No Inputs and Assumptions 1 Capacity 2 Initial Capacity Utilization Factor 3 Annual Gross Generation 4 Auxiliary consumption 5 Annual Net Generation 6 Annual Deration 7 Life of Plant and Machinery / Project Life 8 CapEx 9 Total Cap-Ex 10 Non - Depreciable Amount 11 Depreciable Amount (Cap Cost Less non-depreciable Cost) 12 Debt Fraction 13 Debt 14 Equity 15 Interest Rate on Term Loan 16 Loan Term 17 Moratorium 18 Depreciation (Straight Line Method, Company Law) - initial years 19 Depreciation (Straight Line Method, Company Law) - later years 20 Number of years for initial depreciation rate 21 Number of years for later depreciation rate 22 Discount Rate 23 O&M cost 24 O&M Cost Esclation 25 Return on Equity - pretax (initial years) 26 Return on Equity - pretax (later years) 27 Annuity Factor (25 Years) 28 Interest on working capital 29 Assumed tariff (Iterative) 30 Maintenance spares 31Corporate Tax Rate 32 MAT 33 Post Tax ROE 34 Book depreciation first year 35 Book depreciation from second year 36 Accelerated Depreciation first year 37 Accelerated Depreciation from second year 38Tax Holiday Duration 39Tax Holiday Start Year 40 MAT set off accumulation allowed u/s 115JAA (3A) 41 MAT Setoff Duration 42MAT Setoff Start Year 43 Emission Factor 44 Price of one CER

Fincanial Model_ 2 MW Plant

Embed Size (px)

DESCRIPTION

The file gives the complete financial model for a solar power plant.

Citation preview

Page 1: Fincanial Model_ 2 MW Plant

No Inputs and Assumptions1 Capacity 2 Initial Capacity Utilization Factor3 Annual Gross Generation 4 Auxiliary consumption5 Annual Net Generation 6 Annual Deration 7 Life of Plant and Machinery / Project Life8 CapEx9 Total Cap-Ex

10 Non - Depreciable Amount 11 Depreciable Amount (Cap Cost Less non-depreciable Cost)12 Debt Fraction13 Debt14 Equity15 Interest Rate on Term Loan16 Loan Term17 Moratorium18 Depreciation (Straight Line Method, Company Law) - initial years19 Depreciation (Straight Line Method, Company Law) - later years20 Number of years for initial depreciation rate21 Number of years for later depreciation rate22 Discount Rate 23 O&M cost24 O&M Cost Esclation25 Return on Equity - pretax (initial years)26 Return on Equity - pretax (later years)27 Annuity Factor (25 Years)28 Interest on working capital29 Assumed tariff (Iterative)30 Maintenance spares31 Corporate Tax Rate32 MAT33 Post Tax ROE34 Book depreciation first year35 Book depreciation from second year36 Accelerated Depreciation first year37 Accelerated Depreciation from second year38 Tax Holiday Duration39 Tax Holiday Start Year40 MAT set off accumulation allowed u/s 115JAA (3A)41 MAT Setoff Duration42 MAT Setoff Start Year43 Emission Factor44 Price of one CER

Page 2: Fincanial Model_ 2 MW Plant

45 Exchange Rate46 Number of years for initial return on equity47 Duration of initial Capacity Utilization Factor48 Capacity Utilization Factor for subsequent years49 Fuel requirement/kWh50 Feedstock Price

51 Fuel Cost Escalation

Page 3: Fincanial Model_ 2 MW Plant

Value Unit2 MW

19.00% %33.29 Lakh kWhs0.00% %33.29 Lakh kWhs0.00% %

25 years565 Rs Lakhs/MW

2080 Rs Lakhs.10.00% % of Capital Cost

1872 Lakhs70.00% %

1456 Lakhs624 30.00% Lakhs

10.00% %7 years0 years

5.83% %1.54% %

12 years13 years

10.62% 0.00% %9.00 Rs Lakhs / MW

5.72% %18.00% %24.00% %

8.6612.82% %

6.93 Rs / kWh15% of yearly O&M Cost

32.45% %20% %16% %

2.64% %5.83% %

80% %0.95% %

10 years1 year

11 years10 years11 year

0.9 tons of CO2/MWh0 $/ton

Page 4: Fincanial Model_ 2 MW Plant

50 Rs/US$10 years25 years

90% %0 kg/kWh0 Rs/MT

0% %

Page 5: Fincanial Model_ 2 MW Plant

Renewable Energy Tariff and Financial Analysis

InputSolar PV Quantity

Capacity 2.00Initial Capacity Utilization Factor 19.00%Auxiliary consumption 0.00%CapEx 565.00Number of years for later depreciation rate 10.62%Equity 10.00%

Page 6: Fincanial Model_ 2 MW Plant

Renewable Energy Tariff and Financial Analysis

InputUnitsMW

Rs Lacs/MW

Page 7: Fincanial Model_ 2 MW Plant

Renewable Energy Tariff and Financial Analysis

OutputSolar PV Without AD With AD

Tariff (Rs/kWh) 8.91 7.86DSCR 1.44MINIMUM DSCR 0.26Project IRR-Post Tax 15.92%Equity IRR (Post Tax) 0.24%

Note: Accelerated Depreciation (AD) applies only to Solar projects

Page 8: Fincanial Model_ 2 MW Plant

Renewable Energy Tariff and Financial Analysis

Note: Accelerated Depreciation (AD) applies only to Solar projects

Page 9: Fincanial Model_ 2 MW Plant

Depreciation Calculations for SLM Value

CapEx 2080

Annual Net Generation 33.29

Annual Deration 0.00%

Life of Plant and Machinery / Project Life 25

Annual Depreciation for period of term loan 109.14

Advance Against Depreciation 0.00

Amount remaining to be depreciated post-term loan 562.35

Depreciation for remaining years (post-term loan) 43.26

Book depreciation first year 2.64%

Book depreciation from second year 5.83%

Depreciable Amount 1,872.00

Accelerated Depreciation first year 40%

Accelerated Depreciation from second year 80%

Depreciation from the Fifth Year 0%

Plant&Machinery Income Tax Depreciation 0%

Corporate Tax Rate 32.45%

Accelerated Depreciation Benefit Calculations 1

Book depreciation 54.9

Cumulative Book Depreciation 54.9

Acclerated Depreciation 832.0

Cumulative Accelerated Depreciation 832.0

Plant & Machinery Depreciation -

Cumulative Plant & Machinery Depreciation -

Net depreciation benefit 777.1

Net benefit 252.1

Net Energy sold (lakh kWhs) 33.3

Benefit/kWh 7.6

Levelized benefit 1.05

Page 10: Fincanial Model_ 2 MW Plant

Unit

Rs Lacs

Lakh kWhs

%

years

Lakhs/yr

Lakhs/yr

Lakhs

Lakhs/yr

%

%

Rs Lacs

%

%

%

%

2 3 4 5 6

121.3 121.3 121.3 121.3 121.3

176.2 297.4 418.7 540.0 661.2

998.4 199.7 39.9 0.0 0.0

1,830.4 2,030.1 2,070.0 2,070.0 2,070.0

- - - - -

- - - - -

877.1 78.4 (81.3) (121.3) (121.3)

