Upload
others
View
6
Download
0
Embed Size (px)
Citation preview
GSPublisherVersion 0.5.100.100
EXPANSION OF BULA-GADUDHEALTH CENTER, JUBALAND
STATE,SOMALIA
BULA-GADUDVILLAGE
GSPublisherVersion 0.5.100.100
Sheet No. Content01/2202/22
Site layout
Health center
Section views
Roof plan
Truss detail
Ring beam layout
Electrical plan
Elevations
Elevations
Floor plan
Floor plan and elevations
3D Projection 01
3D Projection 02
3D Projection 033D Projection 04
Water tank and solar panels
3D Projection 05
3D Projection 06
3D Projection 07
03/22
04/22
05/22
06/22
07/22
08/22
09/22
10/22
11/22
12/22
13/22
14/22
15/22
16/22
17/22
18/22
19/22
20/22 3D Projection 08
Master plan
Foundation layout
3D projections
21/22 3D Projection 09
22/22 3D Projection 10
NOVEMBER 2018DRAWING INDEX
GSPublisherVersion 0.5.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,
SOMALIA
Drawing Title:
SCALE:
DATE:
DRAWN BY:ENG. Duale Salah
REVIEWED BY:
A3
AS SHOWN
November 2018
JUBALAND STATE,BULA-GADUD VILLAGE
LABEL
A Proposed health center
Existing rooms to remain
Existing toilets to rehabilitate
Proposed elevated water tank
Proposed solar panels
A
B
C
D
EB
C
D
E
Existing chain-link fenceto rehabilitated
Enterence
SITE LAYOUT
01/22
Local wood post to beremoved and replaced
in to CHS steel80cmx80cm
Existing toilets tobe cleaned, painted
to approval andprovied 2 doors
Existing buildingto remain
Existing chain-likn to bekept and reused afterremoved the local wood
posts
Toilets to be cleaned,painted,provided ventalation blocks,and
installed wooden doors to approval
GSPublisherVersion 0.5.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,
SOMALIA
Drawing Title:
SCALE:
DATE:
DRAWN BY:ENG. Duale Salah
REVIEWED BY:
A3
AS SHOWN
November 2018
JUBALAND STATE,BULA-GADUD VILLAGE
19,400
8,40
0
2,300
2,30
0
6,000
9,00
0
7,00
03,000
1,90
0
5,600
15,750
50,000
50,0
00
OPEN YARD
Ward
Consultationroom
Consultationroom
Delivery room
Labor room
Pharmacy
Passage
Ward
Ward
Existing chain-link fenceto rehabilitated
Enterence02/22
GSPublisherVersion 0.5.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,
SOMALIA
Drawing Title:
SCALE:
DATE:
DRAWN BY:ENG. Duale Salah
REVIEWED BY:
A3
AS SHOWN
November 2018
JUBALAND STATE,BULA-GADUD VILLAGE
1
1
2
2
3
3
4
4
5
5
7
7
F F
E E
D D
C C
B B
A A
6
6
3,800200
3,800200
3,800200
1,500200
5,300
19,400
4,000 4,000 4,000 1,700 1,800
3,800 1,5002,350 2,800 2,3501,500
5,600
5,900 7,900
1,400
1,50
0
11,300
3,80
020
03,
800
200
4,00
0
4,00
02,
300
1,70
02,
000
2,20
0
12,4
00
8,00
0
1,70
01,
500
2,00
01,
500
1,70
0
4,00
02,
300
1,70
02,
000
2,20
0
8,40
0
3,500
1,350 1,500 2,500 1,500 2,500 1,500 1,700 800 2,450 1,500 2,100
4,000 4,000 4,000 1,700 1,800 3,700
3,700
1,400Y-Y
Y-Y
X-X X-X
E01
E04
E03
E02
FLOOR PLAN
WardConsultation
roomConsultation
room
Delivery room
Labor room
Pharmacy
Passage
W.C
W.H.B
Ramp
P.V
P.V P.V P.V P.V
P.V
P.V
P.V
P.V
P.V
P.VP.VP.VP.VP.V
P.V
P.VUp
FLOOR PLAN
03/22
GSPublisherVersion 0.5.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,
