168
GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH DUNCAN BYPASS EMBANKMENT STUDY STEPHENS COUNTY, OKLAHOMA STATE JOB PIECE No. 20316(04) & 20316(23) Prepared For: Oklahoma Department of Transportation Prepared By: EST, Inc. Approved by: Alseny Diop, P .E. Sr. Geotechnical Engineer EST PROJECT NUMBER 6000426 July 29, 2015

GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

GEOTECHNICAL ENGINEERING SERVICES REPORT

SOUTH DUNCAN BYPASS EMBANKMENT STUDY STEPHENS COUNTY, OKLAHOMA

STATE JOB PIECE No. 20316(04) & 20316(23)

Prepared For: Oklahoma Department of Transportation

Prepared By: EST, Inc.

Approved by:

Alseny Diop, P .E. Sr. Geotechnical Engineer

EST PROJECT NUMBER 6000426

July 29, 2015

Page 2: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

GEOTECHNICAL ENGINEERING SERVICES REPORT

SOUTH DUNCAN BYPASS EMBANKMENT STUDY STEPHENS COUNTY, OKLAHOMA

STATE JOB PIECE No. 20316(04) & 20316(23)

 

EST, Inc.

480 24th Avenue NW., Suite 244, Norman, OK 73069 (405) 307-8378

Certificate of Authority Number 3639, Renewal Date 6/30/2016

EST PROJECT NUMBER 6000426

July 29, 2015

Alseny Diop, P.E. Bryce Hanlon, P.E. Sr. Geotechnical Engineer Geotechnical Engineer

Andre Guzman-Rocha Samuel Fadipe, E.I. Engineer in Training Staff Geotechnical Engineer

Page 3: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

South Duncan Bypass, State Job No. 20316(04) & 20316(23) EST Project Number: 6000426 Stephens County, Oklahoma July 29, 2015

EST, Inc.

TABLE OF CONTENTS

1.0 Introduction ......................................................................................................................................... 1 

1.1 Project Authorization ......................................................................................................... 1 1.2 Qualifications .................................................................................................................... 1 

2.0 Evaluation and Recommendations ................................................................................................... 1 

3.0 General .................................................................................................................................................. 3 

Appendix A – Plan & Profile/Cross Section Sheets Appendix B – Test Location Diagram (Standard Penetration Test and Piezocone Soundings) Appendix C – Boring Logs Appendix D – Piezocone Soundings (CPTU) Appendix E – Oedometer Test Results & CPTU Dissipation Curves Appendix F – Slope stability Results Appendix G – Settle 3D output Appendix H – General Notes

Page 4: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

South Duncan Bypass, State Job No. 20316(04) & 20316(23) EST Project Number: 6000426 Stephens County, Oklahoma July 29, 2015

EST, Inc. 1

1.0 Introduction

1.1 Project Authorization EST, Inc. was assigned this project by the Oklahoma Department of Transportation (ODOT) in August

of 2009. The scope of work requested calls for grading, drainage, surfacing and bridges for the

realignment of the South Duncan Bypass. This report provides geotechnical recommendations for the

construction of embankment slopes at locations requiring up to 43 feet of fill. The title sheet along with

the cross sections, plan and profile sheets included in Appendix A of this report show the total extent of

the project.

1.2 Qualifications The field sampling and laboratory testing were performed in general accordance with the June 29, 2011

ODOT Geotechnical Specifications for Roadway Design under the supervision of an Oklahoma licensed

professional engineer from EST, Inc. The in-situ tests conducted included piezocone (CPTU) soundings,

and standard penetration tests (SPTs). The results of these tests can be found in appendices C and D of

this report.

2.0 Evaluation and Recommendations

The proposed project consists of realining the existing south Duncan Bypass from Stations 627+00 to

past 777+00, as shown in the project title sheet included in Appendix A of this report. Based on our

findings from the Pedological and Geological Survey Report, dated July 24, 2012, the Chickasha, Zaneis,

Kirkland, and Grainola series can be used to construct the embankment slopes. The Port series may be

subject to erosion, so caution should be taken when constructing the embankment slopes using this soil

series. The slope stability analysis results including the minimum factors of safety can be found in

Appendix F of this report.

To evaluate the bearing capacity and potential settlement of the on-site materials to support the expected

embankments, we performed twelve (12) Piezocone soundings and eight (8) borings with continuous

standard penetration testing at locations shown in the test location diagram included in Appendix C of

this report. We also completed two (2) consolidation settlement tests combined with the dissipation

readings from the CPTU soundings to perform settlement analysis. The oedometer results along with the

dissipation curves can be found in Appendix E of this report. Recommendations for constructing the

embankment slopes along with other earthwork recommendations are provided next:

At least 12 inches of topsoil removal should be expected;

After topsoil removals, or after making any necessary cuts, we recommend that any embankment

areas be proof-rolled to identify soft or loose areas to be removed, stabilized and/or reinforced;

Embankments should be constructed in 5-foot stages and allowed to be in-place for at least 15 days.

Page 5: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

South Duncan Bypass, State Job No. 20316(04) & 20316(23) EST Project Number: 6000426 Stephens County, Oklahoma July 29, 2015

EST, Inc. 2

For the purpose of this report, a stage will constitute one day of work;

Materials used to construct the embankments should be compacted to at least 95% of the material’s

maximum dry density and within 2 percentages points above the optimum moisture content;

Materials used to construct the embankments should be as specified in our Pedological Report, dated

June 24, 2012 (EST Project Number 6000426).

Based on Embankment heights of 15 to 43 feet, the following estimated settlements are expected

throughout the project:

- Total Settlements raning from 1.5 inches to 10.26 inches. At least 90% consolidation is expected

within a week after completion of the last stage

- Elastic Settlements ranging from 1.4 to 10.25 inches

- Consolidation Settlements from 0.1 to 0.12 inches

It should be noted that the majority of the settlements are elastic; therefore, immediate (within about

9 days). Estimated elastic and consolidation settlements were generated using Settle 3D, and the

output data can be found in Appendix G of this report;

For factors of safety of 2.1 to 2.3, embankments should be constructed on a 3:1 slope or flatter.

Embankment slopes recommended for this project, including the completed slope stability analysis

using Slope/W along with the generated factors of safety can be found in Appendix F of this report;

As a check, we recommend that settlement monitoring devices (e.i. settlements plates, hook gauges)

be installed under the supervision of EST, Inc. and Dr. James B. Nevels, PhD, P.E. The amount of

monitoring devices and their placement locations need to be established at the time of construction.

The time required for monitoring the total settlement will also be established by Dr. Nevels during

construction. Settlement plates should be placed in general accordance with ASTM test prodecures,

D6598;

Because of the erosion potential of the on-site soils, we recommend applying the appropriate mulches

and native Bermuda grass as specified by the resident engineer;

Using the in-situ test data obtained, we estimate an allowable bearing capacity of 3,000 psf can be

used for design based on a factor of safety of 3;

Throughout the different phases of construction, excessively wet subsurface conditions may be

encountered. If any subsurface conditions exhibit saturation during construction, the geotechnical

engineer should be notified;

All materials and construction procedures should be in accordance with the ODOT “2009 Standard

Specifications for Highway Construction” and the latest special provisions adopted by ODOT to

supplement the standard specifications.

Page 6: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

South Duncan Bypass, State Job No. 20316(04) & 20316(23) EST Project Number: 6000426 Stephens County, Oklahoma July 29, 2015

EST, Inc. 3

3.0 General

This report was prepared for the Oklahoma Department of Transportation in reference to the South

Duncan Bypass project in Stephens County, Oklahoma. This report provides geotechnical evaluation

based on the subsurface conditions encountered at the site. The scope of services contained in this report

does not include any environmental assessment or identification of contaminated or hazardous materials.

Any statements in this report concerning suspicious odors, colors, irregular textures or abnormal

conditions are for informational purpose only and have not been verified by the engineer or testing.

Subsurface conditions may vary between our sampling locations.

Therefore, we recommend EST be retained to provide construction testing and inspection. If variations

appear during construction, it may be necessary to revise the recommendations contained in this report.

However, EST warrants that the findings contained herein have been made with generally accepted

professional geotechnical practices in the local area. No other warranties are implied or expressed.

Page 7: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

South Duncan Bypass, State Job No. 20316(04) & 20316(23) EST Project Number: 6000426 Stephens County, Oklahoma July 29, 2015

EST, Inc.

Appendix A

Plan and Profile Sheets

Page 8: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

SURVEY DATA SEE SURVEY DATA ON SHEET NOS. 51 THRU 68 FOR COMPLETE INFORMATION.

DESIGN DATA

PROPOSED SOUTH DIJICAN BYPASS AADT 2018 AADT 2038 DHV CTWO WAYJ

= 1680 = 2750 = 333

K CDHV/AADT-TWO WAYl = 11X D CDIRECTIONAL DIST .l = 55X T ex OF DHV} = 20X T ex OF ADDT> = 17X T3 (X OF ADDTl = 15X v = 65 ti.PH 20 YEAR FLEX. ESALS = 3.17 M

SCALES

PLAN 1" = 50' PROFILE HORIZONTAL 1" = 50' PROFILE VERTICAL 1" = 5' LAYOUT MAP , .. = 2,000'