284.6 25.4 (26.4) (39.3) (39.3)

33.3 33.3 33.3 33.3 33.3

8.5 0.8 (0.8) (1.2) (1.2)

Rs/kWh

Page 11: Fincanial Model_ 2 MW Plant

7 8 9 10 11

121.3 121.3 121.3 121.3 121.3

782.5 903.8 1,025.0 1,146.3 1,267.6

0.0 0.0 0.0 0.0 0.0

2,070.0 2,070.0 2,070.0 2,070.0 2,070.0

- - - - -

- - - - -

(121.3) (121.3) (121.3) (121.3) (121.3)

(39.3) (39.3) (39.3) (39.3) (39.3)

33.3 33.3 33.3 33.3 33.3

(1.2) (1.2) (1.2) (1.2) (1.2)

Page 12: Fincanial Model_ 2 MW Plant

12 13 14 15 16

121.3 32.1 32.1 32.1 32.1

1,388.8 1,420.9 1,452.9 1,485.0 1,517.1

0.0 0.0 0.0 0.0 0.0

2,070.0 2,070.0 2,070.0 2,070.0 2,070.0

- - - - -

- - - - -

(121.3) (32.1) (32.1) (32.1) (32.1)

(39.3) (10.4) (10.4) (10.4) (10.4)

33.3 33.3 33.3 33.3 33.3

(1.2) (0.3) (0.3) (0.3) (0.3)

Page 13: Fincanial Model_ 2 MW Plant

17 18 19 20 21

32.1 32.1 32.1 32.1 32.1

1,549.1 1,581.2 1,613.3 1,645.3 1,677.4

0.0 0.0 0.0 0.0 0.0

2,070.0 2,070.0 2,070.0 2,070.0 2,070.0

- - - - -

- - - - -

(32.1) (32.1) (32.1) (32.1) (32.1)

(10.4) (10.4) (10.4) (10.4) (10.4)

33.3 33.3 33.3 33.3 33.3

(0.3) (0.3) (0.3) (0.3) (0.3)

