Presentation to A PPCB Date : 25-07-2006 UltraTech Cement Limited A.P. Cement Works, Tadipatri 13 th &14 th May 2010 4 MW Waste He at Recovery Powe r Plant Presenter: V. Devi Prasad Asst. Vice President APCW Po wer Power Sources: 2 x 25 MW The rmal Po wer plant (CF BC Boiler s) 50 MVA EB Po we r 4 MW Wast e Heat Recov ery P owe r plan t 2 x 12 MW DG Powe r plan t (s tand by) Other Options : The rmal, Gas, Wind, Solar, Wast e Heat recov ery. - Steam turbine - Organic Rankine Cycle Total Plant Power Demand : 104 MVA ( Ph-1+II : 39+65 MVA ) 4.0 Waste H eat Recovery Po wer Plant Suppliers: Energy Converter : ORMAT Systems Limited, Israel. WHOH : Transparent Energy Systems, Pune Organic Rankine Cycle Turbine: Tech nical Ben efits High vapor turbine efficiency at low speed Condensing near atmospheric pressure Smaller size air cooled condensers Moisture free turbine expansion. No Wate r Consu mptio n ( N o WT P ) Non IBR ( No Steam) No Extra Manp ow er ( 1 per shift) Attracts CDM Benefits (Environment) Cement Plant - Overview Phase I - Kiln: Design : FLS Capacity : 8000 TPD Dimensions ( Met ) : 75 x 4.75 Dia, Pre- hea ter : 6 Stage Phase I - Cooler Design : FLS, COOLAX, Cooler Fan s : 16, Cooler are a : 141 Sq. M et, Cooler Vent fa n: 58 5 kW. Typical Heat Bala nce in Cement Mfg

4 MW Waste Heat Recovery Power Plant

Embed Size (px)

DESCRIPTION

Waste Heat Recovery Power Plant technology

Citation preview

  • Presentation to APPCBDate : 25-07-2006

    UltraTech Cement LimitedA.P. Cement Works, Tadipatri

    13 th & 14th May 2010

    4 MW Waste He at Recovery Powe r P lant

    Presenter:V. Devi Prasad

    Asst. Vice President

    APCW Po wer

    Power Sour ces:

    2 x 25 MW Thermal Power plant (CFBC Boilers) 50 MVA EB Power 4 MW Waste Heat Recov ery Power plant 2 x 12 MW DG Power plant (stand by)

    Other Options: Thermal, Gas,

    Wind,

    Solar, Waste Heat recov ery.

    - Steam turbine

    - Organic Rankine Cycle

    Total Plant Power Demand : 104 MVA ( Ph-1+II : 39+65 MVA )

    4.0 Waste H eat Recovery Power Plant

    Suppliers:

    Energy Converter : ORMAT Systems Limited, Israel.WHOH : Transparent Energy Systems, Pune

    Organic Rankine Cycle Turbine:

    Technical Benefits High vapor turbine efficiency at low speed

    Condensing near atmospheric pressure Smaller size air cooled condensers

    Moisture free turbine expansion.

    No Water Consumption ( No WT P ) Non IBR ( No Steam) No Extra Manpower ( 1 per shift) Attracts CDM Benefits (Environment)

    Cement Plant - Overview

    Phase I - Kiln: Design : FLS

    Capacity : 8000 TPD Dimensions (Met) : 75 x 4.75 Dia,

    Pre-hea ter : 6 Stage

    Phase I - CoolerDesign : FLS, COOLAX,Cooler Fans : 16, Cooler area : 141 Sq. Met,Cooler Vent fan: 585 kW.

    Typical Heat Bala nce in Cement Mfg

  • WHRU - Input Para meters

    Basis of Design:

    Gas Design Mass Flow rate : 485 Tons / Hr (Vo lu metr ic Fl ow 3 75,500 N m3/ Hr)

    Design Gas (In / out)Temp. : 320 / 150 CMax. Dust loading : 90 mg / Nm3

    Ave. Dust pa rticle size : 45 MicronsAir pressure after ESP : -30 mm WC

    Design ConditionsAmbient Temp. : 35 Deg C. (Ave. Temp : 32 Deg C)

    Altitude : 350 Met AMSL

    Ov erall View

    W ast e ga s

    Cl i n k er C o o l er H ea t S ou r c e

    C l i n k er C o o l er W a st e G a s

    T h e rm al O i l C i r c u i t

    H e at B o i l e r W a s t e H e at R e c o v er y

    O R C - E q u i p m e n t P o w e r G en e r a t i o n

    A i r C o n d e n se r Co o l i n g - P r oc e ss

    P e n ta n e - C i r cu i t C o o l i n g - C i r cu i t

    C y c le D ia gr a m o f Po w er G ene r a t ion F r om Cl ink er C o o le r W as t e G as

    Design Power O utput Param eters:

    Gross Out put : 4000 kW

    Net out put (OEC) : 3335 kW

    Aux. Power Cons. : 665 kW

    Pentane Pumps : 2X180 =360 kW

    ACC Fans : 12 X18.5 = 222 kW

    Seal oil Lube system : 2X3.7 = 7.4 kW

    WHOH Pumps : 2X37 =74 kW

    Air Compressor : 1X12 kW : 12 kW

    WHRU O utput Pa rameters

    P - [ kPa ]

    M - [ t /h ]

    Q - [ kW ]

    T - [ C ]o

    ( 21,800 Q )

    WASTE H EAT

    RECOVERY U NI T

    485 M

    320 T

    270 T

    280 M

    1 20 T270 M

    5 0 KWC IRCU LATION PUMP

    A IR FROM CLINK ER

    THERMAL OIL

    150 T

    485 MWaste Heat Oil Heater

    Out put parameters

    Flow rate : 247 TPH

    Temperature, inlet : 120C

    Temperature, outlet : 270C

    Quantity :125 Tons

    Design Pressure : 7.5 Bar

    Dry Weight : 500 Tons

    Aux. Power Cons. : 65 kW

    WHOH Output Parameters

    Waste Heat Oi l Heater

    Good thermal stability

    High heat transfer coefficient

    Low viscosity

    Non-toxic, safe & easy to handle Non-corrosive

    GENERATOR GROSS POWE R = 4000 KW

    M

    AIR 35 T

    G

    GEN ERATO R

    32 0 K WF EED PUM P

    CON DEN SERAIR COO LED

    200 KW

    TURB IN E

    RECU PERA TOR

    OEC NE T P OW ER = 3400 KW

    FAN S

    18,640

    VAP ORIZER

    PREH EATE R

    11,850 Q

    2,880 Q

    9,950 Q

    ORMAT Energy Converter

    Turbine :Three stage-Impulse typeSpeed: 1500rpm

    Generator:6.6MVA, 50Hz, 1500rpm

    Motive Fluid:Pentane 23 TonsFlow : 172 T/hBefore Turbine:

    Temp: 204 Deg CPressure: 23.8 Bar

    Condenser: Air Cooled

    OEC Details

  • ORMAT Ener gy Conv erter Operation Performa nce

    Maximum Power recor ded : 4.35 MW

    Description Unit 07 - 08 08 - 09 09 - 10

    Gross Generation Lac kW h 224 228 165

    Net Export Power Lac kW h 191 195 140

    Aux. Consumption % 15.1 14.6 15.0

    Ave. Gross Output MW 3.0 3.2 3.0

    Availability factor % 90.7 99.9 93.3

    Run Hours Hrs 7,482 7,037 5,556

    Maintenance

    - Turbine Clocked 21,000 Hrs

    - Turbine seal failed.

    - Major Overhaul done in Mar.10.

    - All internals found OK.

    Project

    OEC (supply) : ORMAT

    WHOH (Supply & Erection): Transparent

    Others: Duc ting, Piping, Civil, Thermic Electrical s, OEC Erection and Plant Commissioning.

    Execution Period: 18 MonthsStart: Sept. 2005

    Commissioned : March 2007

    CDM ProjectCDM Project

    Year CO2 Reduction (Tons o f CO 2)

    2007-08 (VERs) 7,477

    2007-08 (CERs) 7,636

    2008-09 (CERs) 15,079(Und er iss ua nce)

    2009-10 (CERs) 10,823(Und er v erific atio n)

    2010-16 (CERs) 1,05,000(Expect ed )

    Project No Project No 0872 0872 Registration date 19Registration date 19thth oct`07 oct`07 Expected reduction in emission by 20,851 Tons of COExpected reduction in emission by 20,851 Tons of CO22

    Project Challenges.

    In house Engineering

    WHOH - Vendor identifica tion in India

    Pressure drop ac ross WHOH wi th in the fan capacity.

    Execution by in house contracts

    Interfaci ng between OEC & WHOH

    Clarity on input data.

    Hook up during Plant shutdown

  • O&M Teething problems.

    Longer synchroniza tion time

    (Breaker closing angle increased from 5 to 10)

    Turbi ne injec tion Valve (Flow serve to Fisher)

    Vaporizer Lev el controller (Location)

    WHOH HMI to Scada (Improvement)

    ACC Fan Motors (Frequent bearing failures for ACC fan motors)

    Thermic flui d circulation pum ps (Upgraded from 30 to 37 kW)

    Our verdict.

    First of its kind in India & 2nd in world for thi s application.

    One person /shif t opera tion.

    Commissioned in Ma rch`07. Completed 21,000 H rs.

    Meets 4 % of Pha se 1 Power requirement

    Zero water consum ption

    Emphasis on minimizing the thermal pollution.

    High Availability

    No fuel requirem ent N egative Power Genera tion cost

    Happy to answer your questionsHappy to answer your questions....