CONVENTIONAL SYMBOLS PROPOSED ROAD

~~~:§ ::J RAILROADS

__ , __

TOWNSHIP AND RANGE

SECTION LINES

QUARTER SECTION Llt£S

FENCES

GROUND LINE

EXISTING ROADS

BASE LINE

-+rt. - "f.t GRADE LINES

-&-+-&- TELEPHOt£ AM> TELEGRAPH

-<l>-+-<l>- POWER LINES

c:::::::J BUILDINGS

-+- OIL WELL

)::::::::::( DRAINAGE STRUCTURES - IN PLACE

:=::::c DRAINAGE STRUCTURES - NEW

ffiES.R~- RIGHT-OF-WAY LINES - EXISTING

R,fW.:, RIGHT-OF-WAY LINES - NEW

CONTROLLED ACCESS

RIGHT-OF-WAY FENCE

LOCATION MAP DIVISION VII

END BRIDGE STA. 740<55.29 BRIDGE 'G' BRIDGE LENGTH • 642.88 FT.

BEGIN BRIDGE STA. 734•12.41

END BRIDGE STA. 665<20.24 BRIDGE 'D' BRIDGE LENGTH • 4029 FT.

BEGIN BRIDGE STA. 664•79.95

END BRIDGE STA. 647<92.63 BRIDGE 'A' BRIDGE LENGTH • 39.75 FT.

BEGIN BRIDGE STA. 647<52.88

STA. 631•56.70 END INCIDENTAL CONSTRUCTION ANl BEGIN PRO..ECT

ST A. 627• 00.00 BEGIN INCIDENT AL c s CONTROL SUB SECTION NO. X.XX

2009 OKLAHOMA STAM>ARO SPECIFICATIONS FOR HIGHWAY CONSTRUCTION GOVERN, APPROVED BY Tl£ U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION, JANUARY 4, 2010.

STATE OF OKLAHOMA DEPARTMENT OF TRANSPORTATION

----·----PLAN OF PROPOSED

STATE HIGHWAY FEDERAL AID PROJECT NO. NHY-011NC057l

GRADING, DRAINAGE, SURF ACING AND BRIDGES SOUTH DUNCAN BYPASS

STEPHENS COUNTY CONTROL SECTION NO. 00-69-26 STATE JOB PIECE NO. 20316<04>

BRIDGE 'A' - LOCATION NO. 6902 1231X - NBI NO. XXXXX <EXISTING NBI NO. 19545> BRIDGE 'B' - LOCATION NO. 6926 9999X - NBI NO. XXXXX BRIDGE ·c· - LOCATION NO. 6926 9999X - NBI NO. XXXXX BRIDGE 'D' - LOCATION NO. 6902 1264X - NBI NO. XXXXX <EXISTING NBI NO. 19546> BRIDGE 'E' - LOCATION NO. 6926 9999X - NBI NO. XXXXX BRIDGE 'F' - LOCATION NO. 6926 9999X - NBI NO. XXXXX BRIDGE 'G' - LOCATION NO. 6926 9999X - NBI NO. XXXXX

-RBWIR7W-

~

(/)

-------Ii!, EW176 ~

21

PRO,JECT LENGTH BASED ON !j! NORTHBOUND CA022l I NOT FOR CONSTRUCTION I

ROADWAY LENGTH 3,181.21 FT. 2.497 MILES BRIDGE LENGTH 1 ,234.82 FT. 0.233 MILES PROJECT LENGTH 2. 730 MILES EQUATIONS: Q NORTHBOUND IA022> STA. 718<85.13 BACK• STA. 718<59.56 AfEAD EXCEPTIONS: NO~

SHEET NO

1 2. 7

8 - 14 15

16-20 21-26 29-50 51-68 69-73

X2-X90 X91-X109

X110-X113 X114-X118

REVISIONS REV. NO. DESCRIPTION DATE

_& CHANGED ..s'# 10 <O<ll 10/19112

REVISED PROPOSED R/W 10-19-2012

TITLE

INDEX OF SHEETS S!-EET DESCRIPTION

TYPICAL SECTIONS C1 J • C6l RESERVED DRAINAGE AREA MAP GEOM:TRIC DATA C1l - C5l PLAN AND PROFILE SHEET ( 1 l - CBJ RESERVED SURVEY DATA SHEET (1) - (18) UTILITY AND RIGHT-OF-WAY INFORMATION (1) - C5l

CROSS SECTIONS ALONG q; SURVEY CA002l ALONG (; DUNCAN BYPASS 4-LANES CAOOI l ALONG q; SEMINOLE ROAD CA003l ALONG it DETOUR FOR BR. D CONSTRUCTION CA013l

PLANS PREPARED BY EST, INC.

PALI. G. POYNTER, OKLA. REG NO. 19103 DATE

THIS OOCl.NENT IS

PRELIMINARY IN NATl.RE AM> IS NOT

A FINAL, SIGt£0 AND SEALED DOCl.IENT.

EST, INC. CERTIFICATE OF AUTHORIZATION NO. 3639 CPE/LSl EST, INC. CERTIFICATE OF AUTHORIZATION EXPIRES 6/30/14

OKLAHOMA DEPARTti.ENT OF TRANSPORTATION

DATE APPROVE():

""

DEPARHJENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION

DATE APPROVE():

"" CHIEF ENGINEER DIVISION ADMINISTRATOR SWO 4060(1) PROJECT NO. NHY-011NC057) SHEET NO. 1

Page 9: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1100

1090

1080

1070

1060

1050

1040

1030

1020

1010

0 0 + L[) C\J lD

NOTE TYPICAL TO ALL PLAN AND PROFILE SHEETS: ALL PLUS STATIONS AND OFFSETS FOR TIE-DOWNS ARE REFERENCED TO ~ SURVEY, UNLESS NOTED OTHERWISE.

STA 629+94, 144' RT CONST. 12' ASPH. DR.

STA. 630+01 ~ SURVEY CONST. 26' SERVI CE RD. LT.

LI S OF ACCESS

0 0 + L[) r")

lD

STA 629+60.LI, 150'RT CONST. 12' W. ASPH.DRIVES

SEC, 19 T-1-S R-1-W

(_')

LLJ cO EX/57. GRNJE DNE

AT· rt__ PRESENT U5"81 (M04J

~~>-c"f--L_

LLJ f--­lf}

z 0 u

> 0::: ::::0 lf}

0 0 + c-­C\J lO

<( f--­lf}

ccJ <(

f--­z LLJ 0

u z

STR. NO .. (D .S.T A. 63Dt01. Q_ (i_. SURVEY CON.ST. 96 L.F. 24" CGSP, 4.0'RT. w/ CET

STR.NO.@ STA. 630+01 .0 (i_ SURVEY CONST. 82-l.F. 24"-CGSP, -96.0'RT. w/ CET

STR.No:0-·s1P:: 647+79.6 A022 CONST. SMD-TYPE 2, 84. O' LT. STUB ·10 L.T. 18" RCP RT. INTO BR. A

c:o m g 0

:s ~ ~ ~ ~ ~

DD ~ ~

w w u u

> > ~ ~

~ ~

~ Cl:;

NiX q- $tC<)I 0 o~

V.C.=60' "K 0 -S6

w ~-r; O <o "'f: AT ([_ PROP.SERVICE RQ. LT~ 10 N'):";S !EXIST GRNJE UNE

C\J ~ C---r--+-- t; v.,, FI N:I SHED GRADE

-o 650- GW-o~ AT (i_ -SERV-1-CE--i=rn;.LT-. 0 DJJ ----- --------------- ::-----------._ (A005J

CJ

(_')

LLJ cD

>­LLJ > 0::: :-:0

~ ~lf} - w ti~~ 66 ~-~o

c--

lO en + C0 (0

u z

-o. 650% _(A~022l

STR::No. "@>"""ST;;. "6"36+"Q7: 0 (f_ SUR\/EY CONST. 56 L.I'". 18" CGSI", 18-l'RT. TO 231'RT: -_( 2·5· [G. LT. AND- 30'--LG-. RT. TO q_ SERVI CE' RD RT I WI CET

N N

625+00 6 8 9 630+00 2 3 4 635+00 6

ro r0 o: ~

ro ~ * r:--~ s

> w

> J ~ w

.A02_2~ v:.c. =200' K = 595

8

w

> -w >~ ~ w

9

0 0 + 0 ~

lD

BENCHMARK 213: 2" ALUMINUM CAP STA. -641-+95.26 q;_ SURVEY, 70.58' RT. EL:E-V: ~ -10B9.180

Fr=NISHED GRADE Al ~ __ S-':B_ IA02ll

640+00

w 0

SERVICE RD.RT.Sf~ V.C.=200-'

0 '°-

K = 33 or:n

2

+ w ';/ 0

w >

~ w > ~ ~ w

3

0 0 + L[) ~

lD

OPEN CHANNEL

BR.@t STA. 650+18.00 A02l CONST. 3- l 2'Xl O'X258'-6' LG. RCB. 41.4'LG. LT. & 211.l'LG. RT.

~\ SEC

BENCHMARK 214: "X" ON CONC. HCADWALL ST A. -647-+47."14 _q;_ SURVEY, 14."19'- LT. ELEV,- ~ -1-060:299

> u w >~ ~ w

0 0 + 0 L[) lD

1 8,

REVISIONS REV. NO DESCRIPTION DATE

DETOUR NOT SHOWN ON THIS SHEET, SEE SHEET NO, 27

FOR DETOUR DETAILS

T -1 -S,

(\J

CJ <(

Pres.R!W

BENCHMARK 215: aoo: NAIL 1N 6" POST. STA. 652-+07.39 I[ SURVEY, 80.0G' LT. ELEV; 1057-.669-

v .c. 800' - -K ::: 337 1100

1090

1080

-0. 746% (A02JJ FI N--1 SHED -GRADE AT ~ N-S: (A022J

Ex1Sf. GROUND -LiNE- i'ildNG fJj_ SOUTH :N-5 RAM? fNJ2/) 1070 --..__,_-~ ..

0 0 ~

---=----Bit i"bs4:a LT. 6Ll6+01 A021 DRAJN--LT:.

.-......... SEE· X-SECT.

-~-~ 'S.:ao--.......: o,~ ~ (-.........

1022 --Si fr,;

~N rrru

0

'-c:"'= No Wo o+ ~~

~:;;

EX/5f.2--/0'XI')' RCB RF ff__ 1048.90,61.1' LT. 641•4!.4 !J{)2_2

CONST. 3~t2'Xl:O' I[_ 1047 .52 E.

- 650+1-8.0:A021 216 .. l'RT; OR 641+89.3 A022 5ZL 1'RT;--

4 645+00 6 8 9

BR A

EXl':ir,2.-!(YXB' RCB_ lT. /[_ 1049.63,37.0' LT. 650•08.0 A021

CONST. 3-12'X10' I[_ lb48.30 w. 6501: 18_. O-_ A021 41. i\' LT. IFUT:URE CONST; 3-~t-2'Xl-O''E-Xf. :54'-W--. I[ 1D49.05 W. 650'1-18.0- A02E 126;-Q'Lf;I

650+00

0 ITT ~ N

-0 ;'i''l6%--(A02

ro w 0

2 DUNCAN BYPASS SOUTH CONNECTOR

STATE JOB NO. 20316(0LJ)

1060

1050

1040

1030

~~ 1020

3 655+00 STEPHENS COUNTY

SHEET NO. 24

Page 10: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

1070

1050

1040

1030

1020 655+00

SEC,

'fl 'fl 7 w ~

18, T-1-S, R-7-W

~ ~ : 24' RCP IE_ Ja41.30

DETOUR NOT SHOWN ON THIS SHEET, SEE SHEET NO, 27

FOR DETOUR DETAILS

BR. B NEW 2-1.6X15X201' RCB IE_ 1045.90:, STA 661+43.6 A021:, IE_ ·tOl\-S-:30; STA-666'f93-.---r AO-Zl:;

85,3'LT 11:3. w-R

(GONEJ ST A 665+00.00 K!04 DBL.JO' X 12' X 112.5' ({_ R[](

DBL BRRL R.C.B. "X" ING [ 605' LT.& 52' RT. LT.FL ELEV.= 1045.83 RT.FL ELEV.= 1045.45 DA = 1,632.0 ACRES

ru 0 ~o

0 0 ' 0 ~. + ITT ~ 0 ~­w> - w > ~ ~ w

v-~c. =:JJ7-0' = 334

> O.B'-LT. B64+35.0-AD22;4LB'LT. ~ ~L~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~V~C~·~c;0;19~2~0~'~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~--j LLLLI K=400

6 7 B 9 660+00 2 3 4 665+00

0 ~ ~ITT 0 0

6 7 B 9 670+00 2 3 4 675+00 6

0 0 -\-0 d:) LO

BR.@([_ STA. 667+21.50 A021 CONST. 2-16'X 15'X201' LG. RCB, SKEW 15° L.F., 86.25'LG. LT. & 114.75'LG. RT.

BR.© (l STA. 665+13.00 A022 CONST. THREE SPAN 172'- l 43'-72'1 STEEL PLATE GIRDER BRIDGE WITH 38'-0" CLEAR ROADWAY AND 42" F-SHAPED PARAPETS.

BENCHMARK 216: 2" ALUMINUM CAP STA.- 660-00.17 -~ SURVEY, Lf2.53' LT. ELEV. = 1 070.608-

BENCHMARK 217:- 2" ALUMINUM CAP STA._:IQ6_7+JS_.7;:, _:t_S_UR.YEY,_ _236_.22_' LT. ELEV; = 1053.961

0 ~ ITT~

REVISIONS REV. NO DESCRIPTION

(CONST'D. BY OTHERS IN PLACE) BR.@ rt ST A. 665+00. 00 A022 CONST. 2-16'X15'X55' LG. RCB FOLLOWED BY 2-16'X2l'X78' LG. RCB, SKEW 18.4° L.F.

STR.NO.@ STA. 662+16.0 A022 CONST. SMD- TYPE 2, 151 . O' LT. STUB 282 L.F. 24" RCP RT. INTO BR,@

v.c. K

BENCHMARK 21 s:: 2" ALUMINUM CAP STA. :674-+80.73 :q; SURVEY, 13.13'- RT. ELEV-; -= 1074.81-2

BENCHMARK 219:: 2" ALUMINUM CAP ST A._ ;66_3_+36_._6Q _ ~ _S_URVEY, __ 322_._1_ 6' RT. ELEV.: = 10-82.391

1130' 230

SPEC-.-- D1TcH-:RT .-~2-. 47J -D .:l_OUA022) Jj0--2J;

~ ,~ 26G%_ (A"o oc-~~-::

DATE

1110

11 DO

1080

1070

t;:::['\J 22J ~z.ri"-1. """:-~~ 1060 c-;-«= r--:o <.o:o 0-:+ -~

~:~ 1050

1040

~~ l 030

~ ©~~~~~~~~~~~~~~~~~~~~~~~~

gs 6 680+00 2 3 LI 685+00 DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

B 9 STATE JOB NO. 20316(0LJ) SHEET NO. 25

Page 11: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1120

0 0 + 0 en <D

0 0 + L{)

en <D

BENCHMARK 220 2" ALUMINUM CAP f- r..'. (CONST'D. Bi' OTHERS [N PLACEl STA. 695+12.54 q;_ SURVEY, 441.49' RT. 8 Cf) STR. N_G _.@:_ST A .. : _693-1'00_. O j A02_2; 79 .:T LT. -ELEV·.= 1066-.568 --=i ·Z SMD, TYPE 2, STUB 164 L.F. 3Qft RCP BENCHMARK 221: "X" ON NORTH END HEADWALL STA. JO.O+Ti'.3J. t.SURVEY, . .738 .. 3S°)' .. RT. ELEV. = 1059.136 BENCHMARK 222· 2" ALUMINUM CAP ·STA. 700+36.18 ·Q;_ SURVEY, 224.16'· lT ELEV 1077.264

oO n::: U OUT RT. W/. CET. D..: _J CCON"Sl1 0·:· BY""OTHE:Rs·· 1:fJ"Pl"AtEJ

~ ~ STR.NG.@: STA.: 693i90.6:Ao22; w -~ 1:83.2':RT: CONST. 53'1 ·L.F.

R/

18, T-1-S, R-7-W ICONS. T'DAY OJ. HERS. IN P.LACE). STR :NO.\]) STA. 699+27. 1 A022 6' I .-D. MANHOLE 272. 2 RT. STUB loo: L. F .. 36" RCP TO OUT:LET CET

. AT·STA": 0"99+"9B.s··Ao22,··:·344·;o'·RT·.

1110 f-B_E_N_CH_M_A_R_K_2_2-,-, _8_0_0-.-NA-C-.. -IN-.-P-DW_E_R_.-FD_L_E _ _, ,,.....,- o 36" RCP WI ·CET, :STUB· INTG STR; NO. 7 C\J ·U c;N;;;Oc;cTE;c .. ::C_-ccc-'-c:-~-:cc-'-c:-C:C-:cc-'-:c-±~C-Cc:-C:C-:i :

1100

STA. 700+21.31 {SURVEY, 1394.99' LT. ELEV.= 1103.709

A021 : V.C. = 830' K = 162

EXIST. GROUND LINE AWNG !fl. SOUTH N-5 RIWP (/JD2!!

ru 0 ~00 ~

00• - 00 +~ DO :;:-

> rW >"_J ~w

~ ~ UNLESS OTH-ERW I SE NOTED ON CROSS-SECT I ON SHEETS, <[ .z ,_ ~ F FIN I SHED GRADES OF THE CONNECTOR SHOWN

m 0:: ON"THJS SH"EET HAVE" toNFL:ltTS "AMONG "CL ·2:..LANt '-,.J 2-WAY; ROAD· !A023l, ft· S-B ~A02lf, AND l N-B IAQ22J, . 8 ~- ~ GI VEN.: O.ES l:GN GRADE. AI. Ii.ROAD :(A02.3l.W IIl-:I .DESJGN

· ,_ SUPERELEVAT I ON :SHALL GOVERN DN GRADES AT ~ ~ ~ ROAb, AT: l S~B. AJ l N-B ANO CROSS SLOPES.

0 ru Ol (()

1 080 F==F=l=N=l=SH=E=O=G=RA=O=E======~~=-==-=~

1070

1060

1050

1040

1030

AT ~ S-B (A021)

FINISHED Al-~ "N~B

- -SPEC .D1TCHRT-::--~3Q% (7\022)' ~- - ~~ :'.::: ~~

2'~ + 00 WO 00 -00

> - w > ~ ~w

ru o ITT

00 0

ru ru 0 0

00 00 0 0

0

::: 0

m 0

mm 0 0

::i 0

~ ~ mm 0 0

00 00

::i 0

685+00 6 8 9 690+00 2 3 4 595+00 5 8 9 700+00

20+00 OBTAIN

UTILITY EASEMENT

• 0 R/W

TOP OF CUT

0 0 + 0

r-

REV. NO REVISIONS DESCRIPTION DATE

IJ~F=====~---==---~T""'""=-~ T6Eiiif""" SLOPE -----~\" or c\J NO ACC£

:ii 0

g; g; 0 0

UMi1S OF

R/W

OBTAIN UTILITY EASEMENT

ENTRANCE

O~~ ~;rj

~L BARN

UNDERGROUND TELEPHONE UNE CROSSING AT STA.28+45

STA.28+52.00 30" X 41' IREMOVED BY OTHERS! CGMP WfTH CONG.END SECTION SD.[ 20.20' RT. WEST FL EL£v'.- 106/.49 EAST FL ELEV.= 1061.41

(CDNST'D. BY OTHERS IN PLACE)

STR.NiJ.@ STA. 700+.7'1.:4 A.022 100 L:.f. 43'X26' RCPA 268.4B' LT. w/ 2-CETS

!CONST'D, BY OTHER-S IN :PLACE! BR.:(D THRE( SPAN_ (60_'~_90'_-60'1 P,t. BEAM BR·IDGE :WITH·44'-o-'' CLEAR ROADWAY. ANO 42" f7SHAPED PA.RAPE1S, il ·i!.l SlA,··70G+47,·oo·A023

(CONST'D. BY OTl-:IERS ·1N PLACE) SrR .No. @ sTA. 100+84 .:J Aot:2 l 00 l. F. 43"X26" RCP-A

1CONST'D. BY OTHERS IN =PLACE! BR.:@(!_, STA.: 712+08.25 -A022 3-14'Xl 2'X295': LG. RCB,

J.:71.,J:' BJ. w.I .. 2::-CE.Ts SKEWED 66° L:.F., 167.5'LG. LT. ·& "127 :5-' u;·: RT.

-1. 7';32%

•.. : .... · ... : .... C · .... ""o:::::::::~-"·~··. ·• • ••. ~=----:~-g§,. . . :~

LISTED FINISHED GRADE :ELEVATIONS WITH MA~KER ~e· HAVE COUNTED IN THE EFfECT :oF ·clJRVE LENGTHS & : SUPERELEV.l'iTI ON, ADJUSTED FROM THE VERTICAL· CURV:ES SHOWN :IN THE DRAWING;

:ii :ii 0 0

g; gs gs gs gs gs 0 0 0 0 0 0

• • 00 00 0 00

gs gs 0 0

::i 0

• • ITT ~ ~

•• ITT m ~ ~

m 0

110+00

SEC 7, T-1-S, R-7-W

STA.2.8+!Tr'30 30" X 0' IREMOVE.D BY OTHERS! CGMP WITH CONG.EN SECTION 5.0.([_ 31.70' LT. WEST FL ELEV.= 1061. I EAST FL ELEV.= 1060.

STA.29+!4JD 30" X 4~' IREMOVED BY OTHERS! CGMP WITH CONG.EN SECTION 5.0.(l_ 2.0.5CY RT.

BENCHMARK 224:: aoo: NAIL 1N 8" :WOOD POST; STA. 712~9.29 q; SURVEY, 1343;76'· l:L ElEV. ~'11-00:638

1120

~ 63 "~--fA~0~2~3~' ~'~·~'~-c-='~~8~5~o~·~· ~'"""o'-"2~6--cj g:; gj ...,. A021: Y..C. ~ 845'·, K ~ 265 ~S:: ~ A022: V.C. ~ 855':, K ~ 268

>> 1110

WW

ci LJj ci

• • ~ 00 0 ~

BR. F 3--l4'Xlt"RCB· EXT .. 52'W. IF.UTURE .CONS"J: .. J fE_ l 056.. 56. W. AT SJA. 713+02.2 A022, ]96.3'LT.

BR .. .F NE.W:.3.-l.4'.X12'X2.95.' .R.CB 1100 fl 1056.40· w. AT STA. 712+79;68 A022, 151.28'LT.

fl 1%5.52 E. AT STA. l11+58;.82 A.022, 115.S:6'RT. 1090

• • 00 0 ~ 00

2

• • o ru ITT

3

m 00

~--

0

• • om ru ITT

1080

1070

1060

~ 1050

•• ~ 8 1040

4 115+00 DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

2 3 4 705+00 5 8 9 STATE JOB NO. 20316(0LJ) SHEET NO. 26

Page 12: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

1080

1070

0 0 + L() (\J (.!)

STR. NO .G) STA. 630+01. 0 Cl SURVEY CONST. 96 L.F. 24" CGSP, '1.0'RT. w/ CET

STR.NO.@ STA. 629+35.0 rt SURVEY CONST. 100 L.F. 24" CGSP, SKEWED TO CONNECT TO STR. NO. l WI TH ESTIMATED 0.5 C.Y. CLASS A CONC. (ADJUST SKEW & LENGTH IN THE FI ELDJ

STR.NO.@ STA. 647+60 A016 CONST. DBL. 83 L.F. 96" CGSP, 50' LG. LT. & 33' LG. RT. (ADJUST SKEW & LENGTH IN THE FI ELDI

FINISHED GRADE EXIST. GRADE AT 'l_ DETOUR !AOl6J

-Q • 650% (AO J 6)

ALONG /lD/6

@

24p C-GSP I[_ 1076.5± w. I[_ 1071.0± E.

<(

f--­(f)

ITD BE ADJ'D. IN FI ELDI

1060

1050

1040

1030 625+00

"§ 0 r w 0

6

~ 0

7

~ 0

~ 0

8 9

ITT r 0

630+00

ITT r 0

2

NOTE TYPICAL TO ALL PLAN AND PROFILE SHEETS: ALL PLUS STATIONS AND OFFSETS FDR TIE-DOWNS ARE REFERENCED TD Cl SURVEY, UNLESS NOTED OTHERWISE.

0 0 .\-0 tP tP

T

"' N 0°01'34.2" W

... ---=-

SEC, 19, T-1-S, R-7-W

PLAN AND PROFILE SHEET FOR DETOUR FINAL PLAN CONSTRUCTION ARE NOT SHOWN. SEE SHEETS NO. 24 AND 25 FDR DETAILS.

1080

1070

1060

1050

0 0 + 0 L() (.!)

REV. NO

BR. W'l STA. 650+18.00 A021 CONS!. 3-12'X10'X258'-6" LG. RCB, 41 .4' LG. LT. & 211. 1' LG. RT.

REVISIONS DESCRIPTION

Pres.R/lN

0 0

SEC. 18, T-1-S, R-7-W

w w

0 oro +w WO :;:-

> -w >~ ~w

.('. = 300' ~ \,/"

y,_· -~ 1j\"

F j N l·SHED GRA·DE AT :(i_ DETOUR iAO 16!

-Cl.436:%: IAOJ6l

BENCHMARK 213: 2" ALUMINUM CAP ST A. 641 +95.26 (!; SURVEY, 70.58' RT. ELEV. = 1069.180 BENCHMARK 21 "I: "X" ON CONC. HDWLL. STA. :6"17-+"17.4"1 ~SURVEY, 1"1.49' LT. ELEV. 1 060.299

BENCHMARK 215: 800 NAIL IN 6" POST STA. 652-07.39 (!; SURVEY, 80.00' LT. ELEV.= 1057.669

BENC.f1MA-RK 2-16;: ··2" ·ALUMINUM CAP ST A. =660-00.17 fJ; SURVEY, 42.53'· LT. ELEV. 1 070.608 BENCHMARK 2"17: 2" ALUMINUM. CAP STA. :667T15.73 lj;:_ SURVEY, 236.22' LT. ELEV. 1.053.96~

DATE

1080

1070

1060

1050

SEC. 18, T-1-S, R-7-W ro ITT

3

EXIST. GRADE ·uNE ALONG /![J/6 & A005

4 635+00 6

FIN l:SHED. GRADE AI. l[.DE.TOUR .. lA01.6J.& AT (l SERVI CE RD LT. (A0051

7 8 9 640+00

ru r 0

M M

0 • 0 .­+ r ~:::: w

> - w > ~ ~w

:;; 0

65S+OO

r w 0

6

-...--~Y0• c .· ,,. 300

,

K 0:;79----

0 0

0 w 0 +w r o ~ -w

> rW > ~ ~ w

8 9 660+00

= 300' 1./-:.c.. as ' 0

F:I NI SHED GRADE AT l DETOUR (AO.JBI

Tl

~.---c'~·• C "' 300' ~ ~ K. " :96 --_... ..... ~ w

2

0 r 0

3 4 645+00

w 0

6

0%

0 w 0

7

0%

DBL. 96' CGSP rt- 10'19-.30 w. fE_: 10'19:.00 E.

0 0

0 w 0

8

0 0

0 w 0

9

EXIST. GRADE UNE ALONG NJ/6

o ru 0

0 w 0

650+00

0 w 0

0%

0 0 • 0 0

~ g; w­w

> - w >~ tL w

r 0

w 0

2 DUNCAN BYPASS SOUTH CONNECTOR

STATE JOB NO. 20316(0LJ)

r ~

ru w 0

3

w ~ +w MO :;:-

> uw

1080

1080

1070

1060

1050 5:ci l,/~C.

\( = ':)\

:;j 1040

4 655+00 STEPHENS COUNTY

SHEET NO. 27

Page 13: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1100

1090

1080

-150 -1"10 -130 -120 -110

1100

, , • , I ,

1090

1080

-150 -1'10 -130 -120 -110

-150 -1'10 -130 -120 -110

1100

1080

-150 -1'10 -130 -120 -110

10· I •

-100 -90 -80 -70 -60 -50 -40 -30 -20

I[_ SURVEY .......... 1

.. ('

-10 0

628-00 10

I[_ SURVEY

PR~SENT us-81 ,, '.'' '' i' '. • ' • . ' • ' ' l

20 30 40 50 60 70 80 90 100 110 120 130 140

<::i::.:.:::.:.:_:___:;_:::c=~---=~=~==========-c:'.=c::t=~~-=C:::2=t:=2:.:0;;·:;;;, ·~"'· cce-=:::::;;~=-c:'.=C'""=-CC-:C==. , . '" .-.. -... -... ----------- ~'""'· .. ". ~ . =·· .... ". "~·.". ~.· .. ~.·. ,,;.-~-r---· ---- ''''""'''~~·~·:·· --= - -,---- -

-100 -90 -80 -70 -60 -50

-100 -90 -80 -70 -60 -50

-100 -90 -80 -70 -60 -50

-40 -30 -20

-40 -30 -20

-40 -30 -20

-10

-10

-10

0

627-00 10

SURVEY

0

626-00 10

SURVEY

0

625-00 10

20 30 40

20 30 40

20 30 40

50 60 70

50 60 70

50 60 70

HATCH LEGEND ESSJ PHASE 1 CONSTRUCTION l2ZZJ PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130

80 90 100 110 120 130 140

80 90 100 110 120 130 140

STATE JOB NO, 20316(041

1100

1090

1080

150

1100

1090

1080

150

150

1100

1090

1080

150

SHEET NO. XO 1

Page 14: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed
Page 15: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1080

1070

-164.93' LT. TO PRES. RIW

~ SERVICE RD LT. l SURVEY ~ PRESENT US-81 Ii. ND~HBOUND . . . . . . . JTt omu~ ...... L · I -~% ;~~~ ····· ······· ·······•··

· · · .• ~.-. ·• .. ~~~s::sss· ·:::s·~::.;:.:>~:r::::•.~· ~~~-·==~· · ·~·:±:s;:s· · ·;;:::· · ::'.'.:::::r-::==-=·. ~-. =----_;_· ·-· · __ .. ·--" =~~..,-,--·--. -. --.:~~~~Zi?~"--. " " . ',, . " ... ~ " .........

PRES.RIW 1080

1070

,:. '' ,!, '' .: '' 'j' '.;' '. i' --'----~· - _· ~-:--•

1080

1070

-150 -1<10

- 165.96' LT. TO PRES. RIW

-130 -120

' . ' : ' ' ' .: . ' ' : ' ' ' .: ' ' ' ; ' ' ' : '

-110 -100 -9D -so -70 -60 -50 -40 -3D -20 -1D 0

637-00 1D

l SURVEY ..... L

20 3D 5D 6D 7D SD 9D

' 1060

1DO 110 12D 130 140 150

.... PRE D

1070

1060-l-~-i-~-i-~-i-~-r-~-i-~-i-~-i-~-r-~i--~t-~i---,~-i-~-+~-i-~-+~--i-~--r-~-i-~-r-~-i-~+-~i--~r--i~--f~--,~-+~-i-~-r~-r~--r-~-i-~-r-~i--~t-~i----+~-i-~-+~-i-~-+~-r~-r~-T-~-r-~-i-~+-~i--~r-~i----+~--i~-+~-i-~-+~--i-~-r~-r~-+-1060

1080

1070

-150 -140

............ 167.92' LT. TO PRES. RIW

-130 -120 -110 -100 -90 -so -7D -60 -50 -3D -2D -1D D 1D

636-00

l SURVEY ..... L

2D 30 5D 6D 70 so 9D 1DO 110 12D

<REMOVE> STA.635+50.20 2411 X 36' CGMP 5.0. [ 124.B' RT.

~ PRESENT US-B 1 Ii. N~0~'fHBOU~~~F ~t ftty:: fggjiji5 ·1 · .... ,o....... . . . ......................... .

-2%: ~- -4% ' ~~~------.~~~~~

'.,,,,,,; ..

130 HD 150

PRES.R/W 1080

1060-l-~--i-~-i-~i----+~-i-~--r-~-i-~r---i~-+~-i-~t--i~~~-r~-r--~i----+~-i-~-r-~-i-~r---i~-r-~-i-~t--i~-+~-.~-r--~i----+~-i-~--r-~-i-~r--i-~-r-~-,-~r--i~-r~-r~-r--~i----+~-i-~--r-~,-~r--i~-r~-i-~t--i~-+~--i-~-r-~i----J-1060

10'

1090

1080

1070

-150 -140

-169.88' LT. TO PRES. RIW

-130 -120 -110 -100 -90 -SD -70 -60 -50 -4D -30 -20 -1D D

635-00 10

l SURVEY ... !

. ' ' . i '

20 30 50 60 70 80 90 100 110

Ii. NORTHBOUND

120 130 HD 15D

PRES.RIW 1090

1080

1070

1060-t~-i-~-r~-r~-;--~-;-~-;-~,-~r-~r-~r--,~--+~-i-~-r~-r~--;--~,-~-;-~-,-~r-~,-~r--,,--j~-,~-+~-,~-r~-.~-;-~-,-~-;-~,-~r-~,-__,~--,~-+~-,~-r~-.~-;-~-,-~-;-~,-~r-~,--,r--,~-j~-,~-+~-,~-r~-,-~-;-~-,-~-;-~,-~t-1060

-150 -140 -130 -120 -110 -100 -90 -SD -7D -60 -5D -4D -3D -2D -10 0

634-00 10 20 3D 50 60 70

HATCH LEGEND ~ PHASE 1 CONSTRUCTION l?ZZJ PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

SD 9D 100 11D 12D 130 HO 15D

DUNCAN BYPASS SOUTH CONNECTOR STATE JOB NO. 20316(04) SHEET NO. X03

Page 16: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1080

1070

-19535'LT. TO PRES.RIW

~2%

PRES.RIW

t:g:r:_~-. --t--·--·--· -~ 1080

'.,,,,,,:,,,,,,.: ....... ~.. 1070

1060--+-~--+-~--+----i---+--~-+--~-r--~~--;-~---+-~--+-~--+--~--;---~-+--~-r--~---i-~---+-~--+-~--+--~-+--~-+--~~r--~---+-~--+-~--+--~--+--~-+--~-+--~-c--~---+-~---+--+--+--~--+-1060

1080

1070

1080

1070

-150 -140

-t64.93'LT. TO PRES, RIW

-130

'.' :_ . . _._.:~--·

-150 -140

-t64.93'LT. TO PRES. RIW

-130

-120 -110 -100 -90 -80 -70 -60 -50 -30 -20 -10 0

641-00 10 20 30 50 60

~ SERVICE RD LT. r SURVE y ~ PRESENT US-81 • . • • . • • • • • • • • ]Kt DETDUR • • • • • • • • • • . • . ' . .. . T . . '

.. •· ... ~~~~~~~~__;~~I-='-·······.,,.,;_~.·.·= ..... :? .. ~··=···-··=···::::::-·;,;·-·····~-······_···.· ..

-120 -110 -100 -90 -80 -70 -60 -50

~ SERVICE RD LT. . · "&":<l."Df.TOUR' ~"

-30 -20 -10 0

640-00 10

{k_ SURVEY . . . . . . . . I . .

',',' ',:, '. ,'' .. ;'

20 30 50 60

70 80 90 100 110 120 130 150

PRES.R/W

.. 1 1080 IQ. NORTHBOUND

·····.·[,a:~·.··.··.·····.··.··.·. +---:

' : '

. ' ' ' . .: ' ' ' ~ . ' +~~·

-2%

1070

70 80 90 100 110 120 130 150

PRES. RIW ... ""'"'"'"""•"' 1080

1060-t--i---r---i--+--T---+--~-+-~~-+--i--+--+--+---i---+--~-+--~-+---~-r--i--+--i--+-~--r---i--+--~-+--~-+--i---+-~--+-~--+----i---+---i--+---i---+--i--+--i---+--i---+--+--+---i---+---i--+---i----1-1060

-150 -1.!IO

-164.93' LT. TO PRES. RIW

1080 """"""'"''" ·--·--· 1070

-130 -120 -110 -100 -90 -80 -70 -60 -50

~ SERVICE RD LT. & (j:_ DETOUR

-30 -20 -10 0

639-00 10

{k_ SURVEY I

20 30 40 50 60 70 80 90

~ PRESENT US-81

T

100 110 120 130 140 150

PRES.R/W

-:---:--j___-· -~;--·

I I

1080

1070

1060--+-~--+--~--+--~-+--~-+--~-i-~---+-~--+-~--+--~-+--~--;--~-r--~---i-~---+-~---;--~--+--~--;--~-t--~-i-~--+-~--+--~--+--~-+--~--;--~-+---~-i-~---+-~--+--~--+--~-+--~-+-1060

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -10 0

638-00 10 20 30 50 60 70

HATCH LEGEND fSSJ PHASE 1 CONSTRUCTION l2ZZJ PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 150

DUNCAN BYPASS SOUTH CONNECTOR STATE JOB NO. 20316{04) SHEET NO. X04

Page 17: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1070 >~~~··-·····~·-·····-· ·-··········

1060

-150 -1'10 -130 -120 -110 -100 -90 -80 -70 -60 -50

~ N~HBOUND PRES R/W

.. ·······•~ttE4WZ~+i••••I••·········~······••••i••••••L••,•••••••••••••·1~···•I•••••••••••lI••••r•••··~·1•••·••••••••·•••1••••••I• -40 -30 -20 -10 0

6"15-00 10

~ NORTHBOUND .. J

20 30

. 0~-f' . . : . : ..._a. : . . . . . .

· · .:. · · ·· · · ~· · · ·-·s~4'1%' · ·!~, · · ~~:4'4% .:. · · · · · · .:. · · · · · : · · · · · · · ~· · · · · · · ! · · · · · · · :. · · · · · · ·!· ·· · · · · .:. ·

50

-~-"::::z:::i:. ::'.z:::zZ§.;z::'E~·~:;.:=~::. °'77;=;,· -~ . . . . . ... . . .• . . . ... :::+::.L:Z:L-~ .~~-~ .. ~ .. -~

60 70 80 90 100 110 120 130 140

PRES .. l'!/W • . R/W

__ J_U_· ----~--------------

: ...... : ..

1070

1060

150

1080

1070

1060-'---i----r---i---+---i---+--,----r---.--j-----,---t---i---+---,----;---,---r---,----r---,---r---.--,j-----,---t----;---r--,---+---r-+---,---t--.--r---.---t---.---t---,---r--,---;---,--+--;--t--,--r---,---t--,----t---,----;---,---+---r-~1060

-150 -1'10 -130 -120 -110 -100 -90 -so -70 -60 -50 -40 -30 -20 -10

1080

0

6"1"1-00 10

~ NORTHBOUND J

20 30 40 50 60 70 80 90 100 110 120 130 140 150

1080

1070

1060-+---r---r----i---t---i---+--i----,r----,---t---,---t---i--+---.---+--.---t----r--+---,---r---,--+---,---r------,--+---.---+--.---t----r--+---,---r---r--+--.----r-----,--+---.----r---.---t----r---r----,---r---,--+---,---t----,--+----r--+--,-----j-1060 -150 -1'10 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0

6"13-00 10 20 30 40 50 60 70 80 90 100 110 120 130 140

~ NORTHBOUND PRES. R/W R/W

: ~~~ i==:-::.:::;::=::::::======::c~~:::=~;;;;;~--=4=°"'=<~~;;;;;~~-.--. --• - -. -:--. --: -.. -... -. i:;:ii-2§%:. ·,,.· ·=· ·~1 ~· ~'a;:~:?~.;i~~~~::z2c~~2~t'z ___ · -;. ·_ I l }_ •.• ·-· ._ ...... '.~-.-.~.-. ~.-.~•-.-.-:-h-:-~.

150

1080

1070

1060--+---i----i----i---+----i---+---i---+--i--t-----i---t---i----t---i----+----i---+---i---+--i--t--i---r---i---t---;---+---i----r----i---r---i---t--i---t-----i---t---i-----;----i----r---i---+---i---+--;--t--i---r----i---t---i---+---i---+----i---+---i---+-1060 -150 -1'10 -130 -120 -110 -100 -90 -BO -70

I -60 -50 -40 -30 -20 -10 0

6"12-00 10 20 30 40 50 60 70

HATCH LEGEND £SSJ PHASE 1 CONSTRUCTION l22ZJ PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(04) SHEET NO. X05

Page 18: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed
Page 19: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1080

1070

PRES.RIW I 11060

I

lil. NORTHBOUND ....................... ! ......... , •.. ··

~~· : .... .a. . ···:+o:g·\%· ··~~·· !-'4.0~3·

1080

1070

1060

1050-t~-,-~-t~-,-~--r~-,-~-r-~-,--~-;-~-,--~t-~.----,r---,~---t~-,-~--;-~-,-~--;-~-;-~-r-~-r-~-r-~.-~r-~,-----j~--T~-t~-t~--r~-,-~--;-~-,--~-r-~-,--~;-~,-~r-~,-----j~--T~-t~-t~--r~--r~-r-~-r-~-r-~T-~+-~i--~r---i~---t~--T~--r~-t~-+~--r~-+-1050

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50

1080

1070

1060

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50

1070

1060

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50

1070

PRES.RIW

1060

-150 -1'10 -130 -120 -110 -100 -90 -80 -70 -60 -50 10· I •

-40 -30 -20

-40 -30 -20

-10

-10

0

653-00 10

lil. NORTHBOUND . . . . . . . . . . . ! . .

0

652-00 10

lil. NORTHBOUND . '.'' ·''"''' ·'' .. · · · · ·· · · · · · · · · · · · · · · · · · · · · · · .,._,__.2·.0\:)% · · · · ·· · · · ·t·.G·.· ,,Q?.~:~_:.4.00% ..

-40 -30 -20

-40 -30 -20

-10 0

651-00 10

lil. NORTHBOUND ... I .. ,007,BL .....

;-2.00% f.G. · -4,PD%

-10 0

650-00 10

20 30 40

20 30 40

20 30 40

20 30 40

50 60 70

50 60 70

50 60 70

50 60 70

HATCH LEGEND ~ PHASE 1 CONSTRUCTION [ZZI PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100

80 90 100

80 90 100

80 90 100

110 120 130 140 150

1080

1070

R/W 1060

110 120 130 140 150

1070

1060

110 120 130 140 150

1070

1060

110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(04) SHEET NO. X07

Page 20: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

1080

1070

-150 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30

1090

1080

1070

-150 -1'10 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30

1080

1070

1060

-150 -1'10 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30

1080

1070

-20 -10

~ NORTHBOUND . !

0

657-00 10

~ NORTHBOUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ! . . . .

.· ...... .:.. ..... :.t.!;l .. .Q?f? ... '

-20 -10

' c::i".> : ~<Ii'· .• ' . :G· 0

~· +1., 03

0

656-00 10

~ NORTHBOUND ................. ·+·s·.s~r.. .......... i .. 'G' ... ,~7s .. ::.i:q_·1:31_3·

-20 -10

:+3.303

0

655-00 10

~ NORTHBOUND

! ... ,615•9~ ~ .G· :-4.0Q%

20 30 40

20 30 40

20 30 40

1090

1080

R/W 1070

50 60 70 80 90 100 110 120 130 140 150

1090

1080

1070

50 60 70 80 90 100 110 120 130 140 150

1080

1070

50 60 70 80 90 100 110 120 130 140 150

1080

1070

1060

1050~~---r~--+~r-~-c-~r-~-+-~-i--~+-~T-~t-~C-----i~---i~--+~---r~-i-~-i-~--;-~--i--~-t--~T-~r-~T-~r------i~---i~--i~---r~-i-~--r~--i--~--J-~-i--~+-~T-~t-~~---;~--i~--;-~~~--r~-i-~---r-~--r-~-r--~-r-~-r-~~~j--~r----;~~~--+~-i-~---r~r-~--r~~~-1-1050

-150 -1'10 -130 -120 -110 -100 -90 -80 -70

I• 10· •I -60 -50 -40 -30 -20 -10 0

654-00 10 20 30 40 50 60 70

HATCH LEGEND f.333 PHASE 1 CONSTRUCTION EZ2J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(0-4) SHEET NO. XOB

Page 21: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

1080

1070

1060

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60

1090

1080

1070

1060

-150 -140 -130 -120 -110 -100 -90 -BO -70 -60

1090

1080

1070

-150 -1'10 -130 -120 -110 -100 -90 -80 -70 -60

-50 -40 -30 -20

lil. NORTHBOUND

.. +soo3 J.1;.'o~o,•~003

-10 0

660-00

'' i.

10 20 30

STA. 659<81.51, END TYPICAL SECTION NO. 28, BEGIN TYPICAL SECTION NO. 2C.

-50 -40 -30 -20

-50 -30 -20

lil. NORTHBOUND

l.·0··. 1~s1:6.~1.bo% :+s.o93 ~ .

-10 0

659-00 10

lil. NORTHBOUND

. ! '"~""' , .·:r~:~0.3., ~ .G· . :+1.003

-10 0

658-00 10

20 30 40

20 30 40

50 60 70

50 60 70

50 60 70

HATCH LEGEND ES:SJ PHASE 1 CONSTRUCTION l22ZI PHASE 2 CONSTRUCTION ..-:;::::::, FUTURE CONSTRUCTION

80 90 100

80 90 100

80 90 100

1090

1080

1070

R/W 10601

110 120 130 140 150

1090

1080

1070

R W

1060

110 120 130 140 150

1090

1080

1070

110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO, 20316(04) SHEET NO. X09

Page 22: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed
Page 23: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

NORTHBOUND 1100 1100

1090 1090

1080 1080

1070 1070

1060 1060

1050 1050

1040 10'10

-150 -140 -130 -1 0 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

66'1-00

STA. 663'67.00, END APPROACH SLAB, BEGIN BR. 'C' STA. 663+11.51, END TYPICAL SECTION NO. 2C, BEGIN APPROACH SLAB

ill_ NORTHBOUND . . . . . . . . . . . . . . . . . . . . . . . I ' 1100 1100 ................ 'filit~:li/W··· ' "·!'?'?".

"" . J .. :. '+·8~cio'%:' ' .

" ,' " '~S'··

:I 1090 1090

1080 1080

1070 1070

1060 1060

1050 1050

1040 1040

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

I• m •I 663+00

1 HATCH LEGEND

ESS:J PHASE 1 CONSTRUCTION l2'2ZJ PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

STATE JOB NO. 20316(04) SHEET NO. X11

Page 24: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1100

1090

1080

1070

P/W§O W

I I

1056

ST A. 666"93.24, END APPROACH SLAB, BEGIN TYPICAL SECTION NO. 2C STA. 666'58.00, END BR. 'C', BEGIN APPROACH SLAB

1100

1090

1080

1070

1060

1050

1040-+~--i-~-;-~i----;~--i-~-r~~~t--i~-+~-i--~-r-~C--+~--i-~-;-~i----;~-r~-r~-i-~t--i~-+~-i--~-r-~i---+~~~-;-~i----;~-r~-;--~-i-~t--;~-+~-,~-r-~~-j-~--i-~-t-~i----;~-i-~-r~-i-~t--i~-+~-i--~-r-~r--+~--i-~-t-~i-~1--1040

-150 -140 -130 -120 -110 -100 -90 -BO

1100

1090

1080

1070

1060

-70 -60 -50 -40 -30 -20 -10 0 10

666-00

~ NORTHBOUND .L

20 30 40 50 60 70 80 90 100 110 120 130 140 150

1100

1090

1080

1070

1060

1osa-l::=::;:::::+::=-~--;~~~-+-~-i-~t--,~-+~-,~-r--,~-+~-i-~-;-~~--t~~~-r~~~r---i~_;_~.,~-r-~~-+~~~+-~~--t~~~-t-~-i-~~--i-~---r~.-~;--;~-+~--i-~-i--~~--t~~~-t-~~~r--,~---r~.-~~-,_:_::=::_:;::::=.:;::::=;:::::::j_,050 -150 -1"10 -130 -120 -110 -100 -90 -80

10· I • -70 -60 -50 -40 -30 -20 -10 0

665-00 10 20 30 50 60 70

HATCH LEGEND ES.S:] PHASE 1 CONSTRUCTION

E'ZZJ PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

STATE JOB NO. 20316(0.:J) SHEET NO, X12

Page 25: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed
Page 26: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

1080

1070

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30

1100

1090

1080

1070

··~·· 1060 ... · ....... : ....... : "'

' : .

1050

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30

STA. 670+23.24, END

1100

1090

1080

1070

1060

1050

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30

I• 10' •I

1

.... : .. ,,,,;,

-20 -10

: +s.1:93

-20 -10

0

672+00 10

~ NORTHBOUND J : ........ ~:j,' : . ' '\f:::/~~· .

~-" +1.003:

0 10

67Hl0

TYPICAL SECTION NO. 2C, BEGIN

~ NORTHBOUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . I ''''''.'"'''!Ii'-''

~~ : ()~ :

'+8.0~3 '•'•' ·~~,')'.·+1.603·

-20 -10 0 10

670+00

20

20

TYPICAL

20

30 40

30 40

SECTION NO.

30 40

1090

1080

1070

50 60 70 80 90 100 110 120 130 140 150

1100

1090

1080

1070

R/W

1oro

1050

50 60 70 80 90 100 110 120 130 140 150

28.

1100

1090

1080

1070

1060

1050

50 60 70 80 90 100 110 120 130 140 150

HATCH LEGEND £:SS:I PHASE 1 CONSTRUCTION

E'.Zi PHASE 2 CONSTRUCTION ..-0:::::: FUTURE CONSTRUCTION DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

STATE JOB NO. 20316(04) SHEET NO. X14

Page 27: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

1080 '."'I

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40

1090

1080

lil NORTHBOUND ........................ I . .,<>. . . . . . . . . . . . . . .

L-"-L~·_·.:.·_·c.~2~.·~,_:o~L-:_···-···,:·:_.·.:_·•~_,-.:.~._.:~" .. O:_. 6_%_;1:_· -''---L•~'-:--L-;"=~-· ;--·. ·=_ .. ···•··· .. 1· ...•. · .. · .. · ...•. · .. · .. · ...•. · .. · .. · ..•.. · .. ·. RJW.· .. ·. : .. · .. · .. · .... ·=-· .· ....•.. ···=-··· ···•··· .·. ··-= ..•.... · .. ·. L_i .· .. · .. ·. _: .· .. · .....•. =-·· ..

-30 -20 -10 0

676-00 10

!il NORJ,HBOUND

·························t,a@'? ....•........ _. -2.003 .. - .00%;

20 30 40 50 60 70 80 90 100 110 120 130 140 150

1090

1080

1090

1080

1070

1060--+---i---+--i---+---i---r--,----r--i---r---i---;--i---r---i---+---,---+---i--+--,---+--i---r---,---;--;----t--,----r----,---+--,----;--i---r--r---;-----.----t--,---+---,---r--,----r---,---;--.--r---,----;-----.----t--,-----r---,---+---,----t--1060 -150 -140 -130 -120 -110 -100 -90 -80 -10 -60 -50 -40 -3o -20 -10 o 10 20 30 40 50 60 10 80 90 100 110 120 130 140 150

675-00

1090

lil NORTHBOUND

"'" "" """"" . .l. .. ~()~~~I\•"•" ..;Q,973" :'fl·-0:97%:

1090

1080

1070 1070

1060--+---i---+--i---+---i--+--i--t--i---,r---i----;---i---+---i---+--i---+--,---+--i--t--,----j--i----;--,---+---,---r--,---+---,---+--i---;C----;---j--;----j----,---+--,----+---,---+--.----+--,---r---;---j--;----j---,---+---,---+---,---+--1060

-150 -140 -130 -120 -110 -100 -90 -80 -70

1090

1080

1070

-150 -140 -130 -120 -110 -100 -90 -80 -70

-60 -50 -40 -30 -20

-60 -50 -40 -30 -20

-10

-10

0

674-00 10

!il NOR\HBOUND

e' ,a" ~:.,j;-.l..00%.,.

0

673-00 10

20 30

20 30

50 60 70

50 60 70

HATCH LEGEND css:J PHASE 1 CONSTRUCTION [Z2'j PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90

80 90

100 110 120 130 140 150

1090

1080

1070

100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(04) SHEET NO. X 1 5

Page 28: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

lil_ NORTHBOUND . . . . . . . I . . RIW

1090 1090

'.':' .. : -7'f'-i----~~,,--7~---;-~~~~-;.,.--,--~· · ·. ·.··.····I---J_l·.··.······· l[l_·.··.··.········.··.····---······.···· _l·.··

1070j~:~J~i~1:I:1:r:t:L~L~:J:J~J~::~~1~~~~~~~~~~~~~~j~j~~~~~~~~~f ~~~~~~~~~~~~~~~~~~~~1:1:1:1~.I:.·· .. ······,;···~[:t:LJ:J:J:J:J~~~I:I~l:::: -150 -140 -130 -120 -110 -100 -90 -80 -70

1090

-150 -1'10 -130 -120 -110 -100 -90 -80 -70

1090

-150 -1'10 -130 -120 -110 -100 -90 -80 -70

1090

-150 -140 -130 -120 -110 -100 -90 -80 -70

w I •

-60 -50 -40 -30 -20 -10

-60 -50 -40 -30 -20 -10

-60 -50 -40 -30 -20 -10

0

680-00 10

NORTHBOUND

0

679-00 10

lil_ NORTHBOUND . . . . . . . . I . .

0

678-00 10

lil_ NORTHBOUND

20

20

20

30 40 50 60 70

30 40 50 60 70

30 40 50 60 70

80 90 100 110 120 130 140 150

R/W

----J·1·.··.·····.··L··.······.····L·[•·.····.····J·J1·.··.·

80 90 100 110 120 130 140 150

80 90 100 110 120 130 140 150

..... J ·· · ···· ·· · . . . . R/W . . . . . . .

1090

1080

1090

1080

1090

t~~·=··:;;~~···;;:···'2· ::•::=z::;'::;==·=-"'4"'.b=o"~·=="i~0 ~'0~··-~ ...

0

4:;,:_":;;;o;;,r,=· "'."'·ee;:·· j~~--··········-=·•.· .. ·.1-..•...........•. ~.- .. · .. ·.•· .. ·._:············=··············~---•.· .. · .. · .. ·~=··············=· 1080

-60 -50 -40 -30 -20 -10 0

677-00 10 20 30 40

: . '':' '.;.

50 60 70

HATCH LEGEND ~ PHASE 1 CONSTRUCTION E'2'.2J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

STATE JOB NO. 20316(04) SHEET NO. XO 1 6

Page 29: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

NORTHBOUND R/W ·-1090

1080 1080

1070 1070

1060-f~--+~-i-~;.-__;~--i-~-+-~-i-~t----i-~---i-~-T-~+-~C----+~--+~-+-~;.----i~--i-~-+-~-i-~+---i~-+~--+~-+-~C---+~--+~-+-~;.-~c----i-~-+-~-i-~+---i~-+~--+~-r-~r---+~--i-~-+-~-i-~t----i-~-+~-T-~+---i~-+~--+~-r-~;.----i~--i-~-+-~-i-~+--1060

-1 0 -140 -130 -120 -110 -100 -90 -80 -70

1090

1080

1070

-1 0 -140 -130 -120 -110 -100 -90 -80 -70

1090

-1 0 -140 -130 -120 -110 -100 -90 -80 -70

1090

-150 -140 -130 -120 -110 -100 -90 -80 -70

-60 -50 -40 -30 -20

-60 -50 -40 -30 -20

-60 -50 -40 -30 -20

-60 -50 -40 -30 -20

-10

-10

-10

0

684-00 10

lil_ NORTHBOUND !

0

683-00 10

lil_ NORTHBOUND !

0

682-00 10

lil_ NORTHBOUND . . . . . . . . . . . . . . . . . . . . . . . . ! . . .

-10 0

681-00 10

20 30 40

20 30 40

20 30 40

20 30 40

50 60 70

50 60 70

50 60 70

50 60 70

HATCH LEGEND E.SS] PHASE 1 CONSTRUCTION ~ PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90

80 90

80 90

80 90

100 110 120 130 140 150

R/W ··-1090

1080

1070

100 110 120 130 140 150

R/W 1090

1080

1070

100 110 120 130 140 150

R/W 1090

1080

1070

100 110 120 130 140

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(04) SHEET NO. X 17

Page 30: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

I•

lil_ NORTHBOUND 1090 !

1080

RIW 1090

1080

Ll£lLD-flf+-Pi4+-f-4-Lf~R+---i;--c-j~~---;i-c-;J;-+-±T~;J;1060 '"' . . . . . ,,, 0 10 20 30 40 50 60 70 80 -40 -30 -20 -10 1060 -120 -110 -100 -90 -80 -70 -60 -50 688+00 -150 -1 '10 -130

1070

lil_ NORTHBOUND 1090 ! 1090

1080 1080

1070

1090

Ii)_ NORTHBOUND ! RIW

1090

1080 1080

EJ_JJJJ TJJ+Wif~r¥f-4--c-r4-J--f-J± 14+M4--r-;r·+~~-.c"-~,060 ''~ ,,, ,,, 0 10 20 30 40 50 60 70 80 90 100 110 1 060 -90 -80 -70 -60 -50 -40 -30 -20 -10 686-00 -150 -140 -130

1070

1090

lil_ NORTHBOUND !

RIW 1090

1080 1080

1070

1060

-150 -140 -130

10· •I

1 DUNCAN BYPASS SOUTH CONNECTOR SHEET NO. X 18 STATE JOB NO. 20316(04)

STEPHENS COUNTY

Page 31: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

1DBD .:~·~·~-···-····-""' --------~ 1.076. 76 · ..

----------: ... ,",' ':' ~=::=?>--~----­

····:·······:······· "''''"'!"'"''''':''''''"'

' . . . : ' ' ' .: ' . . ' ' ' ~ . ' . ; ' . .

109D

1D8D ........•...........• j····i_i·.··· ~ 1014.26

107D---j----,---j----;----t---.---r--,----j--,--;---,----j----;----t---.--;--,----;--,--r--,--r-----,----;---,----j----;---+--,---;--,----;----,---r--,--r----,----;----,--r--,----t---.---r--,-----j--c--j---,----j----,----j----,---;--i----;---i---+--,--l--107D -15D -1"1D -130 -12D -110 -1DO -90 -80 -70 -60 -50 -40 -30 -20 -1D D 10 20 30 40 5D 60 70 80 90 100 110 120 130 140 150

692-00

~ NORTHBOUND 1D9D ·!········:'''''"'('''''':·······: 109D

. . :F·uTU~E "cO~STR.~CTici~· .. ..... ~ .. ···~·~·~·~... : ffYP~ICAU:

s . IN'.A SUBSEQUENT -------------------- --· -·---· ---· __ . __ . __ . -~--· 1DBO 108D

. " ',, ' . i

1D70---j---,---;--,----;----,---r--,--r-----,----r----,--r--,----t---.---r--,-----i--r---r--,--;----,----r---,--r----;r----t---.---r--,-----j--,--;--,--j----;----;----,--r--,----;----,----r--,-----j--,----;---,----j----;----;---,---;--i----;--,--j---,----l--107D

I 10' •

-15D -140 -130 -120 -110 -1DO -90 -BD -70 -6D -5D -"ID -3D -2D -10 0 1D 2D 3D "ID 50 6D 70 80 9D 100 110 120 130 140 150

1090-

691-00

ST A. 690->85, END TYPICAL SECTION NO. 3B, BEGIN TYPICAL SECTION NO. 3C ON NORTHBOUND & SOUTHBOUND STA. 690->85, END PROJECT,

BEGIN INCIDENTAL CONSTRUCTION

~ NORTHBOUND .... ,. .................... ,.,..,,,,,,.,,.,,,,, .... I

: GRA0:1 NG_(~-~P_.i~_!_~>_.PR-OJ_E_Cl ~-· _i=i ""' -1090

-108D

1D7Dl~---,----r--,----+---,---+--,---+--,-----;--,--+---,----+-----,---t---r--t--;---t----,---+---,----r----,--+---r--+----r--i---,---j---,----j----,---+--r--r--r--+---,----+-----,---+--r-+---r----i----;--+---,----;-----,----r---r--+--C-----t----,--~11070

-150 -1"10 -130 -120 -110 -100 -9D -80 -70 -60 -5D -"ID -30 -20 -1D D 10 20 30 "ID 50 60 70 8D 90 100 110 120 130 1"10 150

690-00

~ NORTHBOUND ! "' "" -1090 . . ' .

: . : .

. , . ~~T·U~k. C0°N:S~~~2·T I ON:· -,---"7::'.""'"'"7'"-' :nYP..l;C.AU., .............. ,.. -1080

-1070

" -----~---__c_--~;____; _ ___:_ _ __,__----:------1

1070-t.~~~~~~~~~~~~~~---_;_~t-~~---~-i---:-r----~~~::.,.:::::-l~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~j_--c-L~~--~ 1060-r----,---r--,----+-----,---+--r--j---;----j----,---+---,----;-----,----r--,----+---r---+---.--+---,-----j--i---+---,----;-----,--+---,----+-----,---+---.--+---r----i----,---+---,----;-----,--+---,----+---r---+--,---+------i---+--+---+--+-----..;---+-----l-1060

-150 -1"10 -130 -120 -110 -100 -90 -80 -70 -60 -50 -"ID -30 -20 -10 0 10 20 30 "ID 50 GD 70 80 90 100 110 120 130 1"10 150

•I 6ss-00

I HATCH LEGEND

£S'SJ PHASE 1 CONSTRUCTION l2ZZJ PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

STATE JOB NO. 20316(04) SHEET NO. X19

Page 32: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1100

1090

1080

' .. :~-~: __ ] _ _j__._~J__• __ ~:, ' .. !_. -· -· _.:.~. -:-~---~-· =-----~·::.:;­

',,,,.: . .IL. 10£2 .. 3.5 ..

··························································. ~i- ..... ~~ lil.I NO_:~H~OUNO '-' 'V. ,,_. .

,,_o~·v .~00. . . . .,._r::? . ...

C?· :-2% '?'. -2% ~'?· -~% ' . ~ '

1100

1090 U:

----------------------------------1080

1070-+---i---+--i---+--i---r---,---;--i--;---,---;---i---+---i---+---.--+--i---r--,---;---,--r---,----t---;---j----,--+---.--r---,----r---,---;---,--r---,----t---;---j----,---+-,---r---,---r----,---r---,---;-----,---+---,--+---.--+---.---r-1070 -150 -140 -130 -120 -110 -100 -90 -80 -70

1090

1080 ------------------ -----

If_ 079.~5

-60 -50 -40 -30 -20 -10

.. ,-. .:;\:)'.,,.

0

696-00 10

lil. NORJHBOUND

J 0'>

,JS .. ~·····":>'!% .. ,,.,, .. ,,,,,,, .

20 30

__ : -.. ~.-.. -: .. -.-... h.~~;~.~·~·~·~-:-.. ~,_: ___ · ___ : ..... ] _____ _

50 60 70 80 90 100 110 120 130 140 150

1090

1080

1070-+--i---+---.--+---i---r--,---;---,---r---;~---j---;--+--i---+--r--+--.----;--,---;---,---;---,---+---;--+---.--+--;---r---,---r----,---;---,----j---;--+--.---+---.--+--.----r---,---;---,--r---,----t---;--+--.---+--r--+--,---r--1070

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30

1090

1080 ------.------------, - ------FL i:o1a. Os

-20 -10 0

695-00 10

lil. NORTHBOUND

I ~0

(\•

... (,'~~~-" ". <(. -4%

20

---------------

30 40 50 60 70 80 90 100 110 120 130 140 150

1090

1080

------------------------1070--l---i---i---i----i---i---.+---i--i---i---i---i---i---r---,--i---i---i--'---i---+---i--i---i---i---i---i---r---i---i---+--i-~---i---+--i--+-----i---i---i---r---i---i---i---i---;---i---i----i--i---i---i---i---i---r---i---i----i---i--l--1070

-150 -1<10 -130 -120 -110

1090

1080

, " • I

-150 -140 -130 -120 -110

w •I

-100 -90 -80 -70 -60

STR.(§) STA. 693+00.00 A022, 79.7' LT. UN PLACE) SMD, TYPE 2, STUB 16~ LF JO" RCP OUT RT. W/ CET,

,,,.: ........ : ........ : ....... ;, -. --.---:--·.···:·GRATE ·IE ·j0?6,2·6·

,,,: ........ l ..

-100 -90 -BO -70 -60

-50

-50

-40 -30

-4%

-20

~o ~­

·O'?j·

'· '?' :-2%

-10 0

694-00 10

lil. NORTHBOUND

I ~o

'" .. , ... r<..o<o

0· • -'.'!%

---------------~------

-40 -30 -20 -10 0

693-00 10