Page 14: Fincanial Model_ 2 MW Plant

22 23 24 25 26

32.1 32.1 32.1 32.1 -

1,709.5 1,741.5 1,773.6 1,805.6 -

0.0 0.0 0.0 0.0 -

2,070.0 2,070.0 2,070.0 2,070.0 -

- - - - -

- - - - -

(32.1) (32.1) (32.1) (32.1) -

(10.4) (10.4) (10.4) (10.4) -

33.3 33.3 33.3 33.3 -

(0.3) (0.3) (0.3) (0.3) -

Page 15: Fincanial Model_ 2 MW Plant

27 28 29 30 31

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

Page 16: Fincanial Model_ 2 MW Plant

32 33 34 35 36

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

Page 17: Fincanial Model_ 2 MW Plant

37 38 39 40

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

Page 18: Fincanial Model_ 2 MW Plant

Inputs Value Units

Capacity 2.0 MW

Life of Plant and Machinery / Project Life 25 years

O&M cost 9.00 Rs Lacs / MW

O&M Cost Esclation 5.72% %

Annual Net Generation 33.29 Lakh kWhs

Assumed tariff (Iterative) 6.93 Rs / kWh

Maintenance spares 15.00%

Interest on working capital 12.82% %

Working Capital 1 2

Fuel Cost (4 months equivalent) - -

O&M 18.00 19.03

O&M expenses for 1 month 1.50 1.59

Receivables (2 months of energy charges) 38.45 38.45

Maintenance spare 0.23 0.24

Total working capital 40.17 40.27

Interest on working capital 5.15 5.16

of yearly O&M Cost

Page 19: Fincanial Model_ 2 MW Plant

Working Capital

3 4 5 6 7

- - - - -

20.12 21.27 22.49 23.77 25.13

1.68 1.77 1.87 1.98 2.09

38.45 38.45 38.45 38.45 38.45

0.25 0.27 0.28 0.30 0.31

40.38 40.49 40.60 40.73 40.86

5.18 5.19 5.21 5.22 5.24

Page 20: Fincanial Model_ 2 MW Plant

8 9 10 11 12

- - - - -

26.57 28.09 29.70 31.39 33.19

2.21 2.34 2.47 2.62 2.77

38.45 38.45 38.45 38.45 38.45

0.33 0.35 0.37 0.39 0.41

40.99 41.14 41.29 41.46 41.63

5.26 5.27 5.29 5.31 5.34

Page 21: Fincanial Model_ 2 MW Plant

13 14 15 16 17

- - - - -

35.09 37.10 39.22 41.46 43.83

2.92 3.09 3.27 3.46 3.65

38.45 38.45 38.45 38.45 38.45

0.44 0.46 0.49 0.52 0.55

41.81 42.00 42.21 42.42 42.65

5.36 5.38 5.41 5.44 5.47

Page 22: Fincanial Model_ 2 MW Plant

18 19 20 21 22

- - - - -

46.34 48.99 51.79 54.75 57.89

3.86 4.08 4.32 4.56 4.82

38.45 38.45 38.45 38.45 38.45

0.58 0.61 0.65 0.68 0.72

42.89 43.14 43.41 43.69 44.00

5.50 5.53 5.57 5.60 5.64

Page 23: Fincanial Model_ 2 MW Plant

23 24 25 26 27

- - - - -

61.20 64.70 68.40 - -

5.10 5.39 5.70 - -

38.45 38.45 38.45 - -

0.76 0.81 0.85 - -

44.31 44.65 45.00 - -

5.68 5.72 5.77 - -

Page 24: Fincanial Model_ 2 MW Plant

28 29 30 31 32

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

Page 25: Fincanial Model_ 2 MW Plant

33 34 35 36 37

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

Page 26: Fincanial Model_ 2 MW Plant

38 39 40

- - -

- - -

- - -

- - -

- - -

- - -

- - -

Page 27: Fincanial Model_ 2 MW Plant

Inputs Value

Life of Plant and Machinery / Project Life 25

Number of years for initial depreciation rate 12

Equity 624.00

Return on Equity - pretax (initial years) 18.00%

Return on Equity - pretax (later years) 24.00%

Number of years for initial return on equity 10

Discount Rate 10.62%

Discount Rate after 10 Years 10.62%

Annuity Factor (25 Years) 8.66

Land Lease Rate 5.0%

Year 1

Net Energy sold (lakh kWhs) 33.29

Fixed Costs

O&M 18.00

Depreciation (SLM) 109.14

Interest on term loan 136.07

Interest on working capital 5.15

Return on Equity 112.32

Variable Costs

Fuel Cost -

Total Cost 380.68

Tariff (Rs/kWh) 11.44

Levelized Tariff 8.91

Levelized Tariff with AD 7.86

Nominal Tariff * Discounting Factor 11.44

Discounting Factor 1.00

Levalised Tariff 8.91

Costs in Rs/kWh

O&M 0.54

Depreciation (SLM) 3.28

Interest on term loan 4.09

Interest on working capital 0.15

Return on Equity 3.37

Fuel Cost -

Levelized Tariff 8.91

Levelized Tariff with AD 7.86

Land Lease and Royalty (Lakhs/yr) 14.83

NPV of Lease and Royalty (lakhs/MW) 128.46

Page 28: Fincanial Model_ 2 MW Plant

Tariff Sheet

Units

years

years

lacs

%

%

years

%

%

%

2 3 4 5 6

33.29 33.29 33.29 33.29 33.29

19.03 20.12 21.27 22.49 23.77

109.14 109.14 109.14 109.14 109.14

115.27 94.47 73.67 52.87 32.07

5.16 5.18 5.19 5.21 5.22

112.32 112.32 112.32 112.32 112.32

- - - - -

360.92 341.22 321.59 302.02 282.52

10.84 10.25 9.66 9.07 8.49

8.91 8.91 8.91 8.91 8.91

7.86 7.86 7.86 7.86 7.86

9.80 8.38 7.14 6.06 5.12

0.90 0.82 0.74 0.67 0.60

0.57 0.60 0.64 0.68 0.71

3.28 3.28 3.28 3.28 3.28

3.46 2.84 2.21 1.59 0.96

0.16 0.16 0.16 0.16 0.16

3.37 3.37 3.37 3.37 3.37

- - - - -

8.91 8.91 8.91 8.91 8.91

7.86 7.86 7.86 7.86 7.86

14.83 14.83 14.83 14.83 14.83

Page 29: Fincanial Model_ 2 MW Plant

7 8 9 10 11

33.29 33.29 33.29 33.29 33.29

25.13 26.57 28.09 29.70 31.39

109.14 109.14 109.14 109.14 109.14

11.27 - - - -

5.24 5.26 5.27 5.29 5.31

112.32 112.32 112.32 112.32 149.76

- - - - -

263.10 253.28 254.82 256.45 295.61

7.90 7.61 7.66 7.70 8.88

8.91 8.91 8.91 8.91 8.91

7.86 7.86 7.86 7.86 7.86

4.31 3.75 3.41 3.11 3.24

0.55 0.49 0.45 0.40 0.36

0.75 0.80 0.84 0.89 0.94

3.28 3.28 3.28 3.28 3.28

0.34 - - - -

0.16 0.16 0.16 0.16 0.16

3.37 3.37 3.37 3.37 4.50

- - - - -

8.91 8.91 8.91 8.91 8.91

7.86 7.86 7.86 7.86 7.86

14.83 14.83 14.83 14.83 14.83

Page 30: Fincanial Model_ 2 MW Plant

12 13 14 15 16

33.29 33.29 33.29 33.29 33.29

33.19 35.09 37.10 39.22 41.46

109.14 43.26 43.26 43.26 43.26

- - - - -

5.34 5.36 5.38 5.41 5.44

149.76 149.76 149.76 149.76 149.76

- - - - -

297.42 233.47 235.50 237.65 239.92

8.93 7.01 7.07 7.14 7.21

8.91 8.91 8.91 8.91 8.91

7.86 7.86 7.86 7.86 7.86

2.94 2.09 1.90 1.74 1.59

0.33 0.30 0.27 0.24 0.22

1.00 1.05 1.11 1.18 1.25

3.28 1.30 1.30 1.30 1.30

- - - - -

0.16 0.16 0.16 0.16 0.16

4.50 4.50 4.50 4.50 4.50

- - - - -

8.91 8.91 8.91 8.91 8.91

7.86 7.86 7.86 7.86 7.86

14.83 14.83 14.83 14.83 14.83

Page 31: Fincanial Model_ 2 MW Plant

17 18 19 20 21

33.29 33.29 33.29 33.29 33.29

43.83 46.34 48.99 51.79 54.75

43.26 43.26 43.26 43.26 43.26

- - - - -

5.47 5.50 5.53 5.57 5.60

149.76 149.76 149.76 149.76 149.76

- - - - -

242.32 244.85 247.54 250.37 253.37

7.28 7.36 7.44 7.52 7.61

8.91 8.91 8.91 8.91 8.91

7.86 7.86 7.86 7.86 7.86

1.45 1.32 1.21 1.11 1.01

0.20 0.18 0.16 0.15 0.13

1.32 1.39 1.47 1.56 1.64

1.30 1.30 1.30 1.30 1.30

- - - - -

0.16 0.17 0.17 0.17 0.17

4.50 4.50 4.50 4.50 4.50

- - - - -

8.91 8.91 8.91 8.91 8.91

7.86 7.86 7.86 7.86 7.86

14.83 14.83 14.83 14.83 14.83

Page 32: Fincanial Model_ 2 MW Plant

22 23 24 25 26

33.29 33.29 33.29 33.29 -

57.89 61.20 64.70 68.40 -

43.26 43.26 43.26 43.26 -

- - - - -

5.64 5.68 5.72 5.77 -

149.76 149.76 149.76 149.76 -

- - - - -

256.54 259.90 263.44 267.19 -

7.71 7.81 7.91 8.03 -

8.91 8.91 8.91 8.91 -

7.86 7.86 7.86 7.86 -

0.93 0.85 0.78 0.71

0.12 0.11 0.10 0.09

1.74 1.84 1.94 2.05 -

1.30 1.30 1.30 1.30 -

- - - - -

0.17 0.17 0.17 0.17 -

4.50 4.50 4.50 4.50 -

- - - - -

8.91 8.91 8.91 8.91 -

7.86 7.86 7.86 7.86 -

14.83 14.83 14.83 14.83 -

Page 33: Fincanial Model_ 2 MW Plant

27 28 29 30 31

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

Page 34: Fincanial Model_ 2 MW Plant

32 33 34 35 36

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

Page 35: Fincanial Model_ 2 MW Plant

37 38 39 40

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

Page 36: Fincanial Model_ 2 MW Plant

User Inputs Value

Equity 624.0

Life of Plant and Machinery / Project Life 25

Corporate Tax Rate 32.45%

MAT 20.01%

Tax Holiday Start Year 1

Tax Holiday Duration 10

MAT Setoff Start Year 11

MAT set off accumulation allowed u/s 115JAA (3A) 11

MAT Setoff Duration 10

Iterative Tariff 6.9

Year 1

Net Energy sold (lakh kWhs) 33.29

Tariff (Rs/kWh) 6.93

Income From Sale of Electricity (Lakhs) 230.69

Income From REC Credits -

Income from Carbon Market -

Total Income 230.69

Fuel Cost -

O&M + Insurance -

PBDIT 230.69

Depreciation 832.00

PBIT (601.31)