SOMALIA
Drawing Title:
SCALE:
DATE:
DRAWN BY:ENG. Duale Salah
REVIEWED BY:
A3
AS SHOWN
November 2018
JUBALAND STATE,BULA-GADUD VILLAGE
1
1
2
2
3
3
4
4
5
5
7
7
A
A
B
B
C
C
D
D
E
E
F
F
6
6
450
3,40
0
1,4501,500 2,500 1,500 2,600 1,5001,425
450
3,40
0
2,20
0
1,5002,3501,500 2,8002,350
800
2,20
0
4,000 2,300 1,700 2,000 2,20012,400
4,000 4,000 4,000 1,700 1,80019,400
5,600
4,200
3,700
Right side Elevation E-02
P.VP.VP.V
+0.00(G.Level)
+0.45(G.Floor Level)
+3.85(Roof Level)
+0.00(G.Level)
+0.45(G.Floor Level)
+3.85(Roof Level)
Front Elevation E-01
Roof pitch = 25˚
ELEVATIONS
04/22
GSPublisherVersion 0.5.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,
SOMALIA
Drawing Title:
SCALE:
DATE:
DRAWN BY:ENG. Duale Salah
REVIEWED BY:
A3
AS SHOWN
November 2018
JUBALAND STATE,BULA-GADUD VILLAGE
6
6
5
5
4
4
3
3
2
2
1
1
F
F
E
E
D
D
C
C
B
B
A
A
5
5
1,800 1,700 4,000 4,000 4,000
19,400
4,000 80010
0
3,40
0
2,10
040
0
1,20
0
2,000
1,00
0
2,200 2,000 1,700 2,300 4,00012,200
1,00
01,
200
1,20
0
2,450 800 1,700 1,500 2,500 1,500 2,500 1,5001,500
450
3,40
0
3,700
Roof pitch = 25˚
Rear Elevation E-03
Left side Elevation E-04
P.V P.VP.VP.V
P.V P.V
+0.00(G.Level)
+0.45(G.Floor Level)
+3.85(Roof Level)
+0.00(G.Level)
+0.45(G.Floor Level)
+3.85(Roof Level)
ELEVATIONS
05/22
GSPublisherVersion 0.5.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,
SOMALIA
Drawing Title:
SCALE:
DATE:
DRAWN BY:ENG. Duale Salah
REVIEWED BY:
A3
AS SHOWN
November 2018
JUBALAND STATE,BULA-GADUD VILLAGE
F E D C B A
1 2 3 4 5 764,000 4,000 4,000 1,700 1,800
2,200 2,000 1,700 2,300 4,000
3,700
12mm thick chip-boardceiling on 50X50mmcypress brandering at600 mm centres
Corrugated GI sheets gauge 28, fixed on celcurised cypressstructure: 50x50mm Battens on 200X50mm Rafters @700mm, on 100X50mm Wall-plate bolted @ 1200mmcentres; structure to SE details. GI lining on ridges and cut-outs
200mm thick masonary blockwall with exterior qualityemulsion paint on wood - floatrender to approval.
Section X-X
Steel casement window tothe inside to schedule
Metal door toschedule
10cm thick Ground floor slabwith 6mm bars @ 20cm centres in bothdirections on 1000 gauge polythenedamp proof membrane (dpm ) on 5cmthick sand blinding on 15cm thick wellcompacted hardcore all to Eng's approva
200x200mm RCCLintel beam
50mm diameter,900mmhigh GI pipe handrail oneach side of the ramp to siteEng's approval
900mm high parapetwall with 100mmthick coping
200mmx200mmRCC column startedfrom grade beam
Corrugated GI sheets gauge 28, fixed oncelcurised cypress structure: 50x50mmBattens on 200X50mm Rafters @700mm,on 100X50mm Wall-plate bolted @1200mm centres; structure to SE details. GIlining on ridges and cut-outs
12mm thick chip-board ceilingon 50X50mm cypressbrandering at 600 mm centres
200x200mm RCCLintel beam Consultation room
Passage Verandah
Deliveryroom
VerandahPassage
Ward
900mm high parapetwall with 100mmthick coping
200mm thick masonary blockwall with exterior qualityemulsion paint on wood - floatrender to approval.