20 30 40

--------

20 30 40

50 60 70

50 60 70

HATCH LEGEND ES'SJ PHASE 1 CONSTRUCTION l?Z.2J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90

80 90

100 110 120 130

100 110 120 130

DUNCAN BYPASS SOUTH CONNECTOR STATE JOB NO. 20316(04)

140

140

150

1090

1080 <

150

STEPHENS COUNTY

SHEET NO. X20

Page 33: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1100

1090

1080

1070

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60

1100

1090

1080

1070

-150 -1.:io -130 -120 -110 -100 -90 -80 -70 -60

1100

1090

.:~.-.-. -.: .~~+-• --! __ : ___ ] _0~.--~ -·~· ~:~· ._._.· -·. 1080

-150 -1'10 -130 -120 -110 -100 -90 -80 -70 -60

-50 -40

-50 -40

''''' '''''[']'

-30

-30

~ NORTHBOUND

.. ....... ,,p,~'?~ ... """~~':'Cl,)~~~""" "'~-of' .. ~Oj . '"- .,, ~-' tp· !-2% S?j -2% tp· -fl%.

-20 -10

-20 -10

0

699-00 10

~ NORTHBOUND

~"' "' "·00;~'··

' S?·.

0

698-00 10

¢.;~· : 0rv· · d"

~ NORTHBOUND

'',''"\'b ,,.,,,,.,,,,,,OJ').· '''''t ··,·"·~~l\.rb" .._G ~(j

.·,' '~~%· ''"~·· ·:~2%· ' .. s:i~· '-2%' . ':~· -"!%

20

20

-------------------------·--

-50 -40 -30 -20 -10 0

697-00 10 20

30

30 40

' : .. ' "~ "

30 40

50 60 70 80

50 60 70 80

~----~-----

50 60 70

HATCH LEGEND fS'SJ PHASE 1 CONSTRUCTION

l2ZZJ PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80

90

90

90

1100

1090

1080

1070

100 110 120 130 150

1100

1090

1080

=-'1--1070

100 110 120 130 140 150

1100

1090

100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY ST ATE JOB NO. 20316(04) SHEET NO. X21

Page 34: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1100

1090

1070

-150 -1"10 -130 -120 -110 -100 -90 -80 -70 -60

1100 ........................ ·a .............. . @ iR

········~JJ

'·K 1090 "'i"· .. ,,,.I··

1080 . ,., ' . ' ' . ' ' ' ' . ' .. ' ~ ' ' ' ' ' ' . ' .. ' . ' . ' ' ' ' . ' ' ' ...... : ........ • ........ : ....... • ....... '.· ..... .", ..

1070

-150 -1"10 -130 -120 -110 -100 -90 -80 -70 -60

1100

··················lbc-[\ ·x===·=:x= .. ~x=· I~r 1090 """' "" ., ""''' ""('·

1080 ! .. ,,,,:,.,.,.,.: ....... : .... ,.,,! .. ,,.,,:,,,,, .. : ... , .. ,:,,,,.,,: ..

1070

-130 -120 -110 -100 -90 -80 -70 -60 I 10· •

-50

' • ' • i '

-50

-50

-30

.~ ri''

''"'" ""Q;, ..... : tp· .

-20

~" "' a~ ',,,,,,.,.. ...

~' . '

-10

Ii_ NORTHBOUND ,,,.

I .~

.. ,., .. 1\9.~ ..... , :cp·

0

702-00 10 20

STA. 701 +76.00 A022, END APPROACH SLAB

30

STA. 701 <52.00 A022, END BRIDGE 'E', BEGIN APPROACH SLAB

1080

50 60 70 80 90 100 110 120

l RAMP D STR.NO.@ STA. 700+8'1.3 A022 (IN PLACE) 1 00 L, F. 43"X26" RCPA

Z 171.1' RT. w/ 2-CETs

130

1070_J -------- --------------------

1080

1070

~·~====~~~~~~~~~~~~~==::::::::::::::::::,,,._ Ii_ NOR{HBOUNO ::J ,~:,a~"~~ !~:."'~,f J~,,,~"~ Jl .... ..... ... ..... ... 1000-15+0-. ~-:-1T60-: l"Or-0..cl;.;·~''"' -'"-3r'Xo;2;c6;~8".co'""P"A-A;,.T_1;;,o~'-:"'.c.%~-.,-oro-.~-~2-1r0-. ~-~-~~'0_6-:~~:-'-.~-+..1060

''""""ET''""k'i''''"'E1' "f" ··~· CAUTION:!!!

··············~·····

TI ,,,,., ............ ,,,,,( ,,,., ••••••• 1 •• , • , •• ." •••••. ST.Al00t~33,WERH~AD ... .

-30 -20 -10 0

701-00 10 20 30 50 60 70

.. . .:.. ..... : ....... .:.. ..... '""" .: ...... :.

-30 -20 -10 0

700-00 10

STA. 699'42.00 A022, BEGIN BRIDGE 'E', END APPROACH SLAB STA. 699+18.00 A022, BEGIN APPROACH SLAB

HATCH LEGEND ESS.'] PHASE 1 CONSTRUCTION l2ZZJ PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80

PO#ER CROSSING (4-WIRE:J UJN: ELEV..10941.0

90 100

90 100

······(··

110 120 130 140

110 120 130 140

DUNCAN BYPASS SOUTH CONNECTOR STATE JOB NO. 20316(041

1100

1090

1080

1070

150

1100

1090

1080

"' z _J1070 I u

"" " 1060

150

1100

1090

1080

150

STEPHENS COUNTY SHEET NO. X22

Page 35: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1100

1090

1070

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60

1100

1090

1080

-150 -1£10 -130 -120 -110 -100 -90 -80 -70 -60

1100

1090

1080

-50 -40

,"> ,,p lil. NORTHBOUND

· · · ·:.,_~0~.'. · · · · · · · · · · \ru~~: · · · · · ·! · · · ·;,.,rf~ro.1?'-.~.:. : s-i· _5503 : c;i·: +5.50% Pi· -t.50% :

-30 -20 -10 10 0

706-00 lil. NORTHBOUND

~· I ~()

.. "' ",,a,o;_,. :ip· -3.78%

. '':''. :, '. ': .. ' ,:. '' .:. '' ,:, ... :. '' .:, '' .:. '' ,:, '' j'

20 30 40

-------------~------~----------

-50 -40 -30 -20 -10 0

705-00 10

lil. NOR~HBOUND

l,o°"'~

20 30 40

1100

1090

1080

~- ':c=~=cc c=c --l-1 070

50 60 70 80 90 100 110 120 130 MO 150

1100

1090

50 60 70 80 90 100 110 120 130 MO 150

1100

1090

1080

1010-1-.---;---,--;---,.---r-T---r--,--;--,---;---,---t-.---;---,--;---,.---;--..---,r--,--r--,---;----,---t-.---;---,--;---,.---r-..--,r--,--;--,---;----,---r-.---;---,--;---,.---r-..--r--,--=::::::::;::::::;::::::;::::::;::::::::;::::=:::=-i_,o70 -1~0 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

704-00 lil. NORTHBOUND

.,,.~~~~ I .. .... a.OJ~frx) <p~ -2% :<p·

1100 1100

1090 1090

1080 1080

1070

1oso-c-,--r--;---T---;--,----;---T---;---,--;---i---r---T---;---,---;--T---;---T---;---i---,r---i---r---T---;----T--;--T---;---T---;---i---r---i---r--,---t--,---;--,---;----[--,--i---;----,,---;--,--+---i---i---,---i--.---i--T--i--i---,'--10eo -150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 1"10 150

10· I • 703-00 HATCH LEGEND

£:sS:I PHASE 1 CONSTRUCTION l22Zi PHASE 2 CONSTRUCTION ...-.:::::::: FUTURE CONSTRUCTION DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

ST ATE JOB NO. 20316(04) SHEET NO. X23

Page 36: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

Ii. NORTHBOUND 1100 .. ·1····~~"b~"·· 1100

' : · :ip•, ct.27, '

1090 1090

. f(lf'S, w I

1080 I 1080

I

1070 1070

1060 1060 -150 -1'10 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

709-00

Ii. NDRTHBDUND

1100 ' .. ~q0~ti'0 ":'. o"' b""°'~~ 1100 '''''''''''''''''''•'''''''''' '''"'''()..···

~TR .. N~~@] ST~·: 7os~J.s .. 9:_Ao2~. : oOJ . ·'

· · · \fl' ·~s:a'!. · .~::' tS.8'1, ' ' ,: ... ' 71;.~~. (IN PLACEl SMD, TYPE 2, STUB

1090 a4• RCP DU~ LT.:w; C~T.

1090 ·i···

tjR SMb AT ~TA. :1os+9a. 7

1080 1080 8

1070 1070

' ' !6~ . 2!1~: RCP ~AT. 1 iOO.% .

1060 1060 -150 -140 -130 -120 -110 -100 -90 -80 -70 ·60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

708-00

Ii. NORTHBOUND

o"' I o~"~, 1100 .. : a~?:. ' . 1100

' ·~· -\.2% PRES.RIW ('.,·: .s.8% .. I

.... :.J. 1090 I

1090

1080 1080

1070 1070

1060 1060 -150 -1'10 -130 -120 -110 -100 -90 -BO -70 -60 ·50 -40 -30 -20 ·10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

I• 10' •I 707-00

1 HATCH LEGEND

ESSJ PHASE 1 CONSTRUCTION

l2ZZJ PHASE 2 CONSTRUCTION --==::: FUTURE CONSTRUCTION DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

STATE JOB NO. 20316{04) SHEET NO. X24

Page 37: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

1080

1060

-150

1090

1070

1060

-150

1100

1090

1080

1070

-150

BR.(E)IL STA. 712+08.25 A022 (IN PLACE) 3-l'1'Xl2'X295' LG. RCB, SKEW 66° L.F ., 161.5' LG. LT. & 121.5'LG. RT.

ill_ NORTHBOUND

'b'O oOJ I 9:;9?0 r'\·

0ro'O· ,or:o

,oro "' ······························ ···············L",~% ··:·t;i>:···~5.8'f: ····~:···.;5'.S% .. ,¥i· ...... .

TOP OF SURFACING THIS PROJECT <TYPICAU

GRADING LINE THIS PROJECT !TYPICAL)

' . ' ' . ' ' . . ' ' ' . ' ' '

~==~=====~===~= ~,:,;,\= : ==~l-L ____ ._· __ ._c--U=~·····•·.i.· .. ·• •. · .. · .. ~ .....•......... ~.• .. · .. · .....•.... · .. · .. •.~~.·~·.·•.· .. · .. · .. ·.•.· .. · .. · .. ·.•.· .. · .. · .. ·.• -1 '10 -120 -110 -100 -90 -80 -70 -60

-140 -130 -120 -110 -100 -90 -80 -70 -60

-1"10 -130 -120 -110 -100 -90 -80 -70 -60

-50 -40 -30 -20 -10 0

712-00 10 20 30 40 50 60 70

STA. 711 +36.13 A022, END TYPICAL SECTION NO. 3C, END INCIDENTAL CONSTRUCTION

-50 -40 -30

-50 -40 -30

>So ~·

o" ' .~: ... ,:;5 .. 8%.,

-20

-20

". ~· o" '

ill_ NORTHBOUND

I cl:> o·

,cl' ~· -6.8% cp· -1.2%

-10

-10

0

711 +00

0

710-00

10

10

20 30 40

20 30 40

50 60 70

50 60 70

HATCH LEGEND ~ PHASE 1 CONSTRUCTION CZ2J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130

80 90 100 110 120 130

80 90 100 110 120 130

DUNCAN BYPASS SOUTH CONNECTOR STATE JOB NO. 20316(04)

1090

1080

1070 R/

PREI~ R/W I 1060

50

140 150

1090

1080

140 150

1100

1090

1080

1070

140 150

STEPHENS COUNTY SHEET NO. X25

Page 38: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1070

1060 ·. " " . "~ "

PR~1/}IW

I I

1060

1050-+---.--j--;-----j---,---+--r--r--,--+---,-r---,----r---.-+--r--i----r--+--,--r---,--+---,-----r--,----r---.--r--r----t---,----r----.--r---r----j---,-----r--,----r---.--r---.------t--r---r----.--r---r--+---,-----r--,----r--r--r----.---i-1050 -150 -1'10 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20

1080

1070

1060 -----~-----------~

-10 0

648-00 10

lil. SOUTHBOUND . . . . . . . I

20 30 40

'.'\'b ~·

. : . : ,61,/j. : ' : . : ' :

50

.. : ...... )~~.q,,.aQz ____ d?~----~·-·=1:.?o~ ~-!--: __ ! ___ : ~ ..................... , ..

60 70 80 90 100 110 120 130 140 150

1080

.... 'p ES. RIW

1610

. ·-·• ·_· ·_·• ·_·. -•. _ .. •~. I 1060

1050-+--i--+---i----t---i---+--r--ir---i---+---i--r----T----r--i--+--ir--T---i---r--,---;----,---+---,-r----,--+---,----r--,----t---.--j--,-----j----,---+---,-r----.----r---.--;--,---;----,--;--,-----;----,---+---,-r----,----r--i--+---i--t-1050

1080

1070

-150 -1'10 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0

647-00 10

lil. SOUTHBOUND I

: : : : : : : . : . : : : : : : : : ] <.:irv

L_____:_~~====~::::::::=:;;.=~~~::t:::::~·~·" .. ·~····~·~···~·~·····~···~·.·~·•·•·~···~···.~····~.··.·~···~·r·.•·•~·•=•=••=· =• =• ·=· •=•=~=• =• =·. •====•·=•·~;r;··· ·~. ~~ff f I-2

po% ·--: ____._~--~--

20 30 40 50 60 70 80 90 100 110 120 130 140 150

1060--+---i---+---i---+---i---r--,-----;----i----r---,----t---,--+----,---+----.--+---i---r--i--+---i---i----;--;----,-----j----,--+---,-----;----,---+--.--ir---i--;----,----;----,---+--,---+--,---;----,--r---,---j----;----t----,---+---i---+---i---r---,-+--1060

10'

-150 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20

1080

1070 ____:==----~ ·~· '---=CCCC _______ ~--~---~·~?~·~~~ .

-10 0

646-00 10

lil. SOUTHBOUND .I

20 30 40 50 60 70 80 90 100 110 120 130 140 150

PRES.RIW R/W .. r .. 1

1080

-y-":-/---':T/ --;i-:r---,-.• ;Lj ,,~-~.-~.-~ I 1070

'.;'

1060 --+---i----+---i-----i---c---i--+---i--ir---i---+---i---+---i---+---i--+---i---r----i--r---i--t--i----r---i---+---i--+---i--+--i----t--i-i--t----;--j----i---+---i---+---i---r---i--t--i-i--t--i---+---i---+--i---+---i--+---i--+---i--f--1060 -150 -1'10 -130 -120 -110 -100 -90 -BO -70 -60 -50 -40

•I A.C, 0.00 S.F. v.c. 0.00 C.Y.

I A.F. 0.00 S.F. V.F. 0.00 C.Y.

AREA CUT CA.CJ VOLUME CUT CV.C.) AREA EM8. CA.FJ VOL. EMB. +15% (V.F.)

cur /FILL TABLE

-30 -20 -10 0

645-00 10 20 30 40 50 60 70

HATCH LEGEND cs:::J PHASE 1 CONSTRUCTION l22'ZI PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(04) SHEET NO. X26

Page 39: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1070

1060

-150 -140 -130 -120 -110 -100 -90 -BO -70 -60 -50 -40 -30 -20

1070 ""'"""""'""" """"' .. ,,,,.,, ...... ,,,,.,,,,,, .. , .. , ""'"'""'"'"'

1060 ,.,,.,,: .... ,.,,:.,,,.,,: ....... : .... ' . : ' : ' : ' : . : .

-:-~~:--:--:--:-·-:-:--:--:·-t~~·~· 1050

-150 -140 -130 -120 -110 -100 -90 -BO -70 -60 -50 -40 -30 -20

1070

1060

1050

1040

-150 -1'10 -130 -120 -110 -100 -90 -BO -70 -60 -50 -40 -30 -20

1070

1060

1050

-150 -1'10 -130 -120 -110 -100 -90 -BO -70 -60 -50 -40 -30 -20

I• 10' •I A.C. 0.00 S.F. v.c. 0.00 C.Y,

1 A.F. 0.00 S.F. V.F. 0.00 C.Y.

AREA CUT (A.C.l VOLUME CUT (V.CJ AREA EMS. CA.F.l VOL. EMB. +15% (V.F.l

CUT /FILL TABLE

-10 0

652-00 10

lil. SO~BOUND .I .. ,o~.······.············

-4.00% :~· -2:00%

-10

-10

-10

0 10

651-00

if lil. %0UTHBOUND ,,,,,,, .. t.: ... ,,,, (

0 10

650-00

cF' lil. ~UTHBOUND J0''''•'''''''',''''''''•'''

0

649-00 10

20 30 40 50 60 70 BO 90 100

"""""'"" "'""" """:""'"'";""" ' ""':" -------------~~ : ... ~ ... : ... :.

20 30 40

20 30 40

20 30 40

-------,-,,---~~

50 60 70

50 60 70

50 60 70

HATCH LEGEND CSSJ PHASE 1 CONSTRUCTION l2ZZJ PHASE 2 CONSTRUCTION --==:::'.. FUTURE CONSTRUCTION

BO 90 100

BO 90 100

BO 90 100

110 120 130

110 120 130

k

110 120 130

110 120 130

DUNCAN BYPASS SOUTH CONNECTOR

STATE JOB NO. 20316(04)

140

140

140

140

150

150

150

150

107f'RES. R

I I

1060 I

1070

1060

1050

1070

1060

1050

10'10

PRES. R/W

10701

I

1060

STEPHENS COUNTY SHEET NO. X27

Page 40: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1070 1070

1060 1060

1050-j---i--+--i--+--i--+--i---+---i---+---i--+----i--+--i--+--i--+---i---+--i---i+----i---+---i--+----i--+--i--+--i--+---i---+--i---i+---,--+---i--+---i--+--i--+--i---+--+---+--i--+----i---+---i--,----i--+---i---+--i----l-1050 -150 -140 -130

1070

. : . : 1060 :~·~·~"

. : ' ' . ' : . ' ' j '

-150 -140 -130

1070

1060

-120 -110 -100

. . . : . . . ~ . . :· . . . :· . . . r . . : .... ~.~~·>·

-90

-.--. --. --.--

-120 -110 -100 -90

-80 -70 -60 -50 -40 -30 -20 -10

-so -70 -60 -50 -40 -30 -20 -10

0

656-00

0

655-00

10

10

20 30

20 30 40

50 60 70 so 90 100 110 120 130 MO 150

50 60 70 so 90 100 110 120 130 MO 150

. ,,,.,,,,.,,,,,,,,, . '"''''''''''''' '''. "''':········:········:·······:·······;·······'.·'''•'·:········:"'''''

...... : .. ~.t-~K~ : .. · ........ ! .... : .... · .. ·:· : .. ; ...

',,, '"!~·~·~" '":'·"'"'>"''":"'"":"""';""" '"""'(""'':""' :,,,,:,,,,i,,,,: .... :. ' ~--:._ __ :,,: : : : : . ·:·.' '.' ' '~~~-·· _· --~-· _· ·_: _· ·_·

1070

1060

1070

1060

1050-j----,--r--,---;----,---r--,----,r--,--+--,--r---,--+---.-+--;--t----,---+--,----,c--,--+--,--+----;---j----,--r--,---;----,---r--,----+--,---;--,--r---,--+---,-+--,--+---i--+--,----+--,---;---i--i---i--+--i--+--,---t-1050

1070

1060

1050

m •I

-150 -140 -130 -120 -110 -100 -90 -so -70 -60 -50 -40 -30 -20 -10 0

654-00 10

IP_ SOU~BOUND

: . : . : . : . : . : , : . : : . : . : . : . : . ·) .. ·;,_o~~: ................ ..

·. '"'! .• ~Ttrl °CT=J•• ••..• j •• i i I I~JJ'rf, .. }~

20 30 40 50 60 70 so 90 100 110 120 130 MO 150

. . 1070

1060

/ =t:;z:;J ·.

. :-:: '~<t~W-~c.•·~~.:· ___ . ___ _ .:,,,,: ... i. ,,-,-__ --- --

----~--

--+--+--+--i---+---i----r--,--r----,---+----,-+---,i---;----i--+--i---+---i---+---i--+----i--+---i--+---i--+---,-+--,--+--+----r---i---i+---,--+----,-+---i--+--i--+--i---+--i---+---i---i+----i--+---i--+----i--+--i--+--i----l-1050 -150 -140 -130 -120 -110 -100 -90 -so -70 -60 -50 -40

A.C. 0.00 S.F. v.c. 0.00 C.Y. A.F. 0.00 S.F. V.F. 0.00 C.Y.

AREA CUT (A.CJ VOLUME CUT (V.C.l

-30 -20 -10 0

653-00 10 20 30 40 50

q_ DETOUR

60 70 so 90 100 110 120 130 140 150

HATCH LEGEND

PRE

1 AREA EMB. (A.F.l VOL. EMB. +15% {V.F.l

I

bSSJ PHASE 1 CONSTRUCTION l2'ZZJ PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

CUT /FILL TABLE STATE JOB NO. 20316(04) SHEET NO. X28

Page 41: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1080

1070

1080

1070

lil. SOUTHBOUND . . . . . . . . . . . . . . . . . . . . . . . . I . .

''""'~"'"'"'"1'"'""':""'"!""""':""'"f"'"':""""!"""':"""'[ : : : : ! : : : : : : : : : : : "" ~ .... : .... : .... : .... : ... : ... : ... : ... : .... : .... :. · ....... :. , .j ... , .. : .... : ... : ... : ... : ... : .... ! .... : .... : .... : .... :. . ·. ·,o"\t;y· .. :

---~-~~~~~ . . . . . . . • .. ~· ~-···· ..... ~ ·.·=.· -~.•---~.. ~ .. ·:::;T7c.•·:;···~~·.·.·.·~····~772···=··it•.•.·~3•.•:;· ~-.·~ .. · ·~· 2"#4·:'!)·.ob~.~-=l-~-;;•-;;:;-~;;2 .. 0~.cz~'.·~·2····=···=:···::• =-~Z7' q rn ••••••• • ••••••••••••• :....... l pETou •. R·· ... • • ~ ~~ • -~~~~::. :::::~~;:. =·• = .. =-:--=_,___:o~ .:=.:: . .:~:::::.~r=·"·"·~•=.=.:::;;=;;;;~=o:-="=~::::::::::::.:J~.~~~. -~.

-150 -140 -130 -120 -11 0 -100 -90 -BO -70 -60 -50 -40

. ' .. ·' '' .: .... '' ';.

-30 -20 -10 0 10

660-00

lil. SOUTHBOUND I ..

20 30 40 50 60 70

. . • . • . ,oo"~~ . • . • . • . • l D~TOUR

BO 90 100 110 120 130 140

: ' : .,,',,,,, .. ~ ... ~,00%''~'' 0' '~2:003' : . : '.,,,,,,,:,,,,,,,.',,,,,,,,:, ',,,',' ,,: ., .. ,;.1 .... : ,,.,.: ........ j ........ : ....... ~ ..... ,,;,,,,,.,~ ..... ,,: ... ,,,,,;,,,,,,,.: ........ : ........ , ...... ,!·······: .. . < :;zj;; ...... ·. s2=:z+=+ . < . Z&i.i;k;:,_;:;2i'¢;i;; .. :s• ;:;:::,~c=c=:zz:-'.'.: .. z/ .;:::A~··.~-··.·,,,,~~-..• ·:::·=:j·.· ·.·=· = .. =• .== .. =t°• = .. :-o~c;;:;. ::: .. ;:.;:=--:;::., .. •· ~~~-~=c_ ~~~

1080

1070

150

1080

1070

1060--t---i----r---,---r---i----r--,--t--,----r-----,---+---i-----r---,---r----,----r---,----r--,----r---r----i----;---+---.-----j----,---r--.----r---,---t--,----r-----;----t----;----j-----,---r---,----r---,----r---,---r---r----i----;----t---.-----j----,---r--.---+---,---+-1060

10'

-150 -140 -130 -120 -110 -100 -90 -BO -70 -60 -50 -40 -30 -20 -10 0

659-00 10 20 30

l S~HBOUND q_ DETOUR

40 50 60 70 BO 90 100 110 120 130 140 150

10701-=---- .

1060~, I I ~-,---1~-,--I-~ -~-~~~~_,__··~·····~···.~q·~····-··~~···~~··~····~····~J~a~·~ili~··~~~~i;l~~·~~j~··~~~~.·/7··~~··/~F;~·~~···~····~····=~Fq-~··=-qq~··~~~-~~~-------- d1= -. --: --. : : : . : : ; : v~- : : : : : : -------------

-150 -140 -130 -120 -110 -100 -90 1 i i i I I i i i i

210

I i i 610

I I I 1 I ' I , I , I ' I , 1060

-80 -10 -60 -5o -40 -30 -20 -10 o 10 3o 40 so 10 80 so 100 110 120 130 140 150

1070

1060

1050

•I

658-00

······•··· ...•.. ···························.················.······························································~~~::~;.ND················~=·· -----~----· .. · .. · .. -.•. · .. · .. · .. ·.•.·-=----------~=~-~~222z±-±--r-r.·

1070 ' : '.'.'' '.' '."'' .. '' ,, .. '' '' '.''.''. '•'.'.'' ·:'.' ''.'.' ·:'.''.' '•''.'''' '..'' .. ''''' ''''.;'.'.' .. , ''.'.' ·.·'. ' .. '.''.''.'' ''.'" ,, ' • .... ·. ~.-.-.• -. -~~ .. ~~:~~----j-~~-=~~~ 1060

-+--i---;---i----t---i----r---i--r---i---r--i--;----i--+--i---;---i---+---i---+--i----;---i---r-i--;----;--+-.---+---i--+--i---r---i----t----r--+--i--r---i---r--i--;----i--+--i---r---i---+---i---+--i----,r---i---+---i---+---i~-+-1050

-150 -140 -130 -120 -110 -100 -90 -BO -70 -60 -50 -40

A.C. 0.00 S.F. v.c. 0.00 C.Y.

1 A.F. 0.00 S.F. V.F. 0.00 C.Y.

AREA CUT (A.C.) VOLUME CUT <V.C.) AREA EMB. !A.F.l VOL. EMB. +15% (V.F.l

CUT /FILL TABLE

-30 -20 -10 0

657-00 10 20 30 40 50 60 70

HATCH LEGEND

E3S:J PHASE 1 CONSTRUCTION l?ZZJ PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

BO 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(04) SHEET NO. X29

Page 42: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

I•

PRES.R/W 1080

1070

1060

-150 -140 -130 -120 -110 -100 -90 -BO -70 -60 -50 -•o -30 -20

1080

1070 : ' .. ' ' . ,' ' ' ' ' ' ' ' ' : ' ' ' . ' ' . ' ' ' ' ' . ' ; ' .

1060

IP_ SQl/.i'HBOUND ....... 1 .. ,o~ .................. .

-4.24% ~\:::>· -4;243:

-10 0

66~-00

10 20 30 •o 50 60

1080

1070

1060

70 BO 90 100 110 120 130 HO 150

1080

1070

1060

1050-l---i----i---i---+---i---i---i--+---i--i------i--.;--i-----+---;----i---i---i---i---i---i--+--r---.,~-i----+---i---+---i---+---i---r---i--+---i--r----i---i~--;----j----;---+--i---r---i--+---i--+--i--t-----i---+---i---+---i---+--i---+---i---l-1050

10·

-150

1080

-150

1080

1070

-140 -130 -120 -110 -100 -90 -BO -70 -60 -50 -•o -30 -20

-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -•o -30 -20

-10 0

663-00 10

IP. SOUTHBOUND

L ~,,~o ,o

·::....·4:003 ·~\:::>·· · · +<853·

-10 0

662-00 10

IP. SOUTHBOUND

20 30 •o 50

20 30 <o 50

60 70 80 90 100 110 120 130 HO

60 70 80 90 100 110 120 130 HO

: ; : : : ~ : : : : ""..] "" "~~;~" :~--·: -~-++·~~~·-:---:--:----:.___j_"»-: : . : . : · : · ~-4,00% ~\:::>.""?'., - 2!00% · : · : · : · : · : ' : : ' : . It DETOUR

······· · .. ·· .. ~~~··_· ~::=sz:z~::z::z::zz:;z:z~~z ------ -- .... ==~L ~~~----7--~~~ ' . . '

150

1080

1070

150

1080

1070

1060 -l---i---r---r-~i----i---t---i--+--i--+--i---i---i---+---i---i--~~r-~--i---i--1---i---i---i---i---r---i--i---i---i--i---i---+---i--1----i--+--i---i---r---i--i---i---i--i---i---i---i--1---i---i---i---i---~--i---i---i--T--i~1060 -150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50

•I A.C. 0.00 S.F. v.c. 0.00 C.Y.

I A.F. 0.00 S.F. V.F. 0.00 C.Y.

AREA CUT (A.C.) VOLUME CUT CV.CJ AREA EMB. (A.F.l VOL. EMB. +15% (V.F.J

CUT /FILL TABLE

-•o -30 -20 -10 0

661-00 10 20 30 •o 50 60 70

HATCH LEGEND ~ PHASE 1 CONSTRUCTION EZ2J PHASE 2 CONSTRUCTION -e::::::: FUTURE CONSTRUCTION

80 90 100 110 120 130 HO 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(0..:J) SHEET NO. X30

Page 43: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090 1090

1080 1080

1070 1070

1060 1060

1050 1050

1040-J-~--..-~-r-~i----;~-,~-r-~.-~r-----,~---r-~--,~r-----,~---r~--,~-;-~,-----;~-,~--r~.-~r----,~---r-~--.~r--~,----;-~--,~-r-~,-----;~-,~--r~.-~r----,~---r-~--.~-r-~,----r~--.~-r-~,---,r---,~--r-~-,---~-r----,~---r~--..-~-r-~,----r~---.~--r-~.-~r-1040

-150 -1"10 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20

1090

1080

1070

1060

1050

-150 -1"10 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20

1080

1070

1060

1050

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 10· •I A.C. 0.00 S.F. v.c. 0.00 C.Y.

I A.F. 0.00 S.F. V.F. 0.00 C.Y.

AREA CUT <A.C.l VOLUME CUT <V.C.J AREA EMB. (A.F.l VOL. EMB. +15% (V.FJ

CUT /FILL TABLE

-10 0

667-00 10

~ SOUTHBOUND . I

. " ..,,, ...,Ci. '

.... ,.!.7'.7.·.~?~ :Qi• ·-7.BQ3 ~:.

-10 0 10

666-00

~ SOUTHBOUND

~ ,o PRES. RI ...,oi.rcr

~e·.·533·. ·M~· ........ ·.::0:·533· ....

-10 0 10

665-00

20 30 40 50 60 70

20 30 40 50 60 70

20 30 40 50 60 70

HATCH LEGEND CSSJ PHASE 1 CONSTRUCTION E2Zi PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

1090

1080

. P~ES. fl/W . I •· 1070

I .·. I

1060

.... j_ .. _._.: J_._:~. 1050

80 90 100 110 120 130 140 150

1080

1070

1060

1050

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO, 20316(041 SHEET NO. X31

Page 44: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

I•

lil. SOµ;pHBOUND ............ , ... ,o'?.~: ................ .

-7.803 ~~· :-7,893 . 1090 1090

1080 1080

1070 .... , ""'' •'"" ""'" "' 1070

····zz·············· ··•····~·········· ' ' : ' ' . : . ' . . ' ' ' . ' ' ' ' ' ~ ' . ' ' ' . : ' ' ' . ' ' ~ ' ' ' ' . : ' ' ' ... ·: ... ' .. .. . ' . .

: . : ' ' . . : . -'-"'"".C'°-'2-'-'-'C•C'L:..:_~---(--~---"--~~'---'--L--+.L-"----__L_-,"--"'-i--L,---'---;~___,-~,-.L---,-~~/--c4--C~---<----"-;--L--,~+--'----~·.,-•_ • .... •. •· •. ~ .. -~-e---"-;~-~---;--~--,~--·,_-·~·-· • •. ' ···--"---,-"~"-~

1060 1060

1050-'----i-----r---i---+---i---+----i--+--i--+---C---i--i--;----i-----r---i---+---i--+---i--+--i--r--.'----i---i---+---i---+---.---+---i---r----i--+--,---r---i----t---i---+---,---+---i---r---i---r----,---;---,---r---i----+--,--+---i---+---.--~1oso

10

-150 -1"10 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20

1090

1080

1070

1060

-10 0

670-00 10

lil. SOUT_HBDUND .. ! .. ·~ocqry~ ... ·:·· ..... ·.· ..

.-,7,~0.3, -~~· .. -7.893

20 30 40 50 60 70 80 90 100 110 120 130 140 150

1090

1080

1070

1060

1050-+---i---+---r--+---,---+---r--t--,---r----,----t--,--;----,--r---.---+---,----;---,---j---,---jC---;--;---,--+--,----r-----.---r---.--r---,---t---;---j---;--;----,--+--,--+---,----r---.--r---,---c---,---j---;--;---,----+---.---+--,--+-1050 -150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20

1040

-150 -140 -130 -120 -110 -100 -90 -BO -70 -60 -50 -40 -30 -20

•I A.C. 0.00 S.F. v.c. 0.00 C.Y.

1 A.F. 0.00 S.F. V.F. 0.00 C.Y.

AREA CUT <A.C.l VOLUME CUT (V.C.l AREA EMB. (A.F.l VOL. EMB. +15% <V.F.l

CUT/FILL TABLE

-10 0

669-00 10

'"'''' ...... ry~ ... ,,,,,,,,,,,, Ii_ 8,§l8THBDUND I ' · ·3 · ~ 't8b3' . ~9i·· ' '.""' 7·89' . : .

-10 0

668-00 10

20

20

30 40

30 40

50 60 70

50 60 70

HATCH LEGEND [S'S3 PHASE 1 CONSTRUCTION ['.2Zj PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(04) SHEET NO. X32

Page 45: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1050

-150 -1"10 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20

1090

1080

1070

1060

1050

-TI5!ID -1"10 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20

1090

1080

1070

1060

1050

-150 -1"10 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20

I• 10' •I A.C. 0.00 S.F. v.c. 0.00 C.Y.

1 A.F. 0.00 S.F. V.F. 0.00 C.Y.

AREA CUT CA.CJ VOLUME CUT (V.CJ AREA EMB. <A.FJ VOL. EMB. +15% CV.F.l

CUT/FILL TABLE

Ii_ SOUTHBOUND

. . ~4663 J~ ~o"'~"':oo3

-10 0 10

673-00

Ii. SOUTHBOUND .,,,,.

-4.'6¢3

I .,~ · ·~\3' ':':~. :·"'"'~.s93·. · ·

. " ~ .

' ' ' . ' .

-10 0 10

672-00

Ii. SOUTHBOUND

I ,,.

~ ,o"'

:-5.893 :(:)· ,. -5.B93

-10 0

671-00 10

20 30 40

20 30 40

20 30 40

50 60 70

50 60 70

50 60 70

HATCH LEGEND £SS.:I PHASE 1 CONSTRUCTION EZ2J PHASE 2 CONSTRUCTION ..-::=:::::_ FUTURE CONSTRUCTION

80 90 100

80 90 100

80 90 100

1090

1080

1070

1060

1050

110 120 130 140 150

1090

1080

1070

_: __ . __ : _. 1060

1050

110 120 130 140 150

1090

1080

1070

1060

110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316{04) SHEET NO. X33

Page 46: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

I•

1090 1090

1080

1070 1070

1060-f~---T~-+~-i-~--r-~-i-~+-~-i-~t-~i--~r-~'-----i~--i~--+~--i-~-+~~~--r-~-i-~+-~-i-~t-~i--~r----i~--+~---T~-+~~~--r-~-i-~+-~-i-~t-~i--~r-~-i---i~~~--+~~~-+~-i-~--;-~-i-~+-~-i-~t-~i--~r----i~--+~--i~--+~--i-~-+~-i-~--r-~-i-~+-1060

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20

1090

1080

1070

-10 0

676-00 10

!!_ SOUTHBOUND

Lc~"~:,o·o··· · :-4.00% . ' ,t., O,

20 30 40 50 60 70 80 90 100 110 120 130 140 150

1090

1080

1070

1060-f~--i-~-+~-i-~-;-~-i-~+-~-i-~t-~-i-~r----i~--+~--i~--+~--i-~--r-~~~-r~-i-~t-~i--~r-~-i---i~--i~--+~~~-+~-i-~--r-~-i-~+-~i--~t--~-i-~r-~~--+~---T~-+~--i-~--r-~-i-~-r~-i-~t-~i--~r-~i----i~--i~--+~--i-~-+~-i-~~~-i-~-r~-i-~+-1060

1090

1080

1070

1060

10· •I

-tso -140 -130 -120 -110 -100 -9o -80 -10 -60 -so -4o -3o -20 -10 o 10 20 3o 40 50 so 10 ao 90 100 110 120 130 140 150

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20

A.C. 0.00 S.F. v.c. 0.00 C.Y.

1 A.F. 0.00 S.F. V.F. 0,00 C.Y.

AREA CUT (A.CJ VOLUME CUT (V.CJ AREA EMB, (A.F.l VOL. EMB. +15% CV.F.l

CUT /FILL TABLE

-10

675-00

II_ SOUTHBOUND

I '/;~

·.rp•~0~··"'"'2:·003

0

67"1-00 10 20 30 40 50 60 70

HATCH LEGEND £S'S3 PHASE 1 CONSTRUCTION l22ZJ PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

1090

1080

1070

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(04) SHEET NO. X34

Page 47: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

1080 .... : __ . __ ..

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20

1090

.. .R/W

1080

1070

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20

1090

1080

1070

1060

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20

1090

1080 . • .. R[ . : . • . ' : . : . : . : . :

·~··-·~-=-=~~LL-- b==-····· 1070

1060

-150 -140 -130 -120 -11 o -100 -90 -80 -70 -60 -50 -40 -30 -20

I• 10· •I A.C. 0.00 S.F. v.c. 0.00 C.Y.

1 A.F. 0.00 S.F. V.F. 0.00 C.Y.

AREA CUT CA.CJ VOLUME CUT CV.CJ AREA EMB. CA.F.l VOL. EMB. +15% (V.F.l

CUT/FILL TABLE

Ii_ SOUTHBOUND

....... 1 : '"'

: : or:qri.,· ' ' ' • ' • • ,: ' !\, I ' • ' : ' ' • : '

-10

+1.QO% ~<p· ·+a.06%

0

680-00 10

Ii_ SOUTHBOUND "'" .. 1 ~fl

,o~ .+1.00% ,~· ·:+a.co~·

-10 0 10

679-00

in_ SOUTHBOUND ,,~

"'""" "'"""" I . <:J>"' ' .

.. . . . . :.~?·~~~-~~·. :-1;-q.;5f%

-10 0 10

678-00

Ii_ SOUTHBOUND

I "" .,~· ,o.'. :-4.09% ~ <p· :+2.9~%

-10 0 10

677-00

20 30 40

20 30 40

20 30 40

"'"

..

20 30 40

1090

1080

50 60 70 80 90 100 110 120 130 140 150

1090

1080

1070

50 60 70 80 90 100 110 120 130 140 150

1090

1080

1070

1060

50 60 70 80 90 100 110 120 130 MO 150

1090

1080

1070

1060

50 60 70 80 90 100 110 120 130 140 150

HATCH LEGEND (SS3 PHASE 1 CONSTRUCTION ~ PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

STATE JOB NO. 20316(04) SHEET NO. X35

Page 48: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

R/W

I

I•

1090

1080

1070

"150 -140 -130 -120 -110 -100 ·90 ·80 -70 -60 -50 -40 -30 -20 -10

1090

1080

1070

-150 -140 -130 -120 -110 -100 -90 ·80 -70 -60 -50 ·<O -30 -20 -10

R/W 1090

1080

1070

0

684-00 10

II. SOUTHBOUND I

20

' ...... : ....

0

683-00 10

11_ SOUTHBOUND I

20

30 <O 50 60 70

30 <O 50 60 70

1090

1080

1070

80 90 100 110 120 130 140 150

1090

1080

1070

80 90 100 110 120 130 140 150

1090

1080

1070

1060--+~~~-+~~~-r~~~-;--~~~r-~~~1--~~--i~~~-+~~~-+~~~-r~~~-r-~~~;--~~~r-~~-T~~~-+~~~-r~~~-;--~~~r-~~~r-~~--+~~~-+~~~-+~~~-r~~~-;--~~~r-~~~r-~~-T~~~-+~~~-r~-i-~-i-~~~-1-1060

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 ·30

1090

1070

1060

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 ·50 ·<O ·30 10' •I A,C, 0,00 S.F. v.c. 0.00 C.Y.

1 A.F. 0.00 S.F. V.F. 0.00 C.Y.

AREA CUT (A.CJ VOLUME CUT CV.CJ AREA EMS. <A.FJ VOL. EMB. +15% <V.FJ

CUT /FILL TABLE

·20 ·10

·20 -10

0

682-00 10

SOUTHBOUND

0

681-00 10

20

20

30

30 <O

50 60 70

50 60 70

HATCH LEGEND E.s'SJ PHASE 1 CONSTRUCTION l2'Z2J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

1090

1080

1070

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(04) SHEET NO. X36

Page 49: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

SOUTHBOUND

1090 1090

1080

1070 1070

1060-t-~-i-~+-~i-----t~--i-~--r-~,--~;----,~-;-~-,--~i-~.---j~--i-~-r-~,-----jj-----,-~--j-~,---~;----,~-;-~-,--~+-~.--c~---,-~--r-~,-~r---.~-r~.---~;--.~-r~-,-~-r-~.----t~---,-~--r--~+-~j----,~---;-~-,--~r-~.--c~---,-~-r-~,--.r----,-~-r~-,--~t-1060

-150

1090

1080

1070

-150

1090

1080

1070

-150

1090

1080

1070

1060

-150 10· •I

I

-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30

-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30

···,· ,,,,, .. , ..... , ..... , ......... , ........ ,.,,.,, ..... ,,.,,., .. ,,., .. ,,.,, .. , .. : : : : : : : : ' : ' :

-20

-20

-10 0

688-00 10

fil_ SOUTHBOUND . . . . . . . . . . . . . . . . . . . . . . ! . . . .

-10 0

687-00 10

SOUTHBOUND

20

20

30 50 60 70 80 90

30 40 50 60 70 80 90

--. ----. --,~.-.. -... -,-.... -..... -.... -J--... -... "'.•.c-7-±--rC-7~"'"'7"7CC77C"?Cc~-'"'"7"'"~·-rcc7--~'~"""·~-~-'-r·~-7~r""7;"7-"'7~'.~'Tf-""T--r~7"7-"-or-"7--7~'~~-~~-~~-~77

-140 -130 -120 -100 -90 -80 -70 -60 -50

-140 -130 -120 -110 -100 -90 -80 -70 -60 -50

A.C. 0.00 S.F. v.c. 0.00 C.Y. A.F. 0,00 S.F. V.F. 0.00 C.Y.

AREA CUT (A.CJ VOLUME CUT (V.C.)

AREA EMB. (A.FJ VOL. EMB. -t15% CV.F.J

CUT /FILL TABLE

-40 -30 -20 -10

-40 -30 -20 -10

0

686-00 10

fil_ SOUTHBOUND .J

0

685-00 10

20

20

30 40

30 40

50 60 70

50 60 70

HATCH LEGEND fSS3 PHASE 1 CONSTRUCTION

l2'ZZJ PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90

BO 90

100 110 120 130 140 150

1090

1080

1070

100 110 120 130 140 150

1090

1080

1070

100 110 120 130 Ho 150

1090

1080

1070

100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

STATE JOB NO. 20316(04) SHEET NO. X3 7

Page 50: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

1080

~150 -1-'10 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40

1090

1080 ... """'"""""' "•'

1070

1060

-150 -1'10 -130 -120 -110 -100 -90 -BO -70 -60 -50 -40

I• 10· • I A.C. 0.00 S.F. V.C. 0.00 C.Y.

I A.F. 0.00 S.F. V.F. 0.00 C.Y.

AREA CUT (A.C.l VOLUME CUT (V.CJ AREA EMS. !A.F.l VOL. EMS. +15% fV.F.J

CUT /FILL TABLE

-30 -20 -10

-30 -20 -10

lil_ SOUTHBOUND ........ L

0

690-00 10

SOUTHBOUND

0

689-00 10

20 30

20 30

50 60 70

50 60 70

HATCH LEGEND ESS:J PHASE 1 CONSTRUCTION l2:2ZJ PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

1090

1080

80 90 100 110 120 130 140 150

1090

1080

1070

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(041 SHEET NO. X38

Page 51: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1120

BENCHMARK 220 2" ALUMINUM CAP STA. 695+12.54 q;_ SURVEY, 441.49' RT. -ELEV-. = 1066-.568 BENCHMARK 221: "X" ON NORTH END HEADWALL STA. JQO+Ti'.3J_ t_SURV_EY, _ _738_.3Sf_RT. ELEV. = 1059.136 BENCHMARK 222· 2" ALUMINUM CAP -sTA_ 700+36_ 18 -ii:_ SURVEY, 224.16'- lT ELEV 1077-264

111 0 f-B_E_N_CH_M_A_R_K_2_2-,-, _8_0_0-. -NA_C_ .. -'"-.-P-DW_E_R_.-FO_L_E _ _,

STA. 700+21.31 {SURVEY, 1394.99' LT. ELEV.= 1103.709

1100 A021 : V.C. = 830'

K = 162

'--~~~~-~A~02~2~,v~·~C~.,,C-~1~1~30~'-~~~ 1090 ,- K 230

EXIST. GROUND LINE AWNG !fl_ SOUTH N-5 RIWP (/JD2!!

0 0 + 0 en <D

~ Cl) = 0 u :_:__j

<[ ~

z w Q u = z l5 w m

C\J C\J 0 <[

1 080 F==F=l=N=l=SH=E=D=G=RA=D=,========oc===~~J

1070

1060

1050

1040

1030

685+00

AT ~ S-B (A021)

N 0 ~ N

ro 2'~ + w WO ro -w

> - w > ~ ~w

6

N 0 ITT

8 9 690+00

~

u w --:J 0 Q' Q_

ro 0

N N 0 0

ro ro 0 0

2

0

::: 0

3 4

0 0 + L{)

en <D

R/W

30" RCP

695+00

18, T-1-S, R-7-W

STR .:NO. <J) STA. 699+21, 1 A022 CONST. 6' 1-.D.--MANHOLE 2-12.2= RT. STUB ioo:L.F.- 36" RCP TO OUTLET CET AT STA. ?99+9B.6 A022, :344.~)' RT.

mm 0 0

::; 0

mm ro ro ~ ~ mm 0 0

::; 0

6 8 9 100+00

:ii 0

20+00 OBTAIN

UTILITY EASEMENT

• 0 R/W

TOP OF CUT

0 0 + 0

r-

REV. NO

REVISIONS DESCRIPTION DATE

PRES.R/W

SEE SHT.N0.26 FOR MORE DETAILS OF RAMP C & D CONST.

SEE SHT.N0.27 FOR MORE DETAILS OF SEMINOLE RD. CONST.

c=~C>'i--,C'i'"-'2'-._ R/W SEC 7, T-1-S, R-7-W OBTAIN UTILITY

EASEMENT

O~~ ~;rj

UNDERGROUND TELEPHONE UNE CROSSING AT STA.28+45

STA.28+97.30 30" X 7CY IREMOVEI 4 CGMP WITH CONG.END SECTION 5.0.[ 31.?<Y LT. WEST FL ELEV.= 1061.41

~L STA.28+52.00 30" X 41' (REMOVE) CGMP WfTH CONC.END SECTION SD.[ 20.20' RT. WEST FL EL£v'.- 106/.49

EAST FL ELEV.= 1060.2? 1

BARN EAST FL ELE.V.= 1061.41

STR.NO.@ STA. 160+74-,4 A022 CONST. 100 L.-F. 43"X26"--RCP-A 268.48'LT:. w/-2-CETs

STR.No.-@--sTA. ·160+84:.3 Ad-22 CONST. 100 L.F. 43"X26"·RCPA 171.-l'RT~ w/ 2-CETs

-1. 7';32%

STA.29t/4JO 3(j' x 4?' (REMOVE] I CGMP WITH CONG.END SECTION 5.0.[ 2050' RT.

BR;(D THREE: SPAN (60'~90'-60'1 P.C. BEAM BR]DGE :WITH:44'-{):" CLEAR ROADWAY-AND :42" F~SHAPED PARAPE1S, l ~T STA. 7G0+47~00 A023

BR.:(Dl:STA.: 712+08.25 A022 CONST. 3-14'X12'X295' LG:. RCB, SKEWED 66° L;.F.-, 167,5'LG.--lT. & 127. 5' LG. RT.

BENCHMARK: 224: BOO: NAIL JN 8" :WOOD :POST STA. -712-+69.29 _q;_ SURVEY, 1343.76' LT, -ELEV. 11-00.63-8

~ 63 "~--fA~D~2~3~' ~v~·~'~·~~~s~s~o~·~· ~K"'"'o'-"2~6--'"1 g:; gj ...,- A021: V-.C. ~ 845'-, K ~ 265 ~S:: ~ A022: V.C. ~ 855':, K ~ 268

>> WW

ci LJj ci BR. F 3--l4'Xlt"RCB- EXT .. 52'W. IF-UTURE .c1;msi: .-l I[_ l 056.. 56 -w. AT SJA. 713+02.2 A022, ]96.3'LT.

BR •. .F NE.W:.3.-1A'.X12'X2-95' .RCB fl 1056.40- w. AT STA. 712+79;68 AD22, 151.28'LT.

I[ 10:S5.52 E.

1120

1110

1100

AT STA. l11+58;.82 A022, 115.S:6'RT. 1090

1080

1070

LISTED FINISHED GRADE :ELEVATIONS WITH MA~KER ~e· HAVE COUNTED IN THE EFfECT :oF -clJRVE LEN GT-HS & : SUPERELEV.ATI ON, ADJUSTED FROM THE VERTICAL- CURV:ES SHOWN :IN THE DRAWING;

2 3 4 705+00

0 ro

::; 0

6 8 9

110+00

• • ~ m 0 ~

m 0

::: 0

• • ro o ~ ro

2 DUNCAN BYPASS SOUTH CONNECTOR STATE JOB NO. 20316(23)

0 ro

• • 0 N m

3

m ro ~--

0

• • om Nm

1060

~ 1050

•• ~ 8 1040

4 115+00 STEPHENS COUNTY

SHEET NO. 23

Page 52: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1120

1110

1100

1090

1070

1060

1050

• • •

~~

KJ [if ~~

lf'.l·m· ~~

' ' ~~

;::::;::::

BENCHMARK 224;' 800 NAIL 'IN 8" WOOD 'POST STA. 712-+69.29 q;_ SURVEY, 1343.76' LT. ELEV-. = 11 00,638

A023: V.C.

A021.: V.C. A022: V.C.

850' . K = 266

845' ' K. .= 26.5 855' , K = 268

EQUATIONS ON HORIZONTAL ALIGNMENTS: STA 118+74.1104 BK A021

=STA 718+08.32 AHO A02l STA 118+85.1259 BK A022

=STA 118+59.5627 AHO A022 STA 1lBt79.6482. BK A023

=STA 718+59.5621 AHO A023

;:;:;;;:; ~ 00 o;J -- 0

8~ ~N ·-N"' r<:l 00 N ~~ 0

~~ ~

~~ ~ ~ (\] r<'J'<!" + 0 ~

• •

SEC. I T-1-S, R-1-W

0 0

SEC. 7, T-1-S, R-7-W

BR.@ FOUR ·sPAN 1135'-200'-zlJo·-1~·1 STEEL PLATE GIRDER BRIDGE W:ITH 38'-0" CLEAR ROADWAY AND 42" F-SHAPED PARAPETS, l AT STA. 7S7+34.l)O A022

sTR.No.@ STA. 1=35+82.0 Ao21. CONST. 130 L .. F. 3;6" RCP. 58;'LG. LT. & 12'LG. RT. :W/ 2~cETs

STR.ND. ·w··sTA. 73:7+21;9 AOt'l, CONST 6'X4:'Xl 41 . O' LG. RCB 120°:sKEW R. F .), 85.2'-LG. lT. &- 55.S'LG. RT. CONST-. INLET HDWlL. AT STA. 737+57.5, '11..0'RT:. &--ourlEf-·l-IDWll; AT·:STA J36+-79.·t;· :r0.6':tT·.

.-i-t •. "399_% lAOZtl

- 93 \A0221 ~ +\ · 9 93°_ \AOZ;)\

+"\. ;39 0

FIN I SHED GRADE AT ~ S-B iA021l

EXIST; GROUND UJJE ALONG [_ US-815.CONNECTION (jJ()23!

BENCHMARK:2Q1· 2" ALUMINUM CAP

SEE SHEET NO. 31 FOR MORE INFO ON DITCH CONSTRUCTION

STA. }21-+92:02 q;_ -SURVEY (A001l, 152.35' RT. (OR· STA. ·730+86.66 Ad22, 1685.1-6·' ·RT. l ELEV 1076.517

FIN I SHED GRADE AT ~- N-'B· iA.022l

N 0 ~ ~ ~

0

':;? ;::::; m -N­~

> -w > ~ ~ w

EXIST. GROUND LINE ALONG /Ji:US-.8/:IY. W-.5 RAMP .CA02.IJ.

N N 0 w """0 ~ ~ ~. ® 6 «:;;1; 36' R:CP ~ G'i gj :sen 1Js+s2

T:;~;;~~~~~~~u~~ ~~----2J+~ !021

~ w 0 ~3:ilio69 .. Js v.c.~103-0· ~ ,_G:ill.1068.70

CN~D_T_E-,~~~~~~~~~~~~~~~~~~~ K ~=231 >..:.J &: UNLESS OTHERWISE NOTED Ol'J CROSS-SECT I ON SHEETS, a_ w -1 ~ IF . .F 1-N.1 SH.EIJ .. GRADES. QF .. +HE .. CQNNECTOR .. SHO.WN 0 I 0

ON THl;S SHEET HAVE C:ONFLtCTS /\MONG ti. 2~LANE z o

~~ ~ :'.'.: :'.'.: <'--r-' ('-

2-WAY :ROAD·(A0231, ~ ·S-B (A0211.- AND:~ N-B (A0221, @. · · o:: ..,. G:I VEN ;DES·I GN ·GRABE AT ~·ROAD· JA023i WI TK· DE-S-l:GN !EEXl.ST. 56" BCP w ':;; SUPERELEVATION SHALL· GOVERN ON GRADES AT INLET ff. 1010.19 Rf. a_ :£5

c,.; L-ISTED F·INISHED GRADE ELEVATIONS WITH MARKER ~-e· HAVE ~ COUNTED IN THE EFFECT OF CURVE LENGTHS & :sUPERELEV/\TIDN;

w z LL ADJUSTED FROM THE VERT I CAL CURVES SHOWN 1-N THE DRAW I NG. ti: ROAD, AT·~ S-B, A"f ~ N'-B AND CROSS SLOPES' OUTLEr ff. !069.65 RT. o..>i r--

> -w >~ ~ w

~ ~

v c. -~ 1200'

~ K ; 4.00

1040 ~

1030

•• ~~ WO

~w WW 00

715+00 6 7 8 9

• w 0 0 ~

m ~ ~ ~ 0 0

720+00

mm 0 0

2 3 4 725+00 6 8 9

~ N mo 0

730+00

~

mo 0

2 3 4 735+00 6 8

~ ~ ~ m

REVISIONS DESCRIPTION

SEC. T-1-S,

BENCHMARK 225: 800' NAIL IN 8" 'WOOD :POST STA. :73544.26 [;SURVEY, 583.74' LT. ELEV. 1 072-.677· BENCHMARK· 226: CUT· BOX ON EAST ENO OF HE.AD:l'/AL.L .. · ..... , _EL.EV .... = .1.07.7,07_3 STA. :738-+66.32 I[ SURVEY, 0.54' LT. BENCHMARK 227: 2" ALUMINUM CAP S·TA.-:739-+52.98·!ii: SURVEY; 687.75' LL ELEV. 1 088.915

N N 0 ~·~

w ~

~ -+.·o

Fl NI.SHED :GRADE AT ·!B; N·-B :(A022;"1

-J.~o2% . .iA022J

EXIST. GROUNDUNE NfJNG [B· us-at N. S-W RMf? ( A022J

DATE

12 R-8-W

0 0 +

"' ~

1120

> 1100 ~

1090

1080

1070

1060 N -~ - v . =30 '

~ 0 N 0

~ >

~w >~ ~ w

:': 0

K := 102.1

1050

;;J ~ l 040

w ~~~~~~~~~~~~~~~~~~~~~~~~~ 6 ° 740+00 2 3 4 745+00

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY 9 STATE JOB NO. 20316(23) SHEET NO. 2q

Page 53: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

ST A. 735-1-90 TO

146+\2 A02\, CONST· PAVED DITCH RT·

(MODIFY & LEAVEI STR.NO.@ST A/51+4?.00 EXISTING 6' X 5' X 135.B' re_ RDY R.CB. "X" ING _rt 110.8' LT.& 25' RT. LT.FL ELEV.- 7073.81 RT.FL ELEV.= 1074.75 DA - 66.0 /JCRES Q

0 + LlJ LlJ

;:: l_!r~1~aE~R~o~PC~ICf:::::;::;;;,:;f+J"fll?-ppEs.R/W

<r: 1-(f)

1130

1120

1110

1100

BENCHMARK 203: 2" ALUMINUM CAP STA. 159-+90.24 q;_ SURVEY (A001), 196.78' RT. <OR STA.·755-+92.73 ·A022, 93.12' Rl. l ELEV. = 1087.446

FINISHED GRADE AT Iii N-B (A0221

STR .:NO. @ EX I ST. 6'X5'X 135 8' LG·. RCB: STA. 7l\9+5.8.0 A0.2.1~ 21..-.0' LT: .OUTLET; STA. 750+32. o: A02J:, 92 ~9' RT; DR STA. 75'1f23.5:A022:, 14L9'LT.INLET. REMOVE HDWLLS·. & 27' LG, RCB: RT. EXTt:ND '17. 7' LG. 6'X5' .RCB l T. &. CONST. HDWLL. AT·QUTLE.T ·STA; 749:+32:2· A021, 6t::O'L"f:.

r-~~-----'V~-~C~·-0~5~0~·---------,.~ gjlr----- K=::237 N~ ·~r-O·g N'<l'"1' 0 . ~ EXIST. GROUND LINE =ALONG ~ ':g m mo [jj_ US-81 N. S-W RM!P !A022! :5S ~6 ~~? ~~~ ~ -~ LJ) .,,-;

PRE.J.R/W UM/TS OF NO ACCES

SEC, 12, T-1-S, R-8-W

STR:NO.@ STA. (50+19.8 A021, ·73.T;RT. OR. STA . .154+1.9 .. 0 Ji0.22. 164 .. 2' LT.. CONST. DROP INLET :AND 6'X5'X:192.8' LG. RCB·& HDWLL. AT INLET STA. :75Ll+l9.0 ~022, 33.G'RT.·

STR,NO.@ STA. 754+°31.2 .A022 CONST. SMD- TYPE 2,: 51. 2' LT. STUB·6 L.F·; 24~ fl"CP··~NTO RCB

BENCHMARK 204: 2" ALUMINUM CAP STA. :177+82.31 !{:SURVEY (Ab01l, -181.10' LT (IJR STA.·774+36.21A0221159.1G'·Ll.:J ELEV; - 1091.158

F l:N I SHED GRADE AT: Iii N,-B IAG22l

-J.Go2x 1 FIN I SHED GRADE . A022!

AT [ EXl.ST.2-lANE • ~ _G'.jt;L_ BY ASS !A007!-~ ~ uJ

+l. 2St%l~0211 : : : --~-

-1-0·. SO % tA0.2.1 l

1080

AT Iii S-B IAD21.l

+O 500% \A02ll _ -----~­_:__· __ - -·- ~ ---- ..,...~~ =:;:--o-soo%· tA0211 ---- ~-~ . t' -~-

N AWNG fJl US 81 I 11 ~ 01 NW S RAMP (A02!! I _ _ ______ _

--"~!ST. GROUND L!NE1I1 -,fl _____ --0

- IL 1073.48 ff.. 107381 ff.. !U14.75 -1070 V.C.=300' lf.l'<I' NEW 6'X5' EX/5f 6'X5 EXIST 6X5 ~

l----+-<-'K~o~J0~2~1~-;~~ 749+32 2 749+-573 A021 750+317 A02! <r: ~

1060

1050

1040 745+00 6

~- A021 99'LT 103.ERT 8<D ,_G] 61.0'LT. 1[:·1074:56 ct·~ 6'.:uJ JCT BOX lf.l -

750+19.8 A021 : -~

7 8 9

73»7'RT. >_J

750+00

0

°' 0 ~

~~ ~ ~N ~

~6; ~ ;:::~ 0

~ w

0

°' 0 4

N~ ITT Nro

~6; ;;; ;:::~ 0

2 3

- ... ··~-~...::::~~::--....:.· . .:.__·.:._:.o __ _:_·.:.:_.:.:_·c...~:--·.· .....

4

ITT 0

755+00 6

0

:;; :;; 0 0

8 9

N

:;: :;: :;; 0 0 0

760+00 2

N N 0

<0.

~ -ro ~ m_ ct ;g. w.­~

> u w >~ Q w

3

N N

~ r-c ITT

ro o + "O"{" ~o

w -~

> ;: ~ ~ w

v.c. ~ 300· K \402

4

N N 0 ~ ~

w

~ --j; ~ w -~> f- ·w >~ ~ w

m 0

765+00 6 8 9

REVISIONS REV. NO DESCRIPTION

BENCHMARK 205· 2" ALUMINUM CAP STA. 187"'87.85 it SURVEY moon, 153.63' RT. ELEV:·= 11 'J.1.585

m 0

::i 0

ru N 0 ~

~

1130

I 12D

"': ;,g f----LD <.O 11 lOU 4'-""0'J . UJ ~'.::FINISHED GRADE AT~ r:- T:HE OUTER EDGE OF 0 -~ ~ T:APER (A0221 - 0::: ~ w Q_

+O. T23% ·tA022l

N

:;; 0

LiJ (f) z 0

(\j (__) (\j

0..:....J <C <r:

I­r-- z

LiJ r-- 0

7u Lf) z r--r--<t: CD I- LiJ UJ dJ

~ m

:;; 0

__J

<r: f­z LiJ 0

0

DATE

0

z 1090 LiJ

(\j

C\J 1080 0 <r:

C)

0 1070 + f----· m r--C'--'

1060

~ 1050

~~--~---~---~---~---~---~

o 710+00 2 3 LI 775+00 DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

STATE JOB NO. 20316(23) SHEET NO. 25

Page 54: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

0

1110

1100

1090

1080

1070

1060

1050

1040

1030

M

+ 0 0 ~

[;; 1020 °

700+00

v .c. 160'

OBTAIN UTILITY EASEMENT

g' ~ 0 0

2

R/W

CUT

3

026-C

0 0 + LO 0 r-

UNDERGROUND TELEPHONE UNE CROSSING AT STA2B+45

0 0 + 0

STA.28+52.00 30" X 41' STA. 700+33 TO 103+30 A027 CGMP 5.0.([ 20.20'RT. CONST. PAVED DITCH RT. WEST FL ELEV.~/061.49