Interest on term loan and working capital 141.22

PBT (742.53)

PAT 89.47

Year 1

PBT (742.53)

Add Book Depreciation 832.00

PBDT/Gross Income 89.47

Depreciation (IT-Written Down Value) -

Taxable Income 89.47

Losses Carried Over

Taxable Income after loss carried over 89.47

Years for Tax Holiday 1.00

Income Tax -

MAT -

Set off under MAT -

MAT set off remaining at the end of each year -

TAX Paid (MAT or IT) -

PAT 89.47

Post-Tax ROE 14%

Page 37: Fincanial Model_ 2 MW Plant

Units

lacs CER 8000.0

years Value of CER 420.0

% Total 3,360,000.00

%

year REC 9200.00 1840.0

years REC Price 9300.0

year 7.0

years

years

Rs/Kwh 3.0

2 3 4 5 6

33.29 33.29 33.29 33.29 33.29

6.93 6.93 6.93 6.93 6.93

230.69 230.69 230.69 230.69 230.69

- - - -

- - - - -

230.69 230.69 230.69 230.69 230.69

- - - - -

- - - - -

230.69 230.69 230.69 230.69 230.69

998.40 199.68 39.94 0.00 0.00

(767.71) 31.01 190.75 230.69 230.69

120.43 99.65 78.86 58.08 37.29

(888.15) (68.64) 111.89 172.61 193.39

110.25 131.04 129.44 138.07 154.70

2 3 4 5 6

(888.15) (68.64) 111.89 172.61 193.39

998.40 199.68 39.94 0.00 0.00

110.25 131.04 151.83 172.61 193.39

- - - - -

110.25 131.04 151.83 172.61 193.39

- - - - -

110.25 131.04 151.83 172.61 193.39

2.00 3.00 4.00 5.00 6.00

- - - - -

- - 22.39 34.54 38.69

- - - - -

- - - - -

- - 22.39 34.54 38.69

110.25 131.04 129.44 138.07 154.70

18% 21% 21% 22% 25%

Page 38: Fincanial Model_ 2 MW Plant

7 8 9 10 11

33.29 33.29 33.29 33.29 33.29

6.93 6.93 6.93 6.93 6.93

230.69 230.69 230.69 230.69 230.69

- - - - -

230.69 230.69 230.69 230.69 230.69

- - - - -

- - - - -

230.69 230.69 230.69 230.69 230.69

0.00 0.00 0.00 0.00 0.00

230.69 230.69 230.69 230.69 230.69

16.51 5.26 5.27 5.29 5.31

214.18 225.43 225.41 225.39 225.37

171.33 180.33 180.31 180.30 180.28

7 8 9 10 11

214.18 225.43 225.41 225.39 225.37

0.00 0.00 0.00 0.00 0.00

214.18 225.43 225.41 225.39 225.37

- - - - -

214.18 225.43 225.41 225.39 225.37

- - - - -

214.18 225.43 225.41 225.39 225.37

7.00 8.00 9.00 10.00

- - - - 73.12

42.85 45.10 45.10 45.10 45.09

- - - - 28.03

- - - 273.77 245.74

42.85 45.10 45.10 45.10 45.09

171.33 180.33 180.31 180.30 180.28

27% 29% 29% 29% 29%

Page 39: Fincanial Model_ 2 MW Plant

12 13 14 15 16

33.29 33.29 33.29 33.29 33.29

6.93 3.00 3.00 3.00 3.00

230.69 99.86 99.86 99.86 99.86

- - - - -

230.69 99.86 99.86 99.86 99.86

- - - - -

- - - - -

230.69 99.86 99.86 99.86 99.86

0.00 0.00 0.00 0.00 0.00

230.69 99.86 99.86 99.86 99.86

5.34 5.36 5.38 5.41 5.44

225.35 94.50 94.48 94.45 94.43

180.26 75.60 75.58 75.56 75.53

12 13 14 15 16

225.35 94.50 94.48 94.45 94.43

0.00 0.00 0.00 0.00 0.00

225.35 94.50 94.48 94.45 94.43

- - - - -

225.35 94.50 94.48 94.45 94.43

- - - - -

225.35 94.50 94.48 94.45 94.43

73.11 30.66 30.65 30.65 30.64

45.09 18.91 18.90 18.90 18.89

28.03 11.75 11.75 11.75 11.74

217.71 205.96 194.21 182.46 170.72

45.09 18.91 18.90 18.90 18.89

180.26 75.60 75.58 75.56 75.53

29% 12% 12% 12% 12%

Page 40: Fincanial Model_ 2 MW Plant

17 18 19 20 21

33.29 33.29 33.29 33.29 33.29

3.00 3.00 3.00 3.00 3.00

99.86 99.86 99.86 99.86 99.86

- - - - -

99.86 99.86 99.86 99.86 99.86

- - - - -

- - - - -

99.86 99.86 99.86 99.86 99.86

0.00 0.00 0.00 0.00 0.00

99.86 99.86 99.86 99.86 99.86

5.47 5.50 5.53 5.57 5.60

94.40 94.37 94.33 94.30 94.26

75.51 75.49 75.46 75.43 63.68

17 18 19 20 21

94.40 94.37 94.33 94.30 94.26

0.00 0.00 0.00 0.00 0.00

94.40 94.37 94.33 94.30 94.26

- - - - -

94.40 94.37 94.33 94.30 94.26

- - - - -

94.40 94.37 94.33 94.30 94.26

30.63 30.62 30.61 30.60 30.58

18.89 18.88 18.87 18.87 18.86

11.74 11.74 11.73 11.73 -

158.98 147.24 135.51 123.78 -

18.89 18.88 18.87 18.87 30.58

75.51 75.49 75.46 75.43 63.68

12% 12% 12% 12% 10%

Page 41: Fincanial Model_ 2 MW Plant

22 23 24 25 26

33.29 33.29 33.29 33.29

3.00 3.00 3.00 3.00

99.86 99.86 99.86 99.86

- - - -

99.86 99.86 99.86 99.86

- - - -

- - - -

99.86 99.86 99.86 99.86

0.00 0.00 0.00 0.00

99.86 99.86 99.86 99.86

5.64 5.68 5.72 5.77

94.22 94.18 94.14 94.09

63.65 63.63 63.60 63.57

22 23 24 25 26

94.22 94.18 94.14 94.09

0.00 0.00 0.00 0.00

94.22 94.18 94.14 94.09

- - - -

94.22 94.18 94.14 94.09

- - - -

94.22 94.18 94.14 94.09

30.57 30.56 30.54 30.53

18.85 18.84 18.84 18.83

- - - -

- - - -

30.57 30.56 30.54 30.53

63.65 63.63 63.60 63.57

10% 10% 10% 10% 0%

Page 42: Fincanial Model_ 2 MW Plant

27 28 29 30 31

27 28 29 30 31

0% 0% 0% 0% 0%

Page 43: Fincanial Model_ 2 MW Plant

32 33 34 35 36

32 33 34 35 36

0% 0% 0% 0% 0%

Page 44: Fincanial Model_ 2 MW Plant

37 38 39 40

