Private and Public Sides)
Shared Space
Design Speed 30 km/hr
WC-S1 = 4.3 mP
riva
te S
ide
3.0 m Two Way Cleared Shared Space
Pu
bli
c S
ide
0.15 mFlushCurb
0.15 mFlushCurb
0.50 moffset
clearance
0.50 moffset
clearance
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Walking and CyclingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: WC-S2 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
WC-S2
Pedestrians & Advanced / Intermediate / Novice Commuter& Recreation Cyclists
Core Area, Village Centre
Industrial, Urban Residential, Commercial, Public & Institutional
Mobility, Access, or Destination
Arterial Active, Collector Active
Asphalt
0.3 m Offset with 0.15 m Flush Curb (private side) &0.15 m Flush Curb (public side)
WC-S2 = 3.45 m
Pri
vate
Sid
e
3.0 m Two Way Cleared Shared Space
Pu
bli
c S
ide
Shared Space
Design Speed 20 km/hr
0.15 mFlushCurb
0.30 mflush curb
offset clearance
WC-S2 = 4.05 m
Pri
vate
Sid
e
3.6 m Two Way plus PassingCleared Shared Space
Pu
bli
c S
ide
0.15 mFlushCurb
0.30 mflush curb
offset clearance
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Walking and CyclingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: WC-S3 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
WC-S3
Pedestrians & Advanced / Intermediate / Novice Commuter& Recreation Cyclists
Any
Any
Mobility or Access
Arterial Active, Collector Active
Asphalt
1.5 m Flush Curb, Streetscaping, Planted Boulevard & Fencing/Railingas Necessary (Outside Road R.O.W)
WC-S3 = 6.0 m
Pri
vate
Sid
e
3.0 m Two Way Cleared Shared Space
Pu
bli
c S
ide
Shared Space
Design Speed 30 km/hr
1.5 m Curb andStreetscapingas Necessary
WC-S3 = 6.6 m
Pri
vate
Sid
e
3.6 m Two Way plus PassingCleared Shared Space
Pu
bli
c S
ide
1.5 m Curb andStreetscapingas Necessary
1.5 m Curb andStreetscapingas Necessary
1.5 m Curb andStreetscapingas Necessary
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Walking and CyclingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: WC-S4 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
WC-S4
Pedestrians & Intermediate / Novice Commuter& Recreation Cyclists
Any
Any
Access
Collector Active
Asphalt
0.75 m Hard Surface, Fencing/Railingas Necessary (Outside Road R.O.W)
WC-S4 = 4.0 mP
rivate
Sid
e
2.5 m Two Way ClearedShared Space
Pu
bli
c S
ide
Shared Space
Design Speed 20 km/hr
0.75 m Hard Surfaceand Streetscaping
as Necessary
0.75 m Hard Surfaceand Streetscaping
as Necessary
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
DISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: WCD-S1 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
WCD-S1
MSU, LSU, P, Advanced / Intermediate / Novice Commuterand Recreation Cyclists, Pedestrians
Rural Residential, Industrial, Urban Residential,Public & Institutional
Destination
Local Auto, Local Active
Asphalt and Compact Gravel
3.6 m paved and shared traffic lane with 1.8 m compacted gravel(both sides). No parking on either side.
Shared Space
Design Speed 20 km/hr
Rural, Natural, Suburban, Core Area
WCD-S1 = 5.8 m
Private InterfacePrivate Interface
Allocation of Road Right of Way For
Shared Walking, Cycling, & Driving
3.0 m Shared Drivingand Bicycle Traffic Lane 1.4 m
Gravel Shoulder1.4 m
Gravel Shoulder
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
Allocation of Road Right of Way For
Shared Walking, Cycling, & DrivingDISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: WCD-S2 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
WCD-S2
MSU, LSU, P, Advanced / Intermediate / Novice Commuterand Recreation Cyclists, Pedestrians
Rural Residential, Industrial, Urban, Residential,Public & Institutional
Destination
Local Auto, Local Active
Compact Gravel or Asphalt
Parking may be allowed where width is 8 m
Shared Space
Design Speed 20 km/hr
Rural, Natural, Suburban, Core Area
WCD-S2 = 6 - 8 m
Private InterfacePrivate Interface
Private InterfacePrivate InterfaceWith Parking (One Side)
No Parking
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
DISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: CD-S3 Date Revisions
Computer File:
Shared Space
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
WCD-S3
P, Advanced & Intermediate Commuter & Recreation Cyclists
Natural, Rural
Destination
Local Auto, Local Active
Asphalt
Design Speed
Agricultural, Rural Residential, Public & Institutional
30 km/hr Auto (20 km/hr Cycle/Walking)
1.45 m Drainage Swale & 0.5 m Gravel / Grass Clearance and a 1.0 mConcrete/Bollard Buffer between Driving and Walking/Cycling Spaces. No Parking
Allocation of Road Right of Way For
Shared Walking, Cycling, & Driving
CD-S5 = 13.2 m
2.90 m TrafficLane
2.90 m TrafficLane
1.45 mDrainage Swale 1.45 m
Drainage Swale
0.5 m Gravel/Grass Shoulder
0.5 m Gravel/Grass Shoulder
1.0 mConcrete or
Bollard Buffer
OptionalPlantersshown
2.5 m Two-Way Cleared Shared
W/C Space
1.5 mBoulevard
1.5 mBoulevard
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
DISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: WCD-S4 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
WCD-S4
MSU, LSU, P, Advanced / Intermediate / Novice Commuterand Recreation Cyclists, Pedestrians
Commercial, Public & Institutional
Destination
Local Auto, Local Active
Concrete or Pavers
Maximum 2.5 space for parking, traffic calmed both in terms of speedand volume; landscaping as required
Shared Space
Design Speed 20 km/hr
Village Centre
WCD-S3 = 8 - 10 m
Private InterfacePrivate Interface
Private InterfacePrivate Interface
With Parking (One Side)
With Parking (One Side)
Allocation of Road Right of Way For
Shared Walking, Cycling, & Driving
August 21,
2013Final Draft
MUNICIPAL STANDARD DWG. No.
DISTRICT OF CLEARWATER
PROVINCE OF BRITISH COLUMBIA
Space Type: WCD-S5 Date Revisions
Computer File:
User Type
Context Zone
Land Use
Primary Function
FunctionalClassification
Surface Type
Interface
WCD-S5
MSU, LSU, P, Advanced / Intermediate / Novice Commuterand Recreation Cyclists, Pedestrians
Commercial, Public & Institutional
Destination
Local Auto, Local Active
Concrete or Pavers
Maximum 6 m space for parking, traffic calmed both in terms of speedand volume; landscaping as required
Shared Space
Design Speed 20 km/hr
Village Centre
WCD-S4 = > 10 m
Private InterfacePrivate InterfaceWith Parking (One Side)
Allocation of Road Right of Way For
Shared Walking, Cycling, & Driving
August 21,
2013Final Draft