~~~~~~E~A~S~T~F~LcELEV~---~~~6~L4~?~~~~~

r ~~

ru Oo o~

No 'f"O r--o r--o o+ o+ .-"'· "C""L()

~;::' ~·;=i

ST A. 28+97 30 3a' X 70' CGMP WITH CONG.END SECTION 5.0.(£ 31.70' LT. WEST FL ELEV.-1061.41 EAST FL ELEV.= 1060.27

STA.29ti4JO 30" X 47' CGMP WITH CONG.END SECTION S.0.(£ 2050' RT.

EX!S"T.·GROUND ~ ALONG :/Jl. RAMP D (/10Z1! GRATE

BOX OUTLEJ

V .C. I 130' K = :205

STA. 701+00 TO 1l2+32 A026 CONST. PAVED DITCH LT.

BR. f NEW 3-14'X12'X295' IE. io:56.4Q w. AT STA. 712+61.5 A026.

IE. 1055.52 E. :A.T STA . .7:11+3.D .. '1 A02.7,

~-g o:o

4 705+00 6 7 8 9 710+00 2

RCB

50. O'=L T.

82 .. 1 '.:RT.

0

0., D ~

m Mru ro M~

mro ro roro 0 ;::~

3

rm ~ru

0 0 ~ ~ c:..:: -tj" 0 85~

4

o+ -~ ~;:'.'

715+00 6

0

0., D ~

r-:LJ"Jr<J l!):.,q-<O

,.;:..;<..O ro:ma:J

~:~~ 7

0

0., D ~

LJ"J :cnr<J r--=-" .,;:...:r--m:ma:J

~:~~ 8

Q

SEE SHEET ND. 23 FDR MORE DETAILS OF MAINLINE CONST.

SEE SHEET ND. 27 FDR MORE DETAILS OF SEMINOLE ROAD CONST.

SEC. 7, T - 1 -S, R-7-W

0

0., D ~-

ro m~ - Oro w a;jr-ro roro

~ ~~ 9 720+00

\J ;C. "":200'

0 0

"-:> "-::> D D ~ ~

o.,q-:'°cn -~:LDID

ry;cn :en en roa:J :roro

::::~:~~

0 0

"-:> "-::> D D ~ ¢

~~:~~ Qo:Qo mm:mm

::::~:::::~ 2

0 0

"-::> "-::> D D ~ ¢

c;3 ~~ ~~ -~ ;:::~ ~~

3

0 0

0

0., D ~

"-::> "-::> LJ"Jro 0 D <()<()

A ><>: .,;..,-mm

REVISIONS REV. NO DESCRIPTION DATE

STR.NO.~ STA. 708+35.0 A026, 83.0' RT. CONST. SMD. TYPE 2. STUB 163 L. F. 2'1" RCP OUT LT. WI CET

STR. NO. @ ST A. 700+96. 6 A026 CONST. 100 L.F. 43"X26" RCPA w/ 2-CETs

STR.NO.@ STA. 700+33. 7 A027 CONST. 100 L.F. 43"X26" RCPA w/ 2-CETs

BENCHMARK 222: 2" ALUMINUM CAP STA. :100+36.18 ll:. SURVEY, 224.16' LT. (QR 8TA.·7D009'.83 ·A0261· 3.36'· lT. ·l ELEV. 1077.26Zf

BENCH.MA.RI<:. 22.1: .:x· .ON. NOR.1H . .E.ND .HEADW.ALL STA. =700+77.37 Jt. SURVEY, 738.39' RT. WR STA. 700+26.96 A027, 503.39' RT. J ELEV. 1059.1.36

1110

1100

1090

1080

1070

1060

1050

1040

1030

~;;: g~ ;::~ ~~ ~~~7-2-5~+-0~0~~~6~~~~7~~~-8~~~~9~~-7-3~0+00

;:::~ 0 DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

4 STATE JOB NO. 20316(23) SHEET NO. 26

Page 55: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

50'R 50' R

16' LT.

t ___ 'S~~~~~0~3_!___~---=-~---~---N-~~4_§~I__._g_"_E ________ _

8' RT. J -r----------::::----­----~-------/'"7"--

1110

1100

1090

12'RT.- ~~ //

16'RT ' ' // . \\ / \ \ ~

"INSET 1" GEOMETRIC LAYOUT AT THE WEST END

\ \ (; OVERHENJ POWER LINE CROSSING AT ST A 700+83 LOW WIRE ELEV.= /094JO

FOR REFERENCE ONLY SCALE: l" = 25'

E-W 175 $_-~-,or~~!~

700+00 i

BENCHMARK 223 800 NAIL 'IN POWER POLE STA. 700+21.31 q;_ SURVEY, 1394.99' LT. (QR STA.· 10+24.83 ·A003,. 20.14' RT.·) ELEV.= 1103.709

SEE SHEET NO. 23 FOR MORE DETAILS OF MAINLINE CONST.

SEE SHEET NO. 26 FOR MORE DETAILS OF RAMP CONSTRUCTION

lOBO STA. 2b+so -SPt:;DITCH LT'. BEG.,

& Rf.

1070

1060

1050

1040

1030

1020

20+00

R-7-W

I I~ I 8 ! I I \ I I I I I

ST A. 25+00 TO 26+03 LT. REMOVE POND CONST. PAVED DITCH LT. STA. 21+LIO RT.

2

STA. 27+00 TO 29+39 LT CONST. 4'W. SHOULDER

SEC. 18, T-1-S, R-7-W BENCHMARK 222:: 2" ALUMINUM CAP STA. -700+36.18 .Q;, SURVEY, 224.16' LT. (QR S1A. 2:1-+95.71 A003,. ·10.01' RT.) ELEV.= 1077.26'1

FLiTURE BR El

F .'G.:· AT' It BR:

ELEV. 1091.35

3 4 25+00 6 1

~ 0

6 0 +

8

METAL BARN

0 DMETAL BARN

REVISIONS REV. NO DESCRIPTION DATE

50' R ~ 16' LT. 21.5'LT.

~~ _ _N_8!)'~6'02~._~~,,.RT. ~ ~ALIGNMENT IA0031 vs:w LIL(~ t w~ ~ 16'RT.

~ \\ 1; "INSET 2" r: iC \\ I GEOMETRIC LAYOUT ~" AT THE EAST END

OBTAIN ~I + u o~ FOR REFERENCE ONLY

SCALE: 1" = 25' UTILITY EASEMENT

~ -D

C0 CJ CJ '<(

m C0 + m C\J

<(

1-lf)

1--(fJ r­z en oz uo

u

Od 0::: <(

h­w z _J w oo z~

u :zz w en

r-=+..: .SPECJAl _Jn:: DITCH lt. = ~-0.50% MIN.

r o~ ~ -

. x ~w ~ ow ;.c.,· :r ·-~

i±oJ :r:

;;j~ 'l' ~

C0 CJ CJ <(

CJ L[)

+

1-­(f)

:z: Cl (_)

_J <(

1-:z: w Cl

C0 (_) z

<(

1-lf) Cl

:z: w

WZ/ZJ 111 111

.\

.111· 11·1 111: 111 I.II· LJ

\I II: 111 LLLL

NOTE TO THE CONTRACTOR: THE EXISTING 76 L.F. 4-RAIL PIPE FENCE AND GATE APPROX. FROM STA. 21+60 TO 31+00 LT. ITEMS TO BE REMOVED MAY OR MAY NOT BE PRESENT IN ANY SPECIFIED CONDITION. THE LANDOWNER IS RESPONSIBLE TO REMOVE AND RESET THEM.

NOTES TO THE CONTRACTOR FOR SEMINOLE RD. CONSTRUCTION:

TO REMOVE EXISTING FENCE AS DIRECTED BY THE ENGINEER. THIS REMOVAL ITEM WILL BE CONSIDERED AS INCIDENTAL, AND NOT MEASURED FOR PAYMENT.

TO INSTALL FENCE AND GATES AS DIRECTED BY THE ENGINEER. SEE SHEET NO. 12 FOR THE SCHEDULE.

TO REMOVE AND REPLACE THREE MAIL BOXES AS DIRECTED BY THE ENGINEER. SEE SHEET NO. 12 FOR THE SCHEDULE.

BENCHMARK 221: "X" ON NORTH END HEADWALL ST A. 700+77:37 q;_. SURVEY, 738.39': RT. {QR STA 3·1-+58.4:3 AOG3, 27.50' LT l ELEV. 1 059.136

CSTR.NO.@ .StA_ 22+05.5 .A003 CONST. 100 L.F. 43"X26":RCPA:29.7'LT. :w/ 2~CETs

'·s1R:No:·@·· StA.··26+i:\·9::u· AO'ci3

CONST. 100 L.F. 43"X26"HCPA:36.0'LT.

STR;No;·@·· STA.··2a+s1 .s· AOCi3 CONST. 48 L.F; J6"=CGSP·26.2'RT. w/ 2~cETs

STR.No.@ STA. 29+12:.o Aci03 CONSI •. .48 .l. F .•. J.6".:CGSP .. 2.7 .. O.' RT .• wJ 2~CEis

STR.No.@ si'A. 28+11:-0 A003 CONST. 48 L.F. 36":CGSP.32.0'LT. w/ 2~CETs

STR.NO.@ STA. 29+02. 7 Aci03 CONST. 7'4:' L ;F ,· J6~ :CGSP'A 36 :O' LT; w/· 2~cETs

EX!ST.!3-f7-13Xl!'X.44.5' RCB ff.. 1046.36 [T. ff.. 1046.22 RT.

1110

1100

1090

1080

1070

1060

1050

1040

1030

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

9 30+00 2 STATE JOB NO. 20316(23) SHEET NO. 27

Page 56: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

-----1080

-150 -140 -130

1090

1080

-----

-120

----------

-110 -100 -90 -80

A.C. 69.48 S.F. V.C. 422.22 C.Y. A.F. 383.65 S.F. V.F. 817.03 C.Y.

----------------~----

-70 -60 -50 -40 -30 -20

o" o<O". '

~ -2%

-10

Iii NORTHBOUND

I "" oro"'J·

' <.: i;:i· -4%

0

692-00 10

Iii NORTHBOUND

I[ 1074.26

20 30 40 50

,9(/,, ,o~

«::i;:>· -")%

SURFACING TO BE CONSTRUCTED BY OTHERS IN A SUBSEQUENT PROJECT ITYP I CALJ.

fl l·O·T7 .26

60 70 80 90 100

FUTURE CONSTRUCTION ITYP·I CALI

----- - - -----

1090

1080

110 120 130 140 150

1090

1080

1070-+~~~-r~~~-r-~~~T-~~~r-~~---i~~~---j-~~~-r~~~-r-~~~-c-~~~r-~~~r-~~---i~~~~~~~~~~~~~~~~~~~~~~---i~~~---j-~~~-r~~~-r-~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~f-1070

-150 -140 -130

1090-

-------

1080-

-120 -110 -100 -90 -80 -70 -60 -50

A.C. 158.52 S.F. V.C. 293.56 C.Y. A.F. 0 S.F. V.F. 0 C.Y.

-------

-40 -30 -20 -1 0 0 10 20 30 40

691-00

STA. 690'85, BEGIN TYPICAL SECTION NO. 3A ON NORTHBOUND & SOUTHBOUND STA. 690'85, BEGIN PROJECT, END INCIDENTAL CONSTRUCTION

Iii NORTHBOUND I

50

-----~z-------------------

-------:-- ---------------~~A--;;JNG.:ANO.SLJRFACINGio~Bi:C:ONSfRUcIED -----------------

60 70 80 90

---- . : ..B'!'...D.J.H£~-1.N--A~Q.UU.Jl--E.RDJ.EU. --:,:;_::;;,,..------ ----------

r-~r------------------~~~---lc-------------------=~==--=--=----------------------_--:_-:_-c_-_~-~---=--=---~--~--~---~-~-----------------

100 110 120 130 140 150

-1090

-1080

10701~---i~-+~-T-~i-~C--+~--i-~-r-~T----i~--T~-r-~-i-~r----i~-+~-T-~i-~C--+~--i-~-r-~T----i~~~~~~~~~~~~~~~~~~~~~-r-~T----i~--T~-r-~-i-~r----i~-+~-T-~~~~~~~~~~~~~~~~~~~~~~~~~~,1070

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

1090-

1080-

1070-

A.C. 0.00 S.F. V.C. 0.00 C.Y.

A.F. 0.00 S.F. V.F. 0.00 C.Y.

-------.., ::::::::: ::-.- - - - - - - - - -

."":"-.--... ...... -:..... ------- .....

690-00

STA. 690-00, BEGIN INCIDENTAL CONSTRUCTION

Iii NORTHBOUND I

--------~---

SUBSEQUENT PROJECT CONSJRUCll ON IJYP I C.ALJ

FUTURE CONSTRUCTION

-------=~===;~;~~~;~i~~~~t~;o~~o~::==-~---~~~~=~c:~::--=--=~cc~=~~~=---~~----:~::--_-:_~_~_-_-~~~7-~----------------------

-1090

-1080

-1070

1060-c-~~~~~~---j-~~~-r~~~-r-~~~-c-~~~j--~~~c--~~---i~~~-r~~~--j-~~~-r-~~~i-~~~~~~~~~~~~~~~~~~~~~~-c-~~~j--~~~~~~--c~~~-r~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-1060

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

A.C. 0.00 S.F. V.C. 0.00 C.Y. A.F. 0.00 S.F. V.F. 0.00 C.Y.

AREA CUT (A.C.) VOLUME CUT (V.C.l AREA EMB (A.F.l VOL. EMB. +15% (V.F.l

CUT /FILL TABLE

689-00 HATCH LEGEND

ESs.:J PHASE 1 CONSTRUCTION ESs.:J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION DUNCAN BYPASS SOUTH CONNECTOR

STATE JOB NO. 20316(23) STEPHENS COUNTY

SHEET NO. X02

Page 57: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1100

1090

1080 fL _ l OB2 .-35

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60

A.C. 22.33 S.F. V.C. 69.69 C.Y. A.F. 563.73 S.F. V.F. 2858.62 C.Y.

1090

1080

fl 1019.85

-50 -40 -30 -20 -10

--41'.

0

696-00 10

ill_ NORJHBOUND

j "~ Q~

' C;· :_ ----4%

20 30

R/W 1080

0

w z

----------------------------------------------~ -107-0

I u f­<{

2

1100

0 36" RCP fl l063.37

1060--l~~~~c-~~~-r-~~~-r-~~~~~~~~~~~~~~~~~~~~~~~~~--0

1090 w

150 160 170

40 50 60 1080

uf--------z

1070_J I u f­<{

2

180 190 200

70 80 90

0

210 220 230

---------------

100 110 120

R/W

I 36" RCP fl 1063.67

z ---" I f- 080 <{

~~~~---i2

130 140 150

1060--t~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~+ 1090 u

---------------

z

=--1080 _-_-_-_-_--------13

<{

2

1070--t~~~~~~~~c-~~~T-~~~-c-~~~--+-~~~---j-~~~---i~~~~c-~~~T-~~~-c-~~~--+-~~~---j-~~~~~~~~~~~~~~~~~~~~~~~~---j-~~~---i~~~~c-~~~T-~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~--t-1070

-150 -140 -130 -120 -110 -100 -90 -80 -70

A.C. 15.30 S.F. V.C. 85.91 C.Y. A.F. 778.88 S.F. V.F. 3526.18 C.Y.

1090

1080 -----------------fl L078.06

-60 -50 -40 -30 -20

-41'.

-1 0 0

695-00 10 20 30

1080

1070

40

z

I u f-

50 60 70

STR.NO.@ STA. CONST. 534 L.F. STR. NO.@.

80 90 100

693+90. 6 A022, 183. 2' RT. 36' RCP W/ CET, STUB INTO

R/W

I

<( 36" RCP

110 120 130 140 150

1060::2-+~~~~~~~~~~~~~'r--"~10~6_3_._97~~~~~~~~~-+ 1060 1090 cf] 150 160 170 180 190 200 210 220

z

--"''---'-'~~~~~~~~~~~~~~'-"-c___~r-'080 I u <{

2 1070--t~---;~~~~c-~c-~T--~i-~-T-~-c-~--i-~--+-~--i-~--t~---i~---i~~c-~c-~T--~i-~-T-~-c-~-T-~--+-~--i-~--t~~~~~~~~~~~~~~~~~~~~~~~~--t~--T~---i~~~~c-~T--~i-~-T-~-c-~-T-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-+-1070

-150 -140 -130 -120

1090

1080

-11 o -100 -90 -80 -70

A.C. 31.09 S.F. V.C. 489.19 C.Y.

A.F. 877.19 S.F. V.F. 3663.37 C.Y.

STR.@ ST A. 693+00. 00 A022, CONST. SMD, TYPE 2, STUB 164 OUT RT. W/ CET.

GRATE

-60

79.7'LT. LF 30" RCP

-50 -40 -30 -20 -1 0 0

694-00 10 20 30 40 50 60 70

1080

z

1070_J

-1060

I ------u e;;-1-~~~~~---"~~~~~~

" 150

I I 160 170

I 180

80 90

R/W

I 190

I 200

OPEN DITCH RT. TO STR. NO. 6

I

100 1080

1070

1-060

210

110 120 130 140 150

1090

1080 <{

z

1070-cc--.:.~~~_::_-"--__:_""__:___:___:_c.c___:___:__::_-"'__:__::___:___:_;c_____:___:___:_:;::___:___:_~ _J1070

F================~~===============;:;=;;;:::;:::::;================~~~============t~ B-OX fl 1006;-40 164 L.F. 30" RCP AT -0.48% fl 1065.62 ~

1060--t~~~~~~~~c-~~~i-~~~-c-~~~--+-~~~---j-~~~---i~~~~c-~~~i-~~~-c-~~~--+-~~~---j-~~~~~~~~~~~~~~~~~~~~~~~~---j-~~~---f~~~~c-~~~-r-~~~-j-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~--t-1060

-150 -140 -130 -120 -110 -100 -90 -80

A.C. 233.07 S.F. V.C. 560.28 C.Y. A.F. 843.00 S.F. V.F. 2612.31 C.Y.

AREA CUT (A.C.) VOLUME CUT (V.C.l AREA EMB (A.F.l VOL. EMB. +15% (V.F.l

CUT /FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0 0

693-00 10 20 30 40 50 60 70

HATCH LEGEND ESs.:J PHASE 1 CONSTRUCTION ESs.:J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(23) SHEET NO. X03

Page 58: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1100

1090

1080

1070

1080 u

z

1 070_J

~ NORTHBOUND ~ ,--------------------------­

°'

STR.N0.<2) STA. 699+27.1 A022 CONST. 6' I . D MANHOLE 272. 2 RT. R/W

STUB 100 L.F 36" RCP TD OUTLET 1i I CET AT STA. 699+98.6 A022, 344.0 RT 6 I D.

RIM ELEV. ----------------- - ]~~~::_ ___ _

36" RCP fl 1062 4 7 6' I . D MH

IE_ 1062.39

80

70

1-060-+----------------------------------------------------------~60

150 160 170 180 190 200 210 220 230 240 250 260

------------------------------

270 280

1090

1080 u

z

_J1 070 I u

290

1060-+---'--~-;---~-~-~--;---~--'--~---'--~---'-~--'---~-~-~--;---~--'--~---'--~------------------------~---'-~----~-'---~--;---~--'--------------------------------+-1060

-150

1100

1090

1080

1070

-150

1100

1090

1080

-150

-140 -130 -120

-140 -130 -120

-11 o -100 -90 -80 A.C. 0 S.F. V.C. 0 C.Y. A.F.1730.95 S.F. V.F. 5798.43 C.Y.

-110 -100 -90 -80

A.C. 0 S.F. V.C. 0 C.Y.

A.F. 991.79 S.F. V.F. 3344.67 C.Y.

-70

-70

--------------------------------- ------------

-140 -130 -120 -110 -100 -90 -80

A.C. 0 S.F. V.C. 41.35 C.Y. A.F. 578.75 S.F. V.F. 2433.06 C.Y.

AREA CUT (A.C.) VOLUME CUT (V.C.l AREA EMB (A.F.l VOL. EMB. +15% (V.F.l

CUT /FILL TABLE

-70

-60 -50

-60 -50

-60 -50

-40 -30 -20 -10 0

699-00 10 20 30 40 50 60 70 80 90

1080 -----------------

z

1070_Jf---------------------------------

I u

100 110 120 130

~ o~"RCP

140

R/W

11080

1070

,00

,..,_, "" 150 160 170 180 190 200 210 220 230 240 250 260 270

~cpq, "'OJ~':-ro j~ ::~iHBDLJ~:o ~--+----------------------------------------l-1o_6_',-_n __ ___,_, 060

~""'""~=7===-4~:~~·:::;;::'=';;::-=2~%~·==;:'='::.;:-=2=%~==~"=·=·~-~4~%:::;:::::;;!!""""----

150

1100

1090

z1080

-" I u

. ~~---t'e-f---1 070

-40 -30 -20 -1 0

-4%

-40 -30 -20 -1 0

0

698-00 10 20

<C

w z

-" I u

30 40 50 60 70 80 90 100 110 120 130

R/W

-------------------------------------------------------i--1080

1070

~ o~'RCP i ::~:~HBDLJ~~o~5co---,·6-0 ___ 1,70 ___ 1_8'0 ___ 1's_o _______ 2_1_0 _______ 2_3_o __ l_2_:,:-6-3-·0,7_2_5'0---2~6-0 C?' -4%

0

697-00 10 20 30 40 50 60 70

HATCH LEGEND

ESs.:J PHASE 1 CONSTRUCTION ESs.:J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130

DUNCAN BYPASS SOUTH CONNECTOR

STATE JOB NO. 20316(23)

°'

140 150

1100

1090

140 150

STEPHENS COUNTY

SHEET NO. X04

Page 59: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

~ NORTHBOUND

1100 ........... ,~~ ....... ,,#~~ ..... ! .. ,#~ • So· -2% So~ -2% ~So· -4%

1090

10BO

1070

.... ·. PRES;R/W I . 1: l.;_

1100

1090

10BO

1070

1060----'-~~~-;-~~---;-~~~-;-~~--;~~~-;-~~~;--~~--;-~~~-;-~~---;-~~~-;-~~--;~~~-;-~~~;--~~--;-~~~-;-~~---;-~~~-;-~~--;~~~-;-~~~;--~~--;-~~~-;-~~---;-~~~-;-~~--;~~~-;-~~~;--~~---;-~~~-;-~~--'-1060

1100

1090

10BO

1070

1100

1090

-150 -140 -130 -120 -110 -100 -90 -BO -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 BO 90 100 110 120 130 140 150

-150 -140

. : . :

A.C. 0.00 S.F. V.C. 0.00 C.Y. A.F.2027.36 S.F. V.F. 2072.41 C.Y.

CUT/FILL TABLE FOR STA. 702-00

A.C. 0.00 S.F. V.C. 0.00 C.Y. A.F.2027.36 S.F. V.F. 0.00 C.Y.

CUT /FILL TABLE FOR ST A. 701 +76

.............................. , .............. , ..

-130 -120 -110 -100 -90 -BO -70 -60 -50

702-00

ST A. 701 +76.00 A022, END APPROACH SLAB STA. 701 "'52.00 A022, END BRIDGE 'E', BEGIN APPROACH SLAB

~ NOR,(HBDUND

10BO

z 1070_J

:r: u !--,

10BO

~RAMP D STR.ND.@ STA. 700+84.3 A022

J CONST. 100 L.F. 43'X26' RCPA 171.l'RT. w/ 2-CETs

-------------- -------------------------------- 1070

IL 1062.81 ~1--~~~~1-0_0_L-.-F-.-4-3'-X-26_'_R_C-PA~A-T-0-.-4-9%~~~~------___;;::::-... ........ 1.060 ... ..-.-j......,."'T"'~..,....-~,......-.....,.....,......,..~ ........ ~.,.....~ ....... .....,.~....-......,...,..........,..,...........,~ ....... .....,._,_~..,....-~,......-...-.+~ .......... ,of~······~· ~cJt ..... 1 .. ,#> ............... . 1100

-40

g. ~So· <.:· t-l ~ .• •: . . rr· ·•. . :(>· . n .

----------------------------. : . : . ............................ , .............. , ..

. : . : . : . : . : ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' I '

-30 -20 -10 0

701-00 10 20 30

:150 •

40

10BO <(

z 1070_J

50

CAUTION !!! . STA.700t~3.3,0IER/:i¢AD .. PCINER CROSSING 14-WIREJ · LON ELEV.1094JO .

1090

.PRES.R/W q 10BO

........ I. I z

~~~~~~~~""'=::::;;:~~~:7:7":°~~~:7:~:7:~"'.":"7~7'-:7:~:7:~~:7:,.,t:_J1070

60 70 BO 90 100

CAUTION !!! STA.7W219,fNERHEAD PCINER CROSSING 14-WIREJ LON ELEV.1099.32

110 120 130 140

10BO

1070

:r: u

150

1100

1090

10BO .............. .- 10BO <(

---- ...... --------------- ...... ---------- ------------~--------------------. . . ~-----~----~-~~~ .111£ ................ i Too... I rue: . .I TU~ I I!.!! . . . : . : . : . : . : ..................................................................................................................... 1070

Tix; !UC •rue : Tl£ . : .... · .... • ... ' . •• .I

'''I'''',''':,'',','',:,'',','',:,'',','',:,'','''',:''':''';''''''' I' . . .i~i£~. ~:::;::::;::::;:;::;=::~::;;J~:ruc~==:::::::;::;:::=:=::::=~!!l&.:,~==~<C :::;;

1060-+~~~-;-~~---;-~~~-;-~~--;~~~-;-~~~;--~~--;-~~~-;-~~---;-~~~-;-~~--;~~~-;-~~~;--~~---;-~~~-;-~~---;-~~~-;-~~--;~~~-;-~~~;--~~---;-~~~-;-~~---;-~~~-;-~~--;~~~-;-~~~;--~~---;-~~~-;-~~--+-1060

10· I • -150 -140 -130 -120 -110 -100 -90 -BO -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 BO 90 100 110 120 130 140 150

~~~~~~~~~~~~

A.C. 0 S.F. V.C. 0 C.Y. 700-00 A.F.1730.95 S.F. V.F. 1327.06 C.Y.

CUT/FILL TABLE FOR STA. 699+18 AREA CUT IA.C.l VOLUME CUT IV.C.l AREA EMB. IA.F.l VOL. EMB. •15% IV.F.l

CUT/FILL TABLE

STA. 699"'42.00 A022, BEGIN BRIDGE "E", END APPROACH SLAB STA. 699+18.00 A022, BEGIN APPROACH SLAB

HATCH LEGEND ESS:J PHASE 1 CONSTRUCTION ESS:J PHASE 2 CONSTRUCTION .--C: FUTURE CONSTRUCTION DUNCAN BYPASS SOUTH CONNECTOR

STATE JOB NO. 20316123) STEPHENS COUNTY

SHEET NO. X05

Page 60: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

I• 10'

1100

1100

1090

A.C. 0.00 S.F. V.C. 0.00 C.Y. A_F-2228.09 S_F_ V_F_ 8361.16 C.Y

-:4%

it NORTHBOUND I ,1

- 9'0· ,o .G· -1.50%

PRES.R/W

I

I

-----

PRES.R/W

1100

1090

1080

1070

1100

1090

I

1-LLZ lliJi, ' L J, J, j, ~"~~~ L ~ ~ ~ ~ ob' ,J, ,~~1010 woo " w m oo oo oo oo m oo oo '°' '" '" '" "" '' 1070 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 705-00

-130 -120 -11

o it NORTHBOUND

-150 -140

A.C. 0.00 S.F. V.C. 0.00 C.Y. A.F. 1698.02 S.F. V.F. 6388.38 C.Y.

1080

1100

1090

1o'>() ,00

cp· -1.08%

I_ - ,,_0:1o?"'

cp· -4%

PRES.R/W

1100

1090

I

I

1

-------------

1080 l~-i-:-~-l---:-_--_--~- :,~i~,:_i :_!; i~_!~ --~~ c Jc,~ -J, -,~,,~i-,1,--: --,:_ ,~_J; --_,,~,,,;o~~ '010,-, -;2,lo, --,~,3,o~ c-4Jo;- :_,5Jo; --;6,o ~ l100~ ;8Jo, --, -;9[0~ ,~1,ol,o; c-,1i1;0::;"~12lo~"'~1;3(0~::~1;4,o ---;1J51co 1010 1070- -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 704-+00 I 120 -110

_150

-140 -130 - it NORTHBOUND

A.C. 0.00 S.F. v.c. 0.00 C.Y. ~OJ 'O""? I ... 0"_0_ "0

- - - -~~=--~- ~ -- - -~ - ----------------

1080

1100

A.F.1301.74 S.F. V.F. 5819.81 C.Y. ..._00'°· ·"-OOJ<o· -~

cp· -2% cp· -2%

1090

1080

PRES. R/W

- - - - -- - -

I I

1100

1090

1080

1060

' -140 -130 -120 -150

•I

l I ! ' '~~~j, , _,', ',,,!,-00, ,6 , ,6 , ~· ~ , ~~~, , ,j, , ,j, , ,;', 1060 wm oo oo wo "" '"' "" '°" "' 0 10 20 30 40 50 60 70 -30 -20 -1 0

_ 1 00

-90 -80 -70 -6o ·

50 -

4o 703-00 HATCH LEGEND -110 ON

A.C. 0.00 S.F. V.C. 0.00 C.Y. A.F. 1431.04 S.F. V.F. 7365.11 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l

AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

CUT /FILL TABLE

ESS.:J PHASE 1 CONSTRUCT!

ESS.:J PHASE 2 CONSTRUCTION

~ FUTURE CONSTRUCTION DUNCAN BYPASS SOUTH CONNECTOR

STATE JOB NO. 20316(23)

STEPHENS COUNTY

SHEET NO. X06

Page 61: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1100

1090

1080

-150 -140

1100

1090

1080

1070

-150 -140

1100

1090

1080

1070

-130 -120 -110 -100 -90 -80

A.C. 0.00 S.F. V.C. 0.00 C.Y. A.F.3254.15 S.F. V.F.13647.69 C.Y.

STR_.NEL@: STA.: 708+3_5.0 A026:, 83.-0' RT; CONST• SMD~ TYPE 2, : STUB 163 :L. F. -24" RCP OUT LT. w;: CET.

OR SMD AT :STA .. 708+08.7 AD22, 117.8'

-130 -120 -110 -100 -90 -BO

A.C. 0.00 S.F. V.C. 0.00 C.Y.

A.F.3154.33 S.F. V.F.12703.60 C.Y.

-70 -60 -50

-70 -60 -50

-40 -30 -20

-40 -30 -20

it NORTHBOUND

I "' ()D)'b·

' \'

-1 0 0

709-00 10

o"' -0-· o°' ' c;:i· -6.8%

-1 0

ltl NO'~:HBOUNO o°' ' .. -1.2%

0 10

708-00

it NORTHBOUND

I y,~'

,o°' ip· -1.2%

IE_ 1081.47

20 30 40 50 60 70 80 90 100 110

20 30 40 50 60 70 80 90 100 110

120 130

120 130

1100

1090

PRES.AW

I

I 1oso

I

140 150

1100

PRES. R W

140

I 1090

I

I

150

1080

1070

1100

PRES.R/W

I

I I

1090

1080

1070

1060-+~~~-r~~~-r-~~~T-~~~r-~~---i~~~---j-~~~-r~~~-r-~~~-c-~~~r-~~~r-~~---i~~~~~~~~~~~~~~~~~~~~~~---i~~~---j-~~~-r~~~-r-~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~f-1060

-150 -140 -130 -120 -110 -100 -90 -80

A.C. 0.00 S.F. V.C. 0.00 C.Y. A.F.2810.8"1 S.F. V.F.10731.05 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

CUT /FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0 0

707-00 10 20 30 40 50 60 70

HATCH LEGEND [22] PHASE 1 CONSTRUCTION

[22] PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(23) SHEET NO. X07

Page 62: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

fE_ 1056.'10

BR. (E) ~ STA. 712+08.25 A022 CONST. 3-l'l'X12'X295' LG. RCB, SKEW 66° L.F., 167.5'LG. LT. & 127.5'LG. RT.

fE_ 1080.51

-0.3()% \

'br:;>0 ,o~

\j- -i-5-.8%

Iii NORTHBOUND

I

~~~o ,o

TOP OF SURF ACING THIS PROJECT (TYPICALl

GRADING LINE THIS PROJECT (TYPICAU

1055.52

1090

1080

1 070 R/

PRE,. R/W I

106d

AT STA. 712+79 68,: 151 ;28' LT. 1050-+~~~-r~~~-r-~~~c-~~~r-~~--c~~~--c~~~-r~~~-r-~~~-r-~~~r-~~~r-~~--c~~~~~~~~~~~~~~~~~~~~~~--c~~~--c~~~-r~~~-r-~~~-r-~~~~~~~~~~~-A_T~ST_A_.~7_11_+_5~8_.8_2~·~1_15~8_6'_R~T_.~~~~~~~f- 50

-150 -140 -130 -120

A.C. 0.00 S.F. V.C. 0.00 C.Y. A_F.4464 92 S_F V_F_ 19945_77 CY

1090

1080

1070

1060

-150 -140 -130 -120

A.C. 0.00 S.F. V.C. 0.00 C.Y. A.F.4900.92 S.F. V.F. 0.00 C.Y.

CUT/FILL TABLE FOR STA. 711+QO+

1100

1090

1080

1070

-110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0 0

712-00 10 20 30 40 50 60

STA. 711 +36.13 A022, END TYPICAL SECTION NO. 3A, BEGIN TYPICAL SECTION NO. 3D ON NORTHBOUND

IL I079.Q6

-110 -100 -90 -BO

A.C. 0.00 S.F. V.C. 0.00 C.Y. A.F.2405.72 S.F. V.F.11248.11 C.Y.

CUT/FILL TABLE FOR STA. 711-00-

-70 -60 -50 -40 -30

STARTING FROM STA. 711-00 lil NORTHBOUND (A022l, CUT/FILL TABLES INCLUDE EARTHWORK QUANTITIES

FOR RAMP D CONSTRUCTION ON THE RIGHT.

:_4%

o"' "' o~

' _rp_· -~5.B%

-20 -1 0

Iii NORTHBOUND

I

,~

"o ,o \j• -1.2%

0

711-00 10

ltil NO:~HBOUND [!,· o" ' ~- -1.2%

20 30 40 50 60

70 80 90 100 110 120 130 140 150

70 80 90 100 110 120 130 140 150

1100

1090

1080

PRES.R W

1070

1060-+~~~-r~~~-r-~~~c-~~~r-~~--c~~~--c~~~-r~~~-r-~~~-r-~~~T--~~~c-~~--c~~~~~~~~~~~~~~~~~~~~~~--c~~~--c~~~-r~~~-r-~~~-r-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~f-1060

-150 -140 -130 -120 -110 -100 -90 -80

A.C. 0.00 S.F. V.C. 0.00 C.Y. A.F.2876.00 S.F. V.F.13054.95 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

CUT /FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0 0

710-00 10 20 30 40 50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(23) SHEET NO. XOB

Page 63: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

:..43

1080

1070 --Cc-·~··-~

</? ~·

o~

' r;-i· -+'5.8%

-------------

PRES.A

I

I _________ J_

1090

1080

1070

1080

1070

1060

1oso--+~~~-r~~~-r-~~~c-~~~r--~~---i~~~--+~~~-r~~~-r-~~~-r-~~~r--~~~r--~~--T~~~~~~~~~~~~~~~~~~~~~~--T~~~--+~~~-r~~~-r-~~~-r-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~r-10so

-150 -140 -130 -120 -110 -100 -90 -80

A.C. 0.00 S.F. V.C. 0.00 C.Y. A.F.3614.45 S.F. V.F.17206.07 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

CUT /FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0 0

713-00 10 20 30 40 50 60 70

HATCH LEGEND [22] PHASE 1 CONSTRUCTION

[22] PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(23) SHEET NO. X09

Page 64: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

1080

-150 -140 -130 -120

1090

1080

-150 -140 -130 -120

1090

1080

-150 -140 -130 -120

1090

1070

-110 -100 -90 -80

A.C. 112.40 S.F. V.C. 370.33 C.Y. A_F 16_36 S_F_ V_F 402.03 C.Y

------

-110 -100 -90 -80

A.C. 87.58 S.F. V.C. 354.32 C.Y.• A.F. 172.42 S.F. V.F. 1731.11 C.Y.•

-70 -60 -50

-70 -60 -50

• VOLUME CALCULATION HAS TAKEN ACCOUNT OF STATION EQUATION: STA. 718"85.1259 BK= STA. 718+59.5627 AHD A022

-110 -100 -90 -BO

A.C. 6''!.80 S.F. V.C. 511.39 C.Y. A.F. 474.96 S.F. V.F. 2562.52 C.Y.

-70 -60 -50

-40 -30

-40 -30

-40 -30

-20

-20

"'"' ~-o"' ' ip· -5.7T'/,

-20

-1 0 0

AH 720-00

-1 0 0

AH 719-00

-1 0 0

718-00

1090

1080

10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

PRES.R/W R/W

_________ l ______________ J 1090

1080

10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

1090 PRES.R/W

I R/W

~~--------l ___________ J ____________ _ 1080

10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

1090

PRES.R/W

I R/W

-~-~-___________ !__ l ------

1080

1070

"-..-.. ____________ _

1060-+~~~-r~~~-r-~~~T-~~~r-~~---i~~~---j-~~~-r~~~-r-~~~-c-~~~r-~~~r-~~---i~~~~~~~~~~~~~~~~~~~~~~---i~~~---j-~~~-r~~~-r-~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~f-1060

-150 -140 -130 -120 -110 -100 -90 -80

A.C. 211.35 S.F. V.C. 429.91 C.Y. A.F. 728.31 S.F. V.F. 4638.42 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

CUT /FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0 0

717-00 10 20 30 40 50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(23) SHEET NO. X 1 0

Page 65: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1100

1090

~r;r,,"'

-------'------~------=_::_:-_=-=--=-::_:-::_::_:-_=-=--=-=--=-:-:-=-~-:c-~-~----..:;_ - _+-:- -,,-- -~-"'r-="tC:z" ==''2z::=:::;:::::::;;;"::\~~"<--::."a::~:;~;:~::_:::;;::';";;~::,0::0:;:,;:.~::::_:;lt=I'::" N::;:::0::: 0:::~;:H::B=O;:U=N::~z=~,,,_=-~=-r - r-~ ~ ~ - - - - ~ - - - - - - - - - - ~ - - - _ ]~EJ(~:J~ ------------------------ 1100

1090

1080-+----r-~--r----r----r----c----t----r-~--r----r----c----c-----c----+----r-~-------------~---+----r-~--r----r----c----c-----T-----~-~-~---------t-1080

-150 -140 -130 -120

1100

1090

-110 -100 -90 -80 ~A~.c=. ~3~1.~2~1 ~s~.F~.-v~.c~.-1~5~4~.0~1~c.~v.~

A_F 62.BLI S_F_ V_F 219-29 C.Y

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

AH 724-00

1100

1090

1080-+-~--r-~--r----c----c-----c----+----r-~--r----r----T-----c----t-----~-~---------------+----+----r-~---c----T-----------------~-~-----------f--1080

-150 -140 -130 -120

1100

1090

-110 -100 -90 -80

A.C. 51.99 S.F. V.C. 220.33 C.Y. A.F. 40.13 S.F. V.F. 124.88 C.Y.

-70 -60 -50 -40 -30 -20 -1 0 0 10

AH 723-00

it NORTHBOUND I

20 30 40 50 60 70 80 90 100 110 120 130 140 150

1100

1090

1080-+----'---r--'---r--.;...-T---'--c--"---+----'--+----'---r--'---r---'---r---'--c--"---c----'--+-----------------------+----'--+----'---r--'---r---'---r---'-----------------~-----------f--1080

-150

1100

1090

-140 -130 -120 -110 -100 -90 -80

A.C. 66.99 S.F. V.C. 272.43 C.Y. A.F. 18.51 S.F. V.F. 87.40 C.Y.