37 38 39 40

0% 0% 0% 0%

Page 45: Fincanial Model_ 2 MW Plant

User Input Value Units

Loan amount 1456.00 Rs lacs

Interest Rate 10.00% %

Equity 624 lacs

Moratorium 0 Year

No of installments for principal paym 84 Months

Monthly Principal repayment 17.33 Rs lacs

TERM LOAN REPAYMENT Details 1 2

Instalment-1 17.33 17.33

Instalment-2 17.33 17.33

Instalment-3 17.33 17.33

Instalment-4 17.33 17.33

Instalment-5 17.33 17.33

Instalment-6 17.33 17.33

Instalment-7 17.33 17.33

Instalment-8 17.33 17.33

Instalment-9 17.33 17.33

Instalment-10 17.33 17.33

Instalment-11 17.33 17.33

Instalment-12 17.33 17.33

Total installment 208.00 208.00

Cumulative Principal Payment 208.00 416.00

Outstanding Principal

Outstanding1 1,456.00 1,248.00

Outstanding2 1,438.67 1,230.67

Outstanding3 1,421.33 1,213.33

Outstanding4 1,404.00 1,196.00

Outstanding5 1,386.67 1,178.67

Outstanding6 1,369.33 1,161.33

Outstanding7 1,352.00 1,144.00

Outstanding8 1,334.67 1,126.67

Outstanding9 1,317.33 1,109.33

Outstanding10 1,300.00 1,092.00

Outstanding11 1,282.67 1,074.67

Outstanding12 1,265.33 1,057.33

Interest payments

interest1 12.13 10.40

interest2 11.99 10.26

interest3 11.84 10.11

interest4 11.70 9.97

interest5 11.56 9.82

interest6 11.41 9.68

interest7 11.27 9.53

interest8 11.12 9.39

Page 46: Fincanial Model_ 2 MW Plant

interest9 10.98 9.24

interest10 10.83 9.10

interest11 10.69 8.96

interest12 10.54 8.81

Total interest 136.07 115.27

Page 47: Fincanial Model_ 2 MW Plant

3 4 5 6 7

17.33 17.33 17.33 17.33 17.33

17.33 17.33 17.33 17.33 17.33

17.33 17.33 17.33 17.33 17.33

17.33 17.33 17.33 17.33 17.33

17.33 17.33 17.33 17.33 17.33

17.33 17.33 17.33 17.33 17.33

17.33 17.33 17.33 17.33 17.33

17.33 17.33 17.33 17.33 17.33

17.33 17.33 17.33 17.33 17.33

17.33 17.33 17.33 17.33 17.33

17.33 17.33 17.33 17.33 17.33

17.33 17.33 17.33 17.33 17.33

208.00 208.00 208.00 208.00 208.00

624.00 832.00 1,040.00 1,248.00 1,456.00

1,040.00 832.00 624.00 416.00 208.00

1,022.67 814.67 606.67 398.67 190.67

1,005.33 797.33 589.33 381.33 173.33

988.00 780.00 572.00 364.00 156.00

970.67 762.67 554.67 346.67 138.67

953.33 745.33 537.33 329.33 121.33

936.00 728.00 520.00 312.00 104.00

918.67 710.67 502.67 294.67 86.67

901.33 693.33 485.33 277.33 69.33

884.00 676.00 468.00 260.00 52.00

866.67 658.67 450.67 242.67 34.67

849.33 641.33 433.33 225.33 17.33

8.67 6.93 5.20 3.47 1.73

8.52 6.79 5.06 3.32 1.59

8.38 6.64 4.91 3.18 1.44

8.23 6.50 4.77 3.03 1.30

8.09 6.36 4.62 2.89 1.16

7.94 6.21 4.48 2.74 1.01

7.80 6.07 4.33 2.60 0.87

7.66 5.92 4.19 2.46 0.72

Page 48: Fincanial Model_ 2 MW Plant

7.51 5.78 4.04 2.31 0.58

7.37 5.63 3.90 2.17 0.43

7.22 5.49 3.76 2.02 0.29

7.08 5.34 3.61 1.88 0.14

94.47 73.67 52.87 32.07 11.27

Page 49: Fincanial Model_ 2 MW Plant

8 9 10 11 12

17.33 17.33 17.33

17.33 17.33 17.33

17.33 17.33 17.33

17.33 17.33 17.33

17.33 17.33 17.33

17.33 17.33 17.33

17.33 17.33 17.33

17.33 17.33 17.33

17.33 17.33 17.33

17.33 17.33 17.33

17.33 17.33 17.33

17.33 17.33 17.33

208.00 208.00 208.00 - -

1,664.00 1,872.00 2,080.00 2,080.00 2,080.00

0.00 - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

0.00 - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

Page 50: Fincanial Model_ 2 MW Plant

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

Page 51: Fincanial Model_ 2 MW Plant

13 14 15 16 17

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

2,080.00 2,080.00 2,080.00 2,080.00 2,080.00

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

Page 52: Fincanial Model_ 2 MW Plant

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

Page 53: Fincanial Model_ 2 MW Plant

18 19 20 21 22

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

2,080.00 2,080.00 2,080.00 2,080.00 2,080.00

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

Page 54: Fincanial Model_ 2 MW Plant

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

Page 55: Fincanial Model_ 2 MW Plant

23 24 25 26 27

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

2,080.00 2,080.00 2,080.00 2,080.00 2,080.00

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

Page 56: Fincanial Model_ 2 MW Plant

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

Page 57: Fincanial Model_ 2 MW Plant

28 29 30 31 32

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

2,080.00 2,080.00 2,080.00 2,080.00 2,080.00

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

Page 58: Fincanial Model_ 2 MW Plant

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

Page 59: Fincanial Model_ 2 MW Plant

33 34 35 36 37

