JUNE 10, 2014 | WASHINGTON, DC Peter Brandien VICE-PRESIDENT, SYSTEM OPERATIONS Reliability Technical Conference Federal Energy Regulatory Commission Ensuring Grid Reliability and Resiliency in New England

Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing

Embed Size (px)

Citation preview

Page 1: Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing

J U N E 1 0 , 2 0 1 4 | W A S H I N G T O N , D C

Peter Brandien V I C E - P R E S I D E N T , S Y S T E M O P E R A T I O N S

Reliability Technical Conference Federal Energy Regulatory Commission

Ensuring Grid Reliability and Resiliency in New England

Page 2: Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing

ISO New England’s Strategic Planning Initiative Focused on developing solutions to the region’s top reliability risks

Reliability requires a flexible, high-performance fleet to address strategic risks:

• Natural gas dependency

• Power plant retirements

• Renewable resource integration

2

Page 3: Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing

Dramatic Changes in New England’s Energy Mix

31%

22% 18%

15% 13%

1.7%

33%

<<1% 6%

46%

14%

1%

Nuclear Oil Coal Natural Gas Hydroand Other

Renewables

PumpedStorage

2000 2013

Percent of Total Electric Energy Production by Fuel Type (2000 vs. 2013)

3

Page 4: Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing

Resource Shift is Creating Reliability Challenges

• ISO New England is increasingly reliant on resources with uncertain performance and availability – Natural gas resources lack firm gas transportation or fuel storage and

rely on “just-in-time” fuel supply – Coal, oil-steam fleet is being displaced by more efficient resources – Intermittent resource growth with inherently uncertain output

• 1800 MW of solar PV (cumulative) expected over the next 10 years • Approximately 750 MW of existing wind and 2,000 MW of new wind

proposed in New England

• ISO estimates up to 8,300 MW of non-gas-fired generation is “at risk” for retirement by 2020 (28 older oil and coal units) – If all retire, ISO estimates 6,300 MW of new or repowered capacity will

be needed in the region

4

Page 5: Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing

Operating Experience this Winter was a Challenge

• January ranked among the coldest months in recent history – 9 days were in the coldest 5% of days over the past 20 years

• New England experienced sustained high natural gas prices – ISO frequently operated with little or no gas-fired generation – High natural gas prices made many oil-fired generators economic

• Gas pipelines were constrained even without significant use by gas-fired generators, and more constrained than we expected

• Generation fleet is operating with limited fuel inventories (other than nuclear and coal resources)

• Oil supply chain is increasingly constrained

• Oil-fired generators were vitally important to reliability this winter

5

Page 6: Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing

6

Gas Price Volatility Drove Wholesale Electricity Prices to Record Levels over the Past Two Winters

Elec

tric

Ene

rgy

$/M

Wh

Fuel $/MM

Btu

$0

$5

$10

$15

$20

$25

$30

$0

$20

$40

$60

$80

$100

$120

$140

$160

$180

Wholesale Electricity at New England Hub (Real-Time LMP) Natural Gas

Winter 2012-13 and 2013-14

Page 7: Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing

New Supply is at New England’s Doorstep, but… Moving additional natural-gas supply into New England from the west will require investment in pipeline infrastructure

7

Source: http://pubs.usgs.gov/fs/2011/3092/

USGS National Assessment of Natural Gas, August 2011

Page 8: Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing

… Pipeline Constraints into New England Cause High Prices and Reliability Issues

8

Source: The Hartford Courant, December 2013

Page 9: Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing

“At Risk” Generator Retirements have Begun Not only coal and oil, as expected, but also nuclear plants

• Salem Harbor Station (749 MW) – 4 units (coal & oil)

• Norwalk Harbor Station (342 MW) – 3 units (oil)

• Brayton Point Station (1,535 MW) – 4 units (coal & oil)

• Vermont Yankee Station (604 MW) – 1 unit (nuclear)

Total MW Retiring in New England*

Connecticut 528 MW

Maine 159 MW

Massachusetts 2,682 MW

New Hampshire 56 MW

Rhode Island 64 MW

Vermont 666 MW

Total 4,155 MW

9

Major Retirement Requests:

*Megawatts based on relevant Forward Capacity Auction (FCA) summer qualified capacity (NOTE: total includes full and partial generator and demand response Non-Price Retirement (NPR) requests for Capacity Commitment Period (CCP) 2013-2014 through CCP 2017-2018)

Source: Status of Non-Price Retirement Requests; December 20, 2013

Page 10: Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing

Proposed Generation is Primarily Gas and Wind More than 90% of the resources in the ISO’s Generator Queue

By Type

Natural gas,

4,340, 63%

Wind, 2,067, 30%

Hydro, 12, 0%

Pumped-storage

hydro, 50, 1%

Biomass, 138, 2%

Solar, 10, 0%

Oil, 245, 4%

By State

ME, 1,437, 21%

NH, 154, 2%

VT, 191, 3%

MA, 3,367, 49%

CT, 1,713, 25%

Note: Some natural gas include dual-fuel units (oil)

25

Source: ISO Generator Interconnection Queue (April 2014) Total: 7,000 MW; FERC Jurisdictional Only

Page 11: Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing

New England Governors Request ISO’s Support to Develop Electric and Natural Gas Infrastructure

• January 2014: Governors, through NESCOE, request ISO technical support and tariff filings at FERC to support their objectives to expand energy infrastructure

• New Electric Transmission Infrastructure – Enable delivery of 1,200 MW to 3,600 MW of clean energy into

New England from no and/or low carbon emissions resources

• Increased Natural Gas Capacity – Increase firm pipeline capacity into New England by 1000 mmcf/day

above 2013 levels, or 600 mmcf/day beyond announced projects – Targeted to be in-service by winter 2017/18

• Potential cost recovery through ISO tariff – States to decide on cost allocation

11

Note: NESCOE – New England States Committee on Electricity

Page 12: Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing

Issues to be Addressed

• Assuming the New England States proceed with this direction, three major issues need to be addressed: – The appropriate design to address FERC jurisdiction under the

Federal Power Act

– Who owns the incremental pipeline capacity, and who releases it to the market?