-70 -60 -50 -40 -30 -20 -10 0 10

AH 722-00

it NORTHBOUND I

20 30 40 50 60 70 80 90 100 110

-~g,,'' .;? "<--() >'lopa 0~<o ,gi'9' PRES. R/W R/W

120 130 140 150

~~;~:00% , "'

00

,39% ,,e ,o ·-- ___ • ____ ·-- ___ -____ •---- _._ ----· • I l --'---'--'---'--~======co--=-'-"-rc7-7-~~--====~-::::::::=:::::=::::::::::::=::::::=::::::'.:=:::::Z~======::=:'=C::=L:="'-"'-.:....::z::.z_-7-T ~- - - - - - - -- - ~ - - - - - 1 - - - - - - - - - - - - -- - - - - - - - - - - - - - _______ _

-~--------

1100

1090

1080-t-~--r-~--r----c----r-----c----+-----+--~--r-----r----T-----c----t-----~-~---------------+----+-~--r-~---c-----r---------------~-~-~-----------f--1080

-150 -140 -130 -120 -110 -100 -90 -80

A.C. 80.12 S.F. V.C. 356.52 C.Y. A.F. 22.53 S.F. V.F. 82.82 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

CUT /FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0 0

AH 721-00 10 20 30 40 50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION ESS.:J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(23) SHEET NO. X 1 1

Page 66: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1100

1090 --------------------------------

1080

-150 -140 -130 -120 -11 o -100 -90 -80

A.C. 0.00 S.F. v.c. 0.00 C.Y. A.F 279 22 S_F V.F 356_78 c y

CUT /FILL TABLE FOR ST A. 728+00

A.C. 0.00 S.F. v.c. 0.00 C.Y. A.C. 0.00 S.F. v.c. 9.67 C.Y. A.F. 279.22 S.F. V.F. 0.00 C.Y. A.F. 447.27 S.F. V.F. 1052.08 C.Y.

CUT /FILL TABLE FOR ST A. 727+70+ CUT/FILL TABLE FOR STA. 727+70-1100

1090 -----------------

-150 -140 -130 -120 -110 -100 -90 -80

A.C. 7.46 S.F. V.C. 27.93 C.Y. A.F. 258.47 S.F. V.F. 939.10 C.Y.

CUT/FILL TABLE FOR STA. 727-00

1100

1090

-150 -140 -130 -120 -110 -100 -90 -80

A.C. 7.62 S.F. V.C. 35.54 C.Y.

A.F. 182.50 S.F. V.F. 806.21 C.Y.

1100

1090

-70 -60 -50

-70 -60 -50

SHLDR. BREAKDVERS 1.1°& 4.3°AS SHOWN ( 7' MAX. PERMITTED) CCDNTRACTOR TO ADJUST X-SLOPES AS NEEDED, TO AVOID SHARP EDGES)

-40 -30

SHLDR. BREAKOVERS

-20

1.1° & 4.3°AS SHOWN ( 7° MAX. PERMITTED) CCONTRACTDR TO ADJUST X-SLDPES AS NEEDED, TO AVOID SHARP EDGES)

-40 -30 -20

STARTING FROM STA. 727+70 lil: NORTHBOUND (A022), OR STA. 727+15 lil: SOUTHBOUND (A021l,

CUT/FILL TABLES SPLIT INTO SOUTHBOUND CONSTRUCTION AND NORTHBOUND CONSTRUCTION <IN A DIFFERENT SEn.

-70 -60 -50 -40 -30 -20

It\_ NORTHBOUND '0'?'1-

,oe +1.28% ~ -4.00%

-1 0 0 10

AH 728-00

It\_ NORTHBOUND

I '"' ~-

0~

' ~- -4.00% -1".l1%

-1 0 0 10

AH 727-00

-10 0 10

AH 726-00

20 30

20 30

20 30

40 50 60

PRES.R/W

I I

___________________________ L _________________ _

70 80 90 100 110

PRES.R/W

I

I

120 130 140

~--~--~----~----~-------------- ______ J ____________________ _

40 50

40 50

--,--~-

60 70

60 70

80 90 100 110

PRES. RIW

I I

120 130

_____________ L ______________ _

80 90 100 110 120 130

140

140

R/W

PRES. R/WJ

------------------------- --------------------------

1100

1090

150

1100

1090

150

1100

1090

150

1100

1090

1080--t~~~~~~~~c-~~~T-~~~-c-~~~--+-~~~---j-~~~---i~~~~c-~~~T-~~~-c-~~~--+-~~~---j-~~~~~~~~~~~~~~~~~~~~~~~~---j-~~~---i~~~~c-~~~T-~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~--t-1080

-150 -140 -130 -120 -110 -100 -90 -80

A.C. 11.57 S.F. V.C. 79.22 C.Y.

A.F. 196.07 S.F. V.F. 551.38 C.Y.

AREA CUT CA.C.l VOLUME CUT 1V.C.l

AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

CUT /FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0 0

AH 725-00 10 20 30 40 50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION

~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

STATE JOB NO. 20316(23) SHEET NO. X 1 2

Page 67: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1110

1100

1090

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60

A.C. 0.00 S.F. V.C. 0.00 C.Y. A.F 695.82 S.F. V.F 2758.19 C.Y

1110

1100

1090

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60

A.C. 0.00 S.F. V.C. 0.00 C.Y. A.F. 599.33 S.F. V.F. 2596.34 C.Y.

1110

1100

1090

1080

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60

A.C. 0.00 S.F. V.C. 0.00 C.Y.

A.F. 619.82 S.F. V.F. 2290.31 C.Y.

1100

1090 -~----~---------

1080

-150 -140 -130 -120 -11 o -100 -90 -80 -70 -60

I• 10' •I A.C. 0.00 S.F. V.C. 0.00 C.Y.

l A.F. 455.63 S.F. V.F. 1564.96 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l

AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

CUT /FILL TABLE

~ NORTHBOUND

I

~-~----

-50 -40 -30 -20 -1 0 0 10 20 30 40

AH 732-00

~ NORTHBOUND ej I 00

6· N ,o

' '" O· +1·% <J%

7 .. : J

-50 -40 -30 -20 -1 0 0 10 20 30 40

AH 731-00

STA. 730+36.50, END TYPICAL SECTION NO. LID, BEGIN TYPICAL SECTION NO. LIE

"'6.05%

-50 -40 -30 -20 -10

AH

6.67%

- ----

-50 -40 -30 -20 -1 0

AH

~ NORTHBOUND I

0

"""" (1,• ,o ' c?· ·-a.95%

730-00 10

~ NORTHBOUND

I

0" 0 ,o

' 9· -3.33%

0 10

729-00

20 30 40

20 30 40

50 60 70 80 90 100 110 120 130 140

50 60 70 80 90 100 110 120 130 140

50 60 70 80 90 100 110 120 130 140

PRES.R/W

I I

~----------'-------------------- ______ _] ________________

50 60 70 80 90 100 110 120 130 140

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION

~ FUTURE CONSTRUCTION DUNCAN BYPASS SOUTH CONNECTOR

STATE JOB NO. 20316(23)

150

150

150

150

1110

1100

1090

1110

1100

1090

1110

PRES. R/ 1100 I

1090

1080

1100

1090

1080

I

I

STEPHENS COUNTY

SHEET NO. X13

Page 68: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1110

1100

1090

1080

-150 -140 -130 -120

1110

1100

1090

1080

-150 -140 -130 -120

STA_ 733-+57-33 A022, BEGIN EARTHWORK QUANTITY EXCEPTION

1110

1100

1090

-110 -100 -90 -80

-110 -100 -90 -BO

A.C. 0.00 S.F. V.C. 0.00 C.Y. A.F. 940.95 S.F. V.F. 3060.58 C.Y.

-------

-70

-70

CUT/FILL TABLE FOR STA. 73307.33

~ NORTHBOUND

Li*~cfl -----~--

- --------

-60 -50 -40 -30 -20 -1 0 0 10 20 30 40 50 60 70 80 90

AH 735-00

"3%

--~----------------~~~~~~~~~---'-----------------------

-60 -50 -40 -30 -20 -1 0 0 10 20 30 40

AH 734-00

STA. 733'96.50 A022, END APPROACH SLAB, BEGIN BR. 'G' STA. 733"66.50 A022, BEGIN APPROACH SLAB, END TYPICAL SECTION NO. 4E

ej

"' "' ITT N tS%

~ NORTHBOUND

I "'90">0

' cp· +1 %

50 60 70 80 90

1110

1100

1090

1080

100 110 120 130 140 150

1110

1100

1090

1080

100 110 120 130 140 150

1110

1100

1090

1080-+~~~-r~~~-r-~~~T-~~~r-~~---i~~~---j-~~~-r~~~-r-~~~-c-~~~r-~~~r-~~---i~~~~~~~~~~~~~~~~~~~~~~---i~~~---j-~~~-r~~~-r-~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~f-1080

-150 -140 -130 -120 -110 -100 -90 -80

A.C. 0.00 S.F. V.C. 0.00 C.Y. A.F. 802.94 S.F. V.F. 3191.80 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

CUT /FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0 0

AH 733-00 10 20 30 40 50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(23) SHEET NO. X 1 4

Page 69: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1120 it NORTHBOUND I

1110

1100

1090

1080 --------------- ------------

-----------150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0 0 10

AH 738-00

it NORTHBOUND

~~Aj 1110

1100

1090

1080

---

-150 -140 -130 -120 -110 -100 -90 -BO -70 -60 -50 -40 -30 -20 -1 0 0 10

AH 737-00

It NORTHBOUND

I 0~

. --- ---- --- ---- ---- --- ---- --- - ,,00

LpM{a~ 1110

1100

1090

------------------

1080

1070

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0 0 10

AH 736-00

20 30 40

----

20 30 40

20 30 40

50 60 70

----

50 60 70

50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION

~ FUTURE CONSTRUCTION

80 90 100

80 90 100

80 90 100

110 120 130

--

110 120 130

110 120 130

PRES. R/W

I

I f __ _

140

140

140

DUNCAN BYPASS SOUTH CONNECTOR

STATE JOB NO. 20316(23)

1120

1110

1100

1090

1080

150

1110

1100

1090

1080

150

1110

1100

1090

1080

1070

150

STEPHENS COUNTY

SHEET NO. X 1 5

Page 70: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1110

1100

1090

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50

STA 741-+04_9"1 A022, A.C. 0.00 S.F. V.C. 0.00 C.Y. END EARTHWORK QUANTITY EXCEPTION A.F.3320.93 S.F. V.F. 0.00 C.Y.

CUT/FILL TABLE FOR STA. 741-04.94

1110

1100

1090

1080

-------------------------------

-150 -140 -130 -120 -110 -100 -90 -BO -70 -60 -50

1110

1100

1090

1080 -------------------------------------------

STA. 741-01.50 A022, END APPROACH SLAB, BEGIN TYPICAL SECTION NO. 4E

:+8%

NORTHBOUND 00 ~

~------~- - -- - - -- - - - -- - -

-40 -30 -20 -1 0 0 10

AH 741-00 20 30 40

STA. 740+71.50 A022, END BRIDGE "G", BEGIN APPROACH SLAB

it NORTHBOUND

. --- ---- --- ---- ---- --- ---- --- _[__ ()~()OJ

LfQPL(:a~

50

------~---------------

-40 -30 -20 -1 0 0 10 20 30 40 50

AH 740-00

it NORTHBOUND

I of'

fy . --- ---- --- ---- ---- --- ---- --- -.. ,,a ----11 ,.

60 70 80 90 100

-------------

60 70 80 90 100

PRES.R/W

110

------------------

120 130 140

PRES. R/W

I

I --------J __________ _

110 120 130 140

150

150

:s~1: -----------------------------~~-------------------------------------

1110

1100

1090

1080

1110

1100

1090

1080

1110

1100

1090

1080

1070-+~~~-r~~~-r-~~~c-~~~r-~~---i~~~--c~~~--r~~~-c-~~~-c-~~~r-~~~r-~~---i~~~~~~~~~~~~~~~~~~~~~~---i~~~-c~~~-r~~~-c-~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~f-1070

-150 -140 -130 -120 -110 -100 -90 -80

AREA CUT (A.C.l VOLUME CUT 1V.C.l AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

CUT /FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0 0 10

AH 739-00 20 30 40 50 60 70

HATCH LEGEND [22] PHASE 1 CONSTRUCTION

[22] PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(23) SHEET NO. X 1 6

Page 71: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1100

1090

1080

-140 -130 -120

1110

1100

1090

1080

-140 -130 -120

1110

1100

1090

1080

-110 -100 -90 -80

A.C. 0.00 S.F. V.C. 0.00 C.Y.

A.F. 536.01 S.F. V.F. 3632.36 C.Y.

-110 -100 -90 -BO

A.C. 0.00 S.F. V.C. 0.00 C.Y.

A.F.1169.62 S.F. V.F. 6999.54 C.Y.

-70 -60

-70 -60

STA. 744•31.50 A022, END TYPICAL SECTION NO. 4E, BEGIN TYPICAL SECTION NO. 4D.

~ NORTHBOUND

I

~~ ,o~

c;:i· +1 %

"1" Cb h

_·· ·~-._·· - ___:·_:__;__._··:_:__:_•:__:_:__·:..:_._ ---,---___:_·__:_:_: •• _-----,- -b:::-1'3 ------------------------------------- -

-50 -40 -30 -20 -1 0

"3%

-50 -40 -30 -20 -1 0

~---•--L -~-~--~•--L- _ ----

0 10

AH 744-00

~ NORTHBOUND I

0 10

AH 743-00

~I NO:~HBOUNO (1.• ,o

~-"' ~1%

20 30 40 50

20 30 40 50

60 70 80 90 100 110 120 130 140

----------------------------------

60 70 80 90 100 110 120 130 140

-----~----------------------------

1100

RES. R/W

150

150

I

1d90 I

1080

1110

1100

1090

1080

1110

1100

1090

1080

1070-+~~~-r~~~-r-~~~T-~~~r-~~---i~~~---j-~~~-r~~~-r-~~~-c-~~~r-~~~r-~~---i~~~~~~~~~~~~~~~~~~~~~~---i~~~---j-~~~-r~~~-r-~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~f-1070

-150 -140 -130 -120 -110 -100 -90 -80

A.C. 0.00 S.F. V.C. 0.00 C.Y.

A.F.2117.12 S.F. V.F.11008.93 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l

AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

CUT /FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0 0

AH 742-00 10 20 30 40 50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION

~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

STATE JOB NO. 20316(23) SHEET NO. X 1 7

Page 72: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1100

1090

-140 -130

1100

1090

-140 -130

1100

1090

1080

-150 -140 -130

1100

1090

1080

-120

-120

-110 -100 -90 -80

A.C. 633.82 S.F. V.C. 1861.61 C.Y. A.F o_oo S_F_ V_F o_oo c_y

-110 -100 -90 -80

A.C. 371.45 S.F. V.C. 879.11 C.Y. A.F. 0.00 S.F. V.F. 63.23 C.Y.

----------

-120 -110 -100 -90 -BO

A.C. 103.27 S.F. v.c. 201.59 C.Y. A.F. 29.69 S.F. V.F. 531.11 C.Y.

------------

-70 -60 -50 -40 -30 -20 -1 0

-70 -60 -50 -40 -30 -20 -1 0

"3%

-70 -60 -50 -40 -30 -20 -1 0

it NORTHBOUND

I

0 10

AH 748-00

it NORTHBOUND

I

0 10

AH 747-00

AH

it NORTHBOUND

I roryro

()e

' ~- +1%

0

7%-00 10

20 30

20 30

20 30

40

40

40

50

50

PRES. R/W

i;jt"' I -~-~-~~-~--------1

60 70 80 90 100 110 120

PRES.R/W

~I~ er-.=------:----------------1-------

I

I

I

60 70 80 90 100 110 120

PRES. R/W

~-~ i;j~;:

---'----:-------0--_---,---.'..-_--,--,--,---_~-----·-------------- _---

50 60 70 80 90 100 110 120

130 140

130 140

130 140

PRES.R/W

~ ~ I

~ ~ 1-

-------------------------------------------------- 1

1100

1090

150

1100

1090

150

1100

1090

150

1100

1090

1080

1070-+~~~-r~~~-r-~~~i-~~~r-~~---i~~~---j-~~~-r~~~-r-~~~-c-~~~r-~~~r-~~---i~~~~~~~~~~~~~~~~~~~~~~---i~~~---j-~~~-r~~~-r-~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~f-1070

-150 -140 -130 -120 -110 -100 -90 -80

A.C. 5.59 S.F. V.C. 10.35 C.Y. A.F. 219.70 S.F. V.F. 1609.38 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

CUT /FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0 0

AH 745-00 10 20 30 40 50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(23) SHEET NO. X 1 8

Page 73: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1100

1090

-150 -140

1100

1090

-150 -140

1100

-150 -140

1100

1090

-130 -120

-130 -120

-130 -120

-110 -100 -90 -80

A.C.1089.76 S.F. V.C. 4'192.28 C.Y. A.F o_oo S_F_ V_F o_oo c_y

-110 -100 -90 -80

A.C.1336.07 S.F. V.C. 4713.33 C.Y.

A.F. 0.00 S.F. V.F. 0.00 C.Y.

-110 -100 -90 -80

A.C.1209.13 S.F. V.C. 3939.65 C.Y.

A.F. 0.00 S.F. V.F. 0.00 C.Y.

-~----~~ -------

it NORTHBOUND

-70 -60 -50 -40 -30 -20 -1 0 0 10

AH 752-00

it NORTHBOUND

-70 -60 -50 -40 -30 -20 -1 0 0 10

AH 751-00

it NORTHBOUND

-70 -60 -50 -40 -30 -20 -10 0 10

AH 750-00

It NORTHBOUND

20 30

20 30

20 30

CAUTION !!! LOCATE FIBER OPTIC LINE. ACTUAL BACKSLOPE TO BE DETERMINED BY THE ENGINEER.

40 50 60

CAUTION !!! LOCATE FIBER OPTIC LINE. ACTUAL BACKSLOPE TO BE DETERMINED BY THE ENGINEER.

40 50 60

CAUTION !II LOCATE FIBER OPTIC LINE. ACTUAL BACKSLOPE TO BE DETERMINED BY THE ENGINEER

40 50 60

PRES. R/W

70

PRES. R/W

ES~I '!! __ cc __ --1 c_ 0

-1

70

PRES.R/W

ES~ I '!! __ 5: ___ J c_ 0

- -I

70

80

80

80

PRES. R/W

Eif'-' I 9'.! b:: I c_ 0

- --1

1100

1090

90 100 110 120 130 140 150

1100

1090

90 100 110 120 130 140 150

1100

90 100 110 120 130 140 150

1100

1090

1080-+-~---r-~--r--~-i--~-r-------i-~--+-~---r-~--r--~--c--~-r-----r--~---T-~-~-~-~-~-~-~-~-~--~---T-~--+-~---r-~--r--~--c--~-~--~-~-~-~-~-~-~-~-~-~-~-~-r-1080

-150 -140 -130 -120 -110 -100 -90 -80

A.C. 918.28 S.F. V.C. 2874.26 C.Y. A.F. 0.00 S.F. V.F. 0.00 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

CUT /FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0 0

AH 749-00 10 20 30 40 50 60 70

HATCH LEGEND [22] PHASE 1 CONSTRUCTION

[22] PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(23) SHEET NO. X 1 9

Page 74: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

~NORTHBOUND PRES.R/W

~~-~-· ~~~~~~~~----------.~-.·---.-_~·=_:_=· ~-~=~·~~:,_=z~_~.~~-~:~.~~~~/~.~;~l~:~:~~~~~~-~~~------------~~--l ___ _ ~- IE 1082.84

1080

-150 -140 -130 -120

1090

1080

-150 -140 -130 -120

STR. NO. @ EX I ST. 6'X5'Xl 35 8' LG. RCB STA. 1'19+58.0 A021, 21.0' LT. OUTLET; STA. 150+32.0 A021, 92.9' RT. OR STA. 154+23.5 A022, 141.9'LT.INLET. REMOVE HDWLLS. & 21'LG. RCB RT. EXTEND '11.7' LG. 6'X5' RCB LT. & CONST. HDWLL. AT OUTLET STA. 1'19+32.2 A021, 61.0' LT.

1090

-110 -100 ·90 ·80

A.C. 43.61 S.F. V.C. 128.70 C.Y.

A.F. 116.08 S.F. V.F. 1113."18 C.Y.

-110 -100 ·90 ·80

A.C. 25.89 S.F. V.C. 416.19 C.Y. A.F. 406.77 S.F. V.F. 960."16 C.Y.

·70

·70

STR.NO.@ STA. 750+19.80 A021, 73.TRT. DR STA. 754+19.0 A022, 164.2' LT. CONST. CD I AND 6'X5'X 192. 8' LG. RCB & HDWLL. AT INLET STA. 754+19.0 A022, 33.0' RT.

·60 ·50 ·40 ·30

·60 ·50 ·40 ·30

STR.ND.@ STA. 15'1+31.2 A022 CONST. SMD-TYPE 2, 51 .2' LT. STUB 6 L.F. 2'1' RCP INTO RCB

SEE :CROSS SECJI ON AT STA. 75D+OO: A021 ON SHEET.NO. 32 FOR MORE DETAILS.

GRATE I[ 1080.50 BOX fl 1:D71 .1'.10 PIPE AT RCB --fl_ 1'016 40

·20 ·1 0

·20 ·1 0

6'X5'Xl 92 .:8' LG. RCB AT 0. 70%

IE. 1074.56

0 10 20

AH 756-00

~ NORTHBOUND

I "' o."00·

' -2% i;:i· -4%

0 10 20

AH 755-00

30 40

30 40

IE. ]015 91

50 60

IE 1078.28

50 60

CAUTION !!! LOCATE FIBER OPTIC LINE. EXCAVATION SHALL BE AS DIRECTED BY THE ENGINEER.

70 80 90

70 80 90

1090

1080

100 110 120 130 HO 150

1090

1080

100 110 120 130 140 150

1090

1080

1070-+~...;..~~~...;..~~~.;...~~~.;...~~~"--~~--;~~~...;..~~~...;..~~~.;...~~~.;...~~~"--~~-;~~~~~~~~~~~~~~~~~~~~~~~~~~--;~~~...;..~~~...;..~~~.;...~~~.;...~~~~~~~~~~~~~~~~~~~~~~~~~~~~f-1070

-150 -140 -130 -120 -110 -100 ·90 ·80 ·70 ·60 ·50 ·40 ·30 ·20 ·1 0 0 10 20

AH 754+19

1090

1080

-150 -140 -130 -120 -110 -100 ·90 ·80 ·70 ·60 ·50 ·40 ·30 ·20 ·10 0 10 20

A.C. 198.85 S.F. V.C. 1492.85 C.Y. AH 754-00

A.F. 44.23 S.F. V.F. 94.19 C.Y.

1090

1080

30

30

40 50 60

CAUTION !!! LOCATE FIBER OPTIC LINE. ACTUAL BACKSLOPE TO BE DETERMINED BY THE ENGINEER.

t 1071.86

40 50 60

I[ 1082.86

CAUTION !!! LOCATE FIBER OPTIC LINE. ACTUAL BACKSLOPE TO BE DETERMINED BY THE ENGINEER

70 80

PRES.R/W

70

I

I

I

80

PRES.R/W

::s .. t~.. I ~ ~ I

__ .J

90 100 110 120 130 140 150

1090

1080

90 100 110 120 130 140 150

1090

1080

1070-+~~~-r~~~-c-~~~T-~~~r-~~--i~~~-c~~~-r~~~-c-~~~-c-~~~r-~~~r-~~--i~~~~~~~~~~~~~~~~~~~~~~--i~~~-c~~~-r~~~-c-~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~f-1070

-150 -140 -130 -120 -110 -100 ·90 ·80

A.C. 607.29 S.F. V.C. 3142.69 C.Y.

A.F. 0.00 S.F. V.F. 0.00 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l

AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

CUT /FILL TABLE

·70 ·60 ·50 ·40 ·30 ·20 ·10 0

AH 753-00 10 20 30 40 50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION

~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

STATE JOB NO. 20316(23) SHEET NO. X20

Page 75: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1100

RES. R/~90

I

I

I

1100

1090

1080

1100

1090

1080

1090

1080

-150

-150

-150

-140 -130 -120

-140 -130 -120

-140 -130 -120

-110 -100 -90 -80

A.C. 131.91 S.F. V.C. '127.41 C.Y. A_F 99_5.q S_F_ V_F 561.09 C.Y

-110 -100 -90 -80

A.C. 98.69 S.F. V.C. 362.07 C.Y. A.F. 163.93 S.F. V.F. 777.93 C.Y.

-110 -100 -90 -80

A.C. 96.63 S.F. V.C. 3T7.30 C.Y.

A.F. 201.36 S.F. V.F. 703.44 C.Y.

-70

-70

-70

-60 -50 -40 -30 -20 -1 0

-60 -50 -40 -30 -20 -1 0

-60 -50 -40 -30 -20 -10

it NORTHBOUND I

0 10

AH 760-00

it NORTHBOUND I

0 10

AH 759-00

it NORTHBOUND

0 10

AH 758-00

20 30 40 50

20 30 40 50

20 30 40 50

60

60

60

PRES.R/W

:Ji e: I

Li::~ l~ --- --------------------------------------

oeru .. ···· .I

70 80 90

70 80 90

70 80 90

:------------

100 110 120 130

9;i b:: li-. o_ -

140

PRES.R/W

I

I

I

EJ .. t" .. ---~--- ---------

100 110 120 130 140

100 110 120 130 140

PRES. RIW

ecru I cu c: I ~~

-- >~--1

150

150

150

1100

1090

1100

1090

1080

1100

1090

1080

1090

1080

1070-+~~~--r~~~-r-~~~T--~~~r--~~---i~~~---j-~~~--r~~~-r-~~~-c-~~~r--~~~r--~~--T~~~~~~~~~~~~~~~~~~~~~~--T~~~---j-~~~--r~~~-r-~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~r-1010

-150 -140 -130 -120 -110 -100 -90 -80

A.C. 1 07.11 S.F. V.C. 279.11 C.Y. A.F. 128.95 S.F. V.F. 521.82 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

NORTHBOUND CONST. CUT/FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0 0

AH 757-00 10 20 30 40 50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(23) SHEET NO. X21

Page 76: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

I• 10'

1110

1100

1090

1080

-150

1110

1100

1090

1080

-150

1100

1090

1080

-150

1100

PRES.R/W

I I I _______________ _

-140 -130 -120 -11 o -100 -90 -80

-.A.C. 383.15 S.F. v.c. 1267.52 C.Y. A.F 0-29 S_F_ V.F 15_65 C.Y

-. HAS BEEN SUBTRACTED FROM 6_67 S.F OF REMOVAL OF ASPHALT PAVEMENT

PRES.R/W

I I L~-------~---------

-140 -130 -120 -110 -100 -90 -80

-.A.C. 301.31 S.F. v.c. 1073.80 C.Y. A.F. 7.06 S.F. V.F. 72.47 C.Y.

-. HAS BEEN SUBTRACTED FROM 6.67 S.F. OF REMOVAL OF ASPHALT PAVEMENT

PRES.R/W

I I ---

J ___ __c _____

-140 -130 -120 -110 -100 -90 -80

-.A.C. 278.54 S.F. V.C. 808.78 C.Y. A.F. 26.97 S.F. V.F. 179.42 C.Y.

-. HAS BEEN SUBTRACTED FROM 6.67 S.F. OF REMOVAL OF ASPHALT PAVEMENT.

RES.R/W 1090 I --

I 1--~-----'

1080

-150 -140 -130 -120 -110 -100 -90 -80

•I A.C. 158.20 S.F. V.C. 537.24 C.Y.

l A.F. 57.28 S.F. V.F. 333.97 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l

AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

NORTHBOUND CONST. CUT/FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0

-~~

-70 -60 -50 -40 -30 -20 -1 0

-70 -60 -50 -40 -30 -20 -10

STA. 761->66.31 AD22, END TYPICAL

-70 -60 -50 -40 -30 -20 -1 0

AH

-8%

AH

-8%

AH

~ NORTHBOUND I

0 10

764-00

~ NORTHBOUND I

fl?' ,, ' .. '"' ,arf'.pS

(:,. <Q<v «.·,,_a -8%

0 10

763-00

l NORTHBOUND ~..:y' ,,

" .. O;~ s'0 ,._r:p~

(o· <Q<v '<.::<-.a_ -~8%

0 10

762-00

20

20

20

SECTION NO. 40, BEGIN

~ NORTHBOUND I

0 10 20

AH 761-00

30

--

30

-

30

TYPICAL

---- -

30

1110

1100

1090

1080

40 50 60 70 80 90 100 110 120 130 140 150

1110

-------------------- 1100

1090

1080

40 50 60 70 80 90 100 110 120 130 140 150

1100

----------------~-

1090

1080

40 50 60 70 80 90 100 110 120 130 140 150

SECTION NO. 4H

p

1100

---------

1090

1080

40 50 60 70 80 90 100 110 120 130 140 150

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION

~ FUTURE CONSTRUCTION DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

STATE JOB NO. 20316(23) SHEET NO. X22

Page 77: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1120

1110

1100

1090

1120

1110

1100

1090

1120

1110

1100

1090

1110

1100

1090

10' I •

-150 -140

PRES.R/W

I I I __ ~-~---

-130 -120 -110 -100 -90 -80

.,. HAS BEEN SUBTRACTED FROM 6.67 S.F. TA.C. 359.16 S.F. V.C. 1361.22 C.Y.

-150

OF REMOVAL OF ASPHALT PAVEMENT.

PRES.R/W

I

I

A.F. 0.00 S.F. V.F. 0.00 C.Y.

I _____ _

-140 -130 -120 -110 -100 -90 -80

T HAS BEEN SUBTRACTED FROM 6.67 S.F. "'A.C. 375.90 S.F. V.C. 1"108.35 C.Y.

-150

OF REMOVAL OF ASPHALT PAVEMENT.

PRES.R/W

I

I

l_~_l

A.F. 0.00 S.F. V.F. 0.00 C.Y.

-140 -130 -120 -110 -100 -90 -80

T HAS BEEN SUBTRACTED FROM 6.67 S.F. "'A.C. 384.61 S.F. V.C. 1'169.26 C.Y.

-150

OF REMOVAL OF ASPHALT PAVEMENT.

PRES.R/W

I

I

A.F. 0.00 S.F. V.F. 0.00 C.Y.

1 _______ _

-140 -130 -120 -110 -100 -90 -80

T HAS BEEN SUBTRACTED FROM 6.67 S.F. TA.C. 408.79 S.F. V.C. 1'166.56 C.Y. OF REMOVAL OF ASPHALT PAVEMENT. f-A-.F-. --O._O_O_S-.F-.+-V-.F-.--0-.6-7-C.-Y.__,

AREA CUT (A.C.) VOLUME CUT (V.C.l

AREA EMB (A.F.l VOL. EMB. +15% (V.F.l

NORTHBOUND CONST. CUT/FILL TABLE

-70 -60

-70 -60

-70 -60

-70 -60

-50 -40 -30 -20 -10

-8%

it> NORTHBOUND I

0 10

AH 768-00 20 30

SIA. 751 ¥17.17 A022, BEGIN FULL WIDTH AUXILIARY. LANE

40 50 60 70

ST A. 761 ¥17.17 A022, END TYPICAL SECTION NO. 4H, BEGIN TYPICAL SECTION NO. 48

-50 -40 -30 -20 -1 0

-50 -40 -30 -20 -1 0

_-..__;..

-50 -40 -30 -20 -1 0

~ NORTHBOUND

0 10

AH 767-00

-8%

AH

-8%

it> NORTHBOUND I

0 10

755-00

It> NORTHBOUND I

r,,$' <'

""% "I?" s"J·

.,_aOJ,p_ ,. "' '< ·,o -8%

0 10

AH 765-00

20 30 40

20 30 40

20 30 40

---

50 60 70

50 60 70

50 60 70

HATCH LEGEND ESs.:J PHASE 1 CONSTRUCTION

ESs.:J PHASE 2 CONSTRUCTION

~ FUTURE CONSTRUCTION

1120

1110

1100

1090

1080

80 90 100 110 120 130 140 150

1120

-----------------1110

1100

1090

80 90 100 110 120 130 140 150

1120

---------------- 1110

1100

1090

80 90 100 110 120 130 140 150

1110

1100

1090

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

STATE JOB NO. 20316(23) SHEET NO. X23

Page 78: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1110

PRES.R/W

1100 -8%

Iii NORTHBOUND I 1110

---------------

1100

1090~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-1090

-150 -140 -130 -120 -11 o -100 -90 -80 -70 -60 -50 -40 -30 -20 -10

"' HAS BEEN SUBTRACTED FROM 6.67 S.F. "'A.C. 146.95 S.F. V.C. 702.65 C.Y. OF REMOVAL OF ASPHALT PAVEMENT. A.F. 0.00 S.F. V.F. 0.00 C.Y.

1120

0 10

AH 772-00

Iii NORTHBOUND I

20 30 40 50 60 70 80 90 100 110 120 130 140 150

1120

Page 79: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

STA. 779-00, END INCIDENTAL CONSTRUCTION

•A.C. 0.00 S.F. V.C. 0.00 C.Y. A.F. 0.00 S.F. V.F. 35.24 C.Y. STA. 775'47.17, END PROJECT,

CUT/FILL TABLE FOR STA. 775-tLl7.1'i BEGIN INCIDENTAL CONSTRUCTION

T HAS BEEN SUBTRACTED FROM 6.67 S.F. STA. 775'47.14, END TAPER OF REMOVAL OF ASPHALT PAVEMENT.

~ NORTHBOUND

1110 I :f'~' 1110 <f'r:J<,,,.f,,"'

((;,--~

~rc~s<:)· "Ci&-"<' DETOUR

PREfll ------------ ----~ '<~~<(;~ ----- 1100 -··cs%

I ~

I 1b90 1090

-150 -140 -130 -120 -110 -100 ·90 ·80 ·70 -60 -50 -40 -30 -20 -1 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

•A_C 40.3"1 S_F_ vc 210.56 C.Y AH 775-00

A.F. 0.00 S.F. V.F. 0.00 C.Y.

• HAS BEEN SUBTRACTED FROM 6.67 S.F. OF REMOVAL OF ASPHALT PAVEMENT.

~ NORTHBOUND

1110 I sa"'a' 1110 q_.f' <,,.17

"'" 11_rf.q ------ -------

PR S.R/W ,,_ooi~

c:i· Q:i<v 1100

I ~-e% ~-s%'<<::.T:J 1100

I ------I

1090 1090 _,5@ -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

TA.C. 73.36 S.F. V.C. 327.00 C.Y. AH 774-00

A.F. 0.00 S.F. V.F. 0.00 C.Y.

T HAS BEEN SUBTRACTED FROM 6.67 S.F. OF REMOVAL OF ASPHALT PAVEMENT.

~ NORTHBOUND

1110 I -s<J~<

1110

<f'r:J<,,_.f,,V

"'---~ ---------- -------PRES. RIW (\.'Y-s<::i·

I .._<::iO)'<P -----

1100 -~8% o·-«><v- 1100

I _'<-{>-a-8% -----

I -------

1090 1090 _,5@ -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

I• 10' •I AH 773-00 ,. HAS BEEN SUBTRACTED FROM 6_67 S_F ,.A.C. 103.22 S.F. V.C. '163.28 C.Y.

HATCH LEGEND

1 OF REMOVAL OF ASPHALT PAVEMENT. A.F. 0.00 S.F. V.F. 0.00 C.Y.

STA. 772'51.39, END FULL WIDTH AUXILIARY LANE, BEGIN TAPER ESs.:J PHASE 1 CONSTRUCTION AREA CUT (A.C.) VOLUME CUT (V.C.l ESs.:J PHASE 2 CONSTRUCTION AREA EMB (A.F.l VOL. EMB. +15% (V.F.l ~ FUTURE CONSTRUCTION DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

NORTHBOUND CONST. CUT/FILL TABLE STATE JOB NO. 20316(23) SHEET NO. X25

Page 80: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

S.R/W

I

I I

.RIW

I

I

I

1100

1090

-150 -140 -130 -120

1100

1090

1080

-150 -140 -130 -120

1100

1090

1080

-150 -140 -130 -120

1100

1090

----~-------

-110 -100 -90 -80 -70

A.C. 4.46 S.F. V.C. 0.00 C.Y. A_F 120-43 S_F_ V.F 0.00 C.Y

CUT/FILL TABLE FOR STA. 727+15

EARTHWORK QUANTITIES FOR NORTHBOUND CONSTRUCTION STARTING FROM STA. 727+15 A021

-110 -100 -90 -80 -70

---------------------

-110 -100 -90 -80 -70

-----------------

STA. 727+15.19 A021, END TYPICAL SECTION NO. 3B (MODIFIED), BEGIN TYPICAL SECTION NO. '1C.

-60 -50

-60 -50

-------------

-60 -50

-----------

-40 -30 -20 -1 0

-40 -30 -20 -1 0

- - --

-40 -30 -20 -10

0 10 20

AH 727-00

0 10 20

AH 726-00

~ SOUTHBOUND

I ~" ~"

'" (j•

0 10 20

AH 725-00

~ SOUTHBOUND

SHLDR. BREAKOVERS 0.3' & 5.5" AS SHOWN ( 7" MAX. PERMITTEDl <CONTRACTOR TO ADJUST X-SLOPES AS NEEDED, TO AVOID SHARP EDGESl

30 40

SHLDR. BREAKOVERS 1.2' & 6.5' AS SHOWN ( 7' MAX. PERMITTED) (CONTRACTOR TO ADJUST X-SLOPES AS NEEDED, TO AVOID SHARP EDGEl

30 40

X-SLOPE BREAKOVER 'L5° AS SHOWN (CONTRACTOR TO ROUND CROWN PART & ADcJUST X-SLOPES AS NEEDEDl

30 40

50

50

50

60

60

60

70 80 90 100 110 120 130 140

PRES.R/W

I I

_____________________________________ J _____ _

70 80 90 100 110 120 130 140

PRES.R/W

I

I ____________ L ___________

70 80 90 100 110 120 130 140

I of' R/W cf•

....._:_ z ....c. -/- ~--o-,-~-z-=:7==:;-:z;::::-":;-24=%:;:'::"=:L;::,o=.L;:-=2~':;::=Lr_=L_r=.L;:_=_/_::;_:;_=L_;;::::_=L_;::_===z--:7:_~_/_~,-_-7=-_ - ~ - - - - - - - - - - - - - - - - - - - - - - - - - - - -~R~~ ~[~ l _ -----------

PRES.R/W 11go

150

150

150

I

I

1090

1100

1090

1080

1100

1090

1080

1100

1090

1oso~~~~--r~~~-r-~~~T-~~~r--~~---i~~~---j-~~~--r~~~-r-~~~-r-~~~r--~~~r--~~--T~~~~~~~~~~~~~~~~~~~~~~--T~~~---j-~~~--r~~~-r-~~~-r-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~r-1oso

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0 0 10 20 30 40 50

AH 724-00 EARTHWORK QUANTITIES ARE INCLUDED IN

CUT /FILL TABLES FOR SOUTHBOUND CONSTRUCTION. STA. 72'1'69.27 A021, END TYPICAL SECTION NO. 3B, BEGIN TYPICAL SECTION NO. 3B (MODIFIED). AREA CUT (A.C.l VOLUME CUT 1V.C.l SEE SHEETS X01-X11 FOR CROSS SECTIONS FROM STA. 689+00 TO 723+00. AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

CUT /FILL TABLE

60 70 80 90

HATCH LEGEND ESS:'.) PHASE 1 CONSTRUCTION

E2Z] PHASE 2 CONSTRUCTION

~ FUTURE CONSTRUCTION

100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

STATE JOB NO. 20316(23) SHEET NO. X26

Page 81: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1110

1100

S. R/W 1090

I

I

I 1080

1110

1100

-150

PRES. R/W

R/W

I•

I 1090

I

I

1080

1070

1110

1100

-150

PRES.R/

10~0 I I

1080

-150

1100

1090

1080

-150 10' •I

l

-140 -130 -120

-140 -130 -120

-140 -130 -120

-----

-140 -130 -120

-110 -100 -90 -80 -70 -60 -50 -40

A.C. 0.00 S.F. V.C. 0.00 C.Y. A_F 195_06 S_F_ V_F 928_65 C.Y

-110 -100 -90 -80 -70 -60 -50 -40

A.C. 0.00 S.F. v.c. 0.00 C.Y. AF 241 .00 S_F VF 1021_14 C.Y

---------------------

-110 -100 -90 -80 -70 -60 -50 -40

A.C. 0.00 S.F. v.c. 0.00 C.Y. A.F. 238.49 S.F. V.F 873.68 C.Y.

------------ ----------~ ---------------

-110 -100 -90 -80 -70 -60 -50 -40

A.C. 0.00 S.F. v.c. 7.02 C.Y.

A.F 171.76 S.F. V.F 528.92 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l

AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

SOUTHBOUND CONST. CUT /FILL TABLE

-30 -20 -1 0

-30 -20 -1 0

-30 -20 -10

-30 -20 -1 0

-8%

~ SOUTHBOUND I

0 10

AH 731-00

~ SOUTHBOUND I

-8%

0 10

AH 730-00

~ SOUTHBOUND I

~0 ,,. 00

' -8%

o· -8%

- ---

0 10

AH 729-00 ~ SOUTHBOUND

I "' 0·

o': '

-8% o· -8%

0 10

AH 728-00

20 30 40

20 30 40

20 30 40

20 30 40

1110

-~ 1100

1090

1080

50 60 70 80 90 100 110 120 130 140 150

1110

1100

1090

1080

1070

50 60 70 80 90 100 110 120 130 140 150

1110

1100

1090

1080

50 60 70 80 90 100 110 120 130 140 150

1100

- ---- - - -------------------

1090

1080

50 60 70 80 90 100 110 120 130 140 150

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION

~ FUTURE CONSTRUCTION DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

STATE JOB NO. 20316(23) SHEET NO. X27

Page 82: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

1080

-150

1090

1080

-150

1110

1100

1090

PRES. /W

1070

1110

1100

1090 RES. R/W

I

I I 1oso

I

-150

-140

PRES.R/W

I

I

-130 -120 -110 -100 -90 -80

A.C. 15.37 S.F. V.C. 74.98 C.Y.

A.F. 128.40 S.F. V.F. 542.44 C.Y.

__ J _________________ _

-140 -130 -120

-140 -130 -120

-110 -100 -90 -80

A.C. 25.12 S.F. V.C. 88.30 C.Y. A.F. 126.31 S.F. V.F. 584.24 C.Y.

-110 -100 -90 -80

A.C. 22.56 S.F. v.c. 83.31 C.Y.

A.F. 148.03 S.F. V.F. 632.05 C.Y.

-70 -60 -50 -40 -30 -20 -1 0

-70 -60 -50 -40 -30 -20 -1 0

-70 -60 -50 -40 -30 -20 -1 0

it SOUTHBOUND

I "" G'?J"':J·

' 1090

,. -8% ------------------------------------------

1080

0 10 20 30 40 50 60 70 80 90 100 110 120 130 HO 150

AH 735-00

1090 -------------------8%

1080

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

AH 734-00

it SOUTHBOUND I 1110

1100

----------------~----------- 1090 ------------

1080

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

AH 733-00

It SOUTHBOUND I 1110

1100

-8% 1090

1080

1070-+~~~-r~~~-r-~~~T-~~~r-~~---i~~~---j-~~~-r~~~-r-~~~-c-~~~r-~~~r-~~---i~~~~~~~~~~~~~~~~~~~~~~---i~~~---j-~~~-r~~~-r-~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~f-1070

-150 -140 -130 -120 -110 -100 -90 -80

A.C. 22.43 S.F. V.C. 41.54 C.Y. A.F. 148.76 S.F. V.F. 732.21 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

SOUTHBOUND CONST. CUT /FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0 0

AH 732-00 10 20 30 40 50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(23) SHEET NO. X28

Page 83: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

1080

-150

1090

1080

-150

1090

1080

-150

1090

1080

-150

1090

1080

1070

PRES R/W

I

I

I

-140

-140

-140

-140

-130 -120

-130 -120

-130 -120

-130 -120

-110 -100 -90 -80

A.C. 17.71 S.F. V.C. 32.80 C.Y.

A.F. 291.36 S.F. V.F. 1497.70 C.Y.

-110 -100 -90 -80

A.C. 0.00 S.F. V.C. 15.43 C.Y.

A.F. 411.91 S.F. V.F. 2403.56 C.Y.

-110 -100 -90

-70

-70

AH 736+79. 1

-110 -100 -90 -80

A.C. 8.33 S.F. V.C. 43.89 C.Y.

A.F. 716.72 S.F. V.F. 1799.79 C.Y.

-70

-60 -50 -40 -30 -20 -1 0

-60 -50 -40 -30 -20 -1 0

-60 -50 -40 -30 -20 -1 0

-60 -50 -40 -30 -20 -10

it SOUTHBOUND I

0 10

AH 738-00

-8%

it SOUTHBOUND I

0 10

AH 737-00

-8%

-8%

it SOUTHBOUND

10

it SOUTHBOUND I

0 10

AH 736-00

It SOUTHBOUND

I

-8%

20 30 40 50

20 30 40 50

20 30

20 30 40 50

[- 1071.90

60 70 80 90 100 110 120

--------

60 70 80 90 100 110

NOTE: SECTION AT STA. 737-+57.5 IS AHEAD OF SECTION AT STA. 737-00 IN THIS SHEET LAYOUT, DUE TO THE AVAILABILITY OF THE DRAFTING AREA.