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

2,080.00 2,080.00 2,080.00 2,080.00 2,080.00

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

Page 60: Fincanial Model_ 2 MW Plant

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

Page 61: Fincanial Model_ 2 MW Plant

38 39 40

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

2,080.00 2,080.00 2,080.00

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

Page 62: Fincanial Model_ 2 MW Plant

- - -

- - -

- - -

- - -

- - -

Page 63: Fincanial Model_ 2 MW Plant

Life of Plant and Machinery / Project Life 25 years

PARTICULARS 0 1 2 3

Cash Profit - 89.5 110.3 131.0

Equity 624.0 - - -

Loan Amount 1,456.0 - - -

Total Inflow 2,080.0 89.5 110.3 131.0

Project Cost 2,080.0 - - -

Loan Repayment - 208.0 208.0 208.0

Return of Equity - - -

Total Outflow 2,080.0 208.0 208.0 208.0

Opening Balance - - (118.5) (216.3)

Surplus/Deficit - (118.5) (97.7) (77.0)

Closing Balance - (118.5) (216.3) (293.2)

Page 64: Fincanial Model_ 2 MW Plant

Cash Flow Statement

4 5 6 7 8

129.4 138.1 154.7 171.3 180.3

- - - - -

- - - - -

129.4 138.1 154.7 171.3 180.3

- - - - -

208.0 208.0 208.0 208.0 208.0

- - - - -

208.0 208.0 208.0 208.0 832.0

(293.2) (371.8) (441.7) (495.0) (531.7)

(78.6) (69.9) (53.3) (36.7) (651.7)

(371.8) (441.7) (495.0) (531.7) (1,183.4)

Page 65: Fincanial Model_ 2 MW Plant

9 10 11 12 13 14 15 16

180.3 180.3 180.3 180.3 75.6 75.6 75.6 75.5

- - - - - - - -

- - - - - - - -

180.3 180.3 180.3 180.3 75.6 75.6 75.6 75.5

- - - - - - - -

208.0 208.0 - - - - - -

- - - - - - -

208.0 208.0 - - - - - -

(1,183.4) (1,211.1) (1,238.8) (1,058.5) (878.2) (802.6) (727.1) (651.5)

(27.7) (27.7) 180.3 180.3 75.6 75.6 75.6 75.5

(1,211.1) (1,238.8) (1,058.5) (878.2) (802.6) (727.1) (651.5) (576.0)

Page 66: Fincanial Model_ 2 MW Plant

17 18 19 20 21 22 23 24

75.5 75.5 75.5 75.4 63.7 63.7 63.6 63.6

- - - - - - - -

- - - - - - - -

75.5 75.5 75.5 75.4 63.7 63.7 63.6 63.6

- - - - - - - -

- - - - - - - -

- - - - - - - -

(576.0) (500.5) (425.0) (349.5) (274.1) (210.4) (146.8) (83.1)

75.5 75.5 75.5 75.4 63.7 63.7 63.6 63.6

(500.5) (425.0) (349.5) (274.1) (210.4) (146.8) (83.1) (19.5)

Page 67: Fincanial Model_ 2 MW Plant

25

63.6

-

-

63.6

-

-

-

(19.5)

63.6

44.0

Page 68: Fincanial Model_ 2 MW Plant

Life of Plant and Machinery / Project Life 25

Assets 0

Gross fixed assets

Less: Book Depreciation

Net fixed assets

Cash flow from operations

Principal payment

Cash and Equivalent 0.0

Total assets

Liabilities 0

Equity share capital 624.00

PAT for the year

Reserves and surplus -

Networth 624.00

Rupee debt 1,456.00

Total liabilities 2,080.00

Check

Page 69: Fincanial Model_ 2 MW Plant

Balance Sheet

years

1 2 3 4 5

1,130.00 1,075.09 953.82 832.56 711.30

54.91 121.26 121.26 121.26 121.26

1,075.09 953.82 832.56 711.30 590.03

89.47 110.25 131.04 129.44 138.07

208.00 208.00 208.00 208.00 208.00

(118.53) (216.28) (293.24) (371.80) (441.73)

956.55 737.54 539.32 339.49 148.30

1 2 3 4 5

624.00 624.00 624.00 624.00 624.00

89.47 110.25 131.04 129.44 138.07

89.47 199.72 330.76 460.20 598.27

713.47 823.72 954.76 1,084.20 1,222.27

1,248.00 1,040.00 832.00 624.00 416.00

1,961.47 1,863.72 1,786.76 1,708.20 1,638.27

(1005) (1126) (1247) (1369) (1490)

Page 70: Fincanial Model_ 2 MW Plant

6 7 8 9 10

590.03 468.77 347.50 226.24 104.98

121.26 121.26 121.26 121.26 121.26

468.77 347.50 226.24 104.98 (16.29)

154.70 171.33 180.33 180.31 180.30

208.00 208.00 208.00 208.00 208.00

(495.03) (531.70) (559.38) (587.06) (614.77)

(26.26) (184.20) (333.14) (482.09) (631.06)

6 7 8 9 10

624.00 624.00 624.00 624.00 624.00

154.70 171.33 180.33 180.31 180.30

752.97 924.30 1,104.62 1,284.94 1,465.23

1,376.97 1,548.30 1,728.62 1,908.94 2,089.23

208.00 - (208.00) (416.00) (624.00)

1,584.97 1,548.30 1,520.62 1,492.94 1,465.23

(1611) (1732) (1854) (1975) (2096)

Page 71: Fincanial Model_ 2 MW Plant

11 12 13 14 15

(16.29) (137.55) (258.82) (290.88) (322.94)

121.26 121.26 32.06 32.06 32.06

(137.55) (258.82) (290.88) (322.94) (355.01)

180.28 180.26 75.60 75.58 75.56

- - - - -

(434.49) (254.23) (178.63) (103.06) (27.50)

(572.04) (513.04) (469.51) (426.00) (382.51)

11 12 13 14 15

624.00 624.00 624.00 624.00 624.00

180.28 180.26 75.60 75.58 75.56

1,645.51 1,825.77 1,901.37 1,976.94 2,052.50

2,269.51 2,449.77 2,525.37 2,600.94 2,676.50

(624.00) (624.00) (624.00) (624.00) (624.00)

1,645.51 1,825.77 1,901.37 1,976.94 2,052.50

(2218) (2339) (2371) (2403) (2435)

Page 72: Fincanial Model_ 2 MW Plant

16 17 18 19 20

(355.01) (387.07) (419.14) (451.20) (483.26)

