PROJECT RENOVATION / EXTENSION OF A TWO (2) STOREY RESIDE LOCATION SAN JOSE VILLAGE SUBD., BINAN, LAGUNA No. SCOPE OF WORKS 1 2 3 4 5 6 7 8 1.0 Demolition Works 2.0 Excavation of Additional Columns/Footings 3.0 Poisoning 4.0 Forms & Concreting of 2nd Slab 5.0 Exterior Wall 6.0 Interior Dry Wall 7.0 Columns @ 2nd floor 8.0 Roofbeam 9.0 Trusses and Purlins 10.0 Roofing 11.0 Painting 12.0 Tileworks 13.0 Ceiling 14.0 Stair Railing 15.0 Baluster 16.0 Electrical Works 17.0 Plumbing Works 18.0 Turn-over

Erdc Bar Chart

Embed Size (px)

DESCRIPTION

Erdc Bar Chart

Citation preview

Page 1: Erdc Bar Chart

PROJECT : RENOVATION / EXTENSION OF A TWO (2) STOREY RESIDENCELOCATION : SAN JOSE VILLAGE SUBD., BINAN, LAGUNA

No. SCOPE OF WORKSJUNE

1 2 3 4 5 6 7 8 9 10 11

1.0 Demolition Works2.0 Excavation of Additional

Columns/Footings3.0 Poisoning4.0 Forms & Concreting of 2nd Slab5.0 Exterior Wall6.0 Interior Dry Wall7.0 Columns @ 2nd floor8.0 Roofbeam9.0 Trusses and Purlins

10.0 Roofing11.0 Painting12.0 Tileworks13.0 Ceiling14.0 Stair Railing15.0 Baluster16.0 Electrical Works17.0 Plumbing Works18.0 Turn-over

Page 2: Erdc Bar Chart

JUNE12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

Page 3: Erdc Bar Chart

JUNE JULY30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Page 4: Erdc Bar Chart

JULY AUGUST18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4

Page 5: Erdc Bar Chart

AUGUST5 6 7 8 9