STR.: NO. ·10, -~o"TA:-737~21-.9 A021 CONST. 6'X4'X1.i:\1.0' LG. RCB (-20~ SKEW- R.F.~TO ROADWAY), 85.2' LG. -LT. & =55.8' - LG. RT. WI 2-HDWLLs. (STD. 30° SKEW) tn--srA. 736+7-S..l,--1o~e u.- & STAC 737-97.5, :47.0' :RT.

70 80

AH 737+575

---

90 100 110

120

120

130 HO 150

------------

130 140 150

130 140 150

--~------------------

60 70 80

STR. NO. 9, STA; 735+82 A021 CONST. 1 ~ L.F .. 36" RCP, 58' -L-G: LL & -72' LG.- RT. WI 2-CETs

90 100 110 120 130 140 150

1090

1080

1090

1080

1090

1080

1090

1080

1090

1060-+~~~-r~~~-r-~~~T--~~~r-~~---i~~~---j-~~~-r~~~-r-~~~-c-~~~r-~~~r-~~---i~~~~~~~~~~~~~~~~~~~~~~---i~~~---j-~~~-r~~~-r-~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~r-1060

-150 -140 -130 -120 -110 -100 -90 -80

AREA CUT (A.C.) VOLUME CUT 1V.C.l

AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

CUT /FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0 0 10

AH 735+82 20 30 40 50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION

~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

STATE JOB NO. 20316(23) SHEET NO. X29

Page 84: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

1080

-150 -1 "IO -130 -120

1090

1080

-150 -1 "IO -130 -120

1090

1080

-150 -1 "IO -130 -120

1090

1080

-150 -140 -130 -120

A.C. 0.00 S.F. V.C. 13.33 C.Y.

A.F. 252.22 S.F. V.F. 886.30 C.Y.

PHASE 2 CUT/FILL TABLE AT STA. 739-+85 • 1090

1080

-110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0

A.C. 0.00 S.F. V.C. 0.00 C.Y. A.F. 192.05 S.F. V.F. 831.71 C.Y.

PRES.R/W

-110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0

A.C. 0.00 S.F. V.C. 0.00 C.Y. A.F. 198.49 S.F. V.F. 928.28 C.Y.

it SOUTHBOUND I

0 10

AH 743-00

it SOUTHBOUND I

0 10

AH 742-00

it SOUTHBOUND I

i'

20 30

20 30

40 50 60 70 80 90 100

40 50 60 70 80 90 100

o'Oo·

PRES. R/W C::i" -7% --------------------

: -------------~-"-"-"-=;~;:~ s~~~863____________ -

I ------

-110 -100 -90 -80

A.C. 0.00 S.F. V.C. 0.00 C.Y. A.F. 237.40 S.F. V.F. 1042.71 C.Y.

-70 -60 -50 -40 -30 -20 -1 0 0 10

AH 741-00

it SOUTHBOUND I

" o"'OJ· '

20 30 40 50 60 70 80 90 100

110

110

110

PRES_._R_('W __ -_ _____ ; ______ -_ ____ ; ____ : _____ ; _______________________ 73

__ xL-- -7% _______ ~ _; ---------------

I - • • • • • • .-- ---- ---- t 107689

L ___________________ ~-'--'';.-'"-'~~~~~~~ -110 -100 -90 -80 -70

A.C. 0.00 S.F. V.C. 0.00 C.Y. A.F. 252.22 S.F. V.F. 161.14 C.Y.

PHASE 1 CUT /FILL TABLE •

A.C. 0.00 S.F. V.C. 0.00 C.Y.

A.F. 252.22 S.F. V.F. 0.00 C.Y.

PHASE 1 CUT/FILL TABLE AT STA. 739-+85 •

PRES.R/W

-60 -50 -40 -30

• PHASE 1 CONSTRUCTION STARTS FROM STA. 740-tOO A021 TO E.O.P. SOUTHBOUND. TEMP. LONG. SLOPE ENDS AT STA. 739-t85.

-20

PHASE 2 CONSTRUCTION nAPERl ENDS AT STA 740-tOO. FULL SECTION ENDS AT STA. 739-tBS A021.

-10 0 10 20 30 40

AH 740-00

It SOUTHBOUND

50 60 70 80 90 100 110

120 130 HO

120 130 140

120 130 140

-----

120 130 140

------------------ ------I

I ______ L ______________ _

1090

1080

150

1090

1080

150

1090

1080

150

1090

1080

150

1090

1080

1070-+~~~--r~~~-r-~~~T-~~~r--~~---i~~~---j-~~~--r~~~-r-~~~-c-~~~r--~~~r--~~-+~~~~~~~~~~~~~~~~~~~~~~-+~~~---j-~~~--r~~~-r-~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~r-1070

-150

10· I • -140 -130 -120

A.C. 8.47 S.F. V.C. 48.48 C.Y. A.F. 233.40 S.F. V.F. 1126.06 C.Y.

AREA CUT (A.C.l VOLUME CUT (V.CJ AREA EMB. (A.F.) VOL. EMB. +15% (V.F.J

PHASE 2 CUT /FILL TABLE

-110 -100 -90 -80

AREA CUT (A.C.) VOLUME CUT 1V.C.l AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

-70 -60 -50 -40 -30 -20 -1 0 0 10 20 30 40

AH 739-00 50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(23) SHEET NO. X30

Page 85: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

1080

1070

-150 -140 -130 -120

1090

1080

1070

-150 -140 -130 -120

1090

1080

1070

-150 -140 -130 -120

1090

1080

-4-% PRES.R/W

-11 o -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0 0 10 20 30

TA.C. 33.07 S.F. v.c. 88.37 C.Y. AH 747-00

A.F 163.61 S_F_ V.F 688-25 C.Y STA. 746->97.32 A021, END TYPICAL SECTION NO. 4F, BEGIN TYPICAL T HAS BEEN SUBTRACTED FROM 6.67 S.F.

OF REMOVAL OF ASPHALT PAVEMENT.

~ SOUTHBOUND I 0"'

"°" o~

' PRES.R/W

-----~ss£si:_Z:"~: 3- =

------

-110 -100 -90 -80 -70 -60

TA.C. 1"l65 S.F. v.c. 27.13 C.Y.

A.F. 159.57 S.F. V.F. 693.98 C.Y.

T HAS BEEN SUBTRACTED FROM 6.67 S.F. OF REMOVAL OF ASPHALT PAVEMENT.

-110 -100 -90

A.C. 0.00 S.F. V.C.

A.F. 166.30 S.F. V.F.

PRES.R/W

I

I I ------------

-80

0.00 C.Y.

753.76 C.Y.

PRESCR/W

I I

-70 -60

1-------"---,---

-50 -40 -30 -20 -1 0 0 10 20

AH 746-00

STA. 745+56.26 A021, END TYPICAL SECTION NO. 4C, BEGIN

~ SOUTHBOUND I ,,,,,,

:o· o~

' 4% '

o· c2%

------~-~-:csss::~~~\,cc'> ~

'" s: s

-50 -40 -30 -20 -10

AH

-4%

0 10

745-00

~ SOUTHBOUND I

20

30

TYPICAL

30

1090

1080

1070

40 50 60 70 80 90 100 110 120 130 140 150

SECTION NO. '15.

1090

' I ------

1080

1070

40 50 60 70 80 90 100 110 120 130 140 150

SECTION NO. 4F.

1090

------------- ------

1080

1070

40 50 60 70 80 90 100 110 120 130 140 150

1090

1080

1070-+~~~-T-~~~-r-~~~i-~~~r--~~---i~~~---j-~~~-T-~~~-r-~~~-c-~~~r--~~~r--~~--T~~~~~~~~~~~~~~~~~~~~~~--T~~~---j-~~~-T-~~~-r-~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~r-1070

-150 -140 -130 -120 -11 o -100 -90 -80

A.C. 0.00 S.F. V.C. 0.00 C.Y.

A.F. 187.64 S.F. V.F. 808.60 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l

AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

CUT /FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0 0

AH 744-00 10 20 30 40 50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION

~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

STATE JOB NO. 20316(23) SHEET NO. X31

Page 86: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

PRES.R/W

1080

-150 -140 -130 -120 -110 -100 -90 -80

TA.C. 12.61 S.F. V.C. 46.13 C.Y. A_F 39-2"1 S_F_ V_F 313-42 C.Y

T HAS BEEN SUBTRACTED FROM 6.67 S.F. OF REMOVAL OF ASPHALT PAVEMENT.

1090

PRES.R/W

1080

-70 -60 -50 -40 -30

STR. NO. @ EX I ST. 6'X5'X 135 8' LG. RCB STA. 749+58 0 A021, 21.0'LT. OUTLET; STA. 750+32 0 A021, 92.9' RT. OR STA. 754+23.5 A022, 141.9'LT. INLET. REMOVE HDWLLS. & 27' LG. RCB RT. EXTEND 47.7' LG. 6'X5' RCB LT. & CONST. HDWLL. AT OUTLET STA. 749+32.2 A021, 61 .O' LT.

-20 -1 0

Iii SOUTHBOUND

4%

0 10 20 30 40 50 60

AH 751-00

-4

70 80 90 100

STR.ND.@ STA. 750+19.8 A021, 73.7'RT. OR STA. 754+19.0 A022, 164.2'LT. CONST. CD I AND 6'X5'X192.8' LG. RCB &

110

HDWLL. AT INLET STA. 754+ 19. 0 A022, 33. O' RT.

1"1M 1083.06

120 130 140 150

SEE CROSS SECTION AT STA. 75"1+19 A022 ON SHEET NO. X20 FOR MORE DETAILS.

1090

1080

1090

#==="==o=~=============;=~~==========!-1080 ------~--------NE; 6'X5'Xl92.8'LG. RCB AT 0.70%

-====r~~==~"=============l[_==±i-====================== =========-===============![_"'-"10"',=,=.5'=6========================t 1070-+~~~~~~~~r-~~~-r--~~~-c-~~~-r~~~-r~~~--c~++-~~r-~~~-r--~~~-c-~~~-r~~~-r~~~~~~~~~~~~~~~~~~~~~~~~-r~~~--c~~~~r-~~~-r--~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-+-1070

-150 -140 -130 -120

1090

1080

-150 -140 -130 -120

1090

1080

-110 -100 -90 -80 TA.C. 12.30 S.F. V.C. 56.24 C.Y.

A.F. 1 07.93 S.F. V.F. 601.88 C.Y.

T HAS BEEN SUBTRACTED FROM 6.67 S.F.

-110

OF REMOVAL OF ASPHALT PAVEMENT.

-100

PRES. R/W

-90

I I

I ,r -80

TA.C. 18.07 S.F. V.C. 61.33 C.Y.

A.F. 174.69 S.F. V.F. 687.91 C.Y.

T HAS BEEN SUBTRACTED FROM 6.67 S.F. OF REMOVAL OF ASPHALT PAVEMENT.

PRES. R/W

-70

-70

_______ ,/ / /

-60

-60

-50

-50

-40 -30 -20

-40 -30 -20

-1 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

AH 750-00

1090

-4'l'o

1080

-10 0 10 20 30 40 50 60 70 BO 90 100 110 120 130 140 150

AH 749-00

1090

1080

1070-+~~~~~~~~r-~~~-r--~~~-c-~~~-r~~~-r~~~--c~~~~r-~~~-r--~~~-c-~~~-r~~~-r~~~~~~~~~~~~~~~~~~~~~~~~-r~~~--c~~~~r-~~~-r--~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-+-1070

-150 -140 -130 -120

10· I • -110 -100 -90 -80

TA.C. 15.05 S.F. V.C. 89.11 C.Y.

A.F. 148.33 S.F. V.F. 664.32 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

CUT /FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0

T HAS BEEN SUBTRACTED FROM 6.67 S.F. OF REMOVAL OF ASPHALT PAVEMENT.

0 10 20 30 40

AH 748-00 50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

BO 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(23) SHEET NO. X32

Page 87: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

STA. 752"'46.75 A021, END SOUTHBOUND TAPER EXIT RAMP CONSTRUCTION

It SOUTHBOUND

I ~-,., a %

#."3s<::i·

1090 "-'¥-fl 1090 ·4% '<\_a-

PRES. R/W

I --1080 I -- -- 1080

~------I -----

1070 1070

-150 -140 -130 -120 -110 -100 ·90 ·80 ·70 ·60 ·50 ·40 ·30 ·20 ·10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

.,.A.C. 11.21 S.F. V.C. 20.97 C.Y. AH 752¥16.75

A.F. 1.00 S.F. V.F. 1.99 C.Y .

.,. HAS BEEN SUBTRACTED FROM 6.67 S.F. It SOUTHBOUND OF REMOVAL OF ASPHALT PAVEMENT. r;;,'D¥,.::)'

-°_~'<" (l.1J:<::r

..,a'b.p"::J

1090 C'.:t· 'b<v_ 1090 «·,e:J I

PRES.R/W --I _ _L I -------- -

1080 -- -- 1080

I ---------

1070 1070

-150 -140 -130 -120 -110 -100 ·90 ·80 ·70 ·60 ·50 ·40 ·30 ·20 ·1 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

I• 10' •I AH 752-00 • HAS BEEN SUBTRACTED FROM 6.67 S.F. •A.C. 13.03 S.F. V.C. 47.44 C.Y.

l OF REMOVAL OF ASPHALT PAVEMENT. A.F. 1.00 S.F. V.F. 85.70 C.Y.

HATCH LEGEND [22] PHASE 1 CONSTRUCTION

AREA CUT (A.C.l VOLUME CUT 1V.C.l [22] PHASE 2 CONSTRUCTION AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J ~ FUTURE CONSTRUCTION DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

CUT /FILL TABLE STATE JOB NO. 20316(23) SHEET NO. X33

Page 88: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1100

1090

1080

1100

1090

1080

1100

1090

1080

1070

1100

1090

1080

R/W

I

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0

A.C. 471.39 S.F. V.C. 1728.17 C.Y. A.F. 0.00 S.F. V.F. 0.00 C.Y.

