Aftermarket Engineering,Fabrication and Parts

We serve operators of HRSG, FCCU, process boilersand CO/NOx emission control equipment.

Engineered Solutions and Fabrication• Pressure part modifications/replacement• SCR retrofit/improvement• Solutions to corrosion and tube failures• Installation planning and assistance

Inspection and Field Services• Trouble-shooting• Performance testing• Computerized modeling (mechanical,

thermal, hydraulic)• Root cause analysis• Controls and instrumentation consultation• Start-up and commissioning assistance• Operator training• Technical advice for equipment

installation and repairs• Flow-Accelerated Corrosion (FAC) Analysis

Replacement Parts• Overnight shipping of many items• Difficult-to-find parts• Modifications/substitutions• International orders

Construction ServicesHamon Deltak can offer either construction consulting servicesor a complete turnkey solution, including allengineering, material and labor to design, supply, install andcommission a repair upgrade or replacement project. Our skilledField Engineers average over 30 years offield experience performing this type of work with either locallypreferred construction contractors or our own stable of trustedlabor partners. This gives you, the customer,a single source of responsibility to execute a project fromPurchase Order release through final acceptance.

Hamon Deltak provides a full range of aftermarket ser-vices for existing steam generating systems and SCR/COemission control systems. We specialize in developingcreative and cost-effective solutions to the operationalchallenges of installed equipment... regardless of originalmanufacturer.

Rely on Our Proven Experience to Solve Your Boiler Challenges

Upgraded Facility ProvidesGreater Capacity withinSame FootprintWhen a Middle Eastern plant wasinterested in increasing its processproduction, Hamon Deltak completedan engineering analysis project, whichdetermined that the existing 20-year-oldboiler design was insufficient for thedesired process conditions. We designedand fabricated a new boiler to fit withintight physical constraints, yet meet theincreased process conditions whileminimizing the impact on the rest of theclient’s process.

Page 3: Hamon Deltak - hamonusa.com

Global Reach: Aftermarket Projects in

15+ Countries

185

Economizer Re-designed to Stop LeaksHamon Deltak was asked to provide a complete HRSG inspectionduring a scheduled outage at a cogen facility. One of the issues foundin the inspection was repeated Economizer tube leaks, which causedunscheduled outages every other month. HDI provided a full inspec-tion report with itemized suggestions for immediate actions, actions toplan for the next outage, items to address when convenient and itemsto monitor. The following year, a plan was developed for replacing theEconomizer panels with an improved design. HDI then replaced the upperreturn-bend Economizer bundle with a multiple panel design that isfully ventable. This design change required that the panel support sys-tem and piping be retrofit. HDI provided engineering, fabrication, lo-gistics and a site Technical Advisor for demolition and installation ofthe panels, piping, support systems and internal HRSG components.Hamon Deltak supplied a lifting and turning flame for handling the panels and provided a rigging procedure to maneuver the panels intotheir final positions. There hasn’t been a tube leak since the retrofit.

New SuperheaterCoil & Casing Designedfor Quick Installation

Hamon Deltak supplied a replacementsuperheater coil and corresponding roof casingto a refinery. The coil and roof casing were shop assembled tolimit field assembly, and allow the client to quickly “gut and stuff”the existing equipment. Tube skin thermocouples were providedin new locations to give the plant operators better informationacross various areas of the coil.

Improved Startup Procedures Developed forCogen FacilityHamon Deltak aided a cogeneration plant with issues trippingthe system on high steam temperatures during startup. We senta Field Engineer to observe startup operations, correct riskybehaviors and make recommendations. Our Engineers thenanalyzed the field data to determine acceptable startup limitsand a procedure to reduce the likelihood of plant trips.

+Serving HRSGs, FCCU, ProcessBoilers and CO/NOx Emission

Control Equipment for25 Years

WorldwideAftermarket Projects

Page 4: Hamon Deltak - hamonusa.com

Up to the Challenge

Plug Into Our Legendary Design Talent

Hamon Deltak’s engineering heritage is legend in the power in-dustry. Having designed and built some of the most technically-challenging boilers ever created, we have the “go-to” talent tosupport your aftermarket project. When we design your upgradeor retrofit, you are plugging into the same engineering insight thathas powered thousands of sophisticated boilers worldwide.

New Convection Section/ EconomizerGreatly Reduces FoulingHamon Deltak was approached to help develop a solution to agas-side fouling issue in an existing Waste Heat Boiler at a refinery.After a detailed engineering analysis and site visit to discuss plantneeds and desired process and maintenance requirements, HDIwas selected to design, fabricate and handle freight logistics for aWaste Heat Boiler Convection Section and Economizer Module.The original Convection Section tube and fin design was retrofitwith a new design to minimize gas-side corrosion slag build-up andmake cleaning easier. The Economizer heat transfer surface wasreplaced in-kind, but the internal floor was redesigned to aid in offlinecleaning and minimize corrosion on the drain piping. Additionally,the sidewall casings were designed to be removed for enhancedinspection and maintenance access.

Low Emissions Retrofit of SCR Made WithoutMissing a Beat During RepowerHamon Deltak planned a Selective Catalytic Reduction (SCR)installation as well as designed its upgrade to permit a new gasturbine to be installed while the old turbine stayed on-line. Priorto modifying this SCR to achieve strict NOx and NH3 emissions,we performed CFD Flow Modeling to determineoptimum flow correction, pressure loss andcatalyst performance. The upgrademaximizes the use of existing auxiliaryequipment, while minimizingoff-line interruption.