10cm thick Ground floor slabwith 6mm bars @ 20cm centres in bothdirections on 1000 gauge polythenedamp proof membrane (dpm ) on 5cmthick sand blinding on 15cm thick wellcompacted hardcore all to Eng's approva
Section Y-Y
SECTION VIEWS
06/22
GSPublisherVersion 0.5.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,
SOMALIA
Drawing Title:
SCALE:
DATE:
DRAWN BY:ENG. Duale Salah
REVIEWED BY:
A3
AS SHOWN
November 2018
JUBALAND STATE,BULA-GADUD VILLAGE
1
1
2
2
3
3
4
4
5
5
7
7
F F
E E
D D
C C
B B
A A
6
6
4,000 4,000 4,000 1,700 1,8002,
300
1,70
02,
000
2,20
0
4,000 4,000 4,000 1,700 1,800
4,00
0
4,00
02,
300
1,70
02,
000
2,20
0
3,700
3,700
ROOF PLAN
Corrugated GI sheets gauge 28,fixed on celcurised cypressstructure: 50x50mm Battens on200X50mm Rafters @700mm,on 100X50mm Wall-platebolted @ 1200mm centres;structure to SE details. GI liningon ridges and cut-outs
Gauge 28, 250mm girth benttwice GI gutters fixed with andincluding brackets on150X25mm HW facia (painted)
FALL FALLFALL
FALL FALLFALL
FALL
FALL
FALL
FALL
FALL
FALL
FALL
FALL
FALL
FALL
ROOF PLAN
07/22
GSPublisherVersion 0.5.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,
SOMALIA
Drawing Title:
SCALE:
DATE:
DRAWN BY:ENG. Duale Salah
REVIEWED BY:
A3
AS SHOWN
November 2018
JUBALAND STATE,BULA-GADUD VILLAGE
750
750
75075
0
125250
125
125
250
125
125250 250
12512525
025
0 125
12525
025
0 125
125250
250 125
800
DETAIL 'A'(SCALE 1:20)
2/100x50mm OR100x50mm THICKCOLLAR PLATE EACHFACE
NAILING AREA
12mm DIA. M.S HOLD DOWNBOLTS @ 1500 C/C
RING BEAM
(SCALE 1:20)
DETAIL 'B'
2/100x50mm THICK COLLAR PLATE
100x100x2mmx100 LONG ANGLECLEAT NAILED TO TRUSS ANDWALL PLATE (E.F.)
NAILING AREA
EACH FACE(SCALE 1:20)
DETAIL 'C'
100x50mm THICK COLLAR PLATEEACH FACE
NAILING AREA
150x50mm
TYPICAL NAILING PATTERN(SCALE 1:20)
150x50mmTRUSS MEMBER B
TRUSS MEMBER
TRUSS MEMBER150x50mm
COLLAR PLATE50mm THICK
B
COLLAR PLATE50mm THICK
TRUSS MEMBER
3Y12-01
2Y12-02R8-03-200
300x200 RB1(SCALE 1:25)
TRUSS
08/22
GSPublisherVersion 0.5.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,
SOMALIA
Drawing Title:
SCALE:
DATE:
DRAWN BY:ENG. Duale Salah
REVIEWED BY:
A3
AS SHOWN
November 2018
JUBALAND STATE,BULA-GADUD VILLAGE
1
1
2
2
3
3
4
4
5
5
7
7
F F
E E
D D
C C
B B
A A
6
6
4,000 4,000 4,000 1,700 1,800
3,600400
3,600400
3,600400
1,300400
5,100
19,6008,
600
12,6
00
5,800
6,100
7,700
6,30
0
3,600400
1,300
1,300400
3,300
3,60
040
03,
600
400
3,80
0
4,00
02,
300
1,70
02,
000
2,20
0
2,30
01,
700
2,00
02,
200
7,80
040
040
0
4,000 4,000 4,000 1,700 1,800
2,550 3,000 2,5502,
300
3,15
03,
150
1,30
0
1,60
01,
800
3,700
3,700
FOUNDATION LAYOUT
Ward
Consultationroom
Consultationroom
Delivery room
Labor room
Pharmacy
Verandah
W.C A142
BRC MESHA142
BRC MESH
A142
BRC MESH
A142
BRC MESH
A142
BRC MESH
A142
BRC MESH
A142
BRC MESH
FOUNDATION PLAN
09/22
GSPublisherVersion 0.5.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,