R/W

----~---------~-_-__________ _! ______________ ~---~-'--

it RAMP C I

PRES- R/W

0

704-00 10

it RAMP C I

I

I

I_

20

PRES.R/W

I

I

I_

30 40 50

1100

1090

1080

60 70 80 90 100 110 120 130 140 150

1100

1090

1080

~~~~-r~~~-r-~~~-r-~~~r-~~--c~~~--c~~~-r~~~-r-~~~-r-~~~r-~~~r-~~--c~~~~~~~~~~~~~~~~~~~~~~--c~~~-+~~~-r~~~-r-~~~-r-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~1070

1do

R/W

_________________________ _! ________ _

-150 -140 -130 -120 -110 -100 -90 -BO

A.C. 309.72 S.F. v.c. 584.57 C.Y. A.F. 0.00 S.F. V.F. 358.97 C.Y.

R/W

I

-70

' \

-60 -50 -40 -30 -20

'-"--·~Vi··:_

it RAMP C I

PRES.R/W

I

I

-1 0 0 10 20

702-00

It RAMP C I

PRES. R/W

30

40 50 60 70

40 50 60 70

STR.NO.@ STA. 700+96.6 A026 CONST. 100 L.F. 43"X26' RCPA w/ 2-CETs. (FOR A SECT I ON VI El'I. SEE CROSS SECT I ON AT STA. 22+00 A003 ON SHEET NO. X521

80 90 100

80 90 100

-------------------

110 120 130 140

1100

1090

1080

110 120 130 140 150

1100

1090

1080

-------------------------1070-+~~~-r~~~-r-~~~-r-~~~r-~~--c~~~--c~~~-r~~~-r-~~~-r-~~~-r-~~~c-~~--c~~~~~~~~~~~~~~~~~~~~~~--c~~~--c~~~-r~~~-r-~~~-r-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~f-1070

-150 -140 -130 -120 -110 -100 -90 -80

A.C. 5.95 S.F. V.C. 4.32 C.Y. A.F. 168.56 S.F. V.F. 140.72 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

CUT /FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0 0

701-00 10 20 30

STA. 700->BOAO A026, BEGIN RAMP C CONSTRUCTION

40 50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(23) SHEET NO. X34

Page 89: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1100

RIW 1090

1080

PRES.R/W

I I

I

IL 1068-.62

it RAMP C I

of' oro~·

' -2% i;::i· -2%

1100

1090

1080

1070--t---~~--,---~~~~~~~~~~,--~~-,---~~~:--'"'i-""~===:::c:===;;i"'°"";:-~1:-~~---r:-~~~,--~~-i---~~--i:~~~--,~~~-r-~~~r-~~---,-~~-:i---~~--i:~~~--,~~~l:-~~---:i:-~~---,-~~-,---~~-i---~~--,~~~--,~~~r:-~~~r-~~---r:-1070 -150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

1100

1090

1080

1070

-150 -140 -130 -120

1100

1090

-150 -140 -130 -120

1100

A.C. 138.78 S.F. V.C. 315.91 C.Y. A.F.1043.05 S_F_ V.F 3460.65 C.Y

R/W

I

-110 -100 -90 -80

A.C. 31.81 S.F. v.c. 109.83 C.Y.

A.F. 581.95 S.F. V.F. 1671.78 C.Y.

R/W

-110 -100 -90 -80

A.C. 27.50 S.F. V.C. 437.44 C.Y. A.F. 203.06 S.F. V.F. 432.44 C.Y.

-70 -60

-70 -60

PRES.R/W

-50

-50

I I

I

-40

-40

-30

-30

-20 -1 0

PRES. R/W

-20

I

I

I

-10

708-00

it RAMP C I

~OJ-<o ,a~

-2% i;::i· -2%

0 10 707-00

-2%

it RAMP C I

0

706-00 10

It RAMP C I

20 30 40

20 30 40

1100

1090

1080

50 60 70 80 90 100 110 120 130 140 150

1100

1090

50 60 70 80 90 100 110 120 130 140 150

1100

- RIW. PRES. R/VV. ~

:~~~~~~~~~~~~~~~~~~[-~-[-[-~l~_[·-~-~-J-~-~-~-~-~-1-~-[-l-~-~-:-[-~-~-~-~-J-[-~-~-~-~-1-~-~-1-~-~~~~~~~~~~~~~~~~~:·:2~%~:::~:·'0:~:0~:.:·1:.8:4~%~~~~~-~~-~-~-~~~~~~~~~~~~~~~~~~-~-~-~-~-~-~-~-~-~-~-:-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~~:~~~ -150 -140 -130 -120 -110 -100 -90 -80

A.C. 208.72 S.F. V.C. 1259.46 C.Y. A.F. 0.00 S.F. V.F. 0.00 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

CUT /FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0 0

705-00 10 20 30 40 50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(23) SHEET NO. X35

Page 90: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed
Page 91: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

1080

1070 ![ 1064.33

--------~--~--------------

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20

1090

1080

1070

1060

it RAMP C I

40%

-1 0 0 10

715-00

-5.40%

it RAMP C

I f,,3' ,, ~ -~

,'Ps~· ti'.;;>

('.)~-

20 30

1090

1080

1070

40 50 60 70 80 90 100 110 120 130 HO 150

1090

1080

1070

1060

1050--t~~~~~~~~c-~~~T-~~~-c-~~~--r~~~---j-~~~---i~~~~c-~~~T-~~~-c-~~~--r~~~---j-~~~~~~~~~~~~~~~~~~~~~~~~---j-~~~---i~~~~c-~~~T-~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~--t-1050

-150 -140 -130 -120 -110 -100 -90 -80

A.C. 150.8"1 S.F. V.C. "149.93 C.Y. A.F.1744.16 S.F. V.F. 7747.17 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l

AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

RAMP CONSTRUCTION CUT /FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0 0

712-00 10 20 30 40 50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION

~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

STATE JOB NO. 20316(23) SHEET NO. X3 7

Page 92: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

1080

1070

-150 -1 "IO

1090

1080 -------

1070

-150 -1 "IO

1090

1080

-150 -1 "IO

1090

1080

1070

1060

-150 -140

1090

1080

1070 ----'--'---~--'-''--'-'-----:

1060

-150 -140

I• 10' •I

l

-130

-130

-130

-130

It\_ RAMP C

I '\~o" PRES. R/W R/W ,oro.p

~'---~~~~~~--:::-:==~--:---c-~"'Z_-7-7-7-~"-'-~_== __ =-S:_ "'-:;;-~-4~%2'~~0·=~=-~'2~%=======::::::;:::;_~-==-=~:o-=~~?-e----------------~~~~~_!_ _ ___________ l_ ~------------

-120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 HO 150

720-00 It\_ RAMP c I __ '~-<:i, PRES.R/W 0·' R/W ,<1''1' I c,.~

[ 1081.50 -"1% '<~a -2% I

- - - - ---- -- - - ---- - -________ L ______________

- - -

-120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0 0 10 20 30 40 50 60 70 80 90 100 110

719-00

-120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0 0 10 20 30 40 50 60 70 80 90 100 110

718-00

It\_ RAMP C

1-~~$0"

_:: ___ ::_:I : "

-120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110

717-00

1 R~~: c c:!P'l/';;j':;,

c,,.~"" -5.8% '<(..o -5.B%

120

120

120

130 140

130 140

PRES.-R/W

130

I

I j

140

150

150

R/

150

1090

1080

1070

1090

1080

1070

1090

1080

1070

1060

1090

R/W

PRES. 7~r I ---- - - -- ---- - ---- - - I ---- -

----------~--------------- 10 0

1060

-130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

716-00 HATCH LEGEND

ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION

~ FUTURE CONSTRUCTION DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

STATE JOB NO. 20316(23) SHEET NO. X38

Page 93: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1100

1090

-150 -140 -130 -120

1100

1090

-150 -140 -130 -120

1100

1090

-150 -140 -130 -120

1100

1090

----------

-110

-110

-110

STA. 724+24.74, END 300' LONG TAPER

Iii. RAMP C

o'b~3' 0 '«" ~ SOUTHBOUND

&'f:;s o"" R.-ec Co~ ~~ ,00

,"'~ "" ~ ~ «..:.o '1% ~>-- "' 2%

--_-_-_-_-_-_~-----~-----=-=-~-~-=-=-~-~-===-=-=-Z-~-~-~~ry===~----=SS~~~~z~i~~~L~;2~~~~;z~=~~~~~~~=----~~c~-~T~~7~~--------------------------------

-100 -90 -80 -70 -60 -50

-100 -90 -80 -70 -60 -50

-100 -90 -80 -70 -60 -50

-40 -30 -20

-40 -30 -20

-40 -30 -20

-1 0

-1 0

-10

0

724-00

0

723-00

0

722-00

10 20 30 40

10 20 30 40

10 20 30 40

STA. 721 +24.74, END FULL WIDTH AUXILIARY LANE, BEGIN 300' LONG TAPER

Iii. RAMP C

o'ri,,~:J'-a" ii:,'< ~ SOUTHBOUND

50 60 70 80 90 100 110 120 130 140

50 60 70 80 90 100 110 120 130 140

50 60 70 80 90 100 110 120 130 140

!~)~· ·j. ,_(?_-_"_IP_.

_4% x~a_ -2% _(p:

~---------------------------~~:-~zz.::..:;cJ-~7'"""~~~"""'-~::::.=:::=:.:.::::.:'.'.:'.:::'.:::'.:.=:=:=:=.:..:;.;..~~=~~=~~~=~-.:::..::~==sc='-''"-'.i=~·~r:._:z~;;r-z:.:L;r~~----------------------------

1100

1090

150

1100

1090

150

1100

1090

150

1100

1090

1080-+-~--i--~--c--~-T--~-r--~---i-~--+-~--i--~--c--~-+--~-r--~-r-~----i-~-~-~-~-~-~-~-~-~-~~----i-~--+-~--i--~--c--~-+--~-~-~~-~-~-~-~-~-~-~-~-~-~-~-f-1080

-150 -140 -130 -120 -110 -100 -90

10· I •

l -80 -70 -60 -50 -40 -30 -20 -1 0 0

721-00 10 20 30 40 50 60 70

HATCH LEGEND [22] PHASE 1 CONSTRUCTION

[22] PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(23) SHEET NO. X39

Page 94: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1100

1090

1080

1070

-150

1100

1090

1080

1070

1060

-150

1100

1090

1080

1070

-140 -130 -120 -110 -100 -90 -80 -70

A.C. 893.14 S.F. V.C. 3425.78 C.Y.

A.F. 0.00 S.F. V.F. 0.00 C.Y.

-140 -130 -120 -110 -100 -90 -BO -70

A.C. 956.78 S.F. v.c. 3204.15 C.Y.

A.F. 0.00 S.F. V.F. 0.00 C.Y.

PRES. R/W

I

ft RAMP D I

I R~

::Z_i_ -Z'.)-6--~---~~~~L-L-~~/b1Lh£-722f z- 7 - - ___________________ _! ___________________________ _

-60

PRES. R/W

-60

I

I

_I

-50 -40

-50 -40

-30 -20 -1 0

-30 -20 -1 0

0

702-00 10

ft RAMP D I

0 10

701-00

20 30

20 30

40 50 60 70

STR.NO.@ STA. 700+33. 7 A027 CONST. 100 L.F .Ll3'X26" RCPA w/ 2-CETs. IFOR A SECTION VIEW, SEE CROSS SECTION AT STA. 26+50 A003 ON SHEET NO. X54l

80 90 100 110 120

R/W

________________ l __________ _ 40 50 60 70 80 90 100 110 120

STA. 700-09.58 A027, BEGIN RAMP D CONSTRUCTION

~ RAMP D

R/W

130 140

130 140

--------------------------------------------------------------------------------------------------------------_______________________ l _____________________ _

1100

1090

1080

1070

150

1100

1090

1080

1070

150

1100

1090

1080

1070

1060-+~~~-r~~~-r-~~~i-~~~r-~~---i~~~---j-~~~-r~~~-r-~~~-c-~~~r-~~~r-~~---i~~~~~~~~~~~~~~~~~~~~~~---i~~~---j-~~~-r~~~-r-~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~r-1060

-150 -140 -130 -120 -110 -100 -90 -80

AREA CUT (A.C.l VOLUME CUT 1V.C.l AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

RAMP CONST. CUT /FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0 0

700-00 10 20 30 40 50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(23) SHEET NO. XLIO

Page 95: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1100

1090

1080

1070

-150 -140 -130 -120 -110 -100 -90 -80 -70

A.C. 21.50 S.F. V.C. 82.96 C.Y.

A.F. 682.36 S.F. V.F. 2078.67 C.Y.

1100

1070

1060 -150 -140 -130 -120 -110 -100 -90 -BO -70

A.C. 23.30 S.F. v.c. 851.26 C.Y.

A.F. 293.71 S.F. V.F. 625.49 C.Y.

1100

1090

1080

1070

-60 -50 -40

PRES.R/W

C.I[ 1-072.0Ci

-60 -50

PRES.R/W

I

I

I I

-40

PRES. R/W

I

I

I

-30

-30

-20

-20

-i-3.80%

-1 0

:i-]'.80%·

-1 0

it RAMP D I

,,,, ororv·

' i;::i· -2%

0

705-00 10

it RAMP D I

0 10

704-00

~ RAMP D

20 30 40

20 30 40

R/W

~----_______________ J ___ _

50 60 70 80 90 100

R/W

--------- l ----------------- --

50 60 70 80 90 100

"' .:i..~· ,o R/W

&22~~~%._ ===="· ~-2% ~~------------------------- _____ j

1100

1090

1080

1070

110 120 130 140 150

1100

1090

1080

1070

110 120 130 140 150

1100

1090

1080

1070

1060~~~~--r~~~-r-~~~T--~~~r--~~---i~~~---c~~~--r~~~-r-~~~-c-~~~r--~~~r--~~--T~~~~~~~~~~~~~~~~~~~~~~--T~~~---c~~~--r~~~-r-~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~1060

-150 -140 -130 -120 -110 -100 -90 -80

A.C. 436.38 S.F. V.C. 2"162.07 C.Y. A.F. 0.00 S.F. V.F. 0.00 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

RAMP CONST. CUT /FILL TABLE

-70 -60 -50 -40 -30 -20 -1 0 0

703-00 10 20 30 40 50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(23) SHEET NO. XL! 1

Page 96: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

It RAMP D

1100 I 1100

. ei ~·

G~

' 1090 -!CJ.44% e· ~2% 1090 PRES.R/W

I

1080 I 1080 I

1070 R/W 1070

___________ J_ ----- -

1060 1060

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

A.C. 0.00 S.F. v.c. 0.00 C.Y. 708-00

A.F.2358.45 S.F. V.F. 9155.00 C.Y.

It RAMP D

1100 I 1100

~0 PRES.R/W 0· I G~

1090 ' I 1090

+3.80% \' -2% I

1080 1080

R/W 1070

I

1070

------1060 1060

-150 -140 -130 -120 -110 -100 -90 -BO -70 -60 -50 -40 -30 -20 -1 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

A.C. 0.00 S.F. v.c. 0.00 C.Y. 707-00

A.F.1940.42 S.F. V.F. 6958.39 C.Y.

It RAMP D

1100 I 1100

PRES.R/W

I ~' 1090

""' 1090

I ,o

+3.8.0% e· -2%

1080 1080

- - R/W ,.;...~--

I 1070 ~~ 1070

1060 1060

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

I• 10' •I 706-00 A.C. 0.00 S.F. V.C. 39.81 C.Y.

l A.F.1327.00 S.F. V.F. 4279.19 C.Y.

HATCH LEGEND [22] PHASE 1 CONSTRUCTION

AREA CUT (A.C.l VOLUME CUT 1V.C.l [22] PHASE 2 CONSTRUCTION AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J ~ FUTURE CONSTRUCTION DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

RAMP CONST. CUT /FILL TABLE STATE JOB NO. 20316(23) SHEET NO. X~2

Page 97: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

+1.08% 1090

1080

1070

- - ---- - - ----

1060 -0. 30% \

1050

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0

A.C. 0.00 S.F. v.c. 0.00 C.Y. STARTING FROM STA. 710-+80 Iii: RAMP D CA027l, A.F.2026.11 S.F. V.F. 8843.18 C.Y. EARTHWORK QUANTITIES ARE INCLUDED IN

CUT/FILL TABLES FOR MAINLINE CONSTRUCTION. EARTHWORK TABLE FOR STA. 710"30 SEE SHEET NO. xoa.

1100

:...2% 1090

1080

1070

- - - - -- - - -

1060

-150 -140 -130 -120 -110 -100 -90 -BO -70 -60 -50 -40 -30 -20 -1 0

A.C. 0.00 S.F. v.c. 0.00 C.Y.

A.F.2564.45 S.F. V.F.10995.49 C.Y.

1100

1090 -2%

1080

1070

- -- - -

1060

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0

I• 10' •I A.C. 0.00 S.F. V.C. 0.00 C.Y.

l A.F.2598.65 S.F. V.F.10556.79 C.Y.

AREA CUT (A.C.l VOLUME CUT 1V.C.l

AREA EMB. (A.F.J VOL. EMB. +15% (V.F.J

RAMP CONST. CUT /FILL TABLE

0 10 20 30 40

711-00

Ii\_ RAMP D I

"0 Q·

Q0

' C,· -2%

0 10 20 30 40

710-00

Ii\_ RAMP D I

or 0·

Q~

' \' -2%

0 10 20 30 40

709-00

50

BR.(E)Q. STA. 712+08.25 A022 CONST. 3-14'Xl2'X295' LG. RCB, SKEW 66° L. F., 167. 5' LG. LT. & 127 .5' LG. RT.

I[_ 1055.52 AT STA. 711+30.4 A027, 82.1' RT.

60 70 80 90 100

PRES.R/W

I

I I

50 60 70 80 90 100

PRES.R/W

I

I

50 60 70 80 90 100

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

PRES.R/W

110

I

I

I

120

R/W

I

130

R/W

I

--------------

' '

140

--------

110 120 130 140

R/W

__________ J ___________ 110 120 130 140

DUNCAN BYPASS SOUTH CONNECTOR STATE JOB NO. 20316(23)

1090

1080

1070

1060

1050

150

1100

1090

1080

1070

1060

150

1100

1090

1080

1070

1060

150

STEPHENS COUNTY

SHEET NO. X~3

Page 98: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1090

1080

1070 - -- --- - -

1060

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20

1090

1080

1070

-- - - - -- -- -- - - ---- - - -- - - -

1060

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20

1090

1080

1070

1060

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20

BR.®t STA. 7 l 2+08. 25 A022 CONST. 3-l4'X12'X295' LG. RCB, SKEW 66° L.F ., 161.5' LG. LT. & 127 .5' LG. RT.

1090

-0 30% \

It RAMP D I cc 1 086.87

(TO- BE-ADJ'IJ, IN- FIEL:DI -6.80% -1.20%

- - -

-1 0 0 10

715-00 'so' ~ RAMP D a?«..fiJ . ., I ~?S<;j· ,'1''1'

E>·-4'-'5.80% ~Cl -1.20%

-- - -- --

-1 0 0 10

714-00 ~ RAMP D;-.,

I 0"(-c.SO . .,

OJ'f!S<;j· ,'1''1'

0 'fy +5.EiCJ% "'' (')- ~1".20%'

-1 0 0 10

713-00 It RAMP D <::J"

I ,~, ' "' #,::-.)'\;"

' " O· '/y p,60_% '<~o -1.20%

20 30 40 50 60 70 80

------ - - -

20 30 40 50 60 70 80

20 30 40 50 60 70 80

PRES.RIW

I I

------~-------------------~---------

90 100 110 120 130 HO

PRES.R/W

I I

------~------------------

90 100

90 100

110 120 130 140

PRES. R/W

I I I

------------------------

110 120 130

R/W PRES.

R/~

140

150

150

150

___________ L _______ _

1090

1080

1070

1060

1090

1080

1070

1060

1090

1080

1070

1060

1090

1080

1070

1060

1050-+~~~-r~~~-r-~~~T--~~~r-~~---i~~~---j-~~~-r~~~-r-~~~-c-~~~r-~~~r-~~---i~~~~~~~~~~~~~~~~~~~~~~---i~~~---j-~~~-r~~~-r-~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~f-1050

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0 0

712-00 10 20 30 40 50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

[22] PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(23) SHEET NO. X44

Page 99: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

PRES.R/W R/W 1090 _________ l ______________ J_

1090

1080 1080

1070 1070

-150 -140 -130 -120 -11 o -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

719-00 ~ RAMP D

I act;.,"' ~. i'

l\':'SO· ..._oro,pi

1090 «."='a1Y· PRESoR/W 1090 -6.80% 0 -1.20%

I R/W

-- - - It 1079.60 ______ J ____________ J ___ - - - - --1080 - 1080

-----

1070 1070

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

718-00

~ RAMP D

I ~ "'' o'?xf; i"J" %-

'°"?'so· o'Oofl

1090 Qi."~ 1090 ·6.80% '<. ·..._o -1.20%

1080 PRES.R/W 1080

I R/W ~

/

---- I J 1070 ----1 ________ 1070

- -----------------

1060 1060

-150 -140 -130 -120 -110 -100 -90 -BO -70 -60 -50 -40 -30 -20 -1 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

717-00

~ RAMP D~

I o,;_.,c; IX•%-

'°"Jso· 1090

..._o'Oofl 1090 0 ·'<>'<.,·

-6.80% '<-{-O -1.20%

--~LLLLL_L_~_ R/W

1080

________ :::1:~_J _____ 1080

- -- -

1070 -------------- ------ 1070

1060 1060

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

I• 10' •I 716-00

l HATCH LEGEND

ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION

~ FUTURE CONSTRUCTION DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY

STATE JOB NO. 20316(23) SHEET NO. x~s

Page 100: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

1100

1090

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60

1100

1090

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60

1090

-150 -140 -130 -120 -110 -100 -90 -BO -70 -60

1090

---~-

1080

-50 -40 -30 -20 -1 0 0

723-00 10 20 30 40 50 60 70 80 90 100 110 120 130

STA. 722"'67.59 ~ RAMP D (A027l, END FULL WIDTH AUXILIARY LANE, BEGIN 300" LONG TAPER

-50 -40 -30 -20 -1 0

-50 -40 -30 -20 -1 0

+1.21%

0

722-00

0

721-00

10 20

10 20

30 40

I[ 1085.70

30 40

50 60 70 80 90 100 110 120 130

50 60 70 80 90 100 110 120 130

PRES.R/W R/W

I I -------------~-----------------------------

1100

1090

140 150

1100

1090

140 150

1090

140 150

1090

1080

1070-+~~~--r~~~-r-~~~T-~~~r--~~---i~~~---j-~~~--r~~~-r-~~~-c-~~~r--~~~r--~~-+~~~~~~~~~~~~~~~~~~~~~~-+~~~---j-~~~--r~~~-r-~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~r-1070

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0 0

720-00 10 20 30 40 50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(23) SHEET NO. XLl6

Page 101: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

I• 10'

STA. 725'67.59 ijl RAMP D <A027l, END 300' LONG TAPER

R/W

PRES~ R/W

~ ---------------------------- ---------------------------

1100 1100

-----------------------------1090

1080

-150 -1 "IO -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 HO 150

725-00

ll_ RAMP D

1 0

-rj;l(<)' ~ i:::r«." ll_ NB . ., l ~ ~ 4'-'l" 1100 c ~'-~

ff 0 @-$ ,o ' -2%

w

0 "' 8 t.:· ~4%

- - -- - - - -----

1090 ------------

R/W

PRES. R/W I

- I 1 -----~----~--------________ L ___ --------------------------

1100

1090 -----

1080 -+~~~-r~~~-r-~~~T--~~~r--~~---i~~~---c~~~-r~~~-r-~~~-c-~~~r--~~~r--~~--T~~~~~~~~~~~~~~~~~~~~~~--T~~~---c~~~-r~~~-r-~~~-c-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~r-10so

-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -1 0 0 10

•I 724-00

l 20 30 40 50 60 70

HATCH LEGEND ESS.:J PHASE 1 CONSTRUCTION

ESS.:J PHASE 2 CONSTRUCTION ~ FUTURE CONSTRUCTION

80 90 100 110 120 130 140 150

DUNCAN BYPASS SOUTH CONNECTOR STEPHENS COUNTY STATE JOB NO. 20316(23) SHEET NO. XLl7

Page 102: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

South Duncan Bypass, State Job No. 20316(04) & 20316(23) EST Project Number: 6000426 Stephens County, Oklahoma July 29, 2015

EST, Inc.

Appendix B

Test Location Diagram (Standard Penetration Test and Piezocone Soundings)

Page 103: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

i z ~ ~~ z c --t

en 10 0 0

~ 0 ... > N r-en ...,

~ 0

~ ~ N 0 __.. U'I

SOUTH DUNCAN BYPASS EMBANKMENT STUDY STATE JOB NOS. 20316(04) & 20316(23)

STEPHENS COUNTY, OKLAHOMA BORING LOCATION DIAGRAM (SHEET 1 OF 2)

STA 631<fil\.10 AO??,

'.f ;nj1 +l.>IUIJ t SIJMV ~ s2· RT.. r-

~ :1.W~'. k11: ib~1 I Bf G. ? 5: I TAffR ,

.-1 Sii\ G.Yi• :,G.'fO AO~" -~1A. &J~ •\JG , 10 <t :ilJllVU, I ~~J. ?;bJ• ~~~:~~ ILIAIH LANt. '

P l STA SJ&~. 70 A02Z

STA 6~1'·78 .03 A022 mo tlOAMAL X-SLCPC BEG. X-SLOPE l RAl<S. -

<!01'

F' .::z

n L>A> 0-4

" ' ;z~ ~ ,,.

~o

~~ "' ~

I jll -~I 111 , 11 ._11 111

I'

625+00

SI A li.IO+O ( !il.RVI 1

INlEFlSECTI ON OF IM INLINf. WITH ~ SERVI CE ROAD l T. I AOOSJ ANO l SERVICE ROAD RT.IA0061

-,,:

" L ~ I

- , 630+00 --

635+00

I STA 639•1 4 . 69 A021 t> .n.11. ~ sm11tf>m!'l11

I -STA 636•5?.64 {. S!JlVEY j l ruT\Rf UG-8 1 q-1 ANr

.IH . OO'H I . I N - ~ 1 0.1;,4. l.J.I~

I ' l .SIG,;>\11. ()11 4 I rnn or 10, 1 urrn r I I r I I I 640+00 N lz ._~ I~ I~ I "'

64 5+00

~.;TA 655t-OO A02l

EOU/\TICIN: P .0. T. STA f .!;1+ 12 .6200 ( SURVCY r.A.P. NO. Rf- l (J?C0:1.11nACK

-P.O.T. 5TA 656•45.1100 l SURVEY f.A.f' . NO. Nl lY 011Nf051)AllEAO

Page 104: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

i z ~ ~ ~ ~ 0 z ........ c -t ~ en I 0 0

~ 0 (I) 0 0 N ... > 0 N r- ....... en ..., U'I

/

SOUTH DUNCAN BYPASS EMBANKMENT STUDY

730+00

STATE JOB NOS. 20316(04) & 20316(23)

STEPHENS COUNTY, OKLAHOMA BORING LOCATION DIAGRAM (SHEET 2 OF 2)

- POT 680•~5.4~ A021. 32.00' LT. - rr f,M 14~_ 4q AOPP. sr..00' I T.

POll 68~+45. 4~ A02J. 44 .co· LT.

!

I z <> . 0

" 0 ...,

"' >C

Ut

g ;b u L

b

z

fi lh fiffl+.I~. :,;.• AO?I nu ~II I SIJl'H~ ~fG . X SI Ol'f rnANS.

PT 687+95. 21 A021

STA &90+1&.27 A021 mo X-SLOl'E TRMIS. Bi:G. NUHMJ\!.. X- SLUl't

m i!!! c Ii) m ri.!

690+00

695+00

700+00 -.,,,,::--T-;o:~ -L.__-1--_,

l liHll"~ll ~ \ln .111 IAOO.JI I\) CJ + 0 0

FC 10J+ J 8 . ~0 A02S

705+00

Page 105: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

South Duncan Bypass, State Job No. 20316(04) & 20316(23) EST Project Number: 6000426 Stephens County, Oklahoma July 29, 2015

EST, Inc.

Appendix C

Boring Logs

Page 106: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

12.4

3

13.1

13.3

18.9

19.5

20.4

12.7

20.3

14.3

18.9

20.1

20.0

21.2

20.3

20.7

24.6

13.3

16

CH 5

6

7

8

9

10

11

12

13

15

17

14

SS

SS

SS

SS

ML

L:\G

EO

TE

CH

\201

5 G

EO

TE

CH

PR

OJE

CT

S\6

0004

26 -

SO

UT

HD

UN

CA

NB

YP

AS

S\B

RID

GE

C\G

INT

\600

0426

- G

INT

C.G

PJ

FIR

E

CL

SS

2

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

4

18

16

LOOSE, DARK BROWN, SANDY SILT

STIFF, DARK BROWN, SANDY LEANCLAY

STIFF, DARK BROWN, LEAN CLAY WITHSAND

STIFF, RED-BROWN, FAT CLAY

STIFF, RED-BROWN, SANDY LEAN CLAY

VERY LOOSE TO LOOSE, RED-BROWN,SILTY SAND

SOFT TO MEDIUM STIFF, BROWN,SANDY LEAN CLAY

13

12

15

14

13

15

7

6

1

11

18

18

18

14

12

MEDIUM STIFF, BROWN, LEAN CLAYWITH SAND

24.6

El. = 1049.32

El. = 1047.82

El. = 1046.32

El. = 1044.82

El. = 1043.32

El. = 1037.32

El. = 1035.82

El. = 1028.32

1

13.3

CL

13.1

13.3

18.9

20.4

12.7

12.4

20.3

14.3

18.9

20.1

20.0

21.2

20.3

20.7

VERY SOFT TO SOFT, BROWN, LEANCLAY WITH SAND

19.5

REMARKS:

3201 S. Berry RoadNorman, OK 73072

(OFF.) (405) 307-8378 (FAX) (405) 329-1914

CLIENT: Oklahoma Department of

Transportation

APPROVED

ENGINEER: EST, Inc.

MO

IST

UR

E,

%

12.5 Ft.-AB

5/21/15

CME-55

DR

Y D

EN

SIT

Y,

PC

F

US

CS

SY

MB

OL

NU

MB

ER

5

10

15

20

25

RIG

SP

T-

NB

LOW

S /

FT

.

DE

PT

H,

FT

.

CL

ML

LAYER / MATERIAL

DESCRIPTION

GR

AP

HIC

S L

OG

TY

PE

UN

CO

NF

INE

DS

TR

EN

GT

H,

PS

F

Surface Elev. = 1052.32 feetVegetation Thickness : None

LOCATION: South Duncan Bypass,

Stephens County, Oklahoma

RE

CO

VE

RY

, IN

.

WATER LEVEL OBSERVATIONS

FOREMAN

5/21/1513 Ft.-WS

JOB#

TESTS

BORING STARTED

PROJECT: Bridge "C" over US Highway 81, J/P No.

20316(04)

LIM

ITS

(LL

) (P

L)IN

DE

XE

S (

PI)

#200

SIE

VE

6000426

Station= 665+09.33, 420.08' Rt. of CL Survey

BORING COMPLETED

A.D.

BORING NO. B-01

L.M.

WL

WL

WL

SOIL AND ROCK CLASSIFICATIONS ARE FROM DISTURBED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY

REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF

IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL.

* ESTIMATED FROM POCKET PENETROMETER

PAGE 1 OF 3

SAMPLES

BORING LOG

LL = 26PL = 15PI = 11

-#200 = 60.2%

LL = NPPL = NPPI = NP

-#200 = 56.1%LL = NPPL = NPPI = NP

-#200 = 57.9%LL = 31PL = 19PI = 12

-#200 = 67.4%LL = 35PL = 20PI = 15

-#200 = 74.4%LL = 52PL = 19PI = 33

-#200 = 91.4%LL = 29PL = 13PI = 16

-#200 = 64.4%LL = NPPL = NPPI = NP

-#200 = 43.0%

LL = NPPL = NPPI = NP

-#200 = 43.3%

LL = 31PL = 13PI = 18

-#200 = 72.7%LL = 34PL = 16PI = 18

-#200 = 79.4%LL = 37PL = 18PI = 19

-#200 = 81.5%LL = 33PL = 17PI = 16

-#200 = 78.8%LL = 33PL = 16PI = 17

-#200 = 76.7%

LL = NPPL = NPPI = NP

-#200 = 34.0%

SM

SM

SM

CL

CL

CL

CL

CL

CL

CL

10

6

14

13

6

5

6

3

5

10

7

13

9

9

2

9

12

Page 107: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

TCP

SS

SS

RB

TCP

RB

TCP

RB

TCP

SS

13.0

21.4

RB

L:\G

EO

TE

CH

\201

5 G

EO

TE

CH

PR

OJE

CT

S\6

0004

26 -

SO

UT

HD

UN

CA

NB

YP

AS

S\B

RID

GE

C\G

INT

\600

0426

- G

INT

C.G

PJ

FIR

E

CLSOFT TO MEDIUM STIFF, BROWN,SANDY LEAN CLAY

LOOSE, GRAY, SANDY SILT

DENSE, GRAY, SANDY SILT

MODERATELY HARD, GRAY,WEATHERED SILTSTONE WITHRED-BROWN SHALE SEAMS

HARD, GRAY, WEATHERED SILTSTONEWITH RED-BROWN SHALE SEAMS

0

18

15

0

0

0

0

3

El. = 1023.82

El. = 1022.82

El. = 1013.32

18

19

20

2

4

1

21.4

13.0

El. = 1025.32

El. = 1026.82

BORING NO. B-01

APPROVED

Station= 665+09.33, 420.08' Rt. of CL Survey

BORING COMPLETED

A.D.

BORING LOG

L.M.

LIM

ITS

(LL

) (P

L)IN

DE

XE

S (

PI)

#200

SIE

VE

SOIL AND ROCK CLASSIFICATIONS ARE FROM DISTURBED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY

REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF

IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL.

* ESTIMATED FROM POCKET PENETROMETER

US

CS

SY

MB

OL

MO

IST

UR

E,

%

5/21/15

CME-55

6000426

DR

Y D

EN

SIT

Y,

PC

F

NU

MB

ER

30

35

40

45

50

RIG

SP

T-

NB

LOW

S /

FT

.

RE

CO

VE

RY

, IN

.

PROJECT: Bridge "C" over US Highway 81, J/P No.

20316(04)

FOREMAN

5/21/15

PAGE 2 OF 3

JOB#

(Continued)

TESTS

BORING STARTED

13 Ft.-WSWL

WL

WL

DE

PT

H,

FT

.

LOCATION: South Duncan Bypass,

Stephens County, Oklahoma

GR

AP

HIC

S L

OG

TY

PE

UN

CO

NF

INE

DS

TR

EN

GT

H,

PS

F

SAMPLES

WATER LEVEL OBSERVATIONS

13/6.0"33/6.0"50/3.0"

0

50/5.50"50/1.38"

50/1.13"50/0.63"

50/0.50"50/0.13"

REMARKS:

5

LL = 32PL = 15PI = 17

-#200 = 73.7%LL = 29PL = 15PI = 14

-#200 = 67.8%

LL = NPPL = NPPI = NP

-#200 = 47.5%

3201 S. Berry RoadNorman, OK 73072

(OFF.) (405) 307-8378 (FAX) (405) 329-1914

50/0.38"50/0.19"

12.5 Ft.-AB

LAYER / MATERIAL

DESCRIPTION

CLIENT: Oklahoma Department of

Transportation

ENGINEER: EST, Inc.

Page 108: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

WATER LEVEL OBSERVATIONS

GR

AP

HIC

S L

OG

13 Ft.-WS 5/21/15

FOREMAN

WL

WL

WL

RE

CO

VE

RY

, IN

.

LOCATION: South Duncan Bypass,

Stephens County, Oklahoma

(Continued) UN

CO

NF

INE

DS

TR

EN

GT

H,

PS

F

TY

PE

PROJECT: Bridge "C" over US Highway 81, J/P No.

20316(04)

5

HARD, GRAY, WEATHERED SILTSTONEWITH RED-BROWN SHALE SEAMS(continued)

6

0

0

0

Bottom of Boring at 59.8 feet

TESTS

TCP

RB

TCP

RB

TCP

El. = 992.557

SP

T-

NB

LOW

S /

FT

.

5/21/15

BORING COMPLETED

Station= 665+09.33, 420.08' Rt. of CL Survey

6000426

BORING LOG

RIG

55

60

65

70

75

NU

MB

ER

US

CS

SY

MB

OL

DR

Y D

EN

SIT

Y,

PC

F

JOB#

SAMPLES

A.D.

SOIL AND ROCK CLASSIFICATIONS ARE FROM DISTURBED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY

REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF

IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL.

* ESTIMATED FROM POCKET PENETROMETER

LIM

ITS

(LL

) (P

L)IN

DE

XE

S (

PI)

#200

SIE

VE

L.M.

BORING NO. B-01PAGE 3 OF 3

50/1.00"50/0.38"

CME-55

50/0.25"50/0.06"

L:\G

EO

TE

CH

\201

5 G

EO

TE

CH

PR

OJE

CT

S\6

0004

26 -

SO

UT

HD

UN

CA

NB

YP

AS

S\B

RID

GE

C\G

INT

\600

0426

- G

INT

C.G

PJ

FIR

E

BORING STARTED

50/0.13"50/0.13"

CLIENT: Oklahoma Department of

Transportation

REMARKS:

MO

IST

UR

E,

%

DE

PT

H,

FT

.

APPROVED

3201 S. Berry RoadNorman, OK 73072

(OFF.) (405) 307-8378 (FAX) (405) 329-1914

LAYER / MATERIAL

DESCRIPTION

ENGINEER: EST, Inc.

12.5 Ft.-AB

Page 109: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

15

16

17

12

17.9

13.6

17.1

1

El. = 1043.36

El. = 1040.36

El. = 1038.86

El. = 1037.36

14El. = 1028.36

13

2

3

4

5

6

7

8

9

10

11

17.3

El. = 1029.86

SS

14.4

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

LL = 31PL = 16PI = 15

-#200 = 74.9%

L:\G

EO

TE

CH

\201

5 G

EO

TE

CH

PR

OJE

CT

S\6

0004

26 -

SO

UT

HD

UN

CA

NB

YP

AS

S\B

RID

GE

C\G

INT

\600

0426

- G

INT

C.G

PJ

FIR

E

SS

26.1

25.6

23.6

24.4

27.3

26.7

25.6

26.2

26.8

24.8

18.1

28.1

15

13

8

10

15

16

18

18

18

13

18

18

18

18

18

18

18

LL = 30PL = 16PI = 14

-#200 = 71.9%LL = 25PL = 17PI = 8

-#200 = 66.9%LL = 26PL = 16PI = 10

-#200 = 52.5%LL = 30PL = 17PI = 13

-#200 = 77.1%LL = 30PL = 17PI = 13

-#200 = 81.7%LL = 31PL = 17PI = 14

-#200 = 77.4%LL = 29PL = 18PI = 11

-#200 = 77.6%LL = 35PL = 18PI = 17

-#200 = 83.6%LL = 36PL = 18PI = 18

-#200 = 86.1%LL = 37PL = 19PI = 18

-#200 = 82.9%LL = 37

26.8

14.4

18.1

17.3

26.1

25.6

23.6

24.4

27.3

26.7

13.6

26.2

17.9

28.1

24.8

25.6

MEDIUM STIFF, RED-BROWN, LEANCLAY WITH SAND

17.1

MEDIUM STIFF TO VERY STIFF, BROWN,LEAN CLAY WITH SAND

VERY SOFT TO SOFT, RED-BROWN,LEAN CLAY WITH SAND

VERY SOFT, RED-BROWN, SANDY LEANCLAY

SOFT TO MEDIUM STIFF, RED-BROWN,LEAN CLAY WITH SAND

SOFT TO MEDIUM STIFF, DARK BROWN,LEAN CLAY

SOFT TO MEDIUM STIFF, DARK BROWN,LEAN CLAY WITH SAND

5/21/15

CLIENT: Oklahoma Department of

Transportation

APPROVED

DE

PT

H,

FT

.

MO

IST

UR

E,

%

ENGINEER: EST, Inc.

CME-55

DR

Y D

EN

SIT

Y,

PC

F

US

CS

SY

MB

OL

NU

MB

ER

5

10

15

20

25

RIG

SP

T-

NB

LOW

S /

FT

.

REMARKS:

3201 S. Berry RoadNorman, OK 73072

(OFF.) (405) 307-8378 (FAX) (405) 329-1914

LAYER / MATERIAL

DESCRIPTION

9 Ft.-AB

6000426

BORING LOGG

RA

PH

ICS

LO

G

TY

PE

UN

CO

NF

INE

DS

TR

EN

GT

H,

PS

F

Surface Elev. = 1049.36 feetVegetation Thickness : None

LOCATION: South Duncan Bypass,

Stephens County, Oklahoma

RE

CO

VE

RY

, IN

.

WL

WL

WL

FOREMAN

5/21/159 Ft.-WS

JOB#

TESTS

BORING STARTED

PROJECT: Bridge "C" over US Highway 81, J/P No.

20316(04)

LIM

ITS

(LL

) (P

L)IN

DE

XE

S (

PI)

#200

SIE

VE

Station= 667+03.65, 332.89' Rt. of CL Survey

BORING COMPLETED

A.D.

BORING NO. B-04

L.M.

SOIL AND ROCK CLASSIFICATIONS ARE FROM DISTURBED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY

REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF

IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL.

* ESTIMATED FROM POCKET PENETROMETER

PAGE 1 OF 3

SAMPLES

WATER LEVEL OBSERVATIONS

CL

CL

CL

LL = 35PL = 18PI = 17

-#200 = 80.1%

LL = 36PL = 18PI = 18

-#200 = 77.4%

CL

CL

CL

LL = 30PL = 17PI = 13

-#200 = 77.3%

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

8

LL = 29PL = 17PI = 12

-#200 = 73.0%

20

9

8

2

6

10

5

7

9

5

8

6

7

0

15

16

Page 110: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

24.4

23.3

18.7

19.5

23.6

17.7

24.8

23

251

2

3

25.0

CL

CL

CL

CL

CL

CL-ML

PL = 19PI = 18

-#200 = 80.2%

L:\G

EO

TE

CH

\201

5 G

EO

TE

CH

PR

OJE

CT

S\6

0004

26 -

SO

UT

HD

UN

CA

NB

YP

AS

S\B

RID

GE

C\G

INT

\600

0426

- G

INT

C.G

PJ

FIR

E

TCP

SS

SS

SS

SS

SS

SS

SS

22

RB

TCP

RB

TCP

RB

SS

90

0

0

18

18

24

LL = 34PL = 17PI = 17

-#200 = 78.2%LL = 37PL = 19PI = 18

-#200 = 82.0%LL = 35PL = 18PI = 17

-#200 = 75.4%LL = 30PL = 16PI = 14

-#200 = 72.0%LL = 32PL = 23PI = 9

-#200 = 70.3%LL = 25PL = 17PI = 8

-#200 = 69.9%LL = 22PL = 16PI = 6

-#200 = 68.2%

18

LL = NPPL = NPPI = NP

-#200 = 41.3%

SOFT TO MEDIUM STIFF, DARK BROWN,LEAN CLAY WITH SAND (continued)

18

18

18

18

LL = 32PL = 17PI = 15

-#200 = 72.5%

El. = 1017.86

El. = 1016.36

El. = 1014.86

El. = 1012.86

18

19

20

21

25.0

STIFF, BROWN, SANDY LEAN CLAY

STIFF, BROWN, SANDY SILTY CLAY

STIFF, GRAY, LEAN CLAY WITH SAND

MODERATELY HARD TO HARD, GRAY,WEATHERED SILSTONE WITHRED-BROWN SHALE SEAMS

24.8

24.4

23.3

18.7

19.5

23.6

17.7

Station= 667+03.65, 332.89' Rt. of CL Survey

30

35

40

45

50

RIG

SP

T-

NB

LOW

S /

FT

.

BORING LOG

US

CS

SY

MB

OL

6000426

DR

Y D

EN

SIT

Y,

PC

F

BORING COMPLETED

A.D.

BORING NO. B-04

9 Ft.-AB

LAYER / MATERIAL

DESCRIPTION

CL

CLIENT: Oklahoma Department of

Transportation

NU

MB

ER

APPROVED

DE

PT

H,

FT

.

MO

IST

UR

E,

%

REMARKS:

5/21/15

CME-55

9 Ft.-WS

L.M.

LOCATION: South Duncan Bypass,

Stephens County, Oklahoma

RE

CO

VE

RY

, IN

.

PROJECT: Bridge "C" over US Highway 81, J/P No.

20316(04)

UN

CO

NF

INE

DS

TR

EN

GT

H,

PS

F

5/21/15

TY

PE

JOB#

TESTS

BORING STARTED

FOREMAN

LIM

ITS

(LL

) (P

L)IN

DE

XE

S (

PI)

#200

SIE

VE

SOIL AND ROCK CLASSIFICATIONS ARE FROM DISTURBED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY

REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF

IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL.

* ESTIMATED FROM POCKET PENETROMETER

PAGE 2 OF 3

SAMPLES

(Continued)

ENGINEER: EST, Inc.

WATER LEVEL OBSERVATIONS

WL

WL

WL

GR

AP

HIC

S L

OG

3201 S. Berry RoadNorman, OK 73072

(OFF.) (405) 307-8378 (FAX) (405) 329-1914

50/0.75"50/0.50"

6

8

5

6

13

19

19

24/6.0"50/3.0"

50/0.25"50/0.13"

50/0.38"50/0.25"

Page 111: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

RB

TCP

RB

TCP

RB

50/0.63"50/0.25"

50/0.38"50/0.25"

50/0.50"50/0.25"

50/0.88"50/0.50"

TCP

TCP

Bottom of Boring at 66.8 feet

MODERATELY HARD TO HARD, GRAY,WEATHERED SILSTONE WITHRED-BROWN SHALE SEAMS (continued)

0

0

0

0

7

6

5

4

El. = 982.54

PAGE 3 OF 3

WL

WL

WL

WATER LEVEL OBSERVATIONS

GR

AP

HIC

S L

OG

SAMPLES

SOIL AND ROCK CLASSIFICATIONS ARE FROM DISTURBED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY

REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF

IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL.

* ESTIMATED FROM POCKET PENETROMETER

LIM

ITS

(LL

) (P

L)IN

DE

XE

S (

PI)

#200

SIE

VE

L.M.

BORING NO. B-04

BORING STARTED

TESTS

JOB#

9 Ft.-WS

FOREMAN

PROJECT: Bridge "C" over US Highway 81, J/P No.

20316(04)

RE

CO

VE

RY

, IN

.

LOCATION: South Duncan Bypass,

Stephens County, Oklahoma

(Continued) UN

CO

NF

INE

DS

TR

EN

GT

H,

PS

F

TY

PE

5/21/15

CLIENT: Oklahoma Department of

Transportation

3201 S. Berry RoadNorman, OK 73072

(OFF.) (405) 307-8378 (FAX) (405) 329-1914

LAYER / MATERIAL

DESCRIPTION

ENGINEER: EST, Inc.

APPROVED

9 Ft.-AB

55

60

65

70

75

A.D.

BORING COMPLETED

Station= 667+03.65, 332.89' Rt. of CL Survey

6000426

BORING LOG

RIG

L:\G

EO

TE

CH

\201

5 G

EO

TE

CH

PR

OJE

CT

S\6

0004

26 -

SO

UT

HD

UN

CA

NB

YP

AS

S\B

RID

GE

C\G

INT

\600

0426

- G

INT

C.G

PJ

FIR

E

NU

MB

ER

US

CS

SY

MB

OL

DR

Y D

EN

SIT

Y,

PC

F

CME-55

5/21/15

REMARKS:

MO

IST

UR

E,

%

DE

PT

H,

FT

.

SP

T-

NB

LOW

S /

FT

.

Page 112: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

SS

7.1

SS

SS

ST

ST

16.3

13.6

18.9

15.8

11.0

SS

CL

SC

CL

CL

L:\G

EO

TE

CH

\201

5 G

EO

TE

CH

PR

OJE

CT

S\6

0004

26 -

SO

UT

HD

UN

CA

NB

YP

AS

S\R

EP

OR

TS

\BR

IDG

ES

\BR

IDG

E 'E

'\GIN

T\6

0004

26 -

GIN

T B

R. E

.GP

J F

IRE

CL SS

SS

TCP

RB

TCP

RB

TCP

RB

4 TCP

MEDIUM STIFF, BROWN, SANDY LEANCLAY

LOOSE, BROWN, CLAYEY SAND

STIFF TO VERY STIFF, RED-BROWN,LEAN CLAY WITH SAND

STIFF, RED-BROWN, SANDY LEAN CLAY

MODERATELY HARD TO HARD, GRAY,WEATHERED SILTSTONE WITH SHALESEAMS

SOFT TO MODERATELY HARD,RED-BROWN WITH GRAY SEAMS,WEATHERED SHALE

24

18

5

24

18

18

15

0

0

0

0

184

El. = 1073.43

El. = 1070.93

El. = 1065.93

El. = 1062.43

El. = 1047.93

1

3

5

6

7

8

1

2

3

2

16.3

13.6

18.9

15.8

11.0

7.1

BORING LOG

DR

Y D

EN

SIT

Y,

PC

F

US

CS

SY

MB

OL

NU

MB

ER

5

10

15

20

25

30

RIG

SP

T-

NB

LOW

S /

FT

.

3/17/15

6000426

Station= 699+43.16, 21.22' Rt. of CL Survey

BORING COMPLETED

A.D.

CLIENT: Oklahoma Department of

Transportation

None-AB

ENGINEER: EST, Inc.

LAYER / MATERIAL

DESCRIPTION

3201 S. Berry RoadNorman, OK 73072

(OFF.) (405) 307-8378 (FAX) (405) 329-1914

CME-55 L.M.

APPROVED

DE

PT

H,

FT

.

MO

IST

UR

E,

%

REMARKS:

None-WD

None-24 Hrs. AB

UN

CO

NF

INE

DS

TR

EN

GT

H,

PS

F

Surface Elev. = 1074.93 feetVegetation Thickness : 12" Grass & Weeds

LOCATION: South Duncan Bypass,

Stephens County, Oklahoma

RE

CO

VE

RY

, IN

.

PROJECT: Bridge "E" over Seminole Road, J/P No.

20316(23)

3/17/15

JOB#

TESTS

BORING STARTED

FOREMAN

LIM

ITS

(LL

) (P

L)IN

DE

XE

S (

PI)

#200

SIE

VE

SOIL AND ROCK CLASSIFICATIONS ARE FROM DISTURBED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY

REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF

IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL.

* ESTIMATED FROM POCKET PENETROMETER

PAGE 1 OF 2

SAMPLES

TY

PE

WATER LEVEL OBSERVATIONS

WL

WL

WL

GR

AP

HIC

S L

OG

BORING NO. B-01

LL = 25PL = 14PI = 11

-#200 = 68.0%

LL = 30PL = 14PI = 16

-#200 = 70.2%

LL = NPPL = NPPI = NP

-#200 = 40.5%

LL = 27PL = 16PI = 11

-#200 = 53.3%LL = 23PL = 15PI = 8

-#200 = 45.0%

LL = 35PL = 16PI = 19

-#200 = 82.6%20

6

14

15

10

5/6.0"12/6.0"50/3.0"

50/3.00"50/1.25"

50/0.38"50/0.13"

50/1.13"50/0.75"

50/0.63"50/0.25"

Page 113: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

RB

TCP

RB

L:\G

EO

TE

CH

\201

5 G

EO

TE

CH

PR

OJE

CT

S\6

0004

26 -

SO

UT

HD

UN

CA

NB

YP

AS

S\R

EP

OR

TS

\BR

IDG

ES

\BR

IDG

E 'E

'\GIN

T\6

0004

26 -

GIN

T B

R. E

.GP

J F

IRE

50/1.00"50/0.63"

50/0.50"50/0.06"

50/1.00"50/0.50"

TCP

Bottom of Boring at 42.8 feet

MODERATELY HARD TO HARD, GRAY,INTERBEDDED SHALE, SILTSTONE, ANDSANDSTONE

TCP

0

0

0

SOFT TO MODERATELY HARD,RED-BROWN WITH GRAY SEAMS,WEATHERED SHALE (continued)

RB

7

6

5

El. = 1032.13

El. = 1034.93

GR

AP

HIC

S L

OG

WL

WL

WL

WATER LEVEL OBSERVATIONS

UN

CO

NF

INE

DS

TR

EN

GT

H,

PS

F

SAMPLES

PAGE 2 OF 2

SOIL AND ROCK CLASSIFICATIONS ARE FROM DISTURBED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY

REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF

IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL.

* ESTIMATED FROM POCKET PENETROMETER

FOREMAN

BORING STARTED

TESTS

JOB#

3/17/15

TY

PE

PROJECT: Bridge "E" over Seminole Road, J/P No.

20316(23)

RE

CO

VE

RY

, IN

.

LOCATION: South Duncan Bypass,

Stephens County, Oklahoma

(Continued)

None-WD

None-24 Hrs. AB

LIM

ITS

(LL

) (P

L)IN

DE

XE

S (

PI)

#200

SIE

VE

REMARKS:

MO

IST

UR

E,

%

DE

PT

H,

FT

.

APPROVED

CME-55

CLIENT: Oklahoma Department of

Transportation

3201 S. Berry RoadNorman, OK 73072

(OFF.) (405) 307-8378 (FAX) (405) 329-1914

LAYER / MATERIAL

DESCRIPTION

ENGINEER: EST, Inc.

None-AB

BORING NO. B-01

A.D.

BORING COMPLETED

3/17/15

6000426

L.M.

BORING LOG

SP

T-

NB

LOW

S /

FT

.

RIG

35

40

45

50

55

60

NU

MB

ER

US

CS

SY

MB

OL

DR

Y D

EN

SIT

Y,

PC

F

Station= 699+43.16, 21.22' Rt. of CL Survey

Page 114: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

LOOSE TO MEDIUM DENSE, BROWN,SILTY SAND

MODERATELY HARD, GRAY WITHORANGE SEAMS, WEATHEREDSILTSTONE WITH SHALE SEAMS

3

MEDIUM DENSE, LIGHT BROWN,CLAYEY SAND

El. = 1072.79

El. = 1071.29

El. = 1069.79

El. = 1064.29

El. = 1062.29

El. = 1059.79

El. = 1057.29

El. = 1051.79

1

0

MEDIUM STIFF, BROWN, SANDY LEANCLAY

MEDIUM STIFF, BROWN, LEAN CLAY

SOFT, BROWN, SANDY SILTY CLAY

SOFT TO MEDIUM STIFF, BROWN,SANDY LEAN CLAY

SOFT, BROWN, SANDY SILT

STIFF, LIGHT BROWN, LEAN CLAY

4

17.6

16.6

17.3

16.8

14.5

14.2

2

18.0

18.1

13.3

14.9

15.3

10.8

16.6

L:\G

EO

TE

CH

\201

5 G

EO

TE

CH

PR

OJE

CT

S\6

0004

26 -

SO

UT

HD

UN

CA

NB

YP

AS

S\R

EP

OR

TS

\BR

IDG

ES

\BR

IDG

E 'E

'\GIN

T\6

0004

26 -

GIN

T B

R. E

.GP

J F

IRE

13.6

5

6

7

8

9

10

11

12

13

14

15

2

10

1

LAYER / MATERIAL

DESCRIPTION

0

ENGINEER: EST, Inc.

3201 S. Berry RoadNorman, OK 73072

(OFF.) (405) 307-8378 (FAX) (405) 329-1914

CLIENT: Oklahoma Department of

Transportation

APPROVED

DE

PT

H,

FT

.

MO

IST

UR

E,

%

None-AB

17.3

16.8

14.5

14.2

13.6

18.0

17.6

18.1

13.3

14.9

15.3

3/17/15

10.8

12

REMARKS:

PAGE 1 OF 2

11

LIM

ITS

(LL

) (P

L)IN

DE

XE

S (

PI)

#200

SIE

VE

18

18

18

11

18

18

18

18

8

16

18

6000426

16

CME-75

DR

Y D

EN

SIT

Y,

PC

F

US

CS

SY

MB

OL

NU

MB

ER

5

10

15

20

25

30

RIG

SP

T-

NB

LOW

S /

FT

.

SOIL AND ROCK CLASSIFICATIONS ARE FROM DISTURBED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY

REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF

IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL.

* ESTIMATED FROM POCKET PENETROMETER

Station= 701+50.79, 66.67' Rt. of CL Survey

BORING COMPLETED

A.D.

BORING NO. B-04

R.J.

BORING LOG

11

3

5

3

19

15

16

11

7

6

5

20/6.0"37/6.0'50/3.5"

50/0.75"50/0.38"

50/0.13"50/0.06"

6

GR

AP

HIC

S L

OG

TY

PE

UN

CO

NF

INE

DS

TR

EN

GT

H,

PS

F

Surface Elev. = 1074.29 feetVegetation Thickness : Sparce Grass Cover

LOCATION: South Duncan Bypass,

Stephens County, Oklahoma

RE

CO

VE

RY

, IN

.

WATER LEVEL OBSERVATIONS

FOREMAN

3/17/15 None-WD

None-24 Hrs. AB

JOB#

TESTS

BORING STARTED

PROJECT: Bridge "E" over Seminole Road, J/P No.

20316(23)

WL

WL

WL

SAMPLES

TCP

CL-ML

CL

ML

CL

CL

CL

SC

SS

SS

TCP

SS

RB

SS

SS

ST

SS

SS

ST

SS

SS

SS

SS

SS

SM

SS

LL = 32PL = 17PI = 15

-#200 = 88.2%

CL

CL

LL = 21PL = 17PI = 4

-#200 = 56.0%LL = 24PL = 15PI = 9

-#200 = 58.1%LL = 21PL = 18PI = 3

-#200 = 56.6%LL = 38PL = 18PI = 20

-#200 = 91.0%LL = 36PL = 15PI = 21

-#200 = 93.5%

LL = 37PL = 18PI = 19

-#200 = 43.3%

LL = 25PL = 17PI = 8

-#200 = 62.0%LL = NPPL = NPPI = NP

-#200 = 41.1%LL = NPPL = NPPI = NP

-#200 = 19.8%LL = NPPL = NPPI = NP

-#200 = 47.0%LL = 22PL = 16PI = 6

-#200 = 36.4%

LL = 30PL = 15PI = 15

-#200 = 90.2%

SM

SM

Page 115: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

SS

13.6

13.3

RB

L:\G

EO

TE

CH

\201

5 G

EO

TE

CH

PR

OJE

CT

S\6

0004

26 -

SO

UT

HD

UN

CA

NB

YP

AS

S\R

EP

OR

TS

\BR

IDG

ES

\BR

IDG

E 'E

'\GIN

T\6

0004

26 -

GIN

T B

R. E

.GP

J F

IRE

18

RB

11.4TCP

SS

TCP

RB

TCPSS

RB

TCP

TCP

17

RB

0

7

05

0

6

03

0

11.4

13.3

13.6

El. = 1031.79

El. = 1041.29

El. = 1021.18

316

4

5

MODERATELY HARD, GRAY,WEATHERED SILTSTONE WITH SHALEAND SANDSTONE SEAMS

6

MODERATELY HARD, GRAY WITHORANGE SEAMS, WEATHEREDSILTSTONE WITH SHALE SEAMS(continued)

MODERATELY HARD TO HARD, PURPLE,WEATHERED SHALE WITH SANDSTONESEAMS

Bottom of Boring at 53.1 feet

R.J.

SAMPLES

BORING COMPLETED

A.D. 6000426

BORING NO. B-04

LIM

ITS

(LL

) (P

L)IN

DE

XE

S (

PI)

#200

SIE

VE

SOIL AND ROCK CLASSIFICATIONS ARE FROM DISTURBED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY

REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF

IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL.

* ESTIMATED FROM POCKET PENETROMETER

NU

MB

ER

MO

IST

UR

E,

%

3/17/15

CME-75

Station= 701+50.79, 66.67' Rt. of CL Survey

US

CS

SY

MB

OL

35

40

45

50

55

60

RIG

SP

T-

NB

LOW

S /

FT

.

BORING LOG

DR

Y D

EN

SIT

Y,

PC

F

PAGE 2 OF 2

PROJECT: Bridge "E" over Seminole Road, J/P No.

20316(23)

FOREMAN

3/17/15

JOB#

LOCATION: South Duncan Bypass,

Stephens County, Oklahoma

TESTS

BORING STARTED

None-WD

None-24 Hrs. AB

WATER LEVEL OBSERVATIONS

RE

CO

VE

RY

, IN

.

WL

WL

WL

DE

PT

H,

FT

.

GR

AP

HIC

S L

OG

TY

PE

UN

CO

NF

INE

DS

TR

EN

GT

H,

PS

F

(Continued)

APPROVED

LL = 19PL = 17PI = 2

-#200 = 56.3%

REMARKS:

LL = 19PL = 13PI = 6

-#200 = 47.6%

LL = 27PL = 15PI = 12

-#200 = 82.8%

3201 S. Berry RoadNorman, OK 73072

(OFF.) (405) 307-8378 (FAX) (405) 329-1914

None-AB

LAYER / MATERIAL

DESCRIPTION

CLIENT: Oklahoma Department of

Transportation

ENGINEER: EST, Inc.

50/0.88"50/0.50"50/5.0"

50/0.50"50/0.25"

50/0.50"50/0.25"50/3.5"50/2.5"

50/0.88"50/0.75"

50/1.50"50/1.50"

50/0.63"50/0.25"

Page 116: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

10

L:\G

EO

TEC

H\2

015

GE

OTE

CH

PR

OJE

CTS

\600

0426

- S

OU

THD

UN

CA

NB

YP

AS

S\E

MB

AN

KM

EN

TSTU

DY

\600

0426

- G

INT

E1

- E2.

GP

J F

IRE

28

6

15

38

33

10

21

50/4.0"50/1.5"

50/3.0"50/1.0"

7

19

9

3

Medium Stiff to Stiff, Brown, Silty Clay

Stiff, Red, Lean Clay

Very Stiff to Hard, Red, Sandy Lean Clay

Medium Stiff to Stiff, Red-Brown, Lean Claywith Gravel

17

8

16

16

16

15

16

5

Bottom of Boring at 17.8 feet

14

1

Very Stiff, Brown, Lean Clay

El. = 1072

El. = 1070.5

El. = 1066

El. = 1064.5

El. = 1057.17

2

3

4

5

6

El. = 10638

Moderately Hard to Hard, Gray, InterbeddedShale and Sandstone

WATER LEVEL OBSERVATIONS

LOCATION: South Duncan Bypass,Stephens County, Oklahoma

WL

WL

WL

Station= 702+50 on CL of Survey

GR

AP

HIC

S L

OG

TYP

E

UN

CO

NFI

NE

DS

TRE

NG

TH, P

SF

SP

T- N

BLO

WS

/ FT

.

CME-55

DR

Y D

EN

SIT

Y,

PC

F

US

CS

SY

MB

OL

NU

MB

ER

RIG

BORING COMPLETED

BORING LOG

6000426

5

10

15

20

BORING NO. E1