32.06 32.06 32.06 32.06 32.06

(387.07) (419.14) (451.20) (483.26) (515.33)

75.53 75.51 75.49 75.46 75.43

- - - - -

48.03 123.54 199.03 274.49 349.92

(339.04) (295.59) (252.17) (208.78) (165.41)

16 17 18 19 20

624.00 624.00 624.00 624.00 624.00

75.53 75.51 75.49 75.46 75.43

2,128.03 2,203.54 2,279.03 2,354.49 2,429.92

2,752.03 2,827.54 2,903.03 2,978.49 3,053.92

(624.00) (624.00) (624.00) (624.00) (624.00)

2,128.03 2,203.54 2,279.03 2,354.49 2,429.92

(2467) (2499) (2531) (2563) (2595)

Page 73: Fincanial Model_ 2 MW Plant

21 22 23 24 25

(515.33) (547.39) (579.46) (611.52) (643.58)

32.06 32.06 32.06 32.06 32.06

(547.39) (579.46) (611.52) (643.58) (675.65)

63.68 63.65 63.63 63.60 63.57

- - - - -

413.60 477.25 540.87 604.47 668.04

(133.80) (102.21) (70.65) (39.11) (7.61)

21 22 23 24 25

624.00 624.00 624.00 624.00 624.00

63.68 63.65 63.63 63.60 63.57

2,493.60 2,557.25 2,620.87 2,684.47 2,748.04

3,117.60 3,181.25 3,244.87 3,308.47 3,372.04

(624.00) (624.00) (624.00) (624.00) (624.00)

2,493.60 2,557.25 2,620.87 2,684.47 2,748.04

(2627) (2659) (2692) (2724) (2756)

Page 74: Fincanial Model_ 2 MW Plant

26 27 28 29 30

- - - - -

- - - - -

- - - - -

- - - - -

26 27 28 29 30

Err:508 Err:508 Err:508 Err:508 Err:508

0 0 0 0 0

Page 75: Fincanial Model_ 2 MW Plant

31 32 33 34 35

- - - - -

- - - - -

- - - - -

- - - - -

31 32 33 34 35

Err:508 Err:508 Err:508 Err:508 Err:508

0 0 0 0 0

Page 76: Fincanial Model_ 2 MW Plant

36 37 38 39 40

- - - - -

- - - - -

- - - - -

- - - - -

36 37 38 39 40

Err:508 Err:508 Err:508 Err:508 Err:508

0 0 0 0 0

Page 77: Fincanial Model_ 2 MW Plant

Debt Service Coverage Ratio Calculations Yr0 1

Interest payments 136.07

Principal Repayments 208.00

Total Debt Service - 344.07

Cumulative Debt Service - 344.07

Post-tax Cashflow before Debt Service - 89.47

Cumulative Cashflow for Debt Service - 89.47

DSCR - 0.26

Cummulative DSCR - 0.00

MINIMUM DSCR (after 1st year) 0.26

Average DSCR 0.42

Post-tax Cashflow before Debt Service w/ AD -

DSCR w/ AD - -

Page 78: Fincanial Model_ 2 MW Plant

Debt Service Coverage Ratio

2 3 4 5 6

115.27 94.47 73.67 52.87 32.07

208.00 208.00 208.00 208.00 208.00

323.27 302.47 281.67 260.87 240.07

667.34 969.81 1,251.48 1,512.35 1,752.42

110.25 131.04 129.44 138.07 154.70

199.72 330.76 460.20 598.27 752.97

0.30 0.34 0.37 0.40 0.43

0.00 0.00 0.00 0.00 0.00

- - - - -

Page 79: Fincanial Model_ 2 MW Plant

7 8 9 10 11

11.27 - - - -

208.00 208.00 208.00 208.00 -

219.27 208.00 208.00 208.00 -

1,971.69 2,179.69 2,387.69 2,595.69 -

171.33 180.33 180.31 180.30 180.28

924.30 1,104.62 1,284.94 1,465.23 1,645.51

0.47 0.51 0.54 0.56 -

0.00 0.00 0.00 0.00 -

- - - - -

Page 80: Fincanial Model_ 2 MW Plant

12 13 14 15 16

- - - - -

-

-

-

180.26

1,825.77

-

-

- - - -

- - - - -

Page 81: Fincanial Model_ 2 MW Plant

17 18 19 20 21

- - - - -

- - - - -

- - - - -

Page 82: Fincanial Model_ 2 MW Plant

22 23 24 25 26

- - - - -

- - - - -

- - - - -

Page 83: Fincanial Model_ 2 MW Plant

27 28 29 30 31

- - - - -

- - - - -

- - - - -

Page 84: Fincanial Model_ 2 MW Plant

32 33 34 35 36

- - - - -

- - - - -

- - - - -

Page 85: Fincanial Model_ 2 MW Plant

37 38 39 40

- - - -

-

- - - -

- - - -

Page 86: Fincanial Model_ 2 MW Plant

User Inputs Value

Life of Plant and Machinery / Project Life 25

Interest Rate on Term Loan 10.00%

Re-investment ROR-IRR ratio (for MIRR) 80.00%

Project IRR-Pre Tax Year 0

Profit Before Tax (PBT)

Add Book Depreciation

Cashflow from operations (available for repayment)

Add Interest

Total Inflow-Cashflow before debt service -

Total Outflow-Capex 1,130.00

Net flow (Pre-Tax) (1,130.0)

Project IRR-Pre Tax 2.38%

MIRR-Pre Tax (25 years) 2.36%

Project IRR- Post Tax-Without Tax Shelter 0

Profit After Tax (PAT) -

Add Book Depreciation -

Cashflow from operations-Post tax (avlbl for repayment) -

Add Interest payments -

Total Inflow-Cashflow before debt service -

Total Outflow-Capex 1,130.00

Net Flow (Post Tax) (1,130.0)

Project IRR- Post Tax-Without Tax Shelter 15.92%

NPV of Net Flow without Tax Shelter 348.53

MIRR-Post Tax-Without Tax Shelter (25 years) 13.43%

Project IRR- Post Tax- With Tax Shelter 0

Net Flow (Post Tax) - 1,130.00

Add- Tax shelter (Acc Dep)

Net flows adjusted for tax saving - 1,130.00

Project IRR- Post Tax- With Tax Shelter 24.78%

NPV of Net Flow with Tax Shelter 651.81

MIRR-Post Tax-With Tax Shelter (25 years) 20.46%

Equity IRR 0

Equity Outflow - 624.00

Cashflow available for repayment -

Capital repayments

Inflow -

Net Flow - 624.00

Equity IRR (Post Tax) 0.24%

Page 87: Fincanial Model_ 2 MW Plant

NPV @ Interest Rate (781.37)