SOMALIA
Drawing Title:
SCALE:
DATE:
DRAWN BY:ENG. Duale Salah
REVIEWED BY:
A3
AS SHOWN
November 2018
JUBALAND STATE,BULA-GADUD VILLAGE
1
1
2
2
3
3
4
4
5
5
6
6
F F
E E
D D
C C
B B
A A
6
6
4,000 4,000 4,000 1,700 5,500
19,400
4,000 4,000 4,000 1,700 1,800
5,600
5,900
4,00
02,
300
1,70
02,
000
2,20
0
12,4
00
4,00
02,
300
1,70
02,
000
2,20
0
8,40
0
3,700
6,30
0
4,00
0
5,3003,800
4,00
0
3,800
4,00
0
8,00
03,800
3,80
03,
800
3,5001,500
8,3001,50
01,500
1,500
1,80
02,
000
3,500
2,30
0
RING BEAM LAYOUT
RING BEAM 01 RING BEAM 01 RING BEAM 01 RING BEAM 01 RING BEAM 01
RING BEAM 02 RING BEAM 02 RING BEAM 02
RING BEAM 03
RING BEAM 04 RING BEAM 05
RING BEAM 06
RIN
G B
EAM
07
RIN
G B
EAM
07
RIN
G B
EAM
08
RIN
G B
EAM
08
RIN
G B
EAM
08
RIN
G B
EAM
11
RIN
G B
EAM
09
RIN
G B
EAM
10
10/22
GSPublisherVersion 0.5.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,
SOMALIA
Drawing Title:
SCALE:
DATE:
DRAWN BY:ENG. Duale Salah
REVIEWED BY:
A3
AS SHOWN
November 2018
JUBALAND STATE,BULA-GADUD VILLAGE
IOMMOG114
516-AAZ-MOG114
PROPOSED REHABILITATIONOF LOWYA CADE WARD -ABDUL AZIZ DISTRICT.
-ABDUL AZIZ DISTRICT-
JULY 2013
AHMED KIRISH
ALI HUSSEIN
PETER M.M.
N.T.S
IOM GRANT NO:A3
PROJECT. CLIENT. IMPLEMENTING AGENCY. SCALE
DATE
DRAWN BY:
DRAWING TITLE:
DRAWING NO:
PROJECT NO:SHEET NO:
DAN GUUD
REVIEWED AND APPROVED BY:
ECOTECH LIMITED
P.O. Box 5527-00100,Nairobi - KenyaTel: +254 712 388815Fax: +254 20 250809Email: [email protected]: www.ecotech.co.keLocation: Ecotech House, Woodlands Road, off Lenana Road, Nairobi - Kenya
BENADIR REGIONALADMINISTRATION,MOGADISHU,SOMALIA
CONSULTANT:-
IOM GRANT NO:
NOTES.
All drawings and concepts remain the propertyof ecotech limited
- All dimensions are in mm unless stated otherwise
- Any discrepancies in the drawings should be reported to the consultants before the contractor commences work on site.
ss
wp
s
SYMBOL MEANING
CEILING MOUNTEDLIGHT FIXTURE.CEILING MOUNTEDLIGHT FIXTURE (PENDANT)
WALL MOUNTED LIGHT FIXTURE
RECESSED SPOT LIGHT
FLUORESCENT LIGHT FIXTURE
FLUORESCENT LIGHT FIXTUREUNDER FALSE CEILING
WIRING CONNECTION
SINGLE PLEX RECEPTACLE
DUPLEX RECEPTACLE
SPECIAL RECEPTACLE & OUTLET(WITH PILOT LIGHT)
FLUORESCENT LIGHT FIXTURE WITHSHAVER SOCKET & LOCALISED SWITCHFLUORESCENT LIGHT FIXTURE WITHLOCALISED SWITCH
WATER PROOF RECEPTACLE (SINGLE)
CONSUMER UNIT
TELEPHONE/TV JACK
ALARM KEYPAD
DOORBELL PUSH BUTTON
DOORBELL TRANSFORMER
S3
S2
S
3 gang switch
2 gang switch
Single pole switch
Flood lamp
S SS
OFFICE 01 OFFICE 02 OFFICE 03 OFFICE 04 OFFICE 05
N E W C A N O P Y
SS
T-1 T-2
S3
31371-516-ELEC-09
ELECTRICAL DETAILS ELECTRICAL
09/09
19,400
12,4
00
3,9001,700
4,200 1,700
8,40
0
7,900
6,30
0
2,30
0
ELECTRICAL PLANS S S S
S
S
S2
S
S2
S3
S2
ELECTRICAL PLAN
11/22
GSPublisherVersion 0.5.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,
SOMALIA
Drawing Title:
SCALE:
DATE:
DRAWN BY:ENG. Duale Salah
REVIEWED BY:
A3
AS SHOWN