Surface Elev. = 1075 feetVegetation Thickness : None LI

MIT

S (L

L) (P

L)IN

DE

XE

S (P

I)#2

00 S

IEV

E

SOIL AND ROCK CLASSIFICATIONS ARE FROM DISTURBED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAYREVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OFIN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL.* ESTIMATED FROM POCKET PENETROMETER

PAGE 1 OF 1

SAMPLES

L.M.

RE

CO

VE

RY

, IN

.

PROJECT: South Duncan Bypass Embankment Study

FOREMAN

5/21/15

A.D. JOB#

480 24th Avenue NW, Suite 244Norman, OK 73069

(OFF.) (405) 307-8378 (FAX) (405) 329-1914

TESTS

BORING STARTED 5/21/15

None-WD

SS

SS

SS

SS

SS

SS

SS

SS

PA

SS

REMARKS:

SS

None - AB

LAYER / MATERIAL

DESCRIPTION

CLIENT: Oklahoma Department ofTransportation

APPROVED

DE

PTH

, FT.

MO

ISTU

RE

, %

ENGINEER: EST, Inc.

Page 117: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

14

2

3

4

5

6

7

8

9

10

11

13

15

16

17

18

12

14

5

17

20

30

18

6

13

11

10

15

12

9

L:\G

EO

TEC

H\2

015

GE

OTE

CH

PR

OJE

CTS

\600

0426

- S

OU

THD

UN

CA

NB

YP

AS

S\E

MB

AN

KM

EN

TSTU

DY

\600

0426

- G

INT

E1

- E2.

GP

J F

IRE

5/6.0"20/6.0"50/5.0"

50/4.5"50/2.0"

6

El. = 1055 17

0

1

15

13

9

18

16

18

15

12

13

10

12

14

9

16

17

Very Hard to Hard, Red, Silty Clay

13

Soft, Brown, Silty ClayEl. = 1078.5

El. = 1075.5

El. = 1074

El. = 1072.5

El. = 1069.5

El. = 1065

El. = 1059

El. = 105614

El. = 1049.46

Stiff, Red-Brown, Sandy Silt

Medium Stiff, Red-Brown, Silty Sand

Stiff, Brown, Silty Clay with Gravel

Stiff, Red-Brown, Silty Clay with Gravel

Medium Stiff to Stiff, Brown, Silty Clay

Stiff to Very Stiff, Brown, Silty Clay

Soft to Moderately Hard, Gray, InterbeddedShale and Sandstone

Bottom of Boring at 30.5 feet

Stiff to Very Stiff, Red, Sandy Silty Clay

US

CS

SY

MB

OL

APPROVED

DE

PTH

, FT.

MO

ISTU

RE

, %

REMARKS:

5/22/15

CME-55

BORING COMPLETED

DR

Y D

EN

SIT

Y,

PC

F

CLIENT: Oklahoma Department ofTransportation

NU

MB

ER

5

10

15

20

25

30

RIG

SP

T- N

BLO

WS

/ FT

.

BORING LOG

6000426

12

None - AB

ENGINEER: EST, Inc.

LAYER / MATERIAL

DESCRIPTION

TESTS

BORING STARTED

480 24th Avenue NW, Suite 244Norman, OK 73069

(OFF.) (405) 307-8378 (FAX) (405) 329-1914 A.D.

Station= 694+50 on CL of Survey

None-WD

BORING NO. E2

L.M.

LIM

ITS

(LL)

(PL)

IND

EX

ES

(PI)

#200

SIE

VE

SOIL AND ROCK CLASSIFICATIONS ARE FROM DISTURBED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAYREVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OFIN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL.* ESTIMATED FROM POCKET PENETROMETER

PAGE 1 OF 1

SAMPLES

UN

CO

NFI

NE

DS

TRE

NG

TH, P

SF

WATER LEVEL OBSERVATIONS

WL

WL

WL

GR

AP

HIC

S L

OG

TYP

E

JOB#

Surface Elev. = 1080 feetVegetation Thickness : None

LOCATION: South Duncan Bypass,Stephens County, Oklahoma

RE

CO

VE

RY

, IN

.

PROJECT: South Duncan Bypass Embankment Study

FOREMAN

5/22/15

PA

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

Page 118: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

SS

SS

SS

HS

ST

SS

18.8

11.1

9.0

13.6

7.2

17.8

15.9

20.9

TCP

CL

CL

SS

L:\G

EO

TE

CH

\201

5 G

EO

TE

CH

PR

OJE

CT

S\6

0004

26 -

SO

UT

HD

UN

CA

NB

YP

AS

S\R

EP

OR

TS

\BR

IDG

ES

\BR

IDG

E 'G

'\GIN

T\6

0004

26 -

GIN

T B

R. G

.GP

J F

IRE

RB

TCPHSSS

HS

SS

HS

SSTCP

RB

STIFF TO VERY STIFF, RED-BROWN,LEAN CLAY WITH SAND

11.1

HARD, LIGHT GRAY, LEAN CLAY WITHSAND

HARD TO VERY HARD, GRAY, CLAYLIKESHALE (RESIDUAL)

HARD TO VERY HARD, RED-BROWN,CLAYLIKE SHALE (RESIDUAL)

SOFT TO MODERATELY HARD,RED-BROWN, WEATHERED SHALE

0

12

18

24

18

18

0

18

18

110

9.0

8

2

El. = 1089.07

El. = 1086.57

El. = 1078.07

El. = 1069.57

1

2

3

4

5

18.8

1

7

8

93

6

13.6

7.2

17.8

15.9

20.9

5

10

15

20

25

30

APPROVED

DE

PT

H,

FT

.

MO

IST

UR

E,

%

REMARKS:

3/16/15

CME-55

DR

Y D

EN

SIT

Y,

PC

F

A.D.

NU

MB

ER

RIG

SP

T-

NB

LOW

S /

FT

.

BORING LOG

6000426

Station= 733+38.20, 168.37' Rt. of CL Survey

US

CS

SY

MB

OL

None-AB

ENGINEER: EST, Inc.

LAYER / MATERIAL

DESCRIPTION

3201 S. Berry RoadNorman, OK 73072

(OFF.) (405) 307-8378 (FAX) (405) 329-1914

CLIENT: Oklahoma Department of

Transportation

3/16/15

TY

PE

UN

CO

NF

INE

DS

TR

EN

GT

H,

PS

F

Surface Elev. = 1094.07 feetVegetation Thickness : 6" Grass Cover

LOCATION: South US-81 Connector,

Stephens County, Oklahoma

RE

CO

VE

RY

, IN

.

PROJECT: Bridge "G" over Duncan Bypass, J/P No.

20316(23)

BORING COMPLETED

FOREMAN

None-WD

None-24 Hrs. AB

JOB#

TESTS

BORING STARTED

SAMPLES

BORING NO. B-01

L.M.

LIM

ITS

(LL

) (P

L)IN

DE

XE

S (

PI)

#200

SIE

VE

PAGE 1 OF 2G

RA

PH

ICS

LO

G

WATER LEVEL OBSERVATIONS

WL

WL

WL

SOIL AND ROCK CLASSIFICATIONS ARE FROM DISTURBED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY

REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF

IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL.

* ESTIMATED FROM POCKET PENETROMETER

LL = 39PL = 21PI = 18

-#200 = 99.4%

LL = 36PL = 19PI = 17

-#200 = 99.2%

LL = 28PL = 19PI = 9

-#200 = 87.1%

LL = 42PL = 23PI = 19

-#200 = 99.4%

LL = 29PL = 16PI = 13

-#200 = 97.7%

LL = 36PL = 20PI = 16

-#200 = 77.4%LL = 34PL = 19PI = 15

-#200 = 84.8%

LL = 31PL = 17PI = 14

-#200 = 84.5%

62

50/1.50"50/1.00"

23/6.0"50/5.5"

59

12

39/6.0"27/6.0"

50/4.00"50/2.25"

47/6.0"50/2.0"

48

37

28

Page 119: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

RB

TCP

RB

TCP

TCP

TCP

RB

TCP

RB

TCP

L:\G

EO

TE

CH

\201

5 G

EO

TE

CH

PR

OJE

CT

S\6

0004

26 -

SO

UT

HD

UN

CA

NB

YP

AS

S\R

EP

OR

TS

\BR

IDG

ES

\BR

IDG

E 'G

'\GIN

T\6

0004

26 -

GIN

T B

R. G

.GP

J F

IRE

RB

Bottom of Boring at 55.0 feet

MODERATELY HARD, POORLYCEMENTED, GRAY WEATHEREDSILTSTONE WITH RED-BROWN SHALESEAMS

SOFT TO MODERATELY HARD,RED-BROWN, WEATHERED SHALE(continued)

0

0

0

0

0

0

8

9

7

6

5

4

El. = 1039.08

El. = 1060.07

SAMPLES

PAGE 2 OF 2

SOIL AND ROCK CLASSIFICATIONS ARE FROM DISTURBED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY

REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF

IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL.

* ESTIMATED FROM POCKET PENETROMETER

LIM

ITS

(LL

) (P

L)IN

DE

XE

S (

PI)

#200

SIE

VE

BORING NO. B-01

WATER LEVEL OBSERVATIONS

A.D.

BORING COMPLETED

Station= 733+38.20, 168.37' Rt. of CL Survey

6000426

BORING LOG

SP

T-

NB

LOW

S /

FT

.

L.M.

RE

CO

VE

RY

, IN

.

BORING STARTED

TESTS

JOB#

None-WD

None-24 Hrs. AB

3/16/15

FOREMAN

PROJECT: Bridge "G" over Duncan Bypass, J/P No.

20316(23)

LOCATION: South US-81 Connector,

Stephens County, Oklahoma

(Continued) UN

CO

NF

INE

DS

TR

EN

GT

H,

PS

F

TY

PE

GR

AP

HIC

S L

OG

WL

WL

WL

RIG

50/0.25"50/0.13"

50/0.50"50/0.25"

50/0.88"50/0.38"

50/0.88"50/0.38"

50/0.88"50/0.50"

50/1.00"50/0.50"

NU

MB

ER

US

CS

SY

MB

OL

DR

Y D

EN

SIT

Y,

PC

F

CME-55

3/16/15

REMARKS:

MO

IST

UR

E,

%

DE

PT

H,

FT

.

APPROVED

ENGINEER: EST, Inc.

None-AB

35

40

45

50

55

60

LAYER / MATERIAL

DESCRIPTION

3201 S. Berry RoadNorman, OK 73072

(OFF.) (405) 307-8378 (FAX) (405) 329-1914

CLIENT: Oklahoma Department of

Transportation

Page 120: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

15.0

8

18.2

15.9

9.1

10.3

10.1

9.5

14.5

20.1

14.9

12.0

15.4

19.3

CL

10

11

12

13

14

1

215

TCP

CL

CL

CL

L:\G

EO

TE

CH

\201

5 G

EO

TE

CH

PR

OJE

CT

S\6

0004

26 -

SO

UT

HD

UN

CA

NB

YP

AS

S\R

EP

OR

TS

\BR

IDG

ES

\BR

IDG

E 'G

'\GIN

T\6

0004

26 -

GIN

T B

R. G

.GP

J F

IRE

CL

SS

7

SS

SS

ST

SS

SS

SS

SS

ST

SS

SS

SS

SS

SS

TCP

RB

SS

9

SOFT TO MEDIUM STIFF, DARK BROWN,SILTY CLAY WITH SAND (FILL)

MEDIUM STIFF, DARK BROWN, LEANCLAY (FILL)

STIFF TO VERY STIFF, LIGHT BROWN,LEAN CLAY (FILL)

STIFF, LIGHT BROWN, LEAN CLAY WITHSAND

MEDIUM STIFF, BROWN, LEAN CLAY

VERY STIFF, RED-BROWN WITH GRAY,LEAN CLAY

VERY HARD, RED-BROWN, LEAN CLAY(SHALEY)

18

12

18

24

16

18

18

24

18

18

18

18

15

0

010

16

El. = 1070.94

SOFT, RED, WEATHERED SHALE,INTERBEDDED WITH GRAY SILTSTONE

El. = 1074.44

El. = 1067.94

El. = 1062.44

El. = 1058.44

El. = 1056.94

El. = 1054.44

1

2

3

4

5

6

20.1

CL

18.2

15.9

9.1

10.3

10.1

14.5

19.3

14.9

15.0

12.0

15.4

9.5

REMARKS:

3201 S. Berry RoadNorman, OK 73072

(OFF.) (405) 307-8378 (FAX) (405) 329-1914

CLIENT: Oklahoma Department of

Transportation

APPROVED

ENGINEER: EST, Inc.

MO

IST

UR

E,

%

None-AB

3/16/15

CME-75

DR

Y D

EN

SIT

Y,

PC

F

US

CS

SY

MB

OL

NU

MB

ER

5

10

15

20

25

30

RIG

SP

T-

NB

LOW

S /

FT

.

DE

PT

H,

FT

.

CL

LAYER / MATERIAL

DESCRIPTION

GR

AP

HIC

S L

OG

TY

PE

UN

CO

NF

INE

DS

TR

EN

GT

H,

PS

F

Surface Elev. = 1075.94 feetVegetation Thickness : 4" Grass Cover

LOCATION: South US-81 Connector,

Stephens County, Oklahoma

RE

CO

VE

RY

, IN

.

WATER LEVEL OBSERVATIONS

FOREMAN

3/16/15 None-WD

None-24 Hrs. AB

JOB#

TESTS

BORING STARTED

PROJECT: Bridge "G" over Duncan Bypass, J/P No.

20316(23)

LIM

ITS

(LL

) (P

L)IN

DE

XE

S (

PI)

#200

SIE

VE

6000426

Station= 739+02.35, 260.17' Rt. of CL Survey

BORING COMPLETED

A.D.

BORING NO. B-05

R.J.

WL

WL

WL

SOIL AND ROCK CLASSIFICATIONS ARE FROM DISTURBED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY

REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF

IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL.

* ESTIMATED FROM POCKET PENETROMETER

PAGE 1 OF 2

SAMPLES

BORING LOG

LL = 34PL = 18PI = 16

-#200 = 94.0%

LL = 24PL = 17PI = 7

-#200 = 72.9%LL = 27PL = 19PI = 8

-#200 = 85.8%

LL = 31PL = 18PI = 13

-#200 = 87.6%LL = 32PL = 19PI = 13

-#200 = 90.6%LL = 29PL = 16PI = 13

-#200 = 80.2%LL = 26PL = 15PI = 11

-#200 = 75.1%LL = 29PL = 16PI = 13

-#200 = 80.9%LL = 30PL = 17PI = 13

-#200 = 85.1%LL = 32PL = 17PI = 15

-#200 = 85.2%

LL = 37PL = 18PI = 19

-#200 = 91.4%

LL = 35PL = 18PI = 17

-#200 = 98.9%

LL = 42PL = 21PI = 21

-#200 = 99.2%

21

14

6

9

21

71

18/6.0"45/6.0"50/3.0"

50/0.25"50/3.75"

19

28/6.0"50/4.0"

18

50/3.50"50/3.0"

11

9

5

Page 121: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

SSTCP

RB

TCP

RB

SSTCP

RB

TCP

RB

L:\G

EO

TE

CH

\201

5 G

EO

TE

CH

PR

OJE

CT

S\6

0004

26 -

SO

UT

HD

UN

CA

NB

YP

AS

S\R

EP

OR

TS

\BR

IDG

ES

\BR

IDG

E 'G

'\GIN

T\6

0004

26 -

GIN

T B

R. G

.GP

J F

IRE

24.6

17.2

TCP

RB

MODERATELY HARD TO HARD,PURPLE-GRAY, INTERBEDDED SHALEAND SILTSTONE

MODERATELY HARD, REDDISH-PURPLE,WEATHERED SHALE

Bottom of Boring at 52.2 feet

24.6

SOFT, RED, WEATHERED SHALE,INTERBEDDED WITH GRAY SILTSTONE(continued)

0

0

0

0

0

4

8

17.2

6

717

5

4

LL = 52PL = 23PI = 29

-#200 = 99.4%

16

El. = 1039.44

El. = 1031.44

El. = 1023.79

3

BORING NO. B-05

A.D.

BORING COMPLETED

LIM

ITS

(LL

) (P

L)IN

DE

XE

S (

PI)

#200

SIE

VE

SOIL AND ROCK CLASSIFICATIONS ARE FROM DISTURBED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY

REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF

IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL.

* ESTIMATED FROM POCKET PENETROMETER

PAGE 2 OF 2

SAMPLES

LL = 28PL = 15PI = 13

-#200 = 89.5%

R.J.

SP

T-

NB

LOW

S /

FT

.

CME-75

DR

Y D

EN

SIT

Y,

PC

F

US

CS

SY

MB

OL

NU

MB

ER

RIG

BORING LOG

6000426

Station= 739+02.35, 260.17' Rt. of CL Survey

35

40

45

50

55

60

FOREMAN

3/16/15

RE

CO

VE

RY

, IN

.

JOB#

TESTS

BORING STARTED

None-WD

None-24 Hrs. AB

GR

AP

HIC

S L

OG

WATER LEVEL OBSERVATIONS

PROJECT: Bridge "G" over Duncan Bypass, J/P No.

20316(23)

3/16/15

TY

PE

UN

CO

NF

INE

DS

TR

EN

GT

H,

PS

F

(Continued)

LOCATION: South US-81 Connector,

Stephens County, Oklahoma

WL

WL

WL

50/2.25"50/1.13"

50/2.38"50/2.50"50/6.0"50/2.0"

50/1.63"50/2.0"

50/3.0"50/1.0"

50/0.50"50.25"

50/3.13"50/3.13"

ENGINEER: EST, Inc.

3201 S. Berry RoadNorman, OK 73072

(OFF.) (405) 307-8378 (FAX) (405) 329-1914

None-AB

APPROVED

DE

PT

H,

FT

.

MO

IST

UR

E,

%

REMARKS:

CLIENT: Oklahoma Department of

Transportation

LAYER / MATERIAL

DESCRIPTION

Page 122: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

South Duncan Bypass, State Job No. 20316(04) & 20316(23) EST Project Number: 6000426 Stephens County, Oklahoma July 29, 2015

EST, Inc.

Appendix D

Piezocone Soundings (CPTU)

Page 123: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

Oklahoma Department of Transportation (ODOT)Operator: EST, Inc.

Sounding: CPT 1

Cone Used: DDG1332

GPS Data: 34.4662832, -97.9731361

CPT Date/Time: 6/20/2015 10:42:44 AM

Location: South Duncan Bypass

Job Number: J/P No. 20316(23)

Maximum Depth = 14.27 feet Depth Increment = 0.164 feet

Filter On

*Soil behavior type and SPT based on data from UBC-1983

Tip Resistance

Qt TSF800

0

2

4

6

8

10

12

14

16

Depth(ft)

Local Friction

Fs TSF20

Pore Pressure

Pw TSF4-1

Friction Ratio

Fs/Qt (%) 50

Soil Behavior Type*

Zone: UBC-1983

1 sensitive fine grained 2 organic material 3 clay

4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt

7 silty sand to sandy silt 8 sand to silty sand 9 sand

10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*)

120

Page 124: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

Oklahoma Department of Transportation (ODOT)Operator: EST, Inc.

Sounding: CPT 2

Cone Used: DDG1332

GPS Data: 34.4676234, -97.9727921

CPT Date/Time: 6/20/2015 8:57:16 AM

Location: South Duncan Bypass

Job Number: J/P No. 20316(23)

Maximum Depth = 7.38 feet Depth Increment = 0.164 feet

Filter On

*Soil behavior type and SPT based on data from UBC-1983

Tip Resistance

Qt TSF1400

0

1

2

3

4

5

6

7

8

Depth(ft)

Local Friction

Fs TSF20

Pore Pressure

Pw TSF1-1

Friction Ratio

Fs/Qt (%) 120

Soil Behavior Type*

Zone: UBC-1983

1 sensitive fine grained 2 organic material 3 clay

4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt

7 silty sand to sandy silt 8 sand to silty sand 9 sand

10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*)

120

Page 125: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

Oklahoma Department of Transportation (ODOT)Operator: EST, Inc.

Sounding: CPT 3 Bridge "C" Boring 1

Cone Used: DDG1332

GPS Data: 34.4689843, -97.9729577

CPT Date/Time: 6/19/2015 1:32:52 PM

Location: South Duncan Bypass

Job Number: J/P No. 20316(23)

Maximum Depth = 31.50 feet Depth Increment = 0.164 feet

Filter On

*Soil behavior type and SPT based on data from UBC-1983

Tip Resistance

Qt TSF1200

0

5

10

15

20

25

30

35

Depth(ft)

Local Friction

Fs TSF40

Pore Pressure

Pw TSF7-1

Friction Ratio

Fs/Qt (%) 600

Soil Behavior Type*

Zone: UBC-1983

1 sensitive fine grained 2 organic material 3 clay

4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt

7 silty sand to sandy silt 8 sand to silty sand 9 sand

10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*)

120

Page 126: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

Oklahoma Department of Transportation (ODOT)Operator: EST, Inc.

Sounding: CPT 4 Bridge "C" Boring 4

Cone Used: DDG1332

GPS Data: 34.4697293, -97.9732951

CPT Date/Time: 6/19/2015 11:22:16 AM

Location: South Duncan Bypass

Job Number: J/P No. 20316(23)

Maximum Depth = 34.78 feet Depth Increment = 0.164 feet

Filter On

*Soil behavior type and SPT based on data from UBC-1983

Tip Resistance

Qt TSF600

0

5

10

15

20

25

30

35

Depth(ft)

Local Friction

Fs TSF30

Pore Pressure

Pw TSF9-1

Friction Ratio

Fs/Qt (%) 200

Soil Behavior Type*

Zone: UBC-1983

1 sensitive fine grained 2 organic material 3 clay

4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt

7 silty sand to sandy silt 8 sand to silty sand 9 sand

10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*)

120

Page 127: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

Oklahoma Department of Transportation (ODOT)Operator: EST, Inc.

Sounding: CPT5

Cone Used: DDG1332

GPS Data: 34.470937,-97.975326

CPT Date/Time: 6/20/2015 6:51:26 PM

Location: South Duncan Bypass

Job Number: J/P No. 20316(23)

Maximum Depth = 4.10 feet Depth Increment = 0.164 feet

Filter On

*Soil behavior type and SPT based on data from UBC-1983

Tip Resistance

Qt TSF1800

0

1

2

3

4

5

Depth(ft)

Local Friction

Fs TSF20

Pore Pressure

Pw TSF1-1

Friction Ratio

Fs/Qt (%) 40

Soil Behavior Type*

Zone: UBC-1983

1 sensitive fine grained 2 organic material 3 clay

4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt

7 silty sand to sandy silt 8 sand to silty sand 9 sand

10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*)

120

Page 128: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

Oklahoma Department of Transportation (ODOT)Operator: EST, Inc.

Sounding: CPT6

Cone Used: DDG1332

GPS Data: 34.472475, -97.976080

CPT Date/Time: 6/20/2015 5:02:11 PM

Location: South Duncan Bypass

Job Number: J/P No. 20316(23)

Maximum Depth = 10.99 feet Depth Increment = 0.164 feet

Filter On

*Soil behavior type and SPT based on data from UBC-1983

Tip Resistance

Qt TSF400

0

2

4

6

8

10

12

Depth(ft)

Local Friction

Fs TSF20

Pore Pressure

Pw TSF2-1

Friction Ratio

Fs/Qt (%) 100

Soil Behavior Type*

Zone: UBC-1983

1 sensitive fine grained 2 organic material 3 clay

4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt

7 silty sand to sandy silt 8 sand to silty sand 9 sand

10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*)

120

Page 129: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

Oklahoma Department of Transportation (ODOT)Operator: EST, Inc.

Sounding: CPT 7

Cone Used: DDG1332

GPS Data: 34.473533, -97.977040

CPT Date/Time: 6/20/2015 4:27:37 PM

Location: South Duncan Bypass

Job Number: J/P No. 20316(23)

Maximum Depth = 7.71 feet Depth Increment = 0.164 feet

Filter On

*Soil behavior type and SPT based on data from UBC-1983

Tip Resistance

Qt TSF700

0

1

2

3

4

5

6

7

8

Depth(ft)

Local Friction

Fs TSF30

Pore Pressure

Pw TSF1-1

Friction Ratio

Fs/Qt (%) 120

Soil Behavior Type*

Zone: UBC-1983

1 sensitive fine grained 2 organic material 3 clay

4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt

7 silty sand to sandy silt 8 sand to silty sand 9 sand

10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*)

120

Page 130: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

Oklahoma Department of Transportation (ODOT)Operator: EST, Inc.

Sounding: CPT 8 Bridge "E" Near Boring 1

Cone Used: DDG1332

GPS Data: 34.4777538, -97.9771564

CPT Date/Time: 6/18/2015 5:54:14 PM

Location: South Duncan Bypass

Job Number: J/P No. 20316(23)

Maximum Depth = 10.83 feet Depth Increment = 0.164 feet

Filter On

Tip Resistance

Qt TSF1400

0

2

4

6

8

10

12

Depth(ft)

Local Friction

Fs TSF30

Pore Pressure

Pw TSF2-1

Friction Ratio

Fs/Qt (%) 120

Page 131: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

Oklahoma Department of Transportation (ODOT)Operator: EST, Inc.

Sounding: CPT 9 Bridge "E" Boring 4

Cone Used: DDG1332

GPS Data: 34.4790178, -97.9771561

CPT Date/Time: 6/19/2015 9:03:58 AM

Location: South Duncan Bypass

Job Number: J/P No. 20316(23)

Maximum Depth = 20.67 feet Depth Increment = 0.164 feet

Filter On

*Soil behavior type and SPT based on data from UBC-1983

Tip Resistance

Qt TSF1600

0

5

10

15

20

25

Depth(ft)

Local Friction

Fs TSF30

Pore Pressure

Pw TSF2-1

Friction Ratio

Fs/Qt (%) 90

Soil Behavior Type*

Zone: UBC-1983

1 sensitive fine grained 2 organic material 3 clay

4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt

7 silty sand to sandy silt 8 sand to silty sand 9 sand

10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*)

120

Page 132: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

Oklahoma Department of Transportation (ODOT)Operator: EST, Inc.

Sounding: CPT 10

Cone Used: DDG1332

GPS Data: 34.481067, -97.977698

CPT Date/Time: 6/20/2015 2:20:43 PM

Location: South Duncan Bypass

Job Number: J/P No. 20316(23)

Maximum Depth = 32.32 feet Depth Increment = 0.164 feet

Filter On

*Soil behavior type and SPT based on data from UBC-1983

Tip Resistance

Qt TSF600

0

5

10

15

20

25

30

35

Depth(ft)

Local Friction

Fs TSF20

Pore Pressure

Pw TSF6-1

Friction Ratio

Fs/Qt (%) 70

Soil Behavior Type*

Zone: UBC-1983

1 sensitive fine grained 2 organic material 3 clay

4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt

7 silty sand to sandy silt 8 sand to silty sand 9 sand

10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*)

120

Page 133: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

Oklahoma Department of Transportation (ODOT)Operator: EST, Inc.

Sounding: CPT 11 Bridge "G" Near Boring 1

Cone Used: DDG1332

GPS Data: 34.4866769, -97.9804882

CPT Date/Time: 6/18/2015 3:55:26 PM

Location: South Duncan Bypass

Job Number: J/P No. 20316(23)

Maximum Depth = 8.37 feet Depth Increment = 0.164 feet

Filter On

*Soil behavior type and SPT based on data from UBC-1983

Tip Resistance

Qt TSF1200

0

1

2

3

4

5

6

7

8

9

Depth(ft)

Local Friction

Fs TSF40

Pore Pressure

Pw TSF3-1

Friction Ratio

Fs/Qt (%) 400

Soil Behavior Type*

Zone: UBC-1983

1 sensitive fine grained 2 organic material 3 clay

4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt

7 silty sand to sandy silt 8 sand to silty sand 9 sand

10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*)

120

Page 134: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

Oklahoma Department of Transportation (ODOT)Operator: EST, Inc.

Sounding: CPT 12 Bridge "G" Near Boring 5

Cone Used: DDG1332

GPS Data: 34.4877542, -97.9822290

CPT Date/Time: 6/18/2015 11:31:47 AM

Location: South Duncan Bypass

Job Number: J/P No. 20316(23)

Maximum Depth = 21.16 feet Depth Increment = 0.164 feet

Filter On

*Soil behavior type and SPT based on data from UBC-1983

Tip Resistance

Qt TSF450

0

5

10

15

20

25

Depth(ft)

Local Friction

Fs TSF20

Pore Pressure

Pw TSF6-1

Friction Ratio

Fs/Qt (%) 90

Soil Behavior Type*

Zone: UBC-1983

1 sensitive fine grained 2 organic material 3 clay

4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt

7 silty sand to sandy silt 8 sand to silty sand 9 sand

10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*)

120

Page 135: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

South Duncan Bypass, State Job No. 20316(04) & 20316(23) EST Project Number: 6000426 Stephens County, Oklahoma July 29, 2015

EST, Inc.

Appendix E

Oedometer Test Results & CPTU Dissipation Curve

Page 136: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

PROJECT NAME: South Duncan Bypass DATE TESTED: 7/6/2015PROJECT NUMBER: TESTED BY: Bryce HanlonEST PROJECT NUMBER: SAMPLE LOCATION: 10-12 feetPROJECT LOCATION: Duncan, Oklahoma MATERIAL DESCRIPTION: Lean Clay with Sand (CL)

ASTM D 2435: STANDARD TEST METHODS FOR ONE-DIMENSIONAL CONSOLIDATION PROPERTIES OF SOILS USING ICREMENTAL LOADINGASTM D 4546: STANDARD TEST METHODS FOR ONE-DIMENSIONAL SWELL OR SETTLEMENT POTENTIAL OF COHESIVE SOILS

Wet Density (lbs./ft3)Dry Density (lbs./ft3)Dry Density (kN/m3)Moisture Content (%)

NORMAN OFFICE MOORE OFFICE ARDMORE OFFICE McALESTER OFFICE TULSA OFFICE OKLAHOMA CITY OFFICE

480 24TH AVENUE NW, SUITE 244 201 INDUSTRIAL BLVD. 1960 COOPER DRIVE 1905 N. 13TH ST. SUITE A 108 S. 109TH E. PLACE 615 N. HUDSON, 3RD FLOOR

NORMAN, OK 73069 MOORE, OK 73160 ARDMORE, OK 73401 McALESTER, OK 74501 TULSA, OK 74128 OKLAHOMA CITY, OK 73102

(405) 307-8378 (405) 912-8378 (580) 223-6518 (918) 423-4877 (918) 439-3229 (405) 815-3600

(405) 329-1914 FAX (405) 912-7558 FAX (580) 223-6972 FAX (918) 429-0200 FAX (918) 439-9735 FAX (405) 815-4080 FAX

Comments: Normally Consolidated Sample

Compression Index, Cc 0.222

23.00% Precon. Pressure (tsf) 0.95Initial Void Ratio, eo 0.727 Swelling Index, Cs

VOID RATIO VS. LOG STRESS (KPA)

N/ACPT-4 SAMPLE No.BORING No.

N/A

OCR 1

6000426

VOID RATIO VS. LOG STRESS (TSF)

15.3

VERTICAL STRAIN VS. LOG STRESS (TSF) VERTICAL STRAIN VS. LOG STRESS (KPA)

119.7 Swell Pressure (kPa) 0.0

0.019

97.6 Precon. Pressure (kPa) 91.0Swell Pressure (tsf) 0.0

0.3

0.4

0.5

0.6

0.7

0.8

0.0 0.1 1.0 10.0 100.0

Vo

id R

atio

(e)

log P (tsf)

0.3

0.4

0.5

0.6

0.7

0.8

1 10 100 1000 10000

Vo

id R

atio

(e)

log P(kPa)

-2-10123456789

1011121314151617181920

0.0 0.1 1.0 10.0 100.0

Ver

tica

l Str

ain

%

log P (tsf)

-2-10123456789

1011121314151617181920

1 10 100 1000 10000

Ver

tica

l Str

ain

%

log P(kPa)

Page 137: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

PROJECT NAME: South Duncan Bypass DATE TESTED: 7/6/2015

PROJECT NUMBER: TESTED BY: Bryce HanlonEST PROJECT NUMBER: SAMPLE LOCATION: 20-22 feetPROJECT LOCATION: Duncan, Oklahoma MATERIAL DESCRIPTION: Lean Clay (CL)

ASTM D 2435: STANDARD TEST METHODS FOR ONE-DIMENSIONAL CONSOLIDATION PROPERTIES OF SOILS USING ICREMENTAL LOADINGASTM D 4546: STANDARD TEST METHODS FOR ONE-DIMENSIONAL SWELL OR SETTLEMENT POTENTIAL OF COHESIVE SOILS

Wet Density (lbs./ft3)Dry Density (lbs./ft3)Dry Density (kN/m3)Moisture Content (%)

NORMAN OFFICE MOORE OFFICE ARDMORE OFFICE McALESTER OFFICE TULSA OFFICE OKLAHOMA CITY OFFICE

3201 S. BERRY ROAD 201 INDUSTRIAL BLVD. 1960 COOPER DRIVE 1905 N. 13TH ST. SUITE A 108 S. 109TH E. PLACE 615 N. HUDSON, 3RD FLOOR

NORMAN, OK 73071 MOORE, OK 73160 ARDMORE, OK 73401 McALESTER, OK 74501 TULSA, OK 74128 OKLAHOMA CITY, OK 73102

(405) 307-8378 (405) 912-8378 (580) 223-6518 (918) 423-4877 (918) 439-3229 (405) 815-3600

(405) 329-1914 FAX (405) 912-7558 FAX (580) 223-6972 FAX (918) 429-0200 FAX (918) 439-9735 FAX (405) 815-4080 FAX

Comments: Normally Consolidated Sample

Compression Index 0.103

21.52% Precon. Pressure (tsf) 0.5Initial Void Ratio, eo 0.485 Swelling Index

VOID RATIO VS. LOG STRESS (KPA)

N/ACPT-4 SAMPLE No.BORING No.

N/A

OCR 1

6000426

VOID RATIO VS. LOG STRESS (TSF)

17.8

VERTICAL STRAIN VS. LOG STRESS (TSF) VERTICAL STRAIN VS. LOG STRESS (KPA)

138.2 Swell Pressure (kPa) 7.7

0.007

113.5 Precon. Pressure (kPa) 47.9Swell Pressure (tsf) 0.08

0.25

0.30

0.35

0.40

0.45

0.50

0.01 0.10 1.00 10.00 100.00

Vo

id R

atio

(e)

log P (tsf)

0.25

0.30

0.35

0.40

0.45

0.50

1 10 100 1000 10000

Vo

id R

atio

(e)

log P(kPa)

-2

-1

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

0.01 0.10 1.00 10.00 100.00

Ver

tica

l Str

ain

%

log P (tsf)

-2

-1

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

1 10 100 1000 10000

Ver

tica

l Str

ain

%

log P(kPa)

Page 138: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

Pressure(psi)

Time: (minutes)

CPTU Dissipation CurveOperator EST, Inc.Sounding: CPT12 - Bridge "G" - Boring B-05Cone Used: DDG1332GPS Data: 34.4877542, -97.9822290

CPT Date/Time: 6/18/2015 11:31:47 AMLocation: South Duncan BypassJob Number: J/P No. 20316(23)

Maximum Pressure = 10.299 psiHydrostatic Pressure = 2.705 psi

0 2 4 6 8 10 12 14 16 4

5

6

7

8

9

10

11

Selected Depth(s) (meters)

1.90

Page 139: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

Pressure(psi)

Time: (minutes)

CPTU Dissipation CurveOperator EST, Inc.Sounding: CPT12 - Bridge "G" - Boring B-05Cone Used: DDG1332GPS Data: 34.4877542, -97.9822290

CPT Date/Time: 6/18/2015 11:31:47 AMLocation: South Duncan BypassJob Number: J/P No. 20316(23)

Maximum Pressure = 73.809 psiHydrostatic Pressure = 8.543 psi

0 20 40 60 80 100 120 140 10

20

30

40

50

60

70

80

Selected Depth(s) (meters)

6.00

Page 140: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

Pressure(TSF)

Time: (minutes)

CPTU Dissipation CurveOperator EST, Inc.

Sounding: CPT3 - Bridge "C" - Boring B-01

Cone Used: DDG1332

GPS Data: 34.4689843, -97.9729577

CPT Date/Time: 6/19/2015 1:32:52 PM

Location: South Duncan Bypass

Job Number: J/P No. 20316(23)

Maximum Pressure = 0.578 TSFHydrostatic Pressure = 4.047 TSF

0 20 40 60 80 100 120 140 160 180 200 0

1

Selected Depth(s) (meters)

2.85

Page 141: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

South Duncan Bypass, State Job No. 20316(04) & 20316(23) EST Project Number: 6000426 Stephens County, Oklahoma July 29, 2015

EST, Inc.

Appendix F

Slope Stability Profiles

Page 142: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

φ

φ

Page 143: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

φ

φ

Page 144: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

φ

φ

Page 145: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

φ

Page 146: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

South Duncan Bypass, State Job No. 20316(04) & 20316(23) EST Project Number: 6000426 Stephens County, Oklahoma July 29, 2015

EST, Inc.

Appendix G

Settle 3D Analysis Output

Page 147: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

400

200

0-2

00

-200 0 200

Total Settlement (in) 0.0 1.1 2.2 3.3 4.4 5.5 6.6 7.7 8.8 9.9 11.0

max (stage): 10.26 inmax (all): 10.26 in

Analysis Description Settlement AnalysisCompany EST, Inc.Drawn By EST, Inc.File Name ConsolidationAnalysis.s3zDate 7/13/2015, 10:36:12 AM

Project

South Duncan Bypass

SETTLE3D 3.014

Andre.Guzman
Typewritten Text
Andre.Guzman
Typewritten Text
Andre.Guzman
Typewritten Text
Andre.Guzman
Typewritten Text
TOTAL SETTLEMENT ANALYSIS BRIDGE C
Andre.Guzman
Typewritten Text
Andre.Guzman
Typewritten Text
Andre.Guzman
Typewritten Text
Andre.Guzman
Typewritten Text
Andre.Guzman
Typewritten Text
Andre.Guzman
Typewritten Text
Andre.Guzman
Sticky Note
Accepted set by Andre.Guzman
Andre.Guzman
Typewritten Text
Andre.Guzman
Sticky Note
None set by Andre.Guzman
Andre.Guzman
Typewritten Text
Andre.Guzman
Typewritten Text
Andre.Guzman
Typewritten Text
Andre.Guzman
Typewritten Text
Andre.Guzman
Typewritten Text
Page 148: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

200

0-2

00-4

00

-200 0 200

Immediate Settlement (in) 0.0 1.1 2.2 3.3 4.4 5.5 6.6 7.7 8.8 9.9 11.0

max (stage): 10.15 inmax (all): 10.15 in

Analysis Description Settlement AnalysisCompany EST, Inc.Drawn By EST, Inc.File Name ConsolidationAnalysis.s3zDate 7/13/2015, 10:36:12 AM

Project

South Duncan Bypass

SETTLE3D 3.014

Andre.Guzman
Typewritten Text
IMMEDIATE SETTLEMENT ANALYSIS BRIDGE C
Page 149: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

200

0-2

00-4

00

-200 0 200

Consolidation Settlement (in)

0.000 0.012 0.024 0.036 0.048 0.060 0.072 0.084 0.096 0.108 0.120

max (stage): 0.12 inmax (all): 0.12 in

Analysis Description Settlement AnalysisCompany EST, Inc.Drawn By EST, Inc.File Name ConsolidationAnalysis.s3zDate 7/13/2015, 10:36:12 AM

Project

South Duncan Bypass

SETTLE3D 3.014

Andre.Guzman
Typewritten Text
CONSOLIDATION SETTLEMENT ANALYSIS BRIDGE C
Page 150: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

400

200

0-2

00

-200 0 200

Total Settlement (in) 0.00 0.93 1.86 2.79 3.72 4.65 5.58 6.51 7.44 8.37 9.30

max (stage): 9.30 inmax (all): 9.30 in

Analysis Description Settlement AnalysisCompany EST, Inc.Drawn By EST, Inc.File Name ConsolidationAnalysisTimeDep.s3zDate 7/13/2015, 10:36:12 AM

Project

South Duncan Bypass

SETTLE3D 3.014

Andre.Guzman
Typewritten Text
TOTAL TIME DEPENDENT SETTLEMENT ANALYSIS BRIDGE C
Page 151: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

200

0-2

00-4

00

-200 0 200

Immediate Settlement (in) 0.00 0.93 1.86 2.79 3.72 4.65 5.58 6.51 7.44 8.37 9.30

max (stage): 9.22 inmax (all): 9.22 in

Analysis Description Settlement AnalysisCompany EST, Inc.Drawn By EST, Inc.File Name ConsolidationAnalysisTimeDep.s3zDate 7/13/2015, 10:36:12 AM

Project

South Duncan Bypass

SETTLE3D 3.014

Andre.Guzman
Typewritten Text
IMMEDIATE TIME DEPENDENT SETTLEMENT ANALYSIS BRIDGE C
Page 152: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

200

0-2

00-4

00

-200 0 200

Consolidation Settlement (in)

0.0000 0.0082 0.0164 0.0246 0.0328 0.0410 0.0492 0.0574 0.0656 0.0738 0.0820

max (stage): 0.08 inmax (all): 0.08 in

Analysis Description Settlement AnalysisCompany EST, Inc.Drawn By EST, Inc.File Name ConsolidationAnalysisTimeDep.s3zDate 7/13/2015, 10:36:12 AM

Project

South Duncan Bypass

SETTLE3D 3.014

Andre.Guzman
Typewritten Text
CONSOLIDATION TIME DEPENDENT SETTLEMENT ANALYSIS BRIDGE C
Page 153: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

400

200

0-2

00

-200 0 200

Total Settlement (in) 0.00 0.14 0.28 0.42 0.56 0.70 0.84 0.98 1.12 1.26 1.40

max (stage): 1.39 inmax (all): 1.39 in

Analysis Description Settlement AnalysisCompany EST, Inc.Drawn By EST, Inc.File Name CPT8BridgeEBoring1ConsolidationAnalysis.s3zDate 7/13/2015, 10:36:12 AM

Project

South Duncan Bypass

SETTLE3D 3.014

Andre.Guzman
Typewritten Text
TOTAL SETTLEMENT ANALYSIS BRIDGE E
Page 154: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

200

0-2

00-4

00

-200 0 200

Immediate Settlement (in) 0.00 0.14 0.28 0.42 0.56 0.70 0.84 0.98 1.12 1.26 1.40

max (stage): 1.37 inmax (all): 1.37 in

Analysis Description Settlement AnalysisCompany EST, Inc.Drawn By EST, Inc.File Name CPT8BridgeEBoring1ConsolidationAnalysis.s3zDate 7/13/2015, 10:36:12 AM

Project

South Duncan Bypass

SETTLE3D 3.014

Andre.Guzman
Typewritten Text
IMMEDIATE SETTLEMENT ANALYSIS BRIDGE E
Page 155: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

200

0-2

00-4

00

-200 0 200

Consolidation Settlement (in)

0.0000 0.0017 0.0034 0.0051 0.0068 0.0085 0.0102 0.0119 0.0136 0.0153 0.0170

max (stage): 0.02 inmax (all): 0.02 in

Analysis Description Settlement AnalysisCompany EST, Inc.Drawn By EST, Inc.File Name CPT8BridgeEBoring1ConsolidationAnalysis.s3zDate 7/13/2015, 10:36:12 AM

Project

South Duncan Bypass

SETTLE3D 3.014

Andre.Guzman
Typewritten Text
CONSOLIDATION SETTLEMENT ANALYSIS BRIDGE E
Page 156: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

200

100

0-1

00

-100 0 100

Total Settlement (in) 0.00 0.13 0.26 0.39 0.52 0.65 0.78 0.91 1.04 1.17 1.30

max (stage): 1.20 inmax (all): 1.20 in

Analysis Description Settlement AnalysisCompany EST, Inc.Drawn By EST, Inc.File Name CPT8BridgeEBoring1ConsolidationAnalysisTimDep.s3zDate 7/13/2015, 10:36:12 AM

Project

South Duncan Bypass

SETTLE3D 3.014

Andre.Guzman
Typewritten Text
TOTAL TIME DEPENDENT SETTLEMENT ANALYSIS BRIDGE E
Page 157: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

2010

00

-100

-200

-100 0 100

Immediate Settlement (in) 0.00 0.12 0.24 0.36 0.48 0.60 0.72 0.84 0.96 1.08 1.20

max (stage): 1.19 inmax (all): 1.19 in

Analysis Description Settlement AnalysisCompany EST, Inc.Drawn By EST, Inc.File Name CPT8BridgeEBoring1ConsolidationAnalysisTimDep.s3zDate 7/13/2015, 10:36:12 AM

Project

South Duncan Bypass

SETTLE3D 3.014

Andre.Guzman
Typewritten Text
IMMEDIATE TIME DEPENDENT SETTLEMENT ANALYSIS BRIDGE E
Page 158: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

2010

00

-100

-200

-100 0 100

Consolidation Settlement (in)

0.0000 0.0014 0.0028 0.0042 0.0056 0.0070 0.0084 0.0098 0.0112 0.0126 0.0140

max (stage): 0.01 inmax (all): 0.01 in

Analysis Description Settlement AnalysisCompany EST, Inc.Drawn By EST, Inc.File Name CPT8BridgeEBoring1ConsolidationAnalysisTimDep.s3zDate 7/13/2015, 10:36:12 AM

Project

South Duncan Bypass

SETTLE3D 3.014

Andre.Guzman
Typewritten Text
CONSOLIDATION TIME DEPENDENT SETTLEMENT ANALYSIS BRIDGE E
Page 159: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

200

0-2

00-4

00

-200 0 200 40

Total Settlement (in) 0.00 0.47 0.94 1.41 1.88 2.35 2.82 3.29 3.76 4.23 4.70

max (stage): 4.60 inmax (all): 4.60 in

Analysis Description Settlement AnalysisCompany EST, Inc.Drawn By EST, Inc.File Name CPT9BridgeEBoring4ConsolidationAnalysis.s3zDate 7/13/2015, 10:36:12 AM

Project

South Duncan Bypass

SETTLE3D 3.014

Andre.Guzman
Typewritten Text
TOTAL SETTLEMENT ANALYSIS BRIDGE E
Page 160: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

200

0-2

00-4

00

-200 0 200 40

Immediate Settlement (in) 0.00 0.46 0.92 1.38 1.84 2.30 2.76 3.22 3.68 4.14 4.60

max (stage): 4.56 inmax (all): 4.56 in

Analysis Description Settlement AnalysisCompany EST, Inc.Drawn By EST, Inc.File Name CPT9BridgeEBoring4ConsolidationAnalysis.s3zDate 7/13/2015, 10:36:12 AM

Project

South Duncan Bypass

SETTLE3D 3.014

Andre.Guzman
Typewritten Text
IMMEDIATE SETTLEMENT ANALYSIS BRIDGE E
Page 161: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

400

200

0-2

00-4

00

-200 0 200 40

Consolidation Settlement (in)

0.0000 0.0039 0.0078 0.0117 0.0156 0.0195 0.0234 0.0273 0.0312 0.0351 0.0390

max (stage): 0.04 inmax (all): 0.04 in

Analysis Description Settlement AnalysisCompany EST, Inc.Drawn By EST, Inc.File Name CPT9BridgeEBoring4ConsolidationAnalysis.s3zDate 7/13/2015, 10:36:12 AM

Project

South Duncan Bypass

SETTLE3D 3.014

Andre.Guzman
Typewritten Text
CONSOLIDATION SETTLEMENT ANALYSIS BRIDGE E
Page 162: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

400

200

0-2

00

-200 0 200

Total Settlement (in) 0.00 0.38 0.76 1.14 1.52 1.90 2.28 2.66 3.04 3.42 3.80

max (stage): 3.80 inmax (all): 3.80 in

Analysis Description Settlement AnalysisCompany EST, Inc.Drawn By EST, Inc.File Name CPT9BridgeEBoring4ConsolidationAnalysisTimDep.s3zDate 7/13/2015, 10:36:12 AM

Project

South Duncan Bypass

SETTLE3D 3.014

Andre.Guzman
Typewritten Text
TOTAL TIME DEPENDENT SETTLEMENT ANALYSIS BRIDGE E
Page 163: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

200

0-2

00-4

00

-200 0 200

Immediate Settlement (in) 0.00 0.38 0.76 1.14 1.52 1.90 2.28 2.66 3.04 3.42 3.80

max (stage): 3.77 inmax (all): 3.77 in

Analysis Description Settlement AnalysisCompany EST, Inc.Drawn By EST, Inc.File Name CPT9BridgeEBoring4ConsolidationAnalysisTimDep.s3zDate 7/13/2015, 10:36:12 AM

Project

South Duncan Bypass

SETTLE3D 3.014

Andre.Guzman
Typewritten Text
IMMEDIATE TIME DEPENDENT SETTLEMENT ANALYSIS BRIDGE E
Page 164: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

200

0-2

00-4

00

-200 0 200

Consolidation Settlement (in)

0.0000 0.0032 0.0064 0.0096 0.0128 0.0160 0.0192 0.0224 0.0256 0.0288 0.0320

max (stage): 0.03 inmax (all): 0.03 in

Analysis Description Settlement AnalysisCompany EST, Inc.Drawn By EST, Inc.File Name CPT9BridgeEBoring4ConsolidationAnalysisTimDep.s3zDate 7/13/2015, 10:36:12 AM

Project

South Duncan Bypass

SETTLE3D 3.014

Andre.Guzman
Typewritten Text
CONSOLIDATION TIME DEPENDENT SETTLEMENT ANALYSIS BRIDGE E
Page 165: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

South Duncan Bypass, State Job No. 20316(04) & 20316(23) EST Project Number: 6000426 Stephens County, Oklahoma July 29, 2015

EST, Inc.

Appendix H

General Notes

Page 166: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

EST, INC.

GENERAL NOTES Water levels measured in low permeability soils (clays & unfractured rock) may require long term observations and therefore, the depths shown may not be accurate. Sample Classification and Descriptions Soil Classification: The soil description and classification is based on the Unified Soil

Classification System (USCS) unless noted otherwise

Description Modifier: Trace - material slightly present in sample, less than 15%

Rock: Rock samples are described according to the “General Notes for Rock Classification”

Consistency of Fine-Grained Soils:

Qu, Unconfined Compressive Strength (psf) SPT Consistency < 500 0-2 Very Soft

500 - 1,000 2-5 Soft

1,001 - 2,000 5-10 Medium

2,001 - 4,000 10-20 Stiff

4,001 - 8,000 20-30 Very Stiff

8,001 - 16,000 30-60 Hard

> 16,000 > 60 Very Hard

Relative Density of Coarse-Grained Soils: N-Blows/ft. Relative Density 0-4 Very Loose

5-10 Loose

11-24 Medium Dense

25-50 Dense

51-80 Very Dense

80+ Extremely Dense

Grain Size Terminology: Major Component of Sample Size Range

Boulders Over 12 in. (305mm)

Cobbles 12 in. to 3 in. (300mm to 76mm)

Gravel 3 in. to #4 sieve (75mm to 4.75mm)

Sand #4 to #200 sieve (4.75mm to 0.075mm)

Silt or Clay Passing #200 sieve (0.075mm)

Page 167: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

EST, INC.

BORING LOG ACRONYM LIBRARY Boring Log Symbol Library

SPT-N: Blow or strike count for the Standard Penetration Test or the Texas Cone Penetrometer Test. In general, the Standard Penetration Test “N” is the numbers of strikes required to advance a standard 2-inch outside diameter split-spoon a distance of 1-foot, or portion thereof, with a 140 pound hammer falling 30 inches. In general, the Texas Cone Penetrometer Test “N” is the numbers of strikes with penetration depths required to advance a solid steel three-inch diameter cone of standard dimensions with a170-pound weight falling 24-inches. Two 50 strike intervals or two 6-inch penetration intervals is recorded.

WOH: Weight of Hammer

WOR: Weight of Drilling Rod

USCS Symbol: The Unified Soil Classification System Identification Symbol

ATV: All-Terrain Vehicle Mounted Drill Rig

EL: Elevation

Lt: Left

Rt: Right

LL, PL, PI: Atterberg Limits (Liquid Limit, Plastic Limit, Plasticity Index)

-#200: Percent Passing Standard No. 200 Sieve

NP – Non Plastic

Drilling & Sampling Symbol Library AS: Auger Sample BS: Bucket Sample DB: Diamond Drilling Bit (Truck Rotary Drilling using air or water to remove cuttings) DCD: Diamond Core Barrel Drilling HA: Hand Auger HS: Hollow Stem Auger (Truck Rotary Drilling) PA: Power Auger (Truck Rotary Drilling) PM: Pressure Meter RB: Rock Bit (Truck Rotary Drilling using air or water to remove cuttings) RQD: Rock Quality Designation SS: Standard Penetration Test (Split-Spoon): a 13/8 inch I.D. and 2” O.D. tube, unless noted ST: Thin-Wall Tube Sample (Shelby Tube): a 3” O.D. tube, unless noted otherwise TCP: Texas Cone Penetrometer Test WS: Wash Sample WB: Wash Bore Water Level Symbol Library AB: After Boring Complete DCI: Dry Cave In WCI: Wet Cave In WD: While Drilling WL: Water Level Depth From Boring Surface Elevation WS: While Sampling

Page 168: GEOTECHNICAL ENGINEERING SERVICES REPORT SOUTH … · 2. 7 8 - 14 15 16-20 21-26 29-50 51-68 69-73 x2-x90 x91-x109 x110-x113 x114-x118 revisions rev. no. description date _& changed

EST, INC.

GENERAL NOTES FOR ROCK CLASSIFICATION Igneous Rock Igneous rock is formed from the cooling process of molten material (magna) beneath the earth’s surface (plutonic or intrusive rock) or from the rapid cooling at or near the earth’s surface (volcanic or extrusive rock). The rate of cooling, mineral composition, and mode of deposition control the type, texture, and shape of Igneous rocks. However, the most common Igneous rocks are: Granite: Intrusive rock; very hard; generally coarse-grained; usually light colored (pink, red or gray);

typically lighter weight than most rocks (specific gravity = 2.6); and for the most part composed of Quartz, Feldspar, and some dark minerals, usually Mica, crystalline texture; usually even-grained or grains are equal in size.

Basalt: Extrusive rock; very hard; generally fine-grained; usually dark colored (green, gray, or black); typically heavier weight than most rocks (specific gravity = 2.9); and has a glassy texture.

Sedimentary Rock Sedimentary rock is formed from the deposition of material (previous rock fragments, soil and minerals) by erosion or precipitation. The loose deposited material slowly hardens and develops into rock from the processes of compaction, cementation, and/or recrystallization. Sedimentary rocks are composted of cemented boulders, cobbles, gravels, sands, silts and clay size particles. The most common minerals composing Sedimentary rock are quartz, kaolinite, feldspar, mica, and iron oxides, together with those precipitated from solution such as carbonates (dolomite, calcite, and siderite) and the sulfates gypsum and anhydrite. The most common Sedimentary rocks are: Limestone: White to light gray or bluish-gray in color; crystalline to fine-grained texture; varies in

hardness from soft to very hard; chiefly composed of calcium carbonate which will effervesce upon contact with dilute hydrochloric acid.

Dolomite: Very similar to limestone. Usually harder than limestone and usually does not effervesce upon contact with dilute hydrochloric acid. However, will effervesce upon contact with dilute hydrochloric acid if in powered state.

Shale: Light to dark colored; very fine-grained texture; composed of consolidated clay or silt; bedded in thin layers.

Siltstone: Very similar to shale, but unlaminated. Usually more cemented and less cohesive to non-cohesive.

Sandstone: Commonly light colored; coarse to fine-grained texture; composed of cemented sand size particles.

Conglomerate: Varies in color; composed of boulder size material to silt, generally sand to cobble size; cemented together with various cementing agents.

Chert: Light to dark colored; very fined-grained texture; common constituent of conglomerates; breaks conchoidally or into angular fragments; will scratch glass.

Degree of Weathering Slight: Noted predominantly by color change with no disintegrated zones. May have slight

decomposition of parent material at joints.

Moderate: Noted by color change throughout and some decomposition.

High: Noted by complete color change throughout, highly decomposed, may be extremely broken, general appearance approaching soil.