Equity MIRR (Post Tax - 25 years) 0.86%

Equity IRR (Post Tax)- With Tax Shelter 0

Net Flows adjusted for tax saving - 624.00

Equity IRR (Post Tax)- With Tax Shelter 1.00%

NPV @ Interest Rate (478.09)

Equity MIRR (Post Tax)- With Tax Shelter (25 yrs) 1.80%

Page 88: Fincanial Model_ 2 MW Plant

Units

years

%

%

1 2 3 4 5

(742.5) (888.1) (68.6) 111.9 172.6

- - - - -

(742.5) (888.1) (68.6) 111.9 172.6

136.1 115.3 94.5 73.7 52.9

(606.5) (772.9) 25.8 185.6 225.5

- - - - -

(606.5) (772.9) 25.8 185.6 225.5

1 2 3 4 5

89.5 110.3 131.0 129.4 138.1

- - - - -

89.5 110.3 131.0 129.4 138.1

136.1 115.3 94.5 73.7 52.9

225.5 225.5 225.5 203.1 190.9

225.5 225.5 225.5 203.1 190.9

1 2 3 4 5

225.54 225.52 225.51 203.11 190.94

252.1 284.6 25.4 (26.4) (39.3)

477.66 510.11 250.95 176.72 151.60

1 2 3 4 5

89.47 110.25 131.04 129.44 138.07

208.0 208.0 208.0 208.0 208.0

- 118.53 - 97.75 - 76.96 - 78.56 - 69.93

- 118.53 - 97.75 - 76.96 - 78.56 - 69.93

Page 89: Fincanial Model_ 2 MW Plant

1 2 3 4 5

133.59 186.84 - 51.52 - 104.95 - 109.27

Page 90: Fincanial Model_ 2 MW Plant

IRR

6 7 8 9 10

193.4 214.2 225.4 225.4 225.4

- - - - -

193.4 214.2 225.4 225.4 225.4

32.1 11.3 - - -

225.5 225.4 225.4 225.4 225.4

- - - - -

225.5 225.4 225.4 225.4 225.4

6 7 8 9 10

154.7 171.3 180.3 180.3 180.3

- - - - -

154.7 171.3 180.3 180.3 180.3

32.1 11.3 - - -

186.8 182.6 180.3 180.3 180.3

186.8 182.6 180.3 180.3 180.3

6 7 8 9 10

186.77 182.60 180.33 180.31 180.30

(39.3) (39.3) (39.3) (39.3) (39.3)

147.43 143.25 140.98 140.97 140.95

6 7 8 9 10

154.70 171.33 180.33 180.31 180.30

208.0 208.0 208.0 208.0 208.0

- 53.30 - 36.67 - 27.67 - 27.69 - 27.70

- 53.30 - 36.67 - 27.67 - 27.69 - 27.70

Page 91: Fincanial Model_ 2 MW Plant

6 7 8 9 10

- 92.64 - 76.02 - 67.02 - 67.03 - 67.05

Page 92: Fincanial Model_ 2 MW Plant

11 12 13 14 15

225.4 225.3 94.5 94.5 94.5

- - - - -

225.4 225.3 94.5 94.5 94.5

- - - - -

225.4 225.3 94.5 94.5 94.5

- - - - -

225.4 225.3 94.5 94.5 94.5

11 12 13 14 15

180.3 180.3 75.6 75.6 75.6

- - - - -

180.3 180.3 75.6 75.6 75.6

- - - - -

180.3 180.3 75.6 75.6 75.6

180.3 180.3 75.6 75.6 75.6

11 12 13 14 15

180.28 180.26 75.60 75.58 75.56

(39.3) (39.3) (10.4) (10.4) (10.4)

140.94 140.92 65.19 65.17 65.15

11 12 13 14 15

180.28 180.26 75.60 75.58 75.56

- - - - -

180.28 180.26 75.60 75.58 75.56

180.28 180.26 75.60 75.58 75.56

Page 93: Fincanial Model_ 2 MW Plant

11 12 13 14 15

140.94 140.92 65.19 65.17 65.15

Page 94: Fincanial Model_ 2 MW Plant

16 17 18 19 20

94.4 94.4 94.4 94.3 94.3

- - - - -

94.4 94.4 94.4 94.3 94.3

- - - - -

94.4 94.4 94.4 94.3 94.3

- - - - -

94.4 94.4 94.4 94.3 94.3

16 17 18 19 20

75.5 75.5 75.5 75.5 75.4

- - - - -

75.5 75.5 75.5 75.5 75.4

- - - - -

75.5 75.5 75.5 75.5 75.4

75.5 75.5 75.5 75.5 75.4

16 17 18 19 20

75.53 75.51 75.49 75.46 75.43

(10.4) (10.4) (10.4) (10.4) (10.4)

65.13 65.11 65.08 65.06 65.03

16 17 18 19 20

75.53 75.51 75.49 75.46 75.43

- - - - -

75.53 75.51 75.49 75.46 75.43

75.53 75.51 75.49 75.46 75.43

Page 95: Fincanial Model_ 2 MW Plant

16 17 18 19 20

65.13 65.11 65.08 65.06 65.03

Page 96: Fincanial Model_ 2 MW Plant

21 22 23 24 25

94.3 94.2 94.2 94.1 94.1

- - - - -

94.3 94.2 94.2 94.1 94.1

- - - - -

94.3 94.2 94.2 94.1 94.1

- - - - -

94.3 94.2 94.2 94.1 94.1

21 22 23 24 25

63.7 63.7 63.6 63.6 63.6

- - - - -

63.7 63.7 63.6 63.6 63.6

- - - - -

63.7 63.7 63.6 63.6 63.6

63.7 63.7 63.6 63.6 63.6

21 22 23 24 25

63.68 63.65 63.63 63.60 63.57

(10.4) (10.4) (10.4) (10.4) (10.4)

53.28 53.25 53.22 53.19 53.16

21 22 23 24 25

63.68 63.65 63.63 63.60 63.57

- - - - -

63.68 63.65 63.63 63.60 63.57

63.68 63.65 63.63 63.60 63.57

Page 97: Fincanial Model_ 2 MW Plant

21 22 23 24 25

53.28 53.25 53.22 53.19 53.16

Page 98: Fincanial Model_ 2 MW Plant

26 27 28 29 30

Page 99: Fincanial Model_ 2 MW Plant
Page 100: Fincanial Model_ 2 MW Plant

31 32 33 34 35

Page 101: Fincanial Model_ 2 MW Plant
Page 102: Fincanial Model_ 2 MW Plant

36 37 38 39 40

Page 103: Fincanial Model_ 2 MW Plant
Page 104: Fincanial Model_ 2 MW Plant

Panelepcland

margin

Total Cost 8.19