– Will pipeline developers build the pipe on the strength of a FERC order that guarantees net cost recovery through the ISO tariff, and who will provide the financial assurance to underwrite the arrangement in the ISO tariff?

12

Page 13: Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing

ISO’s Forecasting Tools are Evolving with the Changing Resource Mix

• New England states are investing billions of ratepayer dollars in energy efficiency (EE) and distributed generation (solar PV)

• ISO worked with stakeholders to create EE and DG forecasts

• Wind provides a small, but growing portion of region’s energy

• So, in addition to forecasting energy and peak demand, the ISO now forecasts growing behind-the-meter resources and other renewable generation: – Energy efficiency – Distributed generation (solar PV) – Wind power

13

Page 14: Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing

Energy Efficiency is a Priority for New England Nearly $13 billion to be spent over 14 years

Ranking of state EE efforts by the American Council for an Energy-Efficient Economy:

– Massachusetts 1 – Connecticut 5 – Rhode Island 6 – Vermont 7 – Maine 16 – New Hampshire 21

• States invested billions over the past few years, and more is on the horizon

– Approximately $2.3 billion invested from 2009 to 2012 – Approximately $4.5 billion to be invested from 2013 to 2017 – ISO estimates $5.7 billion to be invested in EE from 2018 to 2023

14

2013 State Energy-Efficiency Scorecard

Source: American Council for an Energy-Efficient Economy

Page 15: Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing

15

New England: Annual Energy Use (GWh) New England: Summer 90/10 Peak (MW)

Source: Final ISO New England EE Forecast for 2018-2023 (April 2014)

EE Affects New England’s Electricity Consumption Peak demand growth is lower; energy use is flat

28,000

29,000

30,000

31,000

32,000

33,000

34,000

35,000

2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

RSP14 RSP14-FCM-EEF RSP14-FCM

125,000

130,000

135,000

140,000

145,000

150,000

155,000

2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

RSP14 RSP14-FCM-EEF RSP14-FCM

Page 16: Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing

State Policies are Driving Significant Growth of Distributed Generation (DG)

• Solar photovoltaics (PV) make up most of this DG

• Historical DG levels were too small to impact the bulk power system, but forecast levels create new challenges

• Most of these resources are not visible to ISO system operators

• Region needs more robust interconnection standards as solar PV grows

16

Page 17: Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing

ISO Forecasts Solar PV Growth over Next Decade

500

1,800

0200400600800

1,0001,2001,4001,6001,8002,000

Thru2013

2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

Meg

awat

ts (M

W)

Cumulative Growth in Solar PV through 2023

17

Source: Final Interim PV Forecast (April 2014) 2% of New England’s

net energy load in 2023

Page 18: Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing

Renewable & EE Resources are all Trending Up

18

700

2,000

Existing Proposed

Wind (MW)

Nameplate capacity of existing wind resources and proposals in the ISO-NE Generator Interconnection Queue; megawatts (MW).

223

1,233

2012 2018-23

Energy Efficiency (MW)

Final ISO-NE Energy-Efficiency Forecast for 2018-23, peak MW savings based on state-sponsored EE program budgets: $5.7 billion.

499

1,807

PV thru 2013 PV in 2023

Solar (MW)

2014 Final Interim ISO-NE Solar PV Forecast, based on state policies.

Page 19: Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing

Highlights of Reliability Challenges

• New England has a growing reliability problem due to natural gas pipeline constraints and declining resource performance

• The region is in a precarious operating position for the next several winters (and any periods of high gas demand or gas pipeline interruptions) as major non-gas resources retire and proposed market enhancements and energy infrastructure improvements are years away

• Expected retirements will exacerbate reliability concerns

• System operators need new tools to balancing a rapidly growing fleet of variable generation resources

19

Page 20: Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing

Highlights of Market Challenges

• Wholesale electric energy market pricing will be volatile and correlated with stressed system conditions on both the gas pipeline and electrical systems

• Capacity market incentives are necessary to improve generator performance and ensure reliability, but may not be sufficient on their own to drive pipeline investments

• Variable generation resources (wind and solar) will reduce demand and energy-market revenues for traditional sources of generation (gas-fired), which are needed to balance the variability of these resources

• Resources will increasingly rely on capacity markets to offset loss of energy market revenues

20

Page 21: Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing

What Does the 21st Century Grid Look Like?

• Retirement of older fossil-fired resources

• Expanded access to lower-priced energy (natural gas)

• Increase in non-carbon resources (wind and hydro)

• Increase in behind-the-meter generation (EE and solar)

• A highly skilled workforce to operate this system reliably

21

Page 22: Ensuring Grid Reliability and Resiliency in New England ISO New England...Ensuring Grid Reliability and ... ISO New England’s Strategic Planning Initiative Focused on developing