November 2018
JUBALAND STATE,BULA-GADUD VILLAGE
2
2
1
1
B B
A A
2 22 2
2
22
2
2,000
2,00
0
2,00
0
2,000
2,300
2,30
0
2,30
0
2,3003,
650
3,35
01,7002,300
600
300
3,35
060
0
4,10
0
E01
600mm highparapet wall
plastic storagewater tank withcapacity of 10m3
Metal steelvertical ladder
N.G.LN.G.L
Solar panels - top view
Solar panels - rear view
Solar panels - front view
side view
water tank - floor plansection view Elevation
BOUNDARY WALL
11/22
GSPublisherVersion 0.5.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,
SOMALIA
Drawing Title:
SCALE:
DATE:
DRAWN BY:ENG. Duale Salah
REVIEWED BY:
A3
AS SHOWN
November 2018
JUBALAND STATE,BULA-GADUD VILLAGE
3D 01
13/22
Solar panels
GSPublisherVersion 0.5.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,
SOMALIA
Drawing Title:
SCALE:
DATE:
DRAWN BY:ENG. Duale Salah
REVIEWED BY:
A3
AS SHOWN
November 2018
JUBALAND STATE,BULA-GADUD VILLAGE
3D 02
14/22
Existing chain-linkfence to rehabilitate
GSPublisherVersion 0.5.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,
SOMALIA
Drawing Title:
SCALE:
DATE:
DRAWN BY:ENG. Duale Salah
REVIEWED BY:
A3
AS SHOWN
November 2018
JUBALAND STATE,BULA-GADUD VILLAGE
3D 03
15/22
Existing roomsto remain
Existing latrinesto rehabilitate
Proposed elevatedwater tank
GSPublisherVersion 0.5.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,
SOMALIA
Drawing Title:
SCALE:
DATE:
DRAWN BY:ENG. Duale Salah
REVIEWED BY:
A3
AS SHOWN
November 2018
JUBALAND STATE,BULA-GADUD VILLAGE
3D 04
16/22
GSPublisherVersion 0.5.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,
SOMALIA
Drawing Title:
SCALE:
DATE:
DRAWN BY:ENG. Duale Salah
REVIEWED BY:
A3
AS SHOWN
November 2018
JUBALAND STATE,BULA-GADUD VILLAGE
3D 05
17/22
Proposed elevatedwater tank
Proposed healthcenter
GSPublisherVersion 0.5.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,
SOMALIA
Drawing Title:
SCALE:
DATE:
DRAWN BY:ENG. Duale Salah
REVIEWED BY:
A3
AS SHOWN
November 2018
JUBALAND STATE,BULA-GADUD VILLAGE
3D 06
18/22
GSPublisherVersion 0.5.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,
SOMALIA
Drawing Title:
SCALE:
DATE:
DRAWN BY:ENG. Duale Salah
REVIEWED BY:
A3
AS SHOWN
November 2018
JUBALAND STATE,BULA-GADUD VILLAGE
3D 07
19/22
GSPublisherVersion 0.5.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,
SOMALIA
Drawing Title:
SCALE:
DATE:
DRAWN BY:ENG. Duale Salah
REVIEWED BY:
A3
AS SHOWN
November 2018
JUBALAND STATE,BULA-GADUD VILLAGE
3D 08
20/22
GSPublisherVersion 0.5.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,
SOMALIA
Drawing Title:
SCALE:
DATE:
DRAWN BY:ENG. Duale Salah
REVIEWED BY:
A3
AS SHOWN
November 2018
JUBALAND STATE,BULA-GADUD VILLAGE
3D 09
21/22
GSPublisherVersion 0.5.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,
SOMALIA
Drawing Title:
SCALE:
DATE:
DRAWN BY:ENG. Duale Salah
REVIEWED BY:
A3
AS SHOWN
November 2018
JUBALAND STATE,BULA-GADUD VILLAGE
3